Open Space– Asset Management Plan

2020/21 – 2040/41

May 2020

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 1

TABLE OF CONTENTS

1. Executive Summary ....................................................................................................................... 2

2. Strategic Objectives....................................................................................................................... 5

3. Services Provided & Classification .............................................................................................. 6

4. Levels of Service & Key Performance Measures ........................................................................ 7

4.1 Key Performance Measures ................................................................................................... 7

5. Condition of Our Assets .............................................................................................................. 11

6. Operations .................................................................................................................................... 13

7. Maintenance ................................................................................................................................. 14

8. Capital Upgrades & New Assets ................................................................................................. 19

9. Asset Rationalisation and Disposal Plan .................................................................................. 20

10. Financial Plan ............................................................................................................................... 20

11. Risk Management Plan ................................................................................................................ 21

11.1 Critical Assets ....................................................................................................................... 22

12. Performance Review and Proposed Improvement Plan .......................................................... 23

13. Appendix A: Mowing Scope of Works and Service Levels...................................................... 24

13.1 Parks and Open Space Maintenance List ............................................................................ 24

13.2 Service maintenance levels – Activity frequency schedule .................................................. 29

14. Appendix B: Rolling Five Year Renewal Programs .................................................................. 30

14.1 Barbeques ............................................................................................................................ 30

14.2 Playgrounds ......................................................................................................................... 30

14.3 Fencing ................................................................................................................................. 31

14.4 Seating ................................................................................................................................. 32

14.5 Tables ................................................................................................................................... 33

14.6 Shelters ................................................................................................................................ 33

14.7 Active Play Areas ................................................................................................................. 33

14.8 Internal Roads ...................................................................................................................... 34

14.9 Sports Equipment ................................................................................................................. 35

14.10 Park Signage ................................................................................................................. 36

15. Appendix C: Upgrade / New Capital Works Program ............................................................... 39

16. Appendix D: 20 Year Financial Plan ........................................................................................... 40

Document Control

Rev No Date Revision Details Author Verifier Approver

1 7/4/2020 First Draft AL/ML NH SM

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 2

1. Executive Summary

Council’s intention is to provide the City with a network of Public Open Space areas, ranging from regional and local sports grounds, regional attractions, passive parks, drainage reserves and precinct linkages that are serviced and maintained to a consistent level service that reflects the community’s expectations whilst operating in a functional and cost effective manner. The replacement cost for the Parks and Open Space assets covered in this plan is $22.0M. Parks and Open Space Assets were re-valued in 30 June 2019.

This plan assists Council in the decision making process and is presented at a high level to provide key information that can be used in the determination of levels of service and funding required.

Table 1.1 below shows the value of the asset groups covered in this plan, the asset expenditure allocated in the 2020/21 budget and the effect this planned expenditure is forecast to have on asset performance.

Figures in Table 1.1 below are extracted from the 2020/21 asset renewal modelling and allocated from the 2020/21 budget. Renewal modelling compares the proposed renewal expenditure over the next 20 years to the renewal funding allocated in the budget and identifies any gaps. The 2020/21 budget delivers a renewal backlog of $1.8M for Year 1 of this plan (2020/21) and is projected to increase to $10.5M in year 20, and an annual average renewal gap of $524K pa.

Table 1.1: What is provided & what does it cost ($, 000)?

Asset Fair Value

Operation & Maintenance

Renewal Upgrade & New

Funding Gap

Backlog Year 1

Backlog Year 20

Barbeques 243 82 - - 23 91 457

Fencing 4,278 1,455 - - 75 18 1,490

Playground 2,319 849 48 - 125 1,000 2,490

Seating 461 163 - - 26 119 528

Shelter 400 136 - - 4 0 75

Structures Walls & Paths 611 207 - - 5 0 104

Tables 207 70 - - 8 30 163

Internal Roads 6,832 2,317 1 - 59 225 1,184

Active Play Areas 4,473 1,517 - - 186 443 3,728

Sporting Equipment 231 78 - - 14 4 274

Park Signage 337 114 32 - -14 -22 -277

Pedestrian Bridges 1,586 538 3 - 13 -60 259

Other - 0 -0 0 1,477

Total 21,978 7,528 84 1,477 524 1,848 10,474

Notes: 1. Budget Figures are the 20 year annual average amounts indexed by 0.9% p.a. for growth; 2. The Upgrade and New works figure of $1.5M pa represents the 20 year average. The five year projected total spend on new works is $29.1M. 3. Fencing figures include Council wide fencing assets. 4. “Other” refers to non-modelled Open Space assets such as lighting, gardens, monuments, internal services, irrigation etc.

Table 1.1 suggests the drivers of the annual average renewal backlog is shared between active play area

renewals and playground renewals, accounting for approximately 60% of the Parks and Open Space backlog.

This plan does not attempt to address the projected renewal backlog nor its implications to ratepayers.

Any negative figures indicate a surplus in the first year which will be required in subsequent years. The

projected budget amounts are based on 2020 dollars increased in real terms for growth by 0.9% per annum.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 3

Figure 1.1: What will we spend over the next 10 years? ($,000)

The current condition of our assets is shown in the following graph based on the value of each asset in each of

10 conditions ranging from 1 to 10, with 1 being near new and 10 as a completely failed asset.

Figure 1.2: What condition are our assets in?

Council’s levels of service and performance measures have been merged to make it easier to reference what the community is asking for, how Council will deliver these services which also includes the key performance measures and how these K.P.I’s are measured. This service level reflects what is outlined in the Community Strategic Plan to meet the community’s expectations of Council’s ability to deliver these services.

0

5

10

15

20

25

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30

$ (M

illio

ns)

Operations Maintenance Renewal Upgrade / Expansion

0

1

2

3

4

5

1 2 3 4 5 6 7 8 9 10

$ (M

illio

ns)

Active Play Areas Barbeques Fencing Internal Roads

Pedestrian Bridges Playground Seating Shelter

Park Signage Sporting Equipment Structures Walls & Paths Tables

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 4

What is the Breakup of our Planned Capital New/Upgrade expenditure?

0

2

4

6

8

10

12

14

16

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30

$ (M

illio

ns)

Park and Reserve Enhancements Rectangular Playing Field Sports Fields Enhancements Orange Cemetery Capital Works

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 5

2. Strategic Objectives

Council manages and maintains Public Open Space assets to achieve the following strategic objectives.

1. Ensure that areas of public open space are maintained at a safe and functional standard as set out in this asset management plan.

2. To provide services to current and future generations.

3. To promote wider community participation and engagement in local community activities such as sport, recreation, leisure and arts.

Orange City Council developed a comprehensive community engagement strategy to ensure a broad range of

opinions; ideas and visions were captured to help shape the Orange Community Strategic Plan. The outcomes

& strategies supported by that plan are detailed in the Asset Management Strategy.

To assist in the delivery of the objectives in this plan, a number of key documents & systems have been

prepared and should be referred to in considering the findings presented:

Table 2.1: Where can I find additional information?

Document / System Content

Community Strategic Plan Outcomes and Strategies identified by the community

Council Asset Policy How we manage assets

Asset Management Strategy

Overall direction of asset management and portfolio summary

Asset Management Manual

Procedures and Processes the guide the management of assets

Condition Assessment Manual

Details on the process of assessing condition, including photographic examples of various conditions

Enterprise Risk Management Plan

The identification and management of risks across Council operations

Civica Asset Management System (AM)

Electronic system that contains the asset register, condition ratings and used to model future renewals

Enlighten GIS Geographical information system that produces maps of assets

Recreational Needs Study Study based on existing facilities and anticipated future needs. To be reviewed once Open Space Strategy is adopted.

Play Strategy Draft – guide to the installation of play facilities across the LGA based on spatial and demographic studies.

Orange Outdoors Strategy (2015-2020)

Draft - guide the management of the public domain in the Orange LGA, with a holistic, stream-lined approach that will better provide for the Community’s needs into the future.

The 2018 Orange Community Strategic Plan Outcomes supported by the Public Open Space AMP include:

Theme Live – A liveable city that is connected through open spaces: o 1.1 Engage with the community to ensure recreation opportunities and facilities meet changing

needs. o 1.2 Maintain and renew recreational spaces and infrastructure to encourage an active and healthy

lifestyle. o 2.1 Identify and deliver sport and recreational facilities to service the community into the future o Partner with key stakeholders to deliver infrastructure that improve the safety and security of the

community.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 6

3. Services Provided & Classification

Public Open Spaces have been categorised into 8 classes to assist in the determination of Levels of Service. Table 3.1 identifies the characteristics that assist in identifying which class an open space will fit into. The overall rating will determine how frequently maintenance is carried out and to what standard.

The establishment of a hierarchy for open spaces provides a useful tool for the planning and provision of active and passive recreation spaces and ensuring the efficient allocation of resources based on maintaining levels of service appropriate to their function within the hierarchy.

Table 3.1: Public Open Space Classification

Class Description

Regional Park A reserve that residents and visitors are willing to travel to from the community that they live in. High frequency of inspections, cleaning and maintenance.

Neighbourhood Park A developed urban reserve designed for ease of pedestrian access. Medium frequency of inspections, cleaning and maintenance.

Local/Pocket Park A local reserve within the urban community that may be partly developed for aesthetic / amenity purposes. Low frequency of inspections, cleaning and maintenance.

Reserves Includes undeveloped Crown land for which Council is Trust Manager and other underdeveloped reserves. Low frequency of inspections, cleaning and maintenance.

Regional Sports Grounds A sports ground that is designed for and used for active sport on a regular basis. High frequency of inspections, cleaning and maintenance.

Local Sports Grounds A reserve that has been primarily developed for activities within the City. Medium frequency of inspections, cleaning and maintenance.

Corporate/Community Building Reserves

A reserve or open space that is mainly dedicated to hosting community facilities such as a community hall Low frequency of inspections, cleaning and maintenance.

Streetscape Perennial and annual gardens in roundabouts, kerb side blisters, street trees and landscape elements.

Utilising these classifications, typical renewal frequencies are currently being developed that will maintain the elements of each public open space at a mix of condition rating of 5 (An asset in fair overall condition.– i.e. only reactive and cyclic maintenance required) and condition 6 (An asset in fair to poor overall condition).

A summary of each component is presented in table 3.2 below.

Table 3.2: Assets Provided

Classification Asset Quantity Units

All Assets Barbeques 27.0 Each

All Assets Fencing 46.5 Length (km)

All Assets Playground 40.0 Each

All Assets Seating 642.0 Each

All Assets Shelter 783.9 Area (sqm)

All Assets Tables 140.0 Each

All Assets Internal Roads and Carparks 218,566.6 Area (sqm)

All Assets Active Play Areas 38.7 Area (Ha)

All Assets Park Signage 891.0 Each

All Assets Pedestrian Bridges 44.0 Each

Growth and Demand:

In addition to assets constructed by Council, new Open Space assets are acquired from land developments. These new areas require additional maintenance and operational expenditure to maintain community standards. Council allocates an additional $100k pa to be used to offset some of the costs associated with these additional open space acquisitions.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 7

4. Levels of Service & Key Performance Measures

One of the basic tenets of sound asset management practice is to provide the level of service the current and

future community want and are prepared to pay for, in the most cost effective way (NZ NAMS 2007)

Public Open Spaces and their assets have been categorised into classes to assist in the determination of Levels

of Service (LOS) which are grouped into:

Community LOS – relates to how the community receives the service in terms of safety, quality,

quantity, reliability responsiveness, cost efficiency and legislative compliance; and

Technical LOS – these are the technical measures of performance developed to ensure the minimum

community levels of service are met.

