OVERHEAD CONSTRUCTION MANUAL

TRANSFORMERS CONCRETE POLE Go to SECTION INDEX Back to MAIN INDEX

Page 2: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG

Ergon Energy Corporation Ltd

ABN 50 087 646 062 FILE: 5 22 1646 1

APPROVED

DATE

PASSED

DRAWN L. Burton Index

4.9.07

B Sh 1

J. Brooks

A. Croft

A ORIGINAL ISSUE

B 30.9.08

OVERHEAD DISTRIBUTION TRANSFORMERS CONCRETE POLE INDEX

Construction Code Guide – Transformer Concrete 1629 Pole

11/22/33kV SUBSTATION CONCRETE POLE

11/22/33kV 25 to 100kVA 3 phase LVABC 1618/1 substation 3.7m downlead on 12.5m x 16/24kN SSC16/11/3 pole – material SSC16/22/3 11/22/33kV 25 to 100kVA 3 phase LVABC 1618/2 SSC16/33/3 substation 3.7m downlead on 12.5m x 16/24kN SSC24/11/3 pole – material SSC24/22/3 11/22/33kV 25 to 100kVA 3 phase LVABC 1618/3 SSC24/33/3 substation 3.7m downlead on 12.5m x 16/24kN PT11/3 pole PT22/3 11/22/33kV 25 to 100kVA 3 phase LVABC 1618/4 PT33/3 substation 3.7m downlead on 12.5m x 16/24kN pole – transformer and HV bridging 11/22/33kV 25 to 100kVA 3 phase LVABC 1618/5 substation 3.7m downlead on 12.5m x 16/24kN pole – LV bridging 11/22/33kV 200/315kVA 3 phase LVABC 1523/1 substation 3.7m downlead on 12.5m x 16/24kN SSC16/11/3 pole - material SSC16/22/3 11/22/33kV 200/315kVA 3 phase LVABC 1523/2 SSC16/33/3 substation 3.7m downlead on 12.5m x 16/24kN SSC24/11/3 pole - material SSC24/22/3 11/22/33kV 200/315kVA 3 phase LVABC 1523/3 SSC24/33/3 Substation 3.7m downlead on 12.5m x 16/24kN PT11/3 pole PT22/3 11/22/33kV 200/315kVA 3 phase LVABC 1523/4 PT33/3 substation 3.7m downlead on 12.5m x 16/24kN pole – transformer and HV bridging 11/22/33kV 200/315kVA 3 phase LVABC 1523/5 substation 3.7m downlead on 12.5m x 16/24kN pole – LV bridging

11/22/33kV 25 to 500kVA 3 phase open wire 1619/1 substation 3.7m downlead on 12.5m x 16/24kN pole – material 11/22/33kV 25 to 500kVA 3 phase open wire 1619/2 SSC16/11/3 substation 3.7m downlead on 12.5m x 16/24kN SSC16/22/3 pole - material SSC16/33/3 11/22/33kV 25 to 500kVA 3 phase open wire 1619/3 SSC24/11/3 substation 3.7m downlead on 12.5m x 16/24kN SSC24/22/3 pole - material SSC24/33/3 11/22/33kV 25 to 500kVA 3 phase open wire 1619/4 PT11/3 substation 3.7m downlead on 12.5m x 16/24kN PT22/3 pole PT33/3 11/22/33kV 25 to 500kVA 3 phase open wire 1619/5 substation 3.7m downlead on 12.5m x 16/24kN pole – transformer and HV bridging 11/22/33kV 25 to 500kVA 3 phase open wire 1619/6 substation 3.7m downlead on 12.5m x 16/24kN pole – LV bridging

Page 3: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

...\52216291.dgn 9/03/2009 1:40:10 PM

Page 4: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

L. Burton 1161822 1618 1

Connection bushing HV 11kV3

3

1

3

ASSY DESCRIPTION QTY

ASSY DESCRIPTION QTY

63-1

61-1

18-10

MATERIAL - H.V. BRIDGING (Sheet 5)

