277
0 Oklahoma Turnpike Authority Request for Proposal 15002 License Plate Tolling

Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

     0  

     

Oklahoma  Turnpike  Authority  Request  for  Proposal  15-­‐002  

License  Plate  Tolling  

Page 2: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

1      

 

Table  of  Contents  

1.   INTRODUCTION  ......................................................................................................................................................  3  

2.   BACKGROUND  .........................................................................................................................................................  3  

3.   SCOPE  OF  SERVICES  TO  BE  PROVIDED  ............................................................................................................  3  

4.   CONTRACT  TERM  ...................................................................................................................................................  4  

5.   INSTRUCTIONS  TO  PROPOSERS  ........................................................................................................................  4  5.1   MANDATORY  PRE-­‐PROPOSAL  MEETING  ............................................................................................................................  4  5.2   WRITTEN  QUESTIONS  ....................................................................................................................................................  4  5.3   ORAL  PRESENTATION  .....................................................................................................................................................  4  5.4   BEST  AND  FINAL  OFFER  .................................................................................................................................................  4  5.5   PROPOSAL  SUBMITTAL  REQUIREMENTS  ............................................................................................................................  4  5.6   MODIFICATION  AND  WITHDRAWAL  OF  PROPOSAL  ..............................................................................................................  5  5.7   AUTHORITY  POLICY  .......................................................................................................................................................  6  5.8   SCHEDULE  ...................................................................................................................................................................  6  5.9   KEY  DATES  ...................................................................................................................................................................  6  

6.   PROPOSAL  FORMAT  ..............................................................................................................................................  6  6.1   COVER  LETTER  ..............................................................................................................................................................  6  6.2   TABLE  OF  CONTENTS  .....................................................................................................................................................  7  6.3   UNDERSTANDING  OF  THE  PROJECT  AND  ABILITY  TO  MEET  ALL  REQUIREMENTS  ........................................................................  7  6.4   FIRM’S  QUALIFICATIONS,  EXPERIENCE  AND  FINANCIAL  SUSTAINABILITY  ..................................................................................  7  6.5   PROJECT  TEAM’S  QUALIFICATIONS,  RELEVANT  EXPERIENCE  AND  ORGANIZATION  .....................................................................  8  6.6   PROPOSED  PROJECT  IMPLEMENTATION  SCHEDULE  ..............................................................................................................  9  6.7   PRICE  PROPOSAL  ..........................................................................................................................................................  9  6.8   ALTERNATE  METHODOLOGY  .........................................................................................................................................  10  6.9   EVIDENCE  OF  INSURABILITY/INSURANCE/APPLICABLE  LICENSE  ............................................................................................  10  6.10   BID  BOND  ...............................................................................................................................................................  10  

7.   EVALUATION  PROCESS  AND  SELECTION  CRITERIA  ..................................................................................  11  

8.   VALIDITY  OF  PROPOSAL  ....................................................................................................................................  11  

9.   NOTICE  OF  AWARD  ..............................................................................................................................................  11  

10.   GENERAL  CONDITIONS  ....................................................................................................................................  11  10.1   TAXES  .....................................................................................................................................................................  11  10.2   CONFIDENTIALITY  AGREEMENT  ....................................................................................................................................  12  10.3   INDEPENDENT  CONTRACTOR  .......................................................................................................................................  12  10.4   ASSIGNMENT  ...........................................................................................................................................................  12  10.5   TERMINATION  AT  THE  AUTHORITY’S  OPTION  .................................................................................................................  12  

Page 3: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

2      

10.6   INDEMNITY  ..............................................................................................................................................................  12  10.7   PUBLICITY  ................................................................................................................................................................  13  10.8   INSURANCE  ..............................................................................................................................................................  13  10.9   BONDS  ....................................................................................................................................................................  14  10.10   ESCROW  ................................................................................................................................................................  14  10.1   REVENUE  LOSS  .........................................................................................................................................................  15  10.2   PUBLIC  AVAILABILITY  TO  RFP  RECORDS  ........................................................................................................................  16  10.3   AUDIT  OF  RECORDS  ...................................................................................................................................................  16  10.4   OTHER  TERMS  &  CONDITIONS  ....................................................................................................................................  16    

Page 4: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

3      

 

1. INTRODUCTION  

The  Oklahoma  Turnpike  Authority  (Authority)  is  requesting  proposals  for  a  License  Plate  Tolling  back  office  solution.  The  purpose  of  this  RFP  is  to  solicit  proposals  from  experienced  vendors  to  operate  a  back  office  for  processing  all  video-­‐based  tolls  from  a  new  All  Electronic  Tolling  interchange  on  the  Oklahoma  Turnpike.    

2. Background  

The  Oklahoma   Turnpike  Authority   is   an   instrumentality   of   the   State   of  Oklahoma.   The  Authority   is   authorized   to  construct,  maintain,  repair,  and  operate  turnpike  projects  at  locations  authorized  by  the  Legislature  of  the  State  of  Oklahoma  and  approved  by  the  State  Department  of  Transportation.  The  Authority  receives  revenues  from  turnpike  tolls,  investments  and  a  percentage  of  the  turnpike  concession  sales.  The  Toll  revenue  for  2014  was  $246  million.        

Across   the   state,   the   Authority   operates   and   maintains   ten   turnpikes.   Turnpike   lane   configurations   consist   of  electronic   toll   collection   (PIKEPASS),   automatic   coin  machine,  manual   toll   collection   and  mixed   configurations   of  each.  A  violation  enforcement  system  is  utilized  on  a  number  of  the  PIKEPASS  and  automatic  coin  machine  lanes.      

3.  SCOPE  OF  SERVICES  TO  BE  PROVIDED  

The  Authority  is  considering  a  phased  introduction  of  an  All  Electronic  Tolling  (AET)  system.  As  part  of  its  evaluation  process,  the  Authority  will  convert  the  Elm/Peoria  Interchange  on  the  Creek  Turnpike  in  the  city  of  Jenks  to  AET.  This  interchange  is  being  reconstructed  as  part  of  a  partnership  with  the  city  of  Jenks  in  a  large  economic  development  effort  by  the  city.  The  Authority  is  taking  advantage  of  the  reconstruction  efforts  to  test  this  conversion  to  AET.  Once  the   Elm/Peroria   interchange   is   converted,   customers   must   pay   electronically,   either   with   a   valid   PIKEPASS  transponder,  Kansas  Turnpike  Authority  KTA  tags,  North  Texas  Tollway  Authority  (NTTA)  Tolltags  or  through  License  Plate   Tolling   (LPT)   as   captured   by   the   Authority’s   photo-­‐monitoring   system.   Customers   at   other   locations   will  continue  to  pay  as  they  currently  do  with  either  their  electronic  pay  transponders  or  cash.  Based  on  the  Authority’s  evaluation  of  the  AET  project  at  Elm/Peoria,  the  Authority  may  convert  more  interchanges  and/or  turnpikes  to  AET  at  later  dates.  Future  expansion  of  the  OTA  AET  system  may  require  the  LPT  operations  to  be  located  in  Oklahoma.  In  the  event  that  OTA  decides  that  an  expanded  operation   is  required  to  be   in  Oklahoma,  the  OTA  may  negotiate  with  the  LPT  Processor  for  continued  services  at  that  time,  or  proceed  with  a  new  procurement.    

Proposers   are   directed   to   Attachment   1   Scope   of   Services   and   Functional   Requirements.     The   Proposer   shall  complete   the   Requirements   Traceability   Matrix   provided   in   Appendix   A   to   ensure   all   services   as   stated   can   be  provided.   Additional   services   or   concepts   may   be   added   to   your   proposal,   but   the   Authority   may   exclude   such  concepts  or  services  at  its  discretion.  

Proposers  are  directed  to  Appendix  D  for  current  OTA  statistics.  This  is  provided  for  information  purposes  only.  

Page 5: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

4      

4. CONTRACT  TERM  

The   initial   term   of   this   Contract   is   3   years.   This   includes   the   design,   development,   testing   and   implementation  phases.   In   addition,   this   Contract   has   two   options   to   renew   for   up   to   one   year   each.   These   options   are   to   be  exercised  at  the  discretion  of  the  OTA  under  the  same  terms  and  conditions  of  the  original  contract.  

5.  INSTRUCTIONS  TO  PROPOSERS  

Proposals  submitted  must  be   in  strict  compliance  with  the  RFP.  Failure  to  comply  with  all  provisions  may  result   in  disqualification.    

5.1 Mandatory  Pre-­‐Proposal  Meeting  

Proposers   are   required   to   participate   in   a  mandatory   pre-­‐proposal   meeting   via   teleconference.   The   meeting   is  tentatively   scheduled   for   July  1st   at   10:00  a.m.  Central  Daylight   Time.  Attendance  of   the  pre-­‐proposal  meeting   is  mandatory   in  order   to  be   included   in   the  proposal  evaluation  process.  For  specific  details  of   the  meeting,  contact  Glen  Branscum  by  email  at  [email protected].    

5.2 Written  Questions  

Proposers  should  submit  written  questions  regarding  this  procurement  by  email  to  [email protected]  and  [email protected].  All  emails  should  reference  RFP  #15-­‐002.  

5.3 Oral  Presentation  

The   Authority   and   its   representatives,   at   its   sole   discretion,  may   interview   proposers.   Presentation   format,   time  limits,  materials   requested,   etc.,   shall   be   sent   to   Proposers   with   whom   interviews   are   deemed   appropriate.   The  Authority  reserves  the  right  to  select  a  preferred  Proposer  without  conducting  interviews.  

5.4 Best  And  Final  Offer  

Proposers  may  be  invited  to  provide  a  Best  and  Final  Offer  (BAFO).  

5.5 Proposal  Submittal  Requirements  

In  submitting  a  proposal,  each  proposer  acknowledges  that  the  Authority  shall  not  be  liable  for  any  costs   incurred  therewith  or  in  connection  with  costs  incurred  by  any  proposer.  This  RFP  does  not  commit  the  Authority  to  award  a  contract;  the  Authority  may  accept  or  reject  in  whole  or  in  part  any  proposal  without  limitation.  

Proposers  must  submit  10  hard  copies  and  2  electronic  versions  on  USB  drives  of  their  response  to  this  RFP  no  later  than  12:00  p.m.,  Central  Daylight  Time,  July  24,  2015  to:  

Oklahoma  Turnpike  Authority  Attention:  Dwight  Brown  Oklahoma  Turnpike  Authority  2401  NW  23rd  Street  Suite  2B-­‐1  

Page 6: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

5      

Oklahoma  City,  OK  73107    PROPOSAL  DUE  DATE:  12:00  p.m.  Central  Daylight  Time,  July  24,  2015  

Late  proposals  will  not  be  considered  and  shall  be  returned  unopened.  Responses  to  this  RFP  must  be  received  by  the   due   date   and   time   stated   above   to   be   included   in   the   evaluation   process.   Telephone,   facsimile   and   email  proposals  will  not  be  accepted.  All  correspondence  in  relation  to  this  proposal  and  the  contract  shall  be  written  in  the  English   language.  All  measurements   should  be   submitted   in  U.S.   customary  units.   Bids  will   open   immediately  after  the  closing  time.    

The  Proposal  shall  adhere  to  a  combined  150-­‐page  limit  (75  double-­‐sided  sheets),  12  font,  standard  margins,  except  as  noted.  The  contents  of  the  exhibits,  required  forms  and  resumes  shall  not  count  toward  the  page  limit.  Tabbed  dividers  within  paper  copies  of  the  Proposal  shall  not  count  toward  the  total  page  limit.  

Each  page  must  include  a  page  number,  number  of  total  pages,  and  identify  the  Proposer  in  the  page  footer.  

Each  package  containing  material  that  the  Proposer  wishes  to  be  considered  as  part  of  the  proposal  must  be  sealed  with  a  self-­‐adhesive  label  marked  “Sealed  Proposal”  (included  in  RFP  mailing).  The  provided  bid  notification  sticker  should  be  affixed  to  the  lower  left  front  of  the  mailing  envelope.  This  bid  notification  sticker  notifies  the  Authority  mailroom   to   not   open   the   envelope,   as   a   sealed   bid   is   enclosed.   Failure   to   use   these   labels   may   result   in   the  inadvertent  opening  of  the  package  and  may  cause  the  proposal  to  be  rejected.    

Requests  for  further   information  or  questions  regarding  this  RFP  should  be  addressed,   in  writing,  to  the   individual  listed  below.  Any  oral  communication  will  be  considered  non-­‐official  and  non-­‐binding.  Respondents  should  rely  only  on  written  statements  issued  by  the  individual  listed  below.  

Information  Requests  and  Questions  Oklahoma  Turnpike  Authority  ATTN:  Glen  Branscum  2401  NW  23rd  Street  Suite  2B-­‐1  Oklahoma  City,  OK  73107  Telephone:  405.936.3640  E-­‐mail:  [email protected]    

5.6 Modification  and  Withdrawal  of  Proposal  

The  Proposer  may,  without  prejudice,  modify  or  withdraw  his  or  her  proposal  by  written  request,  provided  that  the  Authority  receives  the  request  prior  to  the  proposal  due  date  and  time.  Following  withdrawal  of  the  proposal,  the  Proposer  may  submit  a  new  proposal  provided  that  such  new  proposal  will  be  received  on  or  before  the  proposal  due  date  and  time.  

The  Authority  may  modify  any  provision(s)  or  part(s)  of  the  RFP  at  any  time  prior  to  the  proposal  closing  date  and  time.  

Page 7: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

6      

5.7 Authority  Policy  

In   accordance  with   the  Authority’s   policy,   all   qualified   Proposers   are   entitled   to   receive   equal   opportunities.   The  offering  of  gifts,  entertainment,  payments,   loans  or  other  favors  for  the  purpose  of  being  placed  on  the  Proposers  list,   to  obtain  a   contract,  or   to   receive   favorable   treatment  under  a   contract,   is  prohibited.   Furthermore,   it   is   the  Authority’s  policy  that   in  the  event  a  Proposer  or  Contractor   is  found  to  have  offered  or  given  a  gift  or  gratuity  to  obtain   a   contract   or   favorable   treatment   thereunder,   the   Proposer   involved   will   be   refused   further   Proposal  considerations  by  all  of  the  Authority’s  entities.  The  Authority  may  also  obtain  those  remedies  available  under  law  and  the  contract  including,  but  not  limited  to,  termination  for  default.    

Any  Proposer  that  feels  it  has  been  unjustly  treated  may  file  a  written  objection  within  five  business  days  of  date  of  award  to  Ms.  Cheryl  O'Rourke,  Director  of  Administrative  Services.  If  a  Proposer  is  not  satisfied  with  the  response,  they  may  appeal   to  Mr.  Alan  Freeman,  Assistant  Director,  at  Oklahoma  Turnpike  Authority,  2401  NW  23rd  Street,  Suite  2B-­‐1,  Oklahoma  City,  OK  73107.  

5.8 Schedule  

The  following  is  a  tentative  time  schedule.  NOTE:  All  times  are  Central  Daylight  Time  (CDT).  

Issue  Request  for  Proposal   June  23,  2015  Mandatory  Pre-­‐Proposal  Meeting   10  a.m.  July  1,  2015  Deadline  for  submission  of  written  questions     3:00  p.m.  July  6,  2015  Final  Authority  response  to  Questions   3:00  p.m.  July  13,  2015  Proposal  Due  Date   12:00  p.m.  July  24,  2015  Oral  Presentations     August  5  &  6,  2015  Contract  Award     August  24,  2015  Notice  To  Proceed   Within  30  days  of  Contract  Award  

   

5.9 Key  Dates  

Ramp  B  Construction  Completed     June  27,  2016  Ramp  C  Construction  Completed   October  19,  2016  Start  of  Production  Readiness  Test   June  29,  2016  Go  Live   January  4,  2017  

 

6.  PROPOSAL  FORMAT  

The  Proposal   should   include   the  minimum  sections   requested  below   in   the  order   listed.  Additional   information,   if  provided,  should  be  separately  identified  in  the  Proposal.  

6.1 Cover  Letter  

This  section  must  have  a  letter  of  introduction  on  company  letterhead  summarizing  the  proposal  and  signed  by  an  individual  authorized   to  execute   legal  documents  on  behalf  of   the  Proposer.  The  Proposer  must  provide   the   legal  

Page 8: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

7      

name   and   address   of   the   company   responsible   for   the   execution   of   the   Contract;   legal   form   of   the   company  (partnership,  corporation,  joint  venture,  etc.);  and  parent  company  if  the  company  is  a  wholly  owned  subsidiary.  

6.2 Table  of  Contents  

This  section  must  contain  a  comprehensive  table  of  contents  of  material  identified  by  sequential  page  numbers  and  by  section  reference  numbers.  

6.3 Understanding  of  the  Project  and  Ability  to  Meet  All  Requirements  

The  proposal  shall  address  all  three  parts  of  this  section  listed  below.  

1) Proposer’s   understanding   of   the   goals   and   objectives   of   the   project   and   its   ability   to   successfully   and  consistently  meet  or  exceed  all  of  the  specified  requirements  and  related  performance  standards.  

2) Proposer’s   ability   to   expand   their   operations   and   to   update   their   system   software   for   additional  functionality,  as  requested  by  OTA.  

3) Proposer’s  approach  to  successfully  implement  and  manage  the  Project:  

a. Overall  Project  Management    

b. Risk  Management    

c. Data  and  Access  Security    

d. Change  Management  and  Change  Control    

e. Training    

f. Subcontractor  Management  

g. Audit  

h. Quality  Assurance  and  Quality  Control    

6.4 Firm’s  Qualifications,  Experience  and  Financial  Sustainability  

This  section  is  designed  to  establish  the  bidder  as  an  entity  with  the  ability  and  experience  to  complete  the  work  as  specified  in  the  RFP.  This  section  should  include  the  following:  

a. The  firm’s  hierarchy,  overview  of  services  performed,  brief  history  of  the  firm,  company  size  and  client  base.  

b. The  firm’s  recent  (within  the  past  5  years)  and  relevant  experience  in  the  design,  development  and  delivery  of  projects  of  similar  scope  and  complexity.    

c. The  firm’s  recent  (within  the  past  5  years)  and  relevant  experience  in  the  operation  of  a  license  plate  tolling  system.  

Page 9: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

8      

d. The  firm’s  knowledge  of  relevant  technology,  software  applications,  platforms,  policies  and  procedures.    

e. A   list   of   ALL   clients   for  which   the   firm  has   provided   design,   development   and   delivery   for   an  AET   or   LPT  tolling  system.  Five  of  these  clients  shall  be  clearly  designated  as  references  for  which  similar  work  has  been  or  is  currently  being  performed.  The  five  references  should  include  names,  addresses,  email  addresses  and  telephone  numbers.  

f. The  firm’s  most  current  audited  annual  financial  statements.    

g. Details  of  the  firms  last  bankruptcy,  if  any.    

h. Details  of  any  current/pending  litigation  within  the  past  5  years.  

i. Details  of  any  Defaults  or  Terminations  on  contracts  within  the  past  10  years  

6.5 Project  Team’s  Qualifications,  Relevant  Experience  and  Organization  

 This  section  shall  describe  the  following:    

a. The   Proposer’s   organizational   structure,   including   any   subcontractors,   during   design,   development   and  implementation  of  this  project.  

b. The  Proposer’s  organizational  structure,  including  any  subcontractors,  during  on-­‐going  operations.  

c. A  project  organization  chart,  including  any  subcontractors,  which  indicates  functional  areas  of  responsibility  as  well  as  the  number  of  staff  by  position.  

d. The  physical  location  of  staff  that  will  be  working  on  this  project.  

e. The  firm’s  policy  and  practices  regarding  the  performance  of  staff  background  checks.  

f. The   proposed   project   team;   including   the   names,   titles,   qualifications   and   relevant   experience   of   the  following  Key  Personnel.    

i. Design/development  team  

1. Project  Manager  

2. System  Design  Manager  

3. Software  Design  Lead  

4. Test  Manager  

5. Systems  Administrator    

ii. On-­‐going  operations  

1. Project  Manager  

Page 10: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

9      

2. Operations  Manager    

3. Call  Center  Manager    

4. Image  Processing  Manager    

5. Finance  Manager  

6. Quality  Assurance/Quality  Control  Manager  

g. Availability  and  commitment  of  all  Key  Personnel  to  the  Project.    

 6.6 Proposed  Project  Implementation  Schedule  

This   section   shall   describe   the   Proposer’s   ability   to   meet   the   required   Go-­‐Live   date   with   a   fully   developed,  successfully  tested,  LPT  system  and  operation  which  meets  all  the  requirements  of  this  RFP.    

This  shall  include  an  initial  proposed  schedule,  including  the  timing,  duration  and  sequence  of  activities,  to  complete  to  meet  the  required  Go-­‐Live  date.    

6.7 Price  Proposal  

The  proposed  pricing  shall  be  submitted  using  the  form  provide  in  Appendix  B,  Proposal  Pricing  Matrix.  

The  Authority  desires  to  obtain  price  bids  that  are  fair  and  accurate.  Although  price  will  be  a  factor   in  selection,   it  will  be  balanced  by  the  other  criteria  given.  The  ultimate  contract  may  or  may  not  be  awarded  to  the  Proposer  with  the   lowest   price.   The   Contract   Price   shall   constitute   the   full   compensation   to   be   paid   to   the   LPT   Processor   for  performance  of  all  requirements  in  the  Scope  of  Services.  As  described  below,  proposed  pricing  shall  be  submitted  in  two  phases.    

a. Design  and  Development  Phase  Pricing  –  The  price  for  the  LPT  Design  &  Development  Work  shall  be  bid  as  lump  sum  fixed  price,  and  shall  be  paid  in  accordance  with  the  following  Payment  Milestones:    

o Mobilization  (45  days  after  NTP)             10%  

o Design  Document  approval               25%  

o Successful  completion  of  the  Factory  Acceptance  Test       25%  

o Successful  Go-­‐Live                 25%  

o Successful  completion  of  the  System  &  Operational  Acceptance  Test     15%  

b. On-­‐going  Operations  Phase  Pricing  –  The  price   for   the  LPT  on-­‐going  Operation  shall  be  bid  on  a  unit  price  basis  commencing  at  Go-­‐Live  and  continuing  for  the  Term  of  the  base  contract.  The  unit  price  values  will  be  adjusted  for  the  option  years  by  an  amount  not  to  exceed  the  lesser  of  3%  and  the  change  in  the  U.S.  Bureau  of   Labor   Statistics  Consumer  Price   Index   -­‐  CPI   -­‐U,  US  City  Average,  All   Items   less   food  and  energy   for   the  most  recent  calendar  year.  In  no  event,  however,  will  the  adjustment  be  less  than  0%.    

Page 11: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

10      

c. The  following  items  will  be  paid  by  OTA  directly  or  as  a  pass  through  cost  with  no  mark-­‐up:  

o Postage  costs  

o Credit/Debit/ACH  processing  fees  

o OTA  bank  fees  

o DMV/3rd  party  name  and  address  acquisition  fees    

6.8 Alternate  Methodology  

All  Proposers  must  submit  a  Base  Proposal  that  meets  all  requirements  of  the  Statement  of  Work  (SOW)  as  specified  in  this  RFP.  

In  addition  to  providing  a  Base  Proposal,  Proposers  may  submit  an  alternate  method  (or  methods)  of  providing  OTA  with   the   required   basic   functionality   but   not   necessarily   in   the   exact   manner   as   defined   in   the   SOW.   This   may  include  alternate  system  design,  processes,  procedures  or  methodology  that  provide  equivalent,  better  and/or  more  cost   effective   operation   than   achievable   under   the   specifications   as   stated.   Alternate   methodology   may   include  system   design   and/or   operations   that   are   currently   being   used   by   the   Proposer   in   a   similar   operation   or   newly  designed  functionality/operations.  Proposer  creativity  and  innovation  is  encouraged.  

Any  alternate  methods  may  be  highlighted  within  the  body  of  the  Proposal  in  the  appropriate  sections,  however  a  separate  list  of  all  proposed  alternate  methods  shall  also  be  provided  with  the  Proposal.    

The  Proposal  must  clearly  and  separately   identify  any  and  all  deviations  from  the  Base  Proposal  and  describe  how  each  of  these  changes  will  achieve  substantially  equivalent  or  better  value  in  terms  of  improved  operating  efficiency  and/or  enhanced   customer   service.  Additionally,   the  Proposal   shall   indicate   the  effect  of   implementation  of   each  item   or   group   of   items   on   the   Base   Price   Proposal.   This   shall   include   the   price   impact   to   the   Design   and  Development  phase,  as  well  as  to  each  Unit  Price  in  the  Operational  phase,  as  appropriate.  

No   alternate   methods   will   be   considered   unless   the   Proposer   has   submitted   a   complete   and   responsive   Base  Proposal  that  meets  all  requirements  as  stated  in  this  RFP.  OTA  reserves  the  right  to  choose  all,  some  or  none  of  any  alternate  methods  submitted.  

6.9 Evidence  of  Insurability/Insurance/Applicable  License  

All   bidders   shall   submit   evidence   of   required   insurance.   Insurance   requirements   are   detailed   in   the   General  Conditions  section.  

6.10 Bid  Bond  

A   bid   bond   is   required   in   the   amount   of   5%   of   the   proposed   fixed   Design   and   Development   Phase   pricing   (see  Section  6.7  a.).  The  bid  bond  is  to  accompany  your  submitted  bid  proposal.  Further  details  on  the  bid  bond  are  listed  in  the  General  Conditions  section.    

Page 12: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

11      

7.  Evaluation  Process  and  Selection  Criteria  

The   Authority’s   intention   is   to   procure   the   most   cost-­‐effective,   yet   comprehensive   and   professional   services  available.  Proposals  will  be  evaluated  based  on  relevant  factors,  including  the  following:  

o Understanding  of  the  Project  and  Ability  to  Meet  All  Requirements  –  30%  

o Firm’s  Qualifications,  Experience  and  Financial  Sustainability  –  20%  

o Project’s  Team  Qualifications,  Relevant  Experience  and  Organization  –  20%  

o Proposed  Project  Implementation  Schedule  –  5%  

o Price  –  25%  

If  a  firm  submits  both  a  Base  Proposal  and  alternative  methodologies,  each  will  be  evaluated  separately.  

Should   the   Authority   seek   clarification   or   further   information   from   the   Proposer   during   the   Proposal   evaluation  period,  the  Proposer  will  be  expected  to  provide  all  assistance  to  the  Authority  during  this  period,  free  of  charge,  to  enable  the  Authority  to  evaluate  the  Proposal  fully.  

8. Validity  of  Proposal  

It  is  expected  that  a  Proposal  shall  be  accepted,  or  all  Proposals  rejected,  within  30  days  after  the  Proposal  closing  date.  The  Proposals  submitted  shall  be  valid  for  a  minimum  period  of  one  hundred  eighty  days  (180)  after  receipt.  No  work  shall  be  performed  in  connection  with  the  SOW  until  the  Contract  has  been  fully  executed,  delivered,  and  a  Notice  to  Proceed  issued.  

9. Notice  of  Award  

It  is  anticipated  that  a  Proposer  will  be  selected  within  two  to  four  weeks  of  the  Proposal  due  date.  Discussions  with  the   preferred   Proposer   shall   begin   immediately   upon   selection   and   may   culminate   in   an   executed   Contract.  Unsuccessful  Proposers  shall  be  notified  of  the  Contract  Award.  

The  Contractor  shall  begin  work  on  the  date  specified  in  the  Notice  to  Proceed.  The  Authority  will  issue  the  Notice  to  Proceed  within  30  days  of  execution  of  the  Contract  and  receipt  of  all  required  bonds  and  insurance.  

10.  General  Conditions  

10.1 Taxes  

The   Proposer/Contractor   must   provide   a   tax-­‐payer   identification   number   to   the   Authority.   Except   to   the   extent  expressly   provided   to   the   contrary   elsewhere   in   this   Contract,   the   Contractor   shall   pay   when   due   all   state,   and  federal  sales  and  use  taxes,  excise  taxes,  duties  and  all  other  governmental  fees  and  taxes  or  charges  of  whatever  nature  applicable  to  the  performance  of  the  work  and  this  Contract.  In  other  words,  the  Contractor  is  responsible  for  paying  all  taxes  on  purchases  made  to  fulfill   this  contract;  these  taxes  cannot  be  passed  to  the  Authority  as  taxes.  The  Authority  is  tax  exempt.  

Page 13: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

12      

10.2 Confidentiality  Agreement  

The  Contractor  agrees  that  the  Contractor,  and  its  employees,  agents,  and  subcontractors  will  hold  confidential  and  not  divulge  to  third  parties  without  the  written  consent  of  the  Authority  any  information  obtained  by  the  Contractor  from   or   through   the   Authority   in   connection   with   the   Contractor’s   performance   of   this   Contract,   unless   (a)   the  information  was  known  to  the  Contractor  prior  to  obtaining  same  from  the  Authority  and  was  not  obtained  under  a  secrecy   obligation   to   the   Authority   pursuant   to   the   prior   contract;   or   (b)   the   information   was   at   the   time   of  disclosure   to   the   Contractor,   or   thereafter   becomes,   part   of   the   public   domain   but   not   as   a   result   of   fault   or   an  unauthorized  disclosure  of   the  Contractor   or   its   employees,   agents   or   subcontractors;   or   (c)   the   information  was  obtained   by   the   Contractor   from   a   third   party   who   did   not   receive   the   same,   directly   or   indirectly,   from   the  Authority  and  who  had,  to  the  Contractor’s  knowledge  and  belief,  the  right  to  disclose  the  same.  

10.3 Independent  Contractor  

Nothing   in   this   Contract   shall   be   deemed   to   constitute   the   Contractor   or   any   of   the   Contractor’s   employees   or  agents   to   the   agent,   representative   or   employee   of   the   Authority.   The   Contractor   shall   be   an   independent  Contractor   and   shall   have   responsibility   for   and   control   over   the  details   and  means   for   performing   the  work   and  shall  be  subject  to  the  directions  of  the  Authority  only  with  respect  to  the  scope  and  general  results  required.  

10.4 Assignment  

The  Contractor  shall  not  assign  this  Contract  wholly  or  in  part,  voluntarily,  by  operation  of  law,  or  otherwise  without  first  obtaining   the  written   consent  of   the  Authority.  Any  assignment  of   this  Contract   in   violation  of   the   foregoing  shall  be,  at  the  option  of  the  Authority,  void.  Subject  to  the  foregoing,  the  provisions  of  this  Contract  shall  extend  to  the  benefit  of  and  be  binding  upon  the  successors  and  assigns  of  the  parties  hereto.  

10.5 Termination  at  the  Authority’s  Option  

The  Authority  shall  have  the  right  at  any  time,  with  or  without  cause,  to  terminate  further  performance  of  the  work  by  written  notice  to  the  Contractor  specifying  the  date  of  termination.  On  the  date  of  such  termination  stated  in  said  notice,  the  Contractor  shall  discontinue  performance  of  the  work  and  shall  preserve  work  in  progress  and  completed  work,   pending   the   Authority’s   instructions,   and   shall   turn   over   such   work   in   accordance   with   the   Authority’s  instructions.  

If   the   Contractor   has   fully   and   completely   performed   all   obligations   under   this   Contract   up   to   the   date   of  termination,  the  Contractor  shall  recover  from  the  Authority  as  complete  and  full  settlement  for  such  termination  actual  cost  necessarily   incurred  in  effecting  the  termination;   less  all  amounts  previously  paid  to  the  Contractor  for  the  work.  

10.6 Indemnity  

The  Contractor  has  the  absolute  and  entire  responsibility  and  liability  for  all  damage,  loss  of  injury  of  any  kind,  direct  or  indirect,  to  any  person  (including  death)  or  property  (except  as  otherwise  provided  in  the  Contract)  arising  out  of  or   in  any  manner  based  on  the  performance  by  Contractor  under  the  Contract,  or  caused  by  or  resulting  from  the  performance   of   any   work   on   or   relating   to   the   Project.   Contractor   shall,   to   the   fullest   extent   permitted   by   law,  

Page 14: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

13      

indemnify   and  hold  harmless   the  Authority   against   all   losses,   claims,  damage,  expenses   (including  attorneys’   fees  and  costs)  and  liabilities  sustained  or  incurred  by  the  Authority  by  reason  of  any  act,  omission,  conduct,  negligence  or  default  by  Contractor  or  subcontractor  or  their  respective  employees  and  agents.  Excepts  as  may  be  otherwise  provided   by   applicable   law   of   any   Governmental   Authority,   the   Authority’s   right   to   indemnification   shall   not   be  impaired   or   diminished   by   any   act,   omission,   misconduct,   negligence   or   default   (other   than   gross   negligence   or  willful  misconduct)  of  the  Authority  or  any  employee  or  agent  of  the  Authority  who  contributed  or  may  be  alleged  to  have  contributed  thereto.  

10.7 Publicity  

The   Contractor   agrees   to  make   no   news   release   not   to   issue   any   advertising   pertaining   to  work   or   this   Contract  without  first  obtaining  the  written  approval  of  the  Authority.  

10.8 Insurance  

For   the   duration   of   the   contract,   the   Contractor   shall   at   its   sole   cost,   obtain   and  maintain   in   force   the   contract  insurance  of  the  following  types,  with  limits  not  less  than  those  set  forth  below.  

• Workers  Compensation  Insurance,  including  occupational  illness  or  disease  coverage,  in  accordance  with  the  laws   of   the   nation,   state,   territory   or   province   having   jurisdiction   over   the   Contractor’s   employees   and  Employer’s  liability  insurance  with  a  minimum  limit  of  $1,000,000  each  accident,  $1,000,000  disease-­‐policy  limit  and  $1,000,000  disease-­‐each  employee.  The  Contractor  shall  not  utilize  occupational  accident  or  health  insurance  policies,  or  the  equivalent,  in  lieu  of  mandatory  Workers’  Compensation  Insurance,  or  otherwise  attempt  to  opt  out  of  the  statutory  Workers’  Compensation  system.  

• Automobile   Liability   Insurance   covering   use   of   all   owned,   non-­‐owned   and   hired   automobiles   with   a  minimum   combined   single   limit   of   liability   for   bodily   injury   and   property   damage   of   $1,000,000   per  occurrence.   This   policy   shall   be   endorsed   to   name   the  Authority,   including   respective   affiliates,   directors,  and  employees,  as  additional  insured.  

• Commercial   General   Liability   Insurance   (“Occurrence   Form”)   with   a   minimum   combined   single   limit   of  liability   of   $1,000,000   each   occurrence   for   bodily   injury   and   property   damage;   with   a   minimum   limit   of  liability  of  $1,000,000  each  person  for  personal  advertising  injury  liability;  and  a  minimum  limit  of  liability  of  $1,000,000   each   occurrence   for   products/completed   operations   liability.   Such   policy   shall   have   a   general  aggregate   limit  of  not   less   than  $2,000,000.  The  products/completed  operations   liability  coverage  shall  be  maintained   in   full   force   and   effect   for   not   less   than   three   years   following   completion   of   the   Contractor’s  services.   The  policy   shall  be  endorsed   to  name   the  Authority,   including   respective  affiliates,  directors  and  employees,  as  additional  insured.  Such  endorsement  shall  be  made  upon  ISO  Endorsement  CG  20  10  11  85,  “Additional  Insured  –  the  Authority’s,  Lessees  or  the  Contractors  (Form  B).”  

• Professional  Liability  (Errors  &  Omissions)  Insurance  in  an  amount  not  less  than  $1,000,000  per  occurrence,  for   damages   caused   by   any   act   or   omission   of   the   Contractor,   or   of   any   other   person   for  whose   acts   or  omissions  the  Contractor  is   legally  responsible,  arising  out  of  the  performance  of  services  in  a  professional  capacity.   If   the   Contractor   should   terminate   such   coverage   at   any   time   before   three   (3)   years   after  

Page 15: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

14      

acceptance  or  termination  of  the  Contractor’s  work,  the  Contractor  shall  obtain  extended  reporting  period  coverage  (“tail  cover”),  for  a  period  of  not  less  than  three  (3)  years  from  the  Contractor’s  last  services.    

10.9 Bonds  

The  bid  bond  may  be  in  the  form  of  a  bond  or  a  cashier’s  check.  The  cashier’s  check  or  bond  must  be  payable  to  the  Oklahoma  Turnpike  Authority.   Failure   to  provide   such  a  bond  at   the   time  specified  will   result   in   the  proposal  not  being   considered.   The   bond   shall   be   valid   for   a  minimum  of   90   days   from   the   proposal   date.  Withdrawal   of   the  proposal  without  authorization  or  failure  to  successfully  execute  a  contract  within  30  days  of  the  Notice  to  Proceed  will   result   in   forfeiture  of   the  proposal  bond.  The  awarded  Contractor  will  be   required   to  provide  a  default  bond,  performance  bond  and  a  statutory  payment  bond  in  the  amount  of  their  proposal;  see  Appendix  C.  These  bonds  are  required  at  the  time  the  contract  is  signed.  There  is  no  requirement  for  these  forms  to  be  completed  or  submitted  with  the  proposal.  The  surety  selected  by  the  Proposer  must  be  acceptable  to  the  Authority.  Minimum  requirements  are:  

• Licensed  to  conduct  business  in  the  State  of  Oklahoma;  and  

• Names  in  the  current  list  of  “Companies  Holding  Certificates  of  Authority  as  Acceptable  Sureties  on  Federal  bonds   and   as   Acceptable   Reinsuring   Companies”   as   published   annually   in   Circular   570   by   the   U.S.  Department  of  Treasury.  

10.10 Escrow  

Any  and  all  Intellectual  Property  shall  be  placed  in  an  escrow  ("Intellectual  Property  Escrow")  account  in  the  event  that   second   source   availability   is   no   longer   possible.   The   AUTHORITY   and   CONTRACTOR   acknowledge   that   the  CONTRACTOR  and  Third  Parties  that  supply  software,  Source  Code,  or  other   Intellectual  Property  may  not  wish  to  deliver  the  Intellectual  Property  directly  to  the  AUTHORITY  and  that  the  CONTRACTOR  and/or  Third  Parties  desire  to  implement  measures   to  protect  such   information   from  public  disclosure   to   the  extent  permitted  under  applicable  Law.   CONTRACTOR   further   acknowledges   that   the   AUTHORITY   nevertheless   must   be   ensured   access   to   such  Intellectual  Property  at  any  time,  and  must  be  assured  that  the  Intellectual  Property  is  released  and  delivered  to  the  AUTHORITY  immediately.    

The   CONTRACTOR   shall   deposit   the   Intellectual   Property   with   a   neutral   trustee.   The   CONTRACTOR   shall   select,  subject   to   the   AUTHORITY’s   prior   approval,   an   escrow   company   or   other   neutral   custodian   ("Escrow   Agent")  engaged  in  the  business  of  receiving  and  maintaining  escrows  in  the  metropolitan  Oklahoma  City  area,  or  in  another  location  the  Parties  agree  to  in  writing,  of  Source  Code  or  other  Intellectual  Property,  and  establish  an  Intellectual  Property  Escrow  with  the  Escrow  Agent  in  such  location  on  terms  and  conditions  agreed  upon  by  both  Parties  as  for  the  deposit,  retention  and  upkeep  of  Source  Code,  Source  Code  Documentation,  build  tools,  operating  system  and  other   software   necessary   to   configure   and   build   the   software   and/or   other   Intellectual   Property   and   related  documentation.   Intellectual  Property  Escrow  also  may   include  Third  Parties  as  parties  and  may   include  deposit  of  their  Intellectual  Property.  The  CONTRACTOR  shall  be  responsible  for  the  fees  and  costs  of  the  Escrow  Agent.    

License  Plate  Tolling  System  application  software  shall  be  fully  documented,  as  set  forth  elsewhere  in  this  document,  such   that   the   AUTHORITY   shall   possess   sufficient   information   to   make   future   software   changes   with   its   own  resources,  other  software  specialists  or  the  CONTRACTOR  Software  engineers.  The  AUTHORITY  has  no  intention  of  

Page 16: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

15      

marketing  the  License  Plate  Tolling  System  software  to  other  parties  and  the  AUTHORITY,  and  its  Representatives,  shall   endeavor   to   maintain   confidentiality   of   the   developed   software   and   software   documentation,   except   as  needed   to   effect   changes,   expansions   or   improvements   to   the   License   Plate   Tolling   System.   Developed   software  shall  mean  the  computer  software  and  executable  code  (“Source  Code”)  developed  specifically  for  this  project.  

The   intention   of   these   provisions   is   to   ensure   that   the   AUTHORITY   will   not   have   to   rely   exclusively   on   the  CONTRACTOR   to   provide   future   software   modifications   after   the   License   Plate   Tolling   System   is   accepted.   The  AUTHORITY  may  elect  to  use  the  CONTRACTOR  for  such  services,  at  the  AUTHORITY’S  option.  

The  CONTRACTOR  shall  make  such  delivery  to  the  escrow  account  not  later  than,  for  pre-­‐existing  Source  Code  and  Source  Code  Documentation,  immediately  upon  execution  of  this  Contract  or,  if  provided  by  a  License  Plate  Tolling  Vendor,  execution  of  the  relevant  Contract;  for  Source  Code  and  Source  Code  Documentation  incorporated  into  or  used  on  or  for  the  Project,  prior  to  the  applicable  project  completing  the  System  &  Operational  Acceptance  Test;  for  any   Technology   Enhancement,   update,   upgrade   or   correction   of   Source   Code   and   Source   Code   Documentation  incorporated  into  or  used  on  or  for  the  Project  or  any  portion  thereof,  not   later  than  15  days  after  the  end  of  the  calendar  quarter  in  which  it   is  first  incorporated  or  used  in  any  Project;  and  for  any  other  Intellectual  Property,  on  the  Effective  Date  if  it  exists  as  of  such,  and  otherwise  within  15  days  after  the  end  of  the  calendar  quarter  in  which  it  is  first  incorporated  or  used  in  connection  with  the  Project  or  the  Work.  

The   AUTHORITY   shall   be   a   signatory   of   the   escrow   agreement   and   each   Intellectual   Property   Escrow  with   direct  rights  of  enforcement  against   the  CONTRACTOR  and  the  escrow  agent.  Each  escrow  agreement  shall  provide   that  any   amendment   or   supplement   to   such   escrow   agreement   shall   be   subject   to   the   AUTHORITY’s   prior   written  approval  in  its  sole  discretion.  

The   Intellectual   Property   Escrows   shall   survive  expiration  or   earlier   termination  of   this  Contract   regardless  of   the  reason,   until   such   time   as   both   Parties   agree,   in   their   respective   sole   discretion,   that   the   Intellectual   Property  contained  therein  is  of  no  further  use  or  benefit  to  the  Project.  

10.1 Revenue  Loss    

The  LPT  Processor  acknowledges  that  its  performance  under  this  Agreement  is  critical  to  the  operations  and  revenue  collection  of  the  Authority.    

In  the  event  of  any  failure  of  the  License  Plate  Tolling  Processor’s  Systems  (excluding  any  such  failure  to  the  extent  caused  by  force  majeure)  or  any  actions  by  the  LPT  Processor  that  result  in  revenue  loss,  the  LPT  Processor  shall  be  liable  for  losses  incurred  by  the  Authority  as  a  result  thereof,   including  lost  toll  revenues.  In  the  event  of  any  such  failure,  the  LPT  Processor  shall  take  appropriate  measures  to  correct  the  deficiency  that  caused  the  problem.  With  respect  to  any  failure  that  results  in  inability  of  the  License  Plate  Tolling  Processor  to  determine  the  amount  of  lost  revenue,   the   parties   hereby   stipulate   that   lost   revenues   shall   be   calculated   based   on   a   comparison   of   revenues  received  during  the  period  in  question  and  revenues  received  during  a  comparable  prior  period  determined  by  the  Authority.  

The  Authority  may  choose,  in  its  sole  discretion,  to  recover  such  lost  revenue  from  the  LPT  Processor  by  deducting  such  amounts  from  payments  otherwise  due  and  owing  from  the  Authority  to  the  LPT  Processor.  The  LPT  Processor  

Page 17: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Oklahoma  Turnpike  Authority  –  Request  for  Proposal     2015  

 

16      

may  be  required,  at  the  Authority’s  sole  discretion,  to  pay  an  additional  10%  penalty  to  the  Authority  for  any  actual  damages  described  in  this  Section.  

10.2 Public  Availability  to  RFP  Records  

Copies  of  the  proposals  will  be  available  for  public  inspection,  (after  award  has  been  made)  under  supervision  of  the  Purchasing   Department,   in   the   General   Administration   Services   Division   from   7:30   A.M.   to   4:30   P.M.   Monday  through  Friday  at  the  Oklahoma  Turnpike  Authority,  Oklahoma  Turnpike  Authority,  2401  NW  23rd  Street,  Suite  2B-­‐1  Oklahoma  City,  OK  73107.      10.3 Audit  of  Records  

In  the  event  a  contractual  agreement  is  created  pursuant  to  this  RFP,  the  contract  must  contain  the  following  audit  clause.    

[Firm]  shall  permit  OTA  designated  personnel  the  right  to  examine  [firm’s]  relevant  financial  and  operational  records  related  to  this  agreement.  OTA  shall  have  the  right  to  audit  and  verify  statements  submitted  by  [firm]  pursuant  to  this   agreement.   [Firm]   shall   retain   these   records   for   a   period   of   three   years   after   the   final   payment   under   this  agreement  or  until  all  pending  matters  are  closed,  whichever  is  later.  OTA  reserves  the  right  to  dispute  and  receive  credit  for  any  costs  which  an  audit  may  prove  to  be  inappropriate.  

10.4 Other  Terms  &  Conditions  

The  Authority  reserves  the  right  to  reject  any  or  all  proposals  or  to  cancel  this  solicitation  at  any  time.  

The  Authority  reserves  the  right  to  waive  minor  technicalities  in  this  RFP.  

 

Page 18: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

     17  

OKLAHOMA  TURNPIKE  AUTHORITY  

NON-­‐COLLUSION  BIDDING  CERTIFICATION  

___________________  

STATE  OF  OKLAHOMA            )  )  SS  

COUNTY________________)  

A.   For  purposes  of  competitive  bids,  I  certify:  

1. I   am   the   duly   authorized   agent   of   ___________________________________,   the   bidder   submitting   the  competitive  bid  which  is  attached  to  this  statement,  for  the  purpose  of  certifying  the  facts  pertaining  to  the  existence  of  collusion  among  bidders  and  between  bidders  and  state  officials  or  employees,  as  well  as  facts  pertaining   to   the   giving   or   offering   of   things   of   value   to   government   personnel   in   return   for   special  consideration  in  the  letting  of  any  contract  pursuant  to  the  bid  to  which  this  statement  is  attached;  

2. I  am  fully  aware  of  the  facts  and  circumstances  surrounding  the  making  of  the  bid  to  which  this  statement  is  attached  and  has  been  personally  and  directly  involved  in  the  proceedings  leading  to  the  submission  of  such  bid;  and  

3. Neither  the  bidder  nor  anyone  subject  to  the  bidder’s  direction  or  control  has  been  a  party  to  the  following:  a.   Any  collusion  among  bidders  in  restraint  of  freedom  of  competition  by  agreement  to  bid  at  a  fixed  price  

or  to  refrain  from  bidding;  b.   Any   collusion   with   any   state   official   or   employee   as   to   quantity,   quality   or   price   in   the   prospective  

contract,  or  as  to  any  other  terms  of  such  prospective  contract;  and  c.   Any  discussions  between  bidders  and  any  state  official  concerning  exchange  of  money  or  other  thing  of  

value  for  special  consideration  in  the  letting  of  a  contract.  

B.   I   certify,   if   awarded   the   contract,  whether   competitively   bid   or   not,   that   neither   the   Contractors   nor   anyone  subject  to  the  Contractor’s  direction  or  control  has  paid,  given,  or  donated  or  agreed  to  pay,  give,  or  donate  to  any  officer  or  employee  of  the  State  of  Oklahoma  any  money  or  other  thing  of  value,  either  directly  or  indirectly,  in  procuring  the  contract  to  which  this  statement  is  attached.  

Certified  this  _______  day  of  __________________,  20____.  

_________________________________  

(Signature)  

_________________________________     ________________________________  

(Print  Name)                    (Position  in  the  Company)  

 

 

     3/2014  

Page 19: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 1 of 111

Oklahoma Turnpike Authority License Plate Tolling Processor

Request For Proposal

Scope of Services and Functional Requirements

June 2015  

Page 20: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 2 of 111

TABLE OF CONTENTS

PROJECT OVERVIEW ................................................................................................................ 7  

I.   GENERAL REQUIREMENTS .............................................................................................. 7  1   PROJECT OVERVIEW ....................................................................................................................................................7  

  Summary of Scope .............................................................................................................................................7  1.1

  Quality Assurance & Quality Control ................................................................................................................7  1.2

  Customer Satisfaction Surveys ..........................................................................................................................9  1.3

  Existing OTA Contracts .....................................................................................................................................9  1.4

2   PROJECT MANAGEMENT .............................................................................................................................................9     General Project Management Requirements .....................................................................................................9  2.1

3   STAFFING ..................................................................................................................................................................10     Staffing Plans - Team Organization .................................................................................................................10  3.1

4   DOCUMENTATION REQUIREMENTS ...........................................................................................................................11     General Documentation Requirements ............................................................................................................11  4.1

  Deliverable Management .................................................................................................................................11  4.2

  Document Reviews ..........................................................................................................................................12  4.3

  Submittal Approval ..........................................................................................................................................12  4.4

5   PROJECT COMMUNICATIONS .....................................................................................................................................12     Project Scope ...................................................................................................................................................12  5.1

  Meetings ...........................................................................................................................................................13  5.2

  Status Meetings – Design and Development ...................................................................................................13  5.3

  Status Meetings – Operations ..........................................................................................................................14  5.4

6   PROJECT SCHEDULE ..................................................................................................................................................14     General Project Schedule Requirements ..........................................................................................................14  6.1

  Schedule Delays ...............................................................................................................................................15  6.2

  Schedule Revisions ..........................................................................................................................................15  6.3

7   DATA RETENTION AND DESTRUCTION ......................................................................................................................16     General Data Retention and Destruction Requirements ..................................................................................16  7.1

  Specific Data Retention and Destruction Requirements ..................................................................................16  7.2

8   SUCCESSION ..............................................................................................................................................................17     Succession Plan ................................................................................................................................................17  8.1

  Succession Procedures .....................................................................................................................................18  8.2

II.   DESIGN, DEVELOPMENT AND TESTING ..................................................................... 20  9   SYSTEM DEVELOPMENT ............................................................................................................................................20  

  System Design and Development Plan (SDDP) ..............................................................................................20  9.1

Page 21: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 3 of 111

  Requirements Review Workshops ...................................................................................................................21  9.2

  Requirements Traceability Matrix (RTM) .......................................................................................................21  9.3

10   DESIGN ....................................................................................................................................................................21     General Design Requirements .......................................................................................................................21  10.1

  Preliminary Design Document and Review ...................................................................................................22  10.2

  System Design Document (SDD) and Review ..............................................................................................22  10.3

11   TESTING REQUIREMENTS ........................................................................................................................................24     General Testing Requirements .......................................................................................................................24  11.1

  Master Test Plan (MTP) .................................................................................................................................26  11.2

  General Test Plan Requirements ....................................................................................................................28  11.3

  Factory Acceptance Test (FAT) .....................................................................................................................28  11.4

  Installation and Interface Test ........................................................................................................................29  11.5

  Disaster Recovery Test ..................................................................................................................................30  11.6

  Production Readiness Test .............................................................................................................................30  11.7

  System & Operational Acceptance Test ........................................................................................................32  11.8

12   GO-LIVE ..................................................................................................................................................................32     General Go-Live Requirements .....................................................................................................................32  12.1

III.  LICENSE PLATE TOLLING OPERATIONAL REQUIREMENTS .............................. 33  13   TECHNICAL REQUIREMENTS ...................................................................................................................................33  

  System Requirements .....................................................................................................................................33  13.1

  LPT System Data Center Requirements ........................................................................................................33  13.1

  LPT System Requirements ............................................................................................................................34  13.2

  LPT System Operating System and Software ................................................................................................35  13.3

  LPT System Dashboard .................................................................................................................................35  13.4

  Database Requirements ..................................................................................................................................36  13.5

  LPT System End User Requirements ............................................................................................................38  13.1

14   SECURITY ................................................................................................................................................................38     General Security Requirement .......................................................................................................................38  14.1

  Access Security ..............................................................................................................................................38  14.2

  Data Security ..................................................................................................................................................39  14.3

  Payment Card Industry Data Security Standard (PCI DSS) ..........................................................................40  14.4

15   SYSTEM ADMINISTRATION & MAINTENANCE .........................................................................................................41     General System Administration & Maintenance Requirements ....................................................................41  15.1

16   DISASTER RECOVERY/BUSINESS CONTINUITY ........................................................................................................41     General Disaster Recovery/Business Continuity Requirements ....................................................................41  16.1

17   DOCUMENTATION ...................................................................................................................................................44     Policies and Procedures Review ....................................................................................................................44  17.1

Page 22: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 4 of 111

  Manuals ..........................................................................................................................................................45  17.2

18   ADMINISTRATIVE REQUIREMENTS ..........................................................................................................................46     General Administrative Requirements ...........................................................................................................46  18.1

  Staffing ...........................................................................................................................................................46  18.2

  Training ..........................................................................................................................................................47  18.3

  Document Control ..........................................................................................................................................48  18.4

  Customer Information and Privacy ................................................................................................................48  18.5

  Agency Access ...............................................................................................................................................49  18.6

19   LPT PHYSICAL LOCATION .......................................................................................................................................50     General LPT Physical location Requirements ...............................................................................................50  19.1

  Physical Security ............................................................................................................................................51  19.2

  Operating Hours .............................................................................................................................................52  19.3

20   TRANSACTION PROCESSING ....................................................................................................................................52     General Transaction Processing .....................................................................................................................52  20.1

  Image Review ................................................................................................................................................52  20.2

  LPT Watch List ..............................................................................................................................................53  20.3

  PIKEPASS Account Match Processing .........................................................................................................54  20.4

  Name and Address Acquisition via Registered Owner of Vehicle (ROV) Lookup ......................................54  20.5

  LPT Transaction Processing ..........................................................................................................................55  20.6

  LPT Invoice Account Establishment .............................................................................................................56  20.7

21   INVOICE GENERATION AND ESCALATION ...............................................................................................................56     Invoice Generation and Issuance ...................................................................................................................56  21.1

  Invoice Issuance Suppression ........................................................................................................................57  21.2

  Invoice Layout Requirements ........................................................................................................................57  21.3

  Customer Fees ................................................................................................................................................59  21.4

  Invoice Escalation ..........................................................................................................................................59  21.5

22   VIOLATION PROCESSING .........................................................................................................................................65     Violation Processing ......................................................................................................................................65  22.1

  Violation Notice Generation and Issuance ....................................................................................................65  22.2

  Violation Notices Tracking and Resolution ...................................................................................................66  22.3

  Vehicle Registration Stop Flags .....................................................................................................................67  22.4

  Collection Agency .........................................................................................................................................67  22.5

23   PAYMENT PROCESSING ...........................................................................................................................................68     General Payment Processing Requirements ..................................................................................................68  23.1

24   ACCOUNT MAINTENANCE AND MANAGEMENT .......................................................................................................69     Customer Information and Correspondence ..................................................................................................69  24.1

  General Account Management ......................................................................................................................69  24.2

Page 23: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 5 of 111

  Disputes and Adjustments ..............................................................................................................................70  24.3

  Toll/Fee Dismissal .........................................................................................................................................70  24.4

  Transfer of Responsibility (TOR) ..................................................................................................................70  24.5

  UPA Conversion to PIKEPASS .....................................................................................................................71  24.6

25   LPT SYSTEM INTERFACES .......................................................................................................................................71     External Interfaces .........................................................................................................................................71  25.1

  Host Interface .................................................................................................................................................72  25.2

  File Exchanges ...............................................................................................................................................72  25.3

  Transaction Reconciliation ............................................................................................................................73  25.4

  PIKEPASS Account Match Lookups ............................................................................................................73  25.5

  Oklahoma License Plate Lookups .................................................................................................................74  25.6

  Texas License Plate Lookups .........................................................................................................................74  25.7

  CVIEW License Plate Lookups .....................................................................................................................74  25.8

  Hot Lists .........................................................................................................................................................75  25.9

  Oklahoma Tax Commission ........................................................................................................................75  25.10

  Third Party Interfaces ..................................................................................................................................75  25.11

26   MAIL PROCESSING ..................................................................................................................................................76     General Mail Processing Requirements .........................................................................................................76  26.1

  Incoming Mail Processing .............................................................................................................................76  26.2

  Outgoing Mail Processing ..............................................................................................................................77  26.3

27   CUSTOMER COMMUNICATIONS & MATERIALS .......................................................................................................78     Customer Communications ............................................................................................................................78  27.1

  Email ..............................................................................................................................................................78  27.2

  Social Media ..................................................................................................................................................79  27.3

  IVR System ....................................................................................................................................................79  27.4

  Call Center .....................................................................................................................................................80  27.5

28   WEBSITE .................................................................................................................................................................81     Website Requirements ...................................................................................................................................81  28.1

  Website Account Management ......................................................................................................................82  28.2

  Website Services ............................................................................................................................................82  28.3

  Website Security ............................................................................................................................................83  28.4

29   PAYMENT PROCESSING ...........................................................................................................................................84     General Payment Processing Requirements ..................................................................................................84  29.1

  Credit/Debit Card and ACH Processing ........................................................................................................85  29.2

  Cash and Checks Processing ..........................................................................................................................87  29.3

  Refunds ..........................................................................................................................................................88  29.4

30   CASH PAYMENT NETWORK .....................................................................................................................................88  

Page 24: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Attachment 1 – Scope of Services & Functional Requirements Oklahoma Turnpike Authority

Page 6 of 111

  General Cash Payment Location Requirements ............................................................................................88  30.1

  CPN Payments ...............................................................................................................................................89  30.2

  CPN Transaction Fees ....................................................................................................................................89  30.3

  CPN Receipts .................................................................................................................................................90  30.4

  LPT and CPN Interface ..................................................................................................................................90  30.5

  CPN Merchant Locations ...............................................................................................................................90  30.6

  CPN Merchant Locator ..................................................................................................................................91  30.7

  CPN Reports ..................................................................................................................................................91  30.8

  CPN Customer Service Requirements ...........................................................................................................92  30.9

31   FINANCIAL RESPONSIBILITIES .................................................................................................................................93     General Financial Responsibilities Requirements .........................................................................................93  31.1

  Financial Reconciliation ................................................................................................................................93  31.2

32   AUDITING ................................................................................................................................................................95     General Audit Requirements ..........................................................................................................................95  32.1

  Internal Controls ............................................................................................................................................95  32.2

33   REPORTING ..............................................................................................................................................................96     General Reporting Requirements ...................................................................................................................96  33.1

  Ad Hoc Reports ..............................................................................................................................................98  33.2

  Research Screens ...........................................................................................................................................99  33.3

  Specific Report Requirements .......................................................................................................................99  33.4

34   PERFORMANCE STANDARDS .................................................................................................................................107     General Performance Standard Requirements .............................................................................................107  34.1

  Example Performance Standard Adjustment (Percentage Method) ............................................................110  34.2

LIST OF TABLES Table 1: Testing Summary ..................................................................................................................................................27  Table 2: Invoice Escalation Process ...................................................................................................................................60  

Page 25: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 7 of 111

Project Overview

This Scope of Services for the License Plate Tolling (LPT) Processor consists of three major areas as defined below:

• General Requirements – The general requirements of the LPT provider are described in this section.

• Design and Development – Design, development and implementation of all Software, hardware, processes, and operational requirements necessary as defined in this Scope of Services and as identified through the design process to support the OTA LPT operation.