Table 4.1 outlines what the community desires for each asset Category and how Council will deliver it.

Table 4.1: What does the Community want?

CSP Category The Community Wants (Community LOS)

How we Deliver this (Technical LOS)

5.1 5.2

Regional Park Amenity provisions such as toilets, passive recreational opportunities, shelter. Clean, tidy open spaces with healthy lawns and vibrant garden beds

Construction and maintenance of appropriate amenity infrastructure for Regional Parks and commensurate levels of service to ensure that soft landscape elements and presentation of public open space meets the classification.

5.2 Neighbourhood Park

Aesthetically pleasing landscape, passive recreational opportunities

Maintenance of appropriate infrastructure, parks mown, cleaning and litter removed

5.2 Local/Pocket Park Aesthetically pleasing landscape Parks mown and litter removed

5.2 12.1

Reserves Clean and tidy open spaces Surrounds maintenance, control of weeds, litter removed

5.2 6.1

Regional Sports Grounds

Sports fields with suitable playing surfaces, line marking and goal posts, amenity provisions

Mowing frequencies, control of weeds that affect the playing surface quality, implement spring renovation works

5.2 6.1

Local Sports Grounds

Playing surface suitable for the level of competition/training to be undertaken

Mowing frequencies

5.2 Corporate/ Community Building Reserves

Clean, presentable maintained surroundings to building reserves

Mowing frequencies, control of weeds, litter collection

5.2 Streetscape Vibrant, healthy soft landscape areas that are visually appealing

Regular inspection and maintenance of streetscape gardens and street trees to ensure weed and litter free areas and good health and vigour of soft landscape elements.

4.1 Key Performance Measures

The effectiveness of the infrastructure and asset management plan can be measured in the following ways:

The degree to which the required cash flows identified in this asset management plan are incorporated into council’s long term financial plan and Strategic Management Plan;

The degree to which 1-5 year detailed works programs, budgets, business plans and organisational structures take into account the ‘global’ works program trends provided by the asset management plan;

The degree to which improvement plans are implemented and reviewed.

Council has developed key performance measures for Parks and Public Open Space assets in terms of maintaining open space to deliver a general level of service to the community and users of our facilities grouped into:

Quality

Function

Safety

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 8

Condition; and

Accessibility

While a number of the measures have not been assessed it is anticipated that they can be incorporated into the next stage of development of this Asset Management Plan, once community consultation has been completed with the Community Strategic Planning process.

Development of Key Performance Measures based on condition have been developed by considering

Table 4.2 Performance Measures - Playgrounds

Key Performance Measure

Level of Service Target Current

Quality Provide quality playground equipment that is adventurous, entertaining and stimulating.

Less than 10 requests / month Meets targets

Function To provide a diverse range of playgrounds within the City which ensures that user requirements are met

100% subject to budget Not currently measured

Sustainability Playgrounds are managed for future generations Forward program to meet future requirements

Not currently measured

Safety To provide a safe hazard free environment < 5 / month Meets targets

Condition To ensure all components are operational Respond to CRM within 1 working day

Meets targets

Cost effectiveness The playgrounds are managed efficiently for the required level of service

Within -/+ 5% of budget Meets targets

Accessibility To maintain current DDA Accessible and integrated playgrounds 100% Not currently measured

Safety To provide safe hazard free equipment Monthly inspections Monthly inspections

Table 4.3 Performance Measures – Sports Ground Infrastructure

Key Performance Measure

Level of Service Target Current

Quality To ensure all equipment is operating efficiently. 70 to 80% efficient Not currently measured

Function To ensure an area meets service function 100% subject to budget Not currently measured

Sustainability Sports grounds are managed for future generations Forward program to meet future requirements

Not currently measured

Safety To provide a safe hazard free environment < 5 / month per sportsground Meets targets

Condition To provide appropriate sustainable infrastructure 100% CRM

Cost effectiveness The sports grounds are managed efficiently for the required level of service for the total life of the asset

Within -/+ 5% of budget Meets targets

Accessibility To maintain current DDA Accessible and integrated sportsgrounds

100% Not currently measured

Safety To provide safe hazard free equipment Monthly inspections Monthly inspections

Phase up – Phase down

For each asset type, the “intervention level” condition is the condition at which renewal of the asset is proposed to be undertaken. Minimising the life cycle cost and indications of the desired level of service obtained through community engagement have been considered in setting intervention level conditions.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 9

As an example, the intervention level adopted for fencing is 8 and for playgrounds is 6. Assets are rated on a 1 (Near New) to 10 (Completely Failed) scale. Refer to the following Section 5 - Condition of Our Assets for more details.

Evaluating “phase up” and “phase down” scenarios provides information on costs or savings and other impacts to the community based on higher and lower Levels of Service (LoS) options.

A phase up scenario may mean that fencing is renewed at condition level 7 and playgrounds at condition 5 and a phase ramp down scenario could be where fencing renewed at condition level 9 and playgrounds at condition 7.

For playgrounds there needs to be consideration relating around the quality and function of the asset. A clearer indication would be to base phase up/down around the usage of a playground. For example. If a playground is 20yrs old in condition 4 (due to maintenance) but it does not provide the quality of play in current times and not being used, then the utilisation may actually be a 9, therefore requiring replacement.

The average annual renewal costs under each of these scenarios are listed in Table 4.4a and 4.4b below.

Table 4.4a: Phase-Up Scenarios

Asset Scenario Avg Cost Base Case Movement

Active Play Areas Phase Up Cond 6 218 186 31

Barbeques Phase Up Cond 5 27 23 4

Fencing Phase Up Cond 7 104 75 30

Internal Roads Phase Up Cond 7 & 8 102 61 41

Pedestrian Bridges Phase Up Cond 6 26 16 10

Playground Phase Up Cond 5 257 172 85

Seating Phase Up Cond 5 & 6 28 26 1

Shelter Phase Up Cond 5 7 4 4

Park Signage Phase Up Cond 7 21 18 3

Sporting Equipment Phase Up Cond 6 17 14 3

Structures Walls & Paths Phase Up Cond 6 5 5 0

Tables Phase Up Cond 5 & 6 9 8 0

Total Phase-Up Scenarios – Additional $210K pa 821 608 213

Table 4.4b: Phase-Down Scenarios

Asset Scenario Avg Cost Base Case Movement

Active Play Areas Phase Down Cond 8 182 186 -4

Barbeques Phase Down Cond 7 23 23 -0

Fencing Phase Down Cond 9 67 75 -8

Internal Roads Phase Down Cond 9 & 10 31 61 -29

Pedestrian Bridges Phase Down Cond 8 12 16 -4

Playground Phase Down Cond 7 172 172 0

Seating Phase Down Cond 7 & 8 26 26 -0

Shelter Phase Down Cond 7 4 4 0

Park Signage Phase Down Cond 9 18 18 -1

Sporting Equipment Phase Down Cond 8 9 14 -5

Structures Walls & Paths Phase Down Cond 8 3 5 -2

Total Phase-Down Scenarios – Saving of $53K pa 555 608 -53

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 10

Table 4.4a above indicates that if Council were to renew each asset component more frequently by lowering the renewal intervention level for each Parks and Open Space Asset component, Council would save approximately $53K pa in total.

Conversely, if Council were to reduce the rate of asset renewal by increasing the renewal intervention level by one condition point, Table 4.4b indicates that it would cost Council an additional $210K pa.

The financial renewal costs are identified in Tables 4.4a and 4.4b, however, the extra maintenance costs that would be required because of renewal delay under the phase down option have not been captured.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 11

5. Condition of Our Assets

Council maintains a Condition Assessment Manual that details the frequency of inspection and condition rating

to be used for all assets. This data is recorded in the Council Asset Management System and used to predict

the timing of renewal / maintenance requirements in the Long Term Financial Plan.

Assets are rated on a 1 (Near New)to 10 (Completely Failed) scale consistent with the Maloney model and

advanced asset management practices as outlined in the IPWEA International Infrastructure Management

Manual. Details on how Council assesses condition and further information on the rating scale are contained in

the Condition Assessment Manual.

The intent of Council is not to undertake renewal on an asset until it reaches its ‘Intervention Level’, that is the

condition at which the community has determined renewal is required based on the LOS analysis. Typically

assets will be renewed between condition 6 & 8 which ranges from fair/poor to very poor depending on their

classification.

Deterioration profiles have been developed that track the rate of deterioration expected over time for each

material type in each asset group. This information is used in our models to determine when an asset is

expected to be due for renewal, noting that assets will only be renewed when they reach their intervention

condition, not based on their age.

Figure 5.1 provides examples of several deterioration profiles used with the vertical column showing the years

remaining at a particular condition. A Barbeque in a Premier park (Series 1) at condition 3 is expected to last for

another 7 years, until complete failure at condition 10.Figure 5.1: At what rate do we expect our assets to

deteriorate?

021426384

105

1 2 3 4 5 6 7 8 9 10

Fencing

Masonary Timber Steel

048

121620

1 2 3 4 5 6 7 8 9 10

Playground

Premier Standard

012.424.837.249.6

1 2 3 4 5 6 7 8 9 10

Seating

Timber Steel

Recycled Plastic Concrete

021426384

105

1 2 3 4 5 6 7 8 9 10

Pedestrian Bridges

Concrete Steel

Timber Recycled Plastic

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 12

Using the information from the curves above and the intervention level set for the class of an asset we can determine the expected useful lives of our assets as detailed in table 5.1 below.

Table 5.1: What are our Intervention Levels to Renew an Asset?

Component Class Intervention Level Useful Life

BBQ’s Neighbourhood/Regional 7/6 14/12

Seats Local/Neighbourhood/Regional 7/7/6 57/18

Tables Local/Neighbourhood/Regional 7/7/6 60/16

Fencing Local/Neighbourhood/Regional 8 75/40

Other Structures Local/Neighbourhood/Regional 7 35/25

Each asset group’s condition is maintained in the Asset Register. The graphs below give the condition profile

based on the replacement cost of the top 4 valued asset groups.

Figure 5.2: What Conditions are our top 4 assets in?

0

200

400

600

800

1 2 3 4 5 6 7 8 9 10

$ (T

ho

usa

nd

s)

Playground

0

500

1,000

1,500

1 2 3 4 5 6 7 8 9 10

$ (T

ho

usa

nd

s)Fencing

0

50

100

150

200

250

1 2 3 4 5 6 7 8 9 10

$ (T

ho

usa

nd

s)

Seating

0

50

100

150

1 2 3 4 5 6 7 8 9 10

$ (T

ho

usa

nd

s)

Shelter

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 13

6. Operations

Operational activities are those regular activities that are required to continuously provide the service including asset inspection, electricity costs, fuel and overheads.

Table 6.1: When do we undertake Inspections?

