66
Overview and Case Study 2: Overview and Case Study 2: ERPsim Manufacturing (I) ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Embed Size (px)

Citation preview

Page 1: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Overview and Case Study 2:Overview and Case Study 2:ERPsim Manufacturing (I)ERPsim Manufacturing (I)

EGN 5621 Enterprise Systems CollaborationFall, 2011

Page 2: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

ObjectiveObjectiveThe objective of the Manufacturing

introductory ERPsim is to provide a quick hands-on experience of an integrated business process through an ERP manufacturing ERPsim, which combines basic operation functions, such as planning, sales, production, procurement, marketing, investment, and financial accounting for learning how to make business strategy and business decisions.

Page 3: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Corporate Roles DesignationCorporate Roles Designation CEO (Team Leader)

◦ Watch financial statement◦ Price market report◦ Check summary sales report◦ Check sales and market data◦ Check inventory Report

Marketing Manager◦ Marketing Expense Planning◦ Price market report◦ Check sales and market data

Sales Manager◦ Change price◦ Check summary sales report◦ Check sales and market data

MM Manager◦ Forecast – create planned indep. Req.◦ MRP run◦ Automatic generation of POs◦ Purchase Order Tracking◦ Check inventory Report

3

Page 4: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Operations in the Operations in the cash-to-cash cyclecash-to-cash cycle

Page 5: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

The Virtual Business EnvironmentThe Virtual Business Environment

Simulation of a market

Automation of administrative tasksAutomation of administrative tasks

Simulation of the passing of time

Page 6: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Organizational elementsOrganizational elements

Page 7: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Organizational elementsOrganizational elements

Page 8: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Organizational elementsOrganizational elements

Page 9: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Organizational elementsOrganizational elements

Page 10: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Data model of the main master Data model of the main master data used in the simulation gamedata used in the simulation game

Page 11: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Definition of master data (1/2)Definition of master data (1/2)

Page 12: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Definition of master data (2/2)Definition of master data (2/2)

Page 13: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

List of master data to create for List of master data to create for the simulationthe simulation

Page 14: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Muesli CerealsMuesli Cereals

Raisins

Oats

Strawberries

Wheat

Blueberries

Nuts

Page 15: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Your 6 productsYour 6 products

40% wheat40% oat20% nut1 box1 bag

35% wheat35% oat10% raisin10% nut5% strawberry5% blueberry1 box1 bag

50% wheat50% oat1 box1 bag

40% wheat40% oat20% raisin1 box1 bag

40% wheat40% oat20% strawberry1 box1 bag

40% wheat40% oat20% blueberry1 box1 bag

Page 16: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Data model of product Y$$-F06Data model of product Y$$-F06

Page 17: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

German marketGerman market

NorthDC10: 2 retailers

DC12: 19 retailers

SouthDC10: 7 retailersDC12: 23 retailers

WestDC10: 3 retailers

DC12: 17 retailers

Page 18: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Muesli Muesli Manufacturing Manufacturing Association Label Association Label RegulationRegulation

Page 19: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Input CostInput Cost

at low seasonal priceat low seasonal price

Page 20: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Number of stores by Number of stores by

geographical areageographical area

Page 21: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

DC10DC10

HypermarketsHypermarketsBuy only large boxes (1 kg)Payment delay of 20 stepsMore sensitive to priceLess sensitive to advertisingWill have a stronger preference for 3

particular products during the simulation

Page 22: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

DC12DC12

Grocery chainsGrocery chainsBuy small boxes (0.5 kg) and large boxes

(1 kg)

Payment delay of 10 to 15 steps

Will have a stronger preference for 4 particular products during the simulation

Page 23: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

DC14 Independent grocersDC14 Independent grocers

(will be used in Extension ERPsim)(will be used in Extension ERPsim)

Only buy small boxes (0.5 kg)Less price sensitiveSensitive to advertisingPayment delay of 5 to 15 stepsWill have a stronger preference for 3

particular products during the simulation

Page 24: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Number of retailers per Number of retailers per

LocationsLocations

Page 25: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Risk premium on credit Risk premium on credit ratingsratings

Page 26: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Production improvementsProduction improvements(will be used in extension ERPsim)(will be used in extension ERPsim)

Page 27: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Warehousing costWarehousing costautomatically chargedautomatically charged

Each team has 3 warehouse storage areas:◦Finished product - space for 250,000 boxes◦Raw materials - space for 250,000 kg◦Packaging - space for 1,000,000 boxes and

space for 1,000,000 bagsAdditional warehouse space can be rented:

◦100,000 boxes (or part thereof), @ € 200/step (less than € 0.01 per box per step)

◦100,000 kg (or part thereof), @ € 350/step (more expensive because it's raw food product)

◦100,000 boxes AND/OR bags (or part thereof), @ € 50 step

Page 28: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Fixed costs per weekFixed costs per week

Page 29: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Review of the major rulesReview of the major rulesYou may not change the recipe of a product

if you are still carrying inventoryCustomers preferences do not change

throughout the game, hence you may learn from their past behavior

The company displaying the highest shareholder’s equity at the end of the simulation wins the game

You must behave ethically at all timesThe end of game inventory will be value at

cost price in the final balance sheet. Therefore, you shouldn’t sell under cost at any time during the game.

Page 30: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Elements of a winning Elements of a winning strategystrategyUse the ERP system efficientlyDo not run out of stockDelays, production capacities and

liquidity constraints are important elements of the game

Exploration and exploitationTeam organization is more important

than you think

Page 31: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Game layoutGame layout

30 steps30 min

30 steps30 min

30 steps30 min

Page 32: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Rules of the gameRules of the game

• Each round will be of 30 steps (approx 1 min per step)• End-of-round inventory is carried over to the next round• You can sell a product only if you have it in stock• You compete against the other teams and importers• Your objective is to maximize profit

Page 33: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Participant’s job aidParticipant’s job aid

Page 34: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Let’s get started!Let’s get started!• Create your team : • Max 4 persons : User 1 to User 4• Up to 26 company : A to Z

• Log in using user name and passwords giving by your teacher

Page 35: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Login informationLogin information

Client 265

Login : intro_$#$ = Team, # = User 1 to User 4

Password: ERPSIM

Page 36: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

SAP Menu & NavigationSAP Menu & Navigation

Page 37: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Introductory Game: Introductory Game: Round 1Round 1

30 steps30 min

Page 38: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Cost, inventory & initial pricingCost, inventory & initial pricing

Material $$-F01 $$-F02 $$-F03 $$-F04 $$-F05 $$-F06

Name

Nut Muesli1.0 kg.

BlueberryMuesli1.0 kg.

StrawberryMuesli1.0 kg.

Raisin Muesli1.0 kg.

OriginalMuesli1.0 kg.

Mixed FruitMuesli1.0 kg.

Raw material Cost € 1.53 € 1.97 € 1.97 € 1.38 € 1.36 € 1.76

Standard cost € 2.48 € 3.09 € 3.09 € 2.50 € 2.65 € 2.89

Initial price 1012

€ 4.24€ 4.49

€ 5.18€ 5.43

€ 5.18€ 5.43

€ 3.92€ 4.17

€ 3.87€ 4.12

€ 4.75€ 5.00

Initial stock 100,000 100,000 100,000 100,000 100,000 100,000

Page 39: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

The Introductory game:The Introductory game:Round 1 (30 steps- days)Round 1 (30 steps- days)

• You need to maintain the price of your 6 products and invest in marketing.

• What do you need to know in order to make that decision ?• You need to know how to : • Maintain price list• See available stock• Monitor sales orders• Monitor competitors• Monitor your profit !

Page 40: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Participant’s job aid & MenuParticipant’s job aid & Menu

Page 41: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check product costingCheck product costing

Page 42: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Maintain Prices for DC 10 & 12Maintain Prices for DC 10 & 12

Page 43: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Marketing expenseMarketing expense

Page 44: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Stock in material overviewStock in material overview

Page 45: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check sales summary reportCheck sales summary report

Page 46: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check sales order reportCheck sales order report

Page 47: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check market reportCheck market report

Page 48: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check financial statementsCheck financial statements

Page 49: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

The Introductory game:The Introductory game:Round 1 (30 steps – 30 days)Round 1 (30 steps – 30 days)

We start the simulator for 30 steps

Page 50: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Introductory game: Introductory game: Round 2Round 2

30 steps30 min

Page 51: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Participant’s job aid & MenuParticipant’s job aid & Menu

Page 52: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Release production orderRelease production order

Page 53: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Check production scheduleCheck production schedule

Page 54: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Parameters of the gameParameters of the game

Page 55: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

The Introductory game:The Introductory game:Round 2 (30 steps - days)Round 2 (30 steps - days)

We start the simulator for 30 steps

Page 56: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Introductory game: Introductory game: Round 3Round 3

30 steps30 min

Page 57: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Participant’s job aid & MenuParticipant’s job aid & Menu

Page 58: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Raw material cost per PORaw material cost per PO

Page 59: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

ForecastingForecasting

Page 60: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Execute MRPExecute MRP

Page 61: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

After the MRP runAfter the MRP run

Page 62: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Convert purchase requisitions into Convert purchase requisitions into purchase orderspurchase orders

Page 63: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

The Introductory game:The Introductory game:Round 3 (30 steps – 30 days)Round 3 (30 steps – 30 days)

We start the simulator for the last 30 steps

Page 64: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Track purchase ordersTrack purchase orders

Page 65: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Profit center analysisProfit center analysis

Page 66: Overview and Case Study 2: ERPsim Manufacturing (I) EGN 5621 Enterprise Systems Collaboration Fall, 2011

Liquidity planningLiquidity planning