• License Plate Tolling Operations – Perform full and complete service of the on-going operation of the OTA LPT operation related to: o Unregistered LPT Account Establishment

o Image Review o Transaction Processing

o Payment Processing o Customer Service

o Call Center

I. General Requirements

1 Project Overview

Summary of Scope 1.1

1.1.1 The LPT Processor shall provide a comprehensive, fully tested and integrated, “turn-key” solution that shall meet or exceed all requirements herein and shall be responsible for all activities related to establishment, implementation and on-going operation of the OTA LPT operation as described in this document.

1.1.2 The LPT Processor shall work cooperatively with OTA for such things as PIKEPASS integration testing and ongoing operations.

Quality Assurance & Quality Control 1.2

1.2.1 The LPT Processor shall establish, implement and maintain a Quality Assurance (QA) and Quality Control (QC) program throughout all phases of the Contract.

Page 26: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 8 of 111

1.2.2 The LPT Processor shall establish and implement procedures to identify, define, track and report to OTA all items that could adversely impact the success of the Project and/or any areas that may impact customers or their perception of the Project and/or OTA. These items include, without limitation, call center performance, timely and accurate issuance of statements and invoices, transaction processing, image review, all aspects of customer service (including call quality and customer satisfaction), meeting milestone dates, reliability and accuracy of data, and the integrity of reports and financial Transactions.

1.2.3 The LPT Processor shall ensure that all QA/QC requirements are met by all of its Subcontractors and vendors.

1.2.4 The LPT Processor shall prevent, detect, and correct deviations from any requirement, including by Subcontractors, and report such items to OTA.

1.2.5 The LPT Processor’s QA/QC program shall address all staffing, equipment, methods, procedures, activities, and schedule requirements relating to QA/QC activities.

1.2.6 The LPT Processor’s QA/QC program shall ensure the accuracy and timeliness of the issuance of statements, invoices and general correspondence.

1.2.7 The LPT Processor’s QA/QC program shall continually evaluate LPT operations for accuracy, completeness, and efficiency.

1.2.8 The LPT Processor shall establish procedures to ensure that all requirements of the Contract are performed completely, accurately and in a timely manner and correct any area of performance that is below standard.

1.2.9 The LPT Processor’s QA/QC program shall include reasonableness checks that evaluate accuracy and efficiency such as analyses of abnormal deviations in quantity, volume, dollar amounts, elapsed time, and staff hours.

1.2.10 The LPT Processor shall implement changes and/or corrective action upon error identification during the QA/QC processes.

1.2.11 The LPT Processor shall review a random sample of invoices from every batch, automatically generated by the system, for accuracy and quality. The following are checked:

• Issued date;

• Due date;

• Customer address;

• License plate number; and

• Toll amounts.

Page 27: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 9 of 111

Customer Satisfaction Surveys 1.3

1.3.1 The LPT Processor shall establish a process to perform customer satisfaction surveys via the IVR and mail.

1.3.2 The LPT Processor shall work with OTA to finalize the content and questions included in the customer satisfaction surveys.

1.3.3 The LPT Processor shall implement the customer satisfaction surveys as directed by OTA, as frequently as annually.

1.3.4 The LPT Processor shall report the results of customer satisfaction surveys to OTA within one week of the conclusion of a survey period.

1.3.5 The LPT Processor shall not include the time customers spend interacting with the customer satisfaction survey in its call time statistics.

Existing OTA Contracts 1.4

OTA has pre-existing contracts for goods and services with certain providers in support of the PIKEPASS operation. These contracts will be carried forward to support the new LPT operation and OTA will pay the costs incurred under these contracts directly or as a direct pass through to OTA of actual cost. 1.4.1 The LPT Processor shall coordinate its Work with the services provided by OTA’s

other contractors. The pre-existing contracts are as follows:

Credit Card Processor – currently TransFund 1.4.1.1

Banking Services – currently Bank of Oklahoma 1.4.1.2

Collections Services – currently Kansas Counselors, Inc. 1.4.1.3

DMV ROV Look-up – currently American Traffic Solutions (optional) 1.4.1.4

2 Project Management

General Project Management Requirements 2.1

2.1.1 The LPT Processor shall manage the planning and execution of all aspects of the requirements in this document.

2.1.2 The LPT Processor shall provide project management throughout the term of the contract.

2.1.3 The LPT Processor shall coordinate its activities with OTA and other agencies, as required.

Page 28: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 10 of 111

2.1.4 The LPT Processor shall execute the Project in accordance with all required Plans.

2.1.5 The LPT Processor shall deliver monthly and quarterly status reports providing review and analysis of the LPT operation.

2.1.6 The LPT Processor shall schedule and meet with OTA Management on a monthly basis to present and discuss monthly and quarterly status reports.

2.1.7 The LPT Processor shall provide a schedule of services to OTA, as needed, for deployment of new Software, LPT System enhancements, bug fixes, hardware upgrades, and any functionality required for security and LPT System vulnerability mitigation.

3 Staffing

Staffing Plans - Team Organization 3.1

3.1.1 The LPT Processor shall develop a detailed Staffing Plan for OTA review and approval in accordance with the Project Schedule.

3.1.2 The Staffing Plan shall address staffing during the Design and Development Phase and during the LPT Operations Phase.

3.1.3 The Staffing Plan shall include, but not be limited to, the following:

A description of the LPT Processor’s Project team organization, reporting 3.1.3.1relationships, key project personnel and team member contact information.

The physical location of all staff. 3.1.3.2

A detailed Project organization chart that is a graphical representation of the 3.1.3.3LPT Processor’s staff hierarchy, including any Subcontractors, and indicates functional areas of responsibility as well as the number of staff by position.

Performance objectives for each work position and how the LPT Processor 3.1.3.4shall continuously monitor personnel performance against these objectives.

Corrective actions for dealing with any unsatisfactory performance. 3.1.3.5

A description of the LPT Processor’s Policies and Procedures regarding the 3.1.3.6selection of qualified staff, the performance of background checks, the assignment of staff to handle sensitive information and compliance with applicable employment regulations.

A description of all Subcontractor relationships and responsibilities. 3.1.3.7

Page 29: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 11 of 111

4 Documentation Requirements

General Documentation Requirements 4.1

4.1.1 The LPT Processor shall maintain all documentation related to the LPT design, development and operation as defined in this scope of work.

4.1.2 The LPT Processor shall maintain a soft copy library of current versions of all Project documents in a secure location with web access for all approved members of the OTA Project team.

4.1.3 If changes occur in any aspect of the Project that alters operations, the LPT Processor shall update relevant documentation within one month of that change, unless a specific alternative update schedule is approved by OTA.

4.1.4 The LPT Processor shall back up all soft copy library files at least daily.

4.1.5 The LPT Processor shall maintain all documentation in formats found in the Microsoft Office suite unless otherwise specified by OTA.

4.1.6 The LPT Processor shall make all documentation available to OTA in electronic copy format. Electronic versions shall be in the original format in which the document was created (e.g., Microsoft Word/Excel).

4.1.7 The LPT Processor shall ensure each document produced contains a title sheet, table of contents, list of illustrations (if applicable), revision log, and list of reference drawings (if applicable).

4.1.8 With the exception of the original equipment manufacturer standard documentation (e.g., manuals, catalogs), the LPT Processor shall ensure all documents are formatted to be printed double-sided on 8.5" by 11" sheets and may include 11" by 17" “engineering fold” inserts.

4.1.9 The LPT Processor shall ensure the left-hand margin of the sheets in documents is adequate to ensure binding without encumbering the reading of the material.

4.1.10 The LPT Processor shall ensure all drawings, graphs, plans, charts, and illustrations are produced with computer aided drafting software or other software approved by OTA.

Deliverable Management 4.2

4.2.1 The LPT Processor shall submit all deliverables and work products to OTA for review, comment and approval. OTA reserves the right to reject documents prior to detailed review due to the document’s failure to meet the purpose and intent of the deliverable. In the event a deliverable is rejected, OTA will notify the LPT Processor of the basis for rejection in writing. Rejection of a deliverable shall constitute a delay caused by

Page 30: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 12 of 111

the LPT Processor if a completed version of the document is not approved by the document final version approval date in the approved Project Schedule.

Document Reviews 4.3

4.3.1 The LPT Processor shall submit documents for OTA’s review, comment, and approval in accordance with the approved Project Schedule. The schedule shall allow for a minimum of two review/revision cycle iterations, with a 10-Business Day OTA review period for each cycle.

4.3.2 OTA may require additional review time if the LPT Processor submits multiple, simultaneous or overlapping submittals or deliverables in excess of 100 pages.

4.3.3 The LPT Processor shall submit an empty, multi-column comments matrix with each document. OTA will enter its comments into the matrix and the LPT Processor shall track the status of all comments as well as comment responses and resolution for every comment in the matrix.

4.3.4 The LPT Processor shall update the relevant documents to address comments submitted by OTA in sufficient time to maintain the approved Project Schedule.

Submittal Approval 4.4

4.4.1 OTA’s approval of documents shall not relieve or limit the LPT Processor’s responsibility to provide systems and services in full compliance with the Contract.

4.4.2 If and when OTA submits comments, the LPT Processor shall resubmit the documentation and deliverables until such time as OTA accepts the document. Any time required for re-submittal or review of re-submittals shall not be an OTA-Caused Delay.

4.4.3 Deviations from the requirements set forth in this Scope of Services that may be contained within LPT Processor submitted documents, even though the document may be approved by OTA, shall not have the effect of modifying any requirement set forth in the Contract unless such deviations are explicitly disclosed as deviations and OTA expressly acknowledges and approves the deviations. Only formal requests to OTA, from the LPT Processor, for waivers or specification changes that are formally approved by OTA shall modify the requirements set forth in the Contract.

5 Project Communications

Project Scope 5.1

5.1.1 All decisions or directives relating to Project scope, schedule, design, procedures, Business Rules, or policy must be in writing and approved by OTA, in order to be incorporated into the official Contract Documents.

Page 31: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 13 of 111

Meetings 5.2

5.2.1 The LPT Processor shall develop meeting agendas for all meetings called by the LPT Processor or requested by OTA.

5.2.2 The LPT Processor shall distribute meeting agendas at least 24 hours in advance of all meetings for OTA approval.

5.2.3 The LPT Processor shall record notes of all meetings and distribute copies of the draft notes to attendees within 3 Business Days of the meeting for review and comment. At a minimum, the LPT Processor shall include the following in all meeting notes:

A complete list of attendees, whether present or on website/phone 5.2.3.1

Descriptions of issues discussed 5.2.3.2

Decision items, if any, shall be summarized at the beginning of all meeting 5.2.3.3note documents

Direction given 5.2.3.4

Open issues 5.2.3.5

Specific action items, including the responsible individual and estimated 5.2.3.6completion dates

Status Meetings – Design and Development 5.3

5.3.1 The LPT Processor shall schedule status meetings, at least monthly, with designated OTA staff throughout the Design and Development phase. Commencing within the first 30 days after Notice To Proceed (NTP) and continuing until Go-Live the LPT Processor shall schedule and conduct monthly status meetings with OTA to review the status of the Design and Development effort.

5.3.2 Commencing within the first 30 days after issuance of NTP and continuing to System Acceptance, the LPT Processor shall submit a Monthly Progress Report.

5.3.3 The LPT Processor shall submit Design & Development - Monthly Progress Reports by the 7th Business Day of each month for the preceding month.

5.3.4 The LPT Processor shall include the following in all Monthly Progress Reports:

Progress for the prior month for all Project activities. 5.3.4.1

Actual start and actual finish dates of work, percentage complete, and days 5.3.4.2remaining for work-in-progress.

Page 32: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 14 of 111

All potential delays and problems, if any; actions the LPT Processor is taking 5.3.4.3to address the delays or problems, and their estimated effect on the Project Schedule and overall Project completion.

Electronic copies of the updated Project Schedule. If there are any changes to 5.3.4.4the schedule from the previous Monthly Progress Report the changes shall be highlighted.

Progress on activities requiring coordination with third parties. 5.3.4.5

Deliverables scheduled for submittal in the next reporting period. 5.3.4.6

30-day look-ahead report on all activities scheduled. 5.3.4.7

Status Meetings – Operations 5.4

5.4.1 Commencing within the first 30 days after Go-Live and continuing through the end of the Contract, the LPT Processor shall schedule and conduct monthly status meetings with OTA to inform OTA of the performance of the system and operations, any problems noted and solutions.

5.4.2 Monthly status meetings shall include discussion about customer service call quality, customer satisfaction, performance standards and any related issues.

5.4.3 The LPT Processor shall submit Operations - Monthly Status Report (see Requirement 33.4.37) by the 7th Business Day of each month for the preceding month.

6 Project Schedule

General Project Schedule Requirements 6.1

6.1.1 Within 15 business days after NTP, the LPT Processor shall submit a detailed critical path Project Schedule that supports a Go-Live date, currently set for January 4, 2017. This date is dependent on the completion of construction of the ramps at Elm/Peoria. Construction is tentatively schedule to be completed for the first ramp at the end of June 2016 and in mid-October 2016 for the second ramp.

6.1.2 The Project Schedule shall identify all tasks to be accomplished and related dates from System Design to System & Operational Acceptance.

6.1.3 The Project Schedule shall include deliverable and approval dates for all documents that will be submitted for OTA review and approval.

6.1.4 Once the Project Schedule is approved by OTA, the approved version shall be considered the Baseline Schedule and shall not change without explicit written consent from OTA.

Page 33: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 15 of 111

6.1.5 The Project Schedule shall be updated as needed to reflect the current state of the schedule, in addition to showing the Baseline Schedule dates for all tasks.

6.1.6 The Project Schedule shall include all detailed steps that are required to accomplish scheduled Go-Live, including Design, Development and Testing, with related dates.

6.1.7 The LPT Processor shall create a Project Schedule that provides a fully functional LPT operation meeting all requirements in this Scope of Services by the Go-Live date.

6.1.8 Go-Live shall be achieved when all of the following have been completed:

OTA receipt and approval of the all pre Go-Live test reports. 6.1.8.1

OTA receipt and approval of confirmation that the LPT System and software 6.1.8.2escrow deposit contains the current version of all software and materials.

OTA receipt and approval of all Project deliverables. 6.1.8.3

Successful Go-Live in accordance with the OTA approved Go-Live plan. 6.1.8.4

6.1.9 The LPT Processor shall include time for submittal, review and approval of all Project deliverables in the Project Schedule.

6.1.10 Throughout the Term, the LPT Processor shall monitor, and update the Project Schedule whenever changes to the LPT System or operations of a material nature occur, or as directed by OTA.

6.1.11 The LPT Processor shall submit the Project Schedule in Microsoft Project and Adobe PDF formats.

Schedule Delays 6.2

6.2.1 The LPT Processor shall identify and promptly report to OTA all Project Schedule and progress delays during the execution of the Project.

6.2.2 In the event of any Project Schedule delay, the LPT Processor shall take appropriate action to develop a recovery schedule.

6.2.3 The LPT Processor shall submit a recovery schedule immediately following the identification of a Project Schedule delay.

6.2.4 Recovery schedules shall not release the LPT Processor from liability for a delayed schedule.

Schedule Revisions 6.3

6.3.1 The LPT Processor shall submit proposed changes to the Project Schedule along with the reason for the proposed changes for OTA approval as it becomes necessary to modify the Project Schedule.

Page 34: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 16 of 111

6.3.2 Until OTA approves in writing any schedule revision, all Project Schedule submittals shall be tracked against the previously approved Baseline Schedule.

6.3.3 Approved schedule changes shall not release the LPT Processor from the original requirements and Contract Deadlines unless explicitly agreed to in writing by OTA.

6.3.4 The LPT Processor shall create a revised schedule, based on approval of a proposed schedule change, and it shall be used as the basis for the subsequent monthly Project Schedule updates and reports.

7 Data Retention and Destruction

For the purposes of this section, Data Retention and Destruction refers to the storage, archiving and destruction of data related to the LPT operation. Data includes both account specific and non-account specific data. Examples of account specific data and records are customer transactions, customer demographic information, vehicle records, scanned correspondence, invoices, violations, account notes, customer license plate images, and customer payment and financial transactions. Examples of non-account specific data and records are accounting and financial reconciliations, reports, performance standard data, images not identified to a specific account and call center statistics. This also includes audit system logs, access logs, audit trails, application logs, data dictionaries and other system generated data.

General Data Retention and Destruction Requirements 7.1

7.1.1 The LPT Operator shall be responsible for the retention, archiving and destruction of data related to the LPT program.

7.1.2 The LPT Operator shall not destroy any data or records without specific approval of OTA, except as necessary in maintaining compliance with PCI standards.

7.1.3 All archival parameters shall be configurable for each type of data.

Specific Data Retention and Destruction Requirements 7.2

7.2.1 All account specific data and records related to open accounts and/or accounts with unpaid amounts shall be available to authorized users via the LPT System for at least 3 years and shall be archived and retrievable throughout the term of the Contract, including any extensions.

7.2.2 All account specific data and records not covered in Requirement 7.2.1 shall be available to authorized users via the LPT System for 2 years, archived and retrievable for an additional 3 years, and then destroyed.

Page 35: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 17 of 111

7.2.3 All non-account specific System data and records shall be maintained in the LPT System for 2 years, archived and retrievable for an additional 3 years, and then destroyed.

7.2.4 All non-account specific hard copy documents shall be maintained at the LPT processing location for 2 years, archived and retrievable for an additional 3 years, and then destroyed.

7.2.5 Hard copies of all scanned documents shall be retained for 3 months after being scanned, and then destroyed.

7.2.6 The LPT Processor shall perform all data and document destruction within 3 months after the required retention timeframe is reached.

7.2.7 The LPT System shall be capable of restoring archived data on a temporary basis for research and query purposes.

8 Succession

Succession Plan 8.1

8.1.1 Within 365 days of NTP, the LPT Processor shall prepare and submit a Succession Plan for OTA review and approval.

8.1.2 The Succession Plan shall detail a method for the orderly transfer of LPT operations including knowledge, data, manuals, documents, assets, call routing, licensing and business relationships from the LPT Processor to the successor service provider (“Successor”) or OTA, should the Contract terminate for any reason.

8.1.3 The Succession Plan, when implemented, shall ensure no interruption of LPT operations.

8.1.4 At the specific written direction of OTA, the LPT Processor shall implement, perform and carry out all activities as described in the OTA approved Succession Plan.

8.1.5 The Succession Plan shall include an overview and sequential steps detailing the transfer of each LPT operational area to the Successor or OTA.

8.1.6 The Succession Plan shall include, at a minimum, sections covering operational shut downs and the transfer and/or replacement of:

Physical assets, including a current list of assets and their owners 8.1.6.1

Staffing and organization, including training 8.1.6.2

Product usage and Software licenses, including a current list of licenses 8.1.6.3(name, purpose, identifier, contact information, license details)

Page 36: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 18 of 111

Leasing agreements, including a current list of leases (name, purpose, terms, 8.1.6.4dates, contact information)

Service contracts, including a current list of contracts (name, purpose, terms, 8.1.6.5dates, contact information)

Customer information (for example, current and historical data records, 8.1.6.6Transaction processing histories, images, scanned and hard copy documents, open call center cases, applications, forms, correspondence)

Customer notification outreach 8.1.6.7

Call routing 8.1.6.8

Financial ledgers and other financial information 8.1.6.9

LPT System configuration histories 8.1.6.10

Archived data 8.1.6.11

Correspondence templates (editable electronic and printed copies) 8.1.6.12

Invoice/ violation notice templates (editable electronic and printed copies) 8.1.6.13

Current Policies and Procedures documentation 8.1.6.14

Other information or knowledge necessary for succession or as otherwise 8.1.6.15reasonably requested by OTA

8.1.7 The LPT Processor shall update the approved Succession Plan to account for any subsequent changes in policy or operations within 30 days of the change. The updated Succession Plan shall be submitted to OTA for review and approval.

Succession Procedures 8.2

8.2.1 In the event that Notice of Succession is given to the LPT Processor by OTA, the LPT Processor shall designate a succession manager to be a single point of contact for all succession-related issues. The succession manager shall convene regular meetings with relevant staff and with OTA or its designated representatives, at which succession-related issues can be tracked, discussed, and resolved.

8.2.2 Upon Notice of Succession, the LPT Processor shall immediately coordinate formal reviews of all succession activities as detailed in the Succession Plan.

8.2.3 Upon Notice of Succession, the LPT Processor shall develop, submit to OTA for review, finalize, and subsequently adhere to a succession transition schedule that accommodates the needs of the Successor and/or OTA, relative to smoothly transitioning to a new LPT Processor and/or OTA.

Page 37: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 19 of 111

8.2.4 Upon Notice of Succession, the LPT Processor shall provide staff time to work with OTA and/or the Successor to establish database extract procedures acceptable to the OTA and/or the Successor, for the purpose of migrating the LPT System data.

8.2.5 Upon Notice of Succession, the LPT Processor shall provide staff time to work with OTA and/or the Successor to establish mapping conventions acceptable to the OTA and/or the Successor, for the purpose of migrating data to the new LPT Processor.

8.2.6 In the event of a succession, the LPT Processor shall make its existing management staff available for in-person interviews with OTA and/or the Successor staff.

8.2.7 The LPT Processor shall provide in-person training of Successor and/or OTA staff with experienced LPT Processor staff on an “as needed” basis upon request of OTA for a period from Notice of Succession until the end of the Term.

8.2.8 In the event of a succession, the LPT Processor shall ensure the accustomed quantity and quality of staff, supervisors and management are maintained throughout the entire period during which LPT operations is being transitioned to the Successor or OTA.

Page 38: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 20 of 111

II. Design, Development and Testing

This section outlines the system design, development and testing requirements for implementing the LPT System and processes. This phase includes Software design and Software development, as well as preparation of all materials, facilities and hardware necessary for the LPT operation. Design, development and testing shall require OTA participation and approvals throughout the process, beginning with the creation of a System Design and Development Plan (SDDP) and a review of the Requirements Traceability Matrix (RTM) in Appendix A. These documents shall form the basis of the initial LPT System design embodied in the System Design Document (SDD). During workshop sessions and OTA reviews, the LPT Processor shall refine the design resulting in an SDD that shall lead to LPT System development. This phase also includes creation and detailed reviews of Policies and Procedures and series of tests of the entire LPT System.

9 System Development

System Design and Development Plan (SDDP) 9.1

9.1.1 The LPT Processor shall provide for OTA’s review and approval a SDDP that defines the LPT Processor’s approach to design and development of the LPT System.

9.1.2 The SDDP shall include specific details of system development, including definition, design, programming, submittal and acceptance of software design deliverables, documentation, and software quality assurance.

9.1.3 The SDDP shall include the software life-cycle methodology that will be utilized as well as the technical approach, problem reporting and tracking process, software configuration and change management, and regression testing and revision control.

9.1.4 The SDDP shall include plans for design, development, testing and implementation of interfaces between the LPT System and external entities, as described in Appendix E.

9.1.5 The SDDP shall be used for future LPT System modification beyond minor bug fixes. At a minimum, for post-acceptance changes, the process shall include a business case and written acceptance of this document by OTA.

9.1.6 The SDDP shall provide a description of the structure of the software development team that will be assigned to the Project and how personnel will be assigned to the various system development disciplines, including software development, system engineers, test engineers, software test personnel, configuration management staff, documentation specialists, project management staff and software maintenance personnel.

Page 39: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 21 of 111

Requirements Review Workshops 9.2

9.2.1 The LPT Processor shall facilitate workshops with OTA and other parties designated by OTA to refine the requirements, covering at least customer communications, finance, accounting, reporting, website, and operations.

9.2.2 During these workshops, the LPT Processor shall clarify system requirements and Business Rules to ensure a full understanding of the intent of the system functions and Business Rules. The LPT Processor shall discuss how it shall meet requirements through operational procedures, the LPT Processor’s existing system functionality, system configuration or enhancements to its LPT System.

9.2.3 The LPT Processor shall participate in all meetings with OTA and other parties designated by OTA to determine the requirements for the various interfaces, as directed by OTA.

Requirements Traceability Matrix (RTM) 9.3

9.3.1 The LPT Processor shall update the Requirements Traceability Matrix in Appendix A with the results of the workshops and provide it to OTA for approval.

9.3.2 The LPT Processor shall continuously maintain and update the RTM throughout the life of the Project and shall include only OTA-directed requirements or OTA-approved changes that affect the design or functionality of Project hardware or software thereto.

9.3.3 The RTM shall show the origin of requirements, any changes to requirements, and the source of approval for those changes.

9.3.4 The RTM shall be used to verify compliance throughout the system design and development phase, testing and deployment, and into the Operations Phase.

9.3.5 The LPT Processor shall ensure the LPT System and all supporting activities and deliverables comply with the RTM throughout the entire life cycle of the Project.

9.3.6 The LPT Processor shall deliver an OTA-approved RTM in accordance with the approved Project Schedule.

10 Design

General Design Requirements 10.1

10.1.1 The LPT Processor shall produce a Preliminary Design Document (PDD) and a System Design Document (SDD) covering the applicable RTM items and the approved Business Rules.

Page 40: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 22 of 111

Preliminary Design Document and Review 10.2

10.2.1 The Preliminary Design Document (PDD) shall contain detailed information on LPT system design and technical approach and shall include, but not be limited to, the following:

General system design 10.2.1.1

RTM 10.2.1.2

System software specifications and design 10.2.1.3

System hardware specifications and design with cut sheets 10.2.1.4

System and software of the phone system 10.2.1.5

Physical and logical network overview 10.2.1.6

10.2.2 The LPT Processor shall provide system and subsystem block diagrams and data flow diagrams, and demonstrate compliance with system requirements.

10.2.3 The LPT Processor shall submit hardware concept drawings during this review.

10.2.4 The LPT Processor shall submit the PDD three weeks in advance of the scheduled PDR workshop. The PDD will be reviewed by OTA and comments provided to the LPT Processor.

10.2.5 The PDR workshop will be held to review the design documentation, discuss OTA comments and provide an in-depth review of the system design and the design documentation.

10.2.6 The PDR workshop shall take place at OTA offices. The LPT Processor shall provide minutes/action items from the PDR and submit revised versions of the documentation for OTA review and approval. This process will be repeated until OTA determines that the PDD is acceptable.

System Design Document (SDD) and Review 10.3

10.3.1 The SDD shall be an extension of the approved PDD documents and shall include detail such as block diagrams, hardware and software design, user interface and screen layouts, report formats, operational procedures, other pertinent design documentation including a list of equipment for each function along with a description of its role.

10.3.2 The SDD shall include, but not be limited to, the following:

Scope of Project 10.3.2.1

RTM 10.3.2.2

Page 41: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 23 of 111

Specification sheets for all equipment 10.3.2.3

Full software manual set for all Commercial off the Shelf (COTS) software 10.3.2.4as requested by OTA

System sizing and design details 10.3.2.5

Description of all third party software, including Operating Systems 10.3.2.6

System, subsystem and module level descriptions 10.3.2.7

Description of interactions between modules 10.3.2.8

Requirements for all peripheral device interfaces 10.3.2.9

Examples (mockups) of all reports 10.3.2.10

Description of system diagnostics, status monitoring and error handling 10.3.2.11

Description of redundancy and failover processes 10.3.2.12

End to end transaction diagram 10.3.2.13

Interface Control Documents (ICDs) for all external entities 10.3.2.14

File and transaction message formats 10.3.2.15

Design for user interfaces including graphical representation (screen shots 10.3.2.16or mockups) of all menus and screens

Database design and ERD/Data Dictionary 10.3.2.17

Basic Data communications diagram 10.3.2.18

Communications network logical design 10.3.2.19

Communications network physical design 10.3.2.20

10.3.3 The LPT Processor will submit a SDD for design approval that describes the design specifications of all hardware, software and communications to be provided by the LPT Processor to meet the requirements of the Project.

10.3.4 The LPT Processor shall describe all hardware specifications, including appropriate diagrams and facility layouts, in the hardware design.

10.3.5 The LPT Processor shall illustrate the software design and architecture and include modules and/or process levels and procedures. The software design details shall include the code used and how it interacts with the underlying Operating System.

Page 42: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 24 of 111

10.3.6 The SDD will form the basis for the Detail Design Review (DDR) and will be submitted for review, comment and discussion, after which the design reviews will take place.

10.3.7 The DDR provides the final review of the SDD, as implemented in accordance with the approved PDR approach.

10.3.8 The SDD must be received from the LPT Processor no later than three weeks in advance of the scheduled DDR meeting to allow OTA to review the documents in detail prior to the meeting.

10.3.9 Upon completion of the design reviews, the SDD shall be revised and submitted to OTA for final review and approval.

10.3.10 Upon OTA’s approval of the SDD, the LPT Processor shall update the Project Schedule, if necessary, and the RTM to reflect any changes in requirements approved during the design process.

10.3.11 The LPT Processor shall provide minutes/action items from the DDR and submit revised versions of the documentation for OTA review and approval. This process will be repeated until OTA determines that the SDD is acceptable.

10.3.12 Within 30 days after successful completion of the System Acceptance Test, the LPT Processor shall submit the Final SDD, including all changes made during the software development, installation and testing phases.

10.3.13 The LPT Processor shall provide all hardcopy submittals in three-ring binders, accompanied by electronic (soft) copies.

10.3.14 The LPT Processor shall update and submit to the designate person at OTA, the Final SDD with any changes implemented during ongoing operations within 10 business days of the change.

11 Testing Requirements

General Testing Requirements 11.1

The requirements described in this Section detail the test phases, facility, and support services necessary to test the LPT System.

11.1.1 The LPT Processor shall conduct testing of the system to validate the LPT System integrity, reliability, functionality, accuracy and compliance to the requirements of this RFP and demonstrate that the LPT System meets all of the approved requirements in the RTM.

Page 43: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 25 of 111

11.1.2 OTA and its representatives shall have the option to witness or take part in, any or all testing, and the LPT Processor shall work with OTA to schedule tests so that OTA staff, representatives and partners may observe and/or participate in all formal testing.

11.1.3 During the development of the system software, the LPT Processor’s test personnel shall conduct a comprehensive program of internal testing and walk-through sessions with OTA to ensure that the LPT System meets the functional specifications set forth in this RFP and that defects are detected and resolved or identified prior to formal demonstration testing witnessed by OTA.

11.1.4 The LPT Processor shall be responsible for all development and test personnel, equipment, facilities and expenses associated with all system testing.

11.1.5 The LPT Processor shall submit test plans, with test scripts, to OTA for review, comment and approval, at least 15 business days in advance of each test.

11.1.6 The LPT Processor shall incorporate comments and revisions received from OTA and update the Project Schedule, if necessary.

11.1.7 The LPT Processor shall obtain OTA approval of test plans and scripts prior to testing.

11.1.8 The LPT Processor shall accommodate ad hoc testing by OTA during formal testing.

11.1.9 The LPT Processor shall conduct all tests in accordance with the project schedule and the approved test plans and procedures.

11.1.10 Within 10 calendar days of the completion of each test, the LPT Processor shall deliver a test results report to OTA which shall include a listing of all defects (punch list) identified together with the severity level of each (severity levels will be determined in the Master Test Plan); a plan for resolving those defects; and a recommendation for retests (if appropriate).

11.1.11 The LPT Processor shall provide to OTA a report of all test results, notes, and observations.

11.1.12 The LPT Processor shall work together with OTA to indicate a priority level for each punch list item.

11.1.13 The LPT Processor shall correct and retest all punch list items including necessary regression.

11.1.14 The LPT Processor and OTA shall agree on a schedule for correcting and retesting punch list items.

11.1.15 When OTA deems that all punch list items have been resolved, the LPT Processor shall receive final approval of that test.

Page 44: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 26 of 111

Master Test Plan (MTP) 11.2

11.2.1 The LPT Processor shall provide a Master Test Plan describing all tests to be performed from NTP through and including System & Operational Acceptance.

11.2.2 The final set of tests to be conducted shall be finalized during the design phase; however, at a minimum, the LPT Processor shall include the following tests in the Master Test Plan:

Page 45: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 27 of 111

Table 1: Testing Summary

11.2.3 The MTP shall provide a description of each test, the standards for developing

individual test plans and the procedures for the formal testing. These standards shall address test procedure format, severity levels and acceptance criteria for each formal test phase. In addition, the MTP shall describe the entry criteria that must be met before each formal test can be started and the exit criteria that must be met before each test can be considered complete.

11.2.4 The MTP shall address testing approaches and schedule, performance criteria, data collection and sampling methods, testing conditions, testing locations, reporting of results, and procedures for tracking and retesting/regression testing for failed tests.

11.2.5 The MTP shall be submitted to OTA for review and approval according to the approved Project Schedule.

Test Entry Criteria Exit Criteria Description Documentation Factory Acceptance Test (FAT)

Approval of System Design Document, RTM, Master Test Plan, and all associated documentation.

Approval from OTA of successful completion of FAT.

Demonstrate the approved requirements and design of the LPT System.

FAT plan Test scripts Test results report Punch List (if any)

Installation and Interface Test (IIT)

Approval of IIT Plan; Policies and Procedures Manual and user manuals; Successful completion of exit criteria from FAT.

Approval from OTA of successful completion of IIT.

Demonstrate the proper function of all network communications and other physical systems and all external interfaces.

IIT plan Policies and Procedures User manuals Test scripts Test results report Punch List (if any)

Disaster Recovery Test (DRT)

Approval of Disaster Recovery Plan and successful completion of IIT.

Approval from OTA of successful completion of DRT.

Demonstrate the continued operation of the LPT System in the event of a disaster.

DRT plan Test scripts Test results report Punch List (if any)

Production Readiness Test (PRT)

Approval of Production Readiness Test Plan and successful completion IIT.

Approval from OTA of successful completion of PRT and OTA approval of SOAT Plan

Demonstrate the complete functionality and processes at the CSC. Successful completion of the PRT signals the LPT System is ready for Go-Live.

PRT plan Test scripts Test results report Punch List (if any) SOAT plan

System & Operational Acceptance Test (SOAT)

Approval of SOAT Plan (required prior to the end of PRT) Successful completion of exit criteria from PRT.

Completion and approval from OTA of SOAT

Demonstrate compliance with all requirements of SOW and all Performance Standards.

SOAT Plan Test results report

Page 46: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 28 of 111

General Test Plan Requirements 11.3

11.3.1 The LPT Processor shall provide for OTA’s review and approval (prior to test commencement) an individual test plan for each test listed in Table 1.

11.3.2 Each test plan shall include a description, scope, approach, required resources, schedule, including test items, all dependencies (including reliance on and readiness of third parties), test platform (including required equipment and location), features to be tested, test scripts and their expected results, entry and exit criteria including pass/fail criteria, a placeholder to record any defects noted during the test and a description of the ranking that will be used for classifying and recording any defects noted (e.g. critical, major, minor), definitions of a successful test, a place holder to record actual results and any risks requiring contingency planning.

11.3.3 The LPT Processor shall provide all test and support personnel, test equipment and test sites in accordance with the approved Master Test Plan. OTA will review and approve formal test plans and schedules proposed by the LPT Processor and will witness and determine the acceptability of the test results.

11.3.4 Test plans shall document workflows and business processes established during the design phase.

11.3.5 Test plans shall clearly list requirements that the LPT Processor will not test at each respective stage and the reason for their exclusion. These excluded requirements shall be subject to OTA review and approval.

11.3.6 Test plans shall describe how data to be tested will be compiled, such as through use of data simulation software or other mutually agreed upon data sets to create necessary Transaction and payment data.

11.3.7 The LPT Processor shall update each version of the test plans to incorporate or respond to OTA comments on the previous version.

11.3.8 The Factory Acceptance Test plan shall be submitted for OTA approval no sooner than 15 business days after approval of the SDD.

Factory Acceptance Test (FAT) 11.4

11.4.1 LPT Processor shall conduct the Factory Acceptance Test at the end of the development phase in accordance with the approved Project Schedule.

11.4.2 The FAT shall take place at the LPT Processor’s development facility or other equivalent site in the continental United States.

Page 47: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 29 of 111

11.4.3 The FAT shall be a test of the LPT System, using the same communications equipment, software, hardware, user interfaces and configurations as the LPT Processor will use in production.

11.4.4 The FAT shall follow a set of transactions and payments through various use cases that demonstrate the workflow through various sub-systems including LPT processing, image review, Interactive Voice Response (IVR) system, website, customer statements/invoices, and reports, etc.

11.4.5 The LPT Processor shall coordinate with OTA on how to obtain test Transaction and image file data.

11.4.6 The FAT shall utilize compiled Transaction and payment data to perform tests including, but not limited to, a full range of required reports, financial data flow and Transaction and payment reconciliation.

11.4.7 The LPT Processor shall obtain OTA approval of FAT results prior to Installation and Interface Testing.

Installation and Interface Test 11.5

11.5.1 The LPT Processor shall conduct the Installation and Interface Test after the LPT System has been installed in the designated primary hosting site location.

11.5.2 The Installation and Interface Test shall thoroughly test all of the network communications and other physical systems, according to a plan to be approved by OTA.

11.5.3 To the extent possible, the LPT Processor shall acquire test files from external interface sources to allow for the widest possible tests of LPT System functionality.

11.5.4 The LPT Processor shall cooperate with all testing required by third parties with external interfaces as directed by OTA.

11.5.5 The LPT Processor shall demonstrate the interface with the OTA Host to show that it can receive and process Transaction and image files, send results files back through the interface in the agreed-upon format, and show proper system logs of the send/receive cycle.

11.5.6 At a minimum, the LPT Processor shall include the following interfaces in the Installation and Interface Test:

Host/PIKEPASS 11.5.6.1

Credit/debit card processors 11.5.6.2

Banks 11.5.6.3

DMV/Third parties 11.5.6.4

Page 48: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 30 of 111

Mailhouse 11.5.6.5

Collection Agency 11.5.6.6

11.5.7 The LPT Processor shall obtain OTA approval of the Installation and Interface Test results prior to Disaster Recovery testing and the Production Readiness Test.

Disaster Recovery Test 11.6

11.6.1 During the Disaster Recovery Test, the LPT Processor shall exercise the Disaster Recovery/Business Continuity Plan to the fullest extent possible, simulating various LPT System failures and challenges for LPT Processor staff.

11.6.2 The LPT Processor shall obtain OTA approval of Disaster Recovery Test results prior to Go-Live.

11.6.3 The LPT Processor shall conduct the Disaster Recovery Test during Production Readiness Testing.

11.6.4 The LPT Processor shall conduct Disaster Recovery Testing at least annually after Go-Live.

Production Readiness Test 11.7

The Production Readiness Test (PRT) is performed in accordance with the PRT Plan approved by OTA, pending completion of construction. During the PRT, the full systems and operations of LPT System will be operating. Note that during PRT, no transactions will post to production, but instead shall post to a test platform designed to replicate the end-state production for ease of analysis and evaluation. During the PRT, the TransCore Infinity and OTA CE systems will be in operation and will process all PIKEPASS customer transactions from the new AET toll points, and will forward all image-based transactions to the LPT Processor. The objective of the PRT is to exercise all functionality and performance of the LPT System, operations, and maintenance, including but not limited to system logic, system administration, back office functionality, data communications, file transfers, Image Review process, reconciliations, interactions with the Host, Subcontractors and other third parties.

11.7.1 The PRT shall continue until the results are approved by OTA. The goal of a successful PRT is to prove the LPT System and operations are ready for production and the decision to ‘Go-Live.’

11.7.2 Upon completion of construction of each ramp, the LPT Processor shall begin to receive and process transaction and image data from the Host to the LPT System for use in exercising the functionality and processes at the CSC.

11.7.3 The LPT Processor shall perform the Production Readiness Test using actual Host data from transactions created at the Elm-Peoria toll points until Go-Live.

Page 49: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 31 of 111

11.7.4 The LPT Processor shall provide documentation of the agreed-to system configuration as part of the Production Readiness Test Plan.

11.7.5 This Production Readiness Test shall include but not be limited to:

Creating new accounts, issuing invoices, violations, payment processing, 11.7.5.1handling disputes and managing accounts through the website, and IVR system

Invoice escalation including violations and collections 11.7.5.2

Making adjustments in the LPT System to emulate all account and financial 11.7.5.3functions, including transfer of responsibility, chargebacks, refunds, and NSF checks

Interfacing with OTA’s finance department and systems 11.7.5.4

Providing special ad hoc queries, running daily and weekly reports, and 11.7.5.5conducting research on possible issues

Setting up test credit/debit cards and other mechanisms to simulate payments 11.7.5.6

Testing of LPT accounts and maintenance functions 11.7.5.7

Call routing between the LPT Processor and PIKEPASS 11.7.5.8

11.7.6 The LPT Processor shall perform license plate lookup queries during the Production Readiness Test.

11.7.7 The LPT Processor shall coordinate with DMVs and any third party DMV services to test the ROV lookup and license/registration hold interface.

11.7.8 The LPT Processor shall provide all necessary training and support in the use of the PIKEPASS CSC resources and LPT System to all users prior to conducting the Production Readiness Test.

11.7.9 The LPT Processor shall provide remote access for OTA and its representatives to access the LPT System during the Production Readiness Test.

11.7.10 The LPT Processor shall track and document all anomalies, failures, and other issues noted by test participants and observers during this period.

11.7.11 The LPT Processor shall prepare and deliver a test report with all issues prioritized and corrective actions assigned on a weekly basis.

11.7.12 The LPT Processor shall work with OTA to determine and agree upon required retesting.

Page 50: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 32 of 111

11.7.13 The LPT Processor shall continue testing data and recording, prioritizing, and working to correct issues identified until OTA approves a final set of Production Readiness Test results.

System & Operational Acceptance Test 11.8

11.8.1 The System & Operational Acceptance Test shall begin immediately upon Go-Live or as soon as all criteria for entry to this test have been met.

11.8.2 The System & Operational Acceptance Test shall include but not be limited to:

Ensuring the accuracy, consistency and completeness of data recorded in the 11.8.2.1database and reflected in reports

Performance monitoring and ensuring that all requirements and Performance 11.8.2.2Standards are met or exceeded

Following Policies and Procedures, resulting in an efficiently functioning 11.8.2.3CSC that meets all requirements

11.8.3 The LPT Processor shall perform a detailed review of all financial reports, which shall determine that all transactions are accurately summarized, fully accounted for, and supported by detailed Transaction reports.

11.8.4 The LPT Processor shall create a punch list of defects and a report on Performance Standards early in the System & Operational Acceptance Test period to allow early fixes and testing without revenue impacts to the Project. Approval of the System & Operational Acceptance Test shall occur when the LPT Processor demonstrates that it meets all requirements in the SOAT Plan and achieves compliance with all required Performance Standards over 3 consecutive calendar months of CSC Operations.

12 Go-Live

General Go-Live Requirements 12.1

12.1.1 The Go-Live period shall occur over a maximum of three days.

12.1.2 The LPT Processor shall have completed and obtained OTA approval for all testing except System & Operational Acceptance.

12.1.3 The LPT Processor shall provide a detailed Go-Live Plan covering the three-day Go-Live period.

12.1.4 The Go-Live plan shall include an hour-by-hour schedule, a checklist of tasks and tests occurring during Go-Live, the go/no-go decision point, and any other information necessary to ensure a smooth Go-Live.

Page 51: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 33 of 111

12.1.5 The LPT Processor shall evaluate all aspects of its planned operations and ensure that all mechanisms are in place to manage those operations in accordance with all requirements prior to Go-Live.

12.1.6 The LPT Processor shall report on its evaluation to OTA, seek OTA’s approval for implementing any resulting recommendations, and document any such measures implemented.

III. License Plate Tolling Operational Requirements

The LPT Processor shall be responsible for the management and on-going operation of the OTA License Plate Tolling operations and all related activities. These activities include, but are not limited to, image review, invoice generation and issuance, account creation and management, payment processing, customer communications, interfacing with external entities, customer interaction; reconciliation and report generation. Except as specifically stated in this Scope of Services, the LPT Processor shall supply all LPT System and Main Processing Center facilities, enclosures, hardware, software, utilities, and staff necessary to meet the requirements of this Scope of Services.

13 Technical Requirements

System Requirements 13.1

LPT System Data Center Requirements 13.1

13.1.1 The LPT Processor shall provide both a Primary and a Disaster Recovery (DR) data center, with a minimum Tier 3 rating, to house the required infrastructure to process designated OTA LPT transactions and images. A Tier 3 data center is composed of multiple active power and cooling distribution paths, but only one path active, has redundant components, and is concurrently maintainable, providing 99.982% availability.

13.1.2 In both the Primary and DR data centers, the LPT Processor shall maintain and monitor the HVAC(s) system such that it provides the proper environmental conditions that are required for the LPT System.

13.1.3 The LPT Processor shall ensure the LPT System data center components are protected from power outages by the use of generators.

13.1.4 The LPT Processor shall ensure LPT System components are protected by a Power Distribution Unit (PDU) and an Uninterruptible Power Supply (UPS) capable of surge suppression and powering the LPT System during utility to generator transfers.

13.1.5 The LPT Processor shall monitor all PDUs and UPSs for health and loading.

Page 52: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 34 of 111

13.1.6 The LPT Processor shall design, procure and configure a physical and logical Local Area Network (LAN) for the LPT System at the Primary and DR data centers using commercially available hardware.

13.1.7 The LAN topology shall be designed to eliminate single points of failure at network layers 1, 2, and 3. The design and equipment shall be subject to OTA review and approval.

13.1.8 The OTA LPT System shall exclusively use the LAN. No other systems housed in the LPT Processor’s data centers shall use the LAN provided to OTA.

13.1.9 In order to establish communication paths between the Host, LPT Account holders, third party interfaces, and data center to data center a Wide Area Network (WAN) connection shall be provided by the LPT Processor at both the Primary and Disaster Recovery data centers.

13.1.10 It is the LPT Processor’s responsibility to provide and configure all required equipment and cabling to accommodate the WAN link.

13.1.11 The LPT Processor shall coordinate with third party Internet Service Providers (ISP) to install the WAN link within each LPT System data center. The up front and recurring costs of the WAN link shall be the responsibility of the LPT Processor.

13.1.12 The LPT Processor’s WAN topology, bandwidth, and equipment shall be subject to OTA review and approval.

13.1.13 The LPT Processor shall ensure that no data is lost in the event of a data transmission failure.

13.1.14 The LPT System data center components shall be housed in their own secured cabinet/rack. Only authorized and OTA approved personnel shall have access to the LPT System Facility rack.

LPT System Requirements 13.2

13.2.1 The LPT Processor shall furnish an active-standby LPT System between its Primary and DR Data Centers. The LPT System shall include all cabinets, enclosures, servers, storage systems, Keyboard, Video, and Monitor (KVM)s, cabling, and any ancillary equipment, as may be necessary to provide a complete and acceptable LPT System and shall be designed, sized and maintained to meet or exceed all operational and functional requirements and all Performance Standards in this RFP throughout the Term.

13.2.2 The LPT System shall be scalable to meet increased volumes.

13.2.3 The LPT Processor shall provide an isolated LPT System, meaning it will not share physical or logical system, network, or infrastructure components with other co-

Page 53: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 35 of 111

located clients. Two exceptions for sharing physical components are the data building and the data center utility power.

13.2.4 The LPT Processor shall provide hosts that contain adequate memory and processing capacity to meet all requirements.

13.2.5 The LPT System shall include hot swappable components and sub-systems wherever available.

LPT System Operating System and Software 13.3

13.3.1 The operating system for the LPT System(s)/server(s) shall consist of a Commercial Off the Shelf (COTS) multi-user, multitasking operating system.

13.3.2 The LPT Processor is responsible for obtaining all licenses as required and all necessary licenses will be obtained for all COTS operating system software used by the LPT System.

13.3.3 The LPT Processor will retain authorized copies (backups) for all software media to use for periodic system maintenance, upgrades, or restorations, as required.

13.3.4 The proposed operating system shall have warranty and COTS maintenance support services for the Term of the Contract.

13.3.5 If Microsoft Windows is selected, the LPT Processor shall utilize Microsoft Windows 7 or greater for desktops and Windows Server 2012 R2 or greater for servers.

13.3.6 The operating system shall be a proven system and version release with a large installed base, used widely throughout the United States for enterprise-class operations and shall be compatible with relevant database and web-based development and operational tools, and shall not be a “Beta” or first release version.

13.3.7 The LPT Processor shall maintain the Operating System with necessary updates and security patches.

LPT System Dashboard 13.4

13.4.1 The LPT System shall provide a dashboard screen that allows authorized users to monitor the LPT System with drilldown capabilities. This shall include an overview of LPT operations including transaction volume by facility, call center activity, image review, ROV lookups, invoice/violation issuance and escalation, and number of accounts. Specific examples of detail include:

Call Center 13.4.1.1

• Total incoming calls

• Number of calls requesting a CSR

Page 54: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 36 of 111

• Number of calls answered by a CSR • Average wait time for CSR calls

• Average call handling time • Maximum wait time for CSR calls

• Number & Percentage of CSR calls that exceed a specified wait time • Abandoned call rate

Image Review 13.4.1.2

• Oldest transaction date currently being reviewed

• Percentage of images rejected • Top 3 image reject reasons

• Number of image in queue 13.4.2 The dashboard shall allow drilldown capabilities for each of these areas so that users

can view activity on an hourly, daily, weekly, monthly and annual basis. It shall also include comparisons to prior activity.

13.4.3 The dashboard shall provide a visual and graphical representation of the Transaction workflow and shall display data in real-time as well as historical roll-up.

13.4.4 The LPT Processor shall monitor the dashboard and also allow OTA to view the dashboard 24/7/365 on a real time basis. All information that is related to different locations shall be tracked individually as well as in total.

13.4.5 End users shall have the ability to customize their own dashboards by changing column sort criteria, changing the order that columns of data are displayed and hiding columns.

13.4.6 The LPT System shall allow users to establish configurable thresholds for monitoring LPT System and operational performance.

13.4.7 The LPT System shall generate alerts when deviations from established thresholds occur.

Database Requirements 13.5

13.5.1 The LPT System database shall incorporate redundancy in order to minimize LPT System downtime.

13.5.2 The LPT Processor shall design and configure the LPT System database to minimize the possibility of data loss.

13.5.3 The LPT Processor shall design and configure the LPT System database to support future hardware and software upgrades.

Page 55: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 37 of 111

13.5.4 The LPT Processor shall design the LPT System database to be compatible with the operating system and application software.

13.5.5 The LPT Processor shall design the LPT System database to support redundant central processing system architectures.

13.5.6 The LPT Processor shall provide database software with warranty and maintenance support services for the term of the contract.

13.5.7 The LPT Processor shall keep the LPT System database software current—that is, within one major release of the database manufacturer's current general production version.

13.5.8 If Microsoft SQL Server is selected, the LPT Processor shall utilize Microsoft SQL Server 2014 or greater for database software.

13.5.9 The LPT Processor shall provide database monitoring tools such that all aspects of the database are monitored, including but not limited to software capable of alerting appropriate staff to the presence of alarm conditions, capable of giving authorized users real time overviews, details, histories, and maintenance tools suitable for investigating and making adjustments to LPT System database performance, session-level activity, scheduled jobs, alert notification and configuration parameters.

13.5.10 The LPT Processor shall provide and maintain a reporting database or a data warehouse that replicates all the data from the LPT System database, in near real time, to be used for all user-generated reports, including those described in the reports section of this Scope of Services.

13.5.11 The LPT Processor shall configure the reporting database or data warehouse so as to optimize report generation including appropriate indexes and views to allow ad-hoc user generated queries.

13.5.12 The LPT System database shall store certain fields in encrypted form (for example credit/debit card numbers), as determined with OTA during system design. It is the preference of OTA not to maintain social security and/or driver’s license numbers within the LPT System; however OTA understands that some information may be automatically returned by certain DMV sources. In the event that personal information is obtained, the LPT Processor shall ensure this data is fully protected in compliance with prudent personally identifiable information (PII) provisions.

13.5.13 The LPT System database design shall utilize mechanisms designed to protect data integrity including but not limited to: normalized data, foreign key relationships, field-level value constraints, application user roles, data validation triggers, and use of materialized views and prevention of direct base table access by use of stored procedures and views.

13.5.14 The LPT System database design shall incorporate field-level validation whenever possible to limit the possibility of data entry or manual update errors; including but not

Page 56: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 38 of 111

limited to: foreign keys, dollar amount range checks, and telephone number and zip code masks.

13.5.15 For post-System & Operational Acceptance LPT System changes, prior to a change being implemented on a production database, a written test and acceptance plan shall be developed, executed and the results accepted in writing by OTA.

LPT System End User Requirements 13.1

13.1.1 The LPT System shall employ a 100% browser based, graphical user interface (GUI), or a comparable user interface of equal or greater quality and capability that does not require specialized software. A browser is defined as a software program that allows the user to open the GUI in a form that is suitable for display.

13.1.2 The LPT System shall be configurable and shall have appropriate interactive GUIs to allow authorized staff to manage the various configuration parameters required for proper LPT System operation.

14 Security

General Security Requirement 14.1

14.1.1 The LPT Processor shall ensure the LPT System is secured against unauthorized access, data loss, and data integrity loss.

14.1.2 The LPT Processor shall, at a minimum, adhere to the OTA Information Security Policy (see Appendix H) and Physical Security Policy (see Appendix I).

Access Security 14.2

14.2.1 Access to the operating system, database, Virtual Private Network (VPN), and all other applications, shall be controlled by system administrators, on a per-user basis.

14.2.2 The LPT System shall ensure that all user access to any part of the LPT System, except for the customer-facing website, shall be managed from a single directory of authorized users. The LPT System must validate user accounts against a directory service. For example: if the agency disables or locks a user network account via active directory, the LPT application can test for an active, enabled user account. This is so credentials can be maintained in the LPT System but also checked for a valid directory account.

14.2.3 The authorized user directory shall be the authorization provider for, at a minimum, operating system access, database level access, remote access, and access to the user-level application.

14.2.4 All updates to the authorized user directory shall be securely logged.

Page 57: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 39 of 111

14.2.5 System administrator logs and other logs shall be monitored for exceptions and/or improper activity and this log monitoring shall be documented and automated to the extent possible (e.g., use of system log monitoring tools).

14.2.6 Passwords shall be required for access to any part of the LPT System.

14.2.7 All accessible subsystems, including the customer-facing website, shall have the ability to limit valid passwords by length and use of special characters, and to restrict repeated use of the same password by a single user.

14.2.8 All accessible subsystems, including the customer-facing website, shall have the ability to require passwords to be changed periodically.

14.2.9 LPT System functionality shall be secured by passwords and security roles.

14.2.10 The LPT System security role set shall include a role enabling its users to assign or remove security role(s) of other users.

14.2.11 The LPT System security role set shall include a role enabling its users to reconfigure the LPT System rights, which are enabled by other security roles.

14.2.12 The LPT Processor, in conjunction with OTA, shall develop LPT System rights and security roles during the design process.

14.2.13 The LPT Processor shall grant user access based on the OTA-approved Policies and Procedures.

14.2.14 The LPT System shall allow for role-based user access configuration.

14.2.15 The LPT System shall require each user to have unique logon credentials.

14.2.16 The LPT System shall allow user access to be controlled by a system administrator.

14.2.17 The LPT System shall automatically log database records for all user access and all user activity that results in data updates or access to customer data.

14.2.18 The LPT System shall provide functionality for searching the user access logs using commonly available file system or database utilities.

14.2.19 The LPT System shall provide controls to lock out users after a configurable number of unsuccessful system login attempts.

14.2.20 The LPT System shall provide tools that will detect and report any intrusions and/or attempted intrusions.

Data Security 14.3

14.3.1 The LPT Processor shall be responsible for all aspects of protecting LPT System data.

Page 58: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 40 of 111

14.3.2 The LPT Processor shall employ methods to ensure reliable data communications, file transfer and integrity of the database and tools that detect interruption of these.

14.3.3 The LPT Processor shall provide and implement a systematic method for archiving and purging data and ensure that the entire LPT System software and data is backed-up and stored at an off-site location.

14.3.4 The LPT Processor shall ensure that application activity is logged in a common log file format with searchable, and human-readable log files.

14.3.5 The LPT Processor shall configure all operating systems and databases such that all non-essential users, features, and services are either locked or removed.

14.3.6 The LPT Processor shall strengthen all operating system and database passwords, including passwords for LPT System and application users, in accordance with industry best practices.

14.3.7 The LPT Processor shall ensure that system administrator level access is limited, and that any administrator level access is logged.

14.3.8 The LPT Processor shall ensure that operating systems and databases are up to date with the latest security patches.

14.3.9 The LPT Processor shall employ an auditing strategy for the LPT System that maximizes the possibility of detecting unauthorized activity. This shall include an automated event notification and logging process.

14.3.10 The LPT System shall allow the LPT Processor to create user roles and assign/restrict account access and management rights according to training and Policies and Procedures that are documented by the LPT Processor and approved by OTA.

14.3.11 The LPT System shall support configuration of user roles that limits access to sensitive data in compliance with PCI requirements.

14.3.12 The LPT Processor shall ensure that all Microsoft Windows servers and workstations used on the Project have up-to-date virus protection and security management software that are monitored and managed via centrally managed back end software and/or MOMS.

Payment Card Industry Data Security Standard (PCI DSS) 14.4

14.4.1 All systems provided and data maintained by the LPT Processor shall be continually in full compliance with the most current PCI DSS at all times.

14.4.2 The LPT System shall provide for OTA’s classification as a Level 1 merchant as defined in PCI DSS.

Page 59: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 41 of 111

14.4.3 The LPT Processor shall retain a highly qualified and credentialed 3rd party firm to annually certify that all systems provided by the LPT Processor and all processes operated by the LPT Processor meet the PCI DSS requirements. OTA shall approve the PCI DSS compliance subcontractor, and the cost of annual exams shall be borne by the LPT Processor.

14.4.4 The LPT Processor shall provide to OTA prior to Go-Live and annually thereafter, the compliance subcontractor’s report detailing the compliance, including identifying the version of PCI DSS compliance with which each system or process complies.

14.4.5 The LPT Processor shall resolve compliance exceptions in accordance with the Performance Standards. The LPT Processor shall bear the cost of resolving all compliance exceptions including costs related to changes to PCI DSS standards.

15 System Administration & Maintenance

General System Administration & Maintenance Requirements 15.1

15.1.1 The LPT Processor shall be responsible for the resolution of all LPT System issues, Software bugs, required upgrades, users, passwords and LPT System security.

15.1.2 The LPT Processor shall develop a System Administration Manual that details the LPT System administration and maintenance procedures.

15.1.3 The LPT Processor shall ensure that file systems and the databases always have adequate space available.

15.1.4 The LPT Processor shall monitor LPT System resources including CPU usage, memory usage, network performance, and swap space.

15.1.5 The LPT Processor shall provide LPT System software maintenance, LPT System hardware maintenance, as well as any third party hardware and software maintenance contracts.

16 Disaster Recovery/Business Continuity

General Disaster Recovery/Business Continuity Requirements 16.1

16.1.1 The LPT Processor shall ensure continuous ongoing operations in the event of a disaster or other event that disrupts regular business operations.

16.1.2 The LPT Processor shall provide to OTA a comprehensive Disaster Recovery/Business Continuity plan detailing the process for continued LPT operations and performance of critical business functions in the event of an unscheduled service disruption regardless of the duration.

16.1.3 The LPT Processor shall ensure that a OTA approved Disaster Recovery/Business Continuity Plan is in place and fully tested and approved prior to Go-Live.

