On site installation check list 5.0

Embed Size (px)

Citation preview

  • 8/7/2019 On site installation check list 5.0

    1/125

    ON-SITE INSTALLATION CHECK LIST (

    Date: Site Name/Logistic Code:

    Cooperator:

    Telephone Supervisor: Huawei's PM:

    1-Pre-Check (Supervisor) PASS FAIL N/A

    1-1 Engineering documentation available at site

    1-2 Site survey document available at site

    1-3

    1-4

    1-5 Installation equipment (Site master, power meter etc) present at site

    2-GENERAL (Supervisor & Cooperator) PASS FAIL N/A

    2-1 The cabinet is placed as per engineering documents

    2-2

    2-3 The antistatic wrist-strap is inside the cabinet and connected to the ESD port

    2-4

    2-5

    2-6

    2-7

    2-8 The cabinet is fully isolated from the floor

    2 9

    Address:

    Supervisor:

    Site made ready (SMR) for installation from Customer, as per Site surveyrecommendations

    Site equipment received, checked and report made (if missing any) for Huawei's

    PM

    The cabinet is mounted properly on the concrete base. After the installation, thecabinet is leveled and stands firmly on the ground.

    The horizontal error of the cabinet is less than 3 mm and the vertical error is notmore than 3 mm

    All screws are securely fastened. The spring washers are installed on the flatwashers

    The surface of the cabinet is clean and tidy. All the labels on the surface arecorrect, readable, and intact

    The front door of the cabinet is easy to open and close and the paint job of thecabinet is not damaged (while opening/closing the door)

    The cabinet is fully sealed (water tight) and seal adhesives are applied on theholes/outlets of the cabinet

  • 8/7/2019 On site installation check list 5.0

    2/125

    2 9 holes/outlets of the cabinet

    2-10

    2-11 The internal cabling and board configuration are as per engineering documents

    2-12

    2-13

    2-14

    3-TRANSMISION (Supervisor & Cooperator) PASS FAIL N/A

    3-1 E1 trunk cables fixed to cable trays and ladders

    3-2 Good cable route from transmission equipment to BTS (with cable ties)

    3-3 E1 trunk cable cut with suggested redundancy length

    3-4 E1 pair connectors (towards DDF) are made professionally

    3-5 E1 trunk cable properly identified (towards BTS)3-6 E1 pair cable properly identified (towards DDF)

    3-7 E1 pairs connected to DDF

    3-8 E1 trunk cables connected to BTS professionally

    3-9 DDF Box fixed to the wall

    3-10 Cable connectors are professionally done and cover with heat shrink

    3-11 The DCSU board DIP switch is in the correct position (75ohm or 120ohm)

    3-12 The E1 is labeled on both sides (both ends)

    4-ALARMS (Supervisor & Cooperator) PASS FAIL N/A

    4-1 Alarm Box fixed to wall as per engineering documents

    4-2 Alarm Box cables fixed to cable trays and ladders as per engineering documents

    4-3 Alarm cables terminal connectors are made professionally

    4-4 Alarm cables interconnection done professionally as per engineering documents

    4-5 Alarm cables connected to BTS side.

    4-6 Alarm cables connected to Alarm Box

    4-7 The alarm cables are well identified in the Alarm Box.

    4 8 Alarm cables connected to DEMU board and well identified

    The site environment is cleaned (after BTS installation) from any waste and left-over material

    The side power equipment is well secured to the floor and is located on the sideof the BTS cabinet (for indoor only)

    After completion of Site installation, Pending items list (snag list) prepared (ifany)

    The SUPERVISOR to paste/put the Customers inventory label/sticker (calledSIR) on each board/cabinet, installed at each site and make an inventory list ofall the SIR label numbers corresponding to Huaweis labels numbers

