© 2009 Bentley Systems, Incorporated OPTRAM Looking into the Future

Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

OP

TR

AM

Looking into the Future

Page 2: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

2 | WWW.BENTLEY.COM

Universal Truisms of Rail

Too much of: Not Enough of:

Infrastructure Problems Maintenance Budget

Page 3: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

3 | WWW.BENTLEY.COM

Highest Priority Issues

How Do You:

1) Know where to work

2) Know what work to do

3) Prioritize work

4) Monitor work progress, costing and material

5) Extend asset life whilst avoiding run to fail

6) Demonstrate competence to operate

7) Improve safety, reliability and Return on Investment

Page 4: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

4 | WWW.BENTLEY.COM

IntegrationInterpret

Optram

AnalyzeCollect

Condition

Work

Inspection

Equipment Location & Video

Usage

Finance

Disseminate

Workstation

Reporting

Web (Java)

Handheld/ Tablet

3rd party software:EAM, Google, GIS, Etc.

Page 5: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

5 | WWW.BENTLEY.COM

Vizualization

• Enterprise or departmental solution• Present decision support information• Unified view of infrastructure data such as:

− Track layout

− Asset information

− Corridor assets

− Work items

− Condition data

Page 6: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

6 | WWW.BENTLEY.COM

Sample Optram Screen

Track Layout

Designed & Measured

Curve

Work History

Defect History

Geometry History

Mile/KM Post

Roughness History

Page 7: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

7| W

WW

.BE

NT

LEY

.CO

M

Rail G

eometry

Page 8: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

8 | WWW.BENTLEY.COM

Track Geometry with Roughness and OLE

Page 9: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

9| W

WW

.BE

NT

LEY

.CO

M

Image P

lot

Page 10: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

10 | WWW.BENTLEY.COM

Video Synchronisation

Page 11: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

11 | WWW.BENTLEY.COM

Links to Documents and Drawings

Page 12: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

12 | WWW.BENTLEY.COM

Looking into the FutureAnalysis and Forecasting

• Prioritize and plan work

• Identify areas of rapid deterioration or instable condition

• Evaluate work effectiveness

• Calculate quantitative measures of condition

• Do preventive maintenance by predicting failures

• Plan quarterly/monthly instead of annually

• Forecast when conditions will go out of tolerance

An analytic engine built to automatically turn large amounts of railway data into prioritized actions like:

Page 13: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

13 | WWW.BENTLEY.COM

InsightOrganized & Correlated Data

OptramScripts

Optram Analysis and Forecasting

UnifiedDatabase

Visualization and

ReportingCondition

Work

Inspection

Assets

Usage

Finance

Optram

Page 14: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

14 | WWW.BENTLEY.COM

Measurement Alignment

• Automatic

Page 15: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

15 | WWW.BENTLEY.COM

Measurement Thresholds

• Create event list based on threshold values in measurement data

• Output – event data

Threshold Event

56

56.2

56.4 56.6

56.8

57

57.2

57.4 57.6

57.8

58

0 2 4 6 8 10 12 14 16

Page 16: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

16 | WWW.BENTLEY.COM

Track Tolerance

• Use look up tables for defect thresholds for different track types

• Tables held in database

• Works on event sets

If track type = Class 1 then Gauge Threshold >57.6

If track type = Class 2 then Gauge Threshold >57.2

If track type = Class 3 then Gauge Threshold >56.8

……

Page 17: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

17| W

WW

.BE

NT

LEY

.CO

M

Scrip

t Co

mm

and

s

Page 18: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

18 | WWW.BENTLEY.COM

Example: Forecast Tamping

• Forecasts where and when tamping required

• Optram automates 4 steps:– Aligns track measurements – Calculates historic quality indexes every 100m– Extrapolates when tamping is required– Presents results graphically

• Makes prediction over large railways practical

Page 19: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

19 | WWW.BENTLEY.COM

Aligns Track Measurements

Page 20: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

20| W

WW

.BE

NT

LEY

.CO

M

Tren

d V

isualizatio

n

Tamping HistoryTamping History

Last Measuremen

t

Last Measuremen

t

Recommend Tamping

Recommend Tamping

Page 21: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

21 | WWW.BENTLEY.COM

Forecast VisualizationHistoric

Forecast

Tamping History

Tamping History

Last Measuremen

t

Last Measuremen

t

Recommend Tamping

Recommend Tamping

Red = FixGreen = OK

Red = FixGreen = OK

Page 22: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

22 | WWW.BENTLEY.COM

Example: Work Analysis

• Analyzes where tamping work was effective

• Optram automates 4 steps:– Aligns track measurements – Calculate a Track Quality Index for each survey– Determine where Track Quality improved– Compare improved Quality locations with recorded work

• Summarizes amount of– Productive and unproductive work– Unreported work

Page 23: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

23 | WWW.BENTLEY.COM

Optram Aligns Track Measurements

Page 24: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

24 | WWW.BENTLEY.COM

Optram Forecast Visualization

Improved TQI

Improved TQI

No change in TQI

No change in TQI

No change in TQI

No change in TQI

Improved TQI

Improved TQI

Recorded work

Recorded work

Page 25: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

25 | WWW.BENTLEY.COM

Optram Work Analysis Visualization

Recorded Work

Recorded Work

Unproductive work

Unproductive work

Productive work

Productive work

Change in Track Quality

Change in Track Quality

Page 26: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

26 | WWW.BENTLEY.COM

Other Example Scripts Available

• Data Correlation

• Segmentation Creation

• Segmentation Analysis

• Quality Calculation

• Rate of Change

• Prediction

• Alert Limits

• Channel Derivation

• Channel Filtering

Plus whatever the user wants to write

Page 27: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

©20

09 B

entle

y S

yste

ms,

Inco

rpor

ated

27 | WWW.BENTLEY.COM

Look into FutureDevelopment Roadmap

• Field Data System

• Linking to GIS

• Data upload from Bentley Rail design products

• Display and edit survey routes

• Integration with Bentley Platform

Page 28: Optram - Looking Into the Future - bentleyuser.dk · Looking into the Future Analysis and Forecasting • Prioritize and plan work • Identify areas of rapid deterioration or instable

© 2009 Bentley Systems, Incorporated

OP

TR

AM

Looking into the Future