28
Presented by © Copyright 2013 OSIsoft, LLC. Optimal real-time data treatment and displaying in power system operation in Spain Alberto Gil

Optimal real time data treatment and displaying in power

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Optimal real time data treatment and displaying in power

Presented by

© Copyr i gh t 2013 OSIso f t , LLC.

Optimal real-time data

treatment and displaying

in power system operation

in Spain

Alberto Gil

Page 2: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 2

INDEX

1

2

3

4 Conclusions

CECRE: Control Centre for Renewable energies

Necessity of Real-time Data in System Operation

Introduction

Page 3: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 3

Introduction

Page 4: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 4

INTRODUCTION: WHO IS RED ELÉCTRICA?

Red Eléctrica de España (REE) is the Spanish transmission system

operator (TSO)

System Operation:

Operate the grid & coordinates its uses with the generation facilities in order to ensure the

security and continuity of the electricity supply.

Transmission (Since 2007 as exclusive transmission company):

The development and the maintenance of the transmission facilities

Provide maximum service reliability

~ 41,000 km of lines and 78,000 MW of transforming capacity

Page 5: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC.

Hydro-power17.31% Thermical Renewable

0.64% CHP &Other RE7.26%

Combined cycles24.96%

Coal10.75%

Fuel-Gas0.51%

Nuclear7.58%

Wind22.59%

Solar PV4.32%

Solar CSP2.05%

Special regime hydro2.04%

5

Technology MW %

Combined cycles 24947 25.0

Hydro-power 17303 17.3

Coal 10740 10.7

Nuclear 7572 7.6

Fuel-Gas 506 0.5

Total (ordinary regime) 61068 61.1

Wind 22573 22.6

CHP &Other RE 7252 7.3

Solar PV 4313 4.3

Special regime hydro 2039 2.0

Solar CSP 2050 2.1

Thermical Renewable 639 0.6

Total (special regime) 38866 38.9

Total 99934

INTRODUCTION: INSTALLED CAPACITY AUGUST 2013

Page 6: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 6

DEMAND SUPPLY 2013 (FROM 01/01/2013 TO 01/07/2013)

Coal, 8%

Coal national (RD 134/2010), 2%

Combined cycle, 8%

Fuel-Gas, 0%

Nuclear, 22%

Small Hydro, 3%

Hydro-power, 17% Solar CSP, 1%

Solar PV, 3%

Wind, 24%

Thermical Renewable, 2% CHP &Other RE, 14%

∑ Energy without emissions CO 2 ≈ 72% ∑ Renewable Energy ≈ 50%

Page 7: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 7

INTRODUCTION REE demands a constant flow of Real-time Data, such as:

System Frequency

Active & Reactive power of generation units (more than 2.800 units, most of them belonging to the Special Regime –Renewable Energies- and distributed all around Spain)

Voltage values of Transmission Network

Active & Reactive Power Flow values through the Transmission Lines

The complex nature of this process implies the availability of high capacity telecommunications and computerized systems which display the information received in real time from all the facilities and participants of the electrical system.

This requires of REE’s control system, the management of more than 220.000 variables (90.000 analogue and 130.000 digital) at intervals of 4, 8 and 12 seconds and the ability to issue remote control instructions through 40.000 signals.

Page 8: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 8

INTRODUCTION All this information must be easily available in order to help the system operator to

make optimal decisions, hence the interest of REE in data management.

System Operator retrieves all this data through the SCADA System. Which provide a

sufficient graphical representation.

However a more complex both real time and historical data treatment and graphical

representation, requires other specific tools.

PI DataLink provides an easy way to retrieve to Real-time and Historical Data using a friendly interface via Excel

For the time being, Spanish TSO, retrieve through PI DataLink only 12.454 tele-measurements, most of then related with Renewable Energies and involved in automatic processes.

Page 9: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 9

Necessity of Real-time Data in System Operation

Demand Coverage

Page 10: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 10

CCREn CCRE1

System Operator

CECOEL

CCCONV

CECRE

Generation must adapt to demand in each moment

Continuous manageable generation actions are needed in order to maintain system

equilibrium

CECRE

CECORE

DEMAND COVERAGE

Page 11: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 11

DEMAND COVERAGE The PI System allows System Operator to retrieve a huge amount of Real-time

and historical Data instantaneously using a friendly Excel interface.

