9
SUPPLIER SUPPORT COMMITTEE (SSC) MEETING PITTSBURGH 2014 CONFIRMED CONFIRMED MINUTES TUESDAY, OCTOBER 21, 2014 PITTSBURGH, PENNSYLVANIA, USA These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. TUESDAY, OCTOBER 21, 2014 1.0 OPENING COMMENTS 1.1 CALL TO ORDER/QUORUM CHECK The Supplier Support Committee (SSC) was called to order at 5:00 PM by Tom Newton. A quorum was established with the following representatives in attendance: Subscriber Members/Participants Present NAME COMPANY NAME Jon Biddulph Rolls-Royce plc Acting Vice Chairperson Roger Bloomfield Goodrich (UTAS) Julian Buckland SAFRAN Jim Graves Rolls-Royce Corporation Marc-Andre Lefebvre Heroux-Devtek Herman Leibovich Israel Aerospace Industries Ryuichi Nakamura Mitsubishi Heavy Industries Hideki Nakorma Mitsubishi Heavy Industries Michael Riley Goodrich (UTAS) Uri Sol Israel Aerospace Industries Supplier Support Committee Leadership Team Members Present NAME COMPANY NAME Dale Harmon Cincinnati Thermal Spray Vice Chair Jonathan Hebben Ducommun Inc. Secretary Eric Jacklin F.M. Callahan & Son, Inc. Past Chair Advisor David Michaud Fountain Plating Co Inc Tom Newton Aircraft Xray Laboratories Chair

OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

CONFIRMED MINUTESTUESDAY, OCTOBER 21, 2014

PITTSBURGH, PENNSYLVANIA, USA

These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency.

TUESDAY, OCTOBER 21, 2014

1.0 OPENING COMMENTS

1.1 CALL TO ORDER/QUORUM CHECK

The Supplier Support Committee (SSC) was called to order at 5:00 PM by Tom Newton.

A quorum was established with the following representatives in attendance:

Subscriber Members/Participants Present

NAME COMPANY NAME

Jon Biddulph Rolls-Royce plc Acting Vice ChairpersonRoger Bloomfield Goodrich (UTAS)Julian Buckland SAFRANJim Graves Rolls-Royce CorporationMarc-Andre Lefebvre Heroux-DevtekHerman Leibovich Israel Aerospace IndustriesRyuichi Nakamura Mitsubishi Heavy IndustriesHideki Nakorma Mitsubishi Heavy IndustriesMichael Riley Goodrich (UTAS)Uri Sol Israel Aerospace Industries

Supplier Support Committee Leadership Team Members Present

NAME COMPANY NAME

Dale Harmon Cincinnati Thermal Spray Vice ChairJonathan Hebben Ducommun Inc. SecretaryEric Jacklin F.M. Callahan & Son, Inc. Past Chair AdvisorDavid Michaud Fountain Plating Co IncTom Newton Aircraft Xray Laboratories ChairJim Ringer Tech Met Inc.

Supplier Support Committee Sub-Team Leads Present

NAME COMPANY NAME

Lisa Donahoe AlcoaSteve Payne Praxair Surface TechnologiesGary White Orbit Industries, Inc.

Suppliers Present

NAME COMPANY NAME

Roy Adkins Braddock Metallurgical

Page 2: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

James Ahlemeyer DucommunMark Airey Robert Stuart LtdDan Antos Canton Drop ForgeLeandro Aparicio Advanced Coating TechniquesDavid Arnold Metal TechChavez Arturo TIGHITCO LATINOAMERICAAmy Azzano Arrow Gear CompanyWill Babik CCPI IncAndy Bakewell E M Inspection Co LtdAli Bakr Nico Products, Inc.Christy Ballinger DucommunDoug Barra X-Ray IndustriesTimothy Bergquist Absolute Technologies IncGreg Bright TE ConnectivityLinda Brown HyTech Spring and MachineGeorge Bufkin Davro Inc.Dale Bychinski 3MSusan Caldwell ElementGordon Cameron Integrated Technologies/LMI AerospaceAdam Carr MaterionJeff Cerbie Larson ForgeBhaskar Chatrath Universal StainlessJohn Chung AOLTEC InternationalAja Collins Unison Engine ComponentsCharles Costello Sun-Glo Plating Co.Mark Crevier Morton ManufacturingJohn Cristman Integrity Aerospace Group, Inc.Mark Cummings B&B Specialties & G S AerospaceDouglas Davies Alcoa Fastening SystemsSharon Davis Northeast Testing & Manufacturing, LLCJeffrey Davis Hubbard-Hall Inc.Suzanna DeMoss 3MMichael Dudley Aerocom Inspection Service LimitedGary Eisenman Aero Gear, Inc.Bryan Engel Consolidated Precision ProductsEdward Engelhard Solar Atmospheres IncDavid Eshleman The Young Engineers, Inc.Romeo Evangelista Metals Technology, Inc.I-Ting Feng INTAI Technology CorporationBob Ferry FPM HEAT TREATINGGary Fox Anodyne, IncMichael Francisco Stabile Plating Co., Inc.Chris Fredrickson Techmetals, Inc.Dennis Fried Carpenter Technology CorporationGeorge Fry Micro-Tronics Inc.Susan Generalovich Solar Atmospheres of Western PA Inc.Ashley Goossen MaterionDave Gray Mitchell LabsJuston Guzman Aircraft Xray LaboratoriesDebbie Hagar NORDAM Interiors and StructuresBryan Hall NSL Analytical Services, Inc.Darron Harris Exotic Metals Forming CompanyBryan Hebb AMS Coatings, IncBallard Hindman Advanced Coating TechniquesFrank Horton Carpenter TechnologyDean Houser Applied Thermal Technologies, Inc.Don Huffman Lisi Aerospace

