ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
A. Background Information
ECC Control No./ Reference Code
No.
: 0608 – 008 – 2150
Date ECC Issued : March 10, 2008 and amended on September 08, 2008
Project Current Name : Dinagat Islands Chromite and Nickel Mining Project
Project Name in the ECC : Dinagat Islands Chromite and Nickel Mining Project
Project Location : Bel-at, Bgry. Esperanza, Loreto, Dinagat Islands
Area Covered : 648 has.
Project Geographical
Coordinates
: TECHNICAL DESCRIPTION
CORNER LATITUDE
(y)
LONGITUDE (x)
1 10˚ 24’ 00” 125˚ 38’ 30”
2 10˚ 24’ 00” 125˚ 40’ 00”
3 10˚ 23’ 30” 125˚ 40’ 00”
4 10˚ 22’ 30” 125˚ 39’ 30”
5 10˚ 22’ 30” 125˚ 38’ 30”
Proponent Name
:
Oriental Synergy Mining Corporation (OSMC)
Proponent Contact
Person/Position
: Mr. Wu Qi Chang – Project Manager
Proponent Mailing Address : Borromeo St. Corner San Nicolas Street, Surigao
City
Proponent Telephone No./Fax No. : 086 – 826 – 5215
Proponent Email Address : [email protected] / [email protected]
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
HISTORICAL BACKGROUND OF OSMC MINING OPERATION
CHRONOLOGICAL ORDER
1. Mobilization of construction equipment and materials started at the end of first quarter of
2008
2. Construction of two (02) Underground tunnel and Facilities started second quarter of 2008.
3. Initial production of Chromite both Sandy/lumpy ores started last quarter of 2008, we
produced 38,821 kgs.
4. Year 2009 we were able to produce 213,964 kgs of Chromite both Sandy/lumpy ores.
5. Year 2010 to 2012 average year production was 173,685.33 kgs.
6. At the same year, first quarter of 2010 open pit mining for high iron limonite ore was
developed, with the initial production of 98,000 WMT. On the following year 2011, we
produced 176,620 WMT.
7. Operation of Chromite ore was suspended June 2016 due the overlapping of boundaries
between OSMC and AMPHIL.
8. Over all high iron ore production and sold to china was 1,857,349.75 WMT
9. Effective February 16, 2015, OSMC Top Management sent a letter of Temporary Cessation
to MGB-13, EMB-13 and other Stakeholder due to the low market price of high iron ore.
10. Due to the Temporary Cessation status, we are now utilizing Care and Maintenance Program
for the Envi. Department.
B. Photographs
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
x
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
C. Permits and Clearances
Date Issued Permit / Clearance Status (Date of Expiry)
March 8, 2008 ECC Valid and Existing
April 20, 2015
April 20, 2015
April 20, 2015
April 20, 2015
April 20, 2015
Wastewater Discharge Permits:
2015-WDP-D-1367-142
2015-WDP-D-1367-143
2015-WDP-D-1367-144
2015-WDP-D-1367-145
2015-WDP-D-1367-146
April 20, 2020 April 20, 2020 April 20, 2020 April 20, 2020 April 20, 2020
April 19, 2016
April 19, 2016
April 19, 2016
April 19, 2016
April 19, 2016
Permit to Operate (EMB):
2016-POA-D-1367-024
2016-POA-D-1367-025
2016-POA-D-1367-026
2016-POA-D-1367-027
2016-POA-D-1367-028
April 19, 2021
April 19, 2021
April 19, 2021
April 19, 2021
April 19, 2021
March 3, 2016
March 3, 2016
March 3, 2016
March 3, 2016
Permit to Operate (MGB):
CEI-2016-03-002
ICE2016-03
ICE2016-04
ICE2016-05
February 22, 2017
February 22, 2017
February 22, 2017
February 22, 2017
August 29, 2008 DENR ID No. 16-67-0072 Valid and Existing
D. Environmental Performance
Date Activity Summary of Findings/Commitment
Oct. 17-19, 2012 MMT Inspection 1. S
ome existing settling ponds did not maintain
one (1) meter freeboard.
2. T
he settling pond #1 & #3 were de-silted except
settling pond #2.
3. S
ilt collector #4 located near the Bel-at creek is
insufficient to cater the run off of water coming
from haul road.
4. G
arbage thrown at the compost pits was not
properly segregated.
5. P
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
ropagation of endemic species at Nursery #1.
Nursery #2 has no information board.
May 29-31, 2016 MMT Inspection 1. C
ompany shall undertake improvement of
established safety berm at portion of the haul
road.
2. P
roper maintenance of planted trees.
3. C
onstruct series of collector sump at disturbed
area downstream of the Company outpost.
4. I
ncrease capacity volume of the constructed
series of SP at the road four area and install
culvert.
5. P
rovide at least five (5) additional manpower to
maintain the nursery and to undertake tree
planting activities.
6. I
mprove motor pool area and ensure that
spillages will be drained to oil and water
separator.
7. T
ransfer used batteries in a designated storage
area.
8. E
nsure that segregated waste will be thrown to
the designated pit.
9. C
oordinate with the other companies and ensure
that mitigating measure for Bel-at creek
turbidity be minimize.
August 6-9, 2013 MMT Inspection 1. C
ompany identified portion of the block 5 and 6
with approximate of 27 hectare no longer viable
for mining saprolite as confirmed by grade
control officer. Likewise, portion of this area
was initially rehabilitated/reforested.
2. H
igh mortality rate of the planted areas at the top
ridge portion of Block 2, 4 and 6 was observed.
Planted trees also along access road going to
Bel-at creek showed lack of proper
maintenance.
3. C
ontinuous scraping of un-inventoried trees in all
disturbed areas.
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
4. A
dditional series of settling pond is constructed at
the left side if Causeway which perceived that
will be destroyed by wave actions during
“Amihan”.
5. S
tockpile was observed at the right side of the
Causeway area without establishing drainage
system. Construction silt sump is not sufficient
to accommodate the run off in the area.
Oct. 8-10, 2014 MMT Inspection 1. P
oor compliance to the stipulated FMRDF annual
cash provision.
2. N
o approved FMRDP & 5 years plan AEPEP.
(Interim Annual EPEP)
3. N
o landmark signage to identify location T Mine
site & Stockpile.
4. N
o drainage canal at crest upper portion of Road
5 & no proper benching were observed.
5. G
arbage bins and water containers are left
uncovered.
May 6-8, 2015 MMT Inspection 1. S
tored at used oil storage facility: 8 pcs wet cell
batteries, 2 sacks assorted used oil & fuel filters
and 72 drums of used oil as of March 2015.
2. U
navailability of health care worker in the
company.
3. I
nstallation of Solid waste bins with label and
cover was observed by the MMT during the
actual monitoring. However in terms of disposal
of solid waste, particularly residual wastes, a
controlled dumping practiced with minimal
mixed solid wastes disposed therein was
likewise observed by the MMT near the Motor
Pool area.
4. S
ettling pond No. 4E at block 1 was observed
discharging as such effluent will gradually flows
towards the Bel-at creek and will goes out to the
sea coast. Thus the MMT conducted the water
sampling to verify water quality standard.
5. S
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
everal used tires observed openly near the
stockyard 1, hence no proper storage.
6. T
he company established oil and water separator
located within the motor pool area. Used
batteries and drums of used oil were likewise
observed within the motor pool, however no
proper storage facility was noted by the MMT.
August 3-5, 2015 MMT Inspection 1. A
well-managed trash bins and collection point
for solid wastes were observed within the Mine
Camp Site, Bel-at area, however, the company
do not strictly practice segregation of solid
wastes.
2. T
otal of 76.66 drums of used oil stored in drums
were observed at the Hazardous waste storage
facility located at the Mine Camp Site.
3. N
ewly established settling ponds arranged in
series at the Bel-at area do not have Discharge
Permit.
4. S
ettling pond 4A, 4B, 4C, 4D, 4E and the newly
established settling ponds in series were
observed discharging, which will flow directly
towards the Bel-at Creek and goes out the sea.
Hence, the MMT conducted water sampling on
both ponds to verify the standards.
5. I
t was also noted that the company not yet
conducted air sampling.
6. N
o Sanitary Permit and Health Certification.
Nov. 23-25,2015 MMT Inspection None
May 30-June 1,
2016
MMT Inspection 1. S
tripped materials during the construction of access
road at Settling Ponds 5A to 5E observed
alongside the creek.
2. T
races of water seepage observed in the Settling
Pond 5A.
E. Notice of Violation
Date NOV issued Detail of Violation Action Taken Status of the NOV
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
F. Other Environmental Activities/endeavor undertaken such as Adopt-Estero Program, NGP, etc.
1. October 14-16, 2014 – Reforestation Maintenance (NGP, Linao Area)
2. June 20, 2015 – Coastal and Creek Clean-up (Adopt-A-Estero/River/Creek Program)
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
3. Nov.-Dec. 2015 – Tree planting (Bel-at Mine Site)
ORIENTAL SYNERGY MINING CORPORATION Chromite / Nickel Project
Mine site : Esperanza, Loreto, Dinagat Islands
Liaison Office : 03419 Borromeo St., Brgy. Taft, Surigao City
Head Office : 116 C-3 Road,Corner 6th
St.,Brgy.123,Grace Park,Caloocan City
________________________________________________________________________________________________
4. February 2016 – Reforestation Maintenance (NGP, Linao Area)