No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405078 132KV-GANGTOK -CHUZACHEN-1 18-05-2018 11:01 18-05-2018 16:17 0:00:00 0:00:00 0:00:00 5:16:00 OSPD S/D taken by Chuzachen for tree cutting work. 107000065586
405059 132KV-GANGTOK -CHUZHEN-1 11-05-2018 17:14 11-05-2018 20:42 0:00:00 3:28:00 0:00:00 0:00:00 OMSUTripped due to L/A of said line found damaged during heavy
thunderstrom/Lightening107000065144
405068 132KV-GANGTOK -CHUZHEN-1 13-05-2018 11:38 13-05-2018 12:14 0:00:00 0:36:00 0:00:00 0:00:00 OMSU Tripped on B-N fault (Fault is under Chuzachen jurisdiction). R/I at
Gangtok: FD: 25.87KM,FC: 1.53KA.107000065223
405133 132KV-GANGTOK -CHUZHEN-1 28-05-2018 16:20 28-05-2018 16:52 0:00:00 0:32:00 0:00:00 0:00:00 OMSUTripped during heavy rain,thunderstrom & lightening . R/I at Gantok: R-N
fault, Z1,FD-29 KM,F/C: Rph-2.46 KA. (Fault under Chuzachen jurisdiotion)107000066150
0:00:00 4:36:00 0:00:00 5:16:00
405026132KV-MELLI-SILLIGURI-1
06-05-2018 10:00 06-05-2018 14:29 4:29:00 0:00:00 0:00:00 0:00:00 OSPTShutdown taken for AMP work.
107000064841
405053 132KV-MELLI-SILLIGURI-1 10-05-2018 16:58 10-05-2018 18:02 0:00:00 1:04:00 0:00:00 0:00:00 OMSU
Tripped during rain and thunder storm tripped on R-Y, Z2, F/C: Ir: 1.41 KA,
Iy: 1.33 KA, F/D: 104.6 KM (Full length: 94 KM); Fault is beyond Powergrid
jurisdiction.
107000065085
405054 132KV-MELLI-SILLIGURI-1 10-05-2018 18:38 10-05-2018 19:05 0:00:00 0:00:00 0:27:00 0:00:00 LNCCTripped during acute rain and thunder-storm Tripped on Y-B fault. R/I at
Siliguri: Z1, Y-B, F/C: Iy: 2.17 KA, Ib: 2.25 KA, F/D: 46.8 KM;107000065098
405109 132KV-MELLI-SILLIGURI-1 24-05-2018 12:11 24-05-2018 15:33 0:00:00 3:22:00 0:00:00 0:00:00 OMSU For shifting of LT pole by WBSEDCL , fallen under Loc no: 219-220 . 107000065895
405131 132KV-MELLI-SILLIGURI-1 28-05-2018 16:08 28-05-2018 16:46 0:00:00 0:00:00 0:38:00 0:00:00 LNCCTripped during heavy rain,thunderstrom & lightening. R/I at Siliguri: R-Y-N
fault, Z2,FD-104.6 KM,(Line length 94.2KM) F/C: Rph-1.4 KA & Yph-1.31 KA, 107000066148
4:29:00 4:26:00 1:05:00 0:00:00
405034 132KV-RANGPO-GANGTOK-2 08-05-2018 08:25 08-05-2018 18:28 0:00:00 10:03:00 0:00:00 0:00:00 OMSU Shutdown taken for replacement of porcelain insulators by polymer insulators 107000064950
405040 132KV-RANGPO-GANGTOK-2 09-05-2018 09:00 09-05-2018 17:41 0:00:00 8:41:00 0:00:00 0:00:00 OMSU Shutdown taken for replacement of porcelain insulators by polymer insulators 107000065001
405044 132KV-RANGPO-GANGTOK-2 10-05-2018 08:34 10-05-2018 17:33 0:00:00 8:59:00 0:00:00 0:00:00 OMSU Shutdown taken for replacement of porcelain insulators by polymer insulators 107000065075
405058 132KV-RANGPO-GANGTOK-2 11-05-2018 08:35 11-05-2018 17:36 0:00:00 9:01:00 0:00:00 0:00:00 OMSU Shutdown taken for replacement of porcelain insulators by polymer insulators 107000065143
0:00:00 36:44:00 0:00:00 0:00:00
405054 132KV-RANGPO-MELLI-1 10-05-2018 16:58 10-05-2018 17:49 0:00:00 0:51:00 0:00:00 0:00:00 OMSUTripped during rain and thunder storm tripped on R-Y, Z1, F/C: Ir: 1.503 KA,
Iy: 1.446 KA, F/D: 4.359 KM; Fault is under Sikkim Power jurisdiction.107000065092
405132 132KV-RANGPO-MELLI-1 28-05-2018 16:08 28-05-2018 16:35 0:00:00 0:27:00 0:00:00 0:00:00 OMSU
Tripped during heavy rain,thunderstrom & lightening R/I at Rangpo: R-Y-N
fault, Z1,FD-2.370 KM,F/C: Rph-1.633 KA & Yph-1.526 KA, (Fault under
Sikkim jurisdiotion)
107000066149
0:00:00 1:18:00 0:00:00 0:00:00
405089 132KV-SILIGURI-KERSEONG-1 (up to LILO) 22-05-2018 23:41 23-05-2018 00:16 0:00:00 0:00:00 0:35:00 0:00:00 LNCC
Tripped on B-N fault during heavy rain & thunderstrom. R/I at Siliguri: B-
N,FD: 16.2KM, FC: 4.3 KA.R/I at Karseong: B-N,Z1,FD: 15.15KM, FC: 1.13 .KA.. 107000065789
0:00:00 0:00:00 0:35:00 0:00:00
405155 220KV 220KV RANGPO-NMELI--1 30-05-2018 09:39 30-05-2018 16:05 0:00:00 0:00:00 0:00:00 6:26:00 OSPDShutdown taken by M/s TVTPL for bypass arrangement for stringing on New
Melli- Rangpo Line107000066299
0:00:00 0:00:00 0:00:00 6:26:00TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
OUTAGE DETAILS OF ER-I, ER-II (WEST BENGAL & SIKKIM) & ODISHA FOR MAY 2018
Total outage-ER Page 1
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405146 220KV DALKHOLA-KISHANGANJ-1 28-05-2018 19:04 28-05-2018 19:47 0:00:00 0:00:00 0:43:00 0:00:00 GGDC
Tripped from Kishanganj end only on O/C protection operation, there after
H/T at Dalkhola end on no power/ no voltage condition to facilitate for taking
the same into service.
107000066201
0:00:00 0:00:00 0:43:00 0:00:00
405124 220KV DALKHOLA-KISHANGANJ-2 27-05-2018 05:34 27-05-2018 06:17 0:00:00 0:00:00 0:43:00 0:00:00 LNCCTripped during heavy rain/lightening/ thunderstorm.R/I at Dalkhola: B-
N,FD:20.49KM,FC: 1.738KA.107000066052
405147 220KV DALKHOLA-KISHANGANJ-2 28-05-2018 19:04 28-05-2018 19:59 0:00:00 0:00:00 0:55:00 0:00:00 GGDC
Tripped from Kishanganj end only on O/C protection operation, there after
H/T at Dalkhola end on no power/ no voltage condition to facilitate for taking
the same into service.
107000066202
0:00:00 0:00:00 1:38:00 0:00:00
40593 220KV-BIRPARA -BINAGURI-1 23-05-2018 05:51 23-05-2018 06:33 0:00:00 0:00:00 0:42:00 0:00:00 LNCC
Tripped during heavy rain & thunderstrom in the effected area,R/I at Binaguri
end :B-Y-N fault, F/C=Bph:3.396KA,Yph: 2.637KA,F/D: 209.4KM,M2:Y-B-
N,Z1,F/D-63.6KM, At Birpara end:Y-B-N,FD:12.21 KM, FC:Yph=3.353
KA,Bph=7.061 KA
107000065798
405097 220KV-BIRPARA -BINAGURI-1 23-05-2018 08:04 23-05-2018 08:29 0:00:00 0:00:00 0:25:00 0:00:00 LNCC
CB tripped at Birpara end only. A/R successful at Binaguri. Birpara end R/I: R-
N, Z1, F/C: 3.831 KA, F/D: 26.64 KM. R/I at Binaguri end: R-N,Z1, F/D: 47.14
KM, F/C: 3092 Amps. Weather condition: Rain with thunder storm.
107000065808
405105 220KV-BIRPARA -BINAGURI-1 24-05-2018 07:09 24-05-2018 07:09 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Birpara end: Y-N, F/D: 22.29 KM, F/C: 3.62
KA.107000065892
0:00:00 0:00:00 1:07:00 0:00:00
40594 220KV-BIRPARA -BINAGURI-2 23-05-2018 05:51 23-05-2018 06:02 0:00:00 0:00:00 0:11:00 0:00:00 LNCC
Tripped during heavy rain & thunderstrom in the effected areaR/I at Binaguri
end :Y-N fault, FC:Yph: 2.637F/D: 209.4KM,M2:Y-B-N,Z1,F/D-63.6KM, At
Birpara end:Y-N,FD:10.31 KM, FC:Y=3.227 KA,Bph=1.187 KA .
107000065799
405096 220KV-BIRPARA -BINAGURI-2 23-05-2018 08:13 23-05-2018 08:13 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Birpara: B-N, F/C: 3.051 KA, F/D: 34.64
KM. R/I at Binaguri: B-N,Z1, F/D: 40.83 KM, 3583 Amps.107000065807
0:00:00 0:00:00 0:11:00 0:00:00
405077 220KV-BIRPARA -CHUKHA-1 18-05-2018 08:49 18-05-2018 16:57 0:00:00 0:00:00 0:00:00 8:08:00 OSPD S/D taken by Bhutan to replace the decapped insulator. 107000065584
405087 220KV-BIRPARA -CHUKHA-1 22-05-2018 20:41 22-05-2018 21:16 0:00:00 0:35:00 0:00:00 0:00:00 OMSU
Line tripped on R-Y-N Fault R/I at Birpara end (M1)::
FD:38.56KM,FC:Ir:1.717KA,Iy:2.66KA,Ib:600A
(M2)::FD:38.47KM,FC:Ir:2.76KA,Iy:2.97KA,Ib:598A.(Fault is under Bhutan
Jurisdiction)
107000065782
405103 220KV-BIRPARA -CHUKHA-1 24-05-2018 07:05 24-05-2018 07:49 0:00:00 0:44:00 0:00:00 0:00:00 OMSUTripped on R-B-N, R/I at Birpara: F/D: 46.30 km, F/C: Ir: 3.18 KA, Ib: 2.976
KA; Fault is under Bhutan jurisdiction.107000065888
0:00:00 1:19:00 0:00:00 8:08:00
405003 220KV-BIRPARA -CHUKHA-2 01-05-2018 14:50 01-05-2018 15:11 0:00:00 0:21:00 0:00:00 0:00:00 OMSUTripped on R-N fault under Bhutan jurisdiction. R/I at Birpara : R-N, F/D: 37.2
KM, F/C: 3.143 KA . 107000064488
405088 220KV-BIRPARA -CHUKHA-2 22-05-2018 20:41 22-05-2018 21:26 0:00:00 0:45:00 0:00:00 0:00:00 OMSU
Line tripped on R-Y-B-N Fault R/I at Birpara end (M1) ::
FD:37.64KM,Ir:3.272KA,Iy:2.994KM,Ib:4.119KA.
(M2):FD:36.92KM,FC:Ir:3.09KA,Iy:3.09KA,Ib:4.294KA.(Fault is under Bhutan
Jurisdiction).
107000065783
405104 220KV-BIRPARA -CHUKHA-2 24-05-2018 07:05 24-05-2018 07:49 0:00:00 0:44:00 0:00:00 0:00:00 OMSUTripped on B-N, R/I at Birpara: F/D: 37.83 km, F/C: Ib: 2.501 KA; Fault is
under Bhutan jurisdiction.107000065889
0:00:00 1:50:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 2
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405101 220 KV ALIPURDUAR-SALAKATI-I 23-05-2018 11:04 23-05-2018 11:04 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Alipurduae: R-N, Z2, F/C: 1.358 KA, F/D:
110.6 KM .107000065828
405031 220 KV ALIPURDUAR-SALAKATI-I 07-05-2018 21:35 07-05-2018 21:35 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully from both ends. R/I at Alipurduar Main 1: R-N,
F/D: 83km, F/C: 1.564kA. Main 2: R-N, F/D: 78km, F/C: 1.538kA.107000064916
405039 220 KV ALIPURDUAR-SALAKATI-I 09-05-2018 07:18 09-05-2018 08:13 0:00:00 0:00:00 0:55:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Alipurduar : R-N, FD-10.6 KM, F/C-7.086KA ; R/I at Salakati : R-N, FD:
76.8KM, F/C-7.107 KA.107000064997
220 KV ALIPURDUAR-SALAKATI-I 12-05-2018 12:33 12-05-2018 12:55 0:22:00 0:00:00 0:00:00 0:00:00 SPLT * Tripped due to spurious DT received at Alipurduar end due to suspected
PLCC maloperation at Salakati end107000065197
405116 220 KV ALIPURDUAR-SALAKATI-I 26-05-2018 04:16 26-05-2018 04:16 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Alipurduar : R-N, FD: 81.6
KM, FC:1.68 KA. 107000066006
405119 220 KV ALIPURDUAR-SALAKATI-I 26-05-2018 05:35 26-05-2018 05:35 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Alipurduar : Y-N, FD: 100.6
KM, FC:1.44 KA. 107000066009
0:22:00 0:00:00 0:55:00 0:00:00
405032 220 KV ALIPURDUAR-SALAKATI-II 07-05-2018 21:35 07-05-2018 21:35 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully from both ends. R/I at Alipurduar Main 1: R-N,
F/D: 84.4km, F/C: 1.54kA. Main 2: R-N, F/D: 81.63km, F/C: 1.498kA.107000064917
405033 220 KV ALIPURDUAR-SALAKATI-II 07-05-2018 21:36 07-05-2018 21:36 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully from both ends. R/I at Alipurduar Main 1: R-N,
F/D: 64.4km, F/C: 2.209kA. Main 2: R-N, F/D: 60.44km, F/C: 2.268kA.107000064919
405117 220 KV ALIPURDUAR-SALAKATI-II 26-05-2018 04:16 26-05-2018 04:16 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Alipurduar : R-N, FD: 82.5
KM, FC:1.67 KA. 107000066007
405120 220 KV ALIPURDUAR-SALAKATI-II 26-05-2018 05:35 26-05-2018 05:35 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Alipurduar : Y-N, FD: 100.6
KM, FC:1.393 KA. 107000066010
405102 (i) 220 KV ALIPURDUAR-SALAKATI-II 23-05-2018 11:04 23-05-2018 11:04 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Alipurduae: R-N, Z2, F/C: 1.344 KA, F/D:
110.6 KM .107000065830
405157
220 KV ALIPURDUAR-SALAKATI-II
30-05-2018 12:27 30-05-2018 13:06 0:39:00 0:00:00 0:00:00 0:00:00
LEFT Tripped on R-N fault. R/I: Alipurduar end:M1:R-N,Z1,38.8KM,4.11KA,M2:R-
N,Z1,25.35KM,3.33KA Salakati end: R-N,Z1,80.45KM,1.859KA
107000066302
0:39:00 0:00:00 0:00:00 0:00:00
40595 220KV-BIRPARA-MALBASE-3 23-05-2018 06:25 23-05-2018 06:49 0:00:00 0:24:00 0:00:00 0:00:00 OMSUTripped during heavy rain & thunderstrom in the effected areaR/I at Birpara
end :R-N,, FD:41.50KM,F/C:Rph-3.98KA, Fault is under Bhutan jurisdiction.107000065800
0:00:00 0:24:00 0:00:00 0:00:00
405106 220KV-MALDA -DALKHOLA-1 24-05-2018 08:23 24-05-2018 13:59 5:36:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for AMP work. 107000065893
405139 220KV-MALDA -DALKHOLA-1 28-05-2018 19:30 28-05-2018 19:52 0:00:00 0:00:00 0:22:00 0:00:00 GGDCH/T on no power/no Voltage condition to facilitate the same for taking into
service. 107000066190
405151 220KV-MALDA -DALKHOLA-1 30-05-2018 01:05 30-05-2018 01:22 0:00:00 0:00:00 0:17:00 0:00:00 LNCC
A/R successful at Dalkhola end but tripped at Malda end at 01:05 hrs..RI at
Dalkhola end M1 Z1, Y-N, FC-4.37,FD 13.93, M2 Y-N, FC-4.2, FD-14.0.The line
charged at 01:46 hrs.