SUBSTATION CONSTRUCTION :-

MATERIAL -

1

1

1

ASSY DESCRIPTION QTY

MATERIAL -

3

88-15 3Clamp live line to mains (5 - 19mm) (LL1)

140-1

141-9

1

2042-5

X-Arm predrilled single (100) 11/22/33kV to concrete pole2026-1

Cable support to concrete pole2041-3

2041-1

Connector I.P.C. 35/95mm† main to 35/95mm† tap

Lug, compression Cu. 10mm† M12

Cable, bare annealed Cu. 10mm†

72-1

4Bridging support LVABC single to concrete pole

8

2040-1 Bracket transformer mounting to concrete pole 1

19-10

28-10

Connection switch / fuse 95mm† LVABC 1

1Switch / fuse 400A (LVABC) to fuse bracket

2036-1(Common Earth)

Connection neutral terminal to concrete pole 61-2 Connection bushing HV 22kV

Bracket twin LVABC fuse to concrete pole 1

(Seperate Earth)

Connection neutral terminal to LVABC fuse bracket

Brace, single to undrilled X-arm (100) and concrete pole

6

5

Bolt M16 x 300 1

2043-3 1Service fuse bracket concrete pole

63-5 Downlead cable transformer HV (3.7m) 33kV

Downlead cable transformer HV (3.7m) 11/22kV

2046-6

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE - MATERIAL

29.8.07

2080-1 1Downlead cable / transformer earth HV

11/22/33kV 25 TO 100kVA 3 PHASE LVABC SUBSTATION

Bridging cables transformer 3 phase LVABC

2012-15 X-Arm composite fibre 2400x100x100 fuse/link 11/22/33kV

2046-3 E.D.O. Fuse switch (100A) 11/22kV to composite fibre X-Arm (100)

E.D.O. Fuse switch (100A) 33kV to composite fibre X-Arm (100)

2036-12

2029-12

2042-102035-14 1Bolt and nut M20 x 450

TRANSFORMERS CONCRETE POLE

L.V.

Fuse link 50A din size 1

Fuse link 100A din size 1

Fuse link 160A din size 1 (100kVA)

(63kVA)

(25kVA)

3

78-14

78-21

78-27

HARD COPYUNCONTROLLED

B 9.1.13

B

C. Avenell

C. Noel

TX MOUNTING & LV BRIDGING (Sheet 5)

TX MOUNTING & LV BRIDGING (Sheet 5 cont’d)

A ORIGINAL ISSUE

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 5: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

L. Burton 2

NOTES:

161822 1618 2

CONSTRUCTION PRACTICES.

1. For concrete pole attachments and foundations refer to

2. In high fault areas designer to allow for high fault fuse links.

from supply.

3. Transformers on termination construction to be fitted away

SUBSTATION CONSTRUCTION:-

MATERIAL - TRANSFORMER (Sheet 4.)

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE - MATERIAL

29.8.0711/22/33kV 25 TO 100kVA 3 PHASE LVABC SUBSTATION

DETAIL CONCRETE POLE Folder Drawing No. 1612

4. For pole manufacturing details refer MANUFACTURING

TRANSFORMERS CONCRETE POLE

Transformer 100kVA 11kV 3 phase

Transformer 100kVA 22kV 3 phase

Transformer 25kVA 11kV 3 phase

Transformer 63kVA 11kV 3 phase

Transformer 25kVA 22kV 3 phase

Transformer 63kVA 22kV 3 phase

Surge arrester to tank (11kV)

3

1

3

ASSY DESCRIPTION QTY

62-1

62-4

65-4

65-2

65-6

65-16

65-18

65-20

89-13

89-31

110-5

89-33

110-10

110-20

Fuse link 11/22/33kV 16A Class K (11kV - 100kVA)