Inspection Frequency

Regional Parks and Regional Sports grounds Annually

Neighbourhood Parks Biannually

Local Pocket Parks Biannually

Reserves Triennially

Local Sports Grounds Biannually

Corporate/Community Building Reserves Biannually

Streetscapes Annually

The operational costs are detailed in Table 6.2 and exclude the annual depreciation expense.

Table 6.2: What are our Operational Costs?

Item Budget

Employee Costs 3,204

Rates, Fees and Charges 1,103

Materials, Stationery And Equipment 224

Local Event/Program Support & Promotion 264

Cleaning/Garbage Removal/Hygiene 217

Other/Unspecified 62

Total 5,074

Figure 6.1: What is the breakup of our Operational Costs?

63%

22%

5%5%

4% 1%

Employee Costs

Rates, Fees and Charges

Materials,Stationery And Equipment

Local Event/Program Support & Promotion

Cleaning/Garbage Removal/Hygine

Other/Unspecified

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 14

7. Maintenance

Routine maintenance is the regular on-going work that is necessary to keep assets operating to ensure they

reach their useful life. It includes work on an asset where a portion may fail and need immediate repair to make

it operational again. It may be either planned where works are programmed in or cyclic in nature or reactive in

response to storm damage, vandalism etc.

Maintenance is either planned or reactive, defined as:

Reactive maintenance – unplanned repair work carried out in response to service requests.

Planned maintenance – repair work that is identified and managed through a maintenance management system (MMS). MMS activities include inspection, assessing the condition against failure/breakdown experience, prioritising, scheduling, actioning the work and reporting what was done to develop a maintenance history and improve maintenance and service delivery performance.

Maintenance expenditure levels are considered to be adequate to meet required service levels. Future revision of this asset management plan will include linking required maintenance expenditures with required service levels in the CSP. The level of service and standards of care for maintenance is carried out in accordance with Council’s Defined Asset Management Policy (DAMP).

Table 7.1: What are our Maintenance Activities and the frequency we undertake them?

Activity Regional Parks/Sports Grounds

Neighbourhood Parks

Local/Pocket Parks

Reserves

Mowing Weekly 2 to 3 weekly 4 to 6 weekly 4 weekly

Playground Inspections – Visual Fortnightly Fortnightly NA NA

Playground Inspections – Safety Checklist Monthly Monthly NA NA

Repainting/oiling of timber infrastructure items including seats, fences, bridges

Annually Biannually Five yearly Five yearly

Pathway resurfacing/grading Annually Three yearly Five yearly 10 yearly

The opportunity for a reduction in levels of service is primarily through decreasing the mowing and maintenance cycles or frequencies for public open space, or the area of open space maintained. This obviously impacts on the quality of the asset in the short-term as well as creating a cumulative impact on the long-term desirability of the open space.

Through the review and development of a third generation of this POSAMP, in conjunction with the ‘Orange Outdoors’ Strategy, it is proposed to more clearly define the function of each open space parcel with the potential to reduce the level of service standard where the focus is not on public recreation. In essence, reducing the level of service where a function, such as stormwater management, is the primary or only use of a public open space asset.

The opportunity to achieve major cost savings though a reduced level of service appear not to be in reducing the actual level of service but by reducing the amount (ha) of public open space maintained. This can be achieved through further consideration of the disposal of public open spaces that do not provide substantial community benefits.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 15

Table 7.2: What are our Maintenance Costs?

Item Budget

Weed Spraying - Pest & Veg Control 453

Miscellaneous 54

Unspecified Park Maintenance 545

Tree Maintenance 632

Sportsground Maintenance 548

Irrigation 77

Playground Maintenance 36

Garden Maintenance 111

Total 2,454

Figure 7.1: What is the breakup of our Maintenance Costs?

Continual review of operations to ensure efficiencies and improvements are gained is undertaken. For example

to undertake sports field renovation works involving specialised equipment, contractors have historically been

engaged; the sports field renovation market now has many items of plant that are suitable for general renovation

works and these are being trialled for efficiency and fit for purpose for future acquisition.

Similarly with public open space maintenance, a review of levels of service, operational resourcing and ‘can we

do it’ thinking is resulting in gains which enable the expanding network of open space to be managed to meet

community expectations whilst enable resources to be allocated to maintain assets within regional facilities at a

consistently higher condition level.

18%

2%

22%

26%

22%

3% 2% 5%Weed Spraying - Pest & Veg Control

Miscellaneous

Unspecified Park Maintenance

Tree Maintenance

Sportsground Maintenance

Irrigation

Playground Maintenance

Garden Maintenance

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 16

Capital Renewal / Rehabilitation

This includes work on an existing asset to replace or rehabilitate it to a condition that restores the capability of the asset back to that which it had originally. This rehabilitation is generally required as a result of expected aging or “wearing out” of the asset. The intervention level and estimated useful lives are contained in Table 5.1.

Renewal will be undertaken using ‘low-cost’ renewal methods where practical. The aim of ‘low-cost’ renewals is to restore the service potential or future economic benefits of the asset by renewing the assets at a cost less than the full replacement cost.

This Asset Management Plan contains an analysis based on broad assumptions and best available knowledge to date. Asset Renewal Modelling is not an exact science, so we deal with long term averages across the entire asset stock. Work will continue on improving the quality of our asset registers and systems to increase the accuracy of our renewal models.

Verified renewal proposals are ranked by priority using the following criteria and scheduled in future works programmes.

Assets requiring renewal will be generally identified from estimates of remaining life and condition assessments obtained from the asset register and models. Candidate proposals will be inspected to verify the accuracy of the remaining life estimate and to develop a preliminary renewal estimate. Verified proposals are ranked by priority and available funds and scheduled in future works programmes.

Details of planned renewal activities proposed over the next 4 years are contained in Appendix B for all asset categories. The first year of the program will be considered in the development of the next Operational Plan and the remaining 3 years of work will be assessed each year to confirm that the asset has reached its intervention level prior to the work being scheduled.

The costs presented in the following table identifies the current level of funding for the required renewal programs and the funding required to maintain the asset to what is considered an appropriate standard. The required funding in that table is based on the intervention specified in Section 5.

For this asset group, an analysis has been undertaken to determine assets that are already at or above intervention level that are not able to be funded in the next Operational Plan. This work is quantified in the ‘Backlog’ column and is a reflection of allocated renewal expenditure contained within both past budgets and the current budget. The budget figures refer to the annual average for the 20 years of the plan.

Table 8.1: What are our Renewal Costs, Gap and Backlog ($,000)?

Activity Budget Required Gap Backlog Year 1 Backlog Year 20

Barbeques - 23 23 91 457

Fencing - 75 75 18 1,490

Playground 48 172 125 1,000 2,490

Seating - 26 26 119 528

Shelter - 4 4 0 75

Structures Walls & Paths - 5 5 0 104

Tables - 8 8 30 163

Internal Roads 1 61 59 225 1,184

Active Play Areas - 186 186 443 3,728

Sporting Equipment - 14 14 4 274

Park Signage 32 18 -14 -22 -277

Pedestrian Bridges 3 16 13 -60 259

Total 84 608 524 1,848 10,474

Figure 8.1 below highlights both the planned renewal expenditure contained within this budget and its impact on the asset stock backlog across all Parks and Open Space asset categories. Table 8.2 shows the backlog split.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 17

Figure 8.1: What will we spend over the next 10 years on Renewal?

Figure 8.2: What effect will the projected Renewal Expenditure have on Backlog?

As can be seen from Table 8.2 above, the backlog is dominated by Playground renewals and Active Play Area renewals.

Lifecycle costs

The lifecycle costs are determined based on the total cost of ownership of each asset including operations, maintenance, renewal and disposal costs. The twenty (20) year average annualised lifecycle costs for each component is presented in table 8.2.

If not appreciated, Lifecycle Costs are a hidden impairment to Council when acquiring additional assets. It is important to recognise that there are significant ongoing operational, maintenance and eventual renewal costs associated with every asset acquisition which are often not considered nor budgeted for.

0

1

2

3

4

5

6

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30

$ (M

illio

ns)

Barbeques Fencing Playground Seating

Shelter Structures Walls & Paths Tables Internal Roads

Active Play Areas Sporting Equipment Park Signage Pedestrian Bridges

Rolling Backlog

0

1

2

3

4

5

6

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30

$ (M

illio

ns)

Barbeques Fencing Playground Seating

Shelter Structures Walls & Paths Tables Internal Roads

Active Play Areas Sporting Equipment Park Signage Pedestrian Bridges

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 18

Table 8.2: What are our Lifecycle Costs?

Asset Quantity Units O&M Renewal Disposal Average Annual $/Unit p.a

Barbeques 27.0 Each 82.3 20.6 1.0 103.9 3.85

Fencing 46.5 Length (km) 1,454.6 68.0 0.0 1,522.6 32.74

Playground 40.0 Each 849.2 172.0 17.2 1,038.4 25.96

Seating 642.0 Each 163.0 18.4 0.9 182.3 0.28

Shelter 783.9 Area (sqm) 135.6 4.5 0.4 140.5 0.18

Structures Walls & Paths 396.0 Length (m) 207.4 6.0 0.6 213.9 0.54

Tables 140.0 Each 70.4 5.3 0.3 75.9 0.54

Internal Roads 26.7 Length (km) 2,317.4 69.9 0.0 2,387.2 89.34

Active Play Areas 46.1 Area (Ha) 1,517.3 175.3 0.0 1,692.6 36.69

Sporting Equipment 102.0 Each 78.4 12.3 0.6 91.3 0.90

Park Signage 891.0 Each 114.3 16.7 0.8 131.8 0.15

Pedestrian Bridges 44.0 Each 537.9 29.4 4.4 571.7 12.99

Total 7,527.8 598.2 26.3 8,152.3

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 19

8. Capital Upgrades & New Assets

Council, with input from the community, has developed a range of landscape master plans for regional facilities, including Wade and Moulder Parks, the Orange Botanic Gardens, Cook Park, Gosling Creek and Lake Canobolas Reserves. A number of the master plans require review and updating to reflect current community expectations and needs and each master plan should have their implementation strategies identified in the next version of the POS AMP.

Upgrades enhance an existing asset to provide a higher level of service, for example removing an existing rural fence and replacing it with a steel nudge rail type fence. New assets are those created to meet an additional service level requirement or increase the size of a network, for example, the addition of a playground in an area that demand is high due to demographics.

The requirements for new assets may result from growth, social or environmental needs. The impact from growth is included in the demand analysis within the Asset Management Strategy.

Section 94 Contributions will be reviewed prior to the next adaptation of POS AMP 2018/19. Both capital types may be funded at least in part through Developer Contributions in the form of a Sec 94 Contribution, a Voluntary Planning Agreement, or as part of a subdivision development.

New assets and upgrade/expansion of existing assets are identified from various sources such as councillor or community requests, proposals identified by strategic plans or partnerships with other organisations. Concept proposals are inspected to verify need and to develop a preliminary renewal estimate. Verified proposals are ranked by priority and available funds and scheduled in future works programmes.

Council has developed a framework for the prioritisation of capital projects and that information is used in the consideration of all new projects above the threshold set in the framework. Included in the analysis is the identification of life cycle costs as outlined in the Asset Management Strategy.