107000066524
5:36:00 0:00:00 0:39:00 0:00:00
405111 220KV-MALDA -DALKHOLA-2 25-05-2018 08:01 25-05-2018 14:16 6:15:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for AMP work. 107000065951
405140 220KV-MALDA -DALKHOLA-2 28-05-2018 19:30 28-05-2018 19:58 0:00:00 0:00:00 0:28:00 0:00:00 GGDCH/T on no power/no Voltage condition to facilitate the same for taking into
service. 107000066192
405152 220KV-MALDA -DALKHOLA-2 30-05-2018 01:05 30-05-2018 01:05 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R successful Both end at 01:05 hrs.R/I at Malda end Z2,YN,FC:178.4Amp.RI
at Dlk M1 Z1, YN, FC 4.3 kA, FD 13.7 KM, M2 Z1,YN, FC 4.24Ka, FD 13.72 KM. 107000066525
6:15:00 0:00:00 0:28:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 3
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405110 220KV-SLGUR-KISHANGANJ-2 25-05-2018 05:51 25-05-2018 05:51 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Siliguri end: B-N, F/D: 107.81 KM, F/C: 1.52
KA. R/I at K'gunj end: B-N, F/D: 4.21 KM, F/C: 13.38 KA.107000065940
405127 220KV-SLGUR-KISHANGANJ-2 27-05-2018 23:27 27-05-2018 23:27 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Siliguri: B-N, Z2, F/D: 98.45 KM, F/C: 1.49
KA; R/I at Kishengunj: B-N, Z1, F/C: 9.87 KA, F/D: 6.6 KM;107000066095
405128 220KV-SLGUR-KISHANGANJ-2 28-05-2018 00:27 28-05-2018 00:27 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Siliguri: B-N, Z2, F/D: 105 KM, F/C: 1.153
KA; R/I at Kishengunj: B-N, Z1, F/C: 12.7 KA, F/D: 4.4 KM;107000066099
0:00:00 0:00:00 0:00:00 0:00:00
405121 400KV FARAKKA SAGARDIGHI-1 26-05-2018 07:52 26-05-2018 18:31 0:00:00 0:00:00 0:00:00 10:39:00 LCSDShutdown for stringing of Power line crossing between Loc. No: 23/0-24/0 of
Farakka-Baharampur D/C line under ERSS-XV.107000066018
0:00:00 0:00:00 0:00:00 10:39:00
405035 400KV FARAKKA-GOKARNA-1 08-05-2018 09:55 08-05-2018 20:00 10:05:00 0:00:00 0:00:00 0:00:00 OSPT To replace the B-phase CT of 442 bay of FKK-Gokarna line: I at Farakka end. 107000064952
10:05:00 0:00:00 0:00:00 0:00:00
405010 400KV-ANDAL-JAMSHEDPUR-1 02-05-2018 17:35 03-05-2018 15:57 0:00:00 0:00:00 22:22:00 0:00:00 LNCC
Line tripped on B-N fault during heavy rain and thunder-storm on the affected
area. R/I at Jamshedpur: B-N, Z1, F/D: 81.34 KM, F/C: 6.86 KA; Andal end
R/I: B-N, F/C: 2.9 KA, F/D: 125.2 KM; Charging attempt taken at 18:08 hrs
from Jamshedpur but tripped on SOTF. Now R/I at Jamshedpur end: R-B fault,
F/C: R- 8.59 KA, B-9.39 KA, F/D: 39 KM. After line patrolling, E/W clamp
operd between loc.No-293&294 found.
107000064612
405045 400KV-ANDAL-JAMSHEDPUR-1 10-05-2018 06:11 10-05-2018 19:36 0:00:00 0:00:00 13:25:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Jamshedpur hon : B-N,Z3, FD-281.9 KM, F/C-1.16KA. After patrolling ,
Earthwire of CKT-II side found opned at Loc no-49-50. 107000065076
405115 400KV-ANDAL-JAMSHEDPUR-1 25-05-2018 22:37 25-05-2018 22:37 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Jamshedpur : Y-N, FD: 57.2
KM, FC:4.44 KA. R/I at Andal: Y-N, FD: 101.1KM,FC: 3.378KA.107000065994
0:00:00 0:00:00 35:47:00 0:00:00
405046 400KV-ANDAL-JAMSHEDPUR-2 10-05-2018 06:11 10-05-2018 07:42 0:00:00 0:00:00 1:31:00 0:00:00 LNCCTripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Jamshedpur hon : B-N,Z3, FD-281.1 KM, F/C-1.72KA. Charging attempt was
taken at 07:33 hrs but got tripprd on SOTF,R/I-F/C-2.43 KA,F/D-120.4KM
107000065077
405052 400KV-ANDAL-JAMSHEDPUR-2 10-05-2018 16:48 10-05-2018 19:38 2:50:00 0:00:00 0:00:00 0:00:00 OSPTShut down taken to remove the snapped Earth wire of this ckt-2, for which ckt:
1 has been tripped.107000065085
405159 400KV-ANDAL-JAMSHEDPUR-2 30-05-2018 19:53 30-05-2018 19:53 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R successful operated from both end. R/I at Andal: BN, Z2, FD-156.6 Km,
F/C-2.512KA, R/I at Jamshedpur: M-I :BN, FD-22.3 Km, F/C-8.7KA, M-II :BN,
FD-4.81 Km, F/C-8.8KA,107000066303
2:50:00 0:00:00 1:31:00 0:00:00
405007 400KV-BINAGURI -PURNEA NEW-2 02-05-2018 11:06 02-05-2018 19:24 0:00:00 8:18:00 0:00:00 0:00:00 OMSU
S/D taken for the commissioning and testing of IEC 61850 compatible Auto
reclosere relay and scheme at New Purnia i.e totally for system upgradation
purpose
107000064570
0:00:00 8:18:00 0:00:00 0:00:00
405123400KV-BINAGURI-KISUNGANJ-1-LILO
(M/s Powerlink line)27-05-2018 05:32 27-05-2018 06:21 0:00:00 0:49:00 0:00:00 0:00:00 OMSU
Tripped during thunderstorm.R/I at Binaguri: R-N, Z2,FD: 137.8KM,Fault
distance beyond line length. Line belongs to M/s Powerlink107000066051
0:00:00 0:49:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 4
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405125400KV-BINAGURI-KISUNGANJ-2-LILO
(M/s Powerlink Line)27-05-2018 06:02 27-05-2018 06:02 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R operated successfully at both ends. R/I at Binaguri: Y-N, FD:
70.91KM,FC:5.005KA.Line belongs to M/s Powerlink 107000066053
0:00:00 0:00:00 0:00:00 0:00:00
405051 400KV-BINAGURI-MALBASE-3 10-05-2018 09:25 10-05-2018 17:34 0:00:00 0:00:00 0:00:00 8:09:00 OSPD Shut down taken by Tala/ Bhutan for insulator replacement. 107000065083
405092 400KV-BINAGURI-MALBASE-3 23-05-2018 03:33 23-05-2018 03:33 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R successfull at both end at 03:33 hrs of dt 23.05.18,R/I at Binaguri end M1-
Nil, M2:Y-B-N,F/D-126.20 KM,F/C-YPh:1.463,Bph:3.931KA.107000065797
405098 400KV-BINAGURI-MALBASE-3 23-05-2018 08:53 23-05-2018 09:24 0:00:00 0:31:00 0:00:00 0:00:00 OMSUTripped on B-N, Z2, R/I at Binaguri: F/D: 124.4 KM, F/C: 2.72 KA; Fault is
under Bhutan jurisdiction.107000065809
405134 400KV-BINAGURI-MALBASE-3 28-05-2018 18:35 28-05-2018 19:12 0:00:00 0:37:00 0:00:00 0:00:00 OMSU
Tripped during heavy rain,thunderstrom & lightening . R/I at
Binaguri:Gantok: R-B-N fault, Z1,FD-116.97 KM,F/C: Rph-4.839 KA, Bph-
4.654KA. (Fault is under Malbase/Bhutan jurisdiction)
107000066151
0:00:00 1:08:00 0:00:00 8:09:00
405114 Baharampore - Bheramara - I(Indian portion) 24-05-2018 13:38 25-05-2018 20:01 0:00:00 0:00:00 0:00:00 30:23:00 OSPDShut down taken by Bheramara/Bangladesh, for const of new bay for Bus
stability test at Bheramara/Bangladesh end.107000065971
0:00:00 0:00:00 0:00:00 30:23:00
405102(ii) Baharampore - Bheramara - II(Indian Portion) 23-05-2018 09:02 23-05-2018 16:55 0:00:00 0:00:00 0:00:00 7:53:00 OSPDShut down taken by Bheramara/Bangladesh, for const of new bay for Bus
stability test at Bheramara/Bangladesh end.107000065974
0:00:00 0:00:00 0:00:00 7:53:00
405001 400KV-BONGAIGAON -BINAGURI-1 01-05-2018 04:26 01-05-2018 20:37 0:00:00 0:00:00 0:00:00 16:11:00 LVRD H/T as per ERLDC instruction for Voltage Regulation. 107000064424
405149 400KV-BONGAIGAON -BINAGURI-1 29-05-2018 00:57 29-05-2018 00:57 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R successful at both end during heavy rain, thunderstrom & lightening .
R/I at Binaguri end: R-N , Z1, FD-98.92 KM, KM,F/C: 3.288 KA. 107000066155
0:00:00 0:00:00 0:00:00 16:11:00
405118 400KV-BONGAIGAON -BINAGURI-2 26-05-2018 04:44 26-05-2018 04:44 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully at both ends. R/I at Binaguri : R-N, FD: 137 KM,
FC:2.089 KA. 107000066008
0:00:00 0:00:00 0:00:00 0:00:00
405018 400KV-DURGAPUR -FARAKKA-1 03-05-2018 16:09 03-05-2018 16:19 0:10:00 0:00:00 0:00:00 0:00:00 SPLT
CB opened at Farakka end only on D/T recd from Durgapur end as spuruous
signal due to suspected PLCC(BPL make) problem at Durgapur end . 107000064654
405048 400KV-DURGAPUR -FARAKKA-1 10-05-2018 06:27 10-05-2018 07:40 0:00:00 0:00:00 1:13:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Durgapur : Y-N,, FD-7 KM, F/C-14.59KA. 107000065080
0:10:00 0:00:00 1:13:00 0:00:00
405049 400KV-DURGAPUR -FARAKKA-2 10-05-2018 06:27 21-05-2018 20:01 0:00:00 0:00:00 277:34:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Durgapur : Y-B,Z3, FD-9.04 KM, F/C-18.19KA. Charging attempt was taken at
07:46 hrs but got tripprd on SOTF. After patrolling it has been found that 02 nos
towers at Loc no-379 & 378 has been damaged (Bended).
Later on it is found that 02 (Two) nos A+0 towers damaged/bended at Loc no:
378 & 379.
107000065081
0:00:00 0:00:00 277:34:00 0:00:00
405070 400KV-JEERUT-SUBASHGRAM-1 15-05-2018 08:39 15-05-2018 14:25 0:00:00 0:00:00 0:00:00 5:46:00 OSPDShut down taken by Jeerat/ WBSETCL, to attend HOT-SPOT on Y-Phase line
isolator at Jeerat/ WBSETCL end.107000065370
0:00:00 0:00:00 0:00:00 5:46:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 5
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405047 400KV-MAITHON -DURGAPUR-2 10-05-2018 06:21 10-05-2018 06:57 0:00:00 0:00:00 0:36:00 0:00:00 LNCCTripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Maithan : R-N,, FD-67.9 KM, F/C-3.43KA. 107000065078
405050 400KV-MAITHON -DURGAPUR-2 10-05-2018 10:55 10-05-2018 15:06 0:00:00 0:00:00 4:11:00 0:00:00 LNCCEmergency shut down taken at Durgapur end to attend rectification of re-
setting the foundation of R-Phase LA .107000065084
0:00:00 0:00:00 4:47:00 0:00:00
405085 400KV-MAITHON -JAMSHEDPUR-2 22-05-2018 18:11 22-05-2018 18:11 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R operated successfully from both end. R/I at MTN : RN, Z1, FL-72.4 Km,
F/C-4.5 KA. R/I at JSR : RN, Z1, FL-84.58 Km, F/C-1.22 KA.107000065780
405086 400KV-MAITHON -JAMSHEDPUR-2 22-05-2018 18:24 22-05-2018 18:24 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R operated successfully from both end. R/I at MTN : BN, Z1, FL-63.9 Km,
F/C-4.08 KA. R/I at JSR : RN, Z1, FL-127.25 Km, F/C-2.99 KA107000065781
0:00:00 0:00:00 0:00:00 0:00:00
405042 400KV-MAITHON -MAITHON RB-1 10-05-2018 05:21 01-06-2018 00:00 0:00:00 0:00:00 522:39:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Maithon : R-N, FD-19.13 KM, F/C-1.96KA , charging attempt taken from
Maithon end at 05:51hrs but tripped on SOTF. Later on it is found that, 03
(three) nos D+25 towers collapsed at Loc no: 63-64-65.
107000065062
0:00:00 0:00:00 522:39:00 0:00:00
405043 400KV-MAITHON -MAITHON RB-2 10-05-2018 05:21 01-06-2018 00:00 0:00:00 0:00:00 522:39:00 0:00:00 LNCC
Tripped during heavy thunderstrom/lightning/rain in the affected area .R/I at
Maithon : b-N, FD-18.67 KM, F/C-8.5KA , charging attempt taken from
Maithon end at 06:07hrs but tripped on SOTF.
Later on it is found that, 03 (three) nos D+25 towers collapsed at Loc no: 63-64-
65.
