LEBANON: LRA LEBANON: LRA –– IRWA IRWA COCO-- ORDINATION MODALITIES ORDINATION MODALITIES
ORGANIGRAM
1. Tender procedure for Khirbit Khanafar ServiceCenter
2. Tender procedures for rehabilitation works onthe river
3. Follow-up on site for construction of ServiceCenter
4. Follow-up on site for rehabilitation works on theriver
5. Report all the activities to Local Committee
1. Research and analysis of social and economical data of the targetvillages
2. Research and analysis of agricultural data for the target area
3. Identifying proper PPIs for IRWA goals
4. Set-up of Field Surveies linked with identified PPIs
5. Execution of periodical Field surveies
6. Set-up the Demonstration Plot and lab in the service Center
7. Report all the activities to Local Committee
1. Organization and implementation of training sessions for LRApersonnel on:a. Communication skillsb. Management skillsc. Technical skills
2. Organization and implementation of training courses forBekaa farmers on issues described in the Project Document.
3. Organization of seminars, workshops etc.
4. Follow-up of the Demonstration Plot and lab that will beestablished in the Service Center.
5. Organization of an efficient Extension Service for the Bekaafarmers.
6. Report all the activities to Local Committee
Andre' ZoueinCivil Engineer
Ali Naser DinTechnician
Antoine NojaimTechnician
CONSTRUCTION GROUPService Center and River rehabilitation
Coordinator: Francesco Amigoni
Hiba YounesAgr. Engineer
Chadi SaydeAgr. Engineer
STUDIES AND ASSESSMENT GROUPEconomical, social and agriculture data in the target region
Coordinator: Berthe Youakim and Nassim Abou Hamad
TRAINING AND EXTENSION GROUPTraining and capacity building activities
Coordinator: Elie Rejaili and Nassim Abou Hamad
IRWALOCAL COMMITTEE
Kamal Karaa, Emilio Maiandi + Coordinators of the Groups
TARGET REGION: LITANI RIVER TARGET REGION: LITANI RIVER BASIN IN CENTRAL BEKAA VALLEYBASIN IN CENTRAL BEKAA VALLEY
Damascus roadDamascus roadLitani riverLitani river
Khirbet Kanafar Service CenterKhirbet Kanafar Service Center
Qaraaoun lakeQaraaoun lake
KHIRBET KANAFAR SERVICE CENTERKHIRBET KANAFAR SERVICE CENTER
Main Objectives of Khirbet-Kanafar Service Center:
- Provide an efficient Extension Service for the farmers of the region through the Extension Agents who will have their offices in the Center;
- Coordinate with the agricultural institutions and firms in order to test the irrigation material for a better advice to the users ;
- Collect climatic data in order to help the farmer knowing the irrigation calendar and the use of a preventive frost control system ;
- Execute studies to calculate crop water use;- Test irrigation material and adopting a common strategy for water
management;- Study the agricultural problems in the high humidity region;- Test new varieties before releasing them to the farmers;- Collaborate with the agricultural faculties and schools in order to involve the
students particularly on irrigated crops and irrigation methods;
KhirbetKhirbet KanafarKanafar Service Center Service Center overall layoverall lay--outout
Administration -Offices
Administration -Offices
Guard HouseGuard House
LaboratoryLaboratory
Truck parking -Warehouse
Truck parking -Warehouse
Demonstration plotDemonstration plot
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributaries and its tributaries
The intervention StrategyThe intervention Strategy
Flood ZoneFlood Zone
Phase 1a) Assessment on the river at 17 observation and measurement points
(Evaluation Form)
Khirbet Kanafar Service CenterKhirbet Kanafar Service Center
Observation pointObservation point
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributariesand its tributaries
The intervention StrategyThe intervention Strategy
b) Identify the most critical points on the river that require an urgent intervention through the following criteria:Status of the banks;Status of the riverbed;Presence of dams or barriers (natural or artificial) in the river; Presence of cultivated land and irrigation network on the river banks;Presence of farms close to the river;Presence of garbage disposal in the areaEtc.
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributariesand its tributaries
The intervention StrategyThe intervention StrategyCritical points identifiedCritical points identified
For each critical point we have associated one or more of the following intervention plans:
-Gabions
-Mattresses
-Geocomposite
Example: Critical point Example: Critical point -- CG1CG1
CG1CG1
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributariesand its tributaries
Interventions PlansInterventions Plans
1. Gabions1. Gabions
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributaries and its tributaries
Interventions PlansInterventions Plans
2. Mattresses2. Mattresses
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributaries and its tributaries
Interventions PlansInterventions Plans
3. Geo3. Geo--compositecomposite
Rehabilitation of the Rehabilitation of the LitaniLitani River River and its tributaries
Phase 21. Topographical assessment
2. Potential flood study3. Artificial bank extension to increase water flow and to prevent
flooding
and its tributaries
G.I.S. DATA BASE
STUDIES AND ASSESSMENT GROUPSTUDIES AND ASSESSMENT GROUPOBJECTIVESOBJECTIVES
1. Agricultural and socio-economic data in the target region improved
2. Definition of the Project Performance Indicators for the socio-agro-
economic development of the beneficiaries
3. Support the activities (scientific and statistics) of the Khirbet Kanafar
Service Center
4. Campaigns to increase the Awareness of the beneficiaries on river
management (water management, environmental aspects, crops etc.)