Page 60: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 42 of 111

16.1.4 The Disaster Recovery/Business Continuity plan shall include, but not be limited to, the following:

Events and situation that will trigger the Disaster Recovery/Business 16.1.4.1Continuity process

Process management 16.1.4.2

Contact list and notification process 16.1.4.3

Methodology for the full recovery of key components of the LPT System 16.1.4.4within required time periods

Plan/alternative for resuming external interfaces and communications 16.1.4.5

Staffing 16.1.4.6

Off-site storage of all LPT System software, documentation, agreements and 16.1.4.7data

Technical and operations support 16.1.4.8

Routine off-site back-up 16.1.4.9

Data recovery/restoration 16.1.4.10

Alternate sites 16.1.4.11

A new LPT System 16.1.4.12

Transfer of critical functionality to a new LPT System capable of running 16.1.4.13the identical (or recovered) operating systems, applications, and databases

Customer notification 16.1.4.14

Test program 16.1.4.15

Return to normal operations 16.1.4.16

16.1.5 The LPT Processor shall ensure that all necessary measures are in place to implement any and all elements of the Disaster Recovery/Business Continuity Plan as needed throughout the Term.

16.1.6 In the event of a disaster or interruption in business services the LPT Processor shall implement the Disaster Recovery/Business Continuity Plan. When the event is over, the LPT Processor shall document lessons learned and update the Disaster Recovery/Business Continuity Plan in accordance with those lessons.

Page 61: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 43 of 111

16.1.7 The LPT Processor shall prepare and perform periodic tests of its Disaster Recovery/Business Continuity Plan.

16.1.8 Authorized OTA staff shall be provided complete access to observe all Disaster Recovery/Business Continuity test activities.

16.1.9 At the completion of each test, the LPT Processor shall submit to OTA, a comprehensive report detailing the results of all tests and any corrective actions required with specific timeframes for completions.

16.1.10 The LPT Processor shall update the Disaster Recovery/Business Continuity Plan at least once per year and within 30 days of any major LPT System or hardware change and/or after a disruption in business.

16.1.11 Following are the recovery time standards:

Call center 72 hours 16.1.11.1

Payment processing 72 hours 16.1.11.2

Correspondence 5 Business Days 16.1.11.3

Reporting 5 Business Days 16.1.11.4

Finance tasks 5 Business Days 16.1.11.5

LPT System functions* 72 hours 16.1.11.6

*LPT System functions include, but are not limited to, the following. • Transaction processing

• Website

• CSR access to all screens and functions

• Image Review

• Remote access by OTA to all screens and functions

• Invoice and violation notice generation

• All invoice and violation notice generation related activities

16.1.12 All data shall be backed up at an off-site location such that it can be completely restored on an identical LPT System. This process shall ensure that no data is lost in the event of a LPT System malfunction, disaster or malicious interference with the LPT System.

Page 62: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 44 of 111

16.1.13 LPT System disaster recovery operations shall allow for the complete restoration of the LPT System.

17 Documentation

Policies and Procedures Review 17.1

17.1.1 The LPT Processor shall develop and maintain Policies and Procedures documents that define all ongoing operational policies, procedures and processes of the LPT Operation.

17.1.2 The Policies and Procedures documentation shall include operating policy, approved Business Rules and specific procedures required in the performance of all LPT activities, including a detailed description of transaction and data flow processing.

17.1.3 The Policies and Procedures shall encompass all operations covered by the LPT Processor and its third-party contractors (e.g., mail house), including all daily responsibilities and periodic tasks.

17.1.4 The Policies and Procedures shall include:

All LPT program policies 17.1.4.1

All LPT Processor procedures 17.1.4.2

All customer materials and correspondence and the policy for their use 17.1.4.3

Dispute Matrix 17.1.4.4

Customer Authentication Matrix 17.1.4.5

All scripts for common customer service functions, automated recordings, 17.1.4.6and the detailed IVR system menu tree and script

Image review business rules 17.1.4.7

Web page layouts, content and links 17.1.4.8

Samples of all reports, spreadsheets, and reconciliations 17.1.4.9

All required processing timelines 17.1.4.10

All Performance Standards and measurement methods 17.1.4.11

LPT Processor information technology procedures for network 17.1.4.12management, database management, server and PC patching and security.

Legal constraints 17.1.4.13

Page 63: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 45 of 111

Privacy handling and other applicable internal controls 17.1.4.14

PCI compliance information 17.1.4.15

Data security 17.1.4.16

17.1.5 The Policies and Procedures shall reflect configurations and LPT System functionality from the current RTM and SDD.

17.1.6 The Policies and Procedures shall include the LPT Processor’s process and schedule for updating and amending all operations documentation on an on-going basis, including but not limited to the Policies and Procedures, user manuals, and disaster recovery plan.

17.1.7 In accordance with the approved Project Schedule, the LPT Processor shall deliver preliminary Policies and Procedures documents.

17.1.8 After receipt of comments from OTA, the LPT Processor shall, as requested by OTA, participate in working sessions with OTA to review the preliminary Policies and Procedures.

17.1.9 The LPT Processor shall incorporate all revisions, as appropriate, based on comments and input from the working sessions and deliver updated Policies and Procedures documents to OTA for review and approval.

17.1.10 An updated version of the Policies and Procedures shall be provided to OTA for approval on an annual basis or in advance of any material policy or procedural change, or more often as requested by OTA.

Manuals 17.2

17.2.1 The LPT Processor shall develop and provide a complete set of LPT System documentation and user/training manuals in electronic and hardcopy format.

17.2.2 The LPT Processor shall provide user/training manuals for different user types such as, but not limited to, CSRs, image reviewers, system administrators, payment processors, auditors, and accounting staff.

17.2.3 The manuals shall include instructions for the use of the relevant aspects of the LPT System, report access levels and descriptions of reports relevant to each user type.

17.2.4 The LPT Processor shall provide administration manuals for the website and the IVR system.

17.2.5 The LPT Processor shall provide a separate Reports User Manual that includes directions for using the ad hoc reporting system.

Page 64: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 46 of 111

17.2.6 The LPT Processor shall provide to OTA comprehensive data dictionaries of all CSC databases including descriptions and information about relationships, keys, relational and validation constraints for fields, indexes, tables, views, schemas, triggers, procedures, materialized views, scheduled jobs, directories and any other relevant database objects.

17.2.7 The LPT Processor shall provide and obtain OTA approval of training manuals prior to the start of training.

17.2.8 The LPT Processor shall provide all approved manuals to OTA at least one month prior to Go-Live. In addition, an updated version of all manuals shall be provided to OTA for approval on an annual basis, upon any material change, or more often as requested by OTA.

18 Administrative Requirements

General Administrative Requirements 18.1

18.1.1 The LPT Processor shall be responsible for the administration, management, performance and maintenance of all LPT activities.

18.1.2 The LPT Processor shall have up-to-date knowledge of the regulations and laws relative to the Project and ensure that the LPT operation is in compliance with those regulations and laws.

18.1.3 The LPT Processor’s CSC staff shall not engage in any other business activities while acting in this capacity.

18.1.4 As directed by OTA, the LPT Processor shall research, compile and provide data to OTA in response to Oklahoma Opens Records Requests, subpoenas, search warrants, law enforcement requests or other requests. The LPT Processor shall track, document and report to OTA the status of all such requests on a monthly basis.

18.1.5 The LPT Processor shall be responsive to all OTA inquiries for information, research, and other queries during normal business hours and shall have a process available for responding to emergency queries after normal working hours.

Staffing 18.2

18.2.1 The LPT Processor shall provide qualified personnel sufficient in quantity and expertise and experience to meet the requirements of this Scope of Services and in compliance with an approved Staffing Plan.

18.2.2 The LPT Processor shall name individuals to positions identified and described in its organization chart as Key Personnel.

18.2.3 LPT Processor personnel that interact directly with the public shall perform in a professional manner at all times.

Page 65: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 47 of 111

18.2.4 The LPT Processor shall be responsible for all staffing requirements necessary to support the full operation of the LPT Operation, except as specifically indicated, and to meet or exceed all required Performance Standards.

18.2.5 The LPT Processor shall conduct a criminal background check of all License Plate Tolling Processor’s staff immediately prior to employment. The LPT Processor shall certify to OTA that all staff has passed the required background checks.

18.2.6 All staff shall have the appropriate skill, training, background, knowledge, experience, integrity and character necessary to provide the required services in a competent and professional manner.

18.2.7 All LPT Processor staff that interface with the public shall be able to communicate in the English language.

18.2.8 The LPT Processor shall remove any staff member whose qualifications or conduct, in the opinion of OTA, is not appropriate or commensurate with their position.

18.2.9 The LPT Processor shall be responsible for all wages and payroll expenses associated with staffing the License Plate Tolling Operation. Staff of the LPT Processor and/or its Subcontractors and suppliers shall not be considered employees of OTA.

Training 18.3

18.3.1 The LPT Processor shall establish and implement a training program for each position and function.

18.3.2 The LPT Processor shall attend annual security awareness training as prescribed by Payment Card Industry Data Security Standards (PCI DSS) requirements.

18.3.3 All staff shall be fully and properly trained prior to working on the Project. In addition to initial training, all staff shall be informed of any changes to the OTA LPT Program and/or any situations that affect the public and shall be provided instructions and scripts on communicating those changes in a consistent manner.

18.3.4 The LPT Processor shall provide formal CSR training prior to changes to the LPT System that impact the CSR’s use of the LPT System.

18.3.5 The LPT Processor shall notify OTA at least one week prior to all scheduled training so that up to three OTA representatives may observe, monitor or participate in any and all training courses or seminars.

18.3.6 The LPT Processor shall provide training to OTA staff on the use of CSR screens, finding and using standard reports, generating ad-hoc reports, the structure of the database, LPT Policies and Procedures or other topics determined to be of utility to OTA staff.

Page 66: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 48 of 111

18.3.7 The LPT Processor shall provide training that utilizes both classroom training and hands on LPT System training, sufficient to ensure that LPT Processor and OTA staff are proficient in the use of the LPT System.

18.3.8 The LPT Processor shall develop and provide all materials, equipment, and facilities required for training.

18.3.9 The LPT Processor shall ensure that all training programs reflect current Policies and Procedures and identify the responsibilities of each employee with regard to theft, fraud, embezzlement, fiscal misconduct, customer confidentiality and/or violation of OTA and LPT policies.

Document Control 18.4

18.4.1 The LPT Processor shall control and keep current all manuals and documents related to LPT operations.

18.4.2 All incoming and outgoing customer correspondence shall be electronically associated with customer accounts and available online in the customer account.

18.4.3 The LPT Processor shall keep all records and reports related to LPT operations in accordance with the data retention requirements.

18.4.4 The LPT Processor shall safely and securely store all documents, e.g. applications, customer correspondence, forms, financial documents and any documents generated or received by the LPT Processor.

18.4.5 The LPT Processor shall file stored documents in a manner that facilitates easy retrieval by subject, type and/or date. Following the period of storage, the LPT Processor shall be responsible for the timely, secure destruction and disposal of documents.

18.4.6 All documents subject to destruction shall be mechanically shredded or turned over to a professional document disposal service.

18.4.7 The LPT Processor shall notify OTA at least 30 days prior to the scheduled destruction of any stored document and the LPT Processor shall notify OTA once the documents have been destroyed.

18.4.8 The LPT Processor shall not destroy any documents or files without the written consent of OTA.

Customer Information and Privacy 18.5

18.5.1 The LPT Processor shall consider all LPT data as confidential and maintain all data in a secure manner that protects personal identification/identity information using state of the art data security measures.

Page 67: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 49 of 111

18.5.2 All customer information is confidential and shall not be disclosed or released unless requested by the specific customer or unless directed by OTA.

18.5.3 The LPT Processor shall refer all external requests, inquiries, subpoenas and other official information requests to designated OTA management staff. OTA shall be immediately notified of such requests.

18.5.4 The LPT Processor shall not communicate, respond to inquiries, or provide information to the media, other government agencies, or individuals representing organizations other than in the normal course of customer service.

18.5.5 The LPT Processor shall immediately notify OTA of all requests that are outside of the normal course of customer service.

18.5.6 Responding to all inquiries and communications, other than in the normal course of customer service, will be the responsibility of OTA unless the LPT Processor is specifically directed by OTA to respond.

18.5.7 The LPT Processor shall establish and implement reasonable methods to verify the identity of customers prior to release of information. A customer authentication matrix, detailing the various levels of information that can be released based on authentication level, shall be developed by the LPT Processor, approved by OTA and included in the Policies and Procedures.

18.5.8 The LPT Processor shall not sell, use, or distribute general or specific customer information and data externally for any reason, nor shall it aggregate the data for any non-permitted use.

18.5.9 The LPT Processor shall handle all customer and account information in accordance with the OTA privacy policy, and approved customer account terms and conditions.

18.5.10 Destruction shall be documented and periodically reported to OTA.

18.5.11 A written procedure to ensure proper destruction of customer data in accordance with OTA policy shall be included in the Policies and Procedures developed by the LPT Processor and approved by OTA. The procedure shall define who is responsible for executing the applicable information purges, a method for recording/documenting when purges occur, who is responsible for recording the action and where records of the purge are maintained.

Agency Access 18.6

18.6.1 The LPT Processor shall provide authorized OTA staff with remote, real time, secure, browser-based access into the LPT System to provide customer service, research issues, run reports and perform quality assurance/audit reviews.

Page 68: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 50 of 111

18.6.2 The LPT Processor shall provide OTA with various levels of user access privileges commensurate with OTA staff job requirements. The specific access levels shall be defined during the design phase.

18.6.3 OTA remote access shall include, but not be limited to:

Read only access to account data within the LPT System. 18.6.3.1

The ability to input search criteria and perform account information and 18.6.3.2research queries and searches.

The ability to insert notes into customer accounts. 18.6.3.3

The ability to correct or override entries or postings. 18.6.3.4

The ability to generate and retrieve reports in all required formats. 18.6.3.5

Ad-hoc reporting capabilities with full access to the Reporting Database. 18.6.3.6

The ability to print all reports remotely to any printer. 18.6.3.7

Dashboard access. 18.6.3.8

18.6.4 Authorized OTA users shall be issued user names and passwords in accordance with the established LPT System account access rules.

18.6.5 Authorized OTA staff shall have full access (announced and unannounced) to the LPT Processor’s offices and operation for any purpose including quality assurance, internal audit, and observation and monitoring.

18.6.6 The LPT Processor shall provide OTA with workspace (chair and desk) and network access in those offsite facilities in the event that OTA representatives visit those facilities.

18.6.7 OTA shall have the right to inspect the facilities at any time and require the LPT Processor to correct any condition that, in the opinion of OTA, represents safety and/or security concerns and/or is not in keeping with OTA’s public image.

18.6.8 The LPT Processor shall have staff available to support OTA staff by demonstrating and explaining systems and procedures, and answering questions.

19 LPT Physical location

General LPT Physical location Requirements 19.1

19.1.1 The LPT Processor is responsible for establishing, furnishing, supplying, maintaining, staffing, sizing and operating all facilities as needed to meet the requirements of this Scope of Services.

Page 69: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 51 of 111

19.1.2 The LPT Processor shall establish, furnish, supply, maintain, staff, and operate the physical location in accordance with all requirements and Performance Standards.

19.1.3 The LPT physical location shall be of appropriate size to conduct all required LPT operations, house all necessary staff and allow for reasonable expansion and contraction in capacity as the OTA LPT Program evolves.

19.1.4 The LPT Processor shall ensure all locations provided by the LPT Processor are Americans with Disabilities Act (ADA) compliant throughout the Term.

19.1.5 The LPT Processor shall ensure that all locations provided or used by the LPT Processor are professional in appearance and clean.

19.1.6 The LPT physical location shall be available prior to the Production Readiness Test to allow for hiring and training, and to support Production Readiness Testing.

19.1.7 The LPT Processor shall provide all furnishings, fixtures, office equipment, computer hardware, signage, supplies, utilities, building services, and physical security and security related to the operation to all LPT Processor provided facilities.

19.1.8 LPT Processor shall provide and maintain all required connectivity and telephone lines, including connections to OTA, the Host and/or third party networks that provide speed and capacity sufficient to ensure all functions can be performed with no delay and with adherence to all data and privacy security requirements.

19.1.9 The LPT Processor shall ensure all computer hardware is protected by a UPS with surge protection and battery backup.

19.1.10 The LPT Processor shall be responsible for any required build-out and/or leasing of office space.

Physical Security 19.2

19.2.1 The LPT Processor shall be fully responsible for the physical security of the LPT facilities and all related property, assets, data and funds.

19.2.2 The LPT Processor shall utilize security measures and devices including, but not limited to, site access controls, data access controls, safes, vaults, surveillance cameras, environmental controls, data security, inventory security, software security and other tools that will prevent, detect, and/or assist in researching and investigating issues at all LPT locations.

19.2.3 The LPT Processor shall ensure that the physical security controls meet all PCI DSS requirements.

19.2.4 The LPT Processor shall be responsible for the custody of funds and shall provide internal control and security practices to protect the receipt, storage, and transfer of funds.

Page 70: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 52 of 111

Operating Hours 19.3

19.3.1 The LPT Processor’s live CSR call center shall be available to customers Monday through Friday (excluding holidays), 08:00 - 16:30 CST.

19.3.2 The IVR and website shall be available 24 hours a day, 7 days a week except for approved scheduled outages for maintenance and system updates.

19.3.3 LPT Processor management staff shall be available during regular hours of operation and shall be available 24/7 to respond to emergency situations.

20 Transaction Processing

General Transaction Processing 20.1

20.1.1 The LPT Processor shall process all transactions received from the Host as described in this document and its appendices.

20.1.2 The LPT System shall process all transactions in accordance with the most recent OTA toll rate schedule, provided by OTA.

Image Review 20.2

The Host will provide the LPT Processor with color images for processing. Following is some detail of the typical images that will be provided.

• Image Resolution: 2448 x 2048 pixels

• Bits Per Pixel: 8 or 14 bits

• Pixels across the license plate: 100-110 pixels high and 210-220 pixels wide

• Image Format: JPG

• Field of View: The cameras cover a 14’-16’ field of view. The telephoto lens pulls this into a typical lane width of 10’-12’ tall at a 24’ distance.

• Number of Images: Up to 12 images

20.2.1 The LPT Processor shall establish and implement a process to correctly identify the license plate number, jurisdiction and plate type of each license plate image provided by OTA. This may include processes such as Optical Character Recognition (OCR), fingerprinting and manual image review.

20.2.2 The LPT Processor’s image review process shall achieve a license plate (number, jurisdiction and plate type) accuracy rate of 99.95% of all readable images.

20.2.3 The LPT Processor shall perform image review for all images by processing the oldest transaction date first.

20.2.4 The LPT System shall allow users to perform image enhancements to improve the readability of images.

Page 71: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 53 of 111

20.2.5 The LPT System shall allow users to simultaneously view all images related to a particular transaction.

20.2.6 The LPT Processor shall assign an appropriate reject reason, based on a list of reject codes and processing rules to be developed with OTA, to all transactions for which viable license plate information cannot be determined from the available images.

20.2.7 The LPT System shall allow for a minimum of 10 distinct image reject codes, to be defined with and approved by OTA during the design stage.

20.2.8 The LPT System shall reconcile the reject codes to OTA at the transaction level, for all transactions that are rejected.

20.2.9 The LPT System shall allow rejected images to be reviewed for quality assurance purposes.

20.2.10 The LPT Processor shall monitor and report on the quality of images received from the lane system in a manner that allows for the quick escalation of in-lane camera issues to OCR issues.

20.2.11 The LPT System shall automatically queue all previous DMV rejects images for manual re-review, based on a configurable number of retries per transaction.

20.2.12 The LPT System shall allow the number of image review retries to be set to zero.

20.2.13 The LPT Processor shall associate the observed license plate number, plate type (where applicable), and jurisdiction to all transactions for which those data can be determined from the available images.

20.2.14 The LPT Processor shall provide Image Review reports to be developed with OTA during the design stage.

20.2.15 The LPT Processor shall document and adhere to Image Review Policies and Procedures that will be developed with and approved by OTA.

20.2.16 The LPT Processor shall retain all images, including rejected images, according to OTA’s data retention policy.

LPT Watch List 20.3

OTA will refer to the set of vehicle records defined by the requirements in this section as the “Watch List”. 20.3.1 The LPT System shall maintain a manual list of license plate / vehicle information

(string, jurisdiction, and type) records.

20.3.2 The LPT System shall allow authorized LPT Processor and OTA users to access the Watch List and add/remove records.

Page 72: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 54 of 111

20.3.3 The LPT System shall require all transactions with license plate information matching to a Watch List record to go through the manual image review process, regardless of the OCR confidence data associated with the transaction/images.

PIKEPASS Account Match Processing 20.4

OTA will provide the LPT Processor with read access to the vehicle information for active PIKEPASS accounts. Transactions that are associated with a vehicle listed on an active PIKEPASS account are eligible to be posted by OTA to a PIKEPASS account (V-Toll) via the PIKEPASS account match process. Therefore, these transactions will not go through regular LPT processing. After identifying V-Toll eligible transactions, a file identifying these transactions will be sent by the LPT Processor to OTA for processing by OTA.

20.4.1 The LPT System shall compare each license plate associated with a transaction to the current list of V-Toll eligible license plates to determine the appropriate method for processing each transaction.

20.4.2 The LPT System shall send all V-Toll eligible transactions to OTA for processing.

20.4.3 The LPT System shall process all other (not V-Toll eligible) transactions as described in this document.

20.4.4 The LPT System shall reconcile these V-Toll eligible transactions back to OTA.

20.4.5 The LPT System shall not process V-Toll transactions to LPT accounts.

Name and Address Acquisition via Registered Owner of Vehicle (ROV) Lookup 20.5

20.5.1 The LPT Processor shall establish and implement a process for using license plate number, issuing jurisdiction, and plate type (where applicable) to obtain the name and address of the registered owner of vehicles from the appropriate DMV and/or other third party services in all 50 states, Washington D.C., all Canadian Provinces, and all Mexican states where possible.

20.5.2 For license plates that cannot be processed to a PIKEPASS account, the LPT System shall access an OTA database to obtain Oklahoma, Texas and Commercial vehicle registered owner name and address information.

20.5.3 For license plates outside of Oklahoma and Texas that cannot be processed to a PIKEPASS account the LPT System shall submit vehicle information to the ROV source for registered owner name and address information.

20.5.4 The LPT Processor shall utilize plate type (DMV categorization of license plates) in its submissions for all states that require or accept plate type as a means of ensuring the highest and most accurate return rate.

Page 73: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 55 of 111

20.5.5 The LPT Processor shall be capable of submitting requests to several DMV databases where applicable (for example, individual, commercial, apportioned) to ensure the highest and most accurate return rate.

20.5.6 The LPT Processor may utilize the OTA out-of-state ROV look up vendor.

20.5.7 When multiple transactions for the same license plate information require ROV lookup at the same time, the LPT Processor shall initiate only one request for that particular plate and apply the results to each transaction, if doing so will reduce costs incurred by OTA.

20.5.8 The LPT Processor shall track all DMV and other source requests to their disposition, including hits, no hits, rejected license plates and no responses by state/province and by source.

20.5.9 For transactions that reject or receive no response from an ROV source lookup, the LPT Processor shall use other ROV sources and methods available (e.g., skip tracing) to attempt to locate the responsible owner, in accordance with Policies and Procedures to be approved by OTA.

20.5.10 The LPT Processor shall report to OTA the specific reasons for all failures to obtain the ROV, including by source, reason, jurisdiction, and plate type and with an indication of whether the request was a first submission, resubmission, or was never successfully submitted.

20.5.11 The LPT Processor shall use methods or services approved by OTA to perform uniform address cleansing of data returned from ROV sources.

20.5.12 The LPT System shall have the ability to allow authorized users to override the address field based on approved customer requests.

20.5.13 The LPT System shall associate the information related to the ROV request to the transaction(s) for which that lookup was initiated.

20.5.14 The LPT System shall associate the ROV information returned for a particular lookup with the transaction(s) for which that lookup was initiated.

LPT Transaction Processing 20.6

20.6.1 When the LPT System obtains ROV information for a transaction, the LPT System shall check existing unregistered LPT accounts (UPAs) for an exact match to the name, address, and vehicle information.

20.6.2 If the LPT System identifies an existing UPA with an exact match for the name, address, and license plate information, the LPT System shall process the transactions to that UPA.

Page 74: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 56 of 111

20.6.3 If the LPT System identifies an existing UPA with an exact match for the name and license plate information, but a different address, the LPT System shall update the address on that UPA and process the transaction to that account.

20.6.4 If the LPT System determines there is no existing UPA with the exact license plate information and registered owner name, the LPT System shall establish a new UPA for the license plate and ROV information and process the transaction to the new account.

LPT Invoice Account Establishment 20.7

20.7.1 The LPT System shall automatically create new UPAs as dictated by the transaction processing requirements.

20.7.2 The LPT System shall not allow customers or LPT Processor staff to manually establish or close an UPA.

20.7.3 The LPT System shall assign new UPA account numbers sequentially, in order of establishment.

20.7.4 The LPT System shall not allow any UPA to have the same account number as any other UPA or PIKEPASS account.

20.7.5 The LPT System shall use the license plate information associated with a transaction and the ROV information returned by the ROV source to populate the new UPA.

20.7.6 The LPT System shall issue an OTA-approved ‘welcome letter’ to the name/address returned by ROV lookup after the LPT System establishes a new UPA. The timing of issuing the welcome letter will be determined during design.

21 Invoice Generation and Escalation

Invoice Generation and Issuance 21.1

21.1.1 The LPT System shall accumulate LPT transactions on each UPA and generate an invoice for unpaid amounts at the end of the configurable invoice cycle.

21.1.2 The LPT System shall allow for the configurable invoice cycle for the initial invoice to be different than the configurable invoice cycle for all subsequent invoices.

21.1.3 The LPT System shall generate the initial invoice on a new UPA after the end of the initial invoice cycle.

21.1.4 The LPT System shall generate all subsequent invoices (after the initial) for an UPA after the end of the invoice cycle.

21.1.5 The LPT Processor shall have the ability to issue invoices to an email address on file with an UPA, in place of a paper mailing, for accounts opted-in for emailed invoices.

Page 75: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 57 of 111

21.1.6 The LPT Processor shall have the capability to provide a link within invoice emails, providing customers access to their online invoice and payment options, with the required credentials for web access.

21.1.7 The LPT System shall allow CSRs to flag accounts (opt-in) for email invoice delivery, upon customer request and according to Policies and Procedures to be approved by OTA.

21.1.8 The LPT Processor shall be capable of selecting accounts with invoices eligible for inclusion of supplemental materials by account variables such as zip code, toll activity, fees, and account status.

Invoice Issuance Suppression 21.2

21.2.1 The LPT System shall provide the functionality to suppress the issuance of invoices with outstanding amounts below a configurable threshold specified by OTA.

21.2.2 The LPT System shall provide functionality to suppress the issuance of invoices for particular accounts, at the account level, at the request of OTA.

21.2.3 The LPT Processor shall provide the functionality to suppress the issuance of invoices with no toll or financial activity during the invoice period.

21.2.4 For accounts with invoice issuance suppressed, the LPT System shall generate the invoice data and associate it with the account but shall not issue the invoice (via mail or email).

21.2.5 The LPT System shall clearly indicate in the account record whether the account has invoice issuance suppressed, along with the reason for that suppression.

21.2.6 The LPT System shall suppress customer mailings that are returned as undeliverable after a configurable number of mailing attempts to the same address.

21.2.7 The LPT System shall have the capability to manually override mail suppression at the account level.

21.2.8 For accounts with invoice mailing suppressed due to returned/undeliverable mail, the LPT System shall have the capability to escalate unpaid amounts.

Invoice Layout Requirements 21.3

21.3.1 On each invoice, the LPT Processor shall provide individual transaction details, including time, date, toll location, vehicle class, license plate information, and toll amount.

21.3.2 The LPT Processor shall display all toll transaction times in Central Time.

Page 76: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 58 of 111

21.3.3 On each invoice, the LPT Processor shall have the ability to include UPA-specific data, including but not limited to:

invoice date 21.3.3.1

invoice period 21.3.3.2

invoice number 21.3.3.3

PIN for IVR/web access 21.3.3.4

due date 21.3.3.5

registered owner name 21.3.3.6

registered owner mailing address 21.3.3.7

amount due (new tolls due and total due) for the current invoice cycle 21.3.3.8

amounts due from prior invoice cycles (tolls and fees) broken down by 21.3.3.9invoice cycle

amounts due broken down by past due time periods (e.g., past due, 30 21.3.3.10days past due, 60 days past due)

amount in collections 21.3.3.11

payments received since the issuance of the prior invoice 21.3.3.12

amounts in violation status (by violation notice level, 1st and 2nd) 21.3.3.13

vehicle registration stop flag status 21.3.3.14

21.3.4 On each invoice, the LPT Processor shall have the ability to include general information, including but not limited to:

Customer Service telephone number 21.3.4.1

Customer Service website URL 21.3.4.2

payment instructions 21.3.4.3

PIKEPASS account information 21.3.4.4

escalation timelines and penalties 21.3.4.5

applicable laws and legal means available to OTA for collecting unpaid tolls 21.3.4.6

dispute instructions 21.3.4.7

Page 77: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 59 of 111

21.3.5 The LPT Processor shall have the ability to include a barcode that uniquely identifies the invoice.

21.3.6 The LPT System shall support a distinct document layout for invoices that include tolls only.

21.3.7 The LPT System shall support a distinct document layout for invoices that include fees.

21.3.8 The LPT System shall support a distinct document layout for invoices that include violations.

21.3.9 The LPT System shall support a distinct document layout for invoices issued for UPAs with a vehicle registration stop flag placed.

21.3.10 The LPT System shall support a distinct document layout for invoices issued for UPAs with amounts due open with a Collections agency.

21.3.11 The LPT Processor shall work collaboratively with OTA in the design, format and content of all invoices (email and paper), envelopes, and any related materials or inserts during the design phase and subject to the approval of OTA.

21.3.12 The LPT Processor shall be capable of inserting (for paper statements) or attaching (for email statements) other materials in or with selected customer statements as directed by OTA.

Customer Fees 21.4

21.4.1 The LPT System shall allow for the assessment of customer fees.

21.4.2 The LPT System shall allow all fee amounts and the timing of assessment to be configurable.

21.4.3 The LPT System shall provide for all fee amounts to be separately configured.

21.4.4 The LPT System shall allow authorized users to reverse and/or adjust any fee.

Invoice Escalation 21.5

The LPT System accumulates LPT transactions on each UPA and generates an invoice at the end of the invoice cycle.

21.5.1 The LPT System shall set an invoice payment due date for each invoice (a configurable number of days from that particular invoice’s issuance date) that will be visible to customers on their invoices.

21.5.2 The LPT System shall include an invoice payment “grace period” (a configurable number of days from an invoice due date) that will not be visible to customers. The invoice escalation process shall be based on the amounts that are unpaid at the end of the grace period.

Page 78: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 60 of 111

21.5.3 The LPT System shall process amounts that remain unpaid for a particular invoice cycle through the escalation process independent of unpaid amounts from other invoice cycles.

21.5.4 The LPT System shall include tolls that are not paid in full at the conclusion of the grace period on the next month’s invoice, and shall assess a late fee (configurable amount) for those outstanding tolls.

21.5.5 The LPT System shall escalate all tolls and fees that appeared on the Unpaid Invoice at the same time, prior to generation of the New Invoice, regardless of the occurrence date or posting date of any particular toll or fee.

21.5.6 The LPT System shall be able to accommodate the invoice/violation escalation process detailed in Table 2. The exact escalation process and related timing will be defined during the design phase.

Table 2 provides an example of the escalation process for one set of tolls accumulated for one invoice cycle.

Table 2: Escalation Process

* For this example the Status is based on an invoice due date plus grace period, totaling 30 days.

Escalation Level Escalation Process Status*

Level A Invoice This is the first time the transactions and related tolls appear on an invoice. Tolls are due at the end of the Grace Period. No fees assessed.

Current

Level B Invoice Tolls that remain unpaid at the conclusion of the Level A Grace Period shall escalate to Level B. This is the 2nd time these tolls are appearing on an invoice. A late fee is assessed prior to generation of this invoice and is included on the invoice.

Past Due 1 Day

Level C Invoice Toll/fee amounts that remain unpaid at the conclusion of the Level B Grace Period shall escalate to Level C. This is the 3rd time these tolls are appearing on an invoice. No additional fees assessed. The late fee assessed at Level B is carried forward, if unpaid, to Level C and appears on the invoice.

Past Due 32 Days

Page 79: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 61 of 111

Escalation Level Escalation Process Status*

Level D Invoice Toll/fee amounts that remain unpaid at the conclusion of the Level C Grace Period shall escalate to Level D. This is the 4th time these tolls are appearing on an invoice. Unpaid amounts (tolls and fee) that escalate to Level D are now considered a Violation. Unpaid late fee that was assessed at Level B is carried forward to Level D and appears on the invoice. A Violation fee is assessed prior to generation of the invoice, and the Violation fee appears on the Level D invoice. Violation In addition to the Invoice, a separate 1st Violation Notice is generated and sent via 1st class mail. The 1st Violation Notice includes: Unpaid toll amount, Unpaid late fee that was assessed at Level B, and Violation fee assessed at Level D.

Past Due 63 Days

Page 80: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 62 of 111

Escalation Level Escalation Process Status*

Level E Invoice Tolls/fees that remain unpaid at the conclusion of the Level D Grace Period shall escalate to Level E. This is the 5th time these tolls are appearing on an invoice. No additional fees are assessed. Unpaid late fee assessed at Level B is carried forward to Level E. Unpaid Violation fee assessed at Level D is carried forward to Level E. A Collection Agency fee is assessed and appears on the Level E invoice. Violation Tolls/fees that remain unpaid at the conclusion of the Level D Grace Period shall escalate to Level E. In addition to the invoice, a separate 2nd Violation Notice is generated and sent via Certified Mail. This includes: Unpaid toll amount, Unpaid late fee that was assessed at Level B, Violation fee that was assessed at Level D, a new Collection Agency fee that is assessed at this level (Level E). Collection Agency Tolls/fees that remain unpaid at the conclusion of the Level D Grace Period shall escalate to the Collection Agency.

Past Due 94 Days

Page 81: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 63 of 111

Escalation Level Escalation Process Status*

Level F Invoice Tolls/fees that remain unpaid at the conclusion of the Level E Grace Period shall escalate to Level F. This is the 6th time these tolls are appearing on an invoice. No additional fees are assessed. Unpaid late fee that was assessed at Level B is carried forward to Level F. Unpaid Violation fee that was assessed at Level D is carried forward to Level F. Unpaid Collection Agency fee that was assessed at Level E is carried forward to Level F. Violation No additional Violation Notices are issued. No additional Violation fees assessed. Collection Agency The Collection Agency continues to pursue outstanding amounts. Registration Hold A stop flag is placed on the Oklahoma vehicle registration.

Past Due 125 Days

Level G and Beyond

Invoice Tolls/fees that remain unpaid at the conclusion of the Level F Grace Period shall be included on subsequent invoices until they are paid or written off by OTA.

Past Due 125 + Days

21.5.7 The LPT System shall allow for all unpaid amounts to display on an invoice broken down by invoice period and escalation level.

21.5.8 The LPT System shall have the capability to assess all past due and escalation fees at any stage in the escalation process.

21.5.9 The LPT System shall have the capability to assess past due and other escalation-related fees.

21.5.10 The LPT System shall have the capability to change where escalation fees are assessed in the escalation process.

Page 82: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 64 of 111

21.5.11 The LPT System shall have the capability to assess a violation fee for any invoice escalated to a violation.

21.5.12 The LPT System shall reflect associated fees on invoices, violation notices, and other correspondence as appropriate.

21.5.13 The LPT System shall allow for the assessment of configurable invoice late fees at the transaction level and the invoice level.

21.5.14 The LPT System shall allow for unpaid tolls and fees to be grouped, escalated and displayed on invoices by the period for which they were originally invoiced.

21.5.15 The LPT System shall allow for violations to be included on invoices as well as being issued as a separate violation notice.

21.5.16 The LPT System shall allow for a separate violation notice to be generated and issued for tolls and fees due for each invoice period.

21.5.17 The LPT System shall only generate and issue a violation notice if the violation amounts due are in excess of a configurable minimum amounts. The configurable minimum amounts shall be separate for tolls and fees.

21.5.18 The LPT System shall allow for the escalation of amounts due to an OTA specified Collection Agency.

21.5.19 The LPT System shall escalate amounts due to the Collection Agency only if the amounts due are in excess of a configurable minimum amounts. The configurable minimum amounts shall be separate for tolls and fees.

21.5.20 The LPT System shall allow for the assessment of a Collection Agency fee.

21.5.21 The LPT System shall allow for the assessment of a configurable Collection Agency fee that is based on a percentage of the total amounts due, a flat fee for the invoice period and/or a per-transaction fee.

21.5.22 The LPT System shall allow for a vehicle registration Stop Flag to be placed on Oklahoma license plate with amounts due in excess of configurable minimum amounts. The configurable minimum amounts shall be separate for tolls and fees.

21.5.23 The LPT Processor shall have a process to perform DMV registration holds or other OTA enforcement methods allowed by interstate interoperability enforcement agreements. The details of this process shall be determined during the design phase.

21.5.24 The LPT System shall allow for the write-off of unpaid tolls and/or fees as dictated by the OTA-approved Policies and Procedures.

21.5.25 The LPT System shall have the ability to prevent disputed transactions from escalating until the dispute has been resolved.

Page 83: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 65 of 111

22 Violation Processing

Violation Processing 22.1

22.1.1 The LPT Processor shall be responsible for all violation processing, including the generation and issuance of violation notices and applicable correspondence, payment processing, and all related customer service activities per the Oklahoma legislation (Appendix G).

22.1.2 The LPT System shall visually indicate to users whether an UPA has any outstanding amount due that has escalated to violation processing.

Violation Notice Generation and Issuance 22.2

Note that LPT violations are unpaid invoice amounts, per Oklahoma legislation, and there is not necessarily a one-to-one relationship between toll occurrences and violations. 22.2.1 The LPT Processor shall generate and issue all violation notices for LPT violations.

22.2.2 The LPT Processor shall issue all violation notices in the form of paper notices.

22.2.3 The LPT Processor shall issue paper violation notices even for accounts with invoice mailing suppressed.

22.2.4 The LPT Processor shall issue paper violation notices even for accounts opted-in for email delivery of invoices.

22.2.5 The LPT System shall include a configurable minimum dollar amount required to issue a violation notice.

22.2.6 The LPT System shall have the capability to suppress the issuance of violation notices with outstanding amounts below a configurable threshold.

22.2.7 On each violation notice, the LPT Processor shall have the ability to include the following violation-specific information:

notice date 22.2.7.1

notice due date 22.2.7.2

notice number 22.2.7.3

PIN for IVR/web access 22.2.7.4

time and date for each toll 22.2.7.5

location for each toll 22.2.7.6

axle count for each toll 22.2.7.7

Page 84: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 66 of 111

license plate image 22.2.7.8

license plate number and state 22.2.7.9

vehicle make 22.2.7.10

vehicle owner name and address 22.2.7.11

amount due (tolls due, fees due, total due) 22.2.7.12

barcode that uniquely identifies the violation notice 22.2.7.13

22.2.8 On each violation notice, the LPT Processor shall have the ability to include the following general information:

payment instructions 22.2.8.1

escalation information 22.2.8.2

applicable laws 22.2.8.3

PIKEPASS account information 22.2.8.4

OTA website URL 22.2.8.5

dispute information 22.2.8.6

Customer Service telephone number 22.2.8.7

22.2.9 The LPT Processor shall work collaboratively with OTA in the design, format and content of all violation notices, envelopes, and any related materials or inserts during the design phase and subject to the approval of OTA.

22.2.10 The LPT System shall support distinct layouts for 1st violation notices and 2nd violation notices.

Violation Notices Tracking and Resolution 22.3

22.3.1 The LPT Processor shall update the status of each violation and violation notice during its life cycle process so that the LPT Processor and OTA can effectively manage and track violations and violation notices. The LPT Processor shall track the following information:

Payments that result in payment in full, partial payment, or over-payment. 22.3.1.1

Payment reversals due to insufficient funds or chargebacks. 22.3.1.2

Violations disputed or under administrative review. 22.3.1.3

Page 85: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 67 of 111

Violations dismissed, negotiated, hearing requested or dispute denied. 22.3.1.4

Vehicle Registration Stop Flags 22.4

Vehicle registration holds / stop flags prevent the renewal of Oklahoma vehicle registrations for vehicle owners with outstanding OTA violations. OTA currently places vehicle registration holds for delinquent violators with Oklahoma license plates in the Oklahoma Tax Commission (Commission) system directly.

22.4.1 The LPT Processor shall develop an interface to the Oklahoma Tax Commission system to automate the transmission of vehicle registration stop flag placement and removal requests to the Commission.

22.4.2 The LPT Processor shall update the stop flag status in real time as the account status changes.

22.4.3 The LPT Processor shall never place a stop flag for outstanding amounts consisting only of fees—there must be some toll amount included.

22.4.4 The LPT System shall track and report on stop flag activity, including placement requests, removal requests, and payments.

22.4.5 The LPT System shall visually indicate to users whether an UPA has amounts due related to a stop flag.

22.4.6 The LPT System shall clearly display to customer service users the total payment amount required to remove the stop flag, for accounts on which there is an active stop flag.

Collection Agency 22.5

OTA currently utilizes a 3rd party collection agency to assist in collection of outstanding tolls and fees related to the PIKEPASS operation. 22.5.1 The LPT System shall interface with the collection agency for the exchange of debt

placements and payment data based on an ICD that shall be developed jointly between the collections agency and the LPT Processor.

22.5.2 The LPT System shall place unpaid tolls and fees with the collection agency based on the approved escalation process.

22.5.3 The LPT System shall only escalate unpaid tolls and fees to the collection agency when are in excess of configurable minimum amounts. The configurable minimum amounts shall be separate for tolls and fees.

22.5.4 The LPT System shall reconcile placements and payments with the collection agency.

22.5.5 The LPT System shall report to OTA the status of amounts placed with the collection agency based on information provided by the collection agency.

Page 86: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 68 of 111

22.5.6 The LPT System shall accept, process and track payments made to the LPT Processor for debt placed with the collection agency.

22.5.7 The LPT Processor shall update the collection agency with all payments made for transactions in collections.

22.5.8 The LPT System shall provide reporting on collection agency related violations and payments as required by OTA.

22.5.9 The LPT System shall visually indicate to users whether an UPA has amounts due that have been escalated to the collection agency.

22.5.10 The LPT System shall clearly display to customer service users the total outstanding amount that has been escalated to the collection agency.

23 Payment Processing

General Payment Processing Requirements 23.1

23.1.1 The LPT System shall allow authorized users to process customer payments according to OTA-approved payment processing Policies and Procedures.

23.1.2 The LPT Processor shall develop specific Policies and Procedures for processing partial payments.

23.1.3 The LPT System shall allow for partial payment of invoices and violation notices.

23.1.4 The LPT System shall provide functionality to process partial payments and over-payments.

23.1.5 The LPT System shall apply partial payments to outstanding amounts (all tolls and fees) on a first-in, first-out basis.

23.1.6 The LPT System shall provide an option to allow authorized users to override the first-in, first-out rule and apply payments to user-selected tolls and fees.

23.1.7 The LPT System shall apply invoice overpayment amounts to the account as a prepaid balance for use in a subsequent invoice cycle.

23.1.8 The LPT System shall apply prepaid balances to outstanding amounts (all tolls and fees) on a first-in, first-out basis prior to issuing an invoice. This payment shall be reflected on the invoice.

23.1.9 The LPT System shall allow authorized users to initiate a refund of any prepaid balance amount in accordance with OTA-approved Policies and Procedures (e.g., due to customer request).

Page 87: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 69 of 111

23.1.10 The LPT System shall have the capability to assess non-sufficient funds (NSF) fees for returned checks.

24 Account Maintenance and Management

Customer Information and Correspondence 24.1

24.1.1 The LPT System shall support electronically linking documents to accounts, including both incoming and outgoing correspondence.

24.1.2 The LPT System shall ensure all customer correspondence is easily accessible by the LPT Processor and OTA staff in the performance of customer service tasks.

24.1.3 The LPT System shall allow authorized users to enter account notes on any account at any time, and shall store all user-entered notes with the account.

24.1.4 The LPT System shall allow authorized users to enter an email address on an UPA for customer communications.

24.1.5 The LPT System shall allow authorized users to mark an UPA with a valid email address on file as opted-in for emailed invoices.

General Account Management 24.2

24.2.1 The LPT System shall allow authorized LPT staff and authorized OTA users to manage LPT accounts, which shall include the following capabilities:

View posted Transactions 24.2.1.1

View payment history 24.2.1.2

View the account balance 24.2.1.3

View account notes and contact history 24.2.1.4

View documents sent to and received from the customer 24.2.1.5

Attach documents to an account 24.2.1.6

View and modify customer demographics 24.2.1.7

View and modify invoice delivery options 24.2.1.8

View vehicle information 24.2.1.9

View transaction images 24.2.1.10

Add and remove credit/debit card and ACH information 24.2.1.11

Page 88: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 70 of 111

Process payments 24.2.1.12

Dispute tolls and fees 24.2.1.13

24.2.2 The LPT System shall not allow modification or removal of the name/address information returned by an ROV source lookup.

Disputes and Adjustments 24.3

24.3.1 The LPT Processor shall establish and implement processes to receive, research, document, and resolve all customer disputes.

24.3.2 The LPT Processor shall develop Policies and Procedures, subject to OTA review and approval, for handling all disputes, including conditions under which OTA approval is required.

24.3.3 The disposition of all disputes shall be communicated to the customer in the same manner as the dispute was received from the customer (e.g., mail, email, telephone).

24.3.4 The LPT Processor shall develop and document, for OTA approval, a dispute escalation process in which certain unresolved disputes shall be escalated to OTA for administrative review.

24.3.5 The LPT Processor shall thoroughly research disputes and provide OTA with all relevant documentation related to disputes submitted for administrative review.

24.3.6 The LPT System shall allow authorized users to adjust tolls, payments, and fees posted to an account, according to approved Policies and Procedures, and with an appropriate audit trail.

24.3.7 The LPT System shall require authorized users to enter account notes for all actions taken in cases of dismissals, disputes, reversals, corrections, and adjustments.

24.3.8 The LPT Processor shall schedule hearings (formal process for disputing violation notices) requested by violation notice recipients and prepare hearing evidence packages. Hearings will be conducted by OTA.

Toll/Fee Dismissal 24.4

24.4.1 The LPT System shall support the ability to dismiss one or more transactions (tolls and/or fees separately).

24.4.2 The LPT Processor shall develop Policies and Procedures, subject to OTA approval, for dismissing tolls and/or fees.

Transfer of Responsibility (TOR) 24.5

24.5.1 The LPT System shall have the capability and the LPT Processor shall establish and implement procedures for the transfer of responsibility for transactions and related

Page 89: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 71 of 111

amounts due based on updated vehicle owner information, e.g., rental/leased vehicles or transfer of vehicle ownership.

24.5.2 The LPT Processor shall develop Policies and Procedures for obtaining appropriate evidence to support and validate TOR information.

24.5.3 If the LPT Processor determines that an invoice or violation notice is eligible for a TOR, according to OTA-approved Policies and Procedures, the fees shall be dismissed and the tolls only shall be mailed on a new invoice to the new responsible party’s name and address, restarting the regular escalation process.

24.5.4 The LPT System shall retain a record of the transfer on the original account.

UPA Conversion to PIKEPASS 24.6

24.6.1 The LPT Processor shall work with OTA to develop the procedures and design the functionality required to support conversion of LPT accounts to PIKEPASS accounts. OTA will be responsible for all PIKEPASS development.

24.6.2 The LPT System shall allow UPAs to be converted to PIKEPASS accounts by OTA users accessing the LPT System from the OTA CSC only.

24.6.3 The LPT System shall retain all LPT account history for the converted UPA, including toll and financial transaction history.

24.6.4 The LPT System shall not allow toll or payment transactions to post to any LPT account that has been converted to PIKEPASS. OTA will be responsible for all postings to PIKEPASS accounts established by conversion from LPT accounts.

24.6.5 The LPT System shall not allow PIKEPASS conversion of any LPT account with unpaid violations, past-due tolls, or fees.

24.6.6 The LPT Processor shall require OTA’s authorization to reduce or waive amounts due on an LPT account for the purposes of conversion to a PIKEPASS account.

24.6.7 The LPT System shall provide for functionality that flags financial adjustments as due to PIKEPASS conversion / with OTA authorization.

24.6.8 Upon successful conversion, the LPT System shall update the LPT account with a status indicating the account was converted to PIKEPASS.

25 LPT System Interfaces

External Interfaces 25.1

25.1.1 The LPT Processor shall interface with the following entities and shall collaboratively develop, where applicable, an Interface Control Document (ICD) with each entity to establish communication protocol.

Page 90: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 72 of 111

Host system operated by OTA (current ICD is in Appendix E), which 25.1.1.1includes LPT transactions and images, PIKEPASS account match lookups, Oklahoma, Texas and Commercial vehicle License Plate (ROV) lookups, and the HOT list

ACH and credit/debit card processors 25.1.1.2

All required DMVs and/or third party providers who provide vehicle 25.1.1.3registration information

Registration stop flags with the Oklahoma Tax Commission 25.1.1.4

Bank(s) 25.1.1.5

Collection agency 25.1.1.6

25.1.2 The LPT Processor shall coordinate with third parties and update external interfaces as needed.

Host Interface 25.2

OTA will develop a web service interface and allow a secure VPN connection, and corresponding ICD, for the LPT System and the Host to exchange data including LPT transactions, images and reconciliations, PIKEPASS account match look-ups, Oklahoma, Texas and Commercial registered owner vehicle information and HOT lists.

25.2.1 The LPT System shall interface with the OTA Host as detailed in the Interface Control Document.

25.2.2 The LPT Processor shall ensure that all data received via the interface with the OTA Host is properly accounted for and processed in a timely and accurate manner.

25.2.3 The LPT Processor shall coordinate with OTA to setup a Site-to-Site VPN to secure the data exchanges between the LPT System and OTA Host. It shall be an IPsec or equivalent VPN tunnel with a pre-shared key and an agreed upon encryption method.

File Exchanges 25.3

25.3.1 The LPT Processor shall implement system alerts to the LPT Processor and OTA when any scheduled file exchange does not occur within a configurable amount of time or number of attempts/timeouts.

25.3.2 The LPT Processor shall reconcile with the Host at the file level, for all files received.

25.3.3 The LPT Processor shall reconcile transaction files with the Host at the individual transaction level, for each transaction record in the file received.

Page 91: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 73 of 111

Transaction Reconciliation 25.4

25.4.1 The LPT Processor shall reconcile transaction statuses to OTA that indicate the current processing status of each transaction received from the Host.

25.4.2 The LPT Processor shall prepare and send reconciliation files on a configurable basis.

25.4.3 The LPT Processor shall provide an updated reconciliation status for a given transaction any time there is a change in its processing status from the last update sent to OTA.

25.4.4 The LPT Processor shall use reconciliation codes to indicate the transaction’s current processing status.

25.4.5 The LPT Processor shall finalize the list of reconciliation codes and associated processing statuses with OTA during the design phase.

25.4.6 The LPT Processor shall update the OTA Host to LPT System ICD with the final list of reconciliation codes. Following are examples of the types of statuses for which the LPT Processor shall provide reconciliation codes.

• Interim – Transaction received by the License Plate Tolling Processor

• Rejected – Duplicate transaction

• Rejected – Rejected by DMV/ROV source

• Rejected – No DMV reciprocity

• Dismissed – OTA request

• Interim – In image review

• Interim – Invoiced

• Interim – Past due invoice

• Interim – Transfer of Responsibility (TOR)

• Final – Dismissed at PIKEPASS request

• Final – Dismissed by LPT Processor

• Final – Dismissed for PIKEPASS conversion

• Final – Paid Invoice PIKEPASS Account Match Lookups 25.5

OTA will provide the LPT Processor with access to a read-only database view, or result set of a stored query of the PIKEPASS data, for use in identifying customer transactions eligible to post to a PIKEPASS account (V-Toll).

Page 92: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 74 of 111

25.5.1 The LPT System shall utilize the PIKEPASS data provided by OTA to compare License Plate number and jurisdiction against the PIKEPASS customer database.

25.5.2 The LPT System shall send a file, in an agreed upon format using an interface or file transfer method, the list of Toll Transaction IDs and Image IDs that were found to be PIKEPASS customer transactions.

25.5.3 The LPT System shall request an acknowledgement of receipt and then process the stored transactions and images it sent in the file as dismissed as PIKEPASS or equivalent code.

25.5.4 The LPT System shall track the number of PIKEPASS transactions it finds and provide it in the reconciliation report via the web service with the OTA Host.

Oklahoma License Plate Lookups 25.6

OTA will provide the LPT Processor with access to a read-only database of Oklahoma License Plates and the registered owner of the vehicle (ROV) information.

25.6.1 The LPT System shall query the OTA-provided database of OK License Plate numbers to obtain ROV information for processing tolls.

25.6.2 The LPT Processor shall adhere to OTA data retention and security standards to ensure the PII data received from the OK License Plate database is secure and not breached.

Texas License Plate Lookups 25.7

OTA will provide the LPT Processor with access to a read-only database of the Texas License Plates and the registered owner of the vehicle (ROV) information.

25.7.1 The LPT System shall query the OTA-provided database of TX License Plate numbers to obtain ROV information for processing tolls.

25.7.2 The LPT Processor shall adhere to OTA data retention and security standards to ensure the PII data received from the TX License Plate database is secure and not breached.

Commercial License Plate Lookups (CVIEW) 25.8

25.8.1 OTA will provide the LPT Processor with access to a read-only database of the CVIEW commercial License Plates and the registered owner of the vehicle (ROV) information.

25.8.2 The LPT System shall query the OTA-provided database of CVIEW commercial License Plate numbers to obtain ROV information for processing tolls.

Page 93: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 75 of 111

25.8.3 The LPT Processor shall adhere to OTA data retention and security standards to ensure the PII data received from the CVIEW commercial License Plate database is secure and not breached.

Hot Lists 25.9

OTA may wish to periodically send the LPT Processor Hot Lists, which contain a list of license plates for which OTA would like notification if processed by the LPT System. OTA will send the LPT Processor Hot Lists in an agreed upon file format using a defined transfer method. The OTA Host to LPT System ICD will contain detail of the Hot List data exchange.

25.9.1 The LPT System shall process the Hot List and notify OTA via the web service when License Plate matches are found.

Oklahoma Tax Commission 25.10

25.10.1 The LPT Processor shall place vehicle registration stop flags for Oklahoma license plates with the Oklahoma Tax Commission.

25.10.2 The LPT Processor shall coordinate with the Oklahoma Tax Commission to develop an ICD, which shall define an interface to send registration stop flags to the Oklahoma Tax Commission system.

25.10.3 The LPT System shall request acknowledgement via the interface that the stop flag has been applied.

25.10.4 The LPT System shall notify OTA via the daily reconciliation how many LPT customers have stop flags applied.

25.10.5 The LPT System to Oklahoma Tax Commission interface shall also have the ability to release stop flags, and shall subsequently also notify OTA via the daily report of the number of stop flag releases.

25.10.6 The LPT Processor shall remove the stop flag, update the account and reconcile to OTA when a payment issue has been resolved.

Third Party Interfaces 25.11

25.11.1 The LPT Processor shall coordinate with any third party vendor it uses for LPT processing to develop an ICD that defines the interface between the third party and the LPT System.

25.11.2 All ICDs for third party interfaces, including those below, shall follow the same framework as the OTA Host to LPT System ICD in Appendix E.

ACH and credit/debit card processors 25.11.2.1

Page 94: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 76 of 111

Bank(s) 25.11.2.2

Collection agency 25.11.2.3

26 Mail Processing

General Mail Processing Requirements 26.1

26.1.1 The LPT Processor shall generate, distribute and track all printed customer correspondence, including materials in the form of letters, notices, invoices and general correspondence.

26.1.2 The LPT Processor shall establish and administer all postal service relationships. The actual cost of postage for outgoing mail shall be a direct pass through cost to OTA with no mark-up.

26.1.3 The LPT Processor shall utilize the extended ZIP+4 Codes in all mailing where available.

26.1.4 The LPT Processor shall track and report on all incoming and outgoing correspondence by type.

26.1.5 The LPT Processor shall implement a process to manage, research, correct, and minimize mail returned as undeliverable.

26.1.6 The LPT Processor shall track and report on mail returned as undeliverable.

Incoming Mail Processing 26.2

Incoming mail may include payments, disputes, returned mail, general administrative mail, and general public inquiries.

26.2.1 The LPT Processor shall establish and implement procedures to provide effective and efficient handling of all incoming mail, including procedures for tracking customer correspondence.

26.2.2 The LPT Processor shall accurately timestamp all incoming correspondence for quality assurance and audit purposes.

26.2.3 The LPT Processor shall provide an appropriate response to all customer inquiries received by mail, according to OTA-approved Policies and Procedures.

26.2.4 The LPT Processor shall scan all incoming mail.

26.2.5 The LPT System shall associate scanned mail related to an LPT account with the account to allow users to view a digital image of the document.

Page 95: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 77 of 111

26.2.6 The LPT Processor shall store all scanned mail that is not associated to an LPT account in an electronic file.

Outgoing Mail Processing 26.3

Although mass mailing may be required from time to time, the majority of outgoing mail will be based on specific situations affecting individual customers or groups of customers. 26.3.1 The LPT Processor shall establish and implement a process to provide the timely,

efficient and accurate handling of all outgoing mail.

26.3.2 The LPT Processor shall track the date and time that all outgoing correspondence is mailed for quality assurance and audit purposes.

26.3.3 The LPT Processor shall send all paper customer correspondence via first class mail or better, unless specifically directed by OTA to do otherwise.

26.3.4 The LPT Processor shall send all 2nd violation notices via Certified Mail.

26.3.5 The LPT Processor shall employ bulk mail rates and other mailing economies, where available, including the capacity for pre-sorting mail by Zip Code to ensure the most cost effective postage rates are obtained.

26.3.6 The LPT Processor shall have full responsibility over any mail house services that it may choose to outsource.

26.3.7 The LPT Processor shall establish and implement quality assurance procedures that include the monitoring, spot checking and tracking of all outgoing mail.

26.3.8 The LPT Processor shall generate configurable form letters and individual situational customer correspondence as appropriate.

26.3.9 The LPT Processor shall utilize skip tracing and develop procedures to attempt to obtain an address for all returned mail.

26.3.10 For invoices and violation notices returned by the US Postal Service (USPS) with a forwarding address, the LPT Processor shall reissue the invoice or violation notice to the forwarding address provided by the USPS.

26.3.11 The LPT Processor shall utilize a process for address standardization.

26.3.12 The LPT Processor shall utilize the National Change of Address (NCOA) service.

26.3.13 If the NCOA returns an updated address, the LPT Processor shall reissue the invoice or violation notice to the updated address.

26.3.14 The LPT Processor shall design all customer correspondence with OTA during the design phase. A sample list of the types of customer correspondence envisioned for the LPT program is included below:

Page 96: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 78 of 111

• Welcome Letter

• Invoices

• Violation Notices

• Returned Check Letter

• ACH Reject Letter

• Registration Hold Letter

• Sent to Collections Agency Letter

• Dispute Resolution

• Returned Email

• Refunds

• Other Inquiry Response

27 Customer Communications & Materials

Customer Communications 27.1

Customer correspondence includes fixed materials and forms, as well as variable and unique LPT account and situational based communications.

27.1.1 The LPT Processor shall be responsible for all aspects of communication with LPT customers, including communications via telephone, mail, email, web, and fax.

27.1.2 The LPT Processor shall record and maintain an historical record of all customer contacts in the account.

27.1.3 The LPT Processor shall design, produce, inventory, and distribute all customer communications and correspondence as approved by OTA.