  • 8/7/2019 On site installation check list 5.0

    3/125

  • 8/7/2019 On site installation check list 5.0

    4/125

    7-SYSTEM ANTENNA AND RF (Supervisor & Cooperator) PASS FAIL N/A

    7-1 BTS boards cabling interconnection done as per engineering documents

    7-2 RF jumper connector (towards RF feeder) completed

    7-3 RF jumper connectors (towards BTS port on DDPU) completed

    7-4 RF jumper identified towards BTS cabinet

    7-5 RF jumper identified towards RF feeder (towards feeder cable side)

    7-6 RF jumper fixed to trays and ladders

    7-7 Support for RF antenna fixed on tower/steel pole

    7-8

    7-9

    7-10 RF jumper (Antenna side) identified and fixed

    7-11 RF Feeder connectors completed

    7-12 RF Feeder fixed along tower/steel pole

    7-13 RF Feeder identified at the bottom (towards BTS) and top (towards antenna)

    7-14

    7-15 Grounding clips connected at the middle (for more than 60m tower).

    7-16 Grounding clips attached to feeder are made waterproof

    7-17 Distance between feeder clamps is 1.5m to 2m

    7-18 Each RF path is well connected and identified

    7-19

    7-20

    7-21 The Omni antenna should be vertical with error less than 2 degrees.

    7-22

    7-23 The Paint for the cable feeders and the jumpers are done professionally

    7 24

    Waterproofing and sealing for all outdoor jumpers and feeder cables are as per"antenna system installation" guide

    Feeder cables don't cross each other and the degrees of bending are same forall feeders

    RF Feeder grounding clips connected at top, bottom and before the BTS to theMGB (for less than 60m tower).

    Antennas placement should be in the 45-degree protected area of the lightningrod

    The azimuth and tilt angle of the installed antenna should be as per engineeringdesign specifications and should not be more than 5 degrees. The tilt angleerror should not be more than 0.5 degrees

    The VSWR test result is as per requirement (1.2db or less) and the test resultsready to be provided to Huawei's PM

    The SUPERVISOR will check the Support/Mounting for the GSM antenna (If

    required for a site) In case the GSM antenna cannot be installed with the CDMA

  • 8/7/2019 On site installation check list 5.0

    5/125

    7-25

    8- Testing & Commissioning (Supervisor) PASS FAIL N/A

    8-1 Commissioning guide and tools available at Site

    8-2

    8-3Follow the acceptance protocol/procedure provided by Huawei PM

    8-4Verify the communication between the BTS (Site) and the associated BSC

    8-5 Put Site in service

    9-Documentation (Supervisor & Cooperator) PASS FAIL N/A

    9-1

    9-2

    9-3 Cargo Problems Feedback Form

    9-4 Installation environment check list

    9-5 Antenna VSWR and TRX power test record table

    9-6 Equipment Installation Report (GSM BTS)

    9-7 Preliminary Acceptance Test (PAT)

    9-8 Pictures of all Installation work and equipment, as per SOW

    9-9

    9-10

    __________________________________ _____________________________________

    SIGNATURE FOR Cooperator SIGNATURE FOR Huawei (Superv

    __________________________________ _____________________________________

    (Cooperator's Representative Name) (Huawei's Representative Name)

    The SUPERVISOR will make sure that the original orientation (angle, height,direction and azimuth) of the CDMA antenna remains unchanged, after newmounting installation

    After completion of installation (BTS powered up, Cards internal test completed& TX connected), test and commission the BTS as per Huaweis Commissioningguide/instructions

    Cooperator performs a self check and complete the Site quality check list (thisdocument)

    Supervisor completes the FINAL Site quality check list (this document) and get itsigned by the Cooperator to be submitted to Huaweis PM

    Send to Huawei the Installation Report including all the required inventoryinformation

    Inventory list of all the SIR label numbers corresponding to Huaweis labelsnumbers to be submitted to Huawei's PM

  • 8/7/2019 On site installation check list 5.0

    6/125

    UPERVISOR & COOPERATORS)

    OBSERVATIONS (Please provide comments, in any)

    OBSERVATIONS (Please provide comments, in any)

  • 8/7/2019 On site installation check list 5.0

    7/125

    OBSERVATIONS (Please provide comments, in any)