5. Facilitate the exchange of information in the region
1. Group and organize the socio-economic data already existing and directly related to the problem of irrigation water management through several resources:
LRA (Litani River Authority)
Ministry of Agriculture
Ministry of Environment
Ministry of Hydraulic and Electrical Resources
FAO
ESCWA (Economic and Social Committee for Western Asia)
Chambre de commerce d’industrie et d’agriculture de Zahle
Saint Joseph University
Lebanese Agricultural Research Institute
National Center for Remote Sensing
National Council For Scientific Research,
Agricultural cooperatives and municipalities
STUDIES AND ASSESSMENT GROUPSTUDIES AND ASSESSMENT GROUPACTIVITIESACTIVITIES
2. Identify the needs of the project beneficiaries in the region. According to the on-field investigations, two types of surveys will be implemented:
Survey 1
Objective: Study the actual socio-agro-economic status of the farmers in relation to the river inundation and the potential benefit from River Rehabilitation works.
Survey 2
Objective: Evaluate the know-how of the farmers and the impact of the Service Center activities on the agricultural operation in the project areaTarget: Determined number of farmers in the project area for further follow-up
STUDIES AND ASSESSMENT GROUPSTUDIES AND ASSESSMENT GROUPACTIVITIESACTIVITIES
EM1
Slide 16
EM1 Studies and Assessment group is actually studying some examples of questionnaires already made in Bekaa region: a. At the level of farmers in the first phase:- Appel à l’irrigation- LRA, - Diagnostic du fonctionnement d’une installation de couverture intégrale en petits arroseurs- Cemagref- Jabbouleh Project (Northen Bekaa)- Provision of technology transfer and extension for major irrigation schemes- Dr Marwan Owaygen.b. At the level of municipalities / mayors and farmers in the second phase:- Cadres-World Bank, - Study on the common environmental directives to protect the Nahr el Kabir Basin Syria and Lebanon.Emilio Maiandi; 11/06/2004
STUDIES AND ASSESSMENT GROUPSTUDIES AND ASSESSMENT GROUPACTIVITIES
be ready, meetings will be held with the extension agents in order to define the best procedure of intervention within the communities.Data entry with the possibility to produce digitalized mapsMonitor the survey & Analyze data: Involvement of institutions or universities able to conduct scientific tutoring for the survey and how specific topics could be studied within the thesis preparation of some university students.Updating measures: Study the methodology to have updated figures throughout the project duration.
ACTIVITIES1. Training of the extension agents on good communication tools: when the questionnaire will
2.3. a
4.
5. Results and Recommendations: Final reports will be prepared in order to orient the agricultural training and extension activities.
6. Definition and follow-up of the socio economic Project Performance Indicators 7. Support the scientific activities of the Service Center, especially for the Demonstration Plot,
the Climatic Station and the Lab activities (soil and water analysis)8. Set-up and implementation of awareness campaigns: the people of the region must
understand the “role” of the river as a friend, and not as something that could be violated.9. Regional Sharing of information: IRWA website, annual regional workshop, participation in
conferences and initiatives on water issues etc.
TRAINING AND EXTENSION GROUP: TRAINING AND EXTENSION GROUP: OBJECTIVESOBJECTIVES
1. Train the personnel hired by LRA (5 Agricultural Engineers, 12 Extension Agents, 2 Lab Technicians, 3 Specialized Drivers, 4 Others)
2. Increase the skills of the farmers on irrigation water issues 3. Organize and follow-up the extension activities in the target region4. Follow-up the establishment and functioning of the Demonstration Plot 5. Improve the cooperation at regional level (NGOs, Water Authorities, Local
Authorities, Universities etc.)
COMMUNICATION &
MANAGEMENTTECHNICAL TRAINING EXTENSION TRAINING
TRAINING AND EXTENSION GROUP: TRAINING AND EXTENSION GROUP:
1. COMMUNICATION & MANAGEMENT TRAINING:CommunicationEffective PresentationWritten CommunicationDaily PlanningProblem SolvingTesting, Training and Developing your staff
2. TECHNICAL TRAINING:
ACTIVITIESACTIVITIES
Irrigation network design and techniquesLaboratory (Water and Soil Analysis)Use of G.I.S. in water management River maintenanceAgronomic topics (phyto-sanitary, crop requirements, fertigation etc.)
in extension (demonstration plots, Farmers’
3. EXTENSION TRAINING:Fundamentals of Irrigation and Agricultural ExtensionResearch methodology FieldSchools)Extension TechniquesParticipatory Extension MethodsSupervision in Extension and Human resource development
TRAINING AND EXTENSION GROUP: TRAINING AND EXTENSION GROUP: ACTIVITIESACTIVITIES
SITUATION ON GHEZAYELSITUATION ON GHEZAYEL
SITUATION ON LITANI BANKSSITUATION ON LITANI BANKS
Thank you for your attention !Thank you for your attention !
www.irwaproject.comwww.irwaproject.comwww.irwaproject.com
LEBANON: LRA – IRWA CO- ORDINATION MODALITIESTARGET REGION: LITANI RIVER BASIN IN CENTRAL BEKAA VALLEYKHIRBET KANAFAR SERVICE CENTERKhirbet Kanafar Service Center overall lay-outRehabilitation of the Litani River and its tributaries The intervention StrategyExample: Critical point - CG1CG11. Gabions2. Mattresses3. Geo-compositeSTUDIES AND ASSESSMENT GROUPOBJECTIVESTRAINING AND EXTENSION GROUP: OBJECTIVESTRAINING AND EXTENSION GROUP: ACTIVITIESTRAINING AND EXTENSION GROUP: ACTIVITIESSITUATION ON GHEZAYELSITUATION ON LITANI BANKSThank you for your attention !