27.1.4 The LPT Processor shall answer inquiries from the general public provided the subject is consistent with general information related to the LPT locations and LPT customer service.

27.1.5 The LPT Processor shall not initiate promotional or other unsolicited informational communication with unregistered LPT customers.

Email 27.2

27.2.1 The LPT Processor shall have the capability to receive customer inquiries and requests via email and respond to customer inquiries and requests via email.

27.2.2 The LPT Processor shall send all customer correspondence via email, when provided by and indicated as preferred by the customer, except where hard copies are required.

Page 97: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 79 of 111

27.2.3 The LPT Processor shall establish, implement and maintain a process to allow customers to opt-in to receive messages via email.

27.2.4 The LPT Processor shall use industry best practices for handling undeliverable email messages.

27.2.5 The LPT Processor shall develop the format and content of all email messages during the design phase and shall require OTA approval of any changes thereafter.

Social Media 27.3

27.3.1 The LPT Processor shall work with the OTA’s Director of Communications and/or his designee for implementing and maintaining public communications via social media.

27.3.2 The LPT Processor shall obtain OTA authorization and approval of any customer interaction via social media.

27.3.3 The LPT Processor shall work with OTA to identify and disseminate messages and information about the License Plate Tolling program (e.g., monitor social media, notify OTA of issues, and provide recommended responses and feedback when requested by OTA).

IVR System 27.4

27.4.1 The LPT Processor shall establish, operate and maintain an interactive voice response (IVR) system.

27.4.2 The LPT Processor shall utilize IVR system components, including ancillary equipment and software, which are dedicated to the LPT System for use for the License Plate Tolling program.

27.4.3 The LPT IVR system (“LPT IVR”) or subcomponents and software shall not be shared with other co-located/supported LPT Processor clients.

27.4.4 The LPT Processor shall provide a toll-free telephone number for the LPT IVR.

27.4.5 The LPT IVR shall route calls and accept payments via menu selections and user input.

27.4.6 The LPT IVR shall provide customers with the ability to hear amounts due and make payments (via debit/credit cards or ACH) 24 hours per day, 7 days per week.

27.4.7 The LPT IVR shall require appropriate authentication (e.g., an invoice number and access PIN) prior to providing any account specific information.

27.4.8 The LPT IVR shall provide users with an option to be transferred to a CSR during operating hours.

27.4.9 The LPT IVR shall provide customers with the option to be transferred to a Spanish speaking CSR during operating hours.

Page 98: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 80 of 111

27.4.10 The LPT IVR shall provide callers who request to be transferred to a CSR with the estimated waiting time to speak to a CSR upon entering the CSR queue and every 60 seconds during their time in queue.

27.4.11 The LPT IVR shall be fully integrated with the functional LPT System.

27.4.12 During non-business hours, the LPT IVR shall announce a message informing callers that the live call center is now closed but customers can make payments via the IVR system and website.

27.4.13 The LPT IVR system shall interact with the LPT System database in real time to retrieve account information.

27.4.14 The IVR system shall utilize a single recorded voice talent and have consistency in volume and intonation, except in certain time sensitive situations as directed and approved by OTA.

27.4.15 The LPT Processor shall obtain OTA approval of the IVR system voice talent and script.

27.4.16 The LPT Processor shall have the ability to remotely make short term, time sensitive changes to the IVR system.

27.4.17 The LPT Processor shall make necessary changes to the IVR script, messages, and menu options at no additional cost to and only upon approval by OTA.

27.4.18 The LPT Processor shall ensure that the IVR system is ADA compliant throughout the Term.

Call Center 27.5

27.5.1 The LPT Processor shall provide call center staff that are dedicated solely to the OTA License Plate Tolling program.

27.5.2 The LPT Processor shall provide all hardware and software for processing incoming customer calls.

27.5.3 The LPT Processor shall have sufficient staff in place during the defined operating hours to handle all inbound callers who wish to speak to a CSR within the time parameters specified in the Performance Standards.

27.5.4 The LPT Processor shall establish and document Policies and Procedures, subject to OTA review and approval, for the escalation of calls and issues to LPT Processor supervisory and management staff, as well as to OTA staff.

27.5.5 The LPT Processor shall track and resolve all escalated issues.

27.5.6 The LPT Processor shall record detailed account notes related to each call.

Page 99: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 81 of 111

27.5.7 The LPT System shall document, track and report all IVR system and CSR calls, separately, by specific reason for the call (e.g., dispute, payment).

27.5.8 The LPT Processor shall record the reason(s) for each call via call reason codes that will be established by the LPT Processor and approved by OTA during design.

27.5.9 The LPT System shall provide for input of multiple codes in cases where more than one reason/type code applies to the call.

27.5.10 The LPT System shall provide for, and the LPT Processor shall establish and implement processes for, supervisory monitoring of both live and recorded CSR calls for accuracy, efficiency, professionalism and courteous service.

27.5.11 The LPT Processor shall develop a form to record CSR monitoring activity and shall submit the form to OTA for approval. The LPT Processor shall keep completed CSR monitoring forms on file for a year and submit a monthly summary to OTA.

27.5.12 The LPT Processor shall provide OTA with automated capability to monitor any live customer calls from offsite, at any time without prior notification to the LPT Processor or to the CSR being monitored.

27.5.13 The LPT Processor shall ensure that the phone system announces on all calls that calls may be monitored (e.g., ‘calls may be monitored for quality assurance purposes’).

27.5.14 The LPT Processor shall ensure that the phone system is ADA compliant throughout the Term.

27.5.15 Once a customer call is answered by a CSR, the call shall not be immediately placed on hold to answer another call.

27.5.16 Call center staff shall respond to customer non-LPT related calls (e.g., OTA policies, turnpike operations, PIKEPASS accounts, interoperability, points of customer contact) by providing information in accordance with specific scripts approved by OTA or refer caller to PIKEPASS CSC or website.

28 Website

Website Requirements 28.1

28.1.1 The LPT Processor shall design, develop, implement, host, and maintain an intuitive, user-friendly, and interactive customer website, including the website domain.

28.1.2 The LPT Processor shall provide OTA with a link to the LPT website that can be used on the OTA PIKEPASS website to direct customers to the LPT Processor website.

28.1.3 The LPT Processor shall prominently display a link to PIKEPASS.com for questions and issues not related to License Plate Tolling.

Page 100: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 82 of 111

28.1.4 The LPT System database interface to the LPT website shall facilitate the automatic electronic exchange of all required account information supporting all required functionality.

28.1.5 The LPT Processor shall design the website using industry best practices for easy updating and workflow changes and include a content management module that will allow authorized OTA staff to update content without the need for extensive LPT Processor assistance.

28.1.6 The LPT website shall be optimized for, and function properly, on Internet Explorer, Safari, Firefox and Chrome, as well as on multiple platforms including personal computers, mobile devices and tablet devices.

28.1.7 The LPT website shall be secure and require appropriate customer authentication for all account-specific pages.

28.1.8 The LPT Processor shall define and develop the specific look, functionality, and navigation of the website with OTA during the design phase.

28.1.9 The LPT Processor shall ensure that the website is ADA compliant throughout the Term.

Website Account Management 28.2

28.2.1 The website shall provide customer access to account information through a secure login.

28.2.2 Access to customer account data shall require login with an invoice number and license plate number/state, or an invoice number and access PIN.

28.2.3 All customer account activity made via the website shall be immediately reflected in the database and on the customer account screens.

Website Services 28.3

28.3.1 The LPT Processor website shall provide customers with the following functionality:

View current and past invoices 28.3.1.1

View current and past violations 28.3.1.2

View current and past images 28.3.1.3

Pay invoice via credit card, debit card, or ACH 28.3.1.4

Pay violations via credit card, debit card, or ACH 28.3.1.5

Associate an email with the account 28.3.1.6

Page 101: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 83 of 111

Opt-in/out of email invoices 28.3.1.7

Opt-in/out of email correspondence 28.3.1.8

Dispute process 28.3.1.9

28.3.2 The LPT Processor shall provide a “Contact Us” feature and various methods to communicate with the LPT Processor via the website, using email or HTML forms.

28.3.3 The LPT System shall acknowledge customer inquiries received via the website via an automated email receipt confirmation to the customer.

28.3.4 The website shall provide static informational pages, including the following:

A description of the LPT program 28.3.4.1

Invoice escalation process including violations, collections and fees 28.3.4.2

Vehicle registration stop flag process 28.3.4.3

Payment information 28.3.4.4

How to sign up for a PIKEPASS account 28.3.4.5

Help and frequently asked question 28.3.4.6

Privacy Policy 28.3.4.7

Downloadable forms and customer guides 28.3.4.8

Links to other sites to be determined by OTA 28.3.4.9

28.3.5 The LPT Processor shall perform all website maintenance and content updates.

Website Security 28.4

28.4.1 The LPT Processor shall institute security measures to prevent unauthorized access to the LPT System, and maintain the confidentiality and security of all customer data subject to applicable federal, state and local laws and applicable financial and banking policies, including Payment Card Industry Data Security Standards (PCI DSS).

28.4.2 The LPT Processor shall maintain proper PCI DSS compliance on the website used for account management throughout the Term.

28.4.3 The LPT Processor shall be responsible for all costs related to maintaining compliance with PCI DSS and any related updates.

28.4.4 The website shall incorporate a firewall, or security appliance, with security functions to prevent unauthorized access to any parts of the LPT System.

Page 102: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 84 of 111

28.4.5 The LPT Processor shall use appropriate protocols to ensure secure data transmission from/to the user’s browser.

28.4.6 The website shall utilize secure connection with all confidential communications encrypted Transport Layer Security (TLS) protocol.

28.4.7 LPT Processor shall provide, operate and maintain the website in a manner that adheres to the current industry best practices for website security.

28.4.8 The OTA privacy policy shall be accessible via hyperlink on the footer of every page.

28.4.9 The LPT Processor shall acquire the website security certificate and maintain it in full force and effect throughout the Term.

29 Payment Processing

General Payment Processing Requirements 29.1

29.1.1 The LPT Processor shall securely process all payments received.

29.1.2 The LPT Processor shall accurately track the chain of custody of all payments.

29.1.3 The LPT Processor shall apply all payments to the correct accounts in the LPT System.

29.1.4 The LPT Processor shall establish and implement daily, weekly and monthly reconciliation processes, audit trails and controls to safeguard all funds received.

29.1.5 The LPT Processor shall handle payment adjustments, reversals, refunds, NSF checks, partial payments, overpayments, split payments, and unidentified payments.

29.1.6 The LPT Processor shall establish and implement processes for handling of all payments, including partial payments and overpayments.

29.1.7 The LPT System shall apply payments received without specific customer direction to outstanding customer balances based on OTA approved Policies and Procedures.

29.1.8 The LPT System shall apply partial payments to the oldest tolls/fees first (first-in, first-out) by default.

29.1.9 The LPT System shall provide functionality for users to manually apply partial payments to specific tolls/fees (not first-in, first-out) in accordance with customer instructions or OTA direction.

29.1.10 The LPT Processor shall process, resolve, reconcile, and report unidentified payments (payments not accompanied by information to allow matching to an account).

29.1.11 The LPT Processor shall handle unidentified payments that cannot be resolved in accordance with applicable Oklahoma State escheatment laws.

Page 103: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 85 of 111

29.1.12 The LPT Processor shall gather and package all data related to unidentified payments as directed by OTA.

29.1.13 The LPT Processor shall verify that checks are signed and completed properly, and that credit/debit card numbers and signatures are completed properly.

29.1.14 The LPT Processor shall track, handle and report on incomplete payments such as unsigned checks and incomplete credit/debit card numbers.

29.1.15 The LPT Processor shall scan all customer payment correspondence, including the front and back of all checks.

29.1.16 The LPT System shall associate and store images of scanned payment correspondence, including checks, with the appropriate account.

29.1.17 The LPT Processor shall track and report on all payments by location, by user, by posting date, and by payment method.

29.1.18 The LPT Processor shall reconcile all payments posted to bank deposits and credit/debit card/ACH processing receipts on a daily basis.

29.1.19 The LPT Processor shall maintain a record of any discrepancies with bank deposits and report them immediately to OTA.

29.1.20 The LPT Processor shall ensure that all payments are deposited into the correct bank account as designated by OTA.

29.1.21 The LPT Processor shall reconcile all cash and check payments received from all sources to daily bank deposits.

Credit/Debit Card and ACH Processing 29.2

29.2.1 The LPT Processor shall be responsible for all aspects of credit/debit card and ACH processing.

29.2.2 The LPT Processor shall utilize the OTA credit/debit card and ACH service providers and employ methods and practices that provide OTA with the lowest possible credit/debit card and ACH fees. OTA will pay credit/debit card and ACH processing fees directly to the processors.

29.2.3 The LPT Processor shall accept payments via the following credit/debit cards, at a minimum: Visa, MasterCard, American Express and Discover.

29.2.4 The LPT Processor shall establish and maintain an interface with the credit/debit card/ACH processors.

29.2.5 The LPT Processor shall resolve credit/debit card and ACH transaction processing issues with the processors.

Page 104: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 86 of 111

29.2.6 The LPT Processor shall monitor and immediately report any transaction processing interruptions to OTA.

29.2.7 The LPT Processor shall reconcile LPT System credit/debit card transactions to information provided by the credit/debit card processor and the bank.

29.2.8 The LPT Processor shall ensure that the credit/debit card processor deposits all credit/debit card and ACH payments directly into appropriate bank accounts via electronic transfer.

29.2.9 The LPT Processor shall comply with the security and reporting standards of the credit/debit card issuer and processor.

29.2.10 The LPT Processor shall work with the credit/debit card processor in the review and resolution of customer credit/debit card chargebacks.

29.2.11 The LPT System shall flag payments that are in the chargeback review process and indicate resolution of the review in the account.

29.2.12 The LPT Processor shall make appropriate account adjustments in response to payment chargebacks.

29.2.13 The LPT Processor shall only store and transmit encrypted credit/debit card numbers and shall ensure security over credit/debit card information in compliance with the most current PCI standards.

29.2.14 The LPT Processor shall adhere to all requirements of the credit/debit card processor, the bank and PCI.

29.2.15 The LPT Processor shall review industry standards for enhancements and updates to the credit/debit card and ACH processing platform, at least annually, to ensure that the processing methods and systems remain current with the latest technology, security, and processing rules. The LPT Processor shall provide OTA with the results of such reviews.

29.2.16 In the event of an authorization decline from the processors for reasons other than a lost or stolen credit/debit card, the LPT Processor shall make a configurable number of authorization requests over a configurable period of time.

29.2.17 The LPT Processor shall ensure that all credit/debit card and ACH charges have been posted properly to customer accounts, transmitted to credit/debit card processor for payment, and that payments are received from the processor.

29.2.18 The LPT Processor shall reconcile all credit/debit card transactions with requests sent to the credit/debit card processor and with receipt of funds transferred by the processor.

29.2.19 The LPT Processor shall process all credit/debit card and ACH transactions on a daily basis.

Page 105: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 87 of 111

29.2.20 The LPT System shall track and record all activity related to credit/debit card and ACH payments, payment attempts, reversals and refunds in a customer's account within the LPT System in a sortable and searchable fashion.

29.2.21 The LPT System shall have a configurable limit to the number of customer initiated credit/debit card payments within a configurable period of time.

Cash and Checks Processing 29.3

29.3.1 The LPT Processor shall establish and implement procedures to accept and process all cash and checks received via mail.

29.3.2 The LPT Processor shall establish and implement procedures to accept and process payments received by PIKEPASS for LPT payments.

29.3.3 The LPT Processor shall establish and utilize electronic check processing.

29.3.4 The LPT Processor shall post all cash and checks received to the customer's account and process them for payment by the bank.

29.3.5 The LPT Processor shall provide an armored courier service for the transfer of funds to the designated bank.

29.3.6 The LPT Processor shall properly safeguard all cash and checks at all times and shall maintain records of the chain of custody of all funds.

29.3.7 The LPT System shall reverse any checks that are not honored, record them in the account and assess the appropriate non-sufficient funds (NSF) fee.

29.3.8 The LPT Processor shall establish and implement a process for including NSF check amounts due and related fees on invoices and violation notices.

29.3.9 The LPT System shall track the number of NSF checks received by an individual customer and have the ability to reject check payments by that customer after a configurable number of NSF checks have been received in a configurable period of time.

29.3.10 The LPT Processor shall account for and reconcile each payment received by payment type, by payment source, by CSR or payment processor, on a daily basis.

29.3.11 The LPT Processor shall utilize and support Positive Pay Processing for all refund checks issued. This includes the generation and issuance of Positive Pay files to the bank and the monitoring and handling of all related issues and exceptions.

29.3.12 The LPT Processor shall advise OTA of any issues related to Positive Pay on a daily basis.

Page 106: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 88 of 111

Refunds 29.4

29.4.1 The LPT Processor shall develop and implement OTA-approved Policies and Procedures to evaluate refund requests and process refunds for approved requests, including for eligible customer overpayments and error corrections. The methodology for refunds shall be finalized during design.

29.4.2 The LPT Processor shall designate and identify staff with the authority to process refunds.

29.4.3 The LPT Processor shall document all refunds in the LPT System customer account.

29.4.4 The LPT System shall track and report on refund activity on a monthly basis. This shall include refund information related to refund requests, issued refunds, refund method, accounts, dates, times, customer name and address data, approval level, name or employee ID number of individual processing and approving the refund, pending refunds, and the reason for approval or denial of the refund request.

29.4.5 The LPT Processor shall handle refunds that are returned by the post office as undeliverable in accordance with applicable Oklahoma State escheatment laws. The LPT Processor shall gather and package all data as directed by OTA.

29.4.6 The LPT Processor shall maintain PCI compliance regarding all credit/debit card refunds.

30 Cash Payment Network

Since OTA is removing the option to pay cash at certain locations on the roadway, OTA requires the LPT Processor to introduce a Cash Payment Network (CPN) at convenient merchant locations for patrons to pay invoices and violations using cash or other payment methods that may be accepted by the CPN. The sections below outline the requirements for the CPN.

General Cash Payment Location Requirements 30.1

30.1.1 The LPT Processor shall provide a Cash Payment Network (CPN) to accept customer funds at merchant locations.

30.1.2 The LPT Processor shall ensure the CPN provider is licensed to operate as a money services business in Oklahoma and all states in which the CPN is offering the OTA LPT program payments.

30.1.3 The LPT Processor shall guarantee to OTA all funds for all transactions processed at participating CPN locations.

30.1.4 The LPT Processor shall be responsible for all hardware, software and telecommunications costs incurred by the LPT Processor and its provider(s) associated with the provision of CPN transaction services.

Page 107: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 89 of 111

30.1.5 The CPN interface shall not degrade the LPT System’s performance, reliability, or availability.

30.1.6 The LPT Processor shall document measures being taken to ensure secure transfer of information between the CPN and the LPT Processor and its adherence to PCI compliance requirements.

30.1.7 The LPT Processor shall provide at least 48 hours advanced notice to OTA when the CPN is planned to be unavailable to OTA customers for more than 60 minutes.

30.1.8 The LPT Processor shall provide OTA with immediate notification anytime the CPN becomes unavailable to OTA customers for unplanned periods of longer than 60 minutes.

30.1.9 The LPT Processor shall ensure proper notification is displayed at the point of sale describing the CPN outage whenever the CPN is unavailable to OTA customers.

30.1.10 All payment processing requirements of this Scope of Work apply to payments made via the CPN.

CPN Payments 30.2

30.2.1 The LPT Processor shall implement a CPN that accommodates invoice and violation payment activities at each participating merchant location.

30.2.2 The CPN shall provide the ability for customers to view their outstanding amount due at no cost.

30.2.3 The CPN shall provide for configurable minimum and maximum payment amounts.

30.2.4 The CPN shall require either a scanned document barcode or two data entries for customer access validation as approved by OTA during design.

30.2.5 If the customer enters or scans a paid or escalated invoice barcode, the CPN shall retrieve and display the most recent total outstanding amount due on the account and allow the customer to make a payment to the account.

CPN Transaction Fees 30.3

30.3.1 CPN transaction fees, if any, shall be prominently displayed at the point of sale and available to the customer prior to completing the transaction.

30.3.2 CPN transaction fees charged to customers shall be approved by OTA.

30.3.3 CPN transaction fees shall be posted on the LPT/CPN webpage and printed on all transaction receipts.

Page 108: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 90 of 111

CPN Receipts 30.4

30.4.1 The CPN shall generate, OTA approved, printed receipts for all payments and shall advise customers to retain the receipt for their records as proof of payment.

30.4.2 The CPN shall ensure all receipts include complete transaction information, which may include any or all of the following (to be finalized during design):

• A CPN Reference ID number that uniquely identifies the payment and is searchable in the LPT System

• Type of document (invoice or violation) and document ID for which the payment was initiated

• Account number to which the payment was made • Total amount paid, with a breakdown of any fees • Amount due before payment • Amount due on the account, if any, after payment • Date and local time of the payment • Merchant location identifier • Name and contact details of the merchant • LPT Processor phone number and website address • Configurable message lines, for text to be provided and updated by OTA as

frequently as once per month

LPT and CPN Interface 30.5

30.5.1 The LPT Processor shall develop an interface to the CPN that implements all data exchanges necessary to meet the requirements contained herein.

30.5.2 The CPN System shall provide customers with the same up-to-date account balance information that would be available via the LPT Website or by calling the LPT Processor.

30.5.3 When a CPN transaction is complete at a merchant location, the LPT System shall immediately reflect the payment and update any remaining amount due on the account.

CPN Merchant Locations 30.6

30.6.1 The LPT Processor shall require all publicly located CPN merchant locations to accept cash. Locations may also accept other forms of payment (credit/debit card, check).

30.6.2 Each merchant location proposed for participation in the CPN by the LPT Processor shall require OTA approval prior to rollout or marketing of that location for OTA payments.

30.6.3 The LPT Processor shall ensure that CPN is available at merchant locations within a mutually agreed to area surrounding OTA tolling facilities.

Page 109: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 91 of 111

30.6.4 The LPT Processor shall provide OTA with a plan detailing the identification, recruitment, sign-on, training, and rollout of CPN merchant locations.

30.6.5 CPN services may be performed by point of sale (POS), kiosk, or other systems that shall be pre-approved by OTA.

30.6.6 The LPT Processor shall work with OTA to design a customer-friendly, intuitive user interface, with the final design requiring OTA approval prior to rollout.

30.6.7 The CPN user interface shall display a response to customer data requests in near real-time.

30.6.8 The LPT Processor shall monitor the quality of merchant services and discontinue a merchant location if it is determined that standards are not met or at the request of OTA (within one business day of the request).

CPN Merchant Locator 30.7

30.7.1 The LPT Processor shall develop and maintain a publicly available webpage for locating participating merchants that offer LPT CPN services (the Merchant Locator).

30.7.2 The LPT Processor’s CPN Merchant Locator shall provide a mobile-friendly website.

30.7.3 The LPT Processor shall ensure merchants that are no longer participating or do not meet requirements for the CPN are removed from the Merchant Locator within 1 business day of the removal of functionality, determination of failure to meet standards, or OTA request.

30.7.4 The LPT Processor’s CPN Merchant Locator shall allow users to retrieve a list of a configurable number of the CPN merchant locations closest to an address or Zip Code input by the user.

30.7.5 The LPT Processor’s CPN Merchant Locator shall list the CPN locations returned by the search—with street address, hours of operation, and phone number—and display them on a map view to the user.

30.7.6 The LPT Processor’s CPN Merchant Locator shall include the option to display a static map view of all participating CPN locations, without entering any search criteria.

30.7.7 The CPN Merchant Locator shall be available through the LPT Processor’s customer website.

CPN Reports 30.8

30.8.1 The LPT Processor shall provide daily, monthly and annual detailed CPN transaction reporting to include the following details for every transaction completed in the reporting period:

Page 110: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 92 of 111

Payment type (invoice or violation, based on input account/document ID) 30.8.1.1

Payment date and time 30.8.1.2

Account number 30.8.1.3

Invoice/violation number 30.8.1.4

Payment amount 30.8.1.5

Transaction fee amount 30.8.1.6

Merchant location ID 30.8.1.7

Merchant zip code 30.8.1.8

30.8.2 The LPT Processor shall provide daily, monthly, and annual CPN reporting to include the following summary information for all transactions completed in the reporting period:

Number of payments by type 30.8.2.1

Total payment amount by payment type 30.8.2.2

Total fees by payment type 30.8.2.3

Total payments by merchant location ID 30.8.2.4

Total payments by merchant location zip code 30.8.2.5

Total payments by merchant location county 30.8.2.6

30.8.3 The LPT Processor shall provide a monthly report with CPN system availability by location.

CPN Customer Service Requirements 30.9

30.9.1 The CPN and the LPT Processor shall clearly define and communicate to customers the appropriate point of contact for customer service related to CPN locations and transactions, in accordance with OTA-approved Policies and Procedures.

30.9.2 The LPT Processor shall train its staff to answer customer questions regarding CPN locations, procedures for using the CPN, and CPN usage and payment history.

30.9.3 The System shall flag financial transactions that occur at a CPN so that LPT Processor staff can identify them as such for research and customer service purposes.

30.9.4 The LPT Processor shall ensure each merchant location prominently displays a phone number for help with using the CPN.

Page 111: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 93 of 111

30.9.5 The LPT Processor shall provide Policies and Procedures for researching and addressing CPN customer complaints and this shall be provided to and approved by OTA prior to CPN rollout.

30.9.6 The LPT Processor shall ensure that a customer call center is available to address customer issues regarding the CPN. OTA strongly prefers the call center be available 24/7, however at a minimum, the CPN call center shall be available during the same hours that the LPT Processor call center is available.

31 Financial Responsibilities

General Financial Responsibilities Requirements 31.1

31.1.1 The LPT Processor shall establish and perform all financial functions necessary for the LPT operation, including accepting and processing payments, interfacing with banking institutions and credit/debit card and ACH processors, managing bank transactions and all reconciliations, and implementing audits and internal control procedures.

31.1.2 The LPT System shall have the ability to identify, segregate and accumulate revenue and accounts receivable between locations and cost centers as determined by OTA.

31.1.3 The LPT System shall provide an audit trail for each financial transaction.

31.1.4 The LPT Processor shall use proper cut-off procedures for daily, monthly, and year-end close.

31.1.5 The LPT Processor shall follow OTA’s daily, monthly, and year-end closing schedule and produce timely reports to allow OTA to meet its schedule.

31.1.6 The LPT System shall identify and report on transactions at various stages of their escalation process (e.g., outstanding violations and invoices).

31.1.7 The LPT System shall make a configurable bad debt calculation to each stage of the escalation process. This debt calculation shall include a configurable threshold for the amount outstanding.

31.1.8 The LPT System shall report on and track all write-offs.

Financial Reconciliation 31.2

31.2.1 The LPT Processor shall reconcile all financial activity on a daily and monthly basis.

31.2.2 The LPT Processor shall provide the results of all reconciliations including reconciliation spreadsheets and reports on resolution of variances to OTA in a timely manner.

31.2.3 The LPT Processor shall provide any documentation needed to support reconciliations upon OTA request.

Page 112: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 94 of 111

31.2.4 The LPT Processor shall resolve all variances through adjustments, reversals or research.

31.2.5 The LPT System shall allow users to record results of research, including comments and scanned documents or images, and associate the record with the variance.

31.2.6 As part of the report on resolution of variances, the LPT Processor shall provide a list of action items with a schedule for items that require extended research, system fixes, or other extended time periods for resolution.

31.2.7 The LPT System shall support the reconciliation processes. At a minimum, the LPT System shall do the following:

Exception identification 31.2.7.1

Automated reconciliation procedures 31.2.7.2

Drill down from summary level to the transaction or activity level 31.2.7.3

31.2.8 The LPT System shall provide automated reconciliations for all transactions.

31.2.9 The LPT Processor shall reconcile all payments received by the LPT System using automated system processes. These reconciliations shall include:

All reconciliations required in the payment processing section 31.2.9.1

Separate reconciliations of all types of fees, penalties and miscellaneous 31.2.9.2charges

Reconciliations by payment location, payment method, and fee types 31.2.9.3

Identification and resolution of all variances 31.2.9.4

31.2.10 The LPT Processor shall reconcile with banks and processors for cash, check, electronic funds transfers, ACH, credit/debit cards and any other form of payment regularly accepted using automated system processes. These reconciliations shall include:

Separate reconciliations for each bank account and processor 31.2.10.1

Reconciliation to LPT Processor reports 31.2.10.2

Identification and resolution of all variances 31.2.10.3

Page 113: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 95 of 111

32 Auditing

General Audit Requirements 32.1

32.1.1 The LPT Processor shall audit internal financial records and operations to ensure that it processes financial transactions accurately and in accordance with approved Policies and Procedures.

32.1.2 The LPT Processor shall hire a major independent certified public accounting firm to perform a Service Organization Control (SOC 1) Type 2 audit annually in accordance with Statement on Standards for Attestation Engagement No.16 (SSAE 16) and provide such report to OTA. This review shall include the effectiveness of operational controls related to software, procedures, data security, processing integrity, confidentiality, and privacy. The costs for such audits shall be borne by the LPT Processor.

32.1.3 The LPT Processor shall facilitate access to any material, system, or personnel that OTA or its authorized representatives require for auditing or examination of the LPT Processor’s activities. Such facilitation shall include LPT Processor staff time and effort working with OTA or its authorized representatives.

32.1.4 The LPT Processor shall develop and submit a remediation plan and remediation schedule to OTA for approval and shall implement all audit recommendations on a timely basis as approved by OTA.

Internal Controls 32.2

32.2.1 The LPT Processor shall establish and follow internal control procedures to ensure the safeguarding and proper accounting of OTA funds and related records at all times.

32.2.2 Internal controls shall be based on an industry standard such as the 2013 guidance from the Committee of Sponsoring Organizations of the Treadway Commission (COSO), “Internal Control – Integrated Framework”, or other appropriate standard.

32.2.3 The LPT Processor shall ensure that physical access to money, data, other assets, and documents is adequately safeguarded.

32.2.4 The LPT Processor shall detect and prevent revenue loss, errors, omissions, irregularities, and improper actions as well as identify revenue loss, errors, omissions, irregularities, and improper actions after they have occurred. Any occurrence shall be immediately reported to OTA.

32.2.5 The LPT Processors shall ensure that all financial activity is properly processed and accurately recorded.

32.2.6 The LPT Processor shall have controls and procedures in place to ensure that all processing is complete and accurate, including:

Page 114: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 96 of 111

Sanity checks 32.2.6.1

Acknowledgement files 32.2.6.2

Prevention of duplicate transactions 32.2.6.3

Reconciliations 32.2.6.4

Quality Assurance & Quality Control 32.2.6.5

32.2.7 The LPT Processor shall use exception reporting and sanity checks to detect and list unusual or invalid transactions, adjustments, charges and deviations from proper reconciliation with various components of the financial system.

32.2.8 The LPT Processor shall appropriately segregate duties for various transactions, including handling of cash and checks.

32.2.9 The LPT Processor shall conduct training that details the responsibilities of each employee with regard to internal controls, theft, fraud, embezzlement, fiscal misconduct, and violation of established policies.

32.2.10 The LPT Processor shall use computer system restrictions with varying levels of access control and restrictions on the type of transactions that may be performed by users.

32.2.11 The LPT Processor’s procedures shall require supporting information to verify the propriety and validity of transactions.

32.2.12 The LPT Processor shall ensure that approval authority is commensurate with the nature and significance of the transactions.

32.2.13 The LPT Processor shall remain current with and obey all federal and state applicable laws and regulations and any applicable financial or banking regulations and/or requirements.

33 Reporting

General Reporting Requirements 33.1

33.1.1 Through the LPT System, the LPT Processor shall provide all reports necessary to support the functions outlined in this document.

33.1.2 LPT System reports shall contain near real time data except as approved by OTA during system design.

33.1.3 The LPT System shall allow multiple simultaneous users to generate reports.

33.1.4 The LPT System shall provide all pre-defined reports and ad hoc report/query capabilities without interfering with the normal operations of the LPT System.

Page 115: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 97 of 111

33.1.5 The LPT System shall allow users to browse, apply selection criteria, and run reports on demand through a clearly displayed and user-friendly graphical user interface (GUI).

33.1.6 All authorized users, including OTA staff and its representatives, shall have direct access and be able to generate system reports without the need for intervention of LPT Processor staff.

33.1.7 The LPT System shall offer a robust reporting module that allows users to select date/time ranges, activity type, payment status, and other applicable selection criteria to be determined during the design phase.

33.1.8 The LPT System shall allow users to sort data in reports.

33.1.9 LPT System reports shall include sub-totals, totals and grand totals as appropriate.

33.1.10 The LPT System shall automatically generate reports at pre-determined configurable intervals or when criteria meet pre-determined configurable thresholds.

33.1.11 The LPT System shall allow authorized users to configure reports to be automatically generated on a scheduled basis for a predefined time period.

33.1.12 The LPT System shall support configurable automated distribution of reports via email.

33.1.13 The LPT System shall save all reports generated to a shared archive as configured by report or at the user’s discretion.

33.1.14 The LPT System shall allow authorized users to retrieve archived reports through the reports GUI.

33.1.15 The LPT System shall show reports on screen and allow users to print or to export a report to industry standard formats including Excel, Access, Adobe, PDF, CSV and HTML.

33.1.16 Wherever possible, exported reports shall be formatted to facilitate viewing in the destination format. For example, reports exported to Excel or CSV shall not have header/footer information repeated on multiple pages.

33.1.17 All reports shall contain a standard report header and/or footer that shall include:

ID of the user executing the report 33.1.17.1

Date/time the report was executed 33.1.17.2

Name of the report 33.1.17.3

Page number in the format “Page X of Y” 33.1.17.4

Selection criteria used to generate the report 33.1.17.5

Page 116: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 98 of 111

OTA logo or other such identifier (for formats that support this) 33.1.17.6

33.1.18 All reports shall be available to execute for standard user selectable timeframes including:

Hourly 33.1.18.1

Daily 33.1.18.2

Weekly 33.1.18.3

Monthly 33.1.18.4

Quarterly 33.1.18.5

Yearly 33.1.18.6

33.1.19 The LPT System shall allow users to perform business analysis using drill down, graphing, pivoting and cross-tabulation.

33.1.20 The LPT System reports database shall contain customer service operations data from the IVR system, website, CSR phone system, Cash Payment Network, and other tools used to provide customer service.

33.1.21 The detailed contents and layout of all system and manual reports and report selection screens shall be developed by LPT Processor and approved by OTA during the design phase.

Ad Hoc Reports 33.2

33.2.1 The LPT Processor shall allow for the generation of ad hoc reports through a user-friendly graphical interface.

33.2.2 The LPT System shall allow users to run ad hoc queries and generate reports.

33.2.3 The LPT System shall allow users to store ad hoc reports in a common directory for future access.

33.2.4 The LPT System shall allow authorized users to retrieve archived reports through the reports GUI.

33.2.5 The LPT System shall have run-time control limits to manage large queries, print jobs and downloads to prevent interference with normal operations.

33.2.6 The LPT System shall provide pop-up warnings to users when requested queries may be large and/or require time to compile.

33.2.7 The LPT System shall allow users to preview ad hoc query results and reports before downloading or printing.

Page 117: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 99 of 111

Research Screens 33.3

33.3.1 The LPT System shall provide screens that facilitate searching, filtering, and viewing data available in the LPT System reports database.

33.3.2 The LPT System may limit the number of results returned where not doing so may impact CSC operations; however, there shall be a notification to the user whenever the data returned has been limited.

33.3.3 The LPT System shall provide the ability to do research in areas including:

Transactions 33.3.3.1

Payments 33.3.3.2

Exceptions 33.3.3.3

Accounts 33.3.3.4

System alerts and system events 33.3.3.5

Data transfer logs 33.3.3.6

User tracking logs 33.3.3.7

Image Review 33.3.3.8

IVR and Call Center activity 33.3.3.9

Cash Payment Network activity 33.3.3.10

33.3.4 LPT System research screens shall allow authorized users to query the database using single or multiple parameters on any relevant field. For example, for a query of transactions, available fields might include transaction date/time, OCR confidence value, posting date, invoice date, due date, Host transaction number, license plate number, license plate jurisdiction, and transaction status.

33.3.5 The LPT System shall display a list of query results that includes high-level information relevant to that query, such as time, transaction number, and type. Details about this summary information shall be determined during the design phase.

33.3.6 The LPT System shall allow the user to select any result from the query results list and view more detailed information and/or link to another relevant screen, such as the related account screen.

Specific Report Requirements 33.4

33.4.1 At a minimum, the LPT System shall provide the reports included in this section; however, this is not all-inclusive and shall not relieve the LPT Processor from meeting

Page 118: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 100 of 111

reporting requirements specifically mentioned or implied in other parts of this Scope of Services.

33.4.2 The LPT Processor shall work with OTA to finalize reports during the design phase.

33.4.3 The LPT System shall provide performance monitoring reports as required to monitor and audit compliance with the Performance Standards detailed in Appendix F.

33.4.4 The LPT System performance monitoring reports shall cover all required Performance Standards, comparing actual performance for each standard with the standard itself.

33.4.5 The LPT System shall provide reports on customer service operations that cover all aspects of customer service on a daily basis and over selected date ranges, at both a summary and detail level.

33.4.6 At a minimum, the LPT System shall provide customer service reports on the following:

Customer contacts by contact method, by time period, by type of 33.4.6.1correspondence, and by topic (e.g., payment, dispute, PIKEPASS conversion)

Incoming mail volumes by time period and by type 33.4.6.2

33.4.7 The LPT System shall provide reports on all aspects of the IVR and call center activity to allow users to determine the effectiveness and efficiency of the IVR system and customer service representatives over the phone.

33.4.8 The LPT System shall provide IVR and call center activity reports, at both a detail and a summary level, for various periods including hourly, daily, weekly, monthly and annual.

33.4.9 The LPT System shall provide IVR and call center activity reports that allow users to analyze and compare call center data for similar periods (e.g., the most recent Monday compared to prior Monday and average Monday over the past quarter, year, etc.).

33.4.10 LPT System call center reports shall provide call center data including:

Call Origin 33.4.10.1

Call Volumes 33.4.10.2

Call Reason Codes (reason for call) 33.4.10.3

Call Wait Times 33.4.10.4

Average Talk Time 33.4.10.5

Average Wrap Time 33.4.10.6

Page 119: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 101 of 111

Total Average Talk and Wrap Time 33.4.10.7

Abandoned Calls 33.4.10.8

Abandoned Call Rate 33.4.10.9

Service Levels 33.4.10.10

Use of the IVR Menus 33.4.10.11

Transfers 33.4.10.12

33.4.11 The LPT System shall provide website reports on all aspects of website to allow users to determine the effectiveness and usability of the website.

33.4.12 The LPT System shall provide website reports, at both a detail and a summary level, on a daily basis, monthly basis, and over a user-selected date range.

33.4.13 LPT System website reports shall provide data including:

Number of website page hits 33.4.13.1

Use of the website page links 33.4.13.2

Activity conducted on the web 33.4.13.3

Length of time spent on the website 33.4.13.4

Payments 33.4.13.5

Use of links to OTA website 33.4.13.6

Use of links to CPN locator 33.4.13.7

33.4.14 The LPT System shall provide image review reports that give detail and summary information for daily, monthly, and user-specified date ranges.

33.4.15 The LPT System image review reports shall provide data including:

Number of images received from OTA for review 33.4.15.1

Disposition of all images received 33.4.15.2

Number of images reviewed 33.4.15.3

Number of readable images 33.4.15.4

Number of unreadable images by reject code 33.4.15.5

Page 120: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 102 of 111

Number of images re-reviewed 33.4.15.6

Number of images reviewed from Watch List 33.4.15.7

33.4.16 The LPT System shall provide reports on LPT accounts with detail and summary information as follows:

Account status, including past due statuses 33.4.16.1

Newly established accounts 33.4.16.2

Accounts with frequent toll activity 33.4.16.3

Payment method 33.4.16.4

Payments made 33.4.16.5

Invoice delivery method 33.4.16.6

Account balance 33.4.16.7

Invoice Escalation status including invoice aging, violations, collections 33.4.16.8and Stop Flag status (all by date)

Flag for accounts with past CPN activity 33.4.16.9

33.4.17 The LPT System shall provide reports of invoices issued by specific variables including date, amount due, violation status, payment type, zip code, and mail suppression status.

33.4.18 The LPT System shall provide reports on violations that show, at a detail and a summary level, the current status of all violations.

33.4.19 The LPT System shall provide reports on its interfaces with other systems such as the Host, banks, payment processors, CPN, DMVs and the collection agency.

33.4.20 LPT System interface reports shall provide detail and summary information by date and by interface to:

Verify the timely, complete, and accurate transmission of information 33.4.20.1

Allow reconciliation between reports on counts and amounts from the 33.4.20.2other entity on data sent versus data received

Identify any corrupt or missing information 33.4.20.3

Allow for research of variances identified 33.4.20.4

Page 121: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 103 of 111

33.4.21 The LPT System shall provide reports on LPT transaction processing and disposition that show the current status of all transactions at both a detail and a summary level, by any of the following criteria:

Transaction date 33.4.21.1

Transmission date 33.4.21.2

OCR confidence value 33.4.21.3

Posting date 33.4.21.4

Invoice date 33.4.21.5

Past due status 33.4.21.6

Violation status 33.4.21.7

33.4.22 The LPT System transaction reports shall allow examination by:

Interim statuses such as image review, ROV look up, queued for invoicing 33.4.22.1

Most recent reconciliation code returned to the Host 33.4.22.2

Stage in the invoicing process 33.4.22.3

Violation status, including registration stop flag status 33.4.22.4

Final statuses such as posted, rejected, paid, turned to collection or 33.4.22.5dismissed

33.4.23 The LPT System shall provide reports tracking all invoices, escalations and violation notices sent to customers.

33.4.24 LPT System escalation reports shall allow users to track the current status of all invoices and violation notices by transaction date (range) and date of invoice/notice issuance. At a minimum, these reports shall allow examination of:

Payment details 33.4.24.1

Adjustments 33.4.24.2

Write offs 33.4.24.3

Tolls 33.4.24.4

Fees 33.4.24.5

Vehicle registration stop flags or other escalated collection efforts 33.4.24.6

Page 122: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 104 of 111

Average payment amounts and length of time until payment 33.4.24.7

Aging reports 33.4.24.8

33.4.25 The LPT System shall provide an invoice summary report showing a current snapshot of all transactions that have been invoiced for a selectable period. This report shall be broken down by invoice escalation status at the time the report is run. The report shall include:

The number of transactions invoiced for the period 33.4.25.1

The number of transactions by escalation status 33.4.25.2

The toll and fee amounts charged by escalation status 33.4.25.3

The toll and fee amounts paid by escalation status 33.4.25.4

The toll and fee amounts dismissed/written off, by reason 33.4.25.5

The toll and fee amounts due by escalation status 33.4.25.6

33.4.26 The LPT System shall provide reports on all rejected transactions. At a minimum, these reports shall show at a detail and a summary level the reasons for rejected transactions by transaction date. The reports shall allow analysis of:

Rejects by reason 33.4.26.1

Drill downs into reject reasons 33.4.26.2

DMV lookup failures 33.4.26.3

Trends and variances 33.4.26.4

Rejects by jurisdiction 33.4.26.5

Repeated attempts at a process such as DMV lookup 33.4.26.6

Rejects by stage of transaction processing 33.4.26.7

33.4.27 The LPT System shall provide all the reports required to audit, reconcile, monitor and record the financial activity of the LPT operation.

33.4.28 The LPT System shall provide reports on all payments received.

33.4.29 At a minimum, the LPT System payment reports shall provide detail and summary information by payment date for all payments.

33.4.30 The LPT System payment reports shall allow users to examine payments by:

Page 123: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 105 of 111

Payment methods 33.4.30.1

Payment processor or bank 33.4.30.2

Payment location 33.4.30.3

CSR clerk 33.4.30.4

Successful versus failed payment attempts 33.4.30.5

Reasons for payment failures 33.4.30.6

Chargebacks 33.4.30.7

Variances between expected totals and actuals 33.4.30.8

33.4.31 The LPT System shall provide reports on transaction counts and revenue. At a minimum, these reports shall provide detail and summary information by date and by location.

33.4.32 The LPT System transaction count and revenue reports shall have month and year end roll ups. These revenue reports shall allow users to examine revenue by:

Vehicle class 33.4.32.1

Collected revenue versus accounts receivable 33.4.32.2

Adjustments 33.4.32.3

Trend and variance analysis including same month-prior year comparison 33.4.32.4

PIKEPASS V-Tolls 33.4.32.5

33.4.33 The LPT System shall provide reports on refunds that provide detail and summary information on refunds.

33.4.34 The LPT System refund reports shall allow users to examine refunds by:

Request date 33.4.34.1

Refund status 33.4.34.2

Amount 33.4.34.3

Refund reason 33.4.34.4

Refunds issued 33.4.34.5

Refunds sent to OTA for approval 33.4.34.6

Page 124: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 106 of 111

33.4.35 The LPT System shall provide reports necessary for system administration that give detail and summary information on user activity, system configurations and system issues.

33.4.36 The LPT System admin reports shall allow users to examine:

User lists 33.4.36.1

User permissions 33.4.36.2

User activity logs (identifies user, screens viewed, printouts, reports 33.4.36.3created, and date and time of use)

Automated reports, schedule, and distribution 33.4.36.4

System configuration history 33.4.36.5

Alerts or alarms 33.4.36.6

Maintenance history 33.4.36.7

33.4.37 The LPT Processor shall provide OTA with Monthly Status Reports that include the following:

Number of invoices issued by delivery method 33.4.37.1

Number of images reviewed 33.4.37.2

Number and percent of rejected images by reason 33.4.37.3

Number and percentages of invoices escalated by past due status / 33.4.37.4escalation level, including violation (1st notice and 2nd notice), registration stop flag and collections

Payments by type; Visa, MasterCard, AMEX, Discover, ACH, cash/check 33.4.37.5

Payments by source; mail, web, LPT CSR call, OTA CSR call, IVR, OTA 33.4.37.6walk-in centers, collection agency, DMV, CPN

Total number of customer calls, number of calls entered into a CSR queue, 33.4.37.7number of calls answered, and number of calls abandoned

Number of calls resolved via the IVR by reason 33.4.37.8

Average call wait time, average call talk time, average wrap time, average 33.4.37.9call handle time (talk and wrap time)

Average number of daily and monthly calls, average daily calls answered, 33.4.37.10average daily calls abandoned (provided in total and by day of the week)

Page 125: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 107 of 111

Average web access by hour and by day of the week 33.4.37.11

Disputes by source 33.4.37.12

Refunds by source 33.4.37.13

Payments by source 33.4.37.14

Progress for the prior month for all outstanding action items 33.4.37.15

All potential delays and problems in addressing outstanding issues or 33.4.37.16software updates

New action items and issues 33.4.37.17

Progress on activities requiring coordination with OTA or other external 33.4.37.18parties

Deliverables scheduled for submittal in the next reporting period 33.4.37.19

Monthly Performance Reports, including comparison to the Performance 33.4.37.20Standards

30-day look-ahead on activities to clear action items 33.4.37.21

Other items as deemed noteworthy by OTA or the LPT Processor 33.4.37.22

34 Performance Standards

To promote the consistent, timely, accurate, and reliable operation of the LPT operation, OTA has identified key requirements for which specific Performance Standards have been developed for on-going monitoring and evaluation. These Performance Standards, the adjustment threshold and the adjustment percentages or adjustment amounts (reductions for non-compliance) are listed in Appendix F. Each of the Performance Standards is associated with one or more of the price categories listed in the Pricing Matrix.

General Performance Standard Requirements 34.1

OTA will directly link the LPT Processor’s compensation with the LPT Processor’s compliance with the Performance Standards. 34.1.1 The LPT Processor shall fully meet or exceed all of the requirements detailed in this

document and the Performance Standards.

34.1.2 In accordance with the requirements of this section, the LPT Processor shall establish and implement an ongoing process to monitor, measure, calculate, and report compliance with the Performance Standards.

Page 126: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 108 of 111

34.1.3 The LPT Processor shall submit the format, content and methodology of all performance reporting to OTA for review and approval during the design phase, in accordance with the approved Project Schedule.

34.1.4 For each of the Performance Standards, the LPT Processor shall measure actual performance for each standard based on the required frequency.

34.1.5 The LPT Processor shall report compliance with each Performance Standard on a monthly basis in conjunction with submitting the invoice payment request to OTA.

34.1.6 If the LPT Processor fails to meet any of the Performance Standards, the LPT Processor shall report the deficiencies, calculate the adjustments, and reduce the LPT Processor’s related pricing categories on the following month’s invoice payment request to OTA.

34.1.7 Non-compliance with a Performance Standard and/or the assessment of related invoice adjustments shall not release the LPT Processor from its obligation to complete all required work.

34.1.8 The LPT Processor shall make available to OTA all performance related documentation and reporting, and this will be subject to audit at the discretion of OTA. Actual performance results calculated by the LPT Processor that differ from audited results may be subject to further retroactive adjustment of amounts paid or payable by OTA.

34.1.9 The LPT Processor shall perform all calculations for determining compliance or non-compliance with a Performance Standard to three decimal places.

34.1.10 The following describes the process and methodology that the LPT Processor shall use in determining compliance/non-compliance with Performance Standards, related invoice adjustments and reporting.

The determination of compliance or non-compliance with each 34.1.10.1Performance Standard and any resulting invoice adjustment shall be made individually and separately for each standard. For example, if one Performance Standard states that “Paper invoices shall be mailed within 3 calendar days of the invoice date” with an Adjustment Threshold of 98% and another Performance Standard states that “Paper invoices shall be mailed within 5 calendar days of the statement date” with an Adjustment Threshold of 100%; the LPT Processor may be non-compliant with one, both, or neither of the two standards. Therefore, depending on compliance, the LPT Processor may be assessed an invoice adjusted for one, both or neither standard.

The determination of compliance or non-compliance shall be based on the 34.1.10.2items processed during the specified period (calendar month, day, etc.). For example, if during the month of June, 1,000 images are processed by

Page 127: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 109 of 111

the LPT Processor; compliance shall be determined based on those specific 1,000 images.

Appendix F lists an adjustment threshold for each Performance Standard. 34.1.10.3If the measured performance of each item meets or exceeds the thresholds, then no adjustment to the invoice for that period is made. However, if the actual performance does not at least meet the threshold on any item, an automatic price adjustment will be triggered and OTA will reduce the invoice amount for the related pricing categories accordingly.

Appendix F specifies two methods for calculating the price adjustment 34.1.10.4depending on the specific Performance Standard. Under one method, the LPT Processor shall adjust the invoice by a specific dollar amount for each instance of non-compliance with the Performance Standard. The other method, as described below, requires the LPT Processor to adjust the invoice based on a percentage of the defined pricing categories for the month.

The percentage method employs tiered adjustment percentages. Invoice 34.1.10.5payment deductions shall escalate as actual performance results fall further below the required standard. The adjustment percentage shall determine the amount of payment reduction and shall depend on how far the actual performance falls below the adjustment threshold. If the actual performance is below the adjustment threshold by 5% (absolute) or less, the first adjustment percentage shall be used. If the actual performance is more than 5% but less than 15% below the threshold, a higher percentage is used. Finally, if the performance falls to more than 15% below the threshold, an even higher adjustment percentage is used.

Each Performance Standard is associated with one or more of the Pricing 34.1.10.6Categories and is subject to adjustment for non-compliance with Performance Standards.

More than one pricing category may be related to a Performance Standard. 34.1.10.7If more than one pricing category is listed for a specific Performance Standard, activity for all the categories shall be combined to calculate compliance with the Performance Standard, with any adjustments for non-compliance then being applied to each of the specified pricing categories.

The calculated invoice reduction amount for standards that are non-34.1.10.8compliant shall be increased by 50% if the same standard was found to be non-compliant in any of the 3 months immediately prior to the month for which the adjustment is being made. The 50% increase in the invoice reduction shall only be applied to the month being invoiced and not to prior months’ invoices.

Waiver of the calculated invoice adjustments described above will be at the discretion of OTA.

Page 128: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 110 of 111

Example Performance Standard Adjustment (Percentage Method) 34.2

Following is an example calculation of an invoice adjustment for non-compliance with a specific Performance Standard that shall be followed by the LPT Processor. The example is based on hypothetical values.

Performance Standard

Price Category: Invoices Mailed (paper) Performance Standard: “All paper invoices shall be mailed with 4 business days of the end

of the invoice cycle.”

Adjustment Threshold: 100% Adjustment Percentage (0-5%): 2% Adjustment Percentage (> 5% but < 15%): 4% Adjustment Percentage (>15%): 6%

Actual Performance

# of invoices mailed during the month: 10,000 # of invoices mailed within standard: 9,600 Actual Performance (in compliance with standard): 96%

Determination of Compliance & Adjustment Percentage

Since the actual performance for the month (96%) was below the adjustment threshold (100%), the LPT Processor is non-compliant with the Performance Standard for the month. As a result, an invoice price adjustment shall be made to the appropriate price category for the specific standard. Adjustment threshold: 100% Actual performance: 96% Deviation from threshold: 4% Since the deviation from the threshold of 4% falls into the range of 0% to 5%, the Adjustment Percentage of 2% is used to calculate the invoice adjustment.

Calculation of Price Adjustment

Invoice amount for pricing category related to this Standard (prior to adjustment): Pricing Category: Invoices Mailed Pricing Units: # of Invoices Mailed # of Invoices Mailed (for example): 10,000

Page 129: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Page 111 of 111

Unit Price (for example purposes): $0.25 per Invoice Mailed Invoice Amount for Price Category (prior to adjustment): $2,500 for month Invoice Adjustment for Non-Compliance with Performance Standard: Invoice Amount for Price Category (prior to adjustment): $2,500 for month Adjustment Percentage (0-5%): 2% Invoice Adjustment: $50 ($2,500 x 2%)

Amount payable for this pricing category for the month

$2,500 less $50 = $2,450 (assuming all other Performance Standards related to this pricing category were found to be in compliance with the Performance Standards). The LPT Processor shall perform the above calculation, with appropriate adjustments, for each of the Performance Standards that did not meet the adjustment threshold.

Page 130: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  1  of  87

Yes No Yes No Yes No1 I. General  Requirements2 1 Project  Overview3 1.1 Summary  of  Scope4 1.1.1 The  LPT  Processor  shall  provide  a  comprehensive,  fully  tested  and  

integrated,  “turn-­‐key”  solution  that  shall  meet  or  exceed  all  requirements  herein  and  shall  be  responsible  for  all  activities  related  to  establishment,  implementation  and  on-­‐going  operation  of  the  OTA  LPT  operation  as  described  in  this  document.  

5 1.1.2 The  LPT  Processor  shall  work  cooperatively  with  OTA  for  such  things  as  PIKEPASS  integration  testing  and  ongoing  operations.  

6 1.2 Quality  Assurance  &  Quality  Control7 1.2.1 The  LPT  Processor  shall  establish,  implement  and  maintain  a  Quality  

Assurance  (QA)  and  Quality  Control  (QC)  program  throughout  all  phases  of  the  Contract.  

8 1.2.2 The  LPT  Processor  shall  establish  and  implement  procedures  to  identify,  define,  track  and  report  to  OTA  all  items  that  could  adversely  impact  the  success  of  the  Project  and/or  any  areas  that  may  impact  customers  or  their  perception  of  the  Project  and/or  OTA.    These  items  include,  without  limitation,  call  center  performance,  timely  and  accurate  issuance  of  statements  and  invoices,  transaction  processing,  image  review,  all  aspects  of  customer  service  (including  call  quality  and  customer  satisfaction),  meeting  milestone  dates,  reliability  and  accuracy  of  data,  and  the  integrity  of  reports  and  financial  Transactions.    

9 1.2.3 The  LPT  Processor  shall  ensure  that  all  QA/QC  requirements  are  met  by  all  of  its  Subcontractors  and  vendors.    

10 1.2.4 The  LPT  Processor  shall  prevent,  detect,  and  correct  deviations  from  any  requirement,  including  by  Subcontractors,  and  report  such  items  to  OTA.    

11 1.2.5 The  LPT  Processor’s  QA/QC  program  shall  address  all  staffing,  equipment,  methods,  procedures,  activities,  and  schedule  requirements  relating  to  QA/QC  activities.

12 1.2.6 The  LPT  Processor’s  QA/QC  program  shall  ensure  the  accuracy  and  timeliness  of  the  issuance  of  statements,  invoices  and  general  correspondence.  

13 1.2.7 The  LPT  Processor’s  QA/QC  program  shall  continually  evaluate  LPT  operations  for  accuracy,  completeness,  and  efficiency.

14 1.2.8 The  LPT  Processor  shall  establish  procedures  to  ensure  that  all  requirements  of  the  Contract  are  performed  completely,  accurately  and  in  a  timely  manner  and  correct  any  area  of  performance  that  is  below  standard.

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

Page 131: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  2  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

15 1.2.9 The  LPT  Processor’s  QA/QC  program  shall  include  reasonableness  checks  that  evaluate  accuracy  and  efficiency  such  as  analyses  of  abnormal  deviations  in  quantity,  volume,  dollar  amounts,  elapsed  time,  and  staff  hours.  

16 1.2.10 The  LPT  Processor  shall  implement  changes  and/or  corrective  action  upon  error  identification  during  the  QA/QC  processes.      

17 1.2.11 1.2.11  The  LPT  Processor  shall  review  a  random  sample  of  invoices  from  every  batch,  automatically  generated  by  the  system,  for  accuracy  and  quality.  The  following  are  checked:    -­‐  Issued  date;-­‐  Due  date;-­‐  Customer  address;-­‐  License  plate  number;  and-­‐  Toll  amounts.

18 1.3 Customer  Satisfaction  Surveys19 1.3.1 The  LPT  Processor  shall  establish  a  process  to  perform  customer  

satisfaction  surveys  via  the  IVR  and  mail.    20 1.3.2 1.3.2  The  LPT  Processor  shall  work  with  OTA  to  finalize  the  content  and  

questions  included  in  the  customer  satisfaction  surveys.21 1.3.3 1.3.3  The  LPT  Processor  shall  implement  the  customer  satisfaction  

surveys  as  directed  by  OTA,  as  frequently  as  annually.22 1.3.4 1.3.4  The  LPT  Processor  shall  report  the  results  of  customer  satisfaction  

surveys  to  OTA  within  one  week  of  the  conclusion  of  a  survey  period.23 1.3.5 1.3.5  The  LPT  Processor  shall  not  include  the  time  customers  spend  

interacting  with  the  customer  satisfaction  survey  in  its  call  time  statistics.  

24 1.4 Existing  OTA  Contracts25 1.4.1 The  LPT  Processor  shall  coordinate  its  Work  with  the  services  provided  by  

OTA’s  other  contractors.      The  pre-­‐existing  contracts  are  as  follows:  26 1.4.1.1 Credit  Card  Processor  –  currently  TransFund27 1.4.1.2 Banking  Services  –  currently  Bank  of  Oklahoma28 1.4.1.3 Collections  Services  –  currently  Kansas  Counselors,  Inc.29 1.4.1.4 DMV  ROV  Look-­‐up  –  currently  American  Traffic  Solutions  (optional)30 2 Project  Management31 2.1 General  Project  Management  Requirements32 2.1.1 The  LPT  Processor  shall  manage  the  planning  and  execution  of  all  aspects  

of  the  requirements  in  this  document.  33 2.1.2 The  LPT  Processor  shall  provide  project  management  throughout  the  

term  of  the  contract.

Page 132: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  3  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

34 2.1.3 The  LPT  Processor  shall  coordinate  its  activities  with  OTA  and  other  agencies,  as  required.

