18
Old Fulton Street Summer 2011 Commissioner Janette Sadik-Khan, New York City Department of Transportation Presented to Community Board 2, June 21, 2011 by the Pedestrian Projects Group

Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

1

Old Fulton Street

January 13, 2011

Summer2011

Commissioner Janette Sadik-Khan, New York City Department of TransportationPresented to Community Board 2, June 21, 2011 by the Pedestrian Projects Group

Page 2: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

Locator Map

Brooklyn Bridge Park/Pier 1

DUMBO

Project Site

Brooklyn Heights

Brooklyn Bridge

Promenade Access

Page 3: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

3

Existing Conditions

Gateway to Brooklyn Bridge

Park/Pier 1

Community requested improvements and

developed vision plan

Bicycle Issues: Shared markings

only

Vehicle Issues:•Poor sight lines•Wide roadbed•Bus U-turn requires confusing signal phasing•Illegal parking

Pedestrian Issues:• Desire-line not accommodated•Long crossings•Narrow sidewalks

Page 4: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

• Pavement Markings

• Signal Timing

• New Signage

• Painted and/or Textured Surfaces

• Planters & granite blocks

• Concrete Islands

• Flexible Delineators

DOT’s 2011 Operational Toolkit

Page 5: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

5H

icks

St

Proposed

12

3

Page 6: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

6

Old Fulton St at BQE: Existing

Illegal parking on medians

Wide roadbed with channelization

Wall at BQE Exit blocks sight lines for

pedestrians and drivers

Vegetation restricts visibility of pedestrians for vehicles

1

Page 7: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

7

Old Fulton St at Front St:Existing

No west crosswalk and pedestrian signal

1

Page 8: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

8

Old Fulton St at BQE & Front St: Proposed

New green medians

Remove vegetation to

improve pedestrian

visibility

Expanding existing sidewalks on north side of Old Fulton

Sidewalk extensions to increase safety &

visibility

New crosswalk and

pedestrian signal

1

Page 9: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

9

Old Fulton St West of Front St:Existing

Bicycle route connecting Brooklyn Bridge Park to DUMBO needs

enhancement

High pedestrian volumes +

narrow sidewalk

2

Page 10: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

10

Old Fulton St at Water St:Existing

Illegal parking

Wide roadbed

2

Crosswalk doesn’t follow

desire-line

Page 11: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

11

Old Fulton St at Water St:Proposal

North sidewalk expanded with plaza

and concrete neckdown

Green pedestrian median

Bicycle lanes connecting Dumbo with the Brooklyn waterfront

greenway

Parking maintained next to

plaza

Wide crosswalk to park & pier entrance

2

MTA to reroute bus to eliminate

U-turn

Page 12: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

12

Old Fulton St at Water St:Proposal2

Page 13: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

13

Front St at York St:Existing

Difficult sight lines for drivers on York St

results in pedestrian conflicts

Long crossing distance

3

Page 14: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

14

Front St at York St:Proposed

Crossing distance

shortened

New bicycle markings

Enhanced streetscape -landscaping

Improved sight lines for

York St divers

3

Page 15: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

15

Proposal Summary

1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and granite blocks while maintaining parking

2. Install new signals at Furman Street/Old Fulton Street and Old Fulton Street/Front Street3. Construct landscaped concrete medians and islands 4. Construct landscaped neckdown on Front and York Streets 5. Construct neckdowns on Old Fulton Street at Front Street and at the BQE exit6. Expand sidewalks on north side of Old Fulton Street at Front Street7. Install bicycle markings on Old Fulton and Front Streets8. Eliminate U-turn at foot of Old Fulton Street

Page 16: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

16

Thank You

www.nyc.gov/dot

Page 17: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

Appendix

17

Page 18: Old Fulton Street Summer 2011 - New York...15 Proposal Summary 1. Expand sidewalk on north side of Old Fulton Street between Water & Front Streets with crushed gravel, planters and

Volumes Combined into 1 lane

AM/PM/Sat