Council has an adopted strategy for the expansion of POS with the following new / upgraded assets proposed over the next 10 years to meet demand and safety improvement requirements. Table 9.1 indicates the major projects and groups of new / upgraded assets proposed, a complete list is contained in Appendix C.

Table 9.1: What are the top 6 upgraded / new assets proposed over the next 5 years?

Project 2020/21 2021/22 2022/23 2023/24 2024/25 Total

Implementation of Master Plan 250,000 250,000 250,000 250,000 1,000,000

Plinths New Section 20,000 20,000 20,000 20,000 20,000 100,000

RA 1.45.9735.9999) 500,000 1,500,000 2,000,000

S94 - OS11, Max Stewart Oval - renovation (1.45.9440.9402) 292,500 292,500

Sporting Precinct - Rectangular Playing Fields 10,000,000 15,000,000 25,000,000

Figure 9.1: What will we spend over the next 10 years on Upgraded or New Assets?

0

2

4

6

8

10

12

14

16

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30

$ (M

illio

ns)

Park and Reserve Enhancements Rectangular Playing Field Sports Fields Enhancements Orange Cemetery Capital Works

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 20

9. Asset Rationalisation and Disposal Plan

Disposal is any activity associated with disposal of a decommissioned asset including sale, demolition or

relocation. Assets with a condition rating of 9 (poor condition), where Council has received no contact through

the Customer Request System indicating that the community require the asset (as they have raised concerns or

complaints about the asset condition) may be considered to be a redundant asset or not utilised and therefore

decommissioned and disposed.

Table 10.1: What assets are we planning to dispose of?

Asset Reason Year Cost

Orange Showground – Fence – Concrete/mesh – old trotting track Condition and function failed 2020/21 $1,000

Total 2020/21 $1,000

Note: Costs represent cost of disposal only.

10. Financial Plan

As part of its funding strategy, Council has the option to supplement any or all of the current or new public open

space proposals that come into consideration for construction with borrowings. This strategy is heavily

influenced by the monitoring of Councils Debt Service Ratio. Council currently limits this ratio at 10%.

A summary of the funding requirements and expenditure over the next 20 years is included in Appendix D, with the projected budget amounts being based on 2020 dollars increased for growth by 0.9% per annum.

Funding for management of assets can come from a variety of sources as detailed in the table below.

Table 11.1: Where does our Income come from?

Item Budget

General Fund 40

Grants 1,302

Other Income 35

User Fees & Charges 25

Section 94 Contributions 15

Potential Future Funding 75

Total 1,492

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 21

Figure 11.1: What is the breakup of our income streams?

11. Risk Management Plan

Council is committed to the identification and elimination or reduction of risks associated with hazards that arise

throughout Council operations as far as reasonably practicable. To facilitate this process an Enterprise Risk

Management Plan has been developed which includes the management of risks for each of its assets. From this

Plan the following key Risks have been identified: (data from Pulse .Date)

Table 12.1 Critical Risks and Treatment Plans

Risk Category Risk Description Residual Risk Level (1-5

rating)

Service Delivery Image & Reputation Political

Loss of use of contractors 1

Service Delivery Image & Reputation Financial management

Lack of input into Building AMP 2

Service Delivery Image & Reputation Financial management

Open Space AMP assets condition inspections, asset register maintenance and improvement program for AMP deferred due to staff resourcing

2

Service Delivery Image & Reputation Financial management

Outdated and unachievable Plans of Management/Master Plans 2

Service Delivery Image & Reputation Financial management

Council’s Capital Value Register not correlating with Council’s Asset Register 2

Service Delivery Image & Reputation Financial management

Lack of prioritisation of projects 2

Image & Reputation Environmental

Reduction of natural plantings, and aesthetic quality being compromised to achieve maintenance levels (eg. increased removal of shrubs, increased use of artificial turf, gravel)

2

Service delivery Lack of budget to achieve current expected levels of service 2

Financial Management Missed funding opportunities 2

Image & Reputation Poorly run events by associations impacting Council's image and rep 2

3%

87%

2% 2%1% 5%

General Fund

Grants

Other Income

User Fees & Charges

Section 94 Contributions

Potential Future Funding

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 22

Risk Category Risk Description Residual Risk Level (1-5

rating)

Health & Safety Image & Reputation

Injury arising from public event held on council land (also negative impact on image/rep eg. Taste Orange events in Robertson Park eg. presentation, waste removal, toilets etc)

2

Health & Safety Injury due to working at distance from each other (staff, apprentices and volunteers) 2

Image & Reputation Corporate Governance

Lack of compliant signage as remote supervision 2

Employees Service Delivery Lack of communication of goals to staff (ie what is in next budget, capital works program etc) 3

Financial Management Image & Reputation

Poor planning of new assets coming onto maintenance schedules 3

Corporate Governance Legislative non-compliance (Department of Planning and Infrastructure open space guidelines; Disability Discrimination Act; Building Code of Australia; Kids Safe NSW Best Practice Guidelines; Australian Standards 4685 (Playground Equipment) and AS/NZS4486

3

Corporate Governance Not delivering on Community Strategic Plan (2012-2022), namely key objectives of: providing community open spaces, social and healthy childhood development opportunities

3

Health & Safety Injury/damage due to unlocked toilets overnight 3

Health & safety Injury due to lack of lighting (or lights not meeting standards in parks - including parks with water bodies) open after dusk

3

Health & Safety Image & Reputation

Injury sustained in play space 3

11.1 Critical Assets

One of the outcomes of the Risk assessment process is the determination of Critical Assets. Critical assets are specific assets which have a high consequence of failure but not necessarily a high likelihood of failure by identifying critical assets and critical failure modes, Council can appropriately target and refine inspection regimes, maintenance plans and capital expenditure plans.

Operations and maintenances activities may also be targeted to mitigate critical assets failure and maintain service levels. These activities may include increased inspection frequency, higher maintenance intervention levels, etc.

Critical Park assets and Treatment Plans are detailed in Table 12.2 below:

Table 12.2 Critical Open Space Assets

Critical Assets Critical Failure Mode Treatment Plan

Premier Sports-field - Wade Park Playing Surface

Loss of natural playing surface from disease or pest attack

Implementation of pest/disease inspection/identification program.

Implement “Contingency Venues” list.

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 23

12. Performance Review and Proposed Improvement Plan

Improvement Plan

Task No

Task Responsibility Timeline

1 Continue to expand and improve the accuracy and completeness of the Parks Asset Register encompassing all Open Space and Recreation assets and develop renewal models for all Park & Garden assets.

City Presentation

2 Introduce scenarios based on LOS if we increase/decrease the intervention levels of asset classes and how the community might react.

City Presentation

3 Address demand forecast based on the Open Space Strategy and landscape master plans, for what we currently provide and Community expectations

City Presentation

4 Build on current renewal models for asset components, selecting one high value (based on maintenance costs) asset per new AMP

City Presentation

5 Implement the condition inspection regime based on asset hierarchy. City Presentation

Achievements

The following actions have been completed since the development of the last AMP

The alignment of budget and Asset Management Plans

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 24

13. Appendix A: Mowing Scope of Works and Service Levels

13.1 Parks and Open Space Maintenance List

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Agland Park Calare 29,740 • • 3

Alua Park Calare 1,301 • • 3

Amana Circuit Reserve Bletchington 1,281 • 4

Anson to Anson Reserve Bletchington 10,431 • 4

Anzac Park Bowen 96,299 • • • 2

Banjo Paterson Memorial Park

Narrambla 24,220 •

4

Beech Crescent (Reservoir) Walkway

Calare 605

4

Beech Crescent Park Calare 2,521 • • 3

Beverly Park Calare 2,791 • • 3

Blaxland Walk Warrendine 19,866 • • 4

Bletchington Oval Bletchington 21,480 • • 3

Bletchington Street vacant land (behind Spring St)

Bowen 6,873

4

Bloomfield Park Bloomfield 211,733 • • 4

Blowes Reserve Glenroi 16,039 • • 4

Bouffler Park Warrendine 4,200 • • 3

Bowen Park Bowen 3,412 • • 3

Bowie Reserve Bletchington 6,407 • 4

Bowman Avenue Reserve Calare 507 • 4

Brendon Sturgeon Oval Bletchington 42,740 • • • 2

Brooklands Reserve Bletchington 92,819 • 4

Buckland Drive Drainage Service

March 219

• 4

Burrendong Way Road Reserve

Bletchington 2,035 •

4

Campbell’s Corner Canobolas 1,598 • 4

Carcoar St / Worboys St Reserve

Spring Hill 1,176

4

Carwoola Drive Public Reserve

Calare 7,144 •

4

Cemetery Bowen 98,950 • • 1

Centenary Park Glenroi 8,670 • • 3

Civic Centre Precinct Orange 38,036 • 1

Clergate Road Reserve Bletchington 111,895 • • 4

Clifton Grove Mud Hut Clifton Grove 33,710 • • • 3

Clinton Street Public Pathway

Bletchington 139

4

Colvin Park Bowen 9,347 • • 3

Coogal Park Calare 124,996 • • • 3

Cook Park Orange 40,470 • • • 1

Cootes Park 13,630 • • 3

Coulson Park Bowen 3,473 • 4

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 25

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Courallie Park Bletchington 93 • • 3

Cutcliffe Park Calare 6,303 • • • • 3

Cypress Park Calare 1,777 • • 3

Dalton Street Reserve Bowen 10,120 • • 4

Daydawn Place Reserve Bowen 23,820 • 4

Diamond Drive Reserve Bletchington 8,127 • • 3

Dimboola Way (Footpath) March 5,127 • 4

Dobbin Park Warrendine 947 • • 3

East Orange Channel Bowen 1,327 • 4

Ebber Vale (Part NOB Road)

Bowen 18,480 •

4

Edye Park Glenroi 4,905 • • 3

Elonera Park Glenroi 2,163 • • 3

Endsleigh Park Glenroi 689 • • 3

Esso Park Orange 7,843 • • 3

Eurawillah Street Bletchington 2,943 • 4

Farrell Road Bletchington 1,482 • 4

Flanagan Park Orange 1,526 • • 3

Frost Park Bowen 4,585 • • 3

Garema Park Glenroi 364 • • 3

Gateway Park - Bulky Goods Site

Summer Hill 202,450 •

4

George Weily Reserve Calare 823 3

Glenroi Oval Glenroi 168,900 • • • 2

Governor Phillip Reserve Bletchington 2,567 • • 4

Greengate Park Orange 1,562 • • 3

Greenleigh Walk Glenroi 16,186 • 4

Hargraves Reserve Bletchington 2,022 • 4

Harold Nicholas Walk Calare 24,169 • • 3

Hawke Lane Reserve Bloomfield 39,820 • 4

Hill Park Bowen 65,401 • • • 3

Hill Street Road Reserve Bletchington 28,622 • 4

Honeyman Drive Narrambla 25,218 • 4

International Gardens Warrendine 21,943 • • • • 3

Jaeger Reserve Bletchington 15,520 • • • 2

Kearneys Drive Reserve & Residential Stormwater

Bletchington 10,400 •

4

Kearneys Drive Reserve Wetland

Bletchington 11,610 •

4

Keith Thomas Park Bletchington 31,550 • • 3

Ken Rawle Park Calare 16,334 • • • 3

Kerr's Place Playground Bletchington 1,087 • • 3

Koolangarra Playground Calare 2,495 • • 3

Kylie Park Calare 1,315 • • 3

Larance Park Warrendine 3,307 • • 3

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 26

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Laurel Reserve (connected to Ken Rawle Park)

Calare 769 •

• •

3

Leeds Parade Narrambla 1,137 • • 4

Leewood Drive Reserve Glenroi 5,737 • 4

Leewood Park Glenroi 5,010 • 4

Leonie Healy Park Glenroi 27,620 • • • 3

Lilac Park Calare 3,962 • • 3

Lords Place retention basin Warrendine 6,939 • 4

Lucknow Drainage Reserve

Lucknow 4,894

4

Lucknow Walking Trail & Wentworth Mine

Lucknow 840

• •

3

Machin Park Warrendine 8,938 • • • • 3

Mangowa Close Warrendine 229 • 4

Margaret Stevenson Park Bowen 13,370 • • 3

Matthews Park Orange 33,195 • • 3

Max Stewart Oval Calare 27,020 • • • 2

Memory Park Bowen 12,174 • • 3

Millard Park Bowen 1,062 • • 4

Minali Playground Calare 1,062 • • 3

Mitchell Highway Reserve (Lone Pine)

Bowen 710 •

4

Molong Road Reserve Calare/Bletchington

6,965 •

4

Molong Road Residential (Cnr. Royle Drive)

Calare 336

4

Moulder Park Precinct Orange 120,552 • • • • • 1

Mount Lindsay Rotary Park Bowen 5,824 • • • 2

Mulga Bill Place Orange 4,820 • 4

Mulholland Park Bowen 13,230 • • 3

Narrambla Estate- Open Space

Narrambla 105,039 •

4

Nelson Park Warrendine 41,032 • • • 3

Newman Park Bowen 24,280 • • • • 2

Oleander Park Calare 1,556 • • 3

Ooranga Playground Calare 2,359 • • 3

Ophir Road (total) Suma Park 31,591 • • 4

Panpande Park Calare 500 • • 3

Pasadena Walk Calare 1,333 • • 3

Paul Park Bletchington 25,630 • • 4

Peisley Street Road Reserve (Dalton Street)

Bletchington 40

4

Perry Oval Bletchington 22,328 • • • 2

Phillip Street Retention Basin (Quinlan Run)

Narrambla 1,680

4

Phillip Street Road Reserve/Drainage Reserve

Narrambla 4,676

4

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 27

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Pilcher Park Warrendine 67,290 • • • 3

Pines Lane Reserve Calare 25,330 • 4

Ploughman Lane Land/Wetlands

Calare 121,529 •

4

Ploughman’s Drainage Reserve

Calare 2,973 •

4

Plowman Park Bowen 4,986 • • • 3

Racecourse Road Reserve Calare 3,807 • • 4

Ratcliffe Park Bletchington 2,574 • • 3

Riawena Oval Calare 25,390 • • 3

Ridley Oval Glenroi 89,345 • • • • 3

Rose Park Glenroi 1,177 • • 3

Sieben Drive (Cherrywood lots)

Calare 1,720

4

Sieben Drive Road Reserve

Calare 28

4

Sieben Park Calare 3,327 • • 3

Sir Jack Brabham Park Warrendine 216,640 • • • 1

Sir Neville Howes Park Warrendine 13,060 • • • 3

Smith Park Calare 7,834 • • • 3

Somerset Park Bletchington 124,369 • • • 3

Sophie Drive Reserve Bowen 54,649 • • 4

Speet Place Reserve Bletchington 3,500 • • 3

Spring Hill Park (Alf Reed Park)

Spring Hill 1,530

• •

3

Spring Hill Oval Spring Hill 67,931 • 3

Stirling Avenue Reserve Calare 15,041 • • • 3

Sullivan Circuit North Orange 14,430 • 4

Sundew Circuit Reserve Warrendine 8,740 • • 3

Tanderra Park Calare 15,420 • • 3

Tanner Park Warrendine 2,194 • • 3

Teamsters Walkway Bletchington 16,366 • 4

The Escort Way Calare 64,860 • 4

Thorpe Place Reserve Bletchington 21,326 • 4

Torulosa Park & Reserve Glenroi 8,799 • • 4

Total Park Glenroi 16,245 • • • 3

Uonga Playground Calare 1,065 • • 3

Valencia Drive Parkland Calare 17,659 • • 3

Walkway - Sieben to Lyrebird

Calare 584

4

Warrigal Place Bletchington 32 • 4

Warrigal Reserve Bletchington 8,561 • 4

Warrigal/Distributor Power Lines

Bletchington 33,869 •

4

Watts Reserve Clifton Grove 25,265 • • 4

Weily Park Bowen 7,450 • • 3

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 28

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Wentworth Lane Reserve Calare 310 • 4

Wentworth Walkway Calare 21,180 • 4

Wiare Reserve Calare 16,500 • • • • 2

Wilima Walk Calare 17,781 • • • 3

William Maker Drive March 6,948 • • 3

Winter Street Reserve Bowen 1,596 • • 4

Withington Park Calare 3,500 • • 3

Woraninta Park Warrendine 2,732 • • 3

Footpaths - Orange Urban

Railway Carpark, Peilsey Street

4

Windred Street – road closure

4

Cargo Rd Corner – road verge

4

Endsleigh Avenue – road verge near railway crossing

4

Lone Pine Avenue – footpath

4

Peisley & Dalton Street – road verge

4

Beaurepairs & IGA Corners – road verge

4

Cultural Centre - footpath • 4

Woodward Street – road verge

4

Diamond Dr to Waratah Sports field - walkway

4

Valencia Way - walkway • 4

Robinson Court - verge • 4

Cnr Anson & Phillip - verge • 4

Pippin Way – roadside reserve

4

Kurim Avenue Shopping Complex - footpath

4

East Fork Railway - footpath

4

Old Muirs Shed - footpath • 4

Manning Road – road closure

4

NDR - Anson, Telopea - footpaths

4

Hill Park (Margaret St op Jilba)

4

Footpaths - Spring Hill

Spring Hill – unoccupied road verges

4

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 29

Location Suburb Total Area m2 Mowing Regional District Local Sportsground Park Linear-Ancillary-

Natural

Maintenance Level

Footpaths - Lucknow

Lucknow– unoccupied road verges

4

Chainmen’s Bend • 4

Miners Walk - below Wentworth Mine

4

Wentworth Mine • 3

NOT IN CONTRACT

13.2 Service maintenance levels – Activity frequency schedule

- Parks and open space areas are to be visited per their service level, with maintenance performed as

required to meet the performance criteria specified.

- Parks that are indicated as sportsgrounds are to receive surrounds maintenance only, as Orange City

Council staff will maintain the sports field.

- Artificial cricket wickets are to have edge strips, one mower width wide, mown to the performance

requirements for Cricket Ovals listed in 1420.

- The Recreation Ground at Spring Hill is to be maintained to the performance requirements for Cricket Ovals

in Season.

- Spring Hill and Lucknow village mowing includes mowing of verges that are not maintained by residents.

Service Level Corresponding Park Category Activity Maintenance frequency

1 Regional All activities as specified and required. Weekly Visitation

2 District All activities as specified and required Visit Every Two Weeks

3 Local All activities as specified and required Visit Every Four Weeks

4 Linear/Ancillary/Natural Area All activities as specified and required Visit Every Six Weeks

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 30

14. Appendix B: Rolling Five Year Renewal Programs

The following programs are based on best available information with the first year of works expected to be delivered within budgetary constraints. The following years will be validated each year with a review of the condition so that assets are only renewed at the intervention level. Works that can’t be funded within the 4 years but which are expected to be due based on modelling, are grouped as ‘unfunded works’.

Appendix B – Renewal Program (2020-21 to 2024-25)

14.1 Barbeques

ID Facility Barbeques condition intervention budget fin_yr

56104 Pinnacle Reserve and Lookout BBQ - bluestone - camp oven 8.81 6.0 $ 12,000 2021

150810 Moulder Park Precinct - Park Area (Oval) BBQ - double plate - electric 7.81 6.0 $ 17,000 2021

56097 Newman Park BBQ - double plate - electric 7.84 6.0 $ 8,500 2021

56098 Gosling Creek Reserve BBQ - double plate - gas 7.81 6.0 $ 15,000 2021

150811 Moulder Park Precinct - Park Area (Oval) BBQ - single plate - electric 7.81 6.0 $ 10,400 2021

56096 Matthews Park BBQ - single plate - electric 7.81 6.0 $ 5,200 2021

56103 Pinnacle Reserve and Lookout BBQ - steel - hotplate 7.81 6.0 $ 18,000 2021

151113 Clifton Grove Mud Hut BBQ - single plate - electric 7.84 6.0 $ 5,200 2021

56101 Lake Canobolas Reserve BBQ - double plate - electric 6.91 6.0 $ 7,500 2022

56105 Orange Adventure Playground BBQ - double plate - electric 6.81 6.0 $ 34,000 2022

151259 Gateway Park - Bulky Goods Site BBQ - single plate - electric 6.83 6.0 $ 5,200 2022

56100 Lake Canobolas Reserve BBQ - single plate - electric 6.91 6.0 $ 10,400 2022

56102 Lake Canobolas Reserve BBQ - triple plate - electric 6.91 6.0 $ 10,000 2022

150879 Lake Canobolas Reserve BBQ - single plate - gas 6.91 6.0 $ 15,600 2024

189630 Spring Hill Park BBQ - single plate - gas 6.85 6.0 $ 6,000 2025

Total $ 180,000

14.2 Playgrounds

This schedule may alter pending adoption of the Play Strategy

ID Facility Playground condition intervention budget fin_yr

192959 Kerr's Place Playground Playground 9.71 6.0 $ 60,000 2021

193857 Glenroi Community Centre Playground 8.33 6.0 $ 20,000 2021

195791 Courallie Park Playground - Childcare Centre 7.97 6.0 $ 40,000 2021

195792 Spring Street Child Care Playground - Childcare Centre 7.97 6.0 $ 40,000 2021

196466 Yarrawong Childcare Centre Playground - Childcare Centre 7.90 6.0 $ 40,000 2021

151277 Alua Park Playground - swing 6.79 6.0 $ 10,000 2021

56086 Lake Canobolas Reserve Apex Playground 7.86 6.0 $ 150,000 2021

189617 Lake Canobolas Reserve Cableway 9.93 6.0 $ 40,000 2021

56090 Orange Adventure Playground Playground 7.86 6.0 $ 130,000 2021

56057 Keith Thomas Park Playground 10.00 6.0 $ 40,000 2021

56059 Leonie Healy Park Playground 9.44 6.0 $ 60,000 2021

56061 Margaret Stevenson Park Playground 7.86 6.0 $ 60,000 2021

56069 Sieben Park Playground 8.80 6.0 $ 60,000 2021

56071 Somerset Park Playground 7.86 6.0 $ 40,000 2021

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 31

ID Facility Playground condition intervention budget fin_yr

56076 Sir Neville Howes Park (Cnr Forest & Sharp Rds)

Playground 10.00 6.0 $ 60,000 2021

56077 Spring Hill Park Playground 7.86 6.0 $ 60,000 2021

56080 Newman Park Playground 7.86 6.0 $ 60,000 2021

56084 Gosling Creek Reserve Playground 6.79 6.0 $ 60,000 2021

56055 Glenroi Oval Precinct - Hockcy Playground - Maxwell Ave 6.79 6.0 $ 30,000 2021

151153 Glenroi Oval Precinct - Hockcy Playground - Orchard Grove Rd 7.86 6.0 $ 30,000 2021

56051 Coogal Park Playground - swing 9.90 6.0 $ 10,000 2021

56053 Elonera Park Playground - swing 9.90 6.0 $ 10,000 2021

189618 Lake Canobolas Reserve Swings - Playspace 6.85 6.0 $ 30,000 2021

56091 Moulder Park Precinct - Elephant Park

Playground 6.86 6.0 $ 60,000 2022

151246 Lucknow Walking Trail & Wentworth Mine

Playground 6.86 6.0 $ 40,000 2022

56067 Ratcliffe Park Playground 6.20 6.0 $ 40,000 2022

56082 Esso Park Playground - swing 6.86 6.0 $ 10,000 2022

56079 Memory Park Playground - swings 6.86 6.0 $ 10,000 2022

151116 Clifton Grove Mud Hut Playground 6.86 6.0 $ 30,000 2022

150809 Moulder Park Precinct - Park Area (Oval)

Fitness Stations 6.77 6.0 $ 60,000 2023

56074 Wiare Reserve Playground 6.84 6.0 $ 60,000 2023

56085 Gosling Creek Reserve Fitness Stations 6.79 6.0 $ 30,000 2023

56072 Somerset Park Fitness Stations 6.75 6.0 $ 30,000 2023

56088 Cook Park Junior and Senior Swing 6.82 6.0 $ 30,000 2023

56089 Riawena Oval Playground 6.83 6.0 $ 40,000 2023

187570 Charles Cutler Park Dorothy Cutler Play Space 6.23 6.0 $ 40,000 2025

148712 Beech Crescent Park Playground 6.84 6.0 $ 30,000 2025

Total $ 1,650,000

14.3 Fencing

ID Facility Location Asset(Component) condition intervention budget fin_yr

193007 Cemetery Cemetery -Boundary Fencing

Rear Boundary Fence 9.48 8.0 $ 3,025 2021

150600 Orange Showground Fences Fence - Concrete/mesh - drainage swale

9.26 8.0 $ 3,636 2021

55327 Lake Canobolas Reserve Fences Fence - Rural 9.26 8.0 $ 8,799 2021

150608 Orange Showground Fences Fence - Rural - Cattle Pavilion

9.26 8.0 $ 2,123 2021

150421 Gosling Creek Reserve Fences Rural - 1.2m - old 8.26 8.0 $ 2,933 2022

196686 Lake Canobolas - Mountain Bike Park (Earth Sanct)

Fences Perimeter 1.7m Security Fencing

8.30 8.0 $ 134,544 2024

196622 Ophir Resource Recovery Centre (ORRC)

ORRRC - Fencing Fencing to main Building/Office

8.30 8.0 $ 20,459 2024

55332 Pinnacle Reserve and Lookout

Fences Fence - steel - Lookout 8.26 8.0 $ 5,025 2025

Total $ 180,544

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 32

14.4 Seating

ID Facility Seating condition intervention budget fin_yr

151157 Perry Oval Seating - Bench - timber 10.00 7.0 $ 1,800 2021

55381 Larance Park Seating - Block + wood slat seat 9.41 7.0 $ 795 2021

55453 Pilcher Park Seating - Iron & wood slat park bench - no arms

7.41 7.0 $ 795 2021

55387 Max Stewart Oval Seating - Steel 8.42 7.0 $ 1,620 2021

55372 Glenroi Oval Precinct - Hockcy Seating - timber - bench 10.00 7.0 $ 3,297 2021

55455 Moulder Park Precinct - Elephant Park

Seating - timber - seat 7.81 7.0 $ 3,780 2021

149363 Wirraburra Walk Seating - timber - seat 7.81 7.0 $ 2,590 2021

55450 Moulder Park Precinct - Park Area (Oval)

Seating - timber - seat 7.81 7.0 $ 10,080 2021

150705 Moulder Park Precinct - Anson St Netball Courts

Seating - timber - seat 7.81 7.0 $ 4,410 2021

55421 Orange Botanic Gardens Seating - timber/bluestone - bench 7.81 6.0 $ 1,750 2021

55407 Matthews Park Seating - timber/concrete 7.81 7.0 $ 746 2021

55411 Memory Park Seating - timber/concrete - seat 7.81 7.0 $ 1,400 2021

55414 Newman Park Seating - timber/concrete - seat 7.84 7.0 $ 795 2021

149411 Cook Park Seating - timber/concrete - seat 7.81 6.0 $ 3,822 2021

55408 Matthews Park Seating - timber/metal 7.81 7.0 $ 2,100 2021

55443 Orange Adventure Playground Seating - timber/steel -seat 7.81 6.0 $ 1,260 2021

55445 Bloomfield Park Seating - timber/steel - bench 10.00 7.0 $ 900 2021

55375 Sir Jack Brabham Park Seating - timber/steel - bench 7.81 6.0 $ 18,600 2021

150467 Orange Adventure Playground Seating - timber/steel - bench 7.81 6.0 $ 6,000 2021

55436 Robertson Park Seating - timber/steel - seat 7.81 6.0 $ 21,368 2021

55440 Cook Park Seating - timber/steel - seat 7.81 6.0 $ 2,590 2021

55431 Pinnacle Reserve and Lookout Seating - Wood bench (2.0m long) 7.41 7.0 $ 21,425 2021

55396 Sieben Park Seating - Wooden seat + concrete legs 7.41 7.0 $ 1,586 2021

55398 Total Park Seating - Wooden seat + concrete legs 7.41 7.0 $ 795 2021

55379 Keith Thomas Park Seating Steel powdercoated bench 8.42 7.0 $ 2,449 2021

55383 Machin Park Seating Steel powdercoated bench 8.42 7.0 $ 1,224 2021

14805 Public Carparks - CBD Site Furniture 7.41 7.0 $ 1,022 2021

55370 Edye Park Seating - Concrete 7.15 7.0 $ 1,836 2022

55418 Orange Botanic Gardens Seating - timber - seat 6.81 6.0 $ 33,023 2023

55419 Orange Botanic Gardens Seating - timber - single seat 6.81 6.0 $ 420 2023

55420 Orange Botanic Gardens Seating - timber - tree surround 6.81 6.0 $ 630 2023

149410 Cook Park Seating - timber/steel (Furphy) - bench 6.81 6.0 $ 15,456 2023

55441 Cook Park Seating - timber/steel (Furphy) - seat 6.81 6.0 $ 18,620 2023

149409 Cook Park Seating - timber/steel (Furphy) - seat + plaque

6.81 6.0 $ 5,985 2023

55374 Sir Jack Brabham Park Seating - aluminium - bench 6.82 6.0 $ 5,940 2024

151087 Wade Park Seating - aluminium - bench 6.82 6.0 $ 1,080 2024

151139 Sir Jack Brabham Park Seating - steel - bench 6.82 6.0 $ 6,048 2024

55438 Wade Park Seating - steel - bench 6.82 6.0 $ 7,830 2024

14817 Spring Street Child Care Timber Park bench 7.41 7.0 $ 1,022 2024

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 33

ID Facility Seating condition intervention budget fin_yr

55449 Moulder Park Precinct - Park Area (Oval)

Seating - steel 7.82 7.0 $ 7,290 2025

150707 Moulder Park Precinct - Anson St Netball Courts

Seating - steel 7.82 7.0 $ 5,589 2025

55416 Ridley Oval Seating - steel - bench 7.82 7.0 $ 1,620 2025

55452 Pilcher Park Seating - steel - bench 7.82 7.0 $ 918 2025

55385 Margaret Stevenson Park Seating - steel - bench 7.82 7.0 $ 1,944 2025

55391 Mulholland Park Seating - steel - bench 7.84 7.0 $ 1,080 2025

55377 Jaeger Reserve Seating - steel -bench 7.82 7.0 $ 2,430 2025

55368 Coogal Park Seating Steel powdercoated bench 7.42 7.0 $ 306 2025

55394 Riawena Oval Steel seating 7.82 7.0 $ 2,901 2025

Total $ 240,967

14.5 Tables

ID Facility Tables condition intervention budget fin_yr

150425 Gosling Creek Reserve Combined table/seating - Modwood 7.80 7.0 $ 17,100 2021

55855 Centenary Park Table - steel 7.80 7.0 $ 1,332 2021

55878 Banjo Paterson Memorial Park Table - steel 7.84 7.0 $ 2,664 2021

55889 Orange Adventure Playground Table - timber 7.80 6.0 $ 4,750 2021

55894 Campbells Corner Table - timber 10.00 7.0 $ 1,729 2021

55856 Sir Jack Brabham Park Table - timber 7.80 6.0 $ 1,169 2021

55877 Banjo Paterson Memorial Park Table - timber 7.84 7.0 $ 865 2021

55866 Matthews Park Table - timber 7.80 7.0 $ 865 2022

55887 Cook Park Table - timber 6.80 6.0 $ 7,738 2022

151112 Clifton Grove Mud Hut Table - timber 7.84 7.0 $ 2,461 2022

151095 Anzac Park Precinct Combined table/seating - Modwood 7.80 7.0 $ 15,200 2024

55874 Newman Park Table - steel 7.84 7.0 $ 3,996 2024

149258 Riawena Oval Table - steel 7.82 7.0 $ 1,332 2024

55859 Ratcliffe Park Table - steel 7.80 7.0 $ 1,332 2024

55871 Newman Park Table - timber 7.84 7.0 $ 1,729 2024

Total $ 64,262

14.6 Shelters

ID Facility Shelter condition intervention budget fin_yr

55237 Cootes Park Shelter 6.10 6.0 $ 7,875 2022

Total $ 7,875

14.7 Active Play Areas

ID Facility Park Location condition intervention budget fin_yr

55129 Anzac Park Precinct Anzac Oval Active Play Areas

Anzac Park - Sportsfield

7.47 7.0 $ 101,250 2021

55205 Anzac Park Precinct BMX Track 10.00 7.0 $ 4,793 2021

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 34

ID Facility Park Location condition intervention budget fin_yr

150718 Moulder Park Precinct - Anson St Netball Courts

Netball Courts - Rebound

7.77 7.0 $ 227,040 2021

55203 Glenroi Oval Precinct - Hockcy

BMX Tracks 9.79 7.0 $ 42,827 2021

55204 Spring Hill Park BMX Tracks 10.00 7.0 $ 864 2021

151061 Brendon Sturgeon Oval Cricket Pitch 8.79 7.0 $ 3,055 2021

55189 Sir Jack Brabham Park Cricket Pitches - Synthetic

9.79 7.0 $ 5,070 2021

55182 Cutcliffe Park Cricket wicket 8.87 7.0 $ 3,510 2021

55166 Moulder Park Precinct - Park Area (Oval)

Active Playing Area Sportsground 8.78 7.0 $ 54,315 2021

151094 Anzac Park Precinct SNHS Outdoor Netball Courts

Netball Courts - Playing Surface

7.15 7.0 $ 245,280 2022

188533 Anzac Park Precinct Anzac Oval Active Play Areas

Cricket Wicket - Synthetic Surface

7.20 7.0 $ 4,615 2023

55192 Margaret Stevenson Park

Concrete Cricket Pitch 7.76 7.0 $ 5,100 2023

55198 Ridley Oval Cricket Pitches 7.80 7.0 $ 7,500 2023

55181 Courallie Park Cricket Pitches 7.80 7.0 $ 7,200 2023

55201 Bloomfield Park Cricket Wicket 7.80 7.0 $ 8,100 2023

199339 Bletchington Oval Cricket Wicket - synthetic

7.84 7.0 $ 3,185 2023

188532 Max Stewart Oval Cricket Wicket - synthetic

7.20 7.0 $ 52,000 2023

151250 Ridley Oval Sportground 7.80 7.0 $ 53,325 2023

55131 Courallie Park Sportsground 7.80 7.0 $ 32,571 2023

55143 Sir Jack Brabham Park Sportsground 7.80 7.0 $ 618,390 2023

55145 Jaeger Reserve Sportsground 7.80 7.0 $ 66,915 2023

55156 Perry Oval Sportsground 7.80 7.0 $ 81,000 2023

55202 Moulder Park Precinct - Park Area (Oval)

Active Playing Area Cricket Wicket - synthetic

7.17 7.0 $ 59,800 2023

151251 Ridley Oval Basketball Court 7.28 7.0 $ 29,550 2024

Total $ 1,717,255

14.8 Internal Roads

ID Facility Description AssetSection condition intervention budget fin_yr

193147 Anzac Park Precinct

March Street - BMX Access Road

From March Street to Rear of BMX Track

8.47 8.0 $ 3,280 2021

195496 Colour City Caravan Park

CCCP - North 3 Rd CCCP - Surface 8.03 8.0 $ 2,066 2021

195491 Colour City Caravan Park

CCCP - North-East 1 Rd CCCP - Surface 8.04 8.0 $ 5,546 2021

195977 Ophir Resource Recovery Centre (ORRC)

ORRRC - Internal Road - Section 9

Pavement 10.00 8.0 $ 39,300 2021

196464 Phillip Street Quarry

Phillip St QuarryEntrance (Sealed Section Only)

Phillip St Quarry Entrance - Surface

8.78 8.0 $ 21,700 2021

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 35

ID Facility Description AssetSection condition intervention budget fin_yr

195534 Orange Showground

OSG - Margaret St - Unsealed Rd

OSG - Pavement 8.37 8.0 $ 17,370 2021

195531 Orange Showground

OSG - Rodeo - Unsealed Rd

OSG - Pavement 8.37 8.0 $ 18,090 2021

193177 Sir Jack Brabham Park

SJBP - Huntly Rd North Access

110 From Path to End 8.50 8.0 $ 2021

193169 Sir Jack Brabham Park

SJBP - Huntly Rd South Access

110 From Carpark to Works Compound

8.50 8.0 $ 4,120 2021

196031 Works Depot DIR06-East End Machinery Shed

Surface 8.79 8.0 $ 11,860 2021

196032 Works Depot DIR06-East End Machinery Shed

Pavement 8.36 8.0 $ 17,790 2021

196043 Works Depot DIR09-Records Shed - South East

Surface 9.79 8.0 $ 20,800 2021

196044 Works Depot DIR09-Records Shed - South East

Pavement 8.36 8.0 $ 31,200 2021

196051 Works Depot DIR11-Top Yard Surface 9.79 8.0 $ 38,913 2021

193193 Esso Park Esso Park Internal Road 100 From Hamer Street to End

8.16 8.0 $ 700 2022

193189 Orange Botanic Gardens

OBG - Carpark Compound Exit

120 From Works Compound to Orchard Path

8.16 8.0 $ 1,200 2022

193185 Orange Botanic Gardens

OBG - Carpark South Entrance

110 From Gates to Function Centre Car Park

8.16 8.0 $ 1,482 2022

195970 Ophir Resource Recovery Centre (ORRC)

ORRRC - Internal Road - Section 7

Surface 8.02 8.0 $ 8,487 2022

195523 Orange Showground

OSG - North 2 Rd OSG - Surface 8.01 8.0 $ 6,871 2022

195486 Colour City Caravan Park

CCCP - East 2 Rd CCCP - Surface 8.03 8.0 $ 4,134 2023

196047 Works Depot DIR10-Records Shed - North East

Surface 8.19 8.0 $ 15,650 2023

195469 Colour City Caravan Park

CCCP - Margaret St Entrance

CCCP - Surface 8.03 8.0 $ 10,816 2025

Total $ 281,375

14.9 Sports Equipment

ID Facility Asset Asset(Component) condition intervention budget fin_yr

55481 Spring Hill Park Cricket - Nets 7.40 7.0 $ 4,050 2021

151253 Ridley Oval Goal Posts - Basketball 7.40 7.0 $ 400 2021

151117 Anzac Park Precinct SNHS Outdoor Netball Courts

Goal Posts - Netball 7.40 7.0 $ 3,520 2023

55459 Anzac Park Precinct Anzac Oval Active Play Areas

Goal Posts - League

7.40 7.0 $ 2,600 2023

149256 Riawena Oval Cricket Practice Net - Junior

7.42 7.0 $ 8,100 2023

55465 Sir Jack Brabham Park Goal Post - Soccer (Juniors)

7.40 7.0 $ 5,200 2023

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 36

ID Facility Asset Asset(Component) condition intervention budget fin_yr

55466 Sir Jack Brabham Park Goal Post - Soccer (Seniors Alloy)

7.40 7.0 $ 3,500 2023

55464 Sir Jack Brabham Park Goal Post - Soccer (Seniors)

7.40 7.0 $ 5,200 2023

151062 Brendon Sturgeon Oval

Goal Posts 7.40 7.0 $ 1,300 2023

55187 Glenroi Oval Precinct - Hockcy

Goal Posts - Hockey 7.40 7.0 $ 7,000 2023

55186 Glenroi Oval Precinct - Hockcy

Goal Posts - League 7.40 7.0 $ 1,300 2023

151084 Wade Park Goal Posts - League 7.40 7.0 $ 1,300 2023

151085 Wade Park Goal Posts - Soccer 7.40 7.0 $ 1,300 2023

55472 Newman Park Goal posts - Soccer 7.38 7.0 $ 1,300 2023

151086 Wade Park Goal Posts - Soccer Nets 7.40 7.0 $ 400 2023

55467 Sir Jack Brabham Park Goal Posts - Softball Nets 7.40 7.0 $ 26,000 2023

151148 Sir Jack Brabham Park Softball - Pitching Mat 7.40 7.0 $ 500 2023

193156 Anzac Park Precinct SNHS Outdoor Netball Courts

SNHSS Complex Basket Ball Post/Board/Ring

7.20 7.0 $ 220 2025

55470 Perry Oval Goal Post - Soccer 7.45 7.0 $ 1,300 2025

55462 Bletchington Oval Goal Post - Soccer 7.45 7.0 $ 1,950 2025

55463 Edye Park Goal Post Set - 3 Soccer - wooden

7.45 7.0 $ 500 2025

55474 Sir Jack Brabham Park Softball - Home Plate Mat 7.45 7.0 $ 300 2025

Total $ 77,240

14.10 Park Signage

ID Facility Park condition intervention budget fin_yr

149355 Barrett Park Sign - Naming 8.83 8.0 $ 600 2021

149365 Wirraburra Walk Sign - SARS 8.83 8.0 $ 454 2021

55780 Newman Park Signage - Naming 8.75 8.0 $ 600 2021

55774 Matthews Park Signage - Naming - Timber 8.75 8.0 $ 600 2021

55673 Bowen Park Signage - Wooden - naming 9.51 8.0 $ 600 2021

55724 Oleander Park Signage - Wooden - naming 9.51 8.0 $ 600 2021

55839 Alua Park Sign - Naming - timber 8.76 8.0 $ 600 2022

55756 Woraninta Park Sign - SARS 8.47 8.0 $ 454 2022

55760 Blaxland Walk Sign - SARS 8.47 8.0 $ 908 2022

151093 Anzac Park Precinct Sign - Naming 8.79 8.0 $ 303 2023

55745 Tanderra Park Sign - SARS 8.83 8.0 $ 303 2023

55722 Mulholland Park Sign - SARS 8.84 8.0 $ 303 2023

55660 Agland Park Sign - SARS 8.83 8.0 $ 1,060 2023

55662 Anzac Park Precinct Sign - SARS 8.79 8.0 $ 908 2023

150539 Orange Botanic Gardens Signage - Directional - steel 8.78 8.0 $ 757 2023

151268 Pinnacle Reserve and Lookout Signage - Directional - timber 8.75 8.0 $ 600 2023

55809 Cook Park Signage - Naming 8.79 8.0 $ 600 2023

55837 Cootes Park Signage - Old SORS 8.01 8.0 $ 151 2023

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 37

ID Facility Park condition intervention budget fin_yr

151156 Perry Oval Signage - Prohibition 8.79 8.0 $ 151 2023

55816 Bloomfield Park Signage - SARS 8.79 8.0 $ 151 2023

55727 Perry Oval Signage - SARS 8.79 8.0 $ 757 2023

55768 Spring Hill Park Signage - SARS 8.79 8.0 $ 303 2023

55783 Ridley Oval Signage - SARS 8.79 8.0 $ 757 2023

55694 Glenroi Oval Precinct - Hockcy Signage - SARS 8.79 8.0 $ 1,060 2023

55714 Margaret Stevenson Park Signage - SARS 8.75 8.0 $ 454 2023

55683 Courallie Park Signage - SORS 8.79 8.0 $ 454 2023

55808 Wade Park Signage - SORS 8.79 8.0 $ 454 2023

55832 Hinton Reserve Signage - Wooden - naming 8.01 8.0 $ 600 2023

55693 Frost Park Signage - Wooden - naming 8.01 8.0 $ 600 2023

55664 Lilac Park Signage - Wooden - naming 8.01 8.0 $ 600 2023

150620 Orange Showground Signs 8.78 8.0 $ 606 2023

55729 Ratcliffe Park Sign 8.20 8.0 $ 151 2024

55677 Centenary Park Sign - Prohibition 8.24 8.0 $ 1,500 2024

55728 Ratcliffe Park Signage 8.20 8.0 $ 151 2024

151082 Wade Park Signage - Commemorative 8.80 8.0 $ 1,000 2024

151154 Glenroi Oval Precinct - Hockcy Signage - Prohibition 8.80 8.0 $ 204 2024

55818 Bloomfield Park Signage - Prohibition 8.80 8.0 $ 204 2024

55821 Moulder Park Precinct - John Lomas Skate Park

Signage - Prohibition 8.78 8.0 $ 204 2024

55704 Sir Jack Brabham Park Signage - Recycled Plastic 8.80 8.0 $ 2,036 2024

151059 Brendon Sturgeon Oval Signs - Monument 8.80 8.0 $ 1,000 2024

149012 Mulholland Park Signs - Prohibition 8.85 8.0 $ 204 2024

149364 Wirraburra Walk Sign - Leash free 8.83 8.0 $ 606 2025

149176 Panpande Park Sign - SARS 8.84 8.0 $ 151 2025

55669 Beverly Park Sign - SARS 8.84 8.0 $ 303 2025

55752 Wiare Reserve Sign - SARS 8.84 8.0 $ 454 2025

55755 Withington Park Sign - SARS 8.83 8.0 $ 151 2025

55813 Cook Park Signage - Guildry 8.79 8.0 $ 757 2025

150711 Moulder Park Precinct - Anson St Netball Courts

Signage - Interprative 8.39 8.0 $ 1,000 2025

150786 Moulder Park Precinct - Park Area (Oval)

Signage - Interprative 8.39 8.0 $ 5,000 2025

55834 Gateway Park - Bulky Goods Site

Signage - Interpretive ( Civic Guide) 8.40 8.0 $ 1,000 2025

151255 Gateway Park - Bulky Goods Site

Signage - Interpretive ( Welcome To Orange)