    OBSERVATIONS (Please provide comments, in any)

  • 8/7/2019 On site installation check list 5.0

    8/125

    OBSERVATIONS (Please provide comments, in any)

    OBSERVATIONS (Please provide comments, in any)

  • 8/7/2019 On site installation check list 5.0

    9/125

    OBSERVATIONS (Please provide comments, in any)

  • 8/7/2019 On site installation check list 5.0

    10/125

    OBSERVATIONS (Please provide comments, in any)

    OBSERVATIONS (Please provide comments, in any)

  • 8/7/2019 On site installation check list 5.0

    11/125

  • 8/7/2019 On site installation check list 5.0

    12/125

  • 8/7/2019 On site installation check list 5.0

    13/125

  • 8/7/2019 On site installation check list 5.0

    14/125

  • 8/7/2019 On site installation check list 5.0

    15/125

  • 8/7/2019 On site installation check list 5.0

    16/125

  • 8/7/2019 On site installation check list 5.0

    17/125

  • 8/7/2019 On site installation check list 5.0

    18/125

  • 8/7/2019 On site installation check list 5.0

    19/125

  • 8/7/2019 On site installation check list 5.0

    20/125

  • 8/7/2019 On site installation check list 5.0

    21/125

  • 8/7/2019 On site installation check list 5.0

    22/125

  • 8/7/2019 On site installation check list 5.0

    23/125

  • 8/7/2019 On site installation check list 5.0

    24/125

  • 8/7/2019 On site installation check list 5.0

    25/125

  • 8/7/2019 On site installation check list 5.0

    26/125

  • 8/7/2019 On site installation check list 5.0

    27/125

  • 8/7/2019 On site installation check list 5.0

    28/125

  • 8/7/2019 On site installation check list 5.0

    29/125

  • 8/7/2019 On site installation check list 5.0

    30/125

  • 8/7/2019 On site installation check list 5.0

    31/125

  • 8/7/2019 On site installation check list 5.0

    32/125

  • 8/7/2019 On site installation check list 5.0

    33/125

  • 8/7/2019 On site installation check list 5.0

    34/125

  • 8/7/2019 On site installation check list 5.0

    35/125

  • 8/7/2019 On site installation check list 5.0

    36/125

  • 8/7/2019 On site installation check list 5.0

    37/125

  • 8/7/2019 On site installation check list 5.0

    38/125

  • 8/7/2019 On site installation check list 5.0

    39/125

  • 8/7/2019 On site installation check list 5.0

    40/125

  • 8/7/2019 On site installation check list 5.0

    41/125

  • 8/7/2019 On site installation check list 5.0

    42/125

  • 8/7/2019 On site installation check list 5.0

    43/125

  • 8/7/2019 On site installation check list 5.0

    44/125

  • 8/7/2019 On site installation check list 5.0

    45/125

  • 8/7/2019 On site installation check list 5.0

    46/125

  • 8/7/2019 On site installation check list 5.0

    47/125

  • 8/7/2019 On site installation check list 5.0

    48/125

  • 8/7/2019 On site installation check list 5.0

    49/125

  • 8/7/2019 On site installation check list 5.0

    50/125

  • 8/7/2019 On site installation check list 5.0

    51/125

  • 8/7/2019 On site installation check list 5.0

    52/125

  • 8/7/2019 On site installation check list 5.0

    53/125

  • 8/7/2019 On site installation check list 5.0

    54/125

  • 8/7/2019 On site installation check list 5.0

    55/125

  • 8/7/2019 On site installation check list 5.0

    56/125

  • 8/7/2019 On site installation check list 5.0

    57/125

  • 8/7/2019 On site installation check list 5.0

    58/125

  • 8/7/2019 On site installation check list 5.0

    59/125

  • 8/7/2019 On site installation check list 5.0

    60/125

  • 8/7/2019 On site installation check list 5.0

    61/125

  • 8/7/2019 On site installation check list 5.0

    62/125

  • 8/7/2019 On site installation check list 5.0

    63/125

  • 8/7/2019 On site installation check list 5.0