35 2.1.4 The  LPT  Processor  shall  execute  the  Project  in  accordance  with  all  required  Plans.

36 2.1.5 The  LPT  Processor  shall  deliver  monthly  and  quarterly  status  reports  providing  review  and  analysis  of  the  LPT  operation.  

37 2.1.6 The  LPT  Processor  shall  schedule  and  meet  with  OTA  Management  on  a  monthly  basis  to  present  and  discuss  monthly  and  quarterly  status  reports.

38 2.1.7 The  LPT  Processor  shall  provide  a  schedule  of  services  to  OTA,  as  needed,  for  deployment  of  new  Software,  LPT  System  enhancements,  bug  fixes,  hardware  upgrades,  and  any  functionality  required  for  security  and  LPT  System  vulnerability  mitigation.

39 3 Staffing40 3.1 Staffing  Plans  -­‐  Team  Organization41 3.1.1 The  LPT  Processor  shall  develop  a  detailed  Staffing  Plan  for  OTA  review  

and  approval  in  accordance  with  the  Project  Schedule.    42 3.1.2 The  Staffing  Plan  shall  address  staffing  during  the  Design  and  

Development  Phase  and  during  the  LPT  Operations  Phase.    43 3.1.3 The  Staffing  Plan  shall  include,  but  not  be  limited  to,  the  following:  44 3.1.3.1 A  description  of  the  LPT  Processor’s  Project  team  organization,  

reporting  relationships,  key  project  personnel  and  team  member  contact  information.  

45 3.1.3.2 The  physical  location  of  all  staff.  46 3.1.3.3 A  detailed  Project  organization  chart  that  is  a  graphical  representation  

of  the  LPT  Processor’s  staff  hierarchy,  including  any  Subcontractors,  and  indicates  functional  areas  of  responsibility  as  well  as  the  number  of  staff  by  position.    

47 3.1.3.4 Performance  objectives  for  each  work  position  and  how  the  LPT  Processor  shall  continuously  monitor  personnel  performance  against  these  objectives.  

48 3.1.3.5 Corrective  actions  for  dealing  with  any  unsatisfactory  performance.  49 3.1.3.6 A  description  of  the  LPT  Processor’s  Policies  and  Procedures  regarding  

the  selection  of  qualified  staff,  the  performance  of  background  checks,  the  assignment  of  staff  to  handle  sensitive  information  and  compliance  with  applicable  employment  regulations.

50 3.1.3.7 A  description  of  all  Subcontractor  relationships  and  responsibilities.      51 4 Documentation  Requirements52 4.1 General  Documentation  Requirements

Page 133: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  4  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

53 4.1.1 The  LPT  Processor  shall  maintain  all  documentation  related  to  the  LPT  design,  development  and  operation  as  defined  in  this  scope  of  work.    

54 4.1.2 The  LPT  Processor  shall  maintain  a  soft  copy  library  of  current  versions  of  all  Project  documents  in  a  secure  location  with  web  access  for  all  approved  members  of  the  OTA  Project  team.

55 4.1.3 If  changes  occur  in  any  aspect  of  the  Project  that  alters  operations,  the  LPT  Processor  shall  update  relevant  documentation  within  one  month  of  that  change,  unless  a  specific  alternative  update  schedule  is  approved  by  OTA.

56 4.1.4 The  LPT  Processor  shall  back  up  all  soft  copy  library  files  at  least  daily.57 4.1.5 The  LPT  Processor  shall  maintain  all  documentation  in  formats  found  in  

the  Microsoft  Office  suite  unless  otherwise  specified  by  OTA.58 4.1.6 The  LPT  Processor  shall  make  all  documentation  available  to  OTA  in  

electronic  copy  format.    Electronic  versions  shall  be  in  the  original  format  in  which  the  document  was  created  (e.g.,  Microsoft  Word/Excel).    

59 4.1.7 The  LPT  Processor  shall  ensure  each  document  produced  contains  a  title  sheet,  table  of  contents,  list  of  illustrations  (if  applicable),  revision  log,  and  list  of  reference  drawings  (if  applicable).  

60 4.1.8 With  the  exception  of  the  original  equipment  manufacturer  standard  documentation  (e.g.,  manuals,  catalogs),  the  LPT  Processor  shall  ensure  all  documents  are  formatted  to  be  printed  double-­‐sided  on  8.5"  by  11"  sheets  and  may  include  11"  by  17"  “engineering  fold”  inserts.  

61 4.1.9 The  LPT  Processor  shall  ensure  the  left-­‐hand  margin  of  the  sheets  in  documents  is  adequate  to  ensure  binding  without  encumbering  the  reading  of  the  material.  

62 4.1.10 The  LPT  Processor  shall  ensure  all  drawings,  graphs,  plans,  charts,  and  illustrations  are  produced  with  computer  aided  drafting  software  or  other  software  approved  by  OTA.

63 4.2 Deliverable  Management  64 4.2.1 The  LPT  Processor  shall  submit  all  deliverables  and  work  products  to  OTA  

for  review,  comment  and  approval.  OTA  reserves  the  right  to  reject  documents  prior  to  detailed  review  due  to  the  document’s  failure  to  meet  the  purpose  and  intent  of  the  deliverable.    In  the  event  a  deliverable  is  rejected,  OTA  will  notify  the  LPT  Processor  of  the  basis  for  rejection  in  writing.    Rejection  of  a  deliverable  shall  constitute  a  delay  caused  by  the  LPT  Processor  if  a  completed  version  of  the  document  is  not  approved  by  the  document  final  version  approval  date  in  the  approved  Project  Schedule.

65 4.3 Document  Reviews

Page 134: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  5  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

66 4.3.1 The  LPT  Processor  shall  submit  documents  for  OTA’s  review,  comment,  and  approval  in  accordance  with  the  approved  Project  Schedule.    The  schedule  shall  allow  for  a  minimum  of  two  review/revision  cycle  iterations,  with  a  10-­‐Business  Day  OTA  review  period  for  each  cycle.

67 4.3.2 OTA  may  require  additional  review  time  if  the  LPT  Processor  submits  multiple,  simultaneous  or  overlapping  submittals  or  deliverables  in  excess  of  100  pages.        

68 4.3.3 The  LPT  Processor  shall  submit  an  empty,  multi-­‐column  comments  matrix  with  each  document.    OTA  will  enter  its  comments  into  the  matrix  and  the  LPT  Processor  shall  track  the  status  of  all  comments  as  well  as  comment  responses  and  resolution  for  every  comment  in  the  matrix.      

69 4.3.4 The  LPT  Processor  shall  update  the  relevant  documents  to  address  comments  submitted  by  OTA  in  sufficient  time  to  maintain  the  approved  Project  Schedule.  

70 4.4 Submittal  Approval71 4.4.1 OTA’s  approval  of  documents  shall  not  relieve  or  limit  the  LPT  Processor’s  

responsibility  to  provide  systems  and  services  in  full  compliance  with  the  Contract.  

72 4.4.2 If  and  when  OTA  submits  comments,  the  LPT  Processor  shall  resubmit  the  documentation  and  deliverables  until  such  time  as  OTA  accepts  the  document.    Any  time  required  for  re-­‐submittal  or  review  of  re-­‐submittals  shall  not  be  an  OTA-­‐Caused  Delay.

73 4.4.3 Deviations  from  the  requirements  set  forth  in  this  Scope  of  Services  that  may  be  contained  within  LPT  Processor  submitted  documents,  even  though  the  document  may  be  approved  by  OTA,  shall  not  have  the  effect  of  modifying  any  requirement  set  forth  in  the  Contract  unless  such  deviations  are  explicitly  disclosed  as  deviations  and  OTA  expressly  acknowledges  and  approves  the  deviations.  Only  formal  requests  to  OTA,  from  the  LPT  Processor,  for  waivers  or  specification  changes  that  are  formally  approved  by  OTA  shall  modify  the  requirements  set  forth  in  the  Contract.

74 5 Project  Communications    75 5.1 Project  Scope76 5.1.1 All  decisions  or  directives  relating  to  Project  scope,  schedule,  design,  

procedures,  Business  Rules,  or  policy  must  be  in  writing  and  approved  by  OTA,  in  order  to  be  incorporated  into  the  official  Contract  Documents.

77 5.2 Meetings

Page 135: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  6  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

78 5.2.1 The  LPT  Processor  shall  develop  meeting  agendas  for  all  meetings  called  by  the  LPT  Processor  or  requested  by  OTA.  

79 5.2.2 The  LPT  Processor  shall  distribute  meeting  agendas  at  least  24  hours  in  advance  of  all  meetings  for  OTA  approval.  

80 5.2.3 The  LPT  Processor  shall  record  notes  of  all  meetings  and  distribute  copies  of  the  draft  notes  to  attendees  within  3  Business  Days  of  the  meeting  for  review  and  comment.    At  a  minimum,  the  LPT  Processor  shall  include  the  following  in  all  meeting  notes:

81 5.2.3.1 A  complete  list  of  attendees,  whether  present  or  on  website/phone82 5.2.3.2 Descriptions  of  issues  discussed83 5.2.3.3 Decision  items,  if  any,  shall  be  summarized  at  the  beginning  of  all  

meeting  note  documents84 5.2.3.4 Direction  given85 5.2.3.5 Open  issues86 5.2.3.6 Specific  action  items,  including  the  responsible  individual  and  

estimated  completion  dates  87 5.3 Status  Meetings  –  Design  and  Development  88 5.3.1 The  LPT  Processor  shall  schedule  status  meetings,  at  least  monthly,  with  

designated  OTA  staff  throughout  the  Design  and  Development  phase.  Commencing  within  the  first  30  days  after  Notice  To  Proceed  (NTP)  and  continuing  until  Go-­‐Live  the  LPT  Processor  shall  schedule  and  conduct  monthly  status  meetings  with  OTA  to  review  the  status  of  the  Design  and  Development  effort.  

89 5.3.2 Commencing  within  the  first  30  days  after  issuance  of  NTP  and  continuing  to  System  Acceptance,  the  LPT  Processor  shall  submit  a  Monthly  Progress  Report.  

90 5.3.3 The  LPT  Processor  shall  submit  Design  &  Development  -­‐  Monthly  Progress  Reports  by  the  7th  Business  Day  of  each  month  for  the  preceding  month.  

91 5.3.4 The  LPT  Processor  shall  include  the  following  in  all  Monthly  Progress  Reports:  

92 5.3.4.1 Progress  for  the  prior  month  for  all  Project  activities.93 5.3.4.2 Actual  start  and  actual  finish  dates  of  work,  percentage  complete,  and  

days  remaining  for  work-­‐in-­‐progress.94 5.3.4.3 All  potential  delays  and  problems,  if  any;  actions  the  LPT  Processor  is  

taking  to  address  the  delays  or  problems,  and  their  estimated  effect  on  the  Project  Schedule  and  overall  Project  completion.

95 5.3.4.4 Electronic  copies  of  the  updated  Project  Schedule.  If  there  are  any  changes  to  the  schedule  from  the  previous  Monthly  Progress  Report  the  changes  shall  be  highlighted.

Page 136: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  7  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

96 5.3.4.5 Progress  on  activities  requiring  coordination  with  third  parties.97 5.3.4.6 Deliverables  scheduled  for  submittal  in  the  next  reporting  period.98 5.3.4.7 30-­‐day  look-­‐ahead  report  on  all  activities  scheduled.99 5.4 Status  Meetings  –  Operations100 5.4.1 Commencing  within  the  first  30  days  after  Go-­‐Live  and  continuing  

through  the  end  of  the  Contract,  the  LPT  Processor  shall  schedule  and  conduct  monthly  status  meetings  with  OTA  to  inform  OTA  of  the  performance  of  the  system  and  operations,  any  problems  noted  and  solutions.    

101 5.4.2 Monthly  status  meetings  shall  include  discussion  about  customer  service  call  quality,  customer  satisfaction,  performance  standards  and  any  related  issues.  

102 5.4.3 The  LPT  Processor  shall  submit  Operations  -­‐  Monthly  Status  Report  (see  Requirement  33.4.37)  by  the  7th  Business  Day  of  each  month  for  the  preceding  month.  

103 6 Project  Schedule104 6.1 General  Project  Schedule  Requirements105 6.1.1 Within  15  business  days  after  NTP,  the  LPT  Processor  shall  submit  a  

detailed  critical  path  Project  Schedule  that  supports  a  Go-­‐Live  date,  currently  set  for  January  4,  2017.    This  date  is  dependent  on  the  completion  of  construction  of  the  ramps  at  Elm/Peoria.    Construction  is  tentatively  schedule  to  be  completed  for  the  first  ramp  at  the  end  of  June  2016  and  in  mid-­‐October  2016  for  the  second  ramp.  

106 6.1.2 The  Project  Schedule  shall  identify  all  tasks  to  be  accomplished  and  related  dates  from  System  Design  to  System  &  Operational  Acceptance.  

107 6.1.3 The  Project  Schedule  shall  include  deliverable  and  approval  dates  for  all  documents  that  will  be  submitted  for  OTA  review  and  approval.

108 6.1.4 Once  the  Project  Schedule  is  approved  by  OTA,  the  approved  version  shall  be  considered  the  Baseline  Schedule  and  shall  not  change  without  explicit  written  consent  from  OTA.    

109 6.1.5 The  Project  Schedule  shall  be  updated  as  needed  to  reflect  the  current  state  of  the  schedule,  in  addition  to  showing  the  Baseline  Schedule  dates  for  all  tasks.

110 6.1.6 The  Project  Schedule  shall  include  all  detailed  steps  that  are  required  to  accomplish  scheduled  Go-­‐Live,  including  Design,  Development  and  Testing,  with  related  dates.

111 6.1.7 The  LPT  Processor  shall  create  a  Project  Schedule  that  provides  a  fully  functional  LPT  operation  meeting  all  requirements  in  this  Scope  of  Services  by  the  Go-­‐Live  date.    

Page 137: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  8  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

112 6.1.8 Go-­‐Live  shall  be  achieved  when  all  of  the  following  have  been  completed:

113 6.1.8.1 OTA  receipt  and  approval  of  the  all  pre  Go-­‐Live  test  reports.114 6.1.8.2 OTA  receipt  and  approval  of  confirmation  that  the  LPT  System  and  

software  escrow  deposit  contains  the  current  version  of  all  software  and  materials.

115 6.1.8.3 OTA  receipt  and  approval  of  all  Project  deliverables.116 6.1.8.4 Successful  Go-­‐Live  in  accordance  with  the  OTA  approved  Go-­‐Live  plan.

117 6.1.9 The  LPT  Processor  shall  include  time  for  submittal,  review  and  approval  of  all  Project  deliverables  in  the  Project  Schedule.  

118 6.1.10 Throughout  the  Term,  the  LPT  Processor  shall  monitor,  and  update  the  Project  Schedule  whenever  changes  to  the  LPT  System  or  operations  of  a  material  nature  occur,  or  as  directed  by  OTA.

119 6.1.11 The  LPT  Processor  shall  submit  the  Project  Schedule  in  Microsoft  Project  and  Adobe  PDF  formats.  

120 6.2 Schedule  Delays121 6.2.1 The  LPT  Processor  shall  identify  and  promptly  report  to  OTA  all  Project  

Schedule  and  progress  delays  during  the  execution  of  the  Project.      122 6.2.2 In  the  event  of  any  Project  Schedule  delay,  the  LPT  Processor  shall  take  

appropriate  action  to  develop  a  recovery  schedule.  123 6.2.3 The  LPT  Processor  shall  submit  a  recovery  schedule  immediately  

following  the  identification  of  a  Project  Schedule  delay.  124 6.2.4 Recovery  schedules  shall  not  release  the  LPT  Processor  from  liability  for  a  

delayed  schedule.    125 6.3 Schedule  Revisions126 6.3.1 The  LPT  Processor  shall  submit  proposed  changes  to  the  Project  Schedule  

along  with  the  reason  for  the  proposed  changes  for  OTA  approval  as  it  becomes  necessary  to  modify  the  Project  Schedule.

127 6.3.2 Until  OTA  approves  in  writing  any  schedule  revision,  all  Project  Schedule  submittals  shall  be  tracked  against  the  previously  approved  Baseline  Schedule.  

128 6.3.3 Approved  schedule  changes  shall  not  release  the  LPT  Processor  from  the  original  requirements  and  Contract  Deadlines  unless  explicitly  agreed  to  in  writing  by  OTA.

129 6.3.4 The  LPT  Processor  shall  create  a  revised  schedule,  based  on  approval  of  a  proposed  schedule  change,  and  it  shall  be  used  as  the  basis  for  the  subsequent  monthly  Project  Schedule  updates  and  reports.  

130 7 Data  Retention  and  Destruction131 7.1 General  Data  Retention  and  Destruction  Requirements

Page 138: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  9  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

132 7.1.1 The  LPT  Operator  shall  be  responsible  for  the  retention,  archiving  and  destruction  of  data  related  to  the  LPT  program.  

133 7.1.2 The  LPT  Operator  shall  not  destroy  any  data  or  records  without  specific  approval  of  OTA,  except  as  necessary  in  maintaining  compliance  with  PCI  standards.

134 7.1.3 All  archival  parameters  shall  be  configurable  for  each  type  of  data.135 7.2 Specific  Data  Retention  and  Destruction  Requirements136 7.2.1 All  account  specific  data  and  records  related  to  open  accounts  and/or  

accounts  with  unpaid  amounts  shall  be  available  to  authorized  users  via  the  LPT  System  for  at  least  3  years  and  shall  be  archived  and  retrievable  throughout  the  term  of  the  Contract,  including  any  extensions.    

137 7.2.2 All  account  specific  data  and  records  not  covered  in  Requirement  7.2.1  shall  be  available  to  authorized  users  via  the  LPT  System  for  2  years,  archived  and  retrievable  for  an  additional  3  years,  and  then  destroyed.  

138 7.2.3 All  non-­‐account  specific  System  data  and  records  shall  be  maintained  in  the  LPT  System  for  2  years,  archived  and  retrievable  for  an  additional  3  years,  and  then  destroyed.

139 7.2.4 All  non-­‐account  specific  hard  copy  documents  shall  be  maintained  at  the  LPT  processing  location  for  2  years,  archived  and  retrievable  for  an  additional  3  years,  and  then  destroyed.

140 7.2.5 Hard  copies  of  all  scanned  documents  shall  be  retained  for  3  months  after  being  scanned,  and  then  destroyed.  

141 7.2.6 The  LPT  Processor  shall  perform  all  data  and  document  destruction  within  3  months  after  the  required  retention  timeframe  is  reached.  

142 7.2.7 The  LPT  System  shall  be  capable  of  restoring  archived  data  on  a  temporary  basis  for  research  and  query  purposes.

143 8 Succession    144 8.1 Succession  Plan145 8.1.1 Within  365  days  of  NTP,  the  LPT  Processor  shall  prepare  and  submit  a  

Succession  Plan  for  OTA  review  and  approval.  146 8.1.2 The  Succession  Plan  shall  detail  a  method  for  the  orderly  transfer  of  LPT  

operations  including  knowledge,  data,  manuals,  documents,  assets,  call  routing,  licensing  and  business  relationships  from  the  LPT  Processor  to  the  successor  service  provider  (“Successor”)  or  OTA,  should  the  Contract  terminate  for  any  reason.    

147 8.1.3 The  Succession  Plan,  when  implemented,  shall  ensure  no  interruption  of  LPT  operations.  

148 8.1.4 At  the  specific  written  direction  of  OTA,  the  LPT  Processor  shall  implement,  perform  and  carry  out  all  activities  as  described  in  the  OTA  approved  Succession  Plan.  

Page 139: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  10  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

149 8.1.5 The  Succession  Plan  shall  include  an  overview  and  sequential  steps  detailing  the  transfer  of  each  LPT  operational  area  to  the  Successor  or  OTA.    

150 8.1.6 The  Succession  Plan  shall  include,  at  a  minimum,  sections  covering  operational  shut  downs  and  the  transfer  and/or  replacement  of:  

151 8.1.6.1 Physical  assets,  including  a  current  list  of  assets  and  their  owners152 8.1.6.2 Staffing  and  organization,  including  training  153 8.1.6.3 Product  usage  and  Software  licenses,  including  a  current  list  of  licenses  

(name,  purpose,  identifier,  contact  information,  license  details)  

154 8.1.6.4 Leasing  agreements,  including  a  current  list  of  leases  (name,  purpose,  terms,  dates,  contact  information)

155 8.1.6.5 Service  contracts,  including  a  current  list  of  contracts  (name,  purpose,  terms,  dates,  contact  information)

156 8.1.6.6 Customer  information  (for  example,  current  and  historical  data  records,  Transaction  processing  histories,  images,  scanned  and  hard  copy  documents,  open  call  center  cases,  applications,  forms,  correspondence)

157 8.1.6.7 Customer  notification  outreach158 8.1.6.8 Call  routing159 8.1.6.9 Financial  ledgers  and  other  financial  information160 8.1.6.10 LPT  System  configuration  histories161 8.1.6.11 Archived  data162 8.1.6.12 Correspondence  templates  (editable  electronic  and  printed  copies)163 8.1.6.13 Invoice/violation  notice  templates  (editable  electronic  and  printed  

copies)164 8.1.6.14 Current  Policies  and  Procedures  documentation  165 8.1.6.15 Other  information  or  knowledge  necessary  for  succession  or  as  

otherwise  reasonably  requested  by  OTA166 8.1.7 The  LPT  Processor  shall  update  the  approved  Succession  Plan  to  account  

for  any  subsequent  changes  in  policy  or  operations  within  30  days  of  the  change.    The  updated  Succession  Plan  shall  be  submitted  to  OTA  for  review  and  approval.

167 8.2 Succession  Procedures168 8.2.1 In  the  event  that  Notice  of  Succession  is  given  to  the  LPT  Processor  by  

OTA,  the  LPT  Processor  shall  designate  a  succession  manager  to  be  a  single  point  of  contact  for  all  succession-­‐related  issues.    The  succession  manager  shall  convene  regular  meetings  with  relevant  staff  and  with  OTA  or  its  designated  representatives,  at  which  succession-­‐related  issues  can  be  tracked,  discussed,  and  resolved.

Page 140: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  11  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

169 8.2.2 Upon  Notice  of  Succession,  the  LPT  Processor  shall  immediately  coordinate  formal  reviews  of  all  succession  activities  as  detailed  in  the  Succession  Plan.  

170 8.2.3 Upon  Notice  of  Succession,  the  LPT  Processor  shall  develop,  submit  to  OTA  for  review,  finalize,  and  subsequently  adhere  to  a  succession  transition  schedule  that  accommodates  the  needs  of  the  Successor  and/or  OTA,  relative  to  smoothly  transitioning  to  a  new  LPT  Processor  and/or  OTA.    

171 8.2.4 Upon  Notice  of  Succession,  the  LPT  Processor  shall  provide  staff  time  to  work  with  OTA  and/or  the  Successor  to  establish  database  extract  procedures  acceptable  to  the  OTA  and/or  the  Successor,  for  the  purpose  of  migrating  the  LPT  System  data.

172 8.2.5 Upon  Notice  of  Succession,  the  LPT  Processor  shall  provide  staff  time  to  work  with  OTA  and/or  the  Successor  to  establish  mapping  conventions  acceptable  to  the  OTA  and/or  the  Successor,  for  the  purpose  of  migrating  data  to  the  new  LPT  Processor.

173 8.2.6 In  the  event  of  a  succession,  the  LPT  Processor  shall  make  its  existing  management  staff  available  for  in-­‐person  interviews  with  OTA  and/or  the  Successor  staff.    

174 8.2.7 The  LPT  Processor  shall  provide  in-­‐person  training  of  Successor  and/or  OTA  staff  with  experienced  LPT  Processor  staff  on  an  “as  needed”  basis  upon  request  of  OTA  for  a  period  from  Notice  of  Succession  until  the  end  of  the  Term.

175 8.2.8 In  the  event  of  a  succession,  the  LPT  Processor  shall  ensure  the  accustomed  quantity  and  quality  of  staff,  supervisors  and  management  are  maintained  throughout  the  entire  period  during  which  LPT  operations  is  being  transitioned  to  the  Successor  or  OTA.

176 II. Design,  Development  and  Testing  177 9 System  Development  178 9.1 System  Design  and  Development  Plan  (SDDP)179 9.1.1 The  LPT  Processor  shall  provide  for  OTA’s  review  and  approval  a  SDDP  

that  defines  the  LPT  Processor’s  approach  to  design  and  development  of  the  LPT  System.  

180 9.1.2 The  SDDP  shall  include  specific  details  of  system  development,  including  definition,  design,  programming,  submittal  and  acceptance  of  software  design  deliverables,  documentation,  and  software  quality  assurance.  

181 9.1.3 The  SDDP  shall  include  the  software  life-­‐cycle  methodology  that  will  be  utilized  as  well  as  the  technical  approach,  problem  reporting  and  tracking  process,  software  configuration  and  change  management,  and  regression  testing  and  revision  control.  

Page 141: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  12  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

182 9.1.4 The  SDDP  shall  include  plans  for  design,  development,  testing  and  implementation  of  interfaces  between  the  LPT  System  and  external  entities,  as  described  in  Appendix  E.

183 9.1.5 The  SDDP  shall  be  used  for  future  LPT  System  modification  beyond  minor  bug  fixes.    At  a  minimum,  for  post-­‐acceptance  changes,  the  process  shall  include  a  business  case  and  written  acceptance  of  this  document  by  OTA.

184 9.1.6 The  SDDP  shall  provide  a  description  of  the  structure  of  the  software  development  team  that  will  be  assigned  to  the  Project  and  how  personnel  will  be  assigned  to  the  various  system  development  disciplines,  including  software  development,  system  engineers,  test  engineers,  software  test  personnel,  configuration  management  staff,  documentation  specialists,  project  management  staff  and  software  maintenance  personnel.    

185 9.2 Requirements  Review  Workshops186 9.2.1 The  LPT  Processor  shall  facilitate  workshops  with  OTA  and  other  parties  

designated  by  OTA  to  refine  the  requirements,  covering  at  least  customer  communications,  finance,  accounting,  reporting,  website,  and  operations.  

187 9.2.2 During  these  workshops,  the  LPT  Processor  shall  clarify  system  requirements  and  Business  Rules  to  ensure  a  full  understanding  of  the  intent  of  the  system  functions  and  Business  Rules.    The  LPT  Processor  shall  discuss  how  it  shall  meet  requirements  through  operational  procedures,  the  LPT  Processor’s  existing  system  functionality,  system  configuration  or  enhancements  to  its  LPT  System.    

188 9.2.3 The  LPT  Processor  shall  participate  in  all  meetings  with  OTA  and  other  parties  designated  by  OTA  to  determine  the  requirements  for  the  various  interfaces,  as  directed  by  OTA.

189 9.3 Requirements  Traceability  Matrix  (RTM)190 9.3.1 The  LPT  Processor  shall  update  the  Requirements  Traceability  Matrix  in  

Appendix  D  with  the  results  of  the  workshops  and  provide  it  to  OTA  for  approval.  

191 9.3.2 The  LPT  Processor  shall  continuously  maintain  and  update  the  RTM  throughout  the  life  of  the  Project  and  shall  include  only  OTA-­‐directed  requirements  or  OTA-­‐approved  changes  that  affect  the  design  or  functionality  of  Project  hardware  or  software  thereto.    

192 9.3.3 The  RTM  shall  show  the  origin  of  requirements,  any  changes  to  requirements,  and  the  source  of  approval  for  those  changes.  

Page 142: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  13  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

193 9.3.4 The  RTM  shall  be  used  to  verify  compliance  throughout  the  system  design  and  development  phase,  testing  and  deployment,  and  into  the  Operations  Phase.  

194 9.3.5 The  LPT  Processor  shall  ensure  the  LPT  System  and  all  supporting  activities  and  deliverables  comply  with  the  RTM  throughout  the  entire  life  cycle  of  the  Project.

195 9.3.6 The  LPT  Processor  shall  deliver  an  OTA-­‐approved  RTM  in  accordance  with  the  approved  Project  Schedule.

196 10 Design  197 10.1 General  Design  Requirements198 10.1.1 The  LPT  Processor  shall  produce  a  Preliminary  Design  Document  (PDD)  

and  a  System  Design  Document  (SDD)  covering  the  applicable  RTM  items  and  the  approved  Business  Rules.

199 10.2 Preliminary  Design  Document  and  Review200 10.2.1 The  Preliminary  Design  Document  (PDD)  shall  contain  detailed  

information  on  LPT  system  design  and  technical  approach  and  shall  include,  but  not  be  limited  to,  the  following:

201 10.2.1.1 General  system  design202 10.2.1.2 RTM203 10.2.1.3 System  software  specifications  and  design204 10.2.1.4 System  hardware  specifications  and  design  with  cut  sheets205 10.2.1.5 System  and  software  of  the  phone  system206 10.2.1.6 Physical  and  logical  network  overview207 10.2.2 The  LPT  Processor  shall  provide  system  and  subsystem  block  diagrams  

and  data  flow  diagrams,  and  demonstrate  compliance  with  system  requirements.  

208 10.2.3 The  LPT  Processor  shall  submit  hardware  concept  drawings  during  this  review.    

209 10.2.4 The  LPT  Processor  shall  submit  the  PDD  three  weeks  in  advance  of  the  scheduled  PDR  workshop.  The  PDD  will  be  reviewed  by  OTA  and  comments  provided  to  the  LPT  Processor.  

210 10.2.5 The  PDR  workshop  will  be  held  to  review  the  design  documentation,  discuss  OTA  comments  and  provide  an  in-­‐depth  review  of  the  system  design  and  the  design  documentation.  

211 10.2.6 The  PDR  workshop  shall  take  place  at  OTA  offices.  The  LPT  Processor  shall  provide  minutes/action  items  from  the  PDR  and  submit  revised  versions  of  the  documentation  for  OTA  review  and  approval.  This  process  will  be  repeated  until  OTA  determines  that  the  PDD  is  acceptable.

212 10.3 System  Design  Document  (SDD)  and  Review

Page 143: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  14  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

213 10.3.1 The  SDD  shall  be  an  extension  of  the  approved  PDD  documents  and  shall  include  detail  such  as  block  diagrams,  hardware  and  software  design,  user  interface  and  screen  layouts,  report  formats,  operational  procedures,  other  pertinent  design  documentation  including  a  list  of  equipment  for  each  function  along  with  a  description  of  its  role.

214 10.3.2 The  SDD  shall  include,  but  not  be  limited  to,  the  following:215 10.3.2.1 Scope  of  Project216 10.3.2.2 RTM217 10.3.2.3 Specification  sheets  for  all  equipment218 10.3.2.4 Full  software  manual  set  for  all  Commercial  off  the  Shelf  (COTS)  

software  as  requested  by  OTA219 10.3.2.5 System  sizing  and  design  details220 10.3.2.6 Description  of  all  third  party  software,  including  Operating  Systems221 10.3.2.7 System,  subsystem  and  module  level  descriptions  222 10.3.2.8 Description  of  interactions  between  modules223 10.3.2.9 Requirements  for  all  peripheral  device  interfaces224 10.3.2.10 Examples  (mockups)  of  all  reports225 10.3.2.11 Description  of  system  diagnostics,  status  monitoring  and  error  

handling226 10.3.2.12 Description  of  redundancy  and  failover  processes227 10.3.2.13 End  to  end  transaction  diagram228 10.3.2.14 Interface  Control  Documents  (ICDs)  for  all  external  entities229 10.3.2.15 File  and  transaction  message  formats230 10.3.2.16 Design  for  user  interfaces  including  graphical  representation  (screen  

shots  or  mockups)  of  all  menus  and  screens231 10.3.2.17 Database  design  and  ERD/Data  Dictionary232 10.3.2.18 Basic  Data  communications  diagram233 10.3.2.19 Communications  network  logical  design234 10.3.2.20 Communications  network  physical  design235 10.3.3 The  LPT  Processor  will  submit  a  SDD  for  design  approval  that  describes  

the  design  specifications  of  all  hardware,  software  and  communications  to  be  provided  by  the  LPT  Processor  to  meet  the  requirements  of  the  Project.

236 10.3.4 The  LPT  Processor  shall  describe  all  hardware  specifications,  including  appropriate  diagrams  and  facility  layouts,  in  the  hardware  design.

237 10.3.5 The  LPT  Processor  shall  illustrate  the  software  design  and  architecture  and  include  modules  and/or  process  levels  and  procedures.  The  software  design  details  shall  include  the  code  used  and  how  it  interacts  with  the  underlying  Operating  System.      

Page 144: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  15  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

238 10.3.6 The  SDD  will  form  the  basis  for  the  Detail  Design  Review  (DDR)  and  will  be  submitted  for  review,  comment  and  discussion,  after  which  the  design  reviews  will  take  place.  

239 10.3.7 The  DDR  provides  the  final  review  of  the  SDD,  as  implemented  in  accordance  with  the  approved  PDR  approach.

240 10.3.8 The  SDD  must  be  received  from  the  LPT  Processor  no  later  than  three  weeks  in  advance  of  the  scheduled  DDR  meeting  to  allow  OTA  to  review  the  documents  in  detail  prior  to  the  meeting.  

241 10.3.9 Upon  completion  of  the  design  reviews,  the  SDD  shall  be  revised  and  submitted  to  OTA  for  final  review  and  approval.

242 10.3.10 Upon  OTA’s  approval  of  the  SDD,  the  LPT  Processor  shall  update  the  Project  Schedule,  if  necessary,  and  the  RTM  to  reflect  any  changes  in  requirements  approved  during  the  design  process.  

243 10.3.11 The  LPT  Processor  shall  provide  minutes/action  items  from  the  DDR  and  submit  revised  versions  of  the  documentation  for  OTA  review  and  approval.  This  process  will  be  repeated  until  OTA  determines  that  the  SDD  is  acceptable.  

244 10.3.12 Within  30  days  after  successful  completion  of  the  System  Acceptance  Test,  the  LPT  Processor  shall  submit  the  Final  SDD,  including  all  changes  made  during  the  software  development,  installation  and  testing  phases.

245 10.3.13 The  LPT  Processor  shall  provide  all  hardcopy  submittals  in  three-­‐ring  binders,  accompanied  by  electronic  (soft)  copies.

246 10.3.14 The  LPT  Processor  shall  update  and  submit  to  the  designate  person  at  OTA,  the  Final  SDD  with  any  changes  implemented  during  ongoing  operations  within  10  business  days  of  the  change.  

247 11 Testing  Requirements248 11.1 General  Testing  Requirements249 11.1.1 The  LPT  Processor  shall  conduct  testing  of  the  system  to  validate  the  LPT  

System  integrity,  reliability,  functionality,  accuracy  and  compliance  to  the  requirements  of  this  RFP  and  demonstrate  that  the  LPT  System  meets  all  of  the  approved  requirements  in  the  RTM.

250 11.1.2 OTA  and  its  representatives  shall  have  the  option  to  witness  or  take  part  in,  any  or  all  testing,  and  the  LPT  Processor  shall  work  with  OTA  to  schedule  tests  so  that  OTA  staff,  representatives  and  partners  may  observe  and/or  participate  in  all  formal  testing.

Page 145: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  16  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

251 11.1.3 During  the  development  of  the  system  software,  the  LPT  Processor’s  test  personnel  shall  conduct  a  comprehensive  program  of  internal  testing  and  walk-­‐through  sessions  with  OTA  to  ensure  that  the  LPT  System  meets  the  functional  specifications  set  forth  in  this  RFP  and  that  defects  are  detected  and  resolved  or  identified  prior  to  formal  demonstration  testing  witnessed  by  OTA.

252 11.1.4 The  LPT  Processor  shall  be  responsible  for  all  development  and  test  personnel,  equipment,  facilities  and  expenses  associated  with  all  system  testing.  

253 11.1.5 The  LPT  Processor  shall  submit  test  plans,  with  test  scripts,  to  OTA  for  review,  comment  and  approval,  at  least  15  business  days  in  advance  of  each  test.

254 11.1.6 The  LPT  Processor  shall  incorporate  comments  and  revisions  received  from  OTA  and  update  the  Project  Schedule,  if  necessary.    

255 11.1.7 The  LPT  Processor  shall  obtain  OTA  approval  of  test  plans  and  scripts  prior  to  testing.  

256 11.1.8 The  LPT  Processor  shall  accommodate  ad  hoc  testing  by  OTA  during  formal  testing.  

257 11.1.9 The  LPT  Processor  shall  conduct  all  tests  in  accordance  with  the  project  schedule  and  the  approved  test  plans  and  procedures.

258 11.1.10 Within  10  calendar  days  of  the  completion  of  each  test,  the  LPT  Processor  shall  deliver  a  test  results  report  to  OTA  which  shall  include  a  listing  of  all  defects  (punch  list)  identified  together  with  the  severity  level  of  each  (severity  levels  will  be  determined  in  the  Master  Test  Plan);  a  plan  for  resolving  those  defects;  and  a  recommendation  for  retests  (if  appropriate).  

259 11.1.11 The  LPT  Processor  shall  provide  to  OTA  a  report  of  all  test  results,  notes,  and  observations.    

260 11.1.12 The  LPT  Processor  shall  work  together  with  OTA  to  indicate  a  priority  level  for  each  punch  list  item.  

261 11.1.13 The  LPT  Processor  shall  correct  and  retest  all  punch  list  items  including  necessary  regression.  

262 11.1.14 The  LPT  Processor  and  OTA  shall  agree  on  a  schedule  for  correcting  and  retesting  punch  list  items.  

263 11.1.15 When  OTA  deems  that  all  punch  list  items  have  been  resolved,  the  LPT  Processor  shall  receive  final  approval  of  that  test.

264 11.2 Master  Test  Plan  (MTP)265 11.2.1 The  LPT  Processor  shall  provide  a  Master  Test  Plan  describing  all  tests  to  

be  performed  from  NTP  through  and  including  System  &  Operational  Acceptance.  

Page 146: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  17  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

266 11.2.2 The  final  set  of  tests  to  be  conducted  shall  be  finalized  during  the  design  phase;  however,  at  a  minimum,  the  LPT  Processor  shall  include  the  following  tests  in  the  Master  Test  Plan:    

267 Table  1 See  Table  1:  Testing  Summary  tab.  268 11.2.3 The  MTP  shall  provide  a  description  of  each  test,  the  standards  for  

developing  individual  test  plans  and  the  procedures  for  the  formal  testing.  These  standards  shall  address  test  procedure  format,  severity  levels  and  acceptance  criteria  for  each  formal  test  phase.  In  addition,  the  MTP  shall  describe  the  entry  criteria  that  must  be  met  before  each  formal  test  can  be  started  and  the  exit  criteria  that  must  be  met  before  each  test  can  be  considered  complete.  

269 11.2.4 The  MTP  shall  address  testing  approaches  and  schedule,  performance  criteria,  data  collection  and  sampling  methods,  testing  conditions,  testing  locations,  reporting  of  results,  and  procedures  for  tracking  and  retesting/regression  testing  for  failed  tests.  

270 11.2.5 The  MTP  shall  be  submitted  to  OTA  for  review  and  approval  according  to  the  approved  Project  Schedule.

271 11.3 General  Test  Plan  Requirements  272 11.3.1 The  LPT  Processor  shall  provide  for  OTA’s  review  and  approval  (prior  to  

test  commencement)  an  individual  test  plan  for  each  test  listed  in  Table  1.

273 11.3.2 Each  test  plan  shall  include  a  description,  scope,  approach,  required  resources,  schedule,  including  test  items,  all  dependencies  (including  reliance  on  and  readiness  of  third  parties),  test  platform  (including  required  equipment  and  location),  features  to  be  tested,  test  scripts  and  their  expected  results,  entry  and  exit  criteria  including  pass/fail  criteria,  a  placeholder  to  record  any  defects  noted  during  the  test  and  a  description  of  the  ranking  that  will  be  used  for  classifying  and  recording  any  defects  noted  (e.g.  critical,  major,  minor),  definitions  of  a  successful  test,  a  place  holder  to  record  actual  results  and  any  risks  requiring  contingency  planning.  

274 11.3.3 The  LPT  Processor  shall  provide  all  test  and  support  personnel,  test  equipment  and  test  sites  in  accordance  with  the  approved  Master  Test  Plan.  OTA  will  review  and  approve  formal  test  plans  and  schedules  proposed  by  the  LPT  Processor  and  will  witness  and  determine  the  acceptability  of  the  test  results.

275 11.3.4 Test  plans  shall  document  workflows  and  business  processes  established  during  the  design  phase.

Page 147: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  18  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

276 11.3.5 Test  plans  shall  clearly  list  requirements  that  the  LPT  Processor  will  not  test  at  each  respective  stage  and  the  reason  for  their  exclusion.    These  excluded  requirements  shall  be  subject  to  OTA  review  and  approval.

277 11.3.6 Test  plans  shall  describe  how  data  to  be  tested  will  be  compiled,  such  as  through  use  of  data  simulation  software  or  other  mutually  agreed  upon  data  sets  to  create  necessary  Transaction  and  payment  data.

278 11.3.7 The  LPT  Processor  shall  update  each  version  of  the  test  plans  to  incorporate  or  respond  to  OTA  comments  on  the  previous  version.    

279 11.3.8 The  Factory  Acceptance  Test  plan  shall  be  submitted  for  OTA  approval  no  sooner  than  15  business  days  after  approval  of  the  SDD.

280 11.4 Factory  Acceptance  Test  (FAT)281 11.4.1 LPT  Processor  shall  conduct  the  Factory  Acceptance  Test  at  the  end  of  

the  development  phase  in  accordance  with  the  approved  Project  Schedule.

282 11.4.2 The  FAT  shall  take  place  at  the  LPT  Processor’s  development  facility  or  other  equivalent  site  in  the  continental  United  States.

283 11.4.3 The  FAT  shall  be  a  test  of  the  LPT  System,  using  the  same  communications  equipment,  software,  hardware,  user  interfaces  and  configurations  as  the  LPT  Processor  will  use  in  production.    

284 11.4.4 The  FAT  shall  follow  a  set  of  transactions  and  payments  through  various  use  cases  that  demonstrate  the  workflow  through  various  sub-­‐systems  including  LPT  processing,  image  review,  Interactive  Voice  Response  (IVR)  system,  website,  customer  statements/invoices,  and  reports,  etc.    

285 11.4.5 The  LPT  Processor  shall  coordinate  with  OTA  on  how  to  obtain  test  Transaction  and  image  file  data.  

286 11.4.6 The  FAT  shall  utilize  compiled  Transaction  and  payment  data  to  perform  tests  including,  but  not  limited  to,  a  full  range  of  required  reports,  financial  data  flow  and  Transaction  and  payment  reconciliation.

287 11.4.7 The  LPT  Processor  shall  obtain  OTA  approval  of  FAT  results  prior  to  Installation  and  Interface  Testing.

288 11.5 Installation  and  Interface  Test  289 11.5.1 The  LPT  Processor  shall  conduct  the  Installation  and  Interface  Test  after  

the  LPT  System  has  been  installed  in  the  designated  primary  hosting  site  location.

290 11.5.2 The  Installation  and  Interface  Test  shall  thoroughly  test  all  of  the  network  communications  and  other  physical  systems,  according  to  a  plan  to  be  approved  by  OTA.

291 11.5.3 To  the  extent  possible,  the  LPT  Processor  shall  acquire  test  files  from  external  interface  sources  to  allow  for  the  widest  possible  tests  of  LPT  System  functionality.

Page 148: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  19  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

292 11.5.4 The  LPT  Processor  shall  cooperate  with  all  testing  required  by  third  parties  with  external  interfaces  as  directed  by  OTA.

293 11.5.5 The  LPT  Processor  shall  demonstrate  the  interface  with  the  OTA  Host  to  show  that  it  can  receive  and  process  Transaction  and  image  files,  send  results  files  back  through  the  interface  in  the  agreed-­‐upon  format,  and  show  proper  system  logs  of  the  send/receive  cycle.

294 11.5.6 At  a  minimum,  the  LPT  Processor  shall  include  the  following  interfaces  in  the  Installation  and  Interface  Test:

295 11.5.6.1 Host/PIKEPASS  296 11.5.6.2 Credit/debit  card  processors297 11.5.6.3 Banks298 11.5.6.4 DMV/Third  parties299 11.5.6.5 Mailhouse300 11.5.6.6 Collection  Agency301 11.5.7 The  LPT  Processor  shall  obtain  OTA  approval  of  the  Installation  and  

Interface  Test  results  prior  to  Disaster  Recovery  testing  and  the  Production  Readiness  Test.

302 11.6 Disaster  Recovery  Test303 11.6.1 During  the  Disaster  Recovery  Test,  the  LPT  Processor  shall  exercise  the  

Disaster  Recovery/Business  Continuity  Plan  to  the  fullest  extent  possible,  simulating  various  LPT  System  failures  and  challenges  for  LPT  Processor  staff.

304 11.6.2 The  LPT  Processor  shall  obtain  OTA  approval  of  Disaster  Recovery  Test  results  prior  to  Go-­‐Live.  

305 11.6.3 The  LPT  Processor  shall  conduct  the  Disaster  Recovery  Test  during  Production  Readiness  Testing.  

306 11.6.4 The  LPT  Processor  shall  conduct  Disaster  Recovery  Testing  at  least  annually  after  Go-­‐Live.

307 11.7 Production  Readiness  Test308 11.7.1 The  PRT  shall  continue  until  the  results  are  approved  by  OTA.  The  goal  of  

a  successful  PRT  is  to  prove  the  LPT  System  and  operations  are  ready  for  production  and  the  decision  to  ‘Go-­‐Live.’

309 11.7.2 Upon  completion  of  construction  of  each  ramp,  the  LPT  Processor  shall  begin  to  receive  and  process  transaction  and  image  data  from  the  Host  to  the  LPT  System  for  use  in  exercising  the  functionality  and  processes  at  the  CSC.  

310 11.7.3 The  LPT  Processor  shall  perform  the  Production  Readiness  Test  using  actual  Host  data  from  transactions  created  at  the  Elm-­‐Peoria  toll  points  until  Go-­‐Live.

Page 149: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  20  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

311 11.7.4 The  LPT  Processor  shall  provide  documentation  of  the  agreed-­‐to  system  configuration  as  part  of  the  Production  Readiness  Test  Plan.

312 11.7.5 This  Production  Readiness  Test  shall  include  but  not  be  limited  to:313 11.7.5.1 Creating  new  accounts,  issuing  invoices,  violations,  payment  

processing,  handling  disputes  and  managing  accounts  through  the  website,  and  IVR  system  

314 11.7.5.2 Invoice  escalation  including  violations  and  collections315 11.7.5.3 Making  adjustments  in  the  LPT  System  to  emulate  all  account  and  

financial  functions,  including  transfer  of  responsibility,  chargebacks,  refunds,  and  NSF  checks

316 11.7.5.4 Interfacing  with  OTA’s  finance  department  and  systems317 11.7.5.5 Providing  special  ad  hoc  queries,  running  daily  and  weekly  reports,  and  

conducting  research  on  possible  issues318 11.7.5.6 Setting  up  test  credit/debit  cards  and  other  mechanisms  to  simulate  

payments319 11.7.5.7 Testing  of  LPT  accounts  and  maintenance  functions320 11.7.5.8 Call  routing  between  the  LPT  Processor  and  PIKEPASS  321 11.7.6 The  LPT  Processor  shall  perform  license  plate  lookup  queries  during  the  

Production  Readiness  Test.322 11.7.7 The  LPT  Processor  shall  coordinate  with  DMVs  and  any  third  party  DMV  

services  to  test  the  ROV  lookup  and  license/registration  hold  interface.  323 11.7.8 The  LPT  Processor  shall  provide  all  necessary  training  and  support  in  the  

use  of  the  PIKEPASS  CSC  resources  and  LPT  System  to  all  users  prior  to  conducting  the  Production  Readiness  Test.

324 11.7.9 The  LPT  Processor  shall  provide  remote  access  for  OTA  and  its  representatives  to  access  the  LPT  System  during  the  Production  Readiness  Test.

325 11.7.10 The  LPT  Processor  shall  track  and  document  all  anomalies,  failures,  and  other  issues  noted  by  test  participants  and  observers  during  this  period.

326 11.7.11 The  LPT  Processor  shall  prepare  and  deliver  a  test  report  with  all  issues  prioritized  and  corrective  actions  assigned  on  a  weekly  basis.      

327 11.7.12 The  LPT  Processor  shall  work  with  OTA  to  determine  and  agree  upon  required  retesting.    

328 11.7.13 The  LPT  Processor  shall  continue  testing  data  and  recording,  prioritizing,  and  working  to  correct  issues  identified  until  OTA  approves  a  final  set  of  Production  Readiness  Test  results.

329 11.8 System  &  Operational  Acceptance  Test330 11.8.1 The  System  &  Operational  Acceptance  Test  shall  begin  immediately  upon  

Go-­‐Live  or  as  soon  as  all  criteria  for  entry  to  this  test  have  been  met.

Page 150: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  21  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

331 11.8.2 The  System  &  Operational  Acceptance  Test  shall  include  but  not  be  limited  to:

332 11.8.2.1 Ensuring  the  accuracy,  consistency  and  completeness  of  data  recorded  in  the  database  and  reflected  in  reports

333 11.8.2.2 Performance  monitoring  and  ensuring  that  all  requirements  and  Performance  Standards  are  met  or  exceeded  

334 11.8.2.3 Following  Policies  and  Procedures,  resulting  in  an  efficiently  functioning  CSC  that  meets  all  requirements

335 11.8.3 The  LPT  Processor  shall  perform  a  detailed  review  of  all  financial  reports,  which  shall  determine  that  all  transactions  are  accurately  summarized,  fully  accounted  for,  and  supported  by  detailed  Transaction  reports.  

336 11.8.4 The  LPT  Processor  shall  create  a  punch  list  of  defects  and  a  report  on  Performance  Standards  early  in  the  System  &  Operational  Acceptance  Test  period  to  allow  early  fixes  and  testing  without  revenue  impacts  to  the  Project.    Approval  of  the  System  &  Operational  Acceptance  Test  shall  occur  when  the  LPT  Processor  demonstrates  that  it  meets  all  requirements  in  the  SOAT  Plan  and  achieves  compliance  with  all  required  Performance  Standards  over  3  consecutive  calendar  months  of  CSC  Operations.

337 12 Go-­‐Live  338 12.1 General  Go-­‐Live  Requirements339 12.1.1 The  Go-­‐Live  period  shall  occur  over  a  maximum  of  three  days.    340 12.1.2 The  LPT  Processor  shall  have  completed  and  obtained  OTA  approval  for  

all  testing  except  System  &  Operational  Acceptance.341 12.1.3 The  LPT  Processor  shall  provide  a  detailed  Go-­‐Live  Plan  covering  the  

three-­‐day  Go-­‐Live  period.  342 12.1.4 The  Go-­‐Live  plan  shall  include  an  hour-­‐by-­‐hour  schedule,  a  checklist  of  

tasks  and  tests  occurring  during  Go-­‐Live,  the  go/no-­‐go  decision  point,  and  any  other  information  necessary  to  ensure  a  smooth  Go-­‐Live.

343 12.1.5 The  LPT  Processor  shall  evaluate  all  aspects  of  its  planned  operations  and  ensure  that  all  mechanisms  are  in  place  to  manage  those  operations  in  accordance  with  all  requirements  prior  to  Go-­‐Live.

344 12.1.6 The  LPT  Processor  shall  report  on  its  evaluation  to  OTA,  seek  OTA’s  approval  for  implementing  any  resulting  recommendations,  and  document  any  such  measures  implemented.

345 III. License  Plate  Tolling  Operational  Requirements346 13 Technical  Requirements347 13.1 System  Requirements348 13.1 LPT  System  Data  Center  Requirements

Page 151: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  22  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

349 13.1.1 The  LPT  Processor  shall  provide  both  a  Primary  and  a  Disaster  Recovery  (DR)  data  center,  with  a  minimum  Tier  3  rating,  to  house  the  required  infrastructure  to  process  designated  OTA  LPT  transactions  and  images.  A  Tier  3  data  center  is  composed  of  multiple  active  power  and  cooling  distribution  paths,  but  only  one  path  active,  has  redundant  components,  and  is  concurrently  maintainable,  providing  99.982%  availability.    

350 13.1.2 In  both  the  Primary  and  DR  data  centers,  the  LPT  Processor  shall  maintain  and  monitor  the  HVAC(s)  system  such  that  it  provides  the  proper  environmental  conditions  that  are  required  for  the  LPT  System.  

351 13.1.3 The  LPT  Processor  shall  ensure  the  LPT  System  data  center  components  are  protected  from  power  outages  by  the  use  of  generators.    

352 13.1.4 The  LPT  Processor  shall  ensure  LPT  System  components  are  protected  by  a  Power  Distribution  Unit  (PDU)  and  an  Uninterruptible  Power  Supply  (UPS)  capable  of  surge  suppression  and  powering  the  LPT  System  during  utility  to  generator  transfers.  

353 13.1.5 The  LPT  Processor  shall  monitor  all  PDUs  and  UPSs  for  health  and  loading.

354 13.1.6 The  LPT  Processor  shall  design,  procure  and  configure  a  physical  and  logical  Local  Area  Network  (LAN)  for  the  LPT  System  at  the  Primary  and  DR  data  centers  using  commercially  available  hardware.  

355 13.1.7 The  LAN  topology  shall  be  designed  to  eliminate  single  points  of  failure  at  network  layers  1,  2,  and  3.  The  design  and  equipment  shall  be  subject  to  OTA  review  and  approval.  

356 13.1.8 The  OTA  LPT  System  shall  exclusively  use  the  LAN.  No  other  systems  housed  in  the  LPT  Processor’s  data  centers  shall  use  the  LAN  provided  to  OTA.  

357 13.1.9 In  order  to  establish  communication  paths  between  the  Host,  LPT  Account  holders,  third  party  interfaces,  and  data  center  to  data  center  a  Wide  Area  Network  (WAN)  connection  shall  be  provided  by  the  LPT  Processor  at  both  the  Primary  and  Disaster  Recovery  data  centers.  

358 13.1.10 It  is  the  LPT  Processor’s  responsibility  to  provide  and  configure  all  required  equipment  and  cabling  to  accommodate  the  WAN  link.  

359 13.1.11 The  LPT  Processor  shall  coordinate  with  third  party  Internet  Service  Providers  (ISP)  to  install  the  WAN  link  within  each  LPT  System  data  center.  The  up  front  and  recurring  costs  of  the  WAN  link  shall  be  the  responsibility  of  the  LPT  Processor.  

360 13.1.12 The  LPT  Processor’s  WAN  topology,  bandwidth,  and  equipment  shall  be  subject  to  OTA  review  and  approval.

361 13.1.13 The  LPT  Processor  shall  ensure  that  no  data  is  lost  in  the  event  of  a  data  transmission  failure.

Page 152: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  23  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

362 13.1.14 The  LPT  System  data  center  components  shall  be  housed  in  their  own  secured  cabinet/rack.  Only  authorized  and  OTA  approved  personnel  shall  have  access  to  the  LPT  System  Facility  rack.

363 13.2 LPT  System  Requirements364 13.2.1 The  LPT  Processor  shall  furnish  an  active-­‐standby  LPT  System  between  its  

Primary  and  DR  Data  Centers.  The  LPT  System  shall  include  all  cabinets,  enclosures,  servers,  storage  systems,  Keyboard,  Video,  and  Monitor  (KVM)s,  cabling,  and  any  ancillary  equipment,  as  may  be  necessary  to  provide  a  complete  and  acceptable  LPT  System  and  shall  be  designed,  sized  and  maintained  to  meet  or  exceed  all  operational  and  functional  requirements  and  all  Performance  Standards  in  this  RFP  throughout  the  Term.  

365 13.2.2 The  LPT  System  shall  be  scalable  to  meet  increased  volumes.366 13.2.3 The  LPT  Processor  shall  provide  an  isolated  LPT  System,  meaning  it  will  

not  share  physical  or  logical  system,  network,  or  infrastructure  components  with  other  co-­‐located  clients.  Two  exceptions  for  sharing  physical  components  are  the  data  building  and  the  data  center  utility  power.

367 13.2.4 The  LPT  Processor  shall  provide  hosts  that  contain  adequate  memory  and  processing  capacity  to  meet  all  requirements.

368 13.2.5 The  LPT  System  shall  include  hot  swappable  components  and  sub-­‐systems  wherever  available.

369 13.3 LPT  System  Operating  System  and  Software370 13.3.1 The  operating  system  for  the  LPT  System(s)/server(s)  shall  consist  of  a  

Commercial  Off  the  Shelf  (COTS)  multi-­‐user,  multitasking  operating  system.

371 13.3.2 The  LPT  Processor  is  responsible  for  obtaining  all  licenses  as  required  and  all  necessary  licenses  will  be  obtained  for  all  COTS  operating  system  software  used  by  the  LPT  System.

372 13.3.3 The  LPT  Processor  will  retain  authorized  copies  (backups)  for  all  software  media  to  use  for  periodic  system  maintenance,  upgrades,  or  restorations,  as  required.  

373 13.3.4 The  proposed  operating  system  shall  have  warranty  and  COTS  maintenance  support  services  for  the  Term  of  the  Contract.

374 13.3.5 If  Microsoft  Windows  is  selected,  the  LPT  Processor  shall  utilize  Microsoft  Windows  7  or  greater  for  desktops  and  Windows  Server  2012  R2  or  greater  for  servers.  

Page 153: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  24  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

375 13.3.6 The  operating  system  shall  be  a  proven  system  and  version  release  with  a  large  installed  base,  used  widely  throughout  the  United  States  for  enterprise-­‐class  operations  and  shall  be  compatible  with  relevant  database  and  web-­‐based  development  and  operational  tools,  and  shall  not  be  a  “Beta”  or  first  release  version.

376 13.3.7 The  LPT  Processor  shall  maintain  the  Operating  System  with  necessary  updates  and  security  patches.

377 13.4 LPT  System  Dashboard378 13.4.1 The  LPT  System  shall  provide  a  dashboard  screen  that  allows  authorized  

users  to  monitor  the  LPT  System  with  drilldown  capabilities.    This  shall  include  an  overview  of  LPT  operations  including  transaction  volume  by  facility,  call  center  activity,  image  review,  ROV  lookups,  invoice/violation  issuance  and  escalation,  and  number  of  accounts.  Specific  examples  of  detail  include:

379 13.4.1.1  Call  Center-­‐  Total  incoming  calls  -­‐  Number  of  calls  requesting  a  CSR-­‐  Number  of  calls  answered  by  a  CSR-­‐  Average  wait  time  for  CSR  calls-­‐  Average  call  handling  time-­‐  Maximum  wait  time  for  CSR  calls-­‐  Number  &  Percentage  of  CSR  calls  that  exceed  a  specified  wait  time-­‐  Abandoned  call  rate

380 13.4.1.2 Image  Review-­‐  Oldest  transaction  date  currently  being  reviewed-­‐  Percentage  of  images  rejected    -­‐  Top  3  image  reject  reasons-­‐  Number  of  image  in  queue

381 13.4.2 The  dashboard  shall  allow  drilldown  capabilities  for  each  of  these  areas  so  that  users  can  view  activity  on  an  hourly,  daily,  weekly,  monthly  and  annual  basis.    It  shall  also  include  comparisons  to  prior  activity.  

382 13.4.3 The  dashboard  shall  provide  a  visual  and  graphical  representation  of  the  Transaction  workflow  and  shall  display  data  in  real-­‐time  as  well  as  historical  roll-­‐up.

383 13.4.4 The  LPT  Processor  shall  monitor  the  dashboard  and  also  allow  OTA  to  view  the  dashboard  24/7/365  on  a  real  time  basis.    All  information  that  is  related  to  different  locations  shall  be  tracked  individually  as  well  as  in  total.  

Page 154: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  25  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

384 13.4.5 End  users  shall  have  the  ability  to  customize  their  own  dashboards  by  changing  column  sort  criteria,  changing  the  order  that  columns  of  data  are  displayed  and  hiding  columns.

385 13.4.6 The  LPT  System  shall  allow  users  to  establish  configurable  thresholds  for  monitoring  LPT  System  and  operational  performance.  

386 13.4.7 The  LPT  System  shall  generate  alerts  when  deviations  from  established  thresholds  occur.

387 13.5 Database  Requirements388 13.5.1 The  LPT  System  database  shall  incorporate  redundancy  in  order  to  

minimize  LPT  System  downtime.389 13.5.2 The  LPT  Processor  shall  design  and  configure  the  LPT  System  database  to  

minimize  the  possibility  of  data  loss.390 13.5.3 The  LPT  Processor  shall  design  and  configure  the  LPT  System  database  to  

support  future  hardware  and  software  upgrades.  391 13.5.4 The  LPT  Processor  shall  design  the  LPT  System  database  to  be  compatible  

with  the  operating  system  and  application  software.392 13.5.5 The  LPT  Processor  shall  design  the  LPT  System  database  to  support  

redundant  central  processing  system  architectures.  393 13.5.6 The  LPT  Processor  shall  provide  database  software  with  warranty  and  

maintenance  support  services  for  the  term  of  the  contract.394 13.5.7 The  LPT  Processor  shall  keep  the  LPT  System  database  software  

current—that  is,  within  one  major  release  of  the  database  manufacturer's  current  general  production  version.  

395 13.5.8 If  Microsoft  SQL  Server  is  selected,  the  LPT  Processor  shall  utilize  Microsoft  SQL  Server  2014  or  greater  for  database  software.

396 13.5.9 The  LPT  Processor  shall  provide  database  monitoring  tools  such  that  all  aspects  of  the  database  are  monitored,  including  but  not  limited  to  software  capable  of  alerting  appropriate  staff  to  the  presence  of  alarm  conditions,  capable  of  giving  authorized  users  real  time  overviews,  details,  histories,  and  maintenance  tools  suitable  for  investigating  and  making  adjustments  to  LPT  System  database  performance,  session-­‐level  activity,  scheduled  jobs,  alert  notification  and  configuration  parameters.  

397 13.5.10 The  LPT  Processor  shall  provide  and  maintain  a  reporting  database  or  a  data  warehouse  that  replicates  all  the  data  from  the  LPT  System  database,  in  near  real  time,  to  be  used  for  all  user-­‐generated  reports,  including  those  described  in  the  reports  section  of  this  Scope  of  Services.

398 13.5.11 The  LPT  Processor  shall  configure  the  reporting  database  or  data  warehouse  so  as  to  optimize  report  generation  including  appropriate  indexes  and  views  to  allow  ad-­‐hoc  user  generated  queries.

Page 155: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  26  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

399 13.5.12 The  LPT  System  database  shall  store  certain  fields  in  encrypted  form  (for  example  credit/debit  card  numbers),  as  determined  with  OTA  during  system  design.    It  is  the  preference  of  OTA  not  to  maintain  social  security  and/or  driver’s  license  numbers  within  the  LPT  System;  however  OTA  understands  that  some  information  may  be  automatically  returned  by  certain  DMV  sources.    In  the  event  that  personal  information  is  obtained,  the  LPT  Processor  shall  ensure  this  data  is  fully  protected  in  compliance  with  prudent  personally  identifiable  information  (PII)  provisions.  

400 13.5.13 The  LPT  System  database  design  shall  utilize  mechanisms  designed  to  protect  data  integrity  including  but  not  limited  to:  normalized  data,  foreign  key  relationships,  field-­‐level  value  constraints,  application  user  roles,  data  validation  triggers,  and  use  of  materialized  views  and  prevention  of  direct  base  table  access  by  use  of  stored  procedures  and  views.  

401 13.5.14 The  LPT  System  database  design  shall  incorporate  field-­‐level  validation  whenever  possible  to  limit  the  possibility  of  data  entry  or  manual  update  errors;  including  but  not  limited  to:  foreign  keys,  dollar  amount  range  checks,  and  telephone  number  and  zip  code  masks.

402 13.5.15 For  post-­‐System  &  Operational  Acceptance  LPT  System  changes,  prior  to  a  change  being  implemented  on  a  production  database,  a  written  test  and  acceptance  plan  shall  be  developed,  executed  and  the  results  accepted  in  writing  by  OTA.

403 13.1 LPT  System  End  User  Requirements404 13.1.1 The  LPT  System  shall  employ  a  100%  browser  based,  graphical  user  

interface  (GUI),  or  a  comparable  user  interface  of  equal  or  greater  quality  and  capability  that  does  not  require  specialized  software.  A  browser  is  defined  as  a  software  program  that  allows  the  user  to  open  the  GUI  in  a  form  that  is  suitable  for  display.

405 13.1.2 The  LPT  System  shall  be  configurable  and  shall  have  appropriate  interactive  GUIs  to  allow  authorized  staff  to  manage  the  various  configuration  parameters  required  for  proper  LPT  System  operation.

406 14 Security  407 14.1 General  Security  Requirement408 14.1.1 The  LPT  Processor  shall  ensure  the  LPT  System  is  secured  against  

unauthorized  access,  data  loss,  and  data  integrity  loss.  409 14.1.2 The  LPT  Processor  shall,  at  a  minimum,  adhere  to  the  OTA  Information  

Security  Policy  (see  Appendix  I)  and  Physical  Security  Policy  (see  Appendix  J).  

410 14.2 Access  Security

Page 156: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  27  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

411 14.2.1 Access  to  the  operating  system,  database,  Virtual  Private  Network  (VPN),  and  all  other  applications,  shall  be  controlled  by  system  administrators,  on  a  per-­‐user  basis.    

412 14.2.2 The  LPT  System  shall  ensure  that  all  user  access  to  any  part  of  the  LPT  System,  except  for  the  customer-­‐facing  website,  shall  be  managed  from  a  single  directory  of  authorized  users.    The  LPT  System  must  validate  user  accounts  against  a  directory  service.    For  example:  if  the  agency  disables  or  locks  a  user  network  account  via  active  directory,  the  LPT  application  can  test  for  an  active,  enabled  user  account.    This  is  so  credentials  can  be  maintained  in  the  LPT  System  but  also  checked  for  a  valid  directory  account.

413 14.2.3 The  authorized  user  directory  shall  be  the  authorization  provider  for,  at  a  minimum,  operating  system  access,  database  level  access,  remote  access,  and  access  to  the  user-­‐level  application.

414 14.2.4 All  updates  to  the  authorized  user  directory  shall  be  securely  logged.  415 14.2.5 System  administrator  logs  and  other  logs  shall  be  monitored  for  

exceptions  and/or  improper  activity  and  this  log  monitoring  shall  be  documented  and  automated  to  the  extent  possible  (e.g.,  use  of  system  log  monitoring  tools).

416 14.2.6 Passwords  shall  be  required  for  access  to  any  part  of  the  LPT  System.    417 14.2.7 All  accessible  subsystems,  including  the  customer-­‐facing  website,  shall  

have  the  ability  to  limit  valid  passwords  by  length  and  use  of  special  characters,  and  to  restrict  repeated  use  of  the  same  password  by  a  single  user.  

418 14.2.8 All  accessible  subsystems,  including  the  customer-­‐facing  website,  shall  have  the  ability  to  require  passwords  to  be  changed  periodically.  

419 14.2.9 LPT  System  functionality  shall  be  secured  by  passwords  and  security  roles.

420 14.2.10 The  LPT  System  security  role  set  shall  include  a  role  enabling  its  users  to  assign  or  remove  security  role(s)  of  other  users.

421 14.2.11 The  LPT  System  security  role  set  shall  include  a  role  enabling  its  users  to  reconfigure  the  LPT  System  rights,  which  are  enabled  by  other  security  roles.

422 14.2.12 The  LPT  Processor,  in  conjunction  with  OTA,  shall  develop  LPT  System  rights  and  security  roles  during  the  design  process.  

423 14.2.13 The  LPT  Processor  shall  grant  user  access  based  on  the  OTA-­‐approved  Policies  and  Procedures.  

424 14.2.14 The  LPT  System  shall  allow  for  role-­‐based  user  access  configuration.425 14.2.15 The  LPT  System  shall  require  each  user  to  have  unique  logon  credentials.  

Page 157: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  28  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

426 14.2.16 The  LPT  System  shall  allow  user  access  to  be  controlled  by  a  system  administrator.

427 14.2.17 The  LPT  System  shall  automatically  log  database  records  for  all  user  access  and  all  user  activity  that  results  in  data  updates  or  access  to  customer  data.

428 14.2.18 The  LPT  System  shall  provide  functionality  for  searching  the  user  access  logs  using  commonly  available  file  system  or  database  utilities.

429 14.2.19 The  LPT  System  shall  provide  controls  to  lock  out  users  after  a  configurable  number  of  unsuccessful  system  login  attempts.

430 14.2.20 The  LPT  System  shall  provide  tools  that  will  detect  and  report  any  intrusions  and/or  attempted  intrusions.

431 14.3 Data  Security432 14.3.1 The  LPT  Processor  shall  be  responsible  for  all  aspects  of  protecting  LPT  

System  data.433 14.3.2 The  LPT  Processor  shall  employ  methods  to  ensure  reliable  data  

communications,  file  transfer  and  integrity  of  the  database  and  tools  that  detect  interruption  of  these.    

434 14.3.3 The  LPT  Processor  shall  provide  and  implement  a  systematic  method  for  archiving  and  purging  data  and  ensure  that  the  entire  LPT  System  software  and  data  is  backed-­‐up  and  stored  at  an  off-­‐site  location.  

435 14.3.4 The  LPT  Processor  shall  ensure  that  application  activity  is  logged  in  a  common  log  file  format  with  searchable,  and  human-­‐readable  log  files.

436 14.3.5 The  LPT  Processor  shall  configure  all  operating  systems  and  databases  such  that  all  non-­‐essential  users,  features,  and  services  are  either  locked  or  removed.  

437 14.3.6 The  LPT  Processor  shall  strengthen  all  operating  system  and  database  passwords,  including  passwords  for  LPT  System  and  application  users,  in  accordance  with  industry  best  practices.  

438 14.3.7 The  LPT  Processor  shall  ensure  that  system  administrator  level  access  is  limited,  and  that  any  administrator  level  access  is  logged.

439 14.3.8 The  LPT  Processor  shall  ensure  that  operating  systems  and  databases  are  up  to  date  with  the  latest  security  patches.

440 14.3.9 The  LPT  Processor  shall  employ  an  auditing  strategy  for  the  LPT  System  that  maximizes  the  possibility  of  detecting  unauthorized  activity.    This  shall  include  an  automated  event  notification  and  logging  process.  

441 14.3.10 The  LPT  System  shall  allow  the  LPT  Processor  to  create  user  roles  and  assign/restrict  account  access  and  management  rights  according  to  training  and  Policies  and  Procedures  that  are  documented  by  the  LPT  Processor  and  approved  by  OTA.  

Page 158: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  29  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

442 14.3.11 The  LPT  System  shall  support  configuration  of  user  roles  that  limits  access  to  sensitive  data  in  compliance  with  PCI  requirements.

443 14.3.12 The  LPT  Processor  shall  ensure  that  all  Microsoft  Windows  servers  and  workstations  used  on  the  Project  have  up-­‐to-­‐date  virus  protection  and  security  management  software  that  are  monitored  and  managed  via  centrally  managed  back  end  software  and/or  MOMS.      

444 14.4 Payment  Card  Industry  Data  Security  Standard  (PCI  DSS)445 14.4.1 All  systems  provided  and  data  maintained  by  the  LPT  Processor  shall  be  

continually  in  full  compliance  with  the  most  current  PCI  DSS  at  all  times.  446 14.4.2 The  LPT  System  shall  provide  for  OTA’s  classification  as  a  Level  1  

merchant  as  defined  in  PCI  DSS.447 14.4.3 The  LPT  Processor  shall  retain  a  highly  qualified  and  credentialed  3rd  

party  firm  to  annually  certify  that  all  systems  provided  by  the  LPT  Processor  and  all  processes  operated  by  the  LPT  Processor  meet  the  PCI  DSS  requirements.    OTA  shall  approve  the  PCI  DSS  compliance  subcontractor,  and  the  cost  of  annual  exams  shall  be  borne  by  the  LPT  Processor.

448 14.4.4 The  LPT  Processor  shall  provide  to  OTA  prior  to  Go-­‐Live  and  annually  thereafter,  the  compliance  subcontractor’s  report  detailing  the  compliance,  including  identifying  the  version  of  PCI  DSS  compliance  with  which  each  system  or  process  complies.  

449 14.4.5 The  LPT  Processor  shall  resolve  compliance  exceptions  in  accordance  with  the  Performance  Standards.    The  LPT  Processor  shall  bear  the  cost  of  resolving  all  compliance  exceptions  including  costs  related  to  changes  to  PCI  DSS  standards.  

450 15 System  Administration  &  Maintenance451 15.1 General  System  Administration  &  Maintenance  Requirements452 15.1.1 The  LPT  Processor  shall  be  responsible  for  the  resolution  of  all  LPT  

System  issues,  Software  bugs,  required  upgrades,  users,  passwords  and  LPT  System  security.  

453 15.1.2 The  LPT  Processor  shall  develop  a  System  Administration  Manual  that  details  the  LPT  System  administration  and  maintenance  procedures.

454 15.1.3 The  LPT  Processor  shall  ensure  that  file  systems  and  the  databases  always  have  adequate  space  available.

455 15.1.4 The  LPT  Processor  shall  monitor  LPT  System  resources  including  CPU  usage,  memory  usage,  network  performance,  and  swap  space.  

456 15.1.5 The  LPT  Processor  shall  provide  LPT  System  software  maintenance,  LPT  System  hardware  maintenance,  as  well  as  any  third  party  hardware  and  software  maintenance  contracts.  

457 16 Disaster  Recovery/Business  Continuity  

Page 159: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  30  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

458 16.1 General  Disaster  Recovery/Business  Continuity  Requirements459 16.1.1 The  LPT  Processor  shall  ensure  continuous  ongoing  operations  in  the  

event  of  a  disaster  or  other  event  that  disrupts  regular  business  operations.

460 16.1.2 The  LPT  Processor  shall  provide  to  OTA  a  comprehensive  Disaster  Recovery/Business  Continuity  plan  detailing  the  process  for  continued  LPT  operations  and  performance  of  critical  business  functions  in  the  event  of  an  unscheduled  service  disruption  regardless  of  the  duration.

461 16.1.3 The  LPT  Processor  shall  ensure  that  a  OTA  approved  Disaster  Recovery/Business  Continuity  Plan  is  in  place  and  fully  tested  and  approved  prior  to  Go-­‐Live.

462 16.1.4 The  Disaster  Recovery/Business  Continuity  plan  shall  include,  but  not  be  limited  to,  the  following:

463 16.1.4.1 Events  and  situation  that  will  trigger  the  Disaster  Recovery/Business  Continuity  process    

464 16.1.4.2 Process  management465 16.1.4.3 Contact  list  and  notification  process  466 16.1.4.4 Methodology  for  the  full  recovery  of  key  components  of  the  LPT  

System  within  required  time  periods  467 16.1.4.5 Plan/alternative  for  resuming  external  interfaces  and  communications

468 16.1.4.6 Staffing  469 16.1.4.7 Off-­‐site  storage  of  all  LPT  System  software,  documentation,  

agreements  and  data  470 16.1.4.8 Technical  and  operations  support471 16.1.4.9 Routine  off-­‐site  back-­‐up472 16.1.4.10 Data  recovery/restoration473 16.1.4.11 Alternate  sites  474 16.1.4.12 A  new  LPT  System  475 16.1.4.13 Transfer  of  critical  functionality  to  a  new  LPT  System  capable  of  

running  the  identical  (or  recovered)  operating  systems,  applications,  and  databases    

476 16.1.4.14 Customer  notification477 16.1.4.15 Test  program  478 16.1.4.16 Return  to  normal  operations  479 16.1.5 The  LPT  Processor  shall  ensure  that  all  necessary  measures  are  in  place  

to  implement  any  and  all  elements  of  the  Disaster  Recovery/Business  Continuity  Plan  as  needed  throughout  the  Term.

Page 160: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  31  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

480 16.1.6 In  the  event  of  a  disaster  or  interruption  in  business  services  the  LPT  Processor  shall  implement  the  Disaster  Recovery/Business  Continuity  Plan.    When  the  event  is  over,  the  LPT  Processor  shall  document  lessons  learned  and  update  the  Disaster  Recovery/Business  Continuity  Plan  in  accordance  with  those  lessons.

481 16.1.7 The  LPT  Processor  shall  prepare  and  perform  periodic  tests  of  its  Disaster  Recovery/Business  Continuity  Plan.  

482 16.1.8 Authorized  OTA  staff  shall  be  provided  complete  access  to  observe  all  Disaster  Recovery/Business  Continuity  test  activities.  

483 16.1.9 At  the  completion  of  each  test,  the  LPT  Processor  shall  submit  to  OTA,  a  comprehensive  report  detailing  the  results  of  all  tests  and  any  corrective  actions  required  with  specific  timeframes  for  completions.

484 16.1.10 The  LPT  Processor  shall  update  the  Disaster  Recovery/Business  Continuity  Plan  at  least  once  per  year  and  within  30  days  of  any  major  LPT  System  or  hardware  change  and/or  after  a  disruption  in  business.

485 16.1.11 Following  are  the  recovery  time  standards:486 16.1.11.1 Call  center:    72  hours487 16.1.11.2 Payment  processing:    72  hours488 16.1.11.3 Correspondence:    5  Business  Days  489 16.1.11.4 Reporting:    5  Business  Days490 16.1.11.5 Finance  tasks  5:    Business  Days491 16.1.11.6  LPT  System  functions*:    72  hours

*LPT  System  functions  include,  but  are  not  limited  to,  the  following.-­‐  Transaction  processing-­‐  Website-­‐  CSR  access  to  all  screens  and  functions-­‐  Image  Review-­‐  Remote  access  by  OTA  to  all  screens  and  functions-­‐  Invoice  and  violation  notice  generation-­‐  All  invoice  and  violation  notice  generation  related  activities

492 16.1.12 All  data  shall  be  backed  up  at  an  off-­‐site  location  such  that  it  can  be  completely  restored  on  an  identical  LPT  System.    This  process  shall  ensure  that  no  data  is  lost  in  the  event  of  a  LPT  System  malfunction,  disaster  or  malicious  interference  with  the  LPT  System.  

493 16.1.13 LPT  System  disaster  recovery  operations  shall  allow  for  the  complete  restoration  of  the  LPT  System.

494 17 Documentation495 17.1 Policies  and  Procedures  Review  

Page 161: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  32  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

496 17.1.1 The  LPT  Processor  shall  develop  and  maintain  Policies  and  Procedures  documents  that  define  all  ongoing  operational  policies,  procedures  and  processes  of  the  LPT  Operation.    

497 17.1.2 The  Policies  and  Procedures  documentation  shall  include  operating  policy,  approved  Business  Rules  and  specific  procedures  required  in  the  performance  of  all  LPT  activities,  including  a  detailed  description  of  transaction  and  data  flow  processing.  

498 17.1.3 The  Policies  and  Procedures  shall  encompass  all  operations  covered  by  the  LPT  Processor  and  its  third-­‐party  contractors  (e.g.,  mail  house),  including  all  daily  responsibilities  and  periodic  tasks.  

499 17.1.4 The  Policies  and  Procedures  shall  include:500 17.1.4.1 All  LPT  program  policies  501 17.1.4.2 All  LPT  Processor  procedures502 17.1.4.3 All  customer  materials  and  correspondence  and  the  policy  for  their  use

503 17.1.4.4 Dispute  Matrix504 17.1.4.5 Customer  Authentication  Matrix505 17.1.4.6 All  scripts  for  common  customer  service  functions,  automated  

recordings,  and  the  detailed  IVR  system  menu  tree  and  script506 17.1.4.7 Image  review  business  rules507 17.1.4.8 Web  page  layouts,  content  and  links508 17.1.4.9 Samples  of  all  reports,  spreadsheets,  and  reconciliations  509 17.1.4.10 All  required  processing  timelines510 17.1.4.11 All  Performance  Standards  and  measurement  methods511 17.1.4.12 LPT  Processor  information  technology  procedures  for  network  

management,  database  management,  server  and  PC  patching  and  security.

512 17.1.4.13 Legal  constraints513 17.1.4.14 Privacy  handling  and  other  applicable  internal  controls514 17.1.4.15 PCI  compliance  information515 17.1.4.16 Data  security516 17.1.5 The  Policies  and  Procedures  shall  reflect  configurations  and  LPT  System  

functionality  from  the  current  RTM  and  SDD.    517 17.1.6 The  Policies  and  Procedures  shall  include  the  LPT  Processor’s  process  and  

schedule  for  updating  and  amending  all  operations  documentation  on  an  on-­‐going  basis,  including  but  not  limited  to  the  Policies  and  Procedures,  user  manuals,  and  disaster  recovery  plan.

518 17.1.7 In  accordance  with  the  approved  Project  Schedule,  the  LPT  Processor  shall  deliver  preliminary  Policies  and  Procedures  documents.        

Page 162: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  33  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

519 17.1.8 After  receipt  of  comments  from  OTA,  the  LPT  Processor  shall,  as  requested  by  OTA,  participate  in  working  sessions  with  OTA  to  review  the  preliminary  Policies  and  Procedures.    

520 17.1.9 The  LPT  Processor  shall  incorporate  all  revisions,  as  appropriate,  based  on  comments  and  input  from  the  working  sessions  and  deliver  updated  Policies  and  Procedures  documents  to  OTA  for  review  and  approval.  

521 17.1.10 An  updated  version  of  the  Policies  and  Procedures  shall  be  provided  to  OTA  for  approval  on  an  annual  basis  or  in  advance  of  any  material  policy  or  procedural  change,  or  more  often  as  requested  by  OTA.  

522 17.2 Manuals  523 17.2.1 The  LPT  Processor  shall  develop  and  provide  a  complete  set  of  LPT  

System  documentation  and  user/training  manuals  in  electronic  and  hardcopy  format.    

524 17.2.2 The  LPT  Processor  shall  provide  user/training  manuals  for  different  user  types  such  as,  but  not  limited  to,  CSRs,  image  reviewers,  system  administrators,  payment  processors,  auditors,  and  accounting  staff.    

525 17.2.3 The  manuals  shall  include  instructions  for  the  use  of  the  relevant  aspects  of  the  LPT  System,  report  access  levels  and  descriptions  of  reports  relevant  to  each  user  type.

526 17.2.4 The  LPT  Processor  shall  provide  administration  manuals  for  the  website  and  the  IVR  system.

527 17.2.5 The  LPT  Processor  shall  provide  a  separate  Reports  User  Manual  that  includes  directions  for  using  the  ad  hoc  reporting  system.

528 17.2.6 The  LPT  Processor  shall  provide  to  OTA  comprehensive  data  dictionaries  of  all  CSC  databases  including  descriptions  and  information  about  relationships,  keys,  relational  and  validation  constraints  for  fields,  indexes,  tables,  views,  schemas,  triggers,  procedures,  materialized  views,  scheduled  jobs,  directories  and  any  other  relevant  database  objects.

529 17.2.7 The  LPT  Processor  shall  provide  and  obtain  OTA  approval  of  training  manuals  prior  to  the  start  of  training.

530 17.2.8 The  LPT  Processor  shall  provide  all  approved  manuals  to  OTA  at  least  one  month  prior  to  Go-­‐Live.    In  addition,  an  updated  version  of  all  manuals  shall  be  provided  to  OTA  for  approval  on  an  annual  basis,  upon  any  material  change,  or  more  often  as  requested  by  OTA.

531 18 Administrative  Requirements532 18.1 General  Administrative  Requirements533 18.1.1 The  LPT  Processor  shall  be  responsible  for  the  administration,  

management,  performance  and  maintenance  of  all  LPT  activities.

Page 163: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  34  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

534 18.1.2 The  LPT  Processor  shall  have  up-­‐to-­‐date  knowledge  of  the  regulations  and  laws  relative  to  the  Project  and  ensure  that  the  LPT  operation  is  in  compliance  with  those  regulations  and  laws.    

535 18.1.3 The  LPT  Processor’s  CSC  staff  shall  not  engage  in  any  other  business  activities  while  acting  in  this  capacity.  

536 18.1.4 As  directed  by  OTA,  the  LPT  Processor  shall  research,  compile  and  provide  data  to  OTA  in  response  to  Oklahoma  Opens  Records  Requests,  subpoenas,  search  warrants,  law  enforcement  requests  or  other  requests.  The  LPT  Processor  shall  track,  document  and  report  to  OTA  the  status  of  all  such  requests  on  a  monthly  basis.

537 18.1.5 The  LPT  Processor  shall  be  responsive  to  all  OTA  inquiries  for  information,  research,  and  other  queries  during  normal  business  hours  and  shall  have  a  process  available  for  responding  to  emergency  queries  after  normal  working  hours.

538 18.2 Staffing539 18.2.1 The  LPT  Processor  shall  provide  qualified  personnel  sufficient  in  quantity  

and  expertise  and  experience  to  meet  the  requirements  of  this  Scope  of  Services  and  in  compliance  with  an  approved  Staffing  Plan.  

540 18.2.2 The  LPT  Processor  shall  name  individuals  to  positions  identified  and  described  in  its  organization  chart  as  Key  Personnel.  

541 18.2.3 LPT  Processor  personnel  that  interact  directly  with  the  public  shall  perform  in  a  professional  manner  at  all  times.    

542 18.2.4 The  LPT  Processor  shall  be  responsible  for  all  staffing  requirements  necessary  to  support  the  full  operation  of  the  LPT  Operation,  except  as  specifically  indicated,  and  to  meet  or  exceed  all  required  Performance  Standards.    

543 18.2.5 The  LPT  Processor  shall  conduct  a  criminal  background  check  of  all  License  Plate  Tolling  Processor’s  staff  immediately  prior  to  employment.    The  LPT  Processor  shall  certify  to  OTA  that  all  staff  has  passed  the  required  background  checks.

544 18.2.6 All  staff  shall  have  the  appropriate  skill,  training,  background,  knowledge,  experience,  integrity  and  character  necessary  to  provide  the  required  services  in  a  competent  and  professional  manner.

545 18.2.7 All  LPT  Processor  staff  that  interface  with  the  public  shall  be  able  to  communicate  in  the  English  language.

546 18.2.8 The  LPT  Processor  shall  remove  any  staff  member  whose  qualifications  or  conduct,  in  the  opinion  of  OTA,  is  not  appropriate  or  commensurate  with  their  position.

Page 164: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  35  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

547 18.2.9 The  LPT  Processor  shall  be  responsible  for  all  wages  and  payroll  expenses  associated  with  staffing  the  License  Plate  Tolling  Operation.    Staff  of  the  LPT  Processor  and/or  its  Subcontractors  and  suppliers  shall  not  be  considered  employees  of  OTA.  

548 18.3 Training549 18.3.1 The  LPT  Processor  shall  establish  and  implement  a  training  program  for  

each  position  and  function.  550 18.3.2 The  LPT  Processor  shall  attend  annual  security  awareness  training  as  

prescribed  by  Payment  Card  Industry  Data  Security  Standards  (PCI  DSS)  requirements.

551 18.3.3 All  staff  shall  be  fully  and  properly  trained  prior  to  working  on  the  Project.    In  addition  to  initial  training,  all  staff  shall  be  informed  of  any  changes  to  the  OTA  LPT  Program  and/or  any  situations  that  affect  the  public  and  shall  be  provided  instructions  and  scripts  on  communicating  those  changes  in  a  consistent  manner.

552 18.3.4 The  LPT  Processor  shall  provide  formal  CSR  training  prior  to  changes  to  the  LPT  System  that  impact  the  CSR’s  use  of  the  LPT  System.    

553 18.3.5 The  LPT  Processor  shall  notify  OTA  at  least  one  week  prior  to  all  scheduled  training  so  that  up  to  three  OTA  representatives  may  observe,  monitor  or  participate  in  any  and  all  training  courses  or  seminars.  

554 18.3.6 The  LPT  Processor  shall  provide  training  to  OTA  staff  on  the  use  of  CSR  screens,  finding  and  using  standard  reports,  generating  ad-­‐hoc  reports,  the  structure  of  the  database,  LPT  Policies  and  Procedures  or  other  topics  determined  to  be  of  utility  to  OTA  staff.  

555 18.3.7 The  LPT  Processor  shall  provide  training  that  utilizes  both  classroom  training  and  hands  on  LPT  System  training,  sufficient  to  ensure  that  LPT  Processor  and  OTA  staff  are  proficient  in  the  use  of  the  LPT  System.    

556 18.3.8 The  LPT  Processor  shall  develop  and  provide  all  materials,  equipment,  and  facilities  required  for  training.

557 18.3.9 The  LPT  Processor  shall  ensure  that  all  training  programs  reflect  current  Policies  and  Procedures  and  identify  the  responsibilities  of  each  employee  with  regard  to  theft,  fraud,  embezzlement,  fiscal  misconduct,  customer  confidentiality  and/or  violation  of  OTA  and  LPT  policies.

558 18.4 Document  Control559 18.4.1 The  LPT  Processor  shall  control  and  keep  current  all  manuals  and  

documents  related  to  LPT  operations.    560 18.4.2 All  incoming  and  outgoing  customer  correspondence  shall  be  

electronically  associated  with  customer  accounts  and  available  online  in  the  customer  account.

Page 165: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  36  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

561 18.4.3 The  LPT  Processor  shall  keep  all  records  and  reports  related  to  LPT  operations  in  accordance  with  the  data  retention  requirements.    

562 18.4.4 The  LPT  Processor  shall  safely  and  securely  store  all  documents,  e.g.  applications,  customer  correspondence,  forms,  financial  documents  and  any  documents  generated  or  received  by  the  LPT  Processor.    

563 18.4.5 The  LPT  Processor  shall  file  stored  documents  in  a  manner  that  facilitates  easy  retrieval  by  subject,  type  and/or  date.    Following  the  period  of  storage,  the  LPT  Processor  shall  be  responsible  for  the  timely,  secure  destruction  and  disposal  of  documents.    

564 18.4.6 All  documents  subject  to  destruction  shall  be  mechanically  shredded  or  turned  over  to  a  professional  document  disposal  service.    

565 18.4.7 The  LPT  Processor  shall  notify  OTA  at  least  30  days  prior  to  the  scheduled  destruction  of  any  stored  document  and  the  LPT  Processor  shall  notify  OTA  once  the  documents  have  been  destroyed.    

566 18.4.8 The  LPT  Processor  shall  not  destroy  any  documents  or  files  without  the  written  consent  of  OTA.

567 18.5 Customer  Information  and  Privacy568 18.5.1 The  LPT  Processor  shall  consider  all  LPT  data  as  confidential  and  maintain  

all  data  in  a  secure  manner  that  protects  personal  identification/identity  information  using  state  of  the  art  data  security  measures.  

569 18.5.2 All  customer  information  is  confidential  and  shall  not  be  disclosed  or  released  unless  requested  by  the  specific  customer  or  unless  directed  by  OTA.  

570 18.5.3 The  LPT  Processor  shall  refer  all  external  requests,  inquiries,  subpoenas  and  other  official  information  requests  to  designated  OTA  management  staff.    OTA  shall  be  immediately  notified  of  such  requests.

571 18.5.4 The  LPT  Processor  shall  not  communicate,  respond  to  inquiries,  or  provide  information  to  the  media,  other  government  agencies,  or  individuals  representing  organizations  other  than  in  the  normal  course  of  customer  service.    

572 18.5.5 The  LPT  Processor  shall  immediately  notify  OTA  of  all  requests  that  are  outside  of  the  normal  course  of  customer  service.  

573 18.5.6 Responding  to  all  inquiries  and  communications,  other  than  in  the  normal  course  of  customer  service,  will  be  the  responsibility  of  OTA  unless  the  LPT  Processor  is  specifically  directed  by  OTA  to  respond.  

Page 166: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  37  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

574 18.5.7 The  LPT  Processor  shall  establish  and  implement  reasonable  methods  to  verify  the  identity  of  customers  prior  to  release  of  information.    A  customer  authentication  matrix,  detailing  the  various  levels  of  information  that  can  be  released  based  on  authentication  level,  shall  be  developed  by  the  LPT  Processor,  approved  by  OTA  and  included  in  the  Policies  and  Procedures.  

575 18.5.8 The  LPT  Processor  shall  not  sell,  use,  or  distribute  general  or  specific  customer  information  and  data  externally  for  any  reason,  nor  shall  it  aggregate  the  data  for  any  non-­‐permitted  use.  

576 18.5.9 The  LPT  Processor  shall  handle  all  customer  and  account  information  in  accordance  with  the  OTA  privacy  policy,  and  approved  customer  account  terms  and  conditions.    

577 18.5.10 Destruction  shall  be  documented  and  periodically  reported  to  OTA.    578 18.5.11 A  written  procedure  to  ensure  proper  destruction  of  customer  data  in  

accordance  with  OTA  policy  shall  be  included  in  the  Policies  and  Procedures  developed  by  the  LPT  Processor  and  approved  by  OTA.    The  procedure  shall  define  who  is  responsible  for  executing  the  applicable  information  purges,  a  method  for  recording/documenting  when  purges  occur,  who  is  responsible  for  recording  the  action  and  where  records  of  the  purge  are  maintained.    

579 18.6 Agency  Access580 18.6.1 The  LPT  Processor  shall  provide  authorized  OTA  staff  with  remote,  real  

time,  secure,  browser-­‐based  access  into  the  LPT  System  to  provide  customer  service,  research  issues,  run  reports  and  perform  quality  assurance/audit  reviews.  

581 18.6.2 The  LPT  Processor  shall  provide  OTA  with  various  levels  of  user  access  privileges  commensurate  with  OTA  staff  job  requirements.    The  specific  access  levels  shall  be  defined  during  the  design  phase.      

582 18.6.3 OTA  remote  access  shall  include,  but  not  be  limited  to:583 18.6.3.1 Read  only  access  to  account  data  within  the  LPT  System.584 18.6.3.2 The  ability  to  input  search  criteria  and  perform  account  information  

and  research  queries  and  searches.585 18.6.3.3 The  ability  to  insert  notes  into  customer  accounts.586 18.6.3.4 The  ability  to  correct  or  override  entries  or  postings.  587 18.6.3.5 The  ability  to  generate  and  retrieve  reports  in  all  required  formats.  588 18.6.3.6 Ad-­‐hoc  reporting  capabilities  with  full  access  to  the  Reporting  

Database.589 18.6.3.7 The  ability  to  print  all  reports  remotely  to  any  printer.590 18.6.3.8 Dashboard  access.  

Page 167: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  38  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

591 18.6.4 Authorized  OTA  users  shall  be  issued  user  names  and  passwords  in  accordance  with  the  established  LPT  System  account  access  rules.

592 18.6.5 Authorized  OTA  staff  shall  have  full  access  (announced  and  unannounced)  to  the  LPT  Processor’s  offices  and  operation  for  any  purpose  including  quality  assurance,  internal  audit,  and  observation  and  monitoring.    

593 18.6.6 The  LPT  Processor  shall  provide  OTA  with  workspace  (chair  and  desk)  and  network  access  in  those  offsite  facilities  in  the  event  that  OTA  representatives  visit  those  facilities.    

594 18.6.7 OTA  shall  have  the  right  to  inspect  the  facilities  at  any  time  and  require  the  LPT  Processor  to  correct  any  condition  that,  in  the  opinion  of  OTA,  represents  safety  and/or  security  concerns  and/or  is  not  in  keeping  with  OTA’s  public  image.

595 18.6.8 The  LPT  Processor  shall  have  staff  available  to  support  OTA  staff  by  demonstrating  and  explaining  systems  and  procedures,  and  answering  questions.  

596 19 LPT  Physical  location    597 19.1 General  LPT  Physical  location  Requirements598 19.1.1 The  LPT  Processor  is  responsible  for  establishing,  furnishing,  supplying,  

maintaining,  staffing,  sizing  and  operating  all  facilities  as  needed  to  meet  the  requirements  of  this  Scope  of  Services.  

599 19.1.2 The  LPT  Processor  shall  establish,  furnish,  supply,  maintain,  staff,  and  operate  the  physical  location  in  accordance  with  all  requirements  and  Performance  Standards.

600 19.1.3 The  LPT  physical  location  shall  be  of  appropriate  size  to  conduct  all  required  LPT  operations,  house  all  necessary  staff  and  allow  for  reasonable  expansion  and  contraction  in  capacity  as  the  OTA  LPT  Program  evolves.

601 19.1.4 The  LPT  Processor  shall  ensure  all  locations  provided  by  the  LPT  Processor  are  Americans  with  Disabilities  Act  (ADA)  compliant  throughout  the  Term.

602 19.1.5 The  LPT  Processor  shall  ensure  that  all  locations  provided  or  used  by  the  LPT  Processor  are  professional  in  appearance  and  clean.    

603 19.1.6 The  LPT  physical  location  shall  be  available  prior  to  the  Production  Readiness  Test  to  allow  for  hiring  and  training,  and  to  support  Production  Readiness  Testing.

604 19.1.7 The  LPT  Processor  shall  provide  all  furnishings,  fixtures,  office  equipment,  computer  hardware,  signage,  supplies,  utilities,  building  services,  and  physical  security  and  security  related  to  the  operation  to  all  LPT  Processor  provided  facilities.    

Page 168: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  39  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

605 19.1.8 LPT  Processor  shall  provide  and  maintain  all  required  connectivity  and  telephone  lines,  including  connections  to  OTA,  the  Host  and/or  third  party  networks  that  provide  speed  and  capacity  sufficient  to  ensure  all  functions  can  be  performed  with  no  delay  and  with  adherence  to  all  data  and  privacy  security  requirements.  

606 19.1.9 The  LPT  Processor  shall  ensure  all  computer  hardware  is  protected  by  a  UPS  with  surge  protection  and  battery  backup.  

607 19.1.10 The  LPT  Processor  shall  be  responsible  for  any  required  build-­‐out  and/or  leasing  of  office  space.  

608 19.2 Physical  Security609 19.2.1 The  LPT  Processor  shall  be  fully  responsible  for  the  physical  security  of  

the  LPT  facilities  and  all  related  property,  assets,  data  and  funds.  610 19.2.2 The  LPT  Processor  shall  utilize  security  measures  and  devices  including,  

but  not  limited  to,  site  access  controls,  data  access  controls,  safes,  vaults,  surveillance  cameras,  environmental  controls,  data  security,  inventory  security,  software  security  and  other  tools  that  will  prevent,  detect,  and/or  assist  in  researching  and  investigating  issues  at  all  LPT  locations.  

611 19.2.3 The  LPT  Processor  shall  ensure  that  the  physical  security  controls  meet  all  PCI  DSS  requirements.

612 19.2.4 The  LPT  Processor  shall  be  responsible  for  the  custody  of  funds  and  shall  provide  internal  control  and  security  practices  to  protect  the  receipt,  storage,  and  transfer  of  funds.  

613 19.3 Operating  Hours614 19.3.1 The  LPT  Processor’s  live  CSR  call  center  shall  be  available  to  customers  

Monday  through  Friday  (excluding  holidays),  08:00  -­‐  16:30  CST.  615 19.3.2 The  IVR  and  website  shall  be  available  24  hours  a  day,  7  days  a  week  

except  for  approved  scheduled  outages  for  maintenance  and  system  updates.

616 19.3.3 LPT  Processor  management  staff  shall  be  available  during  regular  hours  of  operation  and  shall  be  available  24/7  to  respond  to  emergency  situations.  

617 20 Transaction  Processing618 20.1 General  Transaction  Processing  619 20.1.1 The  LPT  Processor  shall  process  all  transactions  received  from  the  Host  as  

described  in  this  document  and  its  appendices.620 20.1.2 The  LPT  System  shall  process  all  transactions  in  accordance  with  the  most  

recent  OTA  toll  rate  schedule,  provided  by  OTA.621 20.2 Image  Review

Page 169: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  40  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

622 20.2.1 The  LPT  Processor  shall  establish  and  implement  a  process  to  correctly  identify  the  license  plate  number,  jurisdiction  and  plate  type  of  each  license  plate  image  provided  by  OTA.    This  may  include  processes  such  as  Optical  Character  Recognition  (OCR),  fingerprinting  and  manual  image  review.

623 20.2.2 The  LPT  Processor’s  image  review  process  shall  achieve  a  license  plate  (number,  jurisdiction  and  plate  type)  accuracy  rate  of  99.95%  of  all  readable  images.  

624 20.2.3 The  LPT  Processor  shall  perform  image  review  for  all  images  by  processing  the  oldest  transaction  date  first.

625 20.2.4 The  LPT  System  shall  allow  users  to  perform  image  enhancements  to  improve  the  readability  of  images.    

626 20.2.5 The  LPT  System  shall  allow  users  to  simultaneously  view  all  images  related  to  a  particular  transaction.

627 20.2.6 The  LPT  Processor  shall  assign  an  appropriate  reject  reason,  based  on  a  list  of  reject  codes  and  processing  rules  to  be  developed  with  OTA,  to  all  transactions  for  which  viable  license  plate  information  cannot  be  determined  from  the  available  images.

628 20.2.7 The  LPT  System  shall  allow  for  a  minimum  of  10  distinct  image  reject  codes,  to  be  defined  with  and  approved  by  OTA  during  the  design  stage.  

629 20.2.8 The  LPT  System  shall  reconcile  the  reject  codes  to  OTA  at  the  transaction  level,  for  all  transactions  that  are  rejected.  

630 20.2.9 The  LPT  System  shall  allow  rejected  images  to  be  reviewed  for  quality  assurance  purposes.

631 20.2.10 The  LPT  Processor  shall  monitor  and  report  on  the  quality  of  images  received  from  the  lane  system  in  a  manner  that  allows  for  the  quick  escalation  of  in-­‐lane  camera  issues  to  OCR  issues.

632 20.2.11 The  LPT  System  shall  automatically  queue  all  previous  DMV  rejects  for  manual  re-­‐review,  based  on  a  configurable  number  of  retries  per  transaction.    

633 20.2.12 The  LPT  System  shall  allow  the  number  of  image  review  retries  to  be  set  to  zero.

634 20.2.13 The  LPT  Processor  shall  associate  the  observed  license  plate  number,  plate  type  (where  applicable),  and  jurisdiction  to  all  transactions  for  which  those  data  can  be  determined  from  the  available  images.  

635 20.2.14 The  LPT  Processor  shall  provide  Image  Review  reports  to  be  developed  with  OTA  during  the  design  stage.

636 20.2.15 The  LPT  Processor  shall  document  and  adhere  to  Image  Review  Policies  and  Procedures  that  will  be  developed  with  and  approved  by  OTA.

Page 170: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  41  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

637 20.2.16 The  LPT  Processor  shall  retain  all  images,  including  rejected  images,  according  to  OTA’s  data  retention  policy.

638 20.3 LPT  Watch  List639 20.3.1 The  LPT  System  shall  maintain  a  manual  list  of  license  plate  /  vehicle  

information  (string,  jurisdiction,  and  type)  records.    640 20.3.2 The  LPT  System  shall  allow  authorized  LPT  Processor  and  OTA  users  to  

access  the  Watch  List  and  add/remove  records.641 20.3.3 The  LPT  System  shall  require  all  transactions  with  license  plate  

information  matching  to  a  Watch  List  record  to  go  through  the  manual  image  review  process,  regardless  of  the  OCR  confidence  data  associated  with  the  transaction/images.  

642 20.4 PIKEPASS  Account  Match  Processing643 20.4.1 The  LPT  System  shall  compare  each  license  plate  associated  with  a  

transaction  to  the  current  list  of  V-­‐Toll  eligible  license  plates  to  determine  the  appropriate  method  for  processing  each  transaction.

644 20.4.2 The  LPT  System  shall  send  all  V-­‐Toll  eligible  transactions  to  OTA  for  processing.    

645 20.4.3 The  LPT  System  shall  process  all  other  (not  V-­‐Toll  eligible)  transactions  as  described  in  this  document.  

646 20.4.4 The  LPT  System  shall  reconcile  these  V-­‐Toll  eligible  transactions  back  to  OTA.

647 20.4.5 The  LPT  System  shall  not  process  V-­‐Toll  transactions  to  LPT  accounts.  648 20.5 Name  and  Address  Acquisition  via  Registered  Owner  of  Vehicle  (ROV)  

Lookup649 20.5.1 The  LPT  Processor  shall  establish  and  implement  a  process  for  using  

license  plate  number,  issuing  jurisdiction,  and  plate  type  (where  applicable)  to  obtain  the  name  and  address  of  the  registered  owner  of  vehicles  from  the  appropriate  DMV  and/or  other  third  party  services  in  all  50  states,  Washington  D.C.,  all  Canadian  Provinces,  and  all  Mexican  states  where  possible.

650 20.5.2 For  license  plates  that  cannot  be  processed  to  a  PIKEPASS  account,  the  LPT  System  shall  access  an  OTA  database  to  obtain  Oklahoma,  Texas  and  Commercial  vehicle  registered  owner  name  and  address  information.

651 20.5.3 For  license  plates  outside  of  Oklahoma  and  Texas  that  cannot  be  processed  to  a  PIKEPASS  account  the  LPT  System  shall  submit  vehicle  information  to  the  ROV  source  for  registered  owner  name  and  address  information.

652 20.5.4 The  LPT  Processor  shall  utilize  plate  type  (DMV  categorization  of  license  plates)  in  its  submissions  for  all  states  that  require  or  accept  plate  type  as  a  means  of  ensuring  the  highest  and  most  accurate  return  rate.

Page 171: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  42  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

653 20.5.5 The  LPT  Processor  shall  be  capable  of  submitting  requests  to  several  DMV  databases  where  applicable  (for  example,  individual,  commercial,  apportioned)  to  ensure  the  highest  and  most  accurate  return  rate.  

654 20.5.6 The  LPT  Processor  may  utilize  the  OTA  out-­‐of-­‐state  ROV  look  up  vendor.655 20.5.7 When  multiple  transactions  for  the  same  license  plate  information  

require  ROV  lookup  at  the  same  time,  the  LPT  Processor  shall  initiate  only  one  request  for  that  particular  plate  and  apply  the  results  to  each  transaction,  if  doing  so  will  reduce  costs  incurred  by  OTA.  

656 20.5.8 The  LPT  Processor  shall  track  all  DMV  and  other  source  requests  to  their  disposition,  including  hits,  no  hits,  rejected  license  plates  and  no  responses  by  state/province  and  by  source.    

657 20.5.9 For  transactions  that  reject  or  receive  no  response  from  an  ROV  source  lookup,  the  LPT  Processor  shall  use  other  ROV  sources  and  methods  available  (e.g.,  skip  tracing)  to  attempt  to  locate  the  responsible  owner,  in  accordance  with  Policies  and  Procedures  to  be  approved  by  OTA.

658 20.5.10 The  LPT  Processor  shall  report  to  OTA  the  specific  reasons  for  all  failures  to  obtain  the  ROV,  including  by  source,  reason,  jurisdiction,  and  plate  type  and  with  an  indication  of  whether  the  request  was  a  first  submission,  resubmission,  or  was  never  successfully  submitted.  

659 20.5.11 The  LPT  Processor  shall  use  methods  or  services  approved  by  OTA  to  perform  uniform  address  cleansing  of  data  returned  from  ROV  sources.  

660 20.5.12 The  LPT  System  shall  have  the  ability  to  allow  authorized  users  to  override  the  address  field  based  on  approved  customer  requests.

661 20.5.13 The  LPT  System  shall  associate  the  information  related  to  the  ROV  request  to  the  transaction(s)  for  which  that  lookup  was  initiated.

662 20.5.14 The  LPT  System  shall  associate  the  ROV  information  returned  for  a  particular  lookup  with  the  transaction(s)  for  which  that  lookup  was  initiated.

663 20.6 LPT  Transaction  Processing664 20.6.1 When  the  LPT  System  obtains  ROV  information  for  a  transaction,  the  LPT  

System  shall  check  existing  unregistered  LPT  accounts  (UPAs)  for  an  exact  match  to  the  name,  address,  and  vehicle  information.  

665 20.6.2 If  the  LPT  System  identifies  an  existing  UPA  with  an  exact  match  for  the  name,  address,  and  license  plate  information,  the  LPT  System  shall  process  the  transactions  to  that  UPA.

666 20.6.3 If  the  LPT  System  identifies  an  existing  UPA  with  an  exact  match  for  the  name  and  license  plate  information,  but  a  different  address,  the  LPT  System  shall  update  the  address  on  that  UPA  and  process  the  transaction  to  that  account.

Page 172: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  43  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

667 20.6.4 If  the  LPT  System  determines  there  is  no  existing  UPA  with  the  exact  license  plate  information  and  registered  owner  name,  the  LPT  System  shall  establish  a  new  UPA  for  the  license  plate  and  ROV  information  and  process  the  transaction  to  the  new  account.

668 20.7 LPT  Invoice  Account  Establishment  669 20.7.1 The  LPT  System  shall  automatically  create  new  UPAs  as  dictated  by  the  

transaction  processing  requirements.  670 20.7.2 The  LPT  System  shall  not  allow  customers  or  LPT  Processor  staff  to  

manually  establish  or  close  an  UPA.671 20.7.3 The  LPT  System  shall  assign  new  UPA  account  numbers  sequentially,  in  

order  of  establishment.672 20.7.4 The  LPT  System  shall  not  allow  any  UPA  to  have  the  same  account  

number  as  any  other  UPA  or  PIKEPASS  account.673 20.7.5 The  LPT  System  shall  use  the  license  plate  information  associated  with  a  

transaction  and  the  ROV  information  returned  by  the  ROV  source  to  populate  the  new  UPA.

674 20.7.6 The  LPT  System  shall  issue  an  OTA-­‐approved  ‘welcome  letter’  to  the  name/address  returned  by  ROV  lookup  after  the  LPT  System  establishes  a  new  UPA.    The  timing  of  issuing  the  welcome  letter  will  be  determined  during  design.

675 21 Invoice  Generation  and  Escalation676 21.1 Invoice  Generation  and  Issuance  677 21.1.1 The  LPT  System  shall  accumulate  LPT  transactions  on  each  UPA  and  

generate  an  invoice  for  unpaid  amounts  at  the  end  of  the  configurable  invoice  cycle.

678 21.1.2 The  LPT  System  shall  allow  for  the  configurable  invoice  cycle  for  the  initial  invoice  to  be  different  than  the  configurable  invoice  cycle  for  all  subsequent  invoices.  

679 21.1.3 The  LPT  System  shall  generate  the  initial  invoice  on  a  new  UPA  after  the  end  of  the  initial  invoice  cycle.  

680 21.1.4 The  LPT  System  shall  generate  all  subsequent  invoices  (after  the  initial)  for  an  UPA  after  the  end  of  the  invoice  cycle.

681 21.1.5 The  LPT  Processor  shall  have  the  ability  to  issue  invoices  to  an  email  address  on  file  with  an  UPA,  in  place  of  a  paper  mailing,  for  accounts  opted-­‐in  for  emailed  invoices.

682 21.1.6 The  LPT  Processor  shall  have  the  capability  to  provide  a  link  within  invoice  emails,  providing  customers  access  to  their  online  invoice  and  payment  options,  with  the  required  credentials  for  web  access.  

Page 173: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  44  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

683 21.1.7 The  LPT  System  shall  allow  CSRs  to  flag  accounts  (opt-­‐in)  for  email  invoice  delivery,  upon  customer  request  and  according  to  Policies  and  Procedures  to  be  approved  by  OTA.  

684 21.1.8 The  LPT  Processor  shall  be  capable  of  selecting  accounts  with  invoices  eligible  for  inclusion  of  supplemental  materials  by  account  variables  such  as  zip  code,  toll  activity,  fees,  and  account  status.    

685 21.2 Invoice  Issuance  Suppression686 21.2.1 The  LPT  System  shall  provide  the  functionality  to  suppress  the  issuance  

of  invoices  with  outstanding  amounts  below  a  configurable  threshold  specified  by  OTA.  

687 21.2.2 The  LPT  System  shall  provide  functionality  to  suppress  the  issuance  of  invoices  for  particular  accounts,  at  the  account  level,  at  the  request  of  OTA.      

688 21.2.3 The  LPT  Processor  shall  provide  the  functionality  to  suppress  the  issuance  of  invoices  with  no  toll  or  financial  activity  during  the  invoice  period.

689 21.2.4 For  accounts  with  invoice  issuance  suppressed,  the  LPT  System  shall  generate  the  invoice  data  and  associate  it  with  the  account  but  shall  not  issue  the  invoice  (via  mail  or  email).  

690 21.2.5 The  LPT  System  shall  clearly  indicate  in  the  account  record  whether  the  account  has  invoice  issuance  suppressed,  along  with  the  reason  for  that  suppression.

691 21.2.6 The  LPT  System  shall  suppress  customer  mailings  that  are  returned  as  undeliverable  after  a  configurable  number  of  mailing  attempts  to  the  same  address.    

692 21.2.7 The  LPT  System  shall  have  the  capability  to  manually  override  mail  suppression  at  the  account  level.  

693 21.2.8 For  accounts  with  invoice  mailing  suppressed  due  to  returned/undeliverable  mail,  the  LPT  System  shall  have  the  capability  to  escalate  unpaid  amounts.  

694 21.3 Invoice  Layout  Requirements695 21.3.1 On  each  invoice,  the  LPT  Processor  shall  provide  individual  transaction  

details,  including  time,  date,  toll  location,  vehicle  class,  license  plate  information,  and  toll  amount.

696 21.3.2 The  LPT  Processor  shall  display  all  toll  transaction  times  in  Central  Time.  697 21.3.3 On  each  invoice,  the  LPT  Processor  shall  have  the  ability  to  include  UPA-­‐

specific  data,  including  but  not  limited  to:698 21.3.3.1 invoice  date  699 21.3.3.2 invoice  period700 21.3.3.3 invoice  number

Page 174: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  45  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

701 21.3.3.4 PIN  for  IVR/web  access702 21.3.3.5 due  date  703 21.3.3.6 registered  owner  name704 21.3.3.7 registered  owner  mailing  address705 21.3.3.8 amount  due  (new  tolls  due  and  total  due)  for  the  current  invoice  cycle

706 21.3.3.9 amounts  due  from  prior  invoice  cycles  (tolls  and  fees)  broken  down  by  invoice  cycle

707 21.3.3.10 amounts  due  broken  down  by  past  due  time  periods  (e.g.,  past  due,  30  days  past  due,  60  days  past  due)

708 21.3.3.11 amount  in  collections709 21.3.3.12 payments  received  since  the  issuance  of  the  prior  invoice710 21.3.3.13 amounts  in  violation  status  (by  violation  notice  level,  1st  and  2nd)711 21.3.3.14 vehicle  registration  stop  flag  status712 21.3.4 On  each  invoice,  the  LPT  Processor  shall  have  the  ability  to  include  

general  information,  including  but  not  limited  to:713 21.3.4.1 Customer  Service  telephone  number  714 21.3.4.2 Customer  Service  website  URL715 21.3.4.3 payment  instructions716 21.3.4.4 PIKEPASS  account  information717 21.3.4.5 escalation  timelines  and  penalties718 21.3.4.6 applicable  laws  and  legal  means  available  to  OTA  for  collecting  unpaid  

tolls719 21.3.4.7 dispute  instructions  721 21.3.5 The  LPT  Processor  shall  have  the  ability  to  include  a  barcode  that  

uniquely  identifies  the  invoice.722 21.3.6 The  LPT  System  shall  support  a  distinct  document  layout  for  invoices  that  

include  tolls  only.723 21.3.7 The  LPT  System  shall  support  a  distinct  document  layout  for  invoices  that  

include  fees.724 21.3.8 The  LPT  System  shall  support  a  distinct  document  layout  for  invoices  that  

include  violations.725 21.3.9 The  LPT  System  shall  support  a  distinct  document  layout  for  invoices  

issued  for  UPAs  with  a  vehicle  registration  stop  flag  placed.726 21.3.10 The  LPT  System  shall  support  a  distinct  document  layout  for  invoices  

issued  for  UPAs  with  amounts  due  open  with  a  Collections  agency.727 21.3.11 The  LPT  Processor  shall  work  collaboratively  with  OTA  in  the  design,  

format  and  content  of  all  invoices  (email  and  paper),  envelopes,  and  any  related  materials  or  inserts  during  the  design  phase  and  subject  to  the  approval  of  OTA.

Page 175: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  46  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

728 21.3.12 The  LPT  Processor  shall  be  capable  of  inserting  (for  paper  statements)  or  attaching  (for  email  statements)  other  materials  in  or  with  selected  customer  statements  as  directed  by  OTA.    

729 21.4 Customer  Fees  730 21.4.1 The  LPT  System  shall  allow  for  the  assessment  of  customer  fees.  731 21.4.2 The  LPT  System  shall  allow  all  fee  amounts  and  the  timing  of  assessment  

to  be  configurable.732 21.4.3 The  LPT  System  shall  provide  for  all  fee  amounts  to  be  separately  

configured.733 21.4.4 The  LPT  System  shall  allow  authorized  users  to  reverse  and/or  adjust  any  

fee.734 21.5 Invoice  Escalation735 21.5.1 The  LPT  System  shall  set  an  invoice  payment  due  date  for  each  invoice  (a  

configurable  number  of  days  from  that  particular  invoice’s  issuance  date)  that  will  be  visible  to  customers  on  their  invoices.

736 21.5.2 The  LPT  System  shall  include  an  invoice  payment  “grace  period”  (a  configurable  number  of  days  from  an  invoice  due  date)  that  will  not  be  visible  to  customers.  The  invoice  escalation  process  shall  be  based  on  the  amounts  that  are  unpaid  at  the  end  of  the  grace  period.  

737 21.5.3 The  LPT  System  shall  process  amounts  that  remain  unpaid  for  a  particular  invoice  cycle  through  the  escalation  process  independent  of  unpaid  amounts  from  other  invoice  cycles.  

738 21.5.4 The  LPT  System  shall  include  tolls  that  are  not  paid  in  full  at  the  conclusion  of  the  grace  period  on  the  next  month’s  invoice,  and  shall  assess  a  late  fee  (configurable  amount)  for  those  outstanding  tolls.  

739 21.5.5 The  LPT  System  shall  escalate  all  tolls  and  fees  that  appeared  on  the  Unpaid  Invoice  at  the  same  time,  prior  to  generation  of  the  New  Invoice,  regardless  of  the  occurrence  date  or  posting  date  of  any  particular  toll  or  fee.  

740 21.5.6 The  LPT  System  shall  be  able  to  accommodate  the  invoice/violation  escalation  process  detailed  in  Table  2.    The  exact  escalation  process  and  related  timing  will  be  defined  during  the  design  phase.

741 Table  2 See  Table  2:  Escalation  Process  tab.  742 21.5.7 The  LPT  System  shall  allow  for  all  unpaid  amounts  to  display  on  an  

invoice  broken  down  by  invoice  period  and  escalation  level.  743 21.5.8 The  LPT  System  shall  have  the  capability  to  assess  all  past  due  and  

escalation  fees  at  any  stage  in  the  escalation  process.  744 21.5.9 The  LPT  System  shall  have  the  capability  to  assess  past  due  and  other  

escalation-­‐related  fees.

Page 176: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  47  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

745 21.5.10 The  LPT  System  shall  have  the  capability  to  change  where  escalation  fees  are  assessed  in  the  escalation  process.

746 21.5.11 The  LPT  System  shall  have  the  capability  to  assess  a  violation  fee  for  any  invoice  escalated  to  a  violation.

747 21.5.12 The  LPT  System  shall  reflect  associated  fees  on  invoices,  violation  notices,  and  other  correspondence  as  appropriate.    

748 21.5.13 The  LPT  System  shall  allow  for  the  assessment  of  configurable  invoice  late  fees  at  the  transaction  level  and  the  invoice  level.  

749 21.5.14 The  LPT  System  shall  allow  for  unpaid  tolls  and  fees  to  be  grouped,  escalated  and  displayed  on  invoices  by  the  period  for  which  they  were  originally  invoiced.  

750 21.5.15 The  LPT  System  shall  allow  for  violations  to  be  included  on  invoices  as  well  as  being  issued  as  a  separate  violation  notice.

751 21.5.16 The  LPT  System  shall  allow  for  a  separate  violation  notice  to  be  generated  and  issued  for  tolls  and  fees  due  for  each  invoice  period.

752 21.5.17 The  LPT  System  shall  only  generate  and  issue  a  violation  notice  if  the  violation  amounts  due  are  in  excess  of  a  configurable  minimum  amounts.  The  configurable  minimum  amounts  shall  be  separate  for  tolls  and  fees.

753 21.5.18 The  LPT  System  shall  allow  for  the  escalation  of  amounts  due  to  an  OTA  specified  Collection  Agency.

754 21.5.19 The  LPT  System  shall  escalate  amounts  due  to  the  Collection  Agency  only  if  the  amounts  due  are  in  excess  of  a  configurable  minimum  amounts.  The  configurable  minimum  amounts  shall  be  separate  for  tolls  and  fees.

755 21.5.20 The  LPT  System  shall  allow  for  the  assessment  of  a  Collection  Agency  fee.

756 21.5.21 The  LPT  System  shall  allow  for  the  assessment  of  a  configurable  Collection  Agency  fee  that  is  based  on  a  percentage  of  the  total  amounts  due,  a  flat  fee  for  the  invoice  period  and/or  a  per-­‐transaction  fee.  

757 21.5.22 The  LPT  System  shall  allow  for  a  vehicle  registration  Stop  Flag  to  be  placed  on  Oklahoma  license  plate  with  amounts  due  in  excess  of  configurable  minimum  amounts.    The  configurable  minimum  amounts  shall  be  separate  for  tolls  and  fees.  

758 21.5.23 The  LPT  Processor  shall  have  a  process  to  perform  DMV  registration  holds  or  other  OTA  enforcement  methods  allowed  by  interstate  interoperability  enforcement  agreements.    The  details  of  this  process  shall  be  determined  during  the  design  phase.

Page 177: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  48  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

759 21.5.24 The  LPT  System  shall  allow  for  the  write-­‐off  of  unpaid  tolls  and/or  fees  as  dictated  by  the  OTA-­‐approved  Policies  and  Procedures.  

760 21.5.25 The  LPT  System  shall  have  the  ability  to  prevent  disputed  transactions  from  escalating  until  the  dispute  has  been  resolved.  

761 22 Violation  Processing762 22.1 Violation  Processing  763 22.1.1 The  LPT  Processor  shall  be  responsible  for  all  violation  processing,  

including  the  generation  and  issuance  of  violation  notices  and  applicable  correspondence,  payment  processing,  and  all  related  customer  service  activities  per  the  Oklahoma  legislation  (Appendix  G).  

764 22.1.2 The  LPT  System  shall  visually  indicate  to  users  whether  an  UPA  has  any  outstanding  amount  due  that  has  escalated  to  violation  processing.

765 22.2 Violation  Notice  Generation  and  Issuance  766 22.2.1 The  LPT  Processor  shall  generate  and  issue  all  violation  notices  for  LPT  

violations.767 22.2.2 The  LPT  Processor  shall  issue  all  violation  notices  in  the  form  of  paper  

notices.768 22.2.3 The  LPT  Processor  shall  issue  paper  violation  notices  even  for  accounts  

with  invoice  mailing  suppressed.769 22.2.4 The  LPT  Processor  shall  issue  paper  violation  notices  even  for  accounts  

opted-­‐in  for  email  delivery  of  invoices.770 22.2.5 The  LPT  System  shall  include  a  configurable  minimum  dollar  amount  

required  to  issue  a  violation  notice.771 22.2.6 The  LPT  System  shall  have  the  capability  to  suppress  the  issuance  of  

violation  notices  with  outstanding  amounts  below  a  configurable  threshold.

772 22.2.7 On  each  violation  notice,  the  LPT  Processor  shall  have  the  ability  to  include  the  following  violation-­‐specific  information:

773 22.2.7.1 notice  date774 22.2.7.2 notice  due  date  775 22.2.7.3 notice  number776 22.2.7.4 PIN  for  IVR/web  access777 22.2.7.5 time  and  date  for  each  toll778 22.2.7.6 location  for  each  toll779 22.2.7.7 axle  count  for  each  toll780 22.2.7.8 license  plate  image781 22.2.7.9 license  plate  number  and  state  782 22.2.7.10 vehicle  make  783 22.2.7.11 vehicle  owner  name  and  address  784 22.2.7.12 amount  due  (tolls  due,  fees  due,  total  due)  

Page 178: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  49  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

785 22.2.7.13 barcode  that  uniquely  identifies  the  violation  notice786 22.2.8 On  each  violation  notice,  the  LPT  Processor  shall  have  the  ability  to  

include  the  following  general  information:787 22.2.8.1 payment  instructions  788 22.2.8.2 escalation  information  789 22.2.8.3 applicable  laws  790 22.2.8.4 PIKEPASS  account  information791 22.2.8.5 OTA  website  URL  792 22.2.8.6 dispute  information  793 22.2.8.7 Customer  Service  telephone  number  794 22.2.9 The  LPT  Processor  shall  work  collaboratively  with  OTA  in  the  design,  

format  and  content  of  all  violation  notices,  envelopes,  and  any  related  materials  or  inserts  during  the  design  phase  and  subject  to  the  approval  of  OTA.

795 22.2.10 The  LPT  System  shall  support  distinct  layouts  for  1st  violation  notices  and  2nd  violation  notices.  

796 22.3 Violation  Notices  Tracking  and  Resolution  797 22.3.1 The  LPT  Processor  shall  update  the  status  of  each  violation  and  violation  

notice  during  its  life  cycle  process  so  that  the  LPT  Processor  and  OTA  can  effectively  manage  and  track  violations  and  violation  notices.    The  LPT  Processor  shall  track  the  following  information:

798 22.3.1.1 Payments  that  result  in  payment  in  full,  partial  payment,  or  over-­‐payment.

799 22.3.1.2 Payment  reversals  due  to  insufficient  funds  or  chargebacks.800 22.3.1.3 Violations  disputed  or  under  administrative  review.801 22.3.1.4 Violations  dismissed,  negotiated,  hearing  requested  or  dispute  denied.

802 22.4 Vehicle  Registration  Stop  Flags803 22.4.1 The  LPT  Processor  shall  develop  an  interface  to  the  Oklahoma  Tax  

Commission  system  to  automate  the  transmission  of  vehicle  registration  stop  flag  placement  and  removal  requests  to  the  Commission.  

804 22.4.2 The  LPT  Processor  shall  update  the  stop  flag  status  in  real  time  as  the  account  status  changes.

805 22.4.3 The  LPT  Processor  shall  never  place  a  stop  flag  for  outstanding  amounts  consisting  only  of  fees—there  must  be  some  toll  amount  included.    

806 22.4.4 The  LPT  System  shall  track  and  report  on  stop  flag  activity,  including  placement  requests,  removal  requests,  and  payments.    

807 22.4.5 The  LPT  System  shall  visually  indicate  to  users  whether  an  UPA  has  amounts  due  related  to  a  stop  flag.

Page 179: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  50  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

808 22.4.6 The  LPT  System  shall  clearly  display  to  customer  service  users  the  total  payment  amount  required  to  remove  the  stop  flag,  for  accounts  on  which  there  is  an  active  stop  flag.

809 22.5 Collection  Agency810 22.5.1 The  LPT  System  shall  interface  with  the  collection  agency  for  the  

exchange  of  debt  placements  and  payment  data  based  on  an  ICD  that  shall  be  developed  jointly  between  the  collections  agency  and  the  LPT  Processor.

811 22.5.2 The  LPT  System  shall  place  unpaid  tolls  and  fees  with  the  collection  agency  based  on  the  approved  escalation  process.

812 22.5.3 The  LPT  System  shall  only  escalate  unpaid  tolls  and  fees  to  the  collection  agency  when  are  in  excess  of  configurable  minimum  amounts.  The  configurable  minimum  amounts  shall  be  separate  for  tolls  and  fees.

813 22.5.4 The  LPT  System  shall  reconcile  placements  and  payments  with  the  collection  agency.

814 22.5.5 The  LPT  System  shall  report  to  OTA  the  status  of  amounts  placed  with  the  collection  agency  based  on  information  provided  by  the  collection  agency.

815 22.5.6 The  LPT  System  shall  accept,  process  and  track  payments  made  to  the  LPT  Processor  for  debt  placed  with  the  collection  agency.

816 22.5.7 The  LPT  Processor  shall  update  the  collection  agency  with  all  payments  made  for  transactions  in  collections.  

817 22.5.8 The  LPT  System  shall  provide  reporting  on  collection  agency  related  violations  and  payments  as  required  by  OTA.

818 22.5.9 The  LPT  System  shall  visually  indicate  to  users  whether  an  UPA  has  amounts  due  that  have  been  escalated  to  the  collection  agency.

819 22.5.10 The  LPT  System  shall  clearly  display  to  customer  service  users  the  total  outstanding  amount  that  has  been  escalated  to  the  collection  agency.

820 23 Payment  Processing821 23.1 General  Payment  Processing  Requirements822 23.1.1 The  LPT  System  shall  allow  authorized  users  to  process  customer  

payments  according  to  OTA-­‐approved  payment  processing  Policies  and  Procedures.

823 23.1.2 The  LPT  Processor  shall  develop  specific  Policies  and  Procedures  for  processing  partial  payments.

824 23.1.3 The  LPT  System  shall  allow  for  partial  payment  of  invoices  and  violation  notices.

825 23.1.4 The  LPT  System  shall  provide  functionality  to  process  partial  payments  and  over-­‐payments.  

Page 180: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  51  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

826 23.1.5 The  LPT  System  shall  apply  partial  payments  to  outstanding  amounts  (all  tolls  and  fees)  on  a  first-­‐in,  first-­‐out  basis.  

827 23.1.6 The  LPT  System  shall  provide  an  option  to  allow  authorized  users  to  override  the  first-­‐in,  first-­‐out  rule  and  apply  payments  to  user-­‐selected  tolls  and  fees.

828 23.1.7 The  LPT  System  shall  apply  invoice  overpayment  amounts  to  the  account  as  a  prepaid  balance  for  use  in  a  subsequent  invoice  cycle.  

829 23.1.8 The  LPT  System  shall  apply  prepaid  balances  to  outstanding  amounts  (all  tolls  and  fees)  on  a  first-­‐in,  first-­‐out  basis  prior  to  issuing  an  invoice.    This  payment  shall  be  reflected  on  the  invoice.  

830 23.1.9 The  LPT  System  shall  allow  authorized  users  to  initiate  a  refund  of  any  prepaid  balance  amount  in  accordance  with  OTA-­‐approved  Policies  and  Procedures  (e.g.,  due  to  customer  request).

831 23.1.10 The  LPT  System  shall  have  the  capability  to  assess  non-­‐sufficient  funds  (NSF)  fees  for  returned  checks.

832 24 Account  Maintenance  and  Management  833 24.1 Customer  Information  and  Correspondence834 24.1.1 The  LPT  System  shall  support  electronically  linking  documents  to  

accounts,  including  both  incoming  and  outgoing  correspondence.  835 24.1.2 The  LPT  System  shall  ensure  all  customer  correspondence  is  easily  

accessible  by  the  LPT  Processor  and  OTA  staff  in  the  performance  of  customer  service  tasks.

836 24.1.3 The  LPT  System  shall  allow  authorized  users  to  enter  account  notes  on  any  account  at  any  time,  and  shall  store  all  user-­‐entered  notes  with  the  account.

837 24.1.4 The  LPT  System  shall  allow  authorized  users  to  enter  an  email  address  on  an  UPA  for  customer  communications.

838 24.1.5 The  LPT  System  shall  allow  authorized  users  to  mark  an  UPA  with  a  valid  email  address  on  file  as  opted-­‐in  for  emailed  invoices.

839 24.2 General  Account  Management840 24.2.1 The  LPT  System  shall  allow  authorized  LPT  staff  and  authorized  OTA  users  

to  manage  LPT  accounts,  which  shall  include  the  following  capabilities:

841 24.2.1.1 View  posted  Transactions842 24.2.1.2 View  payment  history843 24.2.1.3 View  the  account  balance844 24.2.1.4 View  account  notes  and  contact  history845 24.2.1.5 View  documents  sent  to  and  received  from  the  customer846 24.2.1.6 Attach  documents  to  an  account847 24.2.1.7 View  and  modify  customer  demographics

Page 181: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  52  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

848 24.2.1.8 View  and  modify  invoice  delivery  options849 24.2.1.9 View  vehicle  information850 24.2.1.10 View  transaction  images851 24.2.1.11 Add  and  remove  credit/debit  card  and  ACH  information852 24.2.1.12 Process  payments853 24.2.1.13 Dispute  tolls  and  fees854 24.2.2 The  LPT  System  shall  not  allow  modification  or  removal  of  the  

name/address  information  returned  by  an  ROV  source  lookup.  855 24.3 Disputes  and  Adjustments856 24.3.1 The  LPT  Processor  shall  establish  and  implement  processes  to  receive,  

research,  document,  and  resolve  all  customer  disputes.  857 24.3.2 The  LPT  Processor  shall  develop  Policies  and  Procedures,  subject  to  OTA  

review  and  approval,  for  handling  all  disputes,  including  conditions  under  which  OTA  approval  is  required.  

858 24.3.3 The  disposition  of  all  disputes  shall  be  communicated  to  the  customer  in  the  same  manner  as  the  dispute  was  received  from  the  customer  (e.g.,  mail,  email,  telephone).

859 24.3.4 The  LPT  Processor  shall  develop  and  document,  for  OTA  approval,  a  dispute  escalation  process  in  which  certain  unresolved  disputes  shall  be  escalated  to  OTA  for  administrative  review.    

860 24.3.5 The  LPT  Processor  shall  thoroughly  research  disputes  and  provide  OTA  with  all  relevant  documentation  related  to  disputes  submitted  for  administrative  review.

861 24.3.6 The  LPT  System  shall  allow  authorized  users  to  adjust  tolls,  payments,  and  fees  posted  to  an  account,  according  to  approved  Policies  and  Procedures,  and  with  an  appropriate  audit  trail.

862 24.3.7 The  LPT  System  shall  require  authorized  users  to  enter  account  notes  for  all  actions  taken  in  cases  of  dismissals,  disputes,  reversals,  corrections,  and  adjustments.

863 24.3.8 The  LPT  Processor  shall  schedule  hearings  (formal  process  for  disputing  violation  notices)  requested  by  violation  notice  recipients  and  prepare  hearing  evidence  packages.    Hearings  will  be  conducted  by  OTA.

864 24.4 Toll/Fee  Dismissal865 24.4.1 The  LPT  System  shall  support  the  ability  to  dismiss  one  or  more  

transactions  (tolls  and/or  fees  separately).866 24.4.2 The  LPT  Processor  shall  develop  Policies  and  Procedures,  subject  to  OTA  

approval,  for  dismissing  tolls  and/or  fees.867 24.5 Transfer  of  Responsibility  (TOR)

Page 182: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  53  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

868 24.5.1 The  LPT  System  shall  have  the  capability  and  the  LPT  Processor  shall  establish  and  implement  procedures  for  the  transfer  of  responsibility  for  transactions  and  related  amounts  due  based  on  updated  vehicle  owner  information,  e.g.,  rental/leased  vehicles  or  transfer  of  vehicle  ownership.

869 24.5.2 The  LPT  Processor  shall  develop  Policies  and  Procedures  for  obtaining  appropriate  evidence  to  support  and  validate  TOR  information.    

870 24.5.3 If  the  LPT  Processor  determines  that  an  invoice  or  violation  notice  is  eligible  for  a  TOR,  according  to  OTA-­‐approved  Policies  and  Procedures,  the  fees  shall  be  dismissed  and  the  tolls  only  shall  be  mailed  on  a  new  invoice  to  the  new  responsible  party’s  name  and  address,  restarting  the  regular  escalation  process.    

871 24.5.4 The  LPT  System  shall  retain  a  record  of  the  transfer  on  the  original  account.  

872 24.6 UPA  Conversion  to  PIKEPASS873 24.6.1 The  LPT  Processor  shall  work  with  OTA  to  develop  the  procedures  and  

design  the  functionality  required  to  support  conversion  of  LPT  accounts  to  PIKEPASS  accounts.    OTA  will  be  responsible  for  all  PIKEPASS  development.

874 24.6.2 The  LPT  System  shall  allow  UPAs  to  be  converted  to  PIKEPASS  accounts  by  OTA  users  accessing  the  LPT  System  from  the  OTA  CSC  only.  

875 24.6.3 The  LPT  System  shall  retain  all  LPT  account  history  for  the  converted  UPA,  including  toll  and  financial  transaction  history.

876 24.6.4 The  LPT  System  shall  not  allow  toll  or  payment  transactions  to  post  to  any  LPT  account  that  has  been  converted  to  PIKEPASS.    OTA  will  be  responsible  for  all  postings  to  PIKEPASS  accounts  established  by  conversion  from  LPT  accounts.

877 24.6.5 The  LPT  System  shall  not  allow  PIKEPASS  conversion  of  any  LPT  account  with  unpaid  violations,  past-­‐due  tolls,  or  fees.  

878 24.6.6 The  LPT  Processor  shall  require  OTA’s  authorization  to  reduce  or  waive  amounts  due  on  an  LPT  account  for  the  purposes  of  conversion  to  a  PIKEPASS  account.  

879 24.6.7 The  LPT  System  shall  provide  for  functionality  that  flags  financial  adjustments  as  due  to  PIKEPASS  conversion  /  with  OTA  authorization.  

880 24.6.8 Upon  successful  conversion,  the  LPT  System  shall  update  the  LPT  account  with  a  status  indicating  the  account  was  converted  to  PIKEPASS.  

881 25 LPT  System  Interfaces882 25.1 External  Interfaces

Page 183: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  54  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

883 25.1.1 The  LPT  Processor  shall  interface  with  the  following  entities  and  shall  collaboratively  develop,  where  applicable,  an  Interface  Control  Document  (ICD)  with  each  entity  to  establish  communication  protocol.  

884 25.1.1.1 Host  system  operated  by  OTA  (current  ICD  is  in  Appendix  E),  which  includes  LPT  transactions  and  images,  PIKEPASS  account  match  lookups,  Oklahoma,  Texas  and  CVIEW  Commercial  vehicle  License  Plate  (ROV)  lookups,  and  the  HOT  list

885 25.1.1.2 ACH  and  credit/debit  card  processors  886 25.1.1.3 All  required  DMVs  and/or  third  party  providers  who  provide  vehicle  

registration  information887 25.1.1.4 Registration  stop  flags  with  the  Oklahoma  Tax  Commission888 25.1.1.5 Bank(s)  889 25.1.1.6 Collection  agency890 25.1.2 The  LPT  Processor  shall  coordinate  with  third  parties  and  update  external  

interfaces  as  needed.891 25.2 Host  Interface892 25.2.1 The  LPT  System  shall  interface  with  the  OTA  Host  as  detailed  in  the  

Interface  Control  Document.  893 25.2.2 The  LPT  Processor  shall  ensure  that  all  data  received  via  the  interface  

with  the  OTA  Host  is  properly  accounted  for  and  processed  in  a  timely  and  accurate  manner.    

894 25.2.3 The  LPT  Processor  shall  coordinate  with  OTA  to  setup  a  Site-­‐to-­‐Site  VPN  to  secure  the  data  exchanges  between  the  LPT  System  and  OTA  Host.  It  shall  be  an  IPsec  or  equivalent  VPN  tunnel  with  a  pre-­‐shared  key  and  an  agreed  upon  encryption  method.

895 25.3 File  Exchanges896 25.3.1 The  LPT  Processor  shall  implement  system  alerts  to  the  LPT  Processor  

and  OTA  when  any  scheduled  file  exchange  does  not  occur  within  a  configurable  amount  of  time  or  number  of  attempts/timeouts.

897 25.3.2 The  LPT  Processor  shall  reconcile  with  the  Host  at  the  file  level,  for  all  files  received.

898 25.3.3 The  LPT  Processor  shall  reconcile  transaction  files  with  the  Host  at  the  individual  transaction  level,  for  each  transaction  record  in  the  file  received.

899 25.4 Transaction  Reconciliation900 25.4.1 The  LPT  Processor  shall  reconcile  transaction  statuses  to  OTA  that  

indicate  the  current  processing  status  of  each  transaction  received  from  the  Host.    

901 25.4.2 The  LPT  Processor  shall  prepare  and  send  reconciliation  files  on  a  configurable  basis.

Page 184: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  55  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

902 25.4.3 The  LPT  Processor  shall  provide  an  updated  reconciliation  status  for  a  given  transaction  any  time  there  is  a  change  in  its  processing  status  from  the  last  update  sent  to  OTA.    

903 25.4.4 The  LPT  Processor  shall  use  reconciliation  codes  to  indicate  the  transaction’s  current  processing  status.  

904 25.4.5 The  LPT  Processor  shall  finalize  the  list  of  reconciliation  codes  and  associated  processing  statuses  with  OTA  during  the  design  phase.  

905 25.4.6 The  LPT  Processor  shall  update  the  OTA  Host  to  LPT  System  ICD  with  the  final  list  of  reconciliation  codes.    Following  are  examples  of  the  types  of  statuses  for  which  the  LPT  Processor  shall  provide  reconciliation  codes.-­‐  Interim  –  Transaction  received  by  the  License  Plate  Tolling  Processor  -­‐  Rejected  –  Duplicate  transaction-­‐  Rejected  –  Rejected  by  DMV/ROV  source-­‐  Rejected  –  No  DMV  reciprocity-­‐  Dismissed  –  OTA  request-­‐  Interim  –  In  image  review-­‐  Interim  –  Invoiced-­‐  Interim  –  Past  due  invoice-­‐  Interim  –  Transfer  of  Responsibility  (TOR)-­‐  Final  –  Dismissed  at  PIKEPASS  request-­‐  Final  –  Dismissed  by  LPT  Processor-­‐  Final  –  Dismissed  for  PIKEPASS  conversion  -­‐  Final  –  Paid  Invoice

906 25.5 PIKEPASS  Account  Match  Lookups907 25.5.1 The  LPT  System  shall  utilize  the  PIKEPASS  data  provided  by  OTA  to  

compare  License  Plate  number  and  jurisdiction  against  the  PIKEPASS  customer  database.

908 25.5.2 The  LPT  System  shall  send  a  file,  in  an  agreed  upon  format  using  an  interface  or  file  transfer  method,  the  list  of  Toll  Transaction  IDs  and  Image  IDs  that  were  found  to  be  PIKEPASS  customer  transactions.  

909 25.5.3 The  LPT  System  shall  request  an  acknowledgement  of  receipt  and  then  process  the  stored  transactions  and  images  it  sent  in  the  file  as  dismissed  as  PIKEPASS  or  equivalent  code.  

910 25.5.4 The  LPT  System  shall  track  the  number  of  PIKEPASS  transactions  it  finds  and  provide  it  in  the  reconciliation  report  via  the  web  service  with  the  OTA  Host.  

911 25.6 Oklahoma  License  Plate  Lookups912 25.6.1 The  LPT  System  shall  query  the  OTA-­‐provided  database  of  OK  License  

Plate  numbers  to  obtain  ROV  information  for  processing  tolls.  

Page 185: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  56  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

913 25.6.2 The  LPT  Processor  shall  adhere  to  OTA  data  retention  and  security  standards  to  ensure  the  PII  data  received  from  the  OK  License  Plate  database  is  secure  and  not  breached.

914 25.7 Texas  License  Plate  Lookups  915 25.7.1 The  LPT  System  shall  query  the  OTA-­‐provided  database  of  TX  License  

Plate  numbers  to  obtain  ROV  information  for  processing  tolls.  916 25.7.2 The  LPT  Processor  shall  adhere  to  OTA  data  retention  and  security  

standards  to  ensure  the  PII  data  received  from  the  TX  License  Plate  database  is  secure  and  not  breached.

917 25.8 CVIEW  License  Plate  Lookups  918 25.8.1 OTA  will  provide  the  LPT  Processor  with  access  to  a  read-­‐only  database  of  

the  CVIEW  commercial  License  Plates  and  the  registered  owner  of  the  vehicle  (ROV)  information.    

919 25.8.2 The  LPT  System  shall  query  the  OTA-­‐provided  database  of  CVIEW  commercial  License  Plate  numbers  to  obtain  ROV  information  for  processing  tolls.  

920 25.8.3 The  LPT  Processor  shall  adhere  to  OTA  data  retention  and  security  standards  to  ensure  the  PII  data  received  from  the  CVIEW  commercial  License  Plate  database  is  secure  and  not  breached.

921 25.9 Hot  Lists922 25.9.1 The  LPT  System  shall  process  the  Hot  List  and  notify  OTA  via  the  web  

service  when  License  Plate  matches  are  found.  923 25.10 Oklahoma  Tax  Commission  924 25.10.1 The  LPT  Processor  shall  place  vehicle  registration  stop  flags  for  Oklahoma  

license  plates  with  the  Oklahoma  Tax  Commission.925 25.10.2 The  LPT  Processor  shall  coordinate  with  the  Oklahoma  Tax  Commission  

to  develop  an  ICD,  which  shall  define  an  interface  to  send  registration  stop  flags  to  the  Oklahoma  Tax  Commission  system.  

926 25.10.3 The  LPT  System  shall  request  acknowledgement  via  the  interface  that  the  stop  flag  has  been  applied.

927 25.10.4 The  LPT  System  shall  notify  OTA  via  the  daily  reconciliation  how  many  LPT  customers  have  stop  flags  applied.

928 25.10.5 The  LPT  System  to  Oklahoma  Tax  Commission  interface  shall  also  have  the  ability  to  release  stop  flags,  and  shall  subsequently  also  notify  OTA  via  the  daily  report  of  the  number  of  stop  flag  releases.  

929 25.10.7 The  LPT  Processor  shall  remove  the  stop  flag,  update  the  account  and  reconcile  to  OTA  when  a  payment  has  been  resolved.    

930 25.11 Third  Party  Interfaces

Page 186: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  57  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

931 25.11.1 The  LPT  Processor  shall  coordinate  with  any  third  party  vendor  it  uses  for  LPT  processing  to  develop  an  ICD  that  defines  the  interface  between  the  third  party  and  the  LPT  System.  

932 25.11.2 All  ICDs  for  third  party  interfaces,  including  those  below,  shall  follow  the  same  framework  as  the  OTA  Host  to  LPT  System  ICD  in  Appendix  E.    

933 25.11.2.1 ACH  and  credit/debit  card  processors  934 25.11.2.2 Bank(s)  935 25.11.2.3 Collection  agency936 26 Mail  Processing937 26.1 General  Mail  Processing  Requirements938 26.1.1 The  LPT  Processor  shall  generate,  distribute  and  track  all  printed  

customer  correspondence,  including  materials  in  the  form  of  letters,  notices,  invoices  and  general  correspondence.

939 26.1.2 The  LPT  Processor  shall  establish  and  administer  all  postal  service  relationships.    The  actual  cost  of  postage  for  outgoing  mail  shall  be  a  direct  pass  through  cost  to  OTA  with  no  mark-­‐up.  

940 26.1.3 The  LPT  Processor  shall  utilize  the  extended  ZIP+4  Codes  in  all  mailing  where  available.

941 26.1.4 The  LPT  Processor  shall  track  and  report  on  all  incoming  and  outgoing  correspondence  by  type.

942 26.1.5 The  LPT  Processor  shall  implement  a  process  to  manage,  research,  correct,  and  minimize  mail  returned  as  undeliverable.

943 26.1.6 The  LPT  Processor  shall  track  and  report  on  mail  returned  as  undeliverable.

944 26.2 Incoming  Mail  Processing945 26.2.1 The  LPT  Processor  shall  establish  and  implement  procedures  to  provide  

effective  and  efficient  handling  of  all  incoming  mail,  including  procedures  for  tracking  customer  correspondence.    

946 26.2.2 The  LPT  Processor  shall  accurately  timestamp  all  incoming  correspondence  for  quality  assurance  and  audit  purposes.

947 26.2.3 The  LPT  Processor  shall  provide  an  appropriate  response  to  all  customer  inquiries  received  by  mail,  according  to  OTA-­‐approved  Policies  and  Procedures.  

948 26.2.4 The  LPT  Processor  shall  scan  all  incoming  mail.    949 26.2.5 The  LPT  System  shall  associate  scanned  mail  related  to  an  LPT  account  

with  the  account  to  allow  users  to  view  a  digital  image  of  the  document.    950 26.2.6 The  LPT  Processor  shall  store  all  scanned  mail  that  is  not  associated  to  an  

LPT  account  in  an  electronic  file.  951 26.3 Outgoing  Mail  Processing

Page 187: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  58  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

952 26.3.1 The  LPT  Processor  shall  establish  and  implement  a  process  to  provide  the  timely,  efficient  and  accurate  handling  of  all  outgoing  mail.    

953 26.3.2 The  LPT  Processor  shall  track  the  date  and  time  that  all  outgoing  correspondence  is  mailed  for  quality  assurance  and  audit  purposes.

954 26.3.3 The  LPT  Processor  shall  send  all  paper  customer  correspondence  via  first  class  mail  or  better,  unless  specifically  directed  by  OTA  to  do  otherwise.

955 26.3.4 The  LPT  Processor  shall  send  all  2nd  violation  notices  via  Certified  Mail.956 26.3.5 The  LPT  Processor  shall  employ  bulk  mail  rates  and  other  mailing  

economies,  where  available,  including  the  capacity  for  pre-­‐sorting  mail  by  Zip  Code  to  ensure  the  most  cost  effective  postage  rates  are  obtained.  

957 26.3.6 The  LPT  Processor  shall  have  full  responsibility  over  any  mail  house  services  that  it  may  choose  to  outsource.    

958 26.3.7 The  LPT  Processor  shall  establish  and  implement  quality  assurance  procedures  that  include  the  monitoring,  spot  checking  and  tracking  of  all  outgoing  mail.  

959 26.3.8 The  LPT  Processor  shall  generate  configurable  form  letters  and  individual  situational  customer  correspondence  as  appropriate.    

960 26.3.9 The  LPT  Processor  shall  utilize  skip  tracing  and  develop  procedures  to  attempt  to  obtain  an  address  for  all  returned  mail.

961 26.3.10 For  invoices  and  violation  notices  returned  by  the  US  Postal  Service  (USPS)  with  a  forwarding  address,  the  LPT  Processor  shall  reissue  the  invoice  or  violation  notice  to  the  forwarding  address  provided  by  the  USPS.

962 26.3.11 The  LPT  Processor  shall  utilize  a  process  for  address  standardization.963 26.3.12 The  LPT  Processor  shall  utilize  the  National  Change  of  Address  (NCOA)  

service.964 26.3.13 If  the  NCOA  returns  an  updated  address,  the  LPT  Processor  shall  reissue  

the  invoice  or  violation  notice  to  the  updated  address.  

Page 188: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  59  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

965 26.3.14 The  LPT  Processor  shall  design  all  customer  correspondence  with  OTA  during  the  design  phase.    A  sample  list  of  the  types  of  customer  correspondence  envisioned  for  the  LPT  program  is  included  below:  -­‐  Welcome  Letter-­‐  Invoices-­‐  Violation  Notices-­‐  Returned  Check  Letter-­‐  ACH  Reject  Letter-­‐  Registration  Hold  Letter-­‐  Sent  to  Collections  Agency  Letter-­‐  Dispute  Resolution-­‐  Returned  Email  -­‐  Refunds-­‐  Other  Inquiry  Response

966 27 Customer  Communications  &  Materials967 27.1 Customer  Communications968 27.1.1 The  LPT  Processor  shall  be  responsible  for  all  aspects  of  communication  

with  LPT  customers,  including  communications  via  telephone,  mail,  email,  web,  and  fax.    

969 27.1.2 The  LPT  Processor  shall  record  and  maintain  an  historical  record  of  all  customer  contacts  in  the  account.  

970 27.1.3 The  LPT  Processor  shall  design,  produce,  inventory,  and  distribute  all  customer  communications  and  correspondence  as  approved  by  OTA.    

971 27.1.4 The  LPT  Processor  shall  answer  inquiries  from  the  general  public  provided  the  subject  is  consistent  with  general  information  related  to  the  LPT  locations  and  LPT  customer  service.  

972 27.1.5 The  LPT  Processor  shall  not  initiate  promotional  or  other  unsolicited  informational  communication  with  unregistered  LPT  customers.  

973 27.2 Email  974 27.2.1 The  LPT  Processor  shall  have  the  capability  to  receive  customer  inquiries  

and  requests  via  email  and  respond  to  customer  inquiries  and  requests  via  email.

975 27.2.2 The  LPT  Processor  shall  send  all  customer  correspondence  via  email,  when  provided  by  and  indicated  as  preferred  by  the  customer,  except  where  hard  copies  are  required.

976 27.2.3 The  LPT  Processor  shall  establish,  implement  and  maintain  a  process  to  allow  customers  to  opt-­‐in  to  receive  messages  via  email.

977 27.2.4 The  LPT  Processor  shall  use  industry  best  practices  for  handling  undeliverable  email  messages.

Page 189: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  60  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

978 27.2.5 The  LPT  Processor  shall  develop  the  format  and  content  of  all  email  messages  during  the  design  phase  and  shall  require  OTA  approval  of  any  changes  thereafter.

979 27.3 Social  Media980 27.3.1 The  LPT  Processor  shall  work  with  the  OTA’s  Director  of  Communications  

and/or  his  designee  for  implementing  and  maintaining  public  communications  via  social  media.

981 27.3.2 The  LPT  Processor  shall  obtain  OTA  authorization  and  approval  of  any  customer  interaction  via  social  media.

982 27.3.3 The  LPT  Processor  shall  work  with  OTA  to  identify  and  disseminate  messages  and  information  about  the  License  Plate  Tolling  program  (e.g.,  monitor  social  media,  notify  OTA  of  issues,  and  provide  recommended  responses  and  feedback  when  requested  by  OTA).    

983 27.4 IVR  System  984 27.4.1 The  LPT  Processor  shall  establish,  operate  and  maintain  an  interactive  

voice  response  (IVR)  system.  985 27.4.2 The  LPT  Processor  shall  utilize  IVR  system  components,  including  ancillary  

equipment  and  software,  which  are  dedicated  to  the  LPT  System  for  use  for  the  License  Plate  Tolling  program.  

986 27.4.3 The  LPT  IVR  system  (“LPT  IVR”)  or  subcomponents  and  software  shall  not  be  shared  with  other  co-­‐located/supported  LPT  Processor  clients.

987 27.4.4 The  LPT  Processor  shall  provide  a  toll-­‐free  telephone  number  for  the  LPT  IVR.  

988 27.4.5 The  LPT  IVR  shall  route  calls  and  accept  payments  via  menu  selections  and  user  input.    

989 27.4.6 The  LPT  IVR  shall  provide  customers  with  the  ability  to  hear  amounts  due  and  make  payments  (via  debit/credit  cards  or  ACH)  24  hours  per  day,  7  days  per  week.  

990 27.4.7 The  LPT  IVR  shall  require  appropriate  authentication  (e.g.,  an  invoice  number  and  access  PIN)  prior  to  providing  any  account  specific  information.    

991 27.4.8 The  LPT  IVR  shall  provide  users  with  an  option  to  be  transferred  to  a  CSR  during  operating  hours.  

992 27.4.9 The  LPT  IVR  shall  provide  customers  with  the  option  to  be  transferred  to  a  Spanish  speaking  CSR  during  operating  hours.

993 27.4.10 The  LPT  IVR  shall  provide  callers  who  request  to  be  transferred  to  a  CSR  with  the  estimated  waiting  time  to  speak  to  a  CSR  upon  entering  the  CSR  queue  and  every  60  seconds  during  their  time  in  queue.

994 27.4.11 The  LPT  IVR  shall  be  fully  integrated  with  the  functional  LPT  System.  

Page 190: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  61  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

995 27.4.12 During  non-­‐business  hours,  the  LPT  IVR  shall  announce  a  message  informing  callers  that  the  live  call  center  is  now  closed  but  customers  can  make  payments  via  the  IVR  system  and  website.    

996 27.4.13 The  LPT  IVR  system  shall  interact  with  the  LPT  System  database  in  real  time  to  retrieve  account  information.    

997 27.4.14 The  IVR  system  shall  utilize  a  single  recorded  voice  talent  and  have  consistency  in  volume  and  intonation,  except  in  certain  time  sensitive  situations  as  directed  and  approved  by  OTA.  

998 27.4.15 The  LPT  Processor  shall  obtain  OTA  approval  of  the  IVR  system  voice  talent  and  script.  

999 27.4.16 The  LPT  Processor  shall  have  the  ability  to  remotely  make  short  term,  time  sensitive  changes  to  the  IVR  system.    

1000 27.4.17 The  LPT  Processor  shall  make  necessary  changes  to  the  IVR  script,  messages,  and  menu  options  at  no  additional  cost  to  and  only  upon  approval  by  OTA.

1001 27.4.18 The  LPT  Processor  shall  ensure  that  the  IVR  system  is  ADA  compliant  throughout  the  Term.  

1002 27.5 Call  Center1003 27.5.1 The  LPT  Processor  shall  provide  call  center  staff  that  are  dedicated  solely  

to  the  OTA  License  Plate  Tolling  program.1004 27.5.2 The  LPT  Processor  shall  provide  all  hardware  and  software  for  processing  

incoming  customer  calls.1005 27.5.3 The  LPT  Processor  shall  have  sufficient  staff  in  place  during  the  defined  

operating  hours  to  handle  all  inbound  callers  who  wish  to  speak  to  a  CSR  within  the  time  parameters  specified  in  the  Performance  Standards.  

1006 27.5.4 The  LPT  Processor  shall  establish  and  document  Policies  and  Procedures,  subject  to  OTA  review  and  approval,  for  the  escalation  of  calls  and  issues  to  LPT  Processor  supervisory  and  management  staff,  as  well  as  to  OTA  staff.    

1007 27.5.5 The  LPT  Processor  shall  track  and  resolve  all  escalated  issues.  1008 27.5.6 The  LPT  Processor  shall  record  detailed  account  notes  related  to  each  

call.    1009 27.5.7 The  LPT  System  shall  document,  track  and  report  all  IVR  system  and  CSR  

calls,  separately,  by  specific  reason  for  the  call  (e.g.,  dispute,  payment).1010 27.5.8 The  LPT  Processor  shall  record  the  reason(s)  for  each  call  via  call  reason  

codes  that  will  be  established  by  the  LPT  Processor  and  approved  by  OTA  during  design.    

1011 27.5.9 The  LPT  System  shall  provide  for  input  of  multiple  codes  in  cases  where  more  than  one  reason/type  code  applies  to  the  call.

Page 191: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  62  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1012 27.5.10 The  LPT  System  shall  provide  for,  and  the  LPT  Processor  shall  establish  and  implement  processes  for,  supervisory  monitoring  of  both  live  and  recorded  CSR  calls  for  accuracy,  efficiency,  professionalism  and  courteous  service.

1013 27.5.11 The  LPT  Processor  shall  develop  a  form  to  record  CSR  monitoring  activity  and  shall  submit  the  form  to  OTA  for  approval.    The  LPT  Processor  shall  keep  completed  CSR  monitoring  forms  on  file  for  a  year  and  submit  a  monthly  summary  to  OTA.    

1014 27.5.12 The  LPT  Processor  shall  provide  OTA  with  automated  capability  to  monitor  any  live  customer  calls  from  offsite,  at  any  time  without  prior  notification  to  the  LPT  Processor  or  to  the  CSR  being  monitored.  

1015 27.5.13 The  LPT  Processor  shall  ensure  that  the  phone  system  announces  on  all  calls  that  calls  may  be  monitored  (e.g.,  ‘calls  may  be  monitored  for  quality  assurance  purposes’).

1016 27.5.14 The  LPT  Processor  shall  ensure  that  the  phone  system  is  ADA  compliant  throughout  the  Term.  

1017 27.5.15 Once  a  customer  call  is  answered  by  a  CSR,  the  call  shall  not  be  immediately  placed  on  hold  to  answer  another  call.

1018 27.5.16 Call  center  staff  shall  respond  to  customer  non-­‐LPT  related  calls  (e.g.,  OTA  policies,  turnpike  operations,  PIKEPASS  accounts,  interoperability,  points  of  customer  contact)  by  providing  information  in  accordance  with  specific  scripts  approved  by  OTA  or  refer  caller  to  PIKEPASS  CSC  or  website.

1019 28 Website1020 28.1 Website  Requirements1021 28.1.1 The  LPT  Processor  shall  design,  develop,  implement,  host,  and  maintain  

an  intuitive,  user-­‐friendly,  and  interactive  customer  website,  including  the  website  domain.  

1022 28.1.2 The  LPT  Processor  shall  provide  OTA  with  a  link  to  the  LPT  website  that  can  be  used  on  the  OTA  PIKEPASS  website  to  direct  customers  to  the  LPT  Processor  website.

1023 28.1.3 The  LPT  Processor  shall  prominently  display  a  link  to  PIKEPASS.com  for  questions  and  issues  not  related  to  License  Plate  Tolling.

1024 28.1.4 The  LPT  System  database  interface  to  the  LPT  website  shall  facilitate  the  automatic  electronic  exchange  of  all  required  account  information  supporting  all  required  functionality.  

1025 28.1.5 The  LPT  Processor  shall  design  the  website  using  industry  best  practices  for  easy  updating  and  workflow  changes  and  include  a  content  management  module  that  will  allow  authorized  OTA  staff  to  update  content  without  the  need  for  extensive  LPT  Processor  assistance.    

Page 192: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  63  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1026 28.1.6 The  LPT  website  shall  be  optimized  for,  and  function  properly,  on  Internet  Explorer,  Safari,  Firefox  and  Chrome,  as  well  as  on  multiple  platforms  including  personal  computers,  mobile  devices  and  tablet  devices.

1027 28.1.7 The  LPT  website  shall  be  secure  and  require  appropriate  customer  authentication  for  all  account-­‐specific  pages.    

1028 28.1.8 The  LPT  Processor  shall  define  and  develop  the  specific  look,  functionality,  and  navigation  of  the  website  with  OTA  during  the  design  phase.    

1029 28.1.9 The  LPT  Processor  shall  ensure  that  the  website  is  ADA  compliant  throughout  the  Term.  

1030 28.2 Website  Account  Management1031 28.2.1 The  website  shall  provide  customer  access  to  account  information  

through  a  secure  login.1032 28.2.2 Access  to  customer  account  data  shall  require  login  with  an  invoice  

number  and  license  plate  number/state,  or  an  invoice  number  and  access  PIN.    

1033 28.2.3 All  customer  account  activity  made  via  the  website  shall  be  immediately  reflected  in  the  database  and  on  the  customer  account  screens.  

1034 28.3 Website  Services1035 28.3.1 The  LPT  Processor  website  shall  provide  customers  with  the  following  

functionality:1036 28.3.1.1 View  current  and  past  invoices1037 28.3.1.2 View  current  and  past  violations1038 28.3.1.3 View  current  and  past  images1039 28.3.1.4 Pay  invoice  via  credit  card,  debit  card,  or  ACH1040 28.3.1.5 Pay  violations  via  credit  card,  debit  card,  or  ACH1041 28.3.1.6 Associate  an  email  with  the  account1042 28.3.1.7 Opt-­‐in/out  of  email  invoices1043 28.3.1.8 Opt-­‐in/out  of  email  correspondence1044 28.3.1.9 Dispute  process1045 28.3.2 The  LPT  Processor  shall  provide  a  “Contact  Us”  feature  and  various  

methods  to  communicate  with  the  LPT  Processor  via  the  website,  using  email  or  HTML  forms.

1046 28.3.3 The  LPT  System  shall  acknowledge  customer  inquiries  received  via  the  website  via  an  automated  email  receipt  confirmation  to  the  customer.

1047 28.3.4 The  website  shall  provide  static  informational  pages,  including  the  following:

1048 28.3.4.1 A  description  of  the  LPT  program  1049 28.3.4.2 Invoice  escalation  process  including  violations,  collections  and  fees

Page 193: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  64  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1050 28.3.4.3 Vehicle  registration  stop  flag  process1051 28.3.4.4 Payment  information1052 28.3.4.5 How  to  sign  up  for  a  PIKEPASS  account1053 28.3.4.6 Help  and  frequently  asked  question1054 28.3.4.7 Privacy  Policy1055 28.3.4.8 Downloadable  forms  and  customer  guides1056 28.3.4.9 Links  to  other  sites  to  be  determined  by  OTA1057 28.3.5 The  LPT  Processor  shall  perform  all  website  maintenance  and  content  

updates.  1058 28.4 Website  Security1059 28.4.1 The  LPT  Processor  shall  institute  security  measures  to  prevent  

unauthorized  access  to  the  LPT  System,  and  maintain  the  confidentiality  and  security  of  all  customer  data  subject  to  applicable  federal,  state  and  local  laws  and  applicable  financial  and  banking  policies,  including  Payment  Card  Industry  Data  Security  Standards  (PCI  DSS).  

1060 28.4.2 The  LPT  Processor  shall  maintain  proper  PCI  DSS  compliance  on  the  website  used  for  account  management  throughout  the  Term.

1061 28.4.3 The  LPT  Processor  shall  be  responsible  for  all  costs  related  to  maintaining  compliance  with  PCI  DSS  and  any  related  updates.

1062 28.4.4 The  website  shall  incorporate  a  firewall,  or  security  appliance,  with  security  functions  to  prevent  unauthorized  access  to  any  parts  of  the  LPT  System.    

1063 28.4.5 The  LPT  Processor  shall  use  appropriate  protocols  to  ensure  secure  data  transmission  from/to  the  user’s  browser.  

1064 28.4.6 The  website  shall  utilize  secure  connection  with  all  confidential  communications  encrypted  Transport  Layer  Security  (TLS)  protocol.  

1065 28.4.7 LPT  Processor  shall  provide,  operate  and  maintain  the  website  in  a  manner  that  adheres  to  the  current  industry  best  practices  for  website  security.  

1066 28.4.8 The  OTA  privacy  policy  shall  be  accessible  via  hyperlink  on  the  footer  of  every  page.

1067 28.4.9 The  LPT  Processor  shall  acquire  the  website  security  certificate  and  maintain  it  in  full  force  and  effect  throughout  the  Term.

1068 29 Payment  Processing1069 29.1 General  Payment  Processing  Requirements1070 29.1.1 The  LPT  Processor  shall  securely  process  all  payments  received.    1071 29.1.2 The  LPT  Processor  shall  accurately  track  the  chain  of  custody  of  all  

payments.1072 29.1.3 The  LPT  Processor  shall  apply  all  payments  to  the  correct  accounts  in  the  

LPT  System.  

Page 194: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  65  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1073 29.1.4 The  LPT  Processor  shall  establish  and  implement  daily,  weekly  and  monthly  reconciliation  processes,  audit  trails  and  controls  to  safeguard  all  funds  received.

1074 29.1.5 The  LPT  Processor  shall  handle  payment  adjustments,  reversals,  refunds,  NSF  checks,  partial  payments,  overpayments,  split  payments,  and  unidentified  payments.

1075 29.1.6 The  LPT  Processor  shall  establish  and  implement  processes  for  handling  of  all  payments,  including  partial  payments  and  overpayments.  

1076 29.1.7 The  LPT  System  shall  apply  payments  received  without  specific  customer  direction  to  outstanding  customer  balances  based  on  OTA  approved  Policies  and  Procedures.  

1077 29.1.8 The  LPT  System  shall  apply  partial  payments  to  the  oldest  tolls/fees  first  (first-­‐in,  first-­‐out)  by  default.

1078 29.1.9 The  LPT  System  shall  provide  functionality  for  users  to  manually  apply  partial  payments  to  specific  tolls/fees  (not  first-­‐in,  first-­‐out)  in  accordance  with  customer  instructions  or  OTA  direction.

1079 29.1.10 The  LPT  Processor  shall  process,  resolve,  reconcile,  and  report  unidentified  payments  (payments  not  accompanied  by  information  to  allow  matching  to  an  account).  

1080 29.1.11 The  LPT  Processor  shall  handle  unidentified  payments  that  cannot  be  resolved  in  accordance  with  applicable  Oklahoma  State  escheatment  laws.    

1081 29.1.12 The  LPT  Processor  shall  gather  and  package  all  data  related  to  unidentified  payments  as  directed  by  OTA.

1082 29.1.13 The  LPT  Processor  shall  verify  that  checks  are  signed  and  completed  properly,  and  that  credit/debit  card  numbers  and  signatures  are  completed  properly.    

1083 29.1.14 The  LPT  Processor  shall  track,  handle  and  report  on  incomplete  payments  such  as  unsigned  checks  and  incomplete  credit/debit  card  numbers.

1084 29.1.15 The  LPT  Processor  shall  scan  all  customer  payment  correspondence,  including  the  front  and  back  of  all  checks.    

1085 29.1.16 The  LPT  System  shall  associate  and  store  images  of  scanned  payment  correspondence,  including  checks,  with  the  appropriate  account.    

1086 29.1.17 The  LPT  Processor  shall  track  and  report  on  all  payments  by  location,  by  user,  by  posting  date,  and  by  payment  method.

1087 29.1.18 The  LPT  Processor  shall  reconcile  all  payments  posted  to  bank  deposits  and  credit/debit  card/ACH  processing  receipts  on  a  daily  basis.    

1088 29.1.19 The  LPT  Processor  shall  maintain  a  record  of  any  discrepancies  with  bank  deposits  and  report  them  immediately  to  OTA.

Page 195: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  66  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1089 29.1.20 The  LPT  Processor  shall  ensure  that  all  payments  are  deposited  into  the  correct  bank  account  as  designated  by  OTA.    

1090 29.1.21 The  LPT  Processor  shall  reconcile  all  cash  and  check  payments  received  from  all  sources  to  daily  bank  deposits.

1091 29.2 Credit/Debit  Card  and  ACH  Processing1092 29.2.1 The  LPT  Processor  shall  be  responsible  for  all  aspects  of  credit/debit  card  

and  ACH  processing.    1093 29.2.2 The  LPT  Processor  shall  utilize  the  OTA  credit/debit  card  and  ACH  service  

providers  and  employ  methods  and  practices  that  provide  OTA  with  the  lowest  possible  credit/debit  card  and  ACH  fees.    OTA  will  pay  credit/debit  card  and  ACH  processing  fees  directly  to  the  processors.  

1094 29.2.3 The  LPT  Processor  shall  accept  payments  via  the  following  credit/debit  cards,  at  a  minimum:  Visa,  MasterCard,  American  Express  and  Discover.

1095 29.2.4 The  LPT  Processor  shall  establish  and  maintain  an  interface  with  the  credit/debit  card/ACH  processors.        

1096 29.2.5 The  LPT  Processor  shall  resolve  credit/debit  card  and  ACH  transaction  processing  issues  with  the  processors.    

1097 29.2.6 The  LPT  Processor  shall  monitor  and  immediately  report  any  transaction  processing  interruptions  to  OTA.

1098 29.2.7 The  LPT  Processor  shall  reconcile  LPT  System  credit/debit  card  transactions  to  information  provided  by  the  credit/debit  card  processor  and  the  bank.  

1099 29.2.8 The  LPT  Processor  shall  ensure  that  the  credit/debit  card  processor  deposits  all  credit/debit  card  and  ACH  payments  directly  into  appropriate  bank  accounts  via  electronic  transfer.    

1100 29.2.9 The  LPT  Processor  shall  comply  with  the  security  and  reporting  standards  of  the  credit/debit  card  issuer  and  processor.

1101 29.2.10 The  LPT  Processor  shall  work  with  the  credit/debit  card  processor  in  the  review  and  resolution  of  customer  credit/debit  card  chargebacks.    

1102 29.2.11 The  LPT  System  shall  flag  payments  that  are  in  the  chargeback  review  process  and  indicate  resolution  of  the  review  in  the  account.    

1103 29.2.12 The  LPT  Processor  shall  make  appropriate  account  adjustments  in  response  to  payment  chargebacks.    

1104 29.2.13 The  LPT  Processor  shall  only  store  and  transmit  encrypted  credit/debit  card  numbers  and  shall  ensure  security  over  credit/debit  card  information  in  compliance  with  the  most  current  PCI  standards.

1105 29.2.14 The  LPT  Processor  shall  adhere  to  all  requirements  of  the  credit/debit  card  processor,  the  bank  and  PCI.

Page 196: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  67  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1106 29.2.15 The  LPT  Processor  shall  review  industry  standards  for  enhancements  and  updates  to  the  credit/debit  card  and  ACH  processing  platform,  at  least  annually,  to  ensure  that  the  processing  methods  and  systems  remain  current  with  the  latest  technology,  security,  and  processing  rules.    The  LPT  Processor  shall  provide  OTA  with  the  results  of  such  reviews.

1107 29.2.16 In  the  event  of  an  authorization  decline  from  the  processors  for  reasons  other  than  a  lost  or  stolen  credit/debit  card,  the  LPT  Processor  shall  make  a  configurable  number  of  authorization  requests  over  a  configurable  period  of  time.  

1108 29.2.17 The  LPT  Processor  shall  ensure  that  all  credit/debit  card  and  ACH  charges  have  been  posted  properly  to  customer  accounts,  transmitted  to  credit/debit  card  processor  for  payment,  and  that  payments  are  received  from  the  processor.    

1109 29.2.18 The  LPT  Processor  shall  reconcile  all  credit/debit  card  transactions  with  requests  sent  to  the  credit/debit  card  processor  and  with  receipt  of  funds  transferred  by  the  processor.  

1110 29.2.19 The  LPT  Processor  shall  process  all  credit/debit  card  and  ACH  transactions  on  a  daily  basis.  

1111 29.2.20 The  LPT  System  shall  track  and  record  all  activity  related  to  credit/debit  card  and  ACH  payments,  payment  attempts,  reversals  and  refunds  in  a  customer's  account  within  the  LPT  System  in  a  sortable  and  searchable  fashion.

1112 29.2.21 The  LPT  System  shall  have  a  configurable  limit  to  the  number  of  customer  initiated  credit/debit  card  payments  within  a  configurable  period  of  time.  

1113 29.3 Cash  and  Checks  Processing1114 29.3.1 The  LPT  Processor  shall  establish  and  implement  procedures  to  accept  

and  process  all  cash  and  checks  received  via  mail.1115 29.3.2 The  LPT  Processor  shall  establish  and  implement  procedures  to  accept  

and  process  payments  received  by  PIKEPASS  for  LPT  payments.1116 29.3.3 The  LPT  Processor  shall  establish  and  utilize  electronic  check  processing.      1117 29.3.4 The  LPT  Processor  shall  post  all  cash  and  checks  received  to  the  

customer's  account  and  process  them  for  payment  by  the  bank.1118 29.3.5 The  LPT  Processor  shall  provide  an  armored  courier  service  for  the  

transfer  of  funds  to  the  designated  bank.  1119 29.3.6 The  LPT  Processor  shall  properly  safeguard  all  cash  and  checks  at  all  

times  and  shall  maintain  records  of  the  chain  of  custody  of  all  funds.

Page 197: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  68  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1120 29.3.7 The  LPT  System  shall  reverse  any  checks  that  are  not  honored,  record  them  in  the  account  and  assess  the  appropriate  non-­‐sufficient  funds  (NSF)  fee.

1121 29.3.8 The  LPT  Processor  shall  establish  and  implement  a  process  for  including  NSF  check  amounts  due  and  related  fees  on  invoices  and  violation  notices.  

1122 29.3.9 The  LPT  System  shall  track  the  number  of  NSF  checks  received  by  an  individual  customer  and  have  the  ability  to  reject  check  payments  by  that  customer  after  a  configurable  number  of  NSF  checks  have  been  received  in  a  configurable  period  of  time.  

1123 29.3.10 The  LPT  Processor  shall  account  for  and  reconcile  each  payment  received  by  payment  type,  by  payment  source,  by  CSR  or  payment  processor,  on  a  daily  basis.

1124 29.3.11 The  LPT  Processor  shall  utilize  and  support  Positive  Pay  Processing  for  all  refund  checks  issued.  This  includes  the  generation  and  issuance  of  Positive  Pay  files  to  the  bank  and  the  monitoring  and  handling  of  all  related  issues  and  exceptions.    

1125 29.3.12 The  LPT  Processor  shall  advise  OTA  of  any  issues  related  to  Positive  Pay  on  a  daily  basis.  

1126 29.4 Refunds  1127 29.4.1 The  LPT  Processor  shall  develop  and  implement  OTA-­‐approved  Policies  

and  Procedures  to  evaluate  refund  requests  and  process  refunds  for  approved  requests,  including  for  eligible  customer  overpayments  and  error  corrections.    The  methodology  for  refunds  shall  be  finalized  during  design.

1128 29.4.2 The  LPT  Processor  shall  designate  and  identify  staff  with  the  authority  to  process  refunds.  

1129 29.4.3 The  LPT  Processor  shall  document  all  refunds  in  the  LPT  System  customer  account.

1130 29.4.4 The  LPT  System  shall  track  and  report  on  refund  activity  on  a  monthly  basis.    This  shall  include  refund  information  related  to  refund  requests,  issued  refunds,  refund  method,  accounts,  dates,  times,  customer  name  and  address  data,  approval  level,  name  or  employee  ID  number  of  individual  processing  and  approving  the  refund,  pending  refunds,  and  the  reason  for  approval  or  denial  of  the  refund  request.

1131 29.4.5 The  LPT  Processor  shall  handle  refunds  that  are  returned  by  the  post  office  as  undeliverable  in  accordance  with  applicable  Oklahoma  State  escheatment  laws.    The  LPT  Processor  shall  gather  and  package  all  data  as  directed  by  OTA.

Page 198: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  69  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1132 29.4.6 The  LPT  Processor  shall  maintain  PCI  compliance  regarding  all  credit/debit  card  refunds.

1133 30 Cash  Payment  Network1134 30.1 General  Cash  Payment  Location  Requirements1135 30.1.1 The  LPT  Processor  shall  provide  a  Cash  Payment  Network  (CPN)  to  accept  

customer  funds  at  merchant  locations.1136 30.1.2 The  LPT  Processor  shall  ensure  the  CPN  provider  is  licensed  to  operate  as  

a  money  services  business  in  Oklahoma  and  all  states  in  which  the  CPN  is  offering  the  OTA  LPT  program  payments.  

1137 30.1.3 The  LPT  Processor  shall  guarantee  to  OTA  all  funds  for  all  transactions  processed  at  participating  CPN  locations.    

1138 30.1.4 The  LPT  Processor  shall  be  responsible  for  all  hardware,  software  and  telecommunications  costs  incurred  by  the  LPT  Processor  and  its  provider(s)  associated  with  the  provision  of  CPN  transaction  services.    

1139 30.1.5 The  CPN  interface  shall  not  degrade  the  LPT  System’s  performance,  reliability,  or  availability.

1140 30.1.6 The  LPT  Processor  shall  document  measures  being  taken  to  ensure  secure  transfer  of  information  between  the  CPN  and  the  LPT  Processor  and  its  adherence  to  PCI  compliance  requirements.    