107000065063
0:00:00 0:00:00 522:39:00 0:00:00
405020 400KV-MAITHON -MEJIA-1 04-05-2018 09:21 04-05-2018 19:19 0:00:00 0:00:00 9:58:00 0:00:00 LMAC S/D taken for replacement of damaged insulator,broken by miscreants 107000064707
405080 400KV-MAITHON -MEJIA-1 18-05-2018 17:08 18-05-2018 17:08 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Maithon end: M1: B-N. Z1, F/D: 44.58 KM,
F/C: 4.648 KA; M2: B-N, Z1, F/D: 48.3 KM, F/C: 4.06 KA.107000065589
0:00:00 0:00:00 9:58:00 0:00:00
405006 400KV-MAITHON -MEJIA-2 02-05-2018 09:39 02-05-2018 18:57 0:00:00 0:00:00 9:18:00 0:00:00 LMAC S/D taken for replacement of damaged Insulator broken by Misceants 107000064566
405014 400KV-MAITHON -MEJIA-2 03-05-2018 09:13 03-05-2018 19:45 0:00:00 0:00:00 10:32:00 0:00:00 LMAC S/D taken for replacement of damaged insulator,broken by miscreants 107000064624
0:00:00 0:00:00 19:50:00 0:00:00
405019 400KV-MALDA -PURNEA NEW-1 04-05-2018 01:35 04-05-2018 01:35 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R successful at both end. R/I at New Purnea: Y-N, Z1, F/D: 8.9 KM, F/C:
12.12 KA. 107000064673
405136 400KV-MALDA -PURNEA NEW-1 28-05-2018 19:04 28-05-2018 21:01 1:57:00 0:00:00 0:00:00 0:00:00 SBBTTripped only from Malda end due to Bus-Bar protection operated at Malda end
. 107000066187
405153 400KV-MALDA -PURNEA NEW-1 30-05-2018 01:22 30-05-2018 02:29 0:00:00 0:00:00 1:07:00 0:00:00 LNCC R/I at Malda end: NGR Buchholz Trip durring heavy rain. 107000066526
1:57:00 0:00:00 1:07:00 0:00:00
405071 400KV-MALDA -PURNEA NEW-2 16-05-2018 04:12 16-05-2018 04:12 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful from both end. R/I at Malda : Main-I: YN, FD-97.07 Km, F/C-
3.338KA, R/I at New Purnea: YN, FD-42.57 Km, F/C-5.27KA. 107000065433
405135 400KV-MALDA -PURNEA NEW-2 28-05-2018 19:04 29-05-2018 20:21 0:00:00 0:00:00 25:17:00 0:00:00 LNCC
Tripped during heavy rain,thunderstrom & lightening . R/I at Malda end: R-
N fault, FD-65.81 KM,F/C: 4.62 KA. Charging attempt taken fron New Purnia
at 20.42 hrs but the line tripped on SOTF,R/I at Purnia end :RN,FD:68
KM,FC:3.8 KA.
107000066181
0:00:00 0:00:00 25:17:00 0:00:00
405137 400KV-MALDA-FARAKKA-1 28-05-2018 19:04 28-05-2018 21:26 2:22:00 0:00:00 0:00:00 0:00:00 SBBTTripped only from Malda end due to Bus-Bar protection operated at Malda end
. 107000066188
2:22:00 0:00:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 6
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405138 400KV-MALDA-FARAKKA-2 28-05-2018 19:04 28-05-2018 22:06 3:02:00 0:00:00 0:00:00 0:00:00 SBBTTripped only from Malda end due to Bus-Bar protection operated at Malda end
. 107000066189
3:02:00 0:00:00 0:00:00 0:00:00
405156400KV-MEJIA-JAMSHEDPUR(LILO MTN-JSR-
I)30-05-2018 10:39 30-05-2018 17:47 0:00:00 0:00:00 0:00:00 7:08:00 OSPD
Shutdown taken by M/s DVC for removing looping of CT for differential
protection in panel side107000066297
400KV-MEJIA-JAMSHEDPUR(LILO MTN-JSR-
I)31-05-2018 09:04 31-05-2018 19:07 0:00:00 0:00:00 0:00:00 10:03:00 OSPD
* Shutdown taken by M/s DVC for removing looping of CT for differential
protection in panel side
0:00:00 0:00:00 0:00:00 17:11:00
405038 400KV-RANGPO-BINAGURI-1 09-05-2018 05:45 09-05-2018 05:54 0:00:00 0:00:00 0:09:00 0:00:00 LNCC
Tripped only from Rangpo end during heavy thunderstrom/lightning/rain in
the affected area but A/R successful from Binaguri end. R/I at Binaguri: RN,
FD-69.47 Km, F/C-0.268KA. R/I at Rangpo: RN, FD-33.98 Km, F/C-3.184KA.
The said line synchronised at 05:54hrs on 09.05.18 from Rangpo end.
107000064989
0:00:00 0:00:00 0:09:00 0:00:00
405090 400KV-RANGPO-BINAGURI-2 23-05-2018 00:04 23-05-2018 00:04 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R successfull at both end ,R/I at Binaguri end M1-Nil,M2:R-N,Z1,F/D-28.88
KM,F/C-7.785KA,
R/I at Rangpo end: M1:R-N,Z1,F/D-80.25 KM,F/C-3.175KA.M2:R-N,Z1,F/D-
79.8 KM,F/C-3.2KA.
107000065790
0:00:00 0:00:00 0:00:00 0:00:00
405016 400KV-RANGPO-TEESTA-1 03-05-2018 11:29 03-05-2018 12:18 0:00:00 0:49:00 0:00:00 0:00:00 OMSUHand tripped for Mock Balck start exercised by Teesta: V HPS, as per
instruction of ERLDC, vide approval, thro mail Dtd 02.05.18.107000064651
0:00:00 0:49:00 0:00:00 0:00:00
405017 400KV-RANGPO-TEESTA-2 03-05-2018 11:32 03-05-2018 12:01 0:00:00 0:29:00 0:00:00 0:00:00 OMSUHand tripped for Mock Balck start exercised by Teesta: V HPS, as per
instruction of ERLDC, vide approval, thro mail Dtd 02.05.18.107000064652
0:00:00 0:29:00 0:00:00 0:00:00
405004 400KV-SAGARDIGHI-SUBHASGRAM-1 02-05-2018 07:56 02-05-2018 08:53 0:00:00 0:57:00 0:00:00 0:00:00 OMSUS/D taken by Sagardighi(WBPDCL) for taking out L/R at their end to attend
heavy oil leakage in L/R 107000064543
405005 400KV-SAGARDIGHI-SUBHASGRAM-1 02-05-2018 08:53 02-05-2018 09:07 0:00:00 0:14:00 0:00:00 0:00:00 OMSULine charged from Subhasgram end & at time of Schchronisation Sagardighi
end breaker got tripped on DT received107000064564
405008 400KV-SAGARDIGHI-SUBHASGRAM-1 02-05-2018 11:05 02-05-2018 11:31 0:00:00 0:26:00 0:00:00 0:00:00 OMSU
Tripped on R-N fault . R/I at Subhasgram end: Z2, F/D: 221.9 KM, F/C:1.7 KA;
R/I at Sagardighi end: R-N, Z1, F/D: 1.8 KM, F/C: 8.86 KA; Fault is under
WBPDCL jurisdiction.
107000064567
405060 400KV-SAGARDIGHI-SUBHASGRAM-1 11-05-2018 18:28 11-05-2018 18:43 0:00:00 0:15:00 0:00:00 0:00:00 OMSU
A/R successful at Subhasgram end,breaker tripped at Sagardighi end/
WBPTCL, R/I at S,Gram M1-Z1,B-N,F/D-28.37KM,F/C-5.914KA,M2-Z1,B-
N,F/D-28.3KM,F/C-5.85KA. R/I at S,Dighi end-A/R unsuccessfull,Z2,B-
N,F/D-218KM,F/C-1.92KA.
107000065146
405126 400KV-SAGARDIGHI-SUBHASGRAM-1 27-05-2018 07:20 27-05-2018 13:15 0:00:00 0:00:00 0:00:00 5:55:00 OSPD
Emergency S/D taken by WBPDCL to attend hot spot in line isolator at
Sagardighi end. 107000066073
0:00:00 1:52:00 0:00:00 5:55:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 7
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
403054 400KV-TALA-BINAGURI-1 01-05-2018 00:00 17-05-2018 15:38 0:00:00 0:00:00 0:00:00 399:38:00 LVRDLine kept opened as desired by the system/ERLDC. (Line remains charged as
anti theft upto Tala end, as directed ERLDC).107000061384
405075 400KV-TALA-BINAGURI-1 17-05-2018 15:38 01-06-2018 00:00 0:00:00 0:00:00 0:00:00 344:22:00 OSPD
Shutdown taken by Tala/Bhutan for restoration work at their end till 12.06.18.
The said line was open condition since 13.03.18 as per ERLDC/NLDC
instruction for voltage regulation.
107000065554
0:00:00 0:00:00 0:00:00 744:00:00
405073 400KV-TALA-BINAGURI-2 17-05-2018 15:38 23-05-2018 13:27 0:00:00 141:49:00 0:00:00 0:00:00 OMSU
Switched off to facilitate S/D of Tala-Binaguri-I by Tala/Bhutan to avoid
induction hazards. After completion of todays/17.05.18 S/D work the said
line antitheft charged from Binaguri end upto TALA at 18:00 hrs on 17.05.18 .
107000065553
0:00:00 141:49:00 0:00:00 0:00:00
404103 400KV-TALA-BINAGURI-4 28-04-2018 20:17 30-04-2018 08:48 0:00:00 0:00:00 0:00:00 36:31:00 LVRD H/T as per ERLDC instruction for Voltage Regulation. 107000064298
405069 400KV-TALA-BINAGURI-4 14-05-2018 12:39 17-05-2018 12:59 0:00:00 0:00:00 0:00:00 72:20:00 LVRD H/T as per ERLDC/NLDC instruction for Voltage Regulation. 107000065297
405091 400KV-TALA-BINAGURI-4 23-05-2018 03:33 23-05-2018 04:38 0:00:00 1:05:00 0:00:00 0:00:00 OMSU
Ttripped on Y-N,R/I at Binaguri end M1-Y-N, F/C=-Yph: 2.63KA,F/D:
209.4KM,M2:Y-B-N,Z1,F/D-147.10 KM,F/C-Yph7:4.06KA,Bph:1.193KA.(Fault
is under Bhutan jurisdiction).
107000065795
405099 400KV-TALA-BINAGURI-4 23-05-2018 08:53 23-05-2018 09:19 0:00:00 0:26:00 0:00:00 0:00:00 OMSUTripped on B-N, Z2, R/I at Binaguri: F/D: 147.10 KM, F/C: 2.003 KA; Fault is
under Bhutan jurisdiction.107000065810
405113 400KV-TALA-BINAGURI-4 25-05-2018 13:44 25-05-2018 14:21 0:00:00 0:37:00 0:00:00 0:00:00 OMSUA/R successful at Binaguri end only. CB opened at Tala end. R/I at Binaguri: B-
N, F/D: 119.1 KM, F/C: 3.421 KA.107000065961
405129 400KV-TALA-BINAGURI-4 28-05-2018 08:19 29-05-2018 09:40 0:00:00 0:00:00 0:00:00 25:21:00 OSPDS/D taken by Tala/Bhutan for replacement of De-capped R-phase insulator at
loc. No-TPS-58.107000066114
0:00:00 2:08:00 0:00:00 134:12:00
404080 765 KV ANGUL-JHARSUGURA-1 01-05-2018 00:00 06-05-2018 22:38 0:00:00 0:00:00 0:00:00 142:38:00 LCSD For swapping arrangement work of 765 KV Angul-Jharsugda ckt III & IV with
ckt I & II
107000063963
405148 765 KV ANGUL-JHARSUGURA-1 28-05-2018 23:07 28-05-2018 23:43 0:00:00 0:00:00 0:36:00 0:00:00 LNCC
Tripped during heavy rain,thunderstrom & lightening . R/I at Angul end: R-
N fault, FD-216.2 KM,F/C: 3.65 KA. R/I at Jharsuguda end: R-N fault, FD-57.1
KM,F/C: 5.2 KA
107000066154
0:00:00 0:00:00 0:36:00 142:38:00
404081 765 KV ANGUL-JHARSUGURA-2 01-05-2018 00:00 06-05-2018 22:44 0:00:00 0:00:00 0:00:00 142:44:00 LCSD For swapping arrangement work of 765 KV Angul-Jharsugda ckt III & IV with
ckt I & II107000063959
405055 765 KV ANGUL-JHARSUGURA-2 11-05-2018 05:59 11-05-2018 09:22 3:23:00 0:00:00 0:00:00 0:00:00 SRMTTripped due to PRV operated(Suspected mal operation) in L/R(B-ph) at
Sundergarh end,DT received at Angul end. Details under investigation.107000065165
3:23:00 0:00:00 0:00:00 142:44:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 8
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405012 400KV BARIPADA PANDIABILI-1 02-05-2018 20:14 02-05-2018 20:14 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Baripada: B-N, Z1, F/D: 81.90 KM, F/C:
3.724 KA; R/I at Pandiabily: Z1, B-N, F/D: 177.5 KM, F/C: 1.80 KA.107000064572
0:00:00 0:00:00 0:00:00 0:00:00
405013 400KV- TALCHER -RENGALI-1 02-05-2018 21:44 02-05-2018 22:14 0:00:00 0:00:00 0:30:00 0:00:00 LNCCTripped on R-N fault . R/I at Rengali end: F/D: 8.785 KM, F/C:8.207 KA.
Heavy rain /thunderstorm observed in the effected area.107000064613
0:00:00 0:00:00 0:30:00 0:00:00
405011 400KV- TALCHER -ROURKELA-1 02-05-2018 19:15 02-05-2018 19:15 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Rourkela: Y-N, Z1, F/C: 4.5 KA, F/D: 73.72
KM.107000064571
405036 400KV- TALCHER -ROURKELA-1 08-05-2018 10:42 08-05-2018 18:39 0:00:00 0:00:00 0:00:00 7:57:00 OSFDEmergency shut down taken to attend Oil leakage from Reactor and Air
leakage from pneumatic mechanism of main bay CB, at Talcher/ NTPC end. 107000064951
400KV- TALCHER -ROURKELA-1 12-05-2018 15:00 12-05-2018 21:12 0:00:00 0:00:00 0:00:00 6:12:00 OSPD * Shut down taken by Talcher/NTPC for replacement of Main bay CT of Y-
Phase at Talcher /NTPC end.107000065196
0:00:00 0:00:00 0:00:00 14:09:00
405082 400KV- TALCHER -ROURKELA-2 20-05-2018 17:48 20-05-2018 17:48 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R operated successfully at both ends .R/I at Rourkela:M1-Y-N,ZI,F/D-81.33
KM,F/C-4.2 KA,M2-Y-N,ZI,F/D-84.2 KM,F/C-3.98 KA.R/I at Talcher /NTPC
end:Y-N,F/C-4.13 KA,F/D-87KM.
