Background
• Continues the planning work that was started in Playbook 2029
• Provides context to initiatives within the corporate plan
• Keeps up to date on local, regional and national trending
Playbook 2029Spruce Groves Outdoor Facility Strategy
Presented 7 strategies• Maximize use and expand capacity• Adjust supply to meet current and projected needs• Enhance/maintain quality, safety and sustainability• Control operating costs/cost recovery• Collect/maintain data• Winter sport and recreation facilities• Strengthen/pursue partnerships
Outdoor Amenity Functional Plan2018
Scope included• Joint use sites• Henry Singer Ballpark• Outdoor Ice• Additional Outdoor Amenities/localized Trends• Wheeled sports
Joint Use Sights Identified for Enhancements
• Spruce Grove Composite High School• St Thomas Aquinas and St Marguerite Schools• Greystone Centennial School• Brookwood School
Spruce Grove Composite High School
• Move backstop and infield south
• Reestablish a 100m by 60m field
• Relocate basketball court
St Thomas Aquinas and St Marguerites Schools
• Upgrade Ball diamond
• Remove sand volleyball replace with Junior Soccer
• Rebuild east Soccer pitch
Henry Singer Ball Park
• Install warning tracks• Fencing upgrades• Backstop upgrades• Bleacher pads• Bull pens
Outdoor Ice
• Where possible include leisure ice with boarded rinks
• Geographic gaps in service
• Support amenities and site adjacanies
• Off season use
Beach Volleyball• Supports the concept of
a sport and Recreation Campus
• 6 court competition facility
• Makes use of existing investments (parking, washrooms, etc)
Wheeled Sports
Challenges• Negative behavior• Safety• Not a beginner park• Hidden• Perceptions
Opportunities• Boarding is an Olympic sport• High female growth• Creative/artistic• Boarders from the 80’s and
90’s are parents• Self directed• Spontaneous
Re-Imagined Central Park
Expanded Multi Use Park1. Existing Diamond2. Existing Field3. Existing skate park (Bowel)4. New Skate park Area5. Playground/picnic areas6. Fitness, horseshoes, Adult uses7. Pump Track8. Mountain Bike skills park9. Existing sledding hill10. Existing Outdoor rink11. Seasonal program space
Skate Park Program
• Supervision• Security• Safety• Training• Events &
Activities• Travelling
Skate Park
Additional Operational Work
• Develop minimum outdoor development standards for all major amenity types• Site prerequisites• Site preparation requirements• Surfacing, fencing, barrier standards• Safety
• Develop standardized maintenance and operational protocols
• Continue to monitor trends• Beach Volleyball• Pickleball• Cricket• Support spontaneous/self directed recreation
Internal & External Collaboration
• Minor Sport group conversations• Youth Conversations• Presented to CAPS Team• Present to Joint Tech Committee• Discussed with Engineering, Public Works and Corporate
Communications, Enforcement Services, Recreation• Presented to SLT• Future Presentation to COW
Proposed Next Steps – Short Term 2019 to 2021
• Re-Imagined Central Park - $3,300,000 • Business plan 2019 • Design - 2020• Construction – 2021 to 2022
• Beach Volleyball - $661,000• Design – 2020 • Construction – 2021
• St Thomas & St Marguerite School - $1,100,000• Design - 2021• Construct – 2022 to 2023*
Proposed Next Steps – Long Term 2022 to 2027
• Spruce Grove Comp - $423,000• Design - 2022 • Construction -2022-2023
• Henry Singer - $463,000• Design – 2022 • Construction – 2022-2023
• Outdoor Boarded Rink - $1,000,000• Design - 2022• Construct – 2023
Greystone Centennial Middle School $730,000• Design – 2024 • Construct – 2025–2026
• North East Skating Trail - $400,000• Design – 2024 • Construct - 2025
• Brookwood Field - $990,000• Design – 2026• Construct – 2027-2028