62-7 Surge arrester to tank (33kV)

Surge arrester to tank (22kV)

65-30 Transformer 25kVA 33kV 3 phase

Transformer 63kVA 33kV 3 phase

Transformer 100kVA 33kV 3 phase 65-34

65-32

(33kV - 25/50/63/100kVA)

(22kV - 25/63kVA)

Fuse link 11/22/33kV 3/10A Class K (11kV - 25kVA)

(22kV - 25/63kVA)

Fuse, current limiter 11/22kV - High fault 6A (11kV - 25kVA)

(22kV - 100kVA)

Fuse, current limiter 11/22kV - High fault 8A (11kV - 63kVA)

Fuse, current limiter 11/22kV - High fault 18A (11kV - 100kVA)

(22kV - 100kVA)

Fuse link 11/22/33kV 6/20A Class K (11kV - 63kVA)

B 9.1.13

B

C. Avenell

C. Noel

HARD COPYUNCONTROLLED

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 6: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

22kV - 280mm

11kV - 160mmMain structure/conductor minimum clearance:-

Construction Type

(Substation)

(Substation)

(Transformer)

(Transformer)F

F

F

F

F

F

F

F

F

F

F

L.V.CONSTRUCTION

LV BRIDGING

N

A

TRANSFORMER

F

H.V BRIDGING

PT11/3

PT22/3

FF

Location

vehicular carriageway

direction away from the

of the kerbline in the

the vertical projection

More than 500mm from

Elsewhere

3.6m

4.6m

to ground

Min height

F

to G.L.

lowest HV point

5.5m Min height

F

1618 3

Conc.

F

Pole

F

33kV - 380mm

(Substation)

(Transformer)PT33/3

EARTHING - CONCRETE POLE

Common earth Dwg. 1622 or 1624

3.7m HV DOWNLEAD ON 12.5m x 16/24kN POLE

22 1618 3

Sheet 4

Sheet 5

Sheet 4

28.9.07

L. Burton

11/22/33kV 25 TO 100kVA 3 PHASE LVABC SUBSTATION

25/100kVA

C

C

C

ABCA

BC

nabc

C

C

C

F

Neutral BushN

LV Fuses

L.V. Surge

ArrestersArresters

H.V. Surge

Fuses

E.D.O.

H.V./L.V. WIRING DIAGRAM

Dwg. 1471, 1509 or 1510

POLE CONSTRUCTION

11/22/33kV CONCRETE

CONCRETE POLE Dwg. 1612

MANUFACTURING DETAIL

TRANSFORMERS CONCRETE POLE

HARD COPYUNCONTROLLED

F

F SERVICES

Dwg. 1648

B 4.1.08

D

C 30.9.08

(Substation)

(Substation)

(Substation)

SSC16/11/3

SSC16/22/3

SSC16/33/3

SSC24/11/3

SSC24/22/3

SSC24/33/3

C. Avenell

C. Noel

D 9.5.12

A ORIGINAL ISSUE

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

ABN 50 087 646 062Dwg Sh

OVERHEAD DISTRIBUTION

FILE: 5

Page 7: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

F

F

F

F

Pole

Scre

en e

arth

Assy 8

8-1

5

Assy 1

40-1

Assy 1

41-9

A

00

600

245

F

F

F

F

N

F

F

F

F

F

F F

F

F

1618

1700

2400

1300

F

Assy 2

029-1

2

F

61-1 or 2

Assy S

election

Conc

50

450

500

3200

4500

4745

5100

5200

4

63-1 or 5

Assy S

election

22 1618 4

62-1, 4 or 7

Assy S

election

29.8.07

Assy 2

036-1

2

25 / 1

00kV

A

PR

AC

TIC

ES

CO

NS

TR

UC

TIO

N

ED

O’s - R

efer drg 1

585

H.V. F

US

E LIN

KS

Insulate

d C

u. tail

cut to required length.

