27
OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013

OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Embed Size (px)

Citation preview

Page 1: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013

Page 2: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

BULGARIAN PORTS INFRASTRUCTURE CO.

Kuzman GenovICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of BulRIS Project

RIS Workshop Danube CommissionApril 11, 2011

Budapest

Page 3: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Agenda: Project Overview System Components

Tracking & Tracing Voice VHF Communication System ERI Data Gateway Notices to Skippers

Communication Infrastructure AIS and VHF Network Layout & Design Construction Works What next ? - Phase II and III

Page 4: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Project duration 18 Months Start: May 2010 End: November 2011

Contracting Authority: Bulgarian Ports Infrastructure Co.

Budget 5.6 Mil €

Project is co-funded by EFRD - Operational Program on Transport 2007 – 2013

Project overview - General

Page 5: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Project Overview - Project Goals

To establish the required base infrastructure for RIS operation on the Bulgarian part of Danube

Communication infrastructure Tracking and tracing (AIS) infrastructure Voice VHF Communication System ERI Data Gateway Notices to Skippers

To apply DIRECTIVE 2005/44/EC of the European Parliament and of the Council

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 6: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Task 1: Inception report and planing (completed) Task 2: System design (completed)

Task 3: Construction (in progress) Task 3: Software development (completed) Task 4: System installation (in progress) Task 5: System integration (Q2-Q3’2011) Task 6: Testing and training (Q3-Q4’2011) Task 7: Migration to real life operation

(Q4’2011)

Project Overview – Implementation Schedule

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 7: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRISSystem Components - Tracking and Tracing

AIS based system8 sitesExchange of actual, safety related information

between ships and shoreClient – Server architectureWeb interfaceFunctions:

Provision of a TTI/STIProvision of traffic management or

fairway information servicesWeb access for logistic users

Page 8: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

System Components - Tracking and Tracing

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 9: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

dGPS trough AIS network

Improves the accuracy of the vessel positioning

Functions:

Correction of GPS positioning

Compliant with international recommendations

Tracking and Tracing - Additional AIS functions

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 10: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRISSystem components - Voice VHF Communication Network

8 sites along Bulgarian Danube

Cohabitation with AIS base stations

Independant system

Integration and data exchange with AIS

Graphic presentation of the vessels position

Page 11: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Allows simplification of cross border procedures Functions:

Data exchange between vessel and competent authorities

Available via web application Access according to the user rights

Users: Vessel parties Competent authorities

Compliant with European and international standards

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

System Components - ERI

Page 12: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

System Components - ERI

Page 13: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

National and international exchange of RIS data

Functions: Provision of relevant RIS data Interface to T&T, ERI and Hull system Web based users interface

Users:Governmental usersCommercial users

Different data access rights have to be defined

System Components – Data Gateway

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 14: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

System Components – Data Gateway

Page 15: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Used for fairway information, traffic information and management as well as voyage planning

Functions: Available via web service Automatic translation on 23 languages Input information for voyage planning

Users: Traffic/Fairway authorities Harbour Master’s Offices/Port authority Police Shippers Skippers/Captains Inspection and customs authorities

Compliant with European standards

Implementation of River Information System on the Bulgarian Part of Danube -

BulRISSystem Components – Notices to Skippers

Page 16: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

System Components – Notices to Skippers

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 17: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Total of 16 sites 14 radio reley links 1 dedicated optical link 1 MAN link

Interlinked togeather to form a closed network Network is invisble to outside world Hack proof Used for AIS and VHF communication

Real time data replication between Ruse and Varna backup centre

Implementation of River Information System on the Bulgarian Part of Danube -

BulRISSystem Components – Communication Network

Page 18: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRISSystem Components – Communication Network

Page 19: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

AIS and VHF Network - Locations

Page 20: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

(c) Kongsberg Seatex AS

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

AIS and VHF Network – Radio Coverage

Page 21: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

GUI of the Client Application 1/2

(c) Periskal

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 22: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

GUI of the Client Application 2/2

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 23: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

GUI AIS WEB Application 1/2

(c) Periskal

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 24: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

GUI AIS WEB Application 2/2

(c) Periskal

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 25: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Scope of works Design Evaluation of radiation

influence Obtainig building permits Site construction Exploatation permits

4 new sitesOther sites are existing sites

owned by Bulgarian telecom

Construction Works

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

Page 26: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

Implementation of River Information System on the Bulgarian Part of Danube -

BulRIS

What next? – Phase II and III

Construction of the RIS Center building Conceptual design finalized Technical project – start in May 2011 Construction works – start in fall 2011 In operation – end of 2012

Upgrade and development of the services (pre-project study) Automatic water level measurement/modeling RIS portal WLAN access to RIS services Calamity abatement services ………………………………………

Page 27: OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. BULGARIAN PORTS INFRASTRUCTURE CO. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

THANK YOU FOR YOUR KIND ATTENTION

Kuzman [email protected]