107000065667
405084 400KV- TALCHER -ROURKELA-2 21-05-2018 16:02 21-05-2018 23:40 0:00:00 0:00:00 7:38:00 0:00:00 LNCCShutdown taken to replace Y-ph decapped insulator string at Loc no:342 due to
heavy storm107000065723
0:00:00 0:00:00 7:38:00 0:00:00
400KV-ANGUL -BOLANGIR 12-05-2018 07:26 12-05-2018 19:15 11:49:00 0:00:00 0:00:00 0:00:00 OSPT * Shut down taken for AMP work, at Bolangir end. 107000065187
405150 400KV-ANGUL -BOLANGIR 29-05-2018 18:29 29-05-2018 18:29 0:00:00 0:00:00 0:00:00 0:00:00 LART
A/R successful operated from both end. R/I at Bolangir: RN, FD-44.4 Km, F/C-
2.3 KA, R/I at Angul:RN, FD-157 Km, F/C-2.67 KA, 107000066216
11:49:00 0:00:00 0:00:00 0:00:00
405061 (ii) 400KV-BARIPADA -DUBRI-1 11-05-2018 18:39 11-05-2018 18:39 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end ,R/I at Baripada- Z1,R-N,F/D-136.5KM,F/C-
2.35KA, R/I at Duburi end,-R-N,F/D-28.6KM,F/C-6.43KA.F/D-28.6Km.107000065147
0:00:00 0:00:00 0:00:00 0:00:00
405022400KV-BARIPADA -KEONJHAR-1 (both
LILO Portion)04-05-2018 17:59 04-05-2018 18:21 0:00:00 0:22:00 0:00:00 0:00:00 OMSU
Tripped on B-N fault,R/I at Baripada-ZI,F/D-67.39KM,F/C-4.438KA.R/I-at
Keonjhar-F/D-99.6 KM,F/C--1.8KA. Fault under OPTCL jurisdiction.10700064732
405154400KV-BARIPADA -KEONJHAR-1 (both
LILO Portion)30-05-2018 06:40 30-05-2018 22:02 0:00:00 15:22:00 0:00:00 0:00:00 OMSU
S/D taken to attend replacement of two numbers tension strings at location
No.-46107000066304
0:00:00 15:44:00 0:00:00 0:00:00
405057 400KV-BOLANGIR -JEYPORE-1 11-05-2018 07:47 11-05-2018 20:48 13:01:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for AMP work. 107000065142
405074 400KV-BOLANGIR -JEYPORE-1 17-05-2018 16:47 17-05-2018 18:02 0:00:00 0:00:00 1:15:00 0:00:00 LNCC
During turbulent storm with heavy lightening , line tripped on 3-Phase (R-Y-
B); R/I at Jeypore: D/T recd only from Bolangir end; R/I at Bolangir: Z1,
Tripped phase: R-Y-B; F/C: R: 4.41 KA, Y: 4.86 KA, B: 4.62 KA; F/D: 03 KM;
107000065541
13:01:00 0:00:00 1:15:00 0:00:00
405083 400KV-MENDHASAL-PANDIABILI-2 20-05-2018 22:18 20-05-2018 22:18 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I at Pandiabily end: B-N, F/D: 17.9 M, F/C: 4.5
KA .107000065673
405100 400KV-MENDHASAL-PANDIABILI-2 23-05-2018 09:07 23-05-2018 09:07 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R successful at both end. R/I: at Pandiabily end: Y-N, Z1, F/D: 22.87 KM,
F/C: 3.175 KA.107000065811
0:00:00 0:00:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 9
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
403043 BOLANGIR-BUS REACTOR-1_80MVAR 01-05-2018 00:00 03-05-2018 09:46 0:00:00 0:00:00 0:00:00 57:46:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 1070000612250:00:00 0:00:00 0:00:00 57:46:00
405107 INDRAVATI- BUS REACTOR_125 MVAR 24-05-2018 08:23 24-05-2018 18:54 10:31:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for AMP work. 10700006589010:31:00 0:00:00 0:00:00 0:00:00
404109 JEYPORE 63MVAR BUS REACTOR-1 01-05-2018 00:00 01-05-2018 00:32 0:00:00 0:00:00 0:00:00 0:32:00 SVRD Reactor kept opened as per ERLDC instruction for voltage regulation. 107000064383
405021 JEYPORE 63MVAR BUS REACTOR-1 04-05-2018 13:39 04-05-2018 22:05 0:00:00 0:00:00 0:00:00 8:26:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000064723
405027 JEYPORE 63MVAR BUS REACTOR-1 06-05-2018 15:06 10-05-2018 08:31 0:00:00 0:00:00 0:00:00 89:25:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000064858
0:00:00 0:00:00 0:00:00 98:23:00405025 JEYPORE-BUS REACTOR-2_125MVAR 05-05-2018 21:28 06-05-2018 07:59 0:00:00 0:00:00 0:00:00 10:31:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000064828
405079 JEYPORE-BUS REACTOR-2_125MVAR 18-05-2018 16:30 19-05-2018 07:28 0:00:00 0:00:00 0:00:00 14:58:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000065588
0:00:00 0:00:00 0:00:00 25:29:00405009 PANDIABELLI-BUS_REACTOR-1 02-05-2018 10:30 02-05-2018 16:36 6:06:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for AMP work. 107000064568
6:06:00 0:00:00 0:00:00 0:00:00
405037 ROURKELA 125MVAR BUS REACTOR-1 08-05-2018 15:30 08-05-2018 20:20 4:50:00 0:00:00 0:00:00 0:00:00 SICT Tripped on operation of PRV. 107000064975
405122 ROURKELA 125MVAR BUS REACTOR-1 26-05-2018 13:36 26-05-2018 17:14 0:00:00 0:00:00 0:00:00 3:38:00 SCSDShut down taken for the integration of control of HV side Bus Reactor : I (One)
from SATCOM system.107000066021
4:50:00 0:00:00 0:00:00 3:38:00
405024 ROURKELA BUS REACTOR-2_125 MVAR 05-05-2018 09:29 05-05-2018 18:24 8:55:00 0:00:00 0:00:00 0:00:00 OSPT S/D taken for AMP work. 107000064817
405130 ROURKELA BUS REACTOR-2_125 MVAR 28-05-2018 12:36 28-05-2018 18:04 0:00:00 0:00:00 0:00:00 5:28:00 SCSDS/D taken by Rourkela for integration of control of HV side Bus reactor-II from
the STATCOM system107000066147
8:55:00 0:00:00 0:00:00 5:28:00
405072 ROURKELA CHAIBASA -I L/R 17-05-2018 12:31 17-05-2018 21:46 9:15:00 0:00:00 0:00:00 0:00:00 OSPTShutdown taken to attend DC earth fault in DC Source-I of Switchable 50
MVAR L/R at Rourkela end.107000065532
9:15:00 0:00:00 0:00:00 0:00:00
404070 MAITHAN- BUS REACTOR-1 (125MVAR) 01-05-2018 00:01 01-06-2018 00:00 0:00:00 0:00:00 0:00:00 743:59:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000063704
0:00:00 0:00:00 0:00:00 743:59:00
405041 RANGPO 80 MVAR BUS REACTOR-1 09-05-2018 16:51 13-05-2018 08:08 0:00:00 0:00:00 0:00:00 87:17:00 SVRD H/T as per ERLDC instruction for Voltage Regulation. 107000065014
0:00:00 0:00:00 0:00:00 87:17:00
405108 125 MVAR BUS REACTOR-2 DURGAPUR 24-05-2018 10:19 24-05-2018 13:25 0:00:00 0:00:00 0:00:00 3:06:00 SCSD For commissioning of balance Fire Fighting related work, under ERSS-IX. 107000065894
0:00:00 0:00:00 0:00:00 3:06:00
405112 125MVAR B/R-III AT DURGAPUR 25-05-2018 11:57 25-05-2018 15:24 0:00:00 0:00:00 0:00:00 3:27:00 SCSD For commissioning of balance Fire Fighting related work, under ERSS-IX. 107000065952
405061 (i) 125MVAR B/R-III AT DURGAPUR 11-05-2018 17:33 11-05-2018 19:14 1:41:00 0:00:00 0:00:00 0:00:00 OSPT Shut down taken for Isolator alignment work 107000065149
1:41:00 0:00:00 0:00:00 3:27:00
40515850MVAR switchable L/R of Sagordighi line at
Subhasgram30-05-2018 14:45 01-06-2018 00:00 0:00:00 0:00:00 0:00:00 33:15:00 SVRD
H/T as per ERLDC instruction for Voltage Regulation.107000066301
40402450MVAR switchable L/R of Sagordighi line at
Subhasgram01-05-2018 00:00 12-05-2018 12:35 0:00:00 0:00:00 0:00:00 276:35:00 SVRD Line kept opened as per ERLDC instruction for voltage regulation. 107000062867
0:00:00 0:00:00 0:00:00 309:50:00
405056 ANGUL-SUNDERGARH LINE-2_240MVAR 11-05-2018 05:59 11-05-2018 09:22 3:23:00 0:00:00 0:00:00 0:00:00 SRMTTripped due to PRV operated(Suspected mal operation) in L/R(B-ph) at
Sundergarh end107000065148
3:23:00 0:00:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 10
EVENT
No. NAME OF LINE/ICT
TRIP
DATE TIME
RESTORATION
DATE TIME
Outage
Attributable to
powergrid (T)
Outage
Attributable to
Others(U)
Outage
Attributable to
System
Constraints
( C )
Deemed
Available
( D )
CATE-
GORYREASON SAP
405076 BIRPARA-ICT-2 18-05-2018 07:24 18-05-2018 15:29 0:00:00 8:05:00 0:00:00 0:00:00 OMSU160MVA ICT Shutdown taken for cheking of line isolator alignment for remote
operation from NTAMC i.e for system improvement purpose only107000065587
0:00:00 8:05:00 0:00:00 0:00:00
405143 160 MVA MALDA-ICT-2 28-05-2018 19:29 28-05-2018 19:54 0:00:00 0:00:00 0:25:00 0:00:00 GGDCH/T on no power/no Voltage condition to facilitate the same for taking into
service. 107000066196
405029 160 MVA MALDA-ICT-2 07-05-2018 11:19 07-05-2018 11:47 0:28:00 0:00:00 0:00:00 0:00:00 OSPT 132 KV Bus shut down taken for taking out of Bus CVT . 107000064903
0:28:00 0:00:00 0:25:00 0:00:00
405144 160MVA MALDA-ICT-1 28-05-2018 19:29 28-05-2018 20:05 0:00:00 0:00:00 0:36:00 0:00:00 GGDCH/T on no power/no Voltage condition to facilitate the same for taking into
service. 107000066197
405028 160MVA MALDA-ICT-1 07-05-2018 11:19 07-05-2018 11:47 0:28:00 0:00:00 0:00:00 0:00:00 OSPT 132 KV Bus shut down taken for taking out of Bus CVT . 107000064902
0:28:00 0:00:00 0:36:00 0:00:00
405145 50MVA MALDA-ICT-4 28-05-2018 19:28 28-05-2018 22:02 0:00:00 0:00:00 2:34:00 0:00:00 GGDCH/T on no power/no Voltage condition to facilitate the same for taking into
service. 107000066200
405030 50MVA MALDA-ICT-4 07-05-2018 11:19 07-05-2018 11:49 0:30:00 0:00:00 0:00:00 0:00:00 OSPT 132 KV Bus shut down taken for taking out of Bus CVT . 107000064904
0:30:00 0:00:00 2:34:00 0:00:00405002 NEW SILIGURI-ICT-1 01-05-2018 11:02 01-05-2018 17:57 0:00:00 6:55:00 0:00:00 0:00:00 OMSU S/D taken for Back-up O/C & E/F ralay retrofitting work 107000064456
0:00:00 6:55:00 0:00:00 0:00:00405015 NEW SILIGURI-ICT-2 03-05-2018 11:22 03-05-2018 15:57 0:00:00 4:35:00 0:00:00 0:00:00 OMSU S/D taken for conversion of Static Relay to Numerical Relay(Backup over 107000064635
0:00:00 4:35:00 0:00:00 0:00:00405023 KEONJHAR-ICT-2 04-05-2018 17:59 05-05-2018 21:48 27:49:00 0:00:00 0:00:00 0:00:00 SICT Tripped on differntial protection operated. 107000064750
27:49:00 0:00:00 0:00:00 0:00:00
405081 SUBHASHGRAM-ICT-2 (315 MVA) 20-05-2018 06:15 20-05-2018 11:43 5:28:00 0:00:00 0:00:00 0:00:00 OSPT S/D taken to attend Hot-spot on R-phase isolator of 400 KV Side. 107000065654
5:28:00 0:00:00 0:00:00 0:00:00
405062 315 MVA ICT-1 OF ALIPURDUAR 11-05-2018 12:56 11-05-2018 15:43 0:00:00 2:47:00 0:00:00 0:00:00 OMSU For replacement of ELSTER make SEM with GENUS make SEM. 107000065168
0:00:00 2:47:00 0:00:00 0:00:00
405142 315MVA MALDA-ICT-5 28-05-2018 19:04 28-05-2018 21:06 2:02:00 0:00:00 0:00:00 0:00:00 SBBT Tripped only 400 KV side on Bus Bar protection operation 107000066195
2:02:00 0:00:00 0:00:00 0:00:00
405141 315MVA MALDA-ICT-3 28-05-2018 19:04 28-05-2018 21:59 2:55:00 0:00:00 0:00:00 0:00:00 SBBT Tripped only 400 KV side on Bus Bar protection operation 107000066194
2:55:00 0:00:00 0:00:00 0:00:00
EVENT No. NAME OF LINE/ICTOutage Attributable
to powergrid(T)
Outage Attributable
to Others(U)
Outage Attributable
to System
Constraints
( C )
Deemed
Available
( D )
CATEGORY REASON
107000066359 132 KV ARA-ARA -1 14/05/18 00:42:00 14/05/18 02:06:00 0:00:00 0:00:00 1:24:00 0:00:00 LNCC TRIPPED DUE TO Y-N FAULT CAUSED BY SEVERE CYCLONE AND LIGHETING AROUND THE
FAULT AREA. FD-0.3013KM FROM ARA(PG) AND FC-5.8
0:00:00 0:00:00 1:24:00 0:00:00
107000065032 132 KV ARA-DUMRAON -1 09/05/18 09:52:00 09/05/18 19:36:00 0:00:00 0:00:00 0:00:00 9:44:00 OSPDS/D TAKEN BY BSPTCL FOR STRINGING WORK OF OPGW ON MULTI CKT TOWERS AT GSS ARA
END
107000066360 132 KV ARA-DUMRAON -1 14/05/18 00:45:00 14/05/18 01:07:00 0:00:00 0:22:00 0:00:00 0:00:00 OMSU TRIPPED FROM DUMRAO( BSPTCL END) END ONLY DUE TO R-N FAULT.
0:00:00 0:22:00 0:00:00 9:44:00
107000064324 220 KV ARA-KHAGAUL -1 01/05/18 00:00:00 15/05/18 07:58:00 0:00:00 0:00:00 0:00:00 343:58:00 LPRD KEPT OPEN FOR P/R AS PER ERLDC INSTRUCTION
107000065392 220 KV ARA-KHAGAUL -1 15/05/18 16:21:00 16/05/18 08:07:00 0:00:00 0:00:00 0:00:00 15:46:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 11
107000065474 220 KV ARA-KHAGAUL -1 16/05/18 19:09:00 23/05/18 06:07:00 0:00:00 0:00:00 0:00:00 154:58:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000065826 220 KV ARA-KHAGAUL -1 23/05/18 10:44:00 24/05/18 04:10:00 0:00:00 0:00:00 0:00:00 17:26:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000066336 220 KV ARA-KHAGAUL -1 24/05/18 11:28:00 31/05/18 05:43:00 0:00:00 0:00:00 0:00:00 162:15:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000066464 220 KV ARA-KHAGAUL -1 31/05/18 16:28:00 01/06/18 00:00:00 0:00:00 0:00:00 0:00:00 7:32:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
0:00:00 0:00:00 0:00:00 701:55:00
107000064428 220 KV ARA-KHAGAUL -2 01/05/18 00:00:00 03/05/18 04:50:00 0:00:00 0:00:00 0:00:00 52:50:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000065322 220 KV ARA-KHAGAUL -2 14/05/18 19:09:00 01/06/18 00:00:00 0:00:00 0:00:00 0:00:00 412:51:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000065324 220 KV ARA-KHAGAUL -2 05/05/18 10:07:00 14/05/18 00:41:00 0:00:00 0:00:00 0:00:00 206:34:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000065478 220 KV ARA-KHAGAUL -2 03/05/18 18:59:00 05/05/18 07:12:00 0:00:00 0:00:00 0:00:00 36:13:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
0:00:00 0:00:00 0:00:00 708:28:00
107000066411 220 KV DALKHOLA-PURNEA -1 28/05/18 19:04:00 28/05/18 21:06:00 0:00:00 0:00:00 2:02:00 0:00:00 LNCCTRIPPED ONLY FROM DALKHOLA END DUE TO SEVERE CYLONE AND THUNDER STORM
AROUND THE AFFECTED AREA.
107000066422 220 KV DALKHOLA-PURNEA -1 08/05/18 10:05:00 08/05/18 13:30:00 3:25:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN TO ATTEND OIL SEEPAGE FROM Y-PH CT AT PURNEA.