Page 3: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

Douglas Jacques Renegade Materials CorporationJames Jensen Moeller Manufacturing Company, Inc.Dave Jones 3P ProcessingMasato Katagiri Mitsubishi Heavy IndustriesStauros Katsas AlcoaBoyko Kirilov Alcoa Fastening SystemsKazuaki Kitaoka Toray IndustriesDon Klein Arrow Gear CompanyRichard Kline X-Ray IndustriesJohn Kunkle Alcoa Power & PropulsionSteven Kyriakides Toray Composites (America), Inc.Dave Leaderer Brinkmanprecision.comBeth Lewis PCCJohanna Lisa Valley Metal TreatingDusty Little Ducommun AeroStructuresChristopher Love Amphenol Aerospace OperationsSarah Mansuetti Rex Heat TreatAndrew March Hunting DearbornTimea Marsalko Henkel CorpTyler Moffatt Aerocom Inspection Service Ltd.Joe Morlino Brinkman PrecisionDamon Morse XRI TestingAndre Mulyono Absolute Technologies IncSimone Murphy-

FickenworthChrome Plus International

Abdul Nathani Hi-Tech Metal FinishingOveis Nayeri Lisi AerospaceKen Nelson Continental Heat TreatingMichael Noettl Magnetic Inspection Laboratory Inc.Blair O'Connell Precision Castparts Corp.Jim Olejarczyk Alcoa Power and PropulsionPhil Pacey Canton Drop ForgeLee Parsley Click Bond, Inc.Saroj Patel Jabil Circuits Inc.Gregory Penny Triumph Processing Embee DivisionVictor Perez Fitz AerospaceJuan Perez Aircraft Xray LaboratoriesFrank Peszka Laboratory Testing Inc.Robert Peters MITG. R. Porterfield III Solar Atmospheres, Inc.Ryan Pratt Milan Tool CorporationKaren Quinn ATK Aerospace GroupBarry Rafan Universal Stainless & Alloy ProductsSara Randall Lucideon M+PJames Rauckhorst Tensile Testing MetallurgicalRoy Redmond Hexcel CorporationChris Reed DucommunPamela Reeves River Street Metal Finishing, Inc.Brian Reeves River Street Metal Finishing, Inc.James Reinhardt Applus RTD CanCatherine Renfer Consolidated Precision ProductsDouglas Riley Magellan Aerospace, HaleyTina Rose XRay IndustriesJoseph Russo TE ConnectivityVictor Salazar Jr. OMNI METAL FINISHING, Inc.Mike Schleckman Voss Industries, Inc.Carol Schmidt ATI

Page 4: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

Tammi Schubert LMI Finishing, IncDouglas Schueller AbelConn LLCKevin Seidel Universal Stainless & Alloy ProductsRobert Siegel Sherwin Inc.Stephen Simacek Hytek FinishesVitorio Stana Avcorp Industries Inc.Fabio Sturzen Forgital Italy SpaAllison Tackett Specialty Steel Treating, Inc.Kamlesh Talati Salem Tube Inc.Mitch Tanner Triumph Processing - Embee DivisionJeffrey Tomczak Techmetals, Inc.Jim Tuminello Tech Met Inc.Israel Vasquez Vastek ConsultingMarcus Wagoner Chrome Plus InternationalJerry Wahlin AAA Plating & Inspection Inc.Charles Warburton Greystone-InduplateWilfried Weber PFW Aerospace GmbHKeith Zawrazky Larson ForgeBlanca Zilli-Huerta Bowman Plating Company, Inc

PRI Staff Present

NAME

Connie HessRhonda JosephJoanna LeighJustin McCabeShannon McMeansLinda NovakJoseph Pinto

1.2 INTRODUCTIONS/ROUTING OF ATTENDANCE LIST/CODE OF ETHICS/REVIEW AGENDA

The Code of Ethics, Anti-Trust & Conflict of Interest (pg. 7 Attendees Guide) were reviewed.The SSC viewed the PRI anti-trust video.