2046-3 or 6

Assy S

election

Assy 2

080-1

Assy 2

041-3

Assy 2

035-1

4

Assy 2

026-1

Assy 2

012-1

5

TRANSFORMERS CONCRETE POLE

DOWNLEAD 12.5m x 16/24kN POLE - TRANSFORMER & HV BRIDGING

11/22/33kV 25 TO 100kVA 3 PHASE LVABC SUBSTATION 3.7m

Assy 2

040-1

65-2, 4, 6, 16, 18, 20, 30, 32 or 34

Assy selection

110-5, 10 or 20

or

89-1

3, 31 or 33

Assy S

election

HARD COPYUNCONTROLLED

B 12.02.09

C. Noel

C. Avenell

L. Burton

Assy 8

8-1

7 n

ot 88-1

5

For copper

mains use

NO

TE:

C 15.12.11

D 9.5.12

E 9.1.13EDRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 8: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

...\52216185.dgn 20/08/2009 10:56:29 AM

Page 9: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100
Page 10: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

L. Burton 2

NOTES:

152322 1523 2

CONSTRUCTION PRACTICES.

1. For concrete pole attachments and foundations refer to

2. In high fault areas designer to allow for high fault fuse links.

from supply.

3. Transformers on termination construction to be fitted away

11/22/33kV 200/315kVA 3 PHASE LVABC SUBSTATION

3

1

3

Surge arrester to tank (11kV)

Transformer 200kVA 11kV 3 phase

Transformer 315kVA 11kV 3 phase

Transformer 200kVA 22kV 3 phase

Transformer 315kVA 22kV 3 phase

SUBSTATION CONSTRUCTION:-

ASSY DESCRIPTION QTY

62-1

62-4

65-8

65-10

65-22

65-24

89-13

89-15

89-17

89-19

110-15

110-25

(22kV - 200kVA)

(22kV - 315kVA)

(11kV - 200kVA)

(11kV - 315kVA)

Fuse, Current limiter 11/22kV - High fault 12A (22kV - 200kVA)

Fuse, Current limiter 11/22kV - High fault 20A (22kV - 315kVA)

110-30 Fuse, Current limiter 11/22kV - High fault 25A (11kV - 200kVA)

110-35 Fuse, Current limiter 11/22kV - High fault 30A (11kV - 315kVA)

Fuse link 11/22/33kV 16A Class K

Fuse link 11/22/33kV 20A Class K

Fuse link 11/22/33kV 25A Class K

Fuse link 11/22/33kV 31.5A Class K

62-7 Surge arrester to tank (33kV)

Surge arrester to tank (22kV)

65-36

65-38 Transformer 315kVA 33kV 3 phase

Transformer 200kVA 33kV 3 phase

89-12 Fuse link 11/22/33kV 12A Class K (33kV - 200kVA)

(33kV - 315kVA)

MATERIAL - TRANSFORMER (Sheet 4.)

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE - MATERIAL

29.8.07

DETAIL CONCRETE POLE Folder Drawing No. 1612

4. For pole manufacturing details refer MANUFACTURING

TRANSFORMERS CONCRETE POLEB 9.1.13

B

C. Avenell

C. Noel

HARD COPYUNCONTROLLED

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 11: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

22kV - 280mm

11kV - 160mmMain structure/conductor minimum clearance:-

F

F

F

F

F

F

F

F

F

F

F

L.V.CONSTRUCTION

LV BRIDGING

N

A

TRANSFORMER

F

H.V BRIDGING

C

C

C

A

B

CA

B

C

n

a

b

c

C

C

C

A

B

C

F

LVABCFuses

L.V. Surge

Arresters

Arresters

H.V. Surge

Fuses

E.D.O.

Neutral Bush

H.V./L.V. WIRING DIAGRAM

FF

Location

vehicular carriageway

direction away from the

of the kerbline in the

the vertical projection

More than 500mm from

Elsewhere

3.6m

4.6m

to ground

Min height

F

to G.L.

lowest HV point

5.5m Min height

F

1523 3

Conc.

F

LVABCFuses

Neutral TerminalConnection

Pole

F

200/315kVA

F

33kV - 380mm

EARTHING - CONCRETE POLE

Common Earth Dwg.1622 or 1624

3.7m HV DOWNLEAD ON 12.5m x 16/24kN POLE

11/22/33kV 200/315kVA 3 PHASE LVABC SUBSTATION

22 1523 3

Sheet 4

Sheet 5

Sheet 4

28.9.07

L. Burton

Dwg. 1471, 1509 or 1510

POLE CONSTRUCTION

11/22/33kV CONCRETE

CONCRETE POLE Dwg. 1612

MANUFACTURING DETAIL

TRANSFORMERS CONCRETE POLEHARD COPYUNCONTROLLED

F

F

Dwg. 1648

SERVICES

B 4.2.08

D

Construction Type

(Substation)

(Substation)

(Transformer)

(Transformer)

PT11/3

PT22/3

(Substation)

(Transformer)PT33/3

(Substation)

(Substation)

(Substation)

SSC16/11/3

SSC16/22/3

SSC16/33/3

SSC24/11/3

SSC24/22/3

SSC24/33/3

C 30.9.08

D 10.5.12C. Avenell

C. NoelA ORIGINAL ISSUE

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

ABN 50 087 646 062Dwg Sh

OVERHEAD DISTRIBUTION

FILE: 5

Page 12: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

F

F

H.V. F

US

E LIN

KS

Pole

Assy 8

8-1

5

Assy 1

40-1

Assy 1

41-9

A

00

600

245

F

F

F

F

N

F

F

F

F

F

F

F F

F

F

F

F1523

1700

2400

1300

F

Assy 2

029-1

2

F

61-1 or 2

Assy S

election

200/3

15kV

A

Conc

50

450

500

3200

4500

4745

5100

5200

4

63-1 or 5

Assy S

election

22 1523 4

110-1

5, 25, 30 or 35

or

89-1

2, 13, 15, 17 or 19

Assy S

election

62-1, 4 or 7

Assy S

election

65-8, 10, 22, 24, 36 or 38

Assy selection

29.8.07

Assy 2

036-1

2

11/22/33kV 200/315kVA 3 PHASE LVABC SUBSTATION 3.7m

DOWNLEAD 12.5m x 16/24kN POLE - TRANSFORMER & HV BRIDGING

PR

AC

TIC

ES

CO

NS

TR

UC

TIO

N

ED

O’s - R

efer d

wg 1

585

cut to required length.

Insulate

d C

u. tail

2040-1 or 5

Assy S

election

Assy 2

041-3

Assy 2

080-1

Scre

en e

arth

2046-3 or 6

Assy S

election

Assy 2

035-1

4

Assy 2

026-1

Assy 2

012-1

5

TRANSFORMERS CONCRETE POLE

C. Noel

C. Avenell

L. Burton

Assy 8

8-1

7 n

ot 88-1

5

For copper

mains use

NO

TE:

B 15.12.11 HARD COPYUNCONTROLLED

C 10.5.12

D 9.1.13

DDRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 13: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

...\52215235.dgn 9/03/2009 2:08:17 PM

Page 14: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

L. Burton 1161922 1619 1

MATERIAL -

SUBSTATION CONSTRUCTION :-

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE - MATERIAL

11/22/33kV 25 to 500kVA 3 PHASE OPEN WIRE SUBSTATION

100kVA

200kVA

315kVA

500kVA

1

6

1

1

1

1

1

6

1

1

1

6

1

1

1

6

MATERIAL -

ASSY DESCRIPTIONQTY

52-1

52-5

53-5

25-30 Crossarm undrilled 1800x100x100

1 1 1 1106-10 Connection neutral terminal to crossarm

3333

1 1 1

106-3

106-5

1

TX MOUNTING & LV BRIDGING H.V. BRIDGING

Bracket transformer mounting and LV fuse

Switch Fuse 800A LV Open Wire to x-arm

(500kVA)

Bracket transformer (Exceeding 1500kg)

mounting and L.V. fuse arm to conc. pole

kVAkVA25 50

33

Switch Fuse 600A LV Open Wire to x-arm

(100-315kVA)

Bridging cables transformer 3 phase

95mm† XLPE

Bridging cables transformer 3 phase

2 x 95mm† XLPE

Bridging cables transformer 3 phase

2 x 185mm† XLPE

100kVA

200kVA

315kVA

500kVA

3

3

3

3

MATERIAL -

ASSY DESCRIPTIONQTY

12-28

12-52

TX MOUNTING & LV BRIDGING

kVAkVA25 50

3

312-21

12-23

Cartridge fuse link 50A 2 hole HRC

Cartridge fuse link 100A 2 hole HRC

Brace single to L.V. x-arm (100) and

concrete pole

Cartridge fuse link 160A 2 hole HRC

Cartridge fuse link 250A 2 hole HRC

Cartridge fuse link 400A 4 hole HRC

Cartridge fuse link 710A 4 hole HRC

2027-8

52-3 Bridging cables transformer 3 phase

35mm† XLPE1 1

2041-3 Cable support to concrete pole

1 1 11 1 1

2039-1

2039-5

arm to conc. pole1 1

1 1

1 1

1 1

6 6

28.9.07TRANSFORMERS CONCRETE POLE HARD COPY

UNCONTROLLED

2043-3 Service fuse bracket concrete pole

8 8 8 14 14 14

B 21.11.08

D

Connection bushing HV 11kV3

3

3

ASSY DESCRIPTION QTY

63-1

61-1

MATERIAL -

SUBSTATION CONSTRUCTION :-

1

1

1

3

88-15

140-1

141-9

X-Arm predrilled single (100) 11/22/33kV to concrete pole2026-1

Cable support to concrete pole2041-3

Lug, compression Cu. 10mm† M12

Cable, bare annealed Cu. 10mm†

61-2 Connection bushing HV 22kV

Brace, single to undrilled X-arm (100) and concrete pole

6

5

1

63-5 Downlead cable transformer HV (3.7m) 33kV

Downlead cable transformer HV (3.7m) 11/22kV

2046-6

2080-1 1Downlead cable / transformer earth HV

H.V. BRIDGING

2012-15 X-Arm composite fibre 2400x100x100 fuse/link 11/22/33kV

2046-3

2036-12

E.D.O. Fuse switch (100A) 11/22kV to composite fibre X-Arm (100)

E.D.O. Fuse switch (100A) 33kV to composite fibre X-Arm (100)

2029-12

2035-14 1Bolt and nut M20 x 450

Bolt and Nut M16 x 300

Clamp live line to mains (7/2.75-19/3.75) (LL1)

Connector PG Al-Cu (PG10)

Connector PG Cu-Cu (PG4)

87-4

87-10

3

C 14.8.09

23-10 LV Bridging - open wire transformer 4 4 4 4 4 4

D 19.1.12C. Avenell

C. Noel

12-34

12-43

���

A ORIGINAL ISSUE

���

��

�DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

ABN 50 087 646 062Dwg Sh

OVERHEAD DISTRIBUTION

FILE: 5

��������

Page 15: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

L. Burton 2161922 1619 2

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE - MATERIAL

11/22/33kV 25 TO 500kVA 3 PHASE OPEN WIRE SUBSTATION

NOTES:

3. In high fault areas designer to allow for high fault fuse links.3 3 3 3

1

1

1

1

TRANSFORMER CONSTRUCTION :-

ASSY DESCRIPTION

QTY

62-1

62-4

65-6

65-20

65-8

65-22

65-10

65-24

65-12

65-26

100kV

A

200kV

A

315kV

A

500kV

A

for the entire length that may come into contact with the wood.

1. All metalwork that passes through or into wood shall be greased

CONSTRUCTION PRACTICES.

2. For wood pole attachments and foundations refer to

4. LV Bridging Cable XLPE copper :-

62-7 Surge arrester to tank (33kV)

Surge arrester to tank (11kV)

Surge arrester to tank (22kV)

Transformer 100kVA 11kV 3 phase

Transformer 100kVA 22kV 3 phase

Transformer 200kVA 11kV 3 phase

Transformer 200kVA 22kV 3 phase

Transformer 315kVA 11kV 3 phase

Transformer 315kVA 22kV 3 phase

Transformer 500kVA 11kV 3 phase

Transformer 500kVA 22kV 3 phase

65-34 Transformer 100kVA 33kV 3 phase

Transformer 200kVA 33kV 3 phase 65-36

Transformer 315kVA 33kV 3 phase 65-38

Transformer 500kVA 33kV 3 phase 65-40

25kV

A

50kV

A

3 3

Transformer 25kVA 22kV 3 phase

Transformer 25kVA 33kV 3 phase

Transformer 63kVA 11kV 3 phase

Transformer 63kVA 22kV 3 phase

Transformer 63kVA 33kV 3 phase

65-2

65-16

65-30

65-4

65-18

65-32

Transformer 25kVA 11kV 3 phase

1

1

supply.

5. Transformers on termination construction to be fitted away from

MATERIAL - TRANSFORMER

DETAIL CONCRETE POLE Folder Drawing No. 1612

6. For pole manufacturing details refer MANUFACTURING

30.8.07TRANSFORMERS CONCRETE POLE

1 x 185mm† per neutral

500kVA 2 x 185mm† per phase

1 x 95mm† per neutral

200/315kVA 2 x 95mm† per phase

100kVA 1 x 95mm† per phase & neutral

25/50kVA 1 x 35mm† per phase & neutral

HARD COPYUNCONTROLLED

B 10.1.13

B

C. Avenell

C. Noel

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 16: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100
Page 17: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

F

F

F

F

F

F

F

F

F

F

F

L.V.CONSTRUCTION

LV BRIDGING

TRANSFORMER

F

H.V BRIDGING

FF

Location

vehicular carriageway

direction away from the

of the kerbline in the

the vertical projection

More than 500mm from

Elsewhere

3.6m

4.6m

to ground

Min height

F

to G.L.

lowest HV point

5.5m Min height

F

1619 4

Conc.

F

Pole

F

EARTHING - CONCRETE POLE

Common Earth Dwg. 1622 or 1624

22 1619 4

Sheet 5

Sheet 6

Sheet 5

28.9.07

L. Burton

11/22/33kV 25 TO 500kVA 3 PHASE OPEN WIRE SUBSTATION

N

A

25 / 500kVA

C

C

C

ABCA

BC

nabc

C

C

C

F

Neutral BushN

LV Fuses

L.V. Surge

ArrestersArresters

H.V. Surge

Fuses

E.D.O.

H.V./L.V. WIRING DIAGRAM

22kV - 280mm

11kV - 160mmMain structure/conductor minimum clearance:-

33kV - 380mm

Dwg. 1471, 1509 or 1510

POLE CONSTRUCTION

11/22/33kV CONCRETE

CONCRETE POLE Dwg. 1612

MANUFACTURING DETAIL -

TRANSFORMERS CONCRETE POLE

3.7m DOWNLEAD ON 12.5m x 16/24kN POLE

HARD COPYUNCONTROLLED

F

F SERVICES

Dwg. 1649

B 4.2.08

E

C 30.9.08

Construction Type

(Substation)

(Substation)

(Transformer)

(Transformer)

PT11/3

PT22/3

(Substation)

(Transformer)PT33/3

(Substation)

(Substation)

(Substation)

SSC16/11/3

SSC16/22/3

SSC16/33/3

SSC24/11/3

SSC24/22/3

SSC24/33/3

D 14.8.09

E 9.5.12

C. Avenell

C. Noel

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062Dwg Sh

OVERHEAD DISTRIBUTION

FILE: 5

Page 18: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

F

F

H.V. F

US

E LIN

KS

Pole

Scre

en e

arth

Assy 8

8-1

5

Assy 1

40-1

Assy 1

41-9

A

00

600

245

F

F

F

F

N

F

F

F

F

F

F F

F

F

F

F1619

1700

2400

1300

F

Assy 2

029-1

2

F

61-1 or 2

Assy S

election

Conc

50

450

500

3200

4500

4745

5100

5200

5

63-1 or 5

Assy S

election

22 1619 5

62-1, 4 or 7

Assy S

election

Assy 2

036-1

2

DOWNLEAD 12.5m x 16/24kN POLE - TRANSFORMER & HV BRIDGING

11/22/33kV 25 TO 500kVA 3 PHASE OPEN WIRE SUBSTATION 3.7m

PR

AC

TIC

ES

CO

NS

TR

UC

TIO

N

ED

O’s - R

efer d

wg 1

585

cut to required length.

Insulate

d C

u. tail

19.9.07

2046-3 or 6

Assy S

election

Assy 2

080-1

Assy 2

041-3

2039-1 or 5

Assy S

election

25/5

00kV

A

F

Assy 2

035-1

4

Assy 2

026-1

Assy 2

012-1

5

TRANSFORMERS CONCRETE POLE

30, 35 or 40

110-5, 10, 15, 20, 25,

or

23, 31 or 33

89-1

2, 13, 15, 17, 19,

Assy S

election

65-2 to 4

0

Assy selection

HARD COPYUNCONTROLLED

B 15.12.11

C. Noel

C. Avenell

L. Burton

Assy 8

8-1

7 n

ot 88-1

5

For copper

mains use

NO

TE:

C 10.5.12

D 10.1.13

D

A ORIGINAL ISSUE

DRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5

Page 19: OVERHEAD CONSTRUCTION MANUAL · 2041-3 Cable support to concrete pole 2041-1 Connector I.P.C. 35/95mm† main to 35/95mm† tap ... lec tion C on c 50 450 500 3200 4500 4745 5100

Pole

X

22 1619 61619 6

Conc. Conc.

Assy 25-30

F

L. Burton

F

F

29003000

F

if required

Service positions

F

F

2700

3100

4400

4500

4745

5100

3750

F

3.7m DOWNLEAD 12.5m x 16/24kN POLE - L.V. BRIDGING11/22/33kV 25 TO 500kVA 3 PHASE OPEN WIRE SUBSTATION

B

C

A

N

A

N

kVA

4290

87-4 or 10

Assy Selection

25 / 500

bridging to mains

Double clamp

F

F

Assy 106-10

F106-3 or 5

Assy Selection

Assy 2041-3

53-5

52-1, 3, or 5 or

Assy Selection

30.8.07

Assy 2043-3

TRANSFORMERS CONCRETE POLEHARD COPYUNCONTROLLED

D 14.8.09

Assy 23-10

F

E 19.1.12

C. Avenell

C. Noel

12-21, 23, 28, 34, 43 or 52

Assy Selection

F 10.5.12

FF

F

F

F

F

F

F

F

Hole dia.18 18 22

18

18

350350 300

F

F

1875

325

L.V. FUSE ARM 1.8m DRILLING DETAIL

Assy 2027-8F

G 20.12.16GDRAWN

DATE

PASSED

APPROVED

Ergon Energy Corporation Ltd

A ORIGINAL ISSUE

ABN 50 087 646 062

OVERHEAD DISTRIBUTION

Dwg ShFILE: 5