8.40 8.0 $ 1,000 2025

151143 Sir Jack Brabham Park Signage - Monumental 8.40 8.0 $ 1,500 2025

55703 Sir Jack Brabham Park Signage - Monumental 8.40 8.0 $ 3,000 2025

55804 Robertson Park Signage - Naming 8.79 8.0 $ 600 2025

150760 Moulder Park Precinct - Park Area (Oval)

Signage - Naming 8.77 8.0 $ 600 2025

55824 Griffith Park Signage - Old SORS 8.01 8.0 $ 151 2025

55826 Knight Park Signage - Old SORS 8.01 8.0 $ 151 2025

55828 Brown Park Signage - Old SORS 8.01 8.0 $ 303 2025

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 38

ID Facility Park condition intervention budget fin_yr

55697 Greenleigh Walk Signage - Old SORS 8.01 8.0 $ 303 2025

55709 Larance Park Signage - Old SORS 8.01 8.0 $ 151 2025

55720 Millard Park Signage - Old SORS 8.01 8.0 $ 303 2025

55788 Orange Botanic Gardens Signage - Plant Labels 8.78 8.0 $ 62,850 2025

55779 Colvin Park Signage - Plant naming plaques 8.01 8.0 $ 3,600 2025

55805 Robertson Park Signage - Prohibition 8.79 8.0 $ 4,391 2025

151269 Pinnacle Reserve and Lookout Signage - Prohibition 8.75 8.0 $ 303 2025

150540 Orange Botanic Gardens Signage - Prohibition - Service Entrance 8.78 8.0 $ 303 2025

150764 Moulder Park Precinct - Park Area (Oval)

Signage - Prohibition - Steel 8.77 8.0 $ 303 2025

55799 Lake Canobolas Reserve Signage - Prohibition - Steel 8.76 8.0 $ 1,060 2025

55801 Pinnacle Reserve and Lookout Signage - SARS 8.75 8.0 $ 303 2025

55790 Esso Park Signage - SARS 8.75 8.0 $ 303 2025

55796 Lake Canobolas Reserve Signage - SARS 8.76 8.0 $ 1,211 2025

55810 Cook Park Signage - SARS 8.79 8.0 $ 1,211 2025

55781 Newman Park Signage - SARS 8.75 8.0 $ 606 2025

55773 Matthews Park Signage - SARS 8.75 8.0 $ 606 2025

55741 Smith Park Signage - SARS 8.84 8.0 $ 151 2025

55742 Somerset Park Signage - SARS 8.75 8.0 $ 1,363 2025

55666 Beech Crescent Park Signage - SARS 8.87 8.0 $ 303 2025

151092 Memory Park Signage - SARS 8.76 8.0 $ 151 2025

55817 Bloomfield Park Signage - Small Interprative Signage 8.40 8.0 $ 1,000 2025

55746 Total Park Signage - SORS 8.01 8.0 $ 303 2025

55689 Elonera Park Signage - SORS 8.01 8.0 $ 151 2025

55711 Leonie Healy Park Signage - SORS 8.01 8.0 $ 303 2025

55701 Hill Park Signage - SORS 8.01 8.0 $ 151 2025

55708 Koolangarra Playground Signage - SORS 8.83 8.0 $ 151 2025

55836 Cootes Park Signage - SORS 8.01 8.0 $ 908 2025

150543 Orange Botanic Gardens Signage - Timber 8.78 8.0 $ 300 2025

149184 Pasadena Walk Signge - SARS 8.84 8.0 $ 303 2025

55787 Gosling Creek Reserve Signs - Fauna 8.80 8.0 $ 1,200 2025

150454 Gosling Creek Reserve Signs - Informative 8.80 8.0 $ 606 2025

151069 Max Stewart Oval Signs - Interprative 8.40 8.0 $ 5,000 2025

150455 Gosling Creek Reserve Signs - Naming 8.80 8.0 $ 151 2025

55733 Brendon Sturgeon Oval Signs - Prohabition 8.01 8.0 $ 151 2025

55784 Gosling Creek Reserve Signs - SARS 8.80 8.0 $ 1,211 2025

55730 Riawena Oval Signs - SARS 8.83 8.0 $ 606 2025

149252 Wilima Walk Sign - SARS 8.83 8.0 $ 303 2025

151114 Clifton Grove Mud Hut Signage - Prohibition 8.76 8.0 $ 151 2025

196574 Colour City Caravan Park caravan park - signage - road & kerbing 8.01 8.0 $ 7,500 2025

Total $ 140,953

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 39

15. Appendix C: Upgrade / New Capital Works Program

Project 2020/21 2021/22 2022/23 2023/24 2024/25 Total

Glenroi Oval MasterPlan 125,000 125,000 250,000

Implementation of Master Plan 250,000 250,000 250,000 250,000 1,000,000

Landscaping/Irrigation New Section 5,000 5,000 5,000 5,000 5,000 25,000

Leash Free Dog Area Fencing North Orange 50,000 50,000

MP - Enhance dugout area 110,000 110,000

MP - Primitive camping sites 25,000 25,000 25,000 75,000

Northstoke Way 80,000 80,000

OBG - Koori Walk 80,000 80,000

Plinths New Section 20,000 20,000 20,000 20,000 20,000 100,000

Ploughman's Wetland - Elevated Boardwalk 35,000 35,000

RA 1.45.9735.9999) 500,000 1,500,000 2,000,000

S94 - OS11, Max Stewart Oval - renovation (1.45.9440.9402) 292,500 292,500

Sporting Precinct - Rectangular Playing Fields 10,000,000 15,000,000 25,000,000

Wade Park Irragation Upgrade 60,000 60,000

11,340,000 15,717,500 300,000 1,775,000 25,000 29,157,500

2020-21 Public Open Space Asset Management Plan

Orange City Council Page 40

16. Appendix D: 20 Year Financial Plan

Item 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 Average

Income

General Fund (31) (32) (33) (33) (34) (35) (36) (37) (38) (39) (40) (41) (42) (43) (44) (45) (46) (47) (49) (50) (40)

Grants (10,041) (15,042) (43) (44) (45) (46) (47) (48) (50) (51) (52) (53) (55) (56) (58) (59) (60) (62) (64) (65) (1,302)

Other Income (56) (40) (43) (39) (55) (37) (26) (27) (27) (28) (29) (29) (30) (31) (32) (32) (33) (34) (35) (36) (35)

User Fees & Charges (20) (20) (21) (22) (22) (23) (23) (24) (24) (25) (26) (26) (27) (28) (28) (29) (30) (30) (31) (32) (25)

Section 94 Contributions 0 (293) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (15)

Potential Future Funding 0 0 0 (1,500) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (75)

Total Income (10,147) (15,426) (139) (1,638) (157) (141) (132) (136) (139) (143) (146) (150) (154) (157) (161) (165) (169) (174) (178) (183) (1,492)

Operations

Employee Costs 2,520 2,581 2,645 2,709 2,776 2,844 2,914 2,985 3,059 3,134 3,211 3,290 3,371 3,454 3,539 3,626 3,715 3,807 3,901 3,997 3,204

Rates, Fees and Charges 876 896 917 938 960 983 1,006 1,029 1,054 1,079 1,104 1,131 1,158 1,186 1,214 1,243 1,274 1,304 1,336 1,369 1,103

Materials,Stationery And Equipment 176 180 185 189 194 199 204 209 214 219 225 230 236 242 248 254 261 267 274 281 224

Local Event/Program Support & Promotion 250 237 244 244 263 248 240 245 249 254 258 263 268 273 278 283 288 293 299 305 264

Cleaning/Garbage Removal/Hygine 170 174 179 183 188 192 197 202 207 212 218 223 229 234 240 246 252 259 265 272 217

Other/Unspecified 49 50 51 53 54 55 56 58 59 61 62 64 65 67 68 70 72 74 75 77 62

Total Operations 4,040 4,119 4,220 4,316 4,435 4,521 4,617 4,728 4,842 4,958 5,078 5,200 5,326 5,455 5,587 5,723 5,862 6,004 6,150 6,300 5,074

Maintenance

Weed Spraying - Pest & Veg Control 355 363 372 382 391 401 411 421 432 443 454 465 477 489 501 513 526 539 553 567 453

Miscellaneous 42 43 44 45 46 48 49 50 51 53 54 55 57 58 59 61 62 64 66 67 54

Unspecified Park Maintenance 426 437 448 459 471 482 494 507 519 532 546 559 573 588 602 617 633 649 665 682 545

Tree Maintenance 504 507 519 532 545 559 573 587 602 617 633 648 665 681 698 716 734 752 771 790 632

Sportsground Maintenance 429 440 451 462 473 485 497 510 523 536 549 563 577 591 606 621 637 653 669 686 548

Irrigation 65 66 67 68 69 70 71 73 74 75 77 78 79 81 82 84 85 87 89 90 77

Playground Maintenance 28 29 30 30 31 32 33 34 34 35 36 37 38 39 40 41 42 43 44 45 36

Garden Maintenance 87 89 91 93 96 98 100 103 105 108 111 114 116 119 122 125 129 132 135 138 111

Total Maintenance 1,935 1,973 2,022 2,072 2,123 2,176 2,229 2,285 2,341 2,399 2,459 2,520 2,582 2,646 2,712 2,779 2,848 2,918 2,991 3,065 2,454

Renewals

Park Signage 25 26 26 27 28 29 29 30 31 31 32 33 34 35 36 36 37 38 39 40 32

Pedestrian Bridges 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3

Playground 140 90 90 90 90 90 90 90 90 90 0 0 0 0 0 0 0 0 0 0 48

Internal Roads 7 0 8 0 8 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 1

Total Renewal 232 116 124 117 125 119 127 120 121 121 32 33 34 35 36 36 37 38 39 40 84

Upgrade / Expansion

Park and Reserve Enhancements 1,315 400 275 1,750 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 187

Rectangular Playing Field 10,000 15,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,250

Sports Fields Enhancements 0 293 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15

Orange Cemetery Capital Works 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

Total Upgrade / Expansion 11,340 15,718 300 1,775 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 1,477

Total Expenditure 17,548 21,926 6,665 8,280 6,708 6,840 6,999 7,158 7,329 7,504 7,594 7,778 7,967 8,161 8,359 8,563 8,772 8,986 9,206 9,431 9,089