3:25:00 0:00:00 2:02:00 0:00:00
107000066412 220 KV DALKHOLA-PURNEA -2 28/05/18 19:04:00 28/05/18 20:58:00 0:00:00 0:00:00 1:54:00 0:00:00 LNCCTRIPPED ONLY FROM DALKHOLA END DUE TO SEVER CYLONE AND THUNDER STORM
AROUND THE AFFECTED AREA.
0:00:00 0:00:00 1:54:00 0:00:00
107000064427 220KV ARA NADOKHAR -1 01/05/18 00:00:00 03/05/18 18:58:00 0:00:00 0:00:00 0:00:00 66:58:00 LVRD S/OFF FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION
107000065290 220KV ARA NADOKHAR -1 08/05/18 19:26:00 13/05/18 20:50:00 0:00:00 0:00:00 0:00:00 121:24:00 LVRD S/OFF FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION
107000065291 220KV ARA NADOKHAR -1 13/05/18 20:51:00 15/05/18 09:18:00 0:00:00 0:00:00 0:00:00 36:27:00 LVRD S/OFF FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION
107000066471 220KV ARA NADOKHAR -1 31/05/18 19:31:00 31/05/18 19:59:00 0:00:00 0:00:00 0:28:00 0:00:00 LNCC TRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA. FD=64.01KM FROM ARA END WITH FC=1.8KA
0:00:00 0:00:00 0:28:00 224:49:00
107000065590 220KV DEHRI SASARAM -1 18/05/18 08:17:00 18/05/18 13:11:00 0:00:00 4:54:00 0:00:00 0:00:00 OMSUS/D TAKEN FOR FOR R-PH CVT REPLACEMENT DUE TO SECONDARY VOLTAGE VIOLATION
CAUSED BY FREQUENT FAULT FEEDING BY DOWNSTREM SYSTEM
107000066466 220KV DEHRI SASARAM -1 31/05/18 18:33:00 01/06/18 00:00:00 0:00:00 5:27:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO R-B FAULT, FD=19.55KM FROM SASARAM END (BSPTCL JURISDICTION) WITH
FC: Ir=4.86KA, Ib=4.7KA.
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 12
0:00:00 10:21:00 0:00:00 0:00:00
107000065332 220KV GAYA BODHGAYA -1 14/05/18 02:02:00 14/05/18 11:12:00 0:00:00 0:00:00 0:00:00 9:10:00 LVRD LINE HAND TRIPPED FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION
107000066350 220KV GAYA BODHGAYA -1 08/05/18 20:38:00 08/05/18 21:02:00 0:00:00 0:24:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO 150MVA ICT-II HV SIDE CT BLAST AT BODHGAYA
107000066387 220KV GAYA BODHGAYA -1 26/05/18 12:06:00 26/05/18 12:28:00 0:00:00 0:22:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO Y-B FAULT. FD-65.6KM FROM GAYA,ZONE-3( BSPTCL JURISDICTION), Iy-2.98KA,
Ib-2KA
107000066454 220KV GAYA BODHGAYA -1 28/05/18 21:41:00 28/05/18 22:01:00 0:00:00 0:20:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO THREE PHASE FAULT IN ZONE-III DUE TO PROBLEM AT KHIJIRSARAI
(BSPTCL END).
0:00:00 1:06:00 0:00:00 9:10:00
107000066455 220KV GAYA BODHGAYA -2 28/05/18 21:41:00 28/05/18 22:02:00 0:00:00 0:21:00 0:00:00 0:00:00 OMSUTRIPPED DUE TO THREE PHASE FAULT IN ZONE-III DUE TO PROBLEM AT KHIJIRSARAI
(BSPTCL END).
107000066352 220KV GAYA BODHGAYA -2 08/05/18 20:38:00 08/05/18 21:00:00 0:00:00 0:22:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO 150MVA ICT-II HV SIDE CT BLAST AT BODHGAYA.
107000066390 220KV GAYA BODHGAYA -2 26/05/18 12:06:00 26/05/18 12:29:00 0:00:00 0:23:00 0:00:00 0:00:00 OMSUTRIPPED DUE TO Y-B FAULT. FD-64.3KM FROM GAYA,ZONE-3( BSPTCL JURISDICTION), Iy-2.98KA,
Ib-2.8KA
0:00:00 1:06:00 0:00:00 0:00:00
107000065481 220KV GAYA DEHRI -1 05/05/18 10:59:00 05/05/18 12:00:00 0:00:00 0:00:00 0:00:00 1:01:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
0:00:00 0:00:00 0:00:00 1:01:00
107000065482 220KV GAYA DEHRI -2 05/05/18 10:59:00 05/05/18 12:00:00 0:00:00 0:00:00 0:00:00 1:01:00 LPRD SWITCH OFF FOR POWER REGULATION AS PER ERLDC INSRUCTION
107000066403 220KV GAYA DEHRI -2 28/05/18 14:17:00 28/05/18 14:59:00 0:00:00 0:42:00 0:00:00 0:00:00 OMSUTRIPPED ONLY FROM DEHRI END.A/R SUCCESSFUL AT GAYA END.F.D.=70.8 KM FROM GAYA
(BSPTCL JURIDISCTION),F.C.=2.2 KAMP.
107000066392 220KV GAYA DEHRI -2 26/05/18 15:02:00 26/05/18 15:16:00 0:00:00 0:14:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO B-N FAULT. FD-35.5KM FROM GAYA ( BSPTCL JURISDICTION), FC-3.21KA.
0:00:00 0:56:00 0:00:00 1:01:00
107000066488 220KV PURNEA-NEW PURNEA-1 28/05/18 19:04:00 28/05/18 19:49:00 0:00:00 0:00:00 0:45:00 0:00:00 GGDC TRIPPED ON DIRECTIONAL EARTH FAULT PROTECTION DUE TO DISTURBANCE AT MALDA
107000066361 220KV PURNEA-NEW PURNEA-1 15/05/18 10:16:00 15/05/18 18:55:00 8:39:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR ISOLATOR ALIGNMENT WORK AT NEW PURNEA.
8:39:00 0:00:00 0:45:00 0:00:00
107000066424 220KV PURNEA-NEW PURNEA-2 17/05/18 09:58:00 17/05/18 19:30:00 9:32:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR LINE ISOLATOR ALIGNMENT WORK AT NEW PURNEA.
107000066489 220KV PURNEA-NEW PURNEA-2 28/05/18 19:04:00 28/05/18 20:10:00 0:00:00 0:00:00 1:06:00 0:00:00 GGDC TRIPPED ON DIRECTIONAL EARTH FAULT PROTECTION DUE TO DISTURBANCE AT MALDA
9:32:00 0:00:00 1:06:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 13
107000066458 220KV RANCHI-CHANDIL-1 30/05/18 18:11:00 30/05/18 18:37:00 0:00:00 0:26:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO R-N FAULT. F.D.= 26.7 KM FROM RANCHI (JUSNL JURISDICTION) WITH F.C.=
4.41 KA
107000066408 220KV RANCHI-CHANDIL-1 28/05/18 17:13:00 29/05/18 19:35:00 0:00:00 26:22:00 0:00:00 0:00:00 OMSU TRIPPED IN R-B FAULT.F.D.=18.3 KM FROM RANCHI (JUSNL JURIDISCTION),F.C.=Ir-5.42
KAMP,Ib=7.23 KAMP.
107000065963 220KV RANCHI-CHANDIL-1 20/05/18 16:34:00 20/05/18 17:53:00 0:00:00 1:19:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO Y-N FAULT FD-22.53KM FROM RANCHI(JUSNL JURISDICTION) FC-3.95KA.
107000066400 220KV RANCHI-CHANDIL-1 27/05/18 23:09:00 27/05/18 23:32:00 0:00:00 0:00:00 0:23:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHETING AROUND THE
FAULT AREA. FD- 4.3 KM FROM RANCHI AND FC- 7.4KA
0:00:00 28:07:00 0:23:00 0:00:00
107000066407 220KV RANCHI-HATIA-1 28/05/18 17:10:00 28/05/18 17:10:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT.F.D.=7.8 KM FROM
RANCHI,F.C.=5.25 KAMP.(JUSNL JURISDICTION)
107000066459 220KV RANCHI-HATIA-1 30/05/18 18:22:00 31/05/18 12:51:00 0:00:00 18:29:00 0:00:00 0:00:00 OMSUTRIPPED ON R-B FAULT. FD= 16 KM FROM RANCHI (JUSNL JURISDICTION) WITH F.C= Ir=4 KA
AND Ib=4.73KA
107000066345 220KV RANCHI-HATIA-1 05/05/18 14:57:00 05/05/18 17:43:00 0:00:00 0:00:00 0:00:00 2:46:00 OSFD EMERGENCY S/D TAKEN BY JUSNL FOR REPLACEMENT OF DAMAGED AND MELTED
HARDAWARE FITTINGS OF LINE ISOLATORS AT HATIA.
0:00:00 18:29:00 0:00:00 2:46:00
107000066460 220KV RANCHI-HATIA-2 30/05/18 18:22:00 31/05/18 13:43:00 0:00:00 19:21:00 0:00:00 0:00:00 OMSUTRIPPED ON R-B FAULT. FD= 18.8 KM FROM RANCHI (JUSNL JURISDICTION) WITH F.C= Ir= 3.74
KA AND Ib=4.28 KA.
107000066399 220KV RANCHI-HATIA-2 27/05/18 23:07:00 27/05/18 23:34:00 0:00:00 0:27:00 0:00:00 0:00:00 OMSUTRIPPED ONLY FROM HATIA END DUE TO R-N FAULT. FD-1.3 KM FROM RANCHI AND FC- 12.6
KA. A/R SUCESSFULLY OPERATED FROM RANCHI
107000065964 220KV RANCHI-HATIA-2 20/05/18 16:34:00 20/05/18 18:04:00 0:00:00 1:30:00 0:00:00 0:00:00 OMSUA/R SUCESSFULLY OPERATED FROM RANCHI END BUT TRIPPED FROM HATIA END DUE TO Y-
N FAULT.FD-16.293KM( JUSNL JURISDICTION) AND FC-4.028KA.
0:00:00 21:18:00 0:00:00 0:00:00
107000065298 220KV SASARAM ARA-1 14/05/18 06:39:00 14/05/18 13:17:00 0:00:00 0:00:00 0:00:00 6:38:00 LPRD H/T ON P/R AS PER ERLDC INSTRUCTION
107000065522 220KV SASARAM ARA-1 15/05/18 08:52:00 15/05/18 18:29:00 0:00:00 9:37:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR FOR B-PH CVT REPLACEMENT DUE TO SECONDARY VOLTAGE VIOLATION
CAUSED BY FREQUENT FAULT FEEDING BY DOWNSTREM SYSTEM
0:00:00 9:37:00 0:00:00 6:38:00
107000065516 220KV SASARAM NADOKHAR -1 16/05/18 08:19:00 16/05/18 14:21:00 0:00:00 6:02:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR FOR CVT REPLACEMENT DUE TO SECONDARY VOLTAGE VIOLATION
CAUSED BY FREQUENT FAULT FEEDING BY DOWNSTREM SYSTEM
0:00:00 6:02:00 0:00:00 0:00:00
107000065515 220KV SASARAM SAHUPURI-1 17/05/18 11:08:00 17/05/18 20:08:00 0:00:00 9:00:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR FOR Y-PH CVT REPLACEMENT DUE TO SECONDARY VOLTAGE VIOLATION
CAUSED BY FREQUENT FAULT FEEDING BY DOWNSTREM SYSTEM
107000065962 220KV SASARAM SAHUPURI-1 20/05/18 15:58:00 20/05/18 18:17:00 0:00:00 2:19:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO R-Y FAULT. FD-124.9KM FROM SASARAM( UPPCL JURISDICTION) FC-Ir-
1.44KA AND Iy-1.809KA.
0:00:00 11:19:00 0:00:00 0:00:00
107000066456 400 KV BIHARSHARIF-BALIA-1 29/05/18 16:56:00 29/05/18 17:28:00 0:00:00 0:32:00 0:00:00 0:00:00 OMSUTO FACILITATE THE CHARGING OF 400 KV NEW PURNEA- BIHARSHARIFF -2 IN THE SAME DIA
AT BIHARSHARIFF DUE TO UNAVAILIBILITY OF ITS MAIN BAY AT BIHARSHARIFF.
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 14
107000066397 400 KV BIHARSHARIF-BALIA-1 27/05/18 17:16:00 27/05/18 17:57:00 0:00:00 0:41:00 0:00:00 0:00:00 OMSUTRIPPED ONLY FROM BIHARSHARIFF DUE TO NON AVAILABILITY OF ITS MAIN BAY AT
BIHARSHARIFF DURING TRIPPING OF 400KV BIHARSHARIFF -NEW PURNEA-II( ENICL LINE) IN
ITS DIA
0:00:00 1:13:00 0:00:00 0:00:00
107000066476 400 KV BIHARSHARIF-BALIA-2 31/05/18 21:34:00 31/05/18 21:34:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT, FD=68.1KM FROM BSF
END WITH FC=5.56KA.
0:00:00 0:00:00 0:00:00 0:00:00
107000065842 400 KV CHAIBASA-ROURKELA-1 20/05/18 16:42:00 21/05/18 14:36:00 0:00:00 0:00:00 21:54:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT CAUSED BY THUNDERSTORM AND LIGHTENING AROUND THE
FAULT AREA. FD-0.93KM FROM ROURKELA AND FC-22.
0:00:00 0:00:00 21:54:00 0:00:00
107000065224 400 KV CHAIBASA-ROURKELA-2 07/05/18 16:38:00 07/05/18 17:30:00 0:00:00 0:00:00 0:52:00 0:00:00 LNCCTRIPPED ON Y-N FAULT. F.D.= 45.92 KM FROM RKL WITH F.C.= 4.765 KA. TRIPPED DURING
SEVERE CYCLONE AND LIGHTENING IN AND AROU
0:00:00 0:00:00 0:52:00 0:00:00
107000065883 400 KV JAMSHEDPUR-BARIPADA-2 02/05/18 18:22:00 02/05/18 18:22:00 0:00:00 0:00:00 0:00:00 0:00:00 LART AUTORECLOSED SUCCESSFULLY FROM BOTH ENDS ON B-N FAULT . F.D.= 60.6 KM FROM JSR
WITH F.C.= 6.15 KA.
0:00:00 0:00:00 0:00:00 0:00:00
107000065226 400 KV KHALGAON MAITHON-1 08/05/18 09:44:00 08/05/18 18:30:00 0:00:00 0:00:00 8:46:00 0:00:00 LNCCS/D TAKEN FOR REPLACEMENT OF DECAPPED INSULATORS CAUSED BY SEVERE LIGHTENING
AT LOC.344,369 AND 420
0:00:00 0:00:00 8:46:00 0:00:00
107000066355 400 KV RANCHI-MAITHON -1 10/05/18 14:41:00 10/05/18 14:41:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT.F.D.=84.8 KM FROM
RANCHI,F.C.=4.23 KAMP.
0:00:00 0:00:00 0:00:00 0:00:00
107000065190 400 KV RANCHI-MAITHON RB-1 11/05/18 18:45:00 11/05/18 20:51:00 0:00:00 0:00:00 0:00:00 2:06:00 OSFDEMERGENCY S/D TAKEN TO ATTEND HOT SPOT IN ITS Y-PH LINE ISOLATOR AT MTN(RB) END.
S/D TAKEN BY MPL.
107000066357 400 KV RANCHI-MAITHON RB-1 11/05/18 14:05:00 11/05/18 14:05:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERETED FROM BOTH END DUE TO B-N FAULT. FD-135.5KM FROM
RANCHI & FC-2.54 AND FROM MAITHON(RB) FD-
107000066011 400 KV RANCHI-MAITHON RB-1 25/05/18 20:33:00 25/05/18 20:40:00 0:00:00 0:00:00 0:07:00 0:00:00 LNCCTRIPPED DUE TO UNSUCCESSFUL A/R AT MAITHAN (RB) END, A/R SUCCESSFUL AT RANCHI
END DUE TO Y-N FAULT, F.D=126.8 KM FROM RANCHI, F.C=2.83KA.
107000066362 400 KV RANCHI-MAITHON RB-1 15/05/18 11:15:00 16/05/18 06:30:00 0:00:00 0:00:00 19:15:00 0:00:00 LNCCTRIPPED ON R-N FAULT. FD-91.4KM FROM RANCHI AND FC-3.65KA. INSULATOR DECAPPING
HAPPENED AT LOC. 213 DURING SEVERE LIGHTENING AND CYCLONE AROUND THE FAULT
AREA.
107000066426 400 KV RANCHI-MAITHON RB-1 25/05/18 20:33:00 25/05/18 20:40:00 0:00:00 0:07:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO UNSUCCESSFUL A/R AT MAITHAN (RB) END, A/R SUCCESSFUL AT RANCHI
END DUE TO Y-N FAULT, F.D=126.8 KM FROM RANCHI, F.C=2.83KA.
107000065858 400 KV RANCHI-MAITHON RB-1 02/05/18 16:17:00 02/05/18 16:25:00 0:00:00 0:08:00 0:00:00 0:00:00 OMSU TRIPPED FROM MAITHAN (RB) END ONLY DUE TO PROBLEM AT THEIR END.
107000066409 400 KV RANCHI-MAITHON RB-1 28/05/18 17:22:00 28/05/18 17:22:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT. FD-27.5 KM FROM
RANCHI AND FC-10.04 KA.
0:00:00 0:15:00 19:22:00 2:06:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 15
107000065848 400 KV RANCHI-MAITHON RB-2 02/05/18 15:55:00 02/05/18 16:36:00 0:00:00 0:00:00 0:41:00 0:00:00 LNCCTRIPPED ON R-N FAULT.F.D.= 21.9 KM FROM RNC WITH F.C.= 11.86 KA. LINE TRIPPED DUE TO
HEAVY RAIN AND THUNDERSTORM AROUND TH
107000066396 400 KV RANCHI-MAITHON RB-2 27/05/18 14:12:00 27/05/18 14:22:00 0:00:00 0:00:00 0:10:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHETING AROUND THE
FAULT AREA. FD-22.8KM FROM RANCHI AND FC-11.55KA.
107000066427 400 KV RANCHI-MAITHON RB-2 27/05/18 14:12:00 27/05/18 14:22:00 0:00:00 0:00:00 0:10:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHETING AROUND THE
FAULT AREA.. FD-22.8KM FROM RANCHI AND FC-11.55K
0:00:00 0:00:00 1:01:00 0:00:00
107000065288 400 KV RANCHI-RAGHUNATHPUR-1 13/05/18 15:51:00 13/05/18 15:51:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTAUTORECLOSED SUCCESSFUL FROM BOTH END DUE TO B-N FAULT, F.D=137.4KM FROM RNC,
F.C=2.6KA.
107000066402 400 KV RANCHI-RAGHUNATHPUR-1 28/05/18 07:29:00 28/05/18 18:03:00 0:00:00 0:00:00 0:00:00 10:34:00 OSPD S/D TAKEN BY DVC FOR JUMPER POINT CHECKING
0:00:00 0:00:00 0:00:00 10:34:00
107000065884 400 KV RANCHI-ROURKELA-1 02/05/18 17:57:00 02/05/18 17:57:00 0:00:00 0:00:00 0:00:00 0:00:00 LART AUTORECLOSED ON B-N FAULT. F.D.= 145.2 KM FROM RNC WITH F.C.= 2.41 KA
0:00:00 0:00:00 0:00:00 0:00:00
107000066367 400 KV RANCHI-ROURKELA-2 18/05/18 17:34:00 18/05/18 17:34:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH SIDES DUE TO Y-N FAULT. FD-1.3KM FROM
ROURKELA AND FC-20KA. AND DETAILS FROM RANCHI - F
0:00:00 0:00:00 0:00:00 0:00:00
107000065761 400 KV TATA DVC-BARIPADA-1 22/05/18 08:01:00 22/05/18 14:59:00 0:00:00 0:00:00 0:00:00 6:58:00 OSPD S/D TAKEN BY DVC TO CORRECT THE LOW CLEARANCE BETWEEN TOP GAURD WIRE FROM
TOP CONDUCTOR(B PHASE) IN SPAN BETWEEN DEAD END
107000066366 400 KV TATA DVC-BARIPADA-1 18/05/18 14:11:00 18/05/18 18:14:00 0:00:00 0:00:00 4:03:00 0:00:00 LNCCS/D TAKEN FOR ATTENDING BROKEN INSULATOR STRING HANGER AT LOC NO 112( B PH
TOP) DURING SEVERE CYCLONE AND LIGHTENING AROUND
107000066364 400 KV TATA DVC-BARIPADA-1 16/05/18 15:55:00 16/05/18 15:55:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT, F.D=15.82 KM FROM
TISCO, F.C=6.14KA.
0:00:00 0:00:00 4:03:00 6:58:00
107000066452 400KV BANKA BIHARSARIF-1 28/05/18 19:35:00 28/05/18 19:35:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT.F.D.=168.5 KM FROM
BANKA,F.C.=3.104 KMP.
0:00:00 0:00:00 0:00:00 0:00:00
107000066453 400KV BANKA BIHARSARIF-2 28/05/18 20:25:00 28/05/18 20:25:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO Y-N FAULT.F.D.=104.8 KM FROM
BANKA,F.C.=3.205KMP
107000066461 400KV BANKA BIHARSARIF-2 31/05/18 08:40:00 31/05/18 18:49:00 0:00:00 0:00:00 10:09:00 0:00:00 LNCC S/D TAKEN FOR REPLACEMENT OF INSULATORS DAMAGED DURING SEVERE LIGHTENING
AT LOC NO 330.
0:00:00 0:00:00 10:09:00 0:00:00
107000065331 400KV BARH PATNA -3 14/05/18 01:35:00 14/05/18 13:30:00 0:00:00 0:00:00 0:00:00 11:55:00 LVRD LINE KEPT OPENED FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION.THERE WAS
HIGH VOLTAGE AT BARH END.
107000065330 400KV BARH PATNA -3 14/05/18 01:25:00 14/05/18 01:35:00 0:00:00 0:00:00 0:10:00 0:00:00 LNCC TRIPPED DUE TO R-N FAULT CAUSED BY HEAVY RAIN AND THUNDERSTORM AROUND THE
FAULT AREA. FD-63.1KM FROM PATNA AND FC-4.21KA.
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 16
0:00:00 0:00:00 0:10:00 11:55:00
107000066384 400KV BARH PATNA-1 26/05/18 10:57:00 26/05/18 21:45:00 0:00:00 10:48:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR REPLACEMENT OF PORCELAIN INSULATORS BY POLYMER IN MULTI CKT
TOWERS.
107000066382 400KV BARH PATNA-1 25/05/18 08:53:00 25/05/18 19:29:00 0:00:00 10:36:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR REPLACEMENT OF PORCELAIN INSULATORS BY POLYMER IN MULTI CKT
TOWERS.
0:00:00 21:24:00 0:00:00 0:00:00
107000065326 400KV BARH-MOTIHARI-1 (LILO BARH-GKP) 14/05/18 00:56:00 14/05/18 02:02:00 0:00:00 0:00:00 1:06:00 0:00:00 LNCC TRIPPED DUE TO B-N FAULT CAUSED BY HEAVY RAIN AND THUNDERSTORM AROUND THE
FAULT AREA. FD-159.6KM FROM BARH AND FC-2.685KA.
0:00:00 0:00:00 1:06:00 0:00:00
107000065327 400KV BARH-MOTIHARI-2(LILO BARH-GKP) 14/05/18 00:56:00 14/05/18 01:11:00 0:00:00 0:00:00 0:15:00 0:00:00 LNCC TRIPPED DUE TO R-N FAULT CAUSED BY HEAVY RAIN AND THUNDERSTORM AROUND THE
FAULT AREA. FD-179.1KM FROM BARH AND FC-2.397KA
107000065328 400KV BARH-MOTIHARI-2(LILO BARH-GKP) 14/05/18 01:11:00 14/05/18 10:40:00 0:00:00 0:00:00 0:00:00 9:29:00 LVRD KEPT OPENED FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION. THERE WAS HIGH
VOLTAGE AT BARH END.
107000066463 400KV BARH-MOTIHARI-2(LILO BARH-GKP) 31/05/18 16:11:00 31/05/18 16:20:00 0:00:00 0:00:00 0:09:00 0:00:00 LNCC TRIPPED DUE TO Y-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA FD=8.5KM FROM BARH END WITH FC=13.8KA
0:00:00 0:00:00 0:24:00 9:29:00
107000066474 400KV BIHARSARIF SASARAM-2 31/05/18 20:19:00 31/05/18 20:59:00 0:00:00 0:00:00 0:40:00 0:00:00 LNCC TRIPPED DUE TO Y-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA. FD=148.6KM FROM BSF END WITH FC=2.7KA
0:00:00 0:00:00 0:40:00 0:00:00
107000066475 400KV CHANDWA GAYA-1 31/05/18 20:29:00 31/05/18 20:29:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT, FD=20.6KM FROM GAYA
END WITH FC=8.8KA
0:00:00 0:00:00 0:00:00 0:00:00
107000065028 400KV GAYA MAITHON-1 09/05/18 08:39:00 09/05/18 19:21:00 0:00:00 0:00:00 10:42:00 0:00:00 LMACSHUT DOWN TAKEN FOR REPLACEMENT OF INSULATORS DAMAGED BY MISCREANTS IN
MULTI CKT PORTION.
107000066473 400KV GAYA MAITHON-1 31/05/18 20:17:00 31/05/18 20:47:00 0:00:00 0:00:00 0:30:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA. FD=41.8KM FROM GAYA END WITH FC=2.41KA
107000066404 400KV GAYA MAITHON-1 28/05/18 15:32:00 29/05/18 13:31:00 0:00:00 0:00:00 21:59:00 0:00:00 LNCCTRIPPED DUE TO Y-N FAULT DURING SEVERE CYCLONE AND LIGHETING AROUND THE FAULT
AREA.F.D.=98 KM FROM GAYA,F.C.=3.4 KAMP.
0:00:00 0:00:00 33:11:00 0:00:00
107000064447 400KV GAYA MAITHON-2 30/04/18 07:40:00 30/04/18 07:40:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED IN B-N FAULT.F.D=319 KM FROM GAYA,F.C.=1.38 KAMP.THERE
WAS HEAVY THUNDERSTORM AROUND THE AFFECTED AREA.
0:00:00 0:00:00 0:00:00 0:00:00
107000065188 400KV KHALGAON BARH-1 12/05/18 09:17:00 12/05/18 19:44:00 10:27:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN TO ATTEND JUMPER RECTIFICATION WORK AT LOC. LILO 57
107000066410 400KV KHALGAON BARH-1 28/05/18 18:58:00 28/05/18 19:08:00 0:00:00 0:10:00 0:00:00 0:00:00 OMSUTRIPPED FROM BARH END ONLY.A/R SUCCESSFUL AT KAHALGAON END.F.D.=164 KM FROM
BARH,F.C.=2.7 KAMP
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 17
107000066393 400KV KHALGAON BARH-1 26/05/18 15:39:00 26/05/18 20:26:00 0:00:00 4:47:00 0:00:00 0:00:00 OMSUTO FACILITATE THE S/D OF 400KV KAHALGAON - BARH-2 DUE TO INDUCTION AT MULTI CKT
TOWER.
10:27:00 4:57:00 0:00:00 0:00:00
107000066451 400KV KHALGAON BARH-2 28/05/18 19:23:00 28/05/18 19:23:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT.F.D.=162.6 KM FROM
BARH,F.C.=3.104 KAMP.
107000066385 400KV KHALGAON BARH-2 26/05/18 10:58:00 26/05/18 21:11:00 0:00:00 10:13:00 0:00:00 0:00:00 OMSUS/D TAKEN FOR REPLACEMENT OF PORCELAIN INSULATORS BY POLYMER IN MULTI CKT
TOWERS.
107000066383 400KV KHALGAON BARH-2 25/05/18 08:50:00 25/05/18 19:37:00 0:00:00 10:47:00 0:00:00 0:00:00 OMSUS/D TAKEN FOR REPLACEMENT OF PORCELAIN INSULATORS BY POLYMER IN MULTI CKT
TOWERS.
0:00:00 21:00:00 0:00:00 0:00:00
107000065591 400KV KHALGAON LAKHISARAI-1 18/05/18 11:38:00 18/05/18 12:06:00 0:28:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR TAKING ITS L/R AT LAKHISARAI END
107000065514 400KV KHALGAON LAKHISARAI-1 17/05/18 08:01:00 17/05/18 08:35:00 0:34:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR S/OFF OF ITS LINE REACTOR AT LAKHISARAI END FOR AMP WORKS.
1:02:00 0:00:00 0:00:00 0:00:00
107000064896 400KV KHALGAON MAITHON-2 07/05/18 10:01:00 07/05/18 18:40:00 0:00:00 0:00:00 8:39:00 0:00:00 LNCCS/D TAKEN FOR REPLACEMENT OF DECAPPED INSULATORS CAUSED BY SEVERE LIGHTENING
AT LOC. 281,283,292,364.
0:00:00 0:00:00 8:39:00 0:00:00
107000065653 400KV KISHANGANJ PATNA -1 20/05/18 01:38:00 20/05/18 01:49:00 0:00:00 0:00:00 0:11:00 0:00:00 LNCCTRIPPED DUE TO Y-N FAULT CAUSED BY HEAVY RAIN AND THUNDERSTORM AROUND THE
FAULT AREA.DETAILS FROM PATNA- FD-60.29KM & FC-5.6KA. DETAILS FROM KISHANGANJ- FD-
263.8KM & FC-1.38KA
107000066478 400KV KISHANGANJ PATNA -1 31/05/18 22:14:00 31/05/18 22:14:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT, FD=6.75KM FROM PATNA
END WITH FC=13.62KA
0:00:00 0:00:00 0:11:00 0:00:00
107000066497 400KV KISHANGANJ PATNA-2 03/05/18 18:27:00 03/05/18 18:55:00 0:00:00 0:00:00 0:28:00 0:00:00 GOVC TRIPPED DUE TO OVER VOLTAGE AT PATNA.
107000066349 400KV KISHANGANJ PATNA-2 08/05/18 12:36:00 08/05/18 12:36:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT. FD-99.2KM FROM
KISHANAGANJ END AND FC-3.22KA
107000066401 400KV KISHANGANJ PATNA-2 28/05/18 00:44:00 28/05/18 00:44:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R OF SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT. FD-4.84KM FROM
KISHANGANJ AND FC-8.65KA.
107000066343 400KV KISHANGANJ PATNA-2 02/05/18 08:08:00 02/05/18 08:08:00 0:00:00 0:00:00 0:00:00 0:00:00 LART AURORECLOSED SUCESSFULLY FROM BOTH SIDES DUE TO Y-N FAULT. F.D.= 221.5 KM FROM
PATNA WITH F.C.= 2.09 KA.
0:00:00 0:00:00 0:28:00 0:00:00
107000066391 400KV KODERMA BIHARSARIF-1 26/05/18 12:09:00 26/05/18 12:09:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT. FD-66.47KM FROM
BIHARSHARIFF AND FC-2.011KA.
0:00:00 0:00:00 0:00:00 0:00:00
107000065812 400KV KODERMA BIHARSARIF-2 22/05/18 12:54:00 22/05/18 12:54:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT. FD-98.3KM FROM BSF
AND FC-3.8KA.
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 18
0:00:00 0:00:00 0:00:00 0:00:00
107000065292 400KV KODERMA GAYA-2 13/05/18 22:44:00 14/05/18 00:26:00 0:00:00 0:00:00 1:42:00 0:00:00 LNCC TRIPPED DUE TO B-N FAULT.DETAILS FROM GAYA- 48.3KM &5.71KA. HEAVY RAIN AND
THUNDERSTORM AROUND THE FAULT AREA
107000065030 400KV KODERMA GAYA-2 09/05/18 08:42:00 09/05/18 19:41:00 0:00:00 0:00:00 10:59:00 0:00:00 LMAC SHUT DOWN TAKEN FOR REPLACEMENT OF INSULATORS DAMAGED BY MISCREANTS IN
MULTI CKT PORTION.
107000066413 400KV KODERMA GAYA-2 28/05/18 19:16:00 28/05/18 19:16:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCESSFULLY OPERATED FROM BOTH END DUE TO B-N FAULT.F.D.=65.72 KM FROM
GAYA,F.C.=4.6 KMP.
0:00:00 0:00:00 12:41:00 0:00:00
107000065228 400KV MOTIHARI-GORAKHPUR-1(LILO BARH-GKP 03/05/18 02:39:00 03/05/18 03:44:00 0:00:00 1:05:00 0:00:00 0:00:00 OMSUTRIPPED FROM MOTIHARI END (DMTCL) ONLY ON Y-N FAULT DUE TO PROBLEM AT THEIR
END. A/R SUCCESSFUL FROM GKP END.
0:00:00 1:05:00 0:00:00 0:00:00
107000066470 400KV NABINAGAR SASARAM-2 31/05/18 18:40:00 31/05/18 20:33:00 0:00:00 0:00:00 1:53:00 0:00:00 LNCC TRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA.FD=20.62KM FROM SASARAM END WITH FC=6.5
0:00:00 0:00:00 1:53:00 0:00:00
107000065857 400KV PATNA BALLIA -3 03/05/18 12:53:00 03/05/18 14:34:00 1:41:00 0:00:00 0:00:00 0:00:00 OMST TRIPPED DURING DC EARTH FAULT TESTING AT BALIA. DT RECD. AT PATNA.
1:41:00 0:00:00 0:00:00 0:00:00
107000064860 400KV PATNA BALLIA 4 01/05/18 08:06:00 01/05/18 20:29:00 0:00:00 12:23:00 0:00:00 0:00:00 OMSU S/D TAKEN BY BALIA FOR REPLACEMENT OF PORCELEIN INSULATORS WITH POLYMER
INSULATORS .
107000064867 400KV PATNA BALLIA 4 02/05/18 08:55:00 02/05/18 19:46:00 0:00:00 10:51:00 0:00:00 0:00:00 OMSU S/D TAKEN BY BALIA FOR REPLACEMENT OF PORCELEIN INSULATORS WITH POLYMER
INSULATORS .
107000066363 400KV PATNA BALLIA 4 15/05/18 13:13:00 15/05/18 19:58:00 0:00:00 0:00:00 6:45:00 0:00:00 LNCCTRIPPED ON Y-B.FAULT DURING SEVERE CYCLONE IN AND AROUND THE FAULT AREA. FD-
46.9KM FROM PATNA AND FC-Iy-8.86KA, Ib-8.63KA.
0:00:00 23:14:00 6:45:00 0:00:00
107000066494 400KV PATNA BALLIA-1 26/05/18 19:39:00 26/05/18 20:23:00 0:44:00 0:00:00 0:00:00 0:00:00 OMST TRIPPED ONLY FROM PATNA END DUE TO DT RECEIVED AT PATNA.
107000066365 400KV PATNA BALLIA-1 17/05/18 15:04:00 17/05/18 19:29:00 4:25:00 0:00:00 0:00:00 0:00:00 OSPTS/D TAKEN FOR CHECKING ITS LINE REACTOR AT BALIA AFTER BUSHING REPALCEMENT
WORK.
5:09:00 0:00:00 0:00:00 0:00:00
107000065191 400KV PATNA BALLIA-2 10/05/18 12:11:00 10/05/18 13:17:00 1:06:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN TO ATTEND HOT SPOT IN ITS LINE ISOLATOR AT PATNA END.
107000066477 400KV PATNA BALLIA-2 31/05/18 22:02:00 31/05/18 22:26:00 0:00:00 0:00:00 0:24:00 0:00:00 LNCC TRIPPED DUE TO B-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA. FD=8.26KM FROM PATNA END WITH FC=13.6
1:06:00 0:00:00 0:24:00 0:00:00
107000065221 400KV RAGHUNATHPUR-MAITHON-1 13/05/18 11:27:00 13/05/18 14:30:00 0:00:00 0:00:00 0:00:00 3:03:00 OSFD EMERGENCY S/D TAKEN BY RTPS(DVC) END TO ATTEND WAVE TRAP PROBLEM AT THEIR
END.
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 19
107000066414 400KV RAGHUNATHPUR-MAITHON-1 05/05/18 10:21:00 05/05/18 17:33:00 7:12:00 0:00:00 0:00:00 0:00:00 OSPT TO ATTEND HOT SPOT AT LOC NO.102.
107000066425 400KV RAGHUNATHPUR-MAITHON-1 25/05/18 09:32:00 25/05/18 16:58:00 0:00:00 7:26:00 0:00:00 0:00:00 OMSU S/D TAKEN TO ATTEND HOT SPOT CAUSED BY CONTINUOUS OVERLOADING.
107000066395 400KV RAGHUNATHPUR-MAITHON-1 27/05/18 07:18:00 27/05/18 16:12:00 0:00:00 0:00:00 0:00:00 8:54:00 OSPD S/D TAKEN BY DVC FOR JUMPER POINT CHECKING .
7:12:00 7:26:00 0:00:00 11:57:00
107000066496 400KV RANCHI NEW RANCHI -3 20/05/18 15:33:00 20/05/18 17:12:00 0:00:00 0:00:00 1:39:00 0:00:00 LNCC LINE TRIPPED IN B-N FAULT.F.D.=11.57 KM FROM RANCHI,F.C.=19.16 KAMP.THERE WAS HEAVY
THUNDRSTORM ,HEAVY RAIN AND SEVER CYCLONE AROUND THE FAULT AREA.
0:00:00 0:00:00 1:39:00 0:00:00
107000066457 400KV RANCHI NEW RANCHI 4 30/05/18 17:37:00 30/05/18 17:59:00 0:00:00 0:00:00 0:22:00 0:00:00 LNCC TRIPPED DUE TO B-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA. F.D.= 2.4 KM FROM RNC WITH F.C.= 18 KA
0:00:00 0:00:00 0:22:00 0:00:00
107000065850 400KV RANCHI NEW RANCHI-1 02/05/18 15:56:00 02/05/18 16:50:00 0:00:00 0:00:00 0:54:00 0:00:00 LNCC TRIPPED ON R-N FAULT. F.D.= 21.2 KM FROM RNC WITH F.C.= 11.01 KA. LINE TRIPPED DUE TO
HEAVY RAIN AND THUNDERSTORM AROUND TH
107000065843 400KV RANCHI NEW RANCHI-1 20/05/18 15:33:00 24/05/18 00:19:00 0:00:00 80:46:00 0:00:00 0:00:00 OMSU
TRIPPED DUE TO B-N FAULT CAUSED BY THUNDERSTORM AND LIGHTENING AROUND THE
FAULT AREA. DUE TO FAULT ,B PH BREAKER FAIL AT RANCHI.IT IS TO NOTED THAT
CORPORATE INDIA LIMITED HAD NOT COMMISSIONED OF ITS TIE BAY CB AT RANCHI.PARTY
GOT BANKRUPT. SO DUE TO UNVALABILTY OF TIE 400 KV RANCHI-NEW RANCHI-I TRIPPED.
107000066398 400KV RANCHI NEW RANCHI-1 27/05/18 22:20:00 27/05/18 22:20:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO Y-N FAULT. DETAILS FROM NEW
RANCHI- M1- FD-19.7KM AND FC-8.37KA M2- FD-20.2KM
0:00:00 80:46:00 0:54:00 0:00:00
107000065844 400KV RANCHI NEW RANCHI-2 20/05/18 15:33:00 20/05/18 18:28:00 0:00:00 2:55:00 0:00:00 0:00:00 OMSU
400KV BUS-II TRIPPED DUE TO LBB OPERATION OF ITS B PH BREAKER FAILURE AT RANCHI..IT
IS TO NOTED THAT CORPORATE INDIA LIMITED HAD NOT COMMISSIONED OF ITS TIE BAY CB
AT RANCHI.PARTY GOT BANKRUPT. SO DUE TO UNVALABILTY OF TIE 400 KV RANCHI-NEW
RANCHI-I TRIPPED.
107000065854 400KV RANCHI NEW RANCHI-2 02/05/18 15:56:00 02/05/18 16:51:00 0:00:00 0:00:00 0:55:00 0:00:00 LNCC TRIPPED ON B-N FAULT. F.D.= 14.6 KM FROM RNC WITH F.C.= 12.13 KA. LINE TRIPPED DUE TO
HEAVY RAIN AND THUNDERSTORM AROUND TH
0:00:00 2:55:00 0:55:00 0:00:00
107000066468 400KV SASARAM DALTONGANJ-1 31/05/18 18:43:00 06-01-18 0:00 0:00:00 0:00:00 5:17:00 0:00:00 LNCC
TRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA FD=117KM FROM SASARAM END WITH FC=6.3KA.
TOWER COLLAPSED COMPLETELY AT LOC.36.
0:00:00 0:00:00 5:17:00 0:00:00
107000066469 400KV SASARAM DALTONGANJ-2 31/05/18 18:43:00 06-01-18 0:00 0:00:00 0:00:00 5:17:00 0:00:00 LNCC
TRIPPED DUE TO B-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA.FD=276.9KM FROM SASARAM END WITH FC=1.19KA.
TOWER COLLAPSED COMPLETELY AT LOC.36.
0:00:00 0:00:00 5:17:00 0:00:00
107000066405 765KV GAYA BALIA -1 28/05/18 16:59:00 28/05/18 16:59:00 0:00:00 0:00:00 0:00:00 0:00:00 LARTA/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT.F.D.=71 KM FROM
GAYA,F.C.=4.76 KAMP.
0:00:00 0:00:00 0:00:00 0:00:00
107000064862 765KV GAYA VARANASI -1 01/05/18 08:49:00 01/05/18 18:50:00 0:00:00 10:01:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR TOWER STRENGTHNING WORK BETWEEN LOC.NO.208 TO 492
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 20
107000064865 765KV GAYA VARANASI -1 02/05/18 08:33:00 02/05/18 19:10:00 0:00:00 10:37:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR TOWER STRENGTHNING WORK BETWEEN LOC.NO.208 TO 492
107000065294 765KV GAYA VARANASI -1 13/05/18 23:52:00 01/06/18 00:00:00 0:00:00 0:00:00 432:08:00 0:00:00 LNCC
TRIPPED DUE TO R-B FAULT. DETAILS FROM GAYA- FD-139KM & FC-Ir-4.4KA, Ib-4.8KA. DETAILS
FROM VARANASI - FD-118KM & FC -Ir-5.66KA, Ib-5.82KA. AT LOC NO 368 TOWER COLLAPSED
FROM TOP LEVEL CAUSED BY SEVERE THUNDERSTORM AND RAIN AROUND THE FAULT AREA.
0:00:00 20:38:00 432:08:00 0:00:00
107000066472 765KV GAYA VARANASI -2 31/05/18 19:57:00 31/05/18 20:30:00 0:00:00 0:00:00 0:33:00 0:00:00 LNCCTRIPPED FROM VARANASI END ONLY, A/R SUCCESSFUL FROM GAYA END , DUE TO B-N FAULT
DURING SEVERE CYCLONE AND LIGHTENING AROUND THE FAULT AREA.
FD=75.3KM FROM GAYA WITH FC=4.82KA
107000066465 765KV GAYA VARANASI -2 31/05/18 18:32:00 31/05/18 19:15:00 0:00:00 0:00:00 0:43:00 0:00:00 LNCCTRIPPED DUE TO R-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE
FAULT AREA FD=139.4KM FROM GAYA END WITH FC=3.47KA
0:00:00 0:00:00 1:16:00 0:00:00
107000066467 765KV-SASARAM-FATEHPUR-1 31/05/18 18:39:00 31/05/18 19:02:00 0:00:00 0:00:00 0:23:00 0:00:00 LNCC TRIPPED FROM FATEHPUR END ONLY, A/R SUCCESSFUL FROM SASARAM END ONLY , DUE TO
B-N FAULT DURING SEVERE CYCLONE AND LIGHTENING AROUND THE FAULT AREA,
FD=330KM FROM FATEHPUR WITH FC=2.29KA,
107000066378 765KV-SASARAM-FATEHPUR-1 24/05/18 22:40:00 24/05/18 22:40:00 0:00:00 0:00:00 0:00:00 0:00:00 LART A/R SUCESSFULLY OPERATED FROM BOTH END DUE TO R-N FAULT, F.D=198.9KM FROM
SASARAM (NR3 JURISDICTION), F.C=1.514KA.
0:00:00 0:00:00 0:23:00 0:00:00
107000065217 BIHARSHARIF 50MVAR BUS REACTOR-1 12/05/18 20:25:00 13/05/18 09:21:00 0:00:00 0:00:00 0:00:00 12:56:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065710 BIHARSHARIF 50MVAR BUS REACTOR-1 21/05/18 19:37:00 24/05/18 02:36:00 0:00:00 0:00:00 0:00:00 54:59:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 67:55:00
107000065972 BIHARSHARIF 80MVAR BUS REACTOR-2 25/05/18 19:22:00 29/05/18 07:30:00 0:00:00 0:00:00 0:00:00 84:08:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 84:08:00
107000065219 BIHARSHARIF-BUS REACTOR-3 12/05/18 21:12:00 13/05/18 09:20:00 0:00:00 0:00:00 0:00:00 12:08:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065651 BIHARSHARIF-BUS REACTOR-3 17/05/18 19:41:00 20/05/18 01:21:00 0:00:00 0:00:00 0:00:00 53:40:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065915 BIHARSHARIF-BUS REACTOR-3 24/05/18 20:18:00 29/05/18 07:39:00 0:00:00 0:00:00 0:00:00 107:21:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 173:09:00
107000065218 BIHARSHARIF-BUS REACTOR-4 12/05/18 20:25:00 13/05/18 09:21:00 0:00:00 0:00:00 0:00:00 12:56:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066495 BIHARSHARIF-BUS REACTOR-4 24/05/18 02:36:00 31/05/18 12:00:00 177:24:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN DUE TO ABNORMAL SOUND FROM BUS REACTOR.
107000065711 BIHARSHARIF-BUS REACTOR-4 21/05/18 19:37:00 24/05/18 02:36:00 0:00:00 0:00:00 0:00:00 54:59:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
177:24:00 0:00:00 0:00:00 67:55:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 21
107000063421 400KV MOTIHARI-GORAKHPUR-2(LILO BARH-GKP 07/04/18 09:48:00 01/05/18 00:00:00 0:00:00 566:12:00 0:00:00 0:00:00 OMSU
TRIPPED DUE TO B-N FAULT. FD-160.6KM FROM GORAKHPUR( DMTCL JURISDICTION) AND FC-
2.8KA.CHARGING ATTEMPT TAKEN BY MOTIHARI AT 15:37HRS ON 07.04.18 BUT LINE TRIPPED
ON R-Y FAULT.FD-0KM FROM MOTIHARI AND FC- Ir-9.2KA AND Iy-9.2KA
0:00:00 566:12:00 0:00:00 0:00:00
107000066416 BIHARSHARIF-ICT-2 05/05/18 16:42:00 05/05/18 17:17:00 0:00:00 0:35:00 0:00:00 0:00:00 OMSU BREAKER OPENED FROM BSPTCL END (220KV SIDE) DUE TO PROBLEM AT THEIR END
0:00:00 0:35:00 0:00:00 0:00:00
107000066417 BIHARSHARIF-ICT-3 05/05/18 16:42:00 05/05/18 17:11:00 0:00:00 0:29:00 0:00:00 0:00:00 OMSU BREAKER OPENED FROM BSPTCL END (220KV SIDE) DUE TO PROBLEM AT THEIR END
0:00:00 0:29:00 0:00:00 0:00:00
107000066589 KISANGANJ-ICT-I 25/05/18 05:56:00 25/05/18 18:10:00 0:00:00 12:14:00 0:00:00 0:00:00 OMSU TRIPPED DUE TO MALOPERATION OF BUCHHOLZ REALY CAUSED BY INGRESS OF WATER
0:00:00 12:14:00 0:00:00 0:00:00
107000065566 GAYA 125MVAR_BUS_REACTOR-1 17/05/18 21:13:00 20/05/18 06:35:00 0:00:00 0:00:00 0:00:00 57:22:00 SVRD HAND TRIPPED FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION.
107000065216 GAYA 125MVAR_BUS_REACTOR-1 08/05/18 20:16:00 13/05/18 10:11:00 0:00:00 0:00:00 0:00:00 109:55:00 SVRD S.OFF FOR VOLTAGE REGULATION AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 167:17:00
107000065862 GAYA-ICT-1 05/05/18 10:50:00 05/05/18 11:39:00 0:49:00 0:00:00 0:00:00 0:00:00 SRMT TRIPPED DUE TO OTI MALOPERATION
0:49:00 0:00:00 0:00:00 0:00:00
107000065822 HVDC- PUSAULI 125 MVAR BUS REACTOR-2 23/05/18 10:32:00 23/05/18 21:30:00 0:00:00 0:00:00 0:00:00 10:58:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066348 HVDC- PUSAULI 125 MVAR BUS REACTOR-2 08/05/18 11:19:00 11/05/18 06:45:00 0:00:00 0:00:00 0:00:00 67:26:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066108 HVDC- PUSAULI 125 MVAR BUS REACTOR-2 27/05/18 19:31:00 28/05/18 07:26:00 0:00:00 0:00:00 0:00:00 11:55:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 90:19:00
107000065612 HVDC- PUSAULI 125MVAR BUS REACTOR-1 18/05/18 20:39:00 23/05/18 06:17:00 0:00:00 0:00:00 0:00:00 105:38:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066033 HVDC- PUSAULI 125MVAR BUS REACTOR-1 26/05/18 19:54:00 28/05/18 07:35:00 0:00:00 0:00:00 0:00:00 35:41:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065823 HVDC- PUSAULI 125MVAR BUS REACTOR-1 23/05/18 10:34:00 23/05/18 21:35:00 0:00:00 0:00:00 0:00:00 11:01:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000064990 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 08/05/18 19:33:00 09/05/18 05:31:00 0:00:00 0:00:00 0:00:00 9:58:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065184 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 11/05/18 10:35:00 13/05/18 07:06:00 0:00:00 0:00:00 0:00:00 44:31:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 22
107000065227 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 02/05/18 20:40:00 03/05/18 05:12:00 0:00:00 0:00:00 0:00:00 8:32:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065592 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 18/05/18 18:48:00 18/05/18 23:57:00 0:00:00 0:00:00 0:00:00 5:09:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065323 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 14/05/18 19:11:00 15/05/18 07:10:00 0:00:00 0:00:00 0:00:00 11:59:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065093 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 10/05/18 14:28:00 11/05/18 06:52:00 0:00:00 0:00:00 0:00:00 16:24:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065222 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 13/05/18 12:22:00 13/05/18 17:42:00 0:00:00 0:00:00 0:00:00 5:20:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065289 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 13/05/18 18:57:00 13/05/18 22:38:00 0:00:00 0:00:00 0:00:00 3:41:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065034 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 09/05/18 19:03:00 10/05/18 06:22:00 0:00:00 0:00:00 0:00:00 11:19:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065650 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 19/05/18 19:04:00 20/05/18 01:17:00 0:00:00 0:00:00 0:00:00 6:13:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000064859 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 06/05/18 19:30:00 08/05/18 07:11:00 0:00:00 0:00:00 0:00:00 35:41:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065388 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 15/05/18 14:24:00 18/05/18 05:44:00 0:00:00 0:00:00 0:00:00 63:20:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065477 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 03/05/18 14:50:00 04/05/18 07:38:00 0:00:00 0:00:00 0:00:00 16:48:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065479 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 04/05/18 21:09:00 05/05/18 08:03:00 0:00:00 0:00:00 0:00:00 10:54:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065759 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 22/05/18 12:51:00 22/05/18 15:16:00 0:00:00 0:00:00 0:00:00 2:25:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065975 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 25/05/18 09:01:00 26/05/18 05:12:00 0:00:00 0:00:00 0:00:00 20:11:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066333 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 30/05/18 12:22:00 31/05/18 05:11:00 0:00:00 0:00:00 0:00:00 16:49:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065709 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 21/05/18 18:58:00 22/05/18 06:09:00 0:00:00 0:00:00 0:00:00 11:11:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066238 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 29/05/18 14:12:00 30/05/18 07:44:00 0:00:00 0:00:00 0:00:00 17:32:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065771 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 22/05/18 19:33:00 23/05/18 06:08:00 0:00:00 0:00:00 0:00:00 10:35:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066054 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 26/05/18 11:12:00 27/05/18 05:20:00 0:00:00 0:00:00 0:00:00 18:08:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066462 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 31/05/18 11:47:00 01/06/18 04:26:00 0:00:00 0:00:00 0:00:00 16:39:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065839 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 20/05/18 19:14:00 21/05/18 06:00:00 0:00:00 0:00:00 0:00:00 10:46:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066373 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 24/05/18 09:08:00 25/05/18 06:07:00 0:00:00 0:00:00 0:00:00 20:59:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
Total outage-ER Page 23
107000065859 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 05/05/18 14:53:00 06/05/18 00:41:00 0:00:00 0:00:00 0:00:00 9:48:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065863 HVDC- PUSAULI 330 MVAR BUS REACTOR-1 23/05/18 19:37:00 24/05/18 05:13:00 0:00:00 0:00:00 0:00:00 9:36:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 566:48:00
107000066374 JAMSHEDPUR ICT-3 24/05/18 09:29:00 24/05/18 13:43:00 0:00:00 0:00:00 0:00:00 4:14:00 SCSD S/D TAKEN FOR CSD TESTING WORK.
0:00:00 0:00:00 0:00:00 4:14:00
107000066491 JAMSHEDPUR-BUS REACTOR-1_3X16.67MVAR 30/05/18 11:32:00 30/05/18 17:29:00 5:57:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR MOG REPLACEMENT WORK.
5:57:00 0:00:00 0:00:00 0:00:00
107000066492 JAMSHEDPUR-BUS REACTOR-3 30/05/18 11:32:00 30/05/18 13:22:00 0:00:00 1:50:00 0:00:00 0:00:00 OMSU S/D TAKEN TO FACILITATE ISOLATION OF 50 MVAR B/R-1 AT JSR FOR MOG REPLACEMENT
WORK AT JSR
107000066493 JAMSHEDPUR-BUS REACTOR-3 30/05/18 17:25:00 30/05/18 17:29:00 0:00:00 0:04:00 0:00:00 0:00:00 OMSU S/D TAKEN TO FACILITATE THE CHARGING OF 50 MVAR B/R-1 AT JSR IN ITS PARALLEL
AFTER REPLACEMENT OF MOG OF 50 MVAR B/R-1.
0:00:00 1:54:00 0:00:00 0:00:00
107000065027 LAKHISARAI-ICT-2 09/05/18 08:34:00 09/05/18 18:27:00 9:53:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR AMP WORK.
9:53:00 0:00:00 0:00:00 0:00:00
107000064863 MUZAFFARPUR-125MVAR BUS REACTOR-1 01/05/18 19:42:00 02/05/18 08:54:00 0:00:00 0:00:00 0:00:00 13:12:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000064992 MUZAFFARPUR-125MVAR BUS REACTOR-1 04/05/18 19:40:00 09/05/18 06:48:00 0:00:00 0:00:00 0:00:00 107:08:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065033 MUZAFFARPUR-125MVAR BUS REACTOR-1 09/05/18 16:54:00 13/05/18 08:41:00 0:00:00 0:00:00 0:00:00 87:47:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065391 MUZAFFARPUR-125MVAR BUS REACTOR-1 15/05/18 14:55:00 20/05/18 01:36:00 0:00:00 0:00:00 0:00:00 106:41:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066034 MUZAFFARPUR-125MVAR BUS REACTOR-1 26/05/18 19:18:00 29/05/18 07:08:00 0:00:00 0:00:00 0:00:00 59:50:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066334 MUZAFFARPUR-125MVAR BUS REACTOR-1 30/05/18 19:48:00 31/05/18 05:31:00 0:00:00 0:00:00 0:00:00 9:43:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065840 MUZAFFARPUR-125MVAR BUS REACTOR-1 20/05/18 19:11:00 25/05/18 06:06:00 0:00:00 0:00:00 0:00:00 106:55:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065973 MUZAFFARPUR-125MVAR BUS REACTOR-1 25/05/18 19:09:00 26/05/18 05:31:00 0:00:00 0:00:00 0:00:00 10:22:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 501:38:00
107000065035 MUZAFFARPUR-125MVAR BUS REACTOR-2 09/05/18 19:05:00 13/05/18 08:42:00 0:00:00 0:00:00 0:00:00 85:37:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 24
107000064991 MUZAFFARPUR-125MVAR BUS REACTOR-2 04/05/18 19:00:00 09/05/18 06:55:00 0:00:00 0:00:00 0:00:00 107:55:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000064864 MUZAFFARPUR-125MVAR BUS REACTOR-2 01/05/18 19:43:00 02/05/18 08:49:00 0:00:00 0:00:00 0:00:00 13:06:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065395 MUZAFFARPUR-125MVAR BUS REACTOR-2 15/05/18 19:24:00 17/05/18 08:30:00 0:00:00 0:00:00 0:00:00 37:06:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065652 MUZAFFARPUR-125MVAR BUS REACTOR-2 17/05/18 19:02:00 20/05/18 01:30:00 0:00:00 0:00:00 0:00:00 54:28:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065841 MUZAFFARPUR-125MVAR BUS REACTOR-2 20/05/18 19:07:00 24/05/18 05:40:00 0:00:00 0:00:00 0:00:00 82:33:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000065913 MUZAFFARPUR-125MVAR BUS REACTOR-2 24/05/18 19:29:00 29/05/18 07:14:00 0:00:00 0:00:00 0:00:00 107:45:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
107000066335 MUZAFFARPUR-125MVAR BUS REACTOR-2 29/05/18 19:39:00 31/05/18 05:23:00 0:00:00 0:00:00 0:00:00 33:44:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 522:14:00
107000065185 MUZAFFARPUR-ICT-1 11/05/18 18:37:00 11/05/18 19:00:00 0:00:00 0:23:00 0:00:00 0:00:00 OMSUTRIPPED DUE TO OUTAGE OF 220 KV BUS-1 AT MUZ DUE TO OPN. OF LBB RELAY OF 220 KV MUZ
- HAJIPUR-1 CB AT MUZ END. OPN. OF LBB RELAY CAUSED DUE TO R-N FAULT IN THE SAID
CKT.(OF BSPTCL) AND STUCKING OF ITS CB POLE AT MUZ END (BSPTCL BAY).
0:00:00 0:23:00 0:00:00 0:00:00
107000065186 MUZAFFARPUR-ICT-2 11/05/18 18:37:00 11/05/18 19:02:00 0:00:00 0:25:00 0:00:00 0:00:00 OMSUTRIPPED DUE TO OUTAGE OF 220 KV BUS-1 AT MUZ DUE TO OPN. OF LBB RELAY OF 220 KV MUZ
- HAJIPUR-1 CB AT MUZ END. OPN. OF LBB RELAY CAUSED DUE TO R-N FAULT IN THE SAID
CKT.(OF BSPTCL) AND STUCKING OF ITS CB POLE AT MUZ END (BSPTCL BAY).
0:00:00 0:25:00 0:00:00 0:00:00
107000065299 MUZAFFARPUR-ICT-3 14/05/18 06:35:00 14/05/18 11:39:00 0:00:00 0:00:00 5:04:00 0:00:00 GOFC TRIPPED DUE TO OVERFLUX
0:00:00 0:00:00 5:04:00 0:00:00
107000065914 NEW PURNEA 125MVAR_BUS_REACTOR-2 24/05/18 19:51:00 30/05/18 00:35:00 0:00:00 0:00:00 0:00:00 124:44:00 SVRD SWITCH OFF FOR V/R AS PER ERLDC INSTRUCTION
0:00:00 0:00:00 0:00:00 124:44:00
107000066372 NEW RANCHI-AT-2 24/05/18 09:11:00 24/05/18 19:11:00 0:00:00 0:00:00 0:00:00 10:00:00 SCSD S/D TAKEN FOR STATCOM CONSTRUCTION WORKS.
0:00:00 0:00:00 0:00:00 10:00:00
107000066369 RANCHI-400KV 80MVAR_BUS_REACTOR-1 20/05/18 15:41:00 20/05/18 16:39:00 0:00:00 0:58:00 0:00:00 0:00:00 OMSUTRIPPED DUE TO TRIPPING OF 400KV RANCHI-RAGUNATHPUR-III. B/R WAS IN ITS DIA AND
MAIN BEAKER OF B/R WAS ALREADY OUT OF SERVICE DUE TO OUTAGE OF 400KV BUS-II AT
RANCHI
0:00:00 0:58:00 0:00:00 0:00:00
107000066371 RANCHI-ICT-1 23/05/18 14:32:00 23/05/18 16:15:00 1:43:00 0:00:00 0:00:00 0:00:00 OSPT S/D TAKEN FOR ATTENDING HOT SPOT IN ITS MAIN BAY ISOLATOR (CT SIDE
CONTANTACT) AT RANCHI.
1:43:00 0:00:00 0:00:00 0:00:00
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Total outage-ER Page 25
107000066419 RANCHI-ICT-2 08/05/18 09:36:00 08/05/18 10:24:00 0:00:00 0:48:00 0:00:00 0:00:00 OMSU S/D TAKEN TO ISOLATE ITS TERTIARY FOR INSULATION WRAPPING.
107000066124 RANCHI-ICT-2 27/05/18 23:07:00 28/05/18 14:35:00 0:00:00 0:00:00 15:28:00 0:00:00 LNCC TRIPPED DUE TO BUCHHOLZ RELAY.TRIPPED DUE TO MALOPERATION OF BUCHHOLZ RELAY
CAUSED BY INGRESS OF WATERIN ITS TERMINAL BOX DURING HEAVY RAIN
107000066421 RANCHI-ICT-2 08/05/18 13:24:00 08/05/18 15:26:00 0:00:00 2:02:00 0:00:00 0:00:00 OMSU S/D TAKEN FOR CONNECTING ITS TERTIARY AFTER INSULATION WRAPPING.
0:00:00 2:50:00 15:28:00 0:00:00TOTAL
Total outage-ER Page 26