1141 30.1.7 The  LPT  Processor  shall  provide  at  least  48  hours  advanced  notice  to  OTA  when  the  CPN  is  planned  to  be  unavailable  to  OTA  customers  for  more  than  60  minutes.

1142 30.1.8 The  LPT  Processor  shall  provide  OTA  with  immediate  notification  anytime  the  CPN  becomes  unavailable  to  OTA  customers  for  unplanned  periods  of  longer  than  60  minutes.

1143 30.1.9 The  LPT  Processor  shall  ensure  proper  notification  is  displayed  at  the  point  of  sale  describing  the  CPN  outage  whenever  the  CPN  is  unavailable  to  OTA  customers.

1144 30.1.10 All  payment  processing  requirements  of  this  Scope  of  Work  apply  to  payments  made  via  the  CPN.

1145 30.2 CPN  Payments1146 30.2.1 The  LPT  Processor  shall  implement  a  CPN  that  accommodates  invoice  

and  violation  payment  activities  at  each  participating  merchant  location.1147 30.2.2 The  CPN  shall  provide  the  ability  for  customers  to  view  their  outstanding  

amount  due  at  no  cost.    1148 30.2.3 The  CPN  shall  provide  for  configurable  minimum  and  maximum  payment  

amounts.1149 30.2.4 The  CPN  shall  require  either  a  scanned  document  barcode  or  two  data  

entries  for  customer  access  validation  as  approved  by  OTA  during  design.

Page 199: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  70  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1150 30.2.5 If  the  customer  enters  or  scans  a  paid  or  escalated  invoice  barcode,  the  CPN  shall  retrieve  and  display  the  most  recent  total  outstanding  amount  due  on  the  account  and  allow  the  customer  to  make  a  payment  to  the  account.    

1151 30.3 CPN  Transaction  Fees1152 30.3.1 CPN  transaction  fees,  if  any,  shall  be  prominently  displayed  at  the  point  

of  sale  and  available  to  the  customer  prior  to  completing  the  transaction.    

1153 30.3.2 CPN  transaction  fees  charged  to  customers  shall  be  approved  by  OTA.1154 30.3.3 CPN  transaction  fees  shall  be  posted  on  the  LPT/CPN  webpage  and  

printed  on  all  transaction  receipts.1155 30.4 CPN  Receipts1156 30.4.1 The  CPN  shall  generate,  OTA  approved,  printed  receipts  for  all  payments  

and  shall  advise  customers  to  retain  the  receipt  for  their  records  as  proof  of  payment.  

1157 30.4.2 The  CPN  shall  ensure  all  receipts  include  complete  transaction  information,  which  may  include  any  or  all  of  the  following  (to  be  finalized  during  design):  -­‐  A  CPN  Reference  ID  number  that  uniquely  identifies  the  payment  and  is  searchable  in  the  LPT  System-­‐  Type  of  document  (invoice  or  violation)  and  document  ID  for  which  the  payment  was  initiated-­‐  Account  number  to  which  the  payment  was  made-­‐  Total  amount  paid,  with  a  breakdown  of  any  fees-­‐  Amount  due  before  payment-­‐  Amount  due  on  the  account,  if  any,  after  payment-­‐  Date  and  local  time  of  the  payment-­‐  Merchant  location  identifier-­‐  Name  and  contact  details  of  the  merchant-­‐  LPT  Processor  phone  number  and  website  address-­‐  Configurable  message  lines,  for  text  to  be  provided  and  updated  by  OTA  as  frequently  as  once  per  month

1158 30.5 LPT  and  CPN  Interface1159 30.5.1 The  LPT  Processor  shall  develop  an  interface  to  the  CPN  that  implements  

all  data  exchanges  necessary  to  meet  the  requirements  contained  herein.

1160 30.5.2 The  CPN  System  shall  provide  customers  with  the  same  up-­‐to-­‐date  account  balance  information  that  would  be  available  via  the  LPT  Website  or  by  calling  the  LPT  Processor.    

Page 200: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  71  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1161 30.5.3 When  a  CPN  transaction  is  complete  at  a  merchant  location,  the  LPT  System  shall  immediately  reflect  the  payment  and  update  any  remaining  amount  due  on  the  account.

1162 30.6 CPN  Merchant  Locations1163 30.6.1 The  LPT  Processor  shall  require  all  publicly  located  CPN  merchant  

locations  to  accept  cash.    Locations  may  also  accept  other  forms  of  payment  (credit/debit  card,  check).

1164 30.6.2 Each  merchant  location  proposed  for  participation  in  the  CPN  by  the  LPT  Processor  shall  require  OTA  approval  prior  to  rollout  or  marketing  of  that  location  for  OTA  payments.

1165 30.6.3 The  LPT  Processor  shall  ensure  that  CPN  is  available  at  merchant  locations  within  a  mutually  agreed  to  area  surrounding  OTA  tolling  facilities.

1166 30.6.4 The  LPT  Processor  shall  provide  OTA  with  a  plan  detailing  the  identification,  recruitment,  sign-­‐on,  training,  and  rollout  of  CPN  merchant  locations.  

1167 30.6.5 CPN  services  may  be  performed  by  point  of  sale  (POS),  kiosk,  or  other  systems  that  shall  be  pre-­‐approved  by  OTA.  

1168 30.6.6 The  LPT  Processor  shall  work  with  OTA  to  design  a  customer-­‐friendly,  intuitive  user  interface,  with  the  final  design  requiring  OTA  approval  prior  to  rollout.  

1169 30.6.7 The  CPN  user  interface  shall  display  a  response  to  customer  data  requests  in  near  real-­‐time.

1170 30.6.8 The  LPT  Processor  shall  monitor  the  quality  of  merchant  services  and  discontinue  a  merchant  location  if  it  is  determined  that  standards  are  not  met  or  at  the  request  of  OTA  (within  one  business  day  of  the  request).

1171 30.7 CPN  Merchant  Locator1172 30.7.1 The  LPT  Processor  shall  develop  and  maintain  a  publicly  available  

webpage  for  locating  participating  merchants  that  offer  LPT  CPN  services  (the  Merchant  Locator).  

1173 30.7.2 The  LPT  Processor’s  CPN  Merchant  Locator  shall  provide  a  mobile-­‐friendly  website.

1174 30.7.3 The  LPT  Processor  shall  ensure  merchants  that  are  no  longer  participating  or  do  not  meet  requirements  for  the  CPN  are  removed  from  the  Merchant  Locator  within  1  business  day  of  the  removal  of  functionality,  determination  of  failure  to  meet  standards,  or  OTA  request.    

Page 201: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  72  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1175 30.7.4 The  LPT  Processor’s  CPN  Merchant  Locator  shall  allow  users  to  retrieve  a  list  of  a  configurable  number  of  the  CPN  merchant  locations  closest  to  an  address  or  Zip  Code  input  by  the  user.

1176 30.7.5 The  LPT  Processor’s  CPN  Merchant  Locator  shall  list  the  CPN  locations  returned  by  the  search—with  street  address,  hours  of  operation,  and  phone  number—and  display  them  on  a  map  view  to  the  user.  

1177 30.7.6 The  LPT  Processor’s  CPN  Merchant  Locator  shall  include  the  option  to  display  a  static  map  view  of  all  participating  CPN  locations,  without  entering  any  search  criteria.  

1178 30.7.7 The  CPN  Merchant  Locator  shall  be  available  through  the  LPT  Processor’s  customer  website.

1179 30.8 CPN  Reports1180 30.8.1 The  LPT  Processor  shall  provide  daily,  monthly  and  annual  detailed  CPN  

transaction  reporting  to  include  the  following  details  for  every  transaction  completed  in  the  reporting  period:

1181 30.8.1.1 Payment  type  (invoice  or  violation,  based  on  input  account/document  ID)

1182 30.8.1.2 Payment  date  and  time1183 30.8.1.3 Account  number1184 30.8.1.4 Invoice/violation  number1185 30.8.1.5 Payment  amount1186 30.8.1.6 Transaction  fee  amount1187 30.8.1.7 Merchant  location  ID1188 30.8.1.8 Merchant  zip  code1189 30.8.2 The  LPT  Processor  shall  provide  daily,  monthly,  and  annual  CPN  reporting  

to  include  the  following  summary  information  for  all  transactions  completed  in  the  reporting  period:

1190 30.8.2.1 Number  of  payments  by  type1191 30.8.2.2 Total  payment  amount  by  payment  type1192 30.8.2.3 Total  fees  by  payment  type1193 30.8.2.4 Total  payments  by  merchant  location  ID1194 30.8.2.5 Total  payments  by  merchant  location  zip  code1195 30.8.2.6 Total  payments  by  merchant  location  county1196 30.8.3 The  LPT  Processor  shall  provide  a  monthly  report  with  CPN  system  

availability  by  location.1197 30.9 CPN  Customer  Service  Requirements1198 30.9.1 The  CPN  and  the  LPT  Processor  shall  clearly  define  and  communicate  to  

customers  the  appropriate  point  of  contact  for  customer  service  related  to  CPN  locations  and  transactions,  in  accordance  with  OTA-­‐approved  Policies  and  Procedures.

Page 202: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  73  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1199 30.9.2 The  LPT  Processor  shall  train  its  staff  to  answer  customer  questions  regarding  CPN  locations,  procedures  for  using  the  CPN,  and  CPN  usage  and  payment  history.

1200 30.9.3 The  System  shall  flag  financial  transactions  that  occur  at  a  CPN  so  that  LPT  Processor  staff  can  identify  them  as  such  for  research  and  customer  service  purposes.  

1201 30.9.4 The  LPT  Processor  shall  ensure  each  merchant  location  prominently  displays  a  phone  number  for  help  with  using  the  CPN.

1202 30.9.5 The  LPT  Processor  shall  provide  Policies  and  Procedures  for  researching  and  addressing  CPN  customer  complaints  and  this  shall  be  provided  to  and  approved  by  OTA  prior  to  CPN  rollout.

1203 30.9.6 The  LPT  Processor  shall  ensure  that  a  customer  call  center  is  available  to  address  customer  issues  regarding  the  CPN.  OTA  strongly  prefers  the  call  center  be  available  24/7,  however  at  a  minimum,  the  CPN  call  center  shall  be  available  during  the  same  hours  that  the  LPT  Processor  call  center  is  available.

1204 31 Financial  Responsibilities  1205 31.1 General  Financial  Responsibilities  Requirements1206 31.1.1 The  LPT  Processor  shall  establish  and  perform  all  financial  functions  

necessary  for  the  LPT  operation,  including  accepting  and  processing  payments,  interfacing  with  banking  institutions  and  credit/debit  card  and  ACH  processors,  managing  bank  transactions  and  all  reconciliations,  and  implementing  audits  and  internal  control  procedures.

1207 31.1.2 The  LPT  System  shall  have  the  ability  to  identify,  segregate  and  accumulate  revenue  and  accounts  receivable  between  locations  and  cost  centers  as  determined  by  OTA.

1208 31.1.3 The  LPT  System  shall  provide  an  audit  trail  for  each  financial  transaction.1209 31.1.4 The  LPT  Processor  shall  use  proper  cut-­‐off  procedures  for  daily,  monthly,  

and  year-­‐end  close.    1210 31.1.5 The  LPT  Processor  shall  follow  OTA’s  daily,  monthly,  and  year-­‐end  closing  

schedule  and  produce  timely  reports  to  allow  OTA  to  meet  its  schedule.

1211 31.1.6 The  LPT  System  shall  identify  and  report  on  transactions  at  various  stages  of  their  escalation  process  (e.g.,  outstanding  violations  and  invoices).

1212 31.1.7 The  LPT  System  shall  make  a  configurable  bad  debt  calculation  to  each  stage  of  the  escalation  process.    This  debt  calculation  shall  include  a  configurable  threshold  for  the  amount  outstanding.

1213 31.1.8 The  LPT  System  shall  report  on  and  track  all  write-­‐offs.1214 31.2 Financial  Reconciliation

Page 203: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  74  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1215 31.2.1 The  LPT  Processor  shall  reconcile  all  financial  activity  on  a  daily  and  monthly  basis.  

1216 31.2.2 The  LPT  Processor  shall  provide  the  results  of  all  reconciliations  including  reconciliation  spreadsheets  and  reports  on  resolution  of  variances  to  OTA  in  a  timely  manner.

1217 31.2.3 The  LPT  Processor  shall  provide  any  documentation  needed  to  support  reconciliations  upon  OTA  request.

1218 31.2.4 The  LPT  Processor  shall  resolve  all  variances  through  adjustments,  reversals  or  research.

1219 31.2.5 The  LPT  System  shall  allow  users  to  record  results  of  research,  including  comments  and  scanned  documents  or  images,  and  associate  the  record  with  the  variance.

1220 31.2.6 As  part  of  the  report  on  resolution  of  variances,  the  LPT  Processor  shall  provide  a  list  of  action  items  with  a  schedule  for  items  that  require  extended  research,  system  fixes,  or  other  extended  time  periods  for  resolution.

1221 31.2.7 The  LPT  System  shall  support  the  reconciliation  processes.    At  a  minimum,  the  LPT  System  shall  do  the  following:

1222 31.2.7.1 Exception  identification1223 31.2.7.2 Automated  reconciliation  procedures1224 31.2.7.3 Drill  down  from  summary  level  to  the  transaction  or  activity  level1225 31.2.8 The  LPT  System  shall  provide  automated  reconciliations  for  all  

transactions.1226 31.2.9 The  LPT  Processor  shall  reconcile  all  payments  received  by  the  LPT  

System  using  automated  system  processes.    These  reconciliations  shall  include:

1227 31.2.9.1 All  reconciliations  required  in  the  payment  processing  section1228 31.2.9.2 Separate  reconciliations  of  all  types  of  fees,  penalties  and  

miscellaneous  charges1229 31.2.9.3 Reconciliations  by  payment  location,  payment  method,  and  fee  types1230 31.2.9.4 Identification  and  resolution  of  all  variances1231 31.2.10 The  LPT  Processor  shall  reconcile  with  banks  and  processors  for  cash,  

check,  electronic  funds  transfers,  ACH,  credit/debit  cards  and  any  other  form  of  payment  regularly  accepted  using  automated  system  processes.    These  reconciliations  shall  include:

1232 31.2.10.1 Separate  reconciliations  for  each  bank  account  and  processor  1233 31.2.10.2 Reconciliation  to  LPT  Processor  reports  1234 31.2.10.3 Identification  and  resolution  of  all  variances  1235 32 Auditing  1236 32.1 General  Audit  Requirements

Page 204: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  75  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1237 32.1.1 The  LPT  Processor  shall  audit  internal  financial  records  and  operations  to  ensure  that  it  processes  financial  transactions  accurately  and  in  accordance  with  approved  Policies  and  Procedures.

1238 32.1.2 The  LPT  Processor  shall  hire  a  major  independent  certified  public  accounting  firm  to  perform  a  Service  Organization  Control  (SOC  1)  Type  2  audit  annually  in  accordance  with  Statement  on  Standards  for  Attestation  Engagement  No.16  (SSAE  16)  and  provide  such  report  to  OTA.    This  review  shall  include  the  effectiveness  of  operational  controls  related  to  software,  procedures,  data  security,  processing  integrity,  confidentiality,  and  privacy.    The  costs  for  such  audits  shall  be  borne  by  the  LPT  Processor.

1239 32.1.3 The  LPT  Processor  shall  facilitate  access  to  any  material,  system,  or  personnel  that  OTA  or  its  authorized  representatives  require  for  auditing  or  examination  of  the  LPT  Processor’s  activities.    Such  facilitation  shall  include  LPT  Processor  staff  time  and  effort  working  with  OTA  or  its  authorized  representatives.

1240 32.1.4 The  LPT  Processor  shall  develop  and  submit  a  remediation  plan  and  remediation  schedule  to  OTA  for  approval  and  shall  implement  all  audit  recommendations  on  a  timely  basis  as  approved  by  OTA.

1241 32.2 Internal  Controls  1242 32.2.1 The  LPT  Processor  shall  establish  and  follow  internal  control  procedures  

to  ensure  the  safeguarding  and  proper  accounting  of  OTA  funds  and  related  records  at  all  times.    

1243 32.2.2 Internal  controls  shall  be  based  on  an  industry  standard  such  as  the  2013  guidance  from  the  Committee  of  Sponsoring  Organizations  of  the  Treadway  Commission  (COSO),  “Internal  Control  –  Integrated  Framework”,  or  other  appropriate  standard.          

1244 32.2.3 The  LPT  Processor  shall  ensure  that  physical  access  to  money,  data,  other  assets,  and  documents  is  adequately  safeguarded.

1245 32.2.4 The  LPT  Processor  shall  detect  and  prevent  revenue  loss,  errors,  omissions,  irregularities,  and  improper  actions  as  well  as  identify  revenue  loss,  errors,  omissions,  irregularities,  and  improper  actions  after  they  have  occurred.    Any  occurrence  shall  be  immediately  reported  to  OTA.    

1246 32.2.5 The  LPT  Processors  shall  ensure  that  all  financial  activity  is  properly  processed  and  accurately  recorded.    

1247 32.2.6 The  LPT  Processor  shall  have  controls  and  procedures  in  place  to  ensure  that  all  processing  is  complete  and  accurate,  including:

1248 32.2.6.1 Sanity  checks1249 32.2.6.2 Acknowledgement  files

Page 205: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  76  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1250 32.2.6.3 Prevention  of  duplicate  transactions1251 32.2.6.4 Reconciliations1252 32.2.6.5 Quality  Assurance  &  Quality  Control1253 32.2.7 The  LPT  Processor  shall  use  exception  reporting  and  sanity  checks  to  

detect  and  list  unusual  or  invalid  transactions,  adjustments,  charges  and  deviations  from  proper  reconciliation  with  various  components  of  the  financial  system.

1254 32.2.8 The  LPT  Processor  shall  appropriately  segregate  duties  for  various  transactions,  including  handling  of  cash  and  checks.

1255 32.2.9 The  LPT  Processor  shall  conduct  training  that  details  the  responsibilities  of  each  employee  with  regard  to  internal  controls,  theft,  fraud,  embezzlement,  fiscal  misconduct,  and  violation  of  established  policies.    

1256 32.2.10 The  LPT  Processor  shall  use  computer  system  restrictions  with  varying  levels  of  access  control  and  restrictions  on  the  type  of  transactions  that  may  be  performed  by  users.    

1257 32.2.11 The  LPT  Processor’s  procedures  shall  require  supporting  information  to  verify  the  propriety  and  validity  of  transactions.  

1258 32.2.12 The  LPT  Processor  shall  ensure  that  approval  authority  is  commensurate  with  the  nature  and  significance  of  the  transactions.

1259 32.2.13 The  LPT  Processor  shall  remain  current  with  and  obey  all  federal  and  state  applicable  laws  and  regulations  and  any  applicable  financial  or  banking  regulations  and/or  requirements.

1260 33 Reporting  1261 33.1 General  Reporting  Requirements1262 33.1.1 Through  the  LPT  System,  the  LPT  Processor  shall  provide  all  reports  

necessary  to  support  the  functions  outlined  in  this  document.1263 33.1.2 LPT  System  reports  shall  contain  near  real  time  data  except  as  approved  

by  OTA  during  system  design.        1264 33.1.3 The  LPT  System  shall  allow  multiple  simultaneous  users  to  generate  

reports.1265 33.1.4 The  LPT  System  shall  provide  all  pre-­‐defined  reports  and  ad  hoc  

report/query  capabilities  without  interfering  with  the  normal  operations  of  the  LPT  System.    

1266 33.1.5 The  LPT  System  shall  allow  users  to  browse,  apply  selection  criteria,  and  run  reports  on  demand  through  a  clearly  displayed  and  user-­‐friendly  graphical  user  interface  (GUI).

1267 33.1.6 All  authorized  users,  including  OTA  staff  and  its  representatives,  shall  have  direct  access  and  be  able  to  generate  system  reports  without  the  need  for  intervention  of  LPT  Processor  staff.

Page 206: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  77  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1268 33.1.7 The  LPT  System  shall  offer  a  robust  reporting  module  that  allows  users  to  select  date/time  ranges,  activity  type,  payment  status,  and  other  applicable  selection  criteria  to  be  determined  during  the  design  phase.

1269 33.1.8 The  LPT  System  shall  allow  users  to  sort  data  in  reports.1270 33.1.9 LPT  System  reports  shall  include  sub-­‐totals,  totals  and  grand  totals  as  

appropriate.1271 33.1.10 The  LPT  System  shall  automatically  generate  reports  at  pre-­‐determined  

configurable  intervals  or  when  criteria  meet  pre-­‐determined  configurable  thresholds.

1272 33.1.11 The  LPT  System  shall  allow  authorized  users  to  configure  reports  to  be  automatically  generated  on  a  scheduled  basis  for  a  predefined  time  period.

1273 33.1.12 The  LPT  System  shall  support  configurable  automated  distribution  of  reports  via  email.

1274 33.1.13 The  LPT  System  shall  save  all  reports  generated  to  a  shared  archive  as  configured  by  report  or  at  the  user’s  discretion.    

1275 33.1.14 The  LPT  System  shall  allow  authorized  users  to  retrieve  archived  reports  through  the  reports  GUI.

1276 33.1.15 The  LPT  System  shall  show  reports  on  screen  and  allow  users  to  print  or  to  export  a  report  to  industry  standard  formats  including  Excel,  Access,  Adobe,  PDF,  CSV  and  HTML.    

1277 33.1.16 Wherever  possible,  exported  reports  shall  be  formatted  to  facilitate  viewing  in  the  destination  format.    For  example,  reports  exported  to  Excel  or  CSV  shall  not  have  header/footer  information  repeated  on  multiple  pages.

1278 33.1.17 All  reports  shall  contain  a  standard  report  header  and/or  footer  that  shall  include:

1279 33.1.17.1 ID  of  the  user  executing  the  report1280 33.1.17.2 Date/time  the  report  was  executed1281 33.1.17.3 Name  of  the  report1282 33.1.17.4 Page  number  in  the  format  “Page  X  of  Y”1283 33.1.17.5 Selection  criteria  used  to  generate  the  report1284 33.1.17.6 OTA  logo  or  other  such  identifier  (for  formats  that  support  this)1285 33.1.18 All  reports  shall  be  available  to  execute  for  standard  user  selectable  

timeframes  including:1286 33.1.18.1 Daily1287 33.1.18.2 Weekly1288 33.1.18.3 Monthly1289 33.1.18.4 Quarterly1290 33.1.18.5 Yearly

Page 207: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  78  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1291 33.1.19 The  LPT  System  shall  allow  users  to  perform  business  analysis  using  drill  down,  graphing,  pivoting  and  cross-­‐tabulation.

1292 33.1.20 The  LPT  System  reports  database  shall  contain  customer  service  operations  data  from  the  IVR  system,  website,  CSR  phone  system,  Cash  Payment  Network,  and  other  tools  used  to  provide  customer  service.

1293 33.1.21 The  detailed  contents  and  layout  of  all  system  and  manual  reports  and  report  selection  screens  shall  be  developed  by  LPT  Processor  and  approved  by  OTA  during  the  design  phase.

1294 33.2 Ad  Hoc  Reports1295 33.2.1 The  LPT  Processor  shall  allow  for  the  generation  of  ad  hoc  reports  

through  a  user-­‐friendly  graphical  interface.1296 33.2.2 The  LPT  System  shall  allow  users  to  run  ad  hoc  queries  and  generate  

reports.1297 33.2.3 The  LPT  System  shall  allow  users  to  store  ad  hoc  reports  in  a  common  

directory  for  future  access.1298 33.2.4 The  LPT  System  shall  allow  authorized  users  to  retrieve  archived  reports  

through  the  reports  GUI.1299 33.2.5 The  LPT  System  shall  have  run-­‐time  control  limits  to  manage  large  

queries,  print  jobs  and  downloads  to  prevent  interference  with  normal  operations.

1300 33.2.6 The  LPT  System  shall  provide  pop-­‐up  warnings  to  users  when  requested  queries  may  be  large  and/or  require  time  to  compile.

1301 33.2.7 The  LPT  System  shall  allow  users  to  preview  ad  hoc  query  results  and  reports  before  downloading  or  printing.

1302 33.3 Research  Screens1303 33.3.1 The  LPT  System  shall  provide  screens  that  facilitate  searching,  filtering,  

and  viewing  data  available  in  the  LPT  System  reports  database.    1304 33.3.2 The  LPT  System  may  limit  the  number  of  results  returned  where  not  

doing  so  may  impact  CSC  operations;  however,  there  shall  be  a  notification  to  the  user  whenever  the  data  returned  has  been  limited.    

1305 33.3.3 The  LPT  System  shall  provide  the  ability  to  do  research  in  areas  including:

1306 33.3.3.1 Transactions1307 33.3.3.2 Payments1308 33.3.3.3 Exceptions1309 33.3.3.4 Accounts1310 33.3.3.5 System  alerts  and  system  events1311 33.3.3.6 Data  transfer  logs1312 33.3.3.7 User  tracking  logs    1313 33.3.3.8 Image  Review

Page 208: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  79  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1314 33.3.3.9 IVR  and  Call  Center  activity1315 33.3.3.10 Cash  Payment  Network  activity1316 33.3.4 LPT  System  research  screens  shall  allow  authorized  users  to  query  the  

database  using  single  or  multiple  parameters  on  any  relevant  field.    For  example,  for  a  query  of  transactions,  available  fields  might  include  transaction  date/time,  OCR  confidence  value,  posting  date,  invoice  date,  due  date,  Host  transaction  number,  license  plate  number,  license  plate  jurisdiction,  and  transaction  status.  

1317 33.3.5 The  LPT  System  shall  display  a  list  of  query  results  that  includes  high-­‐level  information  relevant  to  that  query,  such  as  time,  transaction  number,  and  type.    Details  about  this  summary  information  shall  be  determined  during  the  design  phase.

1318 33.3.6 The  LPT  System  shall  allow  the  user  to  select  any  result  from  the  query  results  list  and  view  more  detailed  information  and/or  link  to  another  relevant  screen,  such  as  the  related  account  screen.

1319 33.4 Specific  Report  Requirements1320 33.4.1 At  a  minimum,  the  LPT  System  shall  provide  the  reports  included  in  this  

section;  however,  this  is  not  all-­‐inclusive  and  shall  not  relieve  the  LPT  Processor  from  meeting  reporting  requirements  specifically  mentioned  or  implied  in  other  parts  of  this  Scope  of  Services.    

1321 33.4.2 The  LPT  Processor  shall  work  with  OTA  to  finalize  reports  during  the  design  phase.  

1322 33.4.3 The  LPT  System  shall  provide  performance  monitoring  reports  as  required  to  monitor  and  audit  compliance  with  the  Performance  Standards  detailed  in  Appendix  F.  

1323 33.4.4 The  LPT  System  performance  monitoring  reports  shall  cover  all  required  Performance  Standards,  comparing  actual  performance  for  each  standard  with  the  standard  itself.    

1324 33.4.5 The  LPT  System  shall  provide  reports  on  customer  service  operations  that  cover  all  aspects  of  customer  service  on  a  daily  basis  and  over  selected  date  ranges,  at  both  a  summary  and  detail  level.    

1325 33.4.6 At  a  minimum,  the  LPT  System  shall  provide  customer  service  reports  on  the  following:

1326 33.4.6.1 Customer  contacts  by  contact  method,  by  time  period,  by  type  of  correspondence,  and  by  topic  (e.g.,  payment,  dispute,  PIKEPASS  conversion)  

1327 33.4.6.2 Incoming  mail  volumes  by  time  period  and  by  type  

Page 209: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  80  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1328 33.4.7 The  LPT  System  shall  provide  reports  on  all  aspects  of  the  IVR  and  call  center  activity  to  allow  users  to  determine  the  effectiveness  and  efficiency  of  the  IVR  system  and  customer  service  representatives  over  the  phone.    

1329 33.4.8 The  LPT  System  shall  provide  IVR  and  call  center  activity  reports,  at  both  a  detail  and  a  summary  level,  for  various  periods  including  hourly,  daily,  weekly,  monthly  and  annual.  

1330 33.4.9 The  LPT  System  shall  provide  IVR  and  call  center  activity  reports  that  allow  users  to  analyze  and  compare  call  center  data  for  similar  periods  (e.g.,  the  most  recent  Monday  compared  to  prior  Monday  and  average  Monday  over  the  past  quarter,  year,  etc.).  

1331 33.4.10 LPT  System  call  center  reports  shall  provide  call  center  data  including:1332 33.4.10.1 Call  Origin1333 33.4.10.2 Call  Volumes1334 33.4.10.3 Call  Reason  Codes  (reason  for  call)1335 33.4.10.4 Call  Wait  Times  1336 33.4.10.5 Average  Talk  Time1337 33.4.10.6 Average  Wrap  Time1338 33.4.10.7 Total  Average  Talk  and  Wrap  Time1339 33.4.10.8 Abandoned  Calls1340 33.4.10.9 Abandoned  Call  Rate1341 33.4.10.10 Use  of  the  IVR  Menus1342 33.4.10.11 Transfers1343 33.4.11 The  LPT  System  shall  provide  website  reports  on  all  aspects  of  website  to  

allow  users  to  determine  the  effectiveness  and  usability  of  the  website.

1344 33.4.12 The  LPT  System  shall  provide  website  reports,  at  both  a  detail  and  a  summary  level,  on  a  daily  basis,  monthly  basis,  and  over  a  user-­‐selected  date  range.    

1345 33.4.13 LPT  System  website  reports  shall  provide  data  including:1346 33.4.13.1 Number  of  website  page  hits1347 33.4.13.2 Use  of  the  website  page  links1348 33.4.13.3 Activity  conducted  on  the  web1349 33.4.13.4 Length  of  time  spent  on  the  website1350 33.4.13.5 Payments1351 33.4.13.6 Use  of  links  to  OTA  website1352 33.4.13.7 Use  of  links  to  CPN  locator  1353 33.4.14 The  LPT  System  shall  provide  image  review  reports  that  give  detail  and  

summary  information  for  daily,  monthly,  and  user-­‐specified  date  ranges.1354 33.4.15 The  LPT  System  image  review  reports  shall  provide  data  including:

Page 210: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  81  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1355 33.4.15.1 Number  of  images  received  from  OTA  for  review1356 33.4.15.2 Disposition  of  all  images  received1357 33.4.15.3 Number  of  images  reviewed1358 33.4.15.4 Number  of  readable  images1359 33.4.15.5 Number  of  unreadable  images  by  reject  code1360 33.4.15.6 Number  of  images  re-­‐reviewed1361 33.4.15.7 Number  of  images  reviewed  from  Watch  List1362 33.4.16 The  LPT  System  shall  provide  reports  on  LPT  accounts  with  detail  and  

summary  information  as  follows:1363 33.4.16.1 Account  status,  including  past  due  statuses1364 33.4.16.2 Newly  established  accounts1365 33.4.16.3 Accounts  with  frequent  toll  activity1366 33.4.16.4 Payment  method1367 33.4.16.5 Payments  made1368 33.4.16.6 Invoice  delivery  method1369 33.4.16.7 Account  balance1370 33.4.16.8 Invoice  Escalation  status  including  invoice  aging,  violations,  collections  

and  Stop  Flag  status  (all  by  date)1371 33.4.16.9 Flag  for  accounts  with  past  CPN  activity1372 33.4.17 The  LPT  System  shall  provide  reports  of  invoices  issued  by  specific  

variables  including  date,  amount  due,  violation  status,  payment  type,  zip  code,  and  mail  suppression  status.

1373 33.4.18 The  LPT  System  shall  provide  reports  on  violations  that  show,  at  a  detail  and  a  summary  level,  the  current  status  of  all  violations.

1374 33.4.19 The  LPT  System  shall  provide  reports  on  its  interfaces  with  other  systems  such  as  the  Host,  banks,  payment  processors,  CPN,  DMVs  and  the  collection  agency.    

1375 33.4.20 LPT  System  interface  reports  shall  provide  detail  and  summary  information  by  date  and  by  interface  to:

1376 33.4.20.1 Verify  the  timely,  complete,  and  accurate  transmission  of  information1377 33.4.20.2 Allow  reconciliation  between  reports  on  counts  and  amounts  from  the  

other  entity  on  data  sent  versus  data  received1378 33.4.20.3 Identify  any  corrupt  or  missing  information1379 33.4.20.4 Allow  for  research  of  variances  identified1380 33.4.21 The  LPT  System  shall  provide  reports  on  LPT  transaction  processing  and  

disposition  that  show  the  current  status  of  all  transactions  at  both  a  detail  and  a  summary  level,  by  any  of  the  following  criteria:  

1381 33.4.21.1 Transaction  date1382 33.4.21.2 Transmission  date1383 33.4.21.3 OCR  confidence  value

Page 211: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  82  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1384 33.4.21.4 Posting  date  1385 33.4.21.5 Invoice  date1386 33.4.21.6 Past  due  status1387 33.4.21.7 Violation  status1388 33.4.22 The  LPT  System  transaction  reports  shall  allow  examination  by:1389 33.4.22.1 Interim  statuses  such  as  image  review,  ROV  look  up,  queued  for  

invoicing1390 33.4.22.2 Most  recent  reconciliation  code  returned  to  the  Host1391 33.4.22.3 Stage  in  the  invoicing  process1392 33.4.22.4 Violation  status,  including  registration  stop  flag  status1393 33.4.22.5 Final  statuses  such  as  posted,  rejected,  paid,  turned  to  collection  or  

dismissed1394 33.4.23 The  LPT  System  shall  provide  reports  tracking  all  invoices,  escalations  and  

violation  notices  sent  to  customers.    1395 33.4.24 LPT  System  escalation  reports  shall  allow  users  to  track  the  current  status  

of  all  invoices  and  violation  notices  by  transaction  date  (range)  and  date  of  invoice/notice  issuance.    At  a  minimum,  these  reports  shall  allow  examination  of:

1396 33.4.24.1 Payment  details1397 33.4.24.2 Adjustments  1398 33.4.24.3 Write  offs1399 33.4.24.4 Tolls  1400 33.4.24.5 Fees1401 33.4.24.6 Vehicle  registration  stop  flags  or  other  escalated  collection  efforts1402 33.4.24.7 Average  payment  amounts  and  length  of  time  until  payment1403 33.4.24.8 Aging  reports1404 33.4.25 The  LPT  System  shall  provide  an  invoice  summary  report  showing  a  

current  snapshot  of  all  transactions  that  have  been  invoiced  for  a  selectable  period.    This  report  shall  be  broken  down  by  invoice  escalation  status  at  the  time  the  report  is  run.    The  report  shall  include:

1405 33.4.25.1 The  number  of  transactions  invoiced  for  the  period1406 33.4.25.2 The  number  of  transactions  by  escalation  status1407 33.4.25.3 The  toll  and  fee  amounts  charged  by  escalation  status1408 33.4.25.4 The  toll  and  fee  amounts  paid  by  escalation  status    1409 33.4.25.5 The  toll  and  fee  amounts  dismissed/written  off,  by  reason1410 33.4.25.6 The  toll  and  fee  amounts  due  by  escalation  status1411 33.4.26 The  LPT  System  shall  provide  reports  on  all  rejected  transactions.    At  a  

minimum,  these  reports  shall  show  at  a  detail  and  a  summary  level  the  reasons  for  rejected  transactions  by  transaction  date.    The  reports  shall  allow  analysis  of:

Page 212: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  83  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1412 33.4.26.1 Rejects  by  reason1413 33.4.26.2 Drill  downs  into  reject  reasons  1414 33.4.26.3 DMV  lookup  failures  1415 33.4.26.4 Trends  and  variances1416 33.4.26.5 Rejects  by  jurisdiction1417 33.4.26.6 Repeated  attempts  at  a  process  such  as  DMV  lookup1418 33.4.26.7 Rejects  by  stage  of  transaction  processing  1419 33.4.27 The  LPT  System  shall  provide  all  the  reports  required  to  audit,  reconcile,  

monitor  and  record  the  financial  activity  of  the  LPT  operation.      1420 33.4.28 The  LPT  System  shall  provide  reports  on  all  payments  received.    1421 33.4.29 At  a  minimum,  the  LPT  System  payment  reports  shall  provide  detail  and  

summary  information  by  payment  date  for  all  payments.    1422 33.4.30 The  LPT  System  payment  reports  shall  allow  users  to  examine  payments  

by:1423 33.4.30.1 Payment  methods1424 33.4.30.2 Payment  processor  or  bank1425 33.4.30.3 Payment  location  1426 33.4.30.4 CSR  clerk1427 33.4.30.5 Successful  versus  failed  payment  attempts1428 33.4.30.6 Reasons  for  payment  failures1429 33.4.30.7 Chargebacks1430 33.4.30.8 Variances  between  expected  totals  and  actuals  1431 33.4.31 The  LPT  System  shall  provide  reports  on  transaction  counts  and  revenue.    

At  a  minimum,  these  reports  shall  provide  detail  and  summary  information  by  date  and  by  location.    

1432 33.4.32 The  LPT  System  transaction  count  and  revenue  reports  shall  have  month  and  year  end  roll  ups.    These  revenue  reports  shall  allow  users  to  examine  revenue  by:

1433 33.4.32.1 Vehicle  class1434 33.4.32.2 Collected  revenue  versus  accounts  receivable1435 33.4.32.3 Adjustments1436 33.4.32.4 Trend  and  variance  analysis  including  same  month-­‐prior  year  

comparison1437 33.4.32.5 PIKEPASS  V-­‐Tolls1438 33.4.33 The  LPT  System  shall  provide  reports  on  refunds  that  provide  detail  and  

summary  information  on  refunds.    1439 33.4.34 The  LPT  System  refund  reports  shall  allow  users  to  examine  refunds  by:1440 33.4.34.1 Request  date1441 33.4.34.2 Refund  status1442 33.4.34.3 Amount

Page 213: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  84  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1443 33.4.34.4 Refund  reason1444 33.4.34.5 Refunds  issued1445 33.4.34.6 Refunds  sent  to  OTA  for  approval1446 33.4.35 The  LPT  System  shall  provide  reports  necessary  for  system  administration  

that  give  detail  and  summary  information  on  user  activity,  system  configurations  and  system  issues.    

1447 33.4.36 The  LPT  System  admin  reports  shall  allow  users  to  examine:1448 33.4.36.1 User  lists1449 33.4.36.2 User  permissions1450 33.4.36.3 User  activity  logs  (identifies  user,  screens  viewed,  printouts,  reports  

created,  and  date  and  time  of  use)  1451 33.4.36.4 Automated  reports,  schedule,  and  distribution1452 33.4.36.5 System  configuration  history1453 33.4.36.6 Alerts  or  alarms1454 33.4.36.7 Maintenance  history1455 33.4.37 The  LPT  Processor  shall  provide  OTA  with  Monthly  Status  Reports  that  

include  the  following:  1456 33.4.37.1 Number  of  invoices  issued  by  delivery  method1457 33.4.37.2 Number  of  images  reviewed1458 33.4.37.3 Number  and  percent  of  rejected  images  by  reason1459 33.4.37.4 Number  and  percentages  of  invoices  escalated  by  past  due  status  /  

escalation  level,  including  violation  (1st  notice  and  2nd  notice),  registration  stop  flag  and  collections

1460 33.4.37.5 Payments  by  type;  Visa,  MasterCard,  AMEX,  Discover,  ACH,  cash/check

1461 33.4.37.6 Payments  by  source;  mail,  web,  LPT  CSR  call,  OTA  CSR  call,  IVR,  OTA  walk-­‐in  centers,  collection  agency,  DMV,  CPN

1462 33.4.37.7 Total  number  of  customer  calls,  number  of  calls  entered  into  a  CSR  queue,  number  of  calls  answered,  and  number  of  calls  abandoned

1463 33.4.37.8 Number  of  calls  resolved  via  the  IVR  by  reason1464 33.4.37.9 Average  call  wait  time,  average  call  talk  time,  average  wrap  time,  

average  call  handle  time  (talk  and  wrap  time)1465 33.4.37.10 Average  number  of  daily  and  monthly  calls,  average  daily  calls  

answered,  average  daily  calls  abandoned  (provided  in  total  and  by  day  of  the  week)

1466 33.4.37.11 Average  web  access  by  hour  and  by  day  of  the  week1467 33.4.37.12 Diputes  by  source1468 33.4.37.13 Refunds  by  source1469 33.4.37.14 Payments  by  source1470 33.4.37.15 Progress  for  the  prior  month  for  all  outstanding  action  items

Page 214: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  85  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1471 33.4.37.16 All  potential  delays  and  problems  in  addressing  outstanding  issues  or  software  updates

1472 33.4.37.17 New  action  items  and  issues1473 33.4.37.18 Progress  on  activities  requiring  coordination  with  OTA  or  other  

external  parties1474 33.4.37.19 Deliverables  scheduled  for  submittal  in  the  next  reporting  period1475 33.4.37.20 Monthly  Performance  Reports,  including  comparison  to  the  

Performance  Standards1476 33.4.37.21 30-­‐day  look-­‐ahead  on  activities  to  clear  action  items1477 33.4.37.22 Other  items  as  deemed  noteworthy  by  OTA  or  the  LPT  Processor1478 34 Performance  Standards1479 34.1 General  Performance  Standard  Requirements1480 34.1.1 The  LPT  Processor  shall  fully  meet  or  exceed  all  of  the  requirements  

detailed  in  this  document  and  the  Performance  Standards.  1481 34.1.2 In  accordance  with  the  requirements  of  this  section,  the  LPT  Processor  

shall  establish  and  implement  an  ongoing  process  to  monitor,  measure,  calculate,  and  report  compliance  with  the  Performance  Standards.    

1482 34.1.3 The  LPT  Processor  shall  submit  the  format,  content  and  methodology  of  all  performance  reporting  to  OTA  for  review  and  approval  during  the  design  phase,  in  accordance  with  the  approved  Project  Schedule.  

1483 34.1.4 For  each  of  the  Performance  Standards,  the  LPT  Processor  shall  measure  actual  performance  for  each  standard  based  on  the  required  frequency.  

1484 34.1.5 The  LPT  Processor  shall  report  compliance  with  each  Performance  Standard  on  a  monthly  basis  in  conjunction  with  submitting  the  invoice  payment  request  to  OTA.

1485 34.1.6 If  the  LPT  Processor  fails  to  meet  any  of  the  Performance  Standards,  the  LPT  Processor  shall  report  the  deficiencies,  calculate  the  adjustments,  and  reduce  the  LPT  Processor’s  related  pricing  categories  on  the  following  month’s  invoice  payment  request  to  OTA.  

1486 34.1.7 Non-­‐compliance  with  a  Performance  Standard  and/or  the  assessment  of  related  invoice  adjustments  shall  not  release  the  LPT  Processor  from  its  obligation  to  complete  all  required  work.  

1487 34.1.8 The  LPT  Processor  shall  make  available  to  OTA  all  performance  related  documentation  and  reporting,  and  this  will  be  subject  to  audit  at  the  discretion  of  OTA.    Actual  performance  results  calculated  by  the  LPT  Processor  that  differ  from  audited  results  may  be  subject  to  further  retroactive  adjustment  of  amounts  paid  or  payable  by  OTA.  

1488 34.1.9 The  LPT  Processor  shall  perform  all  calculations  for  determining  compliance  or  non-­‐compliance  with  a  Performance  Standard  to  three  decimal  places.

Page 215: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  86  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1489 34.1.10 The  following  describes  the  process  and  methodology  that  the  LPT  Processor  shall  use  in  determining  compliance/non-­‐compliance  with  Performance  Standards,  related  invoice  adjustments  and  reporting.  

1490 34.1.10.1 The  determination  of  compliance  or  non-­‐compliance  with  each  Performance  Standard  and  any  resulting  invoice  adjustment  shall  be  made  individually  and  separately  for  each  standard.    For  example,  if  one  Performance  Standard  states  that  “Paper  invoices  shall  be  mailed  within  3  calendar  days  of  the  invoice  date”  with  an  Adjustment  Threshold  of  98%  and  another  Performance  Standard  states  that  “Paper  invoices  shall  be  mailed  within  5  calendar  days  of  the  statement  date”  with  an  Adjustment  Threshold  of  100%;  the  LPT  Processor  may  be  non-­‐compliant  with  one,  both,  or  neither  of  the  two  standards.    Therefore,  depending  on  compliance,  the  LPT  Processor  may  be  assessed  an  invoice  adjusted  for  one,  both  or  neither  standard.  

1491 34.1.10.2 The  determination  of  compliance  or  non-­‐compliance  shall  be  based  on  the  items  processed  during  the  specified  period  (calendar  month,  day,  etc.).    For  example,  if  during  the  month  of  June,  1,000  images  are  processed  by  the  LPT  Processor;  compliance  shall  be  determined  based  on  those  specific  1,000  images.    

1492 34.1.10.3 Appendix  F  lists  an  adjustment  threshold  for  each  Performance  Standard.    If  the  measured  performance  of  each  item  meets  or  exceeds  the  thresholds,  then  no  adjustment  to  the  invoice  for  that  period  is  made.    However,  if  the  actual  performance  does  not  at  least  meet  the  threshold  on  any  item,  an  automatic  price  adjustment  will  be  triggered  and  OTA  will  reduce  the  invoice  amount  for  the  related  pricing  categories  accordingly.    

1493 34.1.10.4 Appendix  F  specifies  two  methods  for  calculating  the  price  adjustment  depending  on  the  specific  Performance  Standard.    Under  one  method,  the  LPT  Processor  shall  adjust  the  invoice  by  a  specific  dollar  amount  for  each  instance  of  non-­‐compliance  with  the  Performance  Standard.    The  other  method,  as  described  below,  requires  the  LPT  Processor  to  adjust  the  invoice  based  on  a  percentage  of  the  defined  pricing  categories  for  the  month.      

Page 216: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  A  -­‐  OTA  LPT  Requirements  Traceability  Matrix

Appendix  A  -­‐  Page  87  of  87

Yes No Yes No Yes No

Remarks Proposal Reference(s)

Fully Supported by Existing Sys./Ops

If not supported by Existing System, will requirement be

met via new system development/operation?

Row # Requirement Number

Requirement

Non-System/Non-Operational Requirement:

Will the requirement be met by the Proposer?

1494 34.1.10.5 The  percentage  method  employs  tiered  adjustment  percentages.    Invoice  payment  deductions  shall  escalate  as  actual  performance  results  fall  further  below  the  required  standard.    The  adjustment  percentage  shall  determine  the  amount  of  payment  reduction  and  shall  depend  on  how  far  the  actual  performance  falls  below  the  adjustment  threshold.    If  the  actual  performance  is  below  the  adjustment  threshold  by  5%  (absolute)  or  less,  the  first  adjustment  percentage  shall  be  used.    If  the  actual  performance  is  more  than  5%  but  less  than  15%  below  the  threshold,  a  higher  percentage  is  used.    Finally,  if  the  performance  falls  to  more  than  15%  below  the  threshold,  an  even  higher  adjustment  percentage  is  used.

1495 34.1.10.6 Each  Performance  Standard  is  associated  with  one  or  more  of  the  Pricing  Categories  and  is  subject  to  adjustment  for  non-­‐compliance  with  Performance  Standards.

1496 34.1.10.7 More  than  one  pricing  category  may  be  related  to  a  Performance  Standard.    If  more  than  one  pricing  category  is  listed  for  a  specific  Performance  Standard,  activity  for  all  the  categories  shall  be  combined  to  calculate  compliance  with  the  Performance  Standard,  with  any  adjustments  for  non-­‐compliance  then  being  applied  to  each  of  the  specified  pricing  categories.

1497 34.1.10.8 The  calculated  invoice  reduction  amount  for  standards  that  are  non-­‐compliant  shall  be  increased  by  50%  if  the  same  standard  was  found  to  be  non-­‐compliant  in  any  of  the  3  months  immediately  prior  to  the  month  for  which  the  adjustment  is  being  made.  The  50%  increase  in  the  invoice  reduction  shall  only  be  applied  to  the  month  being  invoiced  and  not  to  prior  months’  invoices.    

Page 217: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  B  -­‐  Pricing  Matrix

Appendix  B  -­‐  Page  1  of  3

             Proposed  PaymentMilestones  for  Payment

1 Mobilization  (30  days  after  NTP) 10%

2 Approved  System  Design  Document 25%

3 Successful  FAT 25%  

4 Successful  Go-­‐Live 25%

5 Successful  SOAT 15%

Operations  PhasePrice

Category  # Yr.  1 Yr.  2 Yr.  31

A 1 Account  to Accounts Required

B Accounts  to Accounts Optional

C Accounts  to Accounts Optional

D Accounts  or  more Required

2A 1 Invoice  to Invoices Required

B Invoices  to Invoices Optional

C Invoices  to Invoices Optional

D Invoices or  more Required

3A 1 Notice  to Notices Required

B Notices  to Notices Optional

C Notices  to Notices Optional

D Notices or  more Required

4A 1 Transaction  to Transactions Required

B Transactions  to Transactions Optional

C Transactions  to Transactions Optional

D Transactions or  more Required

5

Design  &  Development  Phase

LPT  Account  Invoices  -­‐  Mailed  (Paper)    $  Amount  per  Invoice  mailed

$  per  Email  Sent

Additional  MailingsEnvelopes  Mailed $  per  Envelope  Mailed

Violations  -­‐  Mailed      $  Amount  per  Violation  Notice  mailed

Emails  Sent

Account  Maintenance  -­‐  LPT  Accounts

 

 $  Amount  per  Active  LPT  Account

Design  &  Development

 $  Amount  for  each  transaction  that  results  in  the  correct  identification  of  a  license  plate  (number,  jurisdiction  and  type)  

Post  Cards  Mailed$  per  Item  StuffedItems  Stuffed$  per  Post  Card  Mailed

RFP PRICING MATRIXProposers  Price  Form PROPOSED  PRICES

Vendor  Firm  Name:

Initial  Contract  TermOperations  

 

Image  Review

Page 218: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  B  -­‐  Pricing  Matrix

Appendix  B  -­‐  Page  2  of  3

6

 

7 Succession  Implementation   Proposed  Payment

Vendor  Firm  Name  -­‐  Enter  Vendor  Firm  Name

A 1 account  to 100,000 accountsB N/A accounts  to   N/A accountsC N/A accounts  to   N/A accounts

D 100,001   accounts  or more

A 1 account  to 100,000 accountsB 100,001   accounts  to   700,000   accountsC N/A accounts  to   N/A accounts

D 700,001   accounts  or more

A 1 account  to 100,000 accountsB 100,001   accounts  to   500,000   accountsC 500,001   accounts  to   700,000   accounts

D 700,001   accounts  or more

NOTES:

The  following  costs  will  be  paid  directly  by  OTA  or  be  a  direct  pass-­‐through  of  actual  cost  to  OTA:PostageCredit  Card  and  ACH  Processing  FeesBanking  Service  FeesDMV  Look-­‐up  Fees

DESIGN  &  DEVELOPMENT  PHASE:  -­‐  Design  &  Development  Phase  payments  shall  be  invoiced  after  OTA's  approval  of  completion  of  each  individual  milestone  event.  

CSR  -­‐  Call  Center

INSTRUCTIONS:

Additional    Position  2  (enter  job  title): $  per  Hour

$  per  HourCSC  Image  Review  Clerk $  per  HourAdditional    Position  1  (enter  job  title): $  per  Hour

Hourly  Extra  Work

Supervisor $  per  HourCSR  -­‐  General $  per  Hour

Operations  Phase  -­‐  Year  1  commences  with  Go-­‐Live

Software  Developer $  per  Hour

Costs  Paid  by  OTA

Unit  Prices  -­‐  Proposers  shall  enter  the  proposed  unit  price  that  will  be  charged  for  each  pricing  category  for  years  1,  2  and  3  only.    Unit  prices  for  any  extension  years  (if    applicable)    will  be    based  on  the  change  in  the  specified  Consumer  Price  Index.    The  unit  price  values  will  be  adjusted  at  the  start  of  each  extension  year,  by  an  amount  not  to  exceed  the  lesser  of  3%  or  the  change  in  the  U.S.  Bureau  of  Labor  Statistics  Consumer  Price  Index    -­‐  CPI  -­‐U,  US  City  Average,  All  Items  less  food  and  energy  for  the  most  recent  calendar  year.    In  no  event,  however,  will  the  adjustment  be  less  than  0%.

Volume  Price  Ranges  -­‐  Proposers  may  include  volume  range  price  break  points  at  which  different  unit  prices  would  apply  for  Pricing  Categories  1  through  6.    Every  month  the  unit  prices  associated  with  the  applicable  ranges  will  be  used  for  billing  purposes  for  that  month.    Proposers  are  required  to  complete  Volume  Ranges  A  and  D.    In  addition,  Proposers  may  include  Volume  Range  B  or  Volume  Ranges  B  and  C.    Proposers  must  insure  there  are  no  gaps  in  Volume  Ranges.                                                                                                                                                                                                                                                                                          

For  Example,  If  Using  Only  Price  Ranges  A  &  D:

   If  Using  Price  Ranges  A  &  B  &  D:

If  Using  Price  Ranges  A  &  B  &  C  &  D:

EXAMPLE  OF  THE  CALCULATION  OF  UNIT  PRICE  TO  OTA  FOR  THE  MONTH:    

ASSUMING  900,000  UNITS  AND  VOLUME  TIERS  AND  PRICE  BREAKS  AS  FOLLOWS:    

Volume  Range  (monthly)  Unit  Price                                                                                                      A                                          1  to  100,000                            $0.04                                                                                                      B                  100,001  to  500,000                            $0.03                                                                                                      C                    500,001  to  700,000                          $0.02                                                                                                      D                    700,001  or  more                                    $0.01    

THE  MONTHLY  COST  TO  OTA  WOULD  BE  $22,000:    

100,000  UNITS  @  $0.04  =  $  4,000  400,000  UNITS  @  $0.03  =  $12,000  200,000  UNITS  @  $0.02  =  $  4,000  200,000  UNITS  @  $0.01  =  $  2,000  

Page 219: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  B  -­‐  Pricing  Matrix

Appendix  B  -­‐  Page  3  of  3

OPERATIONAL  PHASE:Account  Maintenance  Fee  -­‐  UPA  Accounts

Invoices  Mailed  

Violation  Notices  Mailed  

Additional  Mailings

Hourly  Extra  Work

Succession  

 -­‐  Additional  Mailings  do  not  include  any  mailings  related  to  on-­‐going  customer  service.    Examples  of  mailings  not  included  in  this  category  are  invoices,  escalation  notices,  vehicle  registration  hold  notices,  account  maintenance  correspondence,  and  dispute  related  correspondence.    -­‐  This  category  includes  only  mailings  that  are  specially  requested  by  OTA.    Examples  of  OTA-­‐requested  mailings  may  include  mass  mailings  to  notify  customers  of  a  toll  increase,  major  OTA  policy  changes,  or  a  road  closure.-­‐  This  fee  will  be  applied  to  each  additional  Item  mailed/stuffed/emailed  during  the  month  being  invoiced.

 -­‐  This  is  the  fully  loaded  hourly  rate  that  will  be  applied  for  any  extra  work  not  covered  in  the  Scope  of  Work.    The  LPT  Processor  may  add  up  to  2  additional  hourly  rate  position  titles.  

 -­‐  Succession  is  a  task  that  will  be  performed  by  the  LPT  Processor  at  the  option  of  OTA  and  only  upon  written  Notification  of  Succession  by  OTA.      -­‐  Upon  Notification  of  Succession,  the  LPT  Processor  shall  fully  implement  the  approved  Succession  Plan.    -­‐  The  Succession  payment  amount  will  be  paid  as  follows:    20%  paid  to  the  LPT  Processor  30  days  after  Notification  of  Succession;  and  the  remaining  80%  will  be  paid  upon  successful  completion  of  the  approved  Succession  Plan  and  all  related  activities.  

Image  Review    -­‐  The  fee  will  be  applied  to  the  total  number  of  transactions  that  result  in  the  correct  identification  of  a  license  plate  (number,  jurisdiction  and  type)  during  the  calendar  month  being  invoiced.      -­‐  License  plates  identified  as  part  of  the  LPT  Processor's  QA/QC  process  or  any  image  re-­‐review  process  are  not  counted  towards  the  number  of  plates  identified  for  billing  purposes.  

 -­‐  The  fee  will  be  applied  to  the  total  number  of  "Active"  accounts  on  the  last  day  of  each  invoice  month.        -­‐  An  "Active"  account  is  defined  as  an  account  with  a  least  one  toll  transaction  in  the  past  2  calendar  months  (inclusive  of  the  month  being  invoiced).

 -­‐  This  fee  will  be  applied  to  the  number  of  paper  invoices  mailed  in  the  calendar  month  being  invoiced.  

 -­‐  This  fee  will  be  applied  to  the  number  of  paper  violation  notices  mailed  in  the  calendar  month  being  invoiced.  

 -­‐  This  fee  is  intended  to  cover  all  costs  not  specifically  covered  by  another  Cost  Category.

Page 220: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C1

DEFECT BOND BOND NO. KNOW ALL MEN BY THESE PRESENTS:

That ______________________________________________________, whose principal or home office address and telephone number are:

Street/P. O. Box _____________________________________________ City, State, Zip Code ________________________________________ Telephone: (______)_________________, as Principal, and ___________, a

corporation organized in the State of ________________________, and authorized to transact a commercial surety business in the State of Oklahoma, whose principal or home office mailing address is:

Street/P. O. Box _____________________________________________ City, State, Zip Code ________________________________________

as Surety, are held and firmly bound unto the Oklahoma Turnpike Authority, in the penal sum of not less than and no/100 dollars ($ ). in lawful money of the United States of America, said sum being equal to the estimated contract price, for the payment of which well and truly to be made, we bind ourselves and each of us, our heirs, executors, administrators, trustees, successors and assigns, jointly and severally by these presents.

DATED this ______ day of ______________________, 20____. THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

WHEREAS, said Principal entered into a written Contract with the Oklahoma Turnpike Authority dated _____________________, 20____, for the construction or performance of: PROJECT NO.: COUNTY: TURNPIKE: LENGTH: NA DESCRIPTION: LOCATION: (hereinafter the “Project”) all in compliance with the Project plans, specifications and related documents, including all amendments or changes thereto, which documents are on file in the principal office of the Oklahoma Turnpike Authority and are incorporated herein by reference.

Page 221: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C1

NOW, THEREFORE, if the Principal shall properly and timely remedy or correct all defective workmanship and materials appearing in the Project within one year from and after its acceptance by the Oklahoma Turnpike Authority, and if the Principal shall pay or cause to be paid all those entities who furnish labor and material to correct or remedy such defects and shall otherwise hold harmless and indemnify the Oklahoma Turnpike Authority for all costs it might incur in remedying said defects, then this obligation shall be null and void, otherwise to remain in full force and effect.

The Surety agrees that no quantity overruns, changes in the work or alterations in the contract work or documents, whether accomplished by change order, addenda or supplemental agreement, and that no deviations in the plan or mode of procedure specified in the Contract shall have the effect of releasing the Surety from all or any part of its obligations hereunder.

IN WITNESS WHEREOF, the Principal has caused this document to be executed in its name by a duly authorized officer, agent or representative, and the Surety has caused this document to be executed in its name by an authorized attorney-in-fact or corporate officer, effective as of the day and year first above written. THE COMMISSION ON THIS BOND IS BEING PAID TO: ____________________ _____________________________. ATTEST: (Corporation) [SEAL] PRINCIPAL ____________________________ Secretary of the Corporation

By: Individual Proprietor/ Partner/Authorized Officer

SURETY

By: Authorized Attorney-in-Fact or an Authorized Officer of Surety

SUBSCRIBED by the Principal’s representative before me, a Notary Public, on this _____ day of _______________________, 20___.

Notary Public in and for the State of ____________________

My Commission Expires: _______________________ [SEAL]

Page 222: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

PERFORMANCE BOND BOND NO