Wind Generation in year 2011 (II) Maximum coverage 2012 (24/09/2012): 64% wind production = 13285 MW

Minimum coverage 2011(11/09/2012): <1% wind production = 81 MW

Page 12: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 12

DEMAND COVERAGE Solar Photovoltaic and Solar CSP production

CSP power plants:

Page 13: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 13

Necessity of Real-time Data in System Operation

Voltage Control

Page 14: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 14

Parameter that determines system quality.

Conventional generation, through reactive power injection/absorption, play an

essential roll in continuous system voltage control at the substation level.

Nowadays, RES generators only maintain power factor.

System Operator require Real Time Voltage Data from both renewable and ordinary

production to supervise voltage profile.

The PI System allows System Operator to retrieve this information

instantaneously, and its subsequent graphical representation.

VOLTAGE CONTROL

Page 15: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 15

Page 16: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 16

Necessity of Real Time Data in System Operation

Graphical Representations

Page 17: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 17

GRAPHICAL REPRESENTATIONS Graphical representations help System Operator Dispatchers to take optimal decisions.

Some examples of graphical representation using PI DataLink:

Calculated voltage dip surface after the

simulation of a three-phase dead fault in a

400 kV substation

Diary Area consumption Variation

Page 18: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 18

GRAPHICAL REPRESENTATIONS

Real Time Wind

Production

(09/08/2013 9:45 h)

Real Time SP

Production

(09/08/2013 9:45 h)

Page 19: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 19

Necessity of Historical Data in System Operation

Operational Reports

Page 20: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 20

OPERATIONAL REPORTS REE is requested to elaborate reports in order to analyze System Operation in the past.

Combining PI DataLink with Excel and Visual Basic programming is possible to generate daily

reports automatically.

Page 21: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 21

CECRE: Control Centre for Renewable energies

Page 22: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 22

CONTROL CENTRE FOR RENEWABLE ENERGIES (CECRE) Target: achieve a greater level of integration for renewable energy sources without

compromising system security

Main function: Organise special regime electric production according to the needs of

the electric system.

Page 23: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC.

CCREn

23

System Operator

CECOEL CECORE

CCCONV

Enlaces ICCP Enlaces ICCP Enlaces ICCP

CECRE CECRE

Generators are dispersed and belong to

different companies with different

operation policies.

Communication is needed in case of

emergency, outages or maintenance of

the transmission or distribution assets.

CECRE communicates to 31 Control

Centres which aggregate more than 3

000 generation units

According to RD1065/2010,

aggregations larger than 10 MW must be

linked to CECRE

CECRE: FUNCTIONAL SCHEME

CCRE1

Page 24: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 24

CECRE

GEMAS

Set points

Real-time measurements

CCRE1 CCRE1

CECRE analysis in real time the maximum wind generation supported by the system.

If curtailments are needed, wind generation set-points are calculated and sent.

Wind farms must adapt their production to the given set-point within 15 minutes.

Presently only done for wind generation, but a similar methodology can also be applied for all renewable energy

sources

20 minutes calculation frequency

GEMAS: Analysis in real time the maximum wind generation supported by the system.

CHECKING THE SECURITY WITH THE REAL-TIME WIND SCENARIO

Page 25: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 25

Conclusions

Page 26: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC. 26

CONCLUSIONS

System Operation demands a constant flow of Real-time Data.

Continuously, REE’s computational systems must be able to manage thousands

of variables at different time periods, issuing more than 40.000 signals as

remote control instructions.

In many cases, it’s necessary a complex real time data treatment and graphical

representation.

OSIsoft PI DataLink is powerful tool able to retrieve both Real-time Data and

Historical records easily, allowing Spanish TSO an Optimal real-time data

treatment and graphical displaying.

Page 27: Optimal real time data treatment and displaying in power

© Copyr i gh t 2013 OSIso f t , LLC.

Please don’t forget to……

27

Complete the Online Survey

for this session Share what you saw with

friends on Twitter, Facebook

or Linkedin!

Eventmobi.com/emeauc13

#UC2013

Page 28: Optimal real time data treatment and displaying in power

Brought to you by

© Copyr i gh t 2013 OSIso f t , LLC.