    64/125

  • 8/7/2019 On site installation check list 5.0

    65/125

  • 8/7/2019 On site installation check list 5.0

    66/125

  • 8/7/2019 On site installation check list 5.0

    67/125

  • 8/7/2019 On site installation check list 5.0

    68/125

  • 8/7/2019 On site installation check list 5.0

    69/125

  • 8/7/2019 On site installation check list 5.0

    70/125

  • 8/7/2019 On site installation check list 5.0

    71/125

  • 8/7/2019 On site installation check list 5.0

    72/125

  • 8/7/2019 On site installation check list 5.0

    73/125

  • 8/7/2019 On site installation check list 5.0

    74/125

  • 8/7/2019 On site installation check list 5.0

    75/125

  • 8/7/2019 On site installation check list 5.0

    76/125

  • 8/7/2019 On site installation check list 5.0

    77/125

  • 8/7/2019 On site installation check list 5.0

    78/125

  • 8/7/2019 On site installation check list 5.0

    79/125

  • 8/7/2019 On site installation check list 5.0

    80/125

  • 8/7/2019 On site installation check list 5.0

    81/125

  • 8/7/2019 On site installation check list 5.0

    82/125

  • 8/7/2019 On site installation check list 5.0

    83/125

  • 8/7/2019 On site installation check list 5.0

    84/125

  • 8/7/2019 On site installation check list 5.0

    85/125

  • 8/7/2019 On site installation check list 5.0

    86/125

  • 8/7/2019 On site installation check list 5.0

    87/125

  • 8/7/2019 On site installation check list 5.0

    88/125

  • 8/7/2019 On site installation check list 5.0

    89/125

  • 8/7/2019 On site installation check list 5.0

    90/125

  • 8/7/2019 On site installation check list 5.0

    91/125

  • 8/7/2019 On site installation check list 5.0

    92/125

  • 8/7/2019 On site installation check list 5.0

    93/125

  • 8/7/2019 On site installation check list 5.0

    94/125

  • 8/7/2019 On site installation check list 5.0

    95/125

  • 8/7/2019 On site installation check list 5.0

    96/125

  • 8/7/2019 On site installation check list 5.0

    97/125

  • 8/7/2019 On site installation check list 5.0

    98/125

  • 8/7/2019 On site installation check list 5.0

    99/125

  • 8/7/2019 On site installation check list 5.0

    100/125

  • 8/7/2019 On site installation check list 5.0

    101/125

  • 8/7/2019 On site installation check list 5.0

    102/125

  • 8/7/2019 On site installation check list 5.0

    103/125

  • 8/7/2019 On site installation check list 5.0

    104/125

  • 8/7/2019 On site installation check list 5.0

    105/125

  • 8/7/2019 On site installation check list 5.0

    106/125

  • 8/7/2019 On site installation check list 5.0

    107/125

  • 8/7/2019 On site installation check list 5.0

    108/125

  • 8/7/2019 On site installation check list 5.0

    109/125

  • 8/7/2019 On site installation check list 5.0

    110/125

  • 8/7/2019 On site installation check list 5.0

    111/125

  • 8/7/2019 On site installation check list 5.0

    112/125

  • 8/7/2019 On site installation check list 5.0

    113/125

  • 8/7/2019 On site installation check list 5.0

    114/125

  • 8/7/2019 On site installation check list 5.0

    115/125

  • 8/7/2019 On site installation check list 5.0

    116/125

  • 8/7/2019 On site installation check list 5.0

    117/125

  • 8/7/2019 On site installation check list 5.0

    118/125

  • 8/7/2019 On site installation check list 5.0

    119/125

  • 8/7/2019 On site installation check list 5.0

    120/125

  • 8/7/2019 On site installation check list 5.0

    121/125

  • 8/7/2019 On site installation check list 5.0

    122/125

  • 8/7/2019 On site installation check list 5.0

    123/125

  • 8/7/2019 On site installation check list 5.0

    124/125

  • 8/7/2019 On site installation check list 5.0

    125/125