1.3 MINUTES

The minutes of the June 2014 Nadcap meeting in Dublin were approved

1.4 AWARDS & RECOGNITION

Tom Newton presented. Bill Heeter was presented an appreciation award from the SSC leadership team. The SSC thanked Bill Heeter for his work as Chair of the Communications sub-team.

2.0 2013 SUPPLIER SURVEY REPORT OUT

Page 5: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

3.0 BREAK-OUT SESSIONS

Supplier Survey Results – Brainstorming Session

o How can we increase attendance at Nadcap Meetings?

Discount on Audit Cost for suppliers that attend. Spread out meeting locations to decrease costs. Template to present to supplier management to demonstrate value and justify

attendance. Newsletter/Testimonies to promote meetings. Set up telecommunication/virtual meetings. Use auditors and Primes to promote attendance. Cut the length to 3 days. Process focus. Identify types of suppliers that attend and focus on those groups who do not. Larger block of hotel rooms. Identify local activities. Post agendas earlier with value gained by attending. Identify which supplier functions should attend.

o How can we increase attendance at the SSC meeting?

Have it over lunch. Email reminders. Offer as a networking event/reception. Identify specific topics in pre-event emails. Change to be during the closed meetings on Monday. Official invitation letter. Distribute attendance list to everyone. Bigger meeting room. Cut meeting length. Make meeting more interactive (breakout sessions) Increase exposure of SSC meeting at other meetings. Start earlier. Have each TG task their Subscribers to attend. Have SSC LT present at each Task Group.

o How can we clarify the Task Group Metrics?

Promote/Define what the metrics are. Use dictionary to describe metrics. Include a metric that the supplier can score. Standardize how they are presented. Send out before each meeting. Location of where the metrics are in eAuditNet. How important are the metrics to suppliers. Email tutorial on metrics. Simplify the metrics

o How can we enhance the value of SSC communication to the supplier

Local/Regional chapters for local summary presentations of recent Nadcap Meetings. Offer more technical assistance. Liaison between TG suppliers and TG leadership (SSC TG Rep)

Page 6: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

Define technical line better. Examples of accomplishments. Identify what the SSC does. Post SSC Agenda. Make presentations more visual.

Distribute lessons learned.

4.0 SUPPLIER NEWS

Tom Newton presented.

4.1 New SSC Vision Statement, Core Values and Guiding Principles were presented.

4.2 Mentoring Form

Reviewed new form that is available for suppliers to rerquest a mentor and allow the SSC, PRI and Mentor to understand the scope of assistance needed.

4.3 SSC Request Form

Reviewed new form available for suppliers to request SSC action on various topics. This form includes requirements for the requestor to explain the scope and justify the action.

4.4 Retraction of Supplier Advisory

Automatic retraction now in place if the supplier has won an appeal of the issue.

4.5 End-of-Audit Feedback

The process now includes a voluntary survey to rate the complete process.

5.0 MEDACCRED UPDATE

Joe Pinto presented. Nadcap is recognized for the Aerospace work it performs and has been approached by other industries. Implementing Nadcap style process for Medical devices.

Page 7: OPENING COMMENTS - Performance Review Institutecdn.p-r-i.org/.../09115727/SSCMinutesOct2014CONFIRMED.docx · Web viewClick Bond, Inc. Saroj Patel Jabil Circuits Inc. Gregory Penny

SUPPLIER SUPPORT COMMITTEE (SSC) MEETINGPITTSBURGH 2014

CONFIRMED

6.0 RISK MITIGATION NOP-011

Mike Graham presented.

7.0 SSC CHAIR REPORT OUT – STATE OF THE SSC

Tom Newton presented.

ADJOURNMENT – 21-OCT-2014 – Meeting was adjourned at 6:45 p.m.

Minutes Prepared by: Jonathan Hebben, [email protected]

***** For PRI Staff use only: ******

Are procedural/form changes required based on changes/actions approved during this meeting? (select one)

YES* ☐ NO ☒

*If yes, the following information is required:Documents requiring revision: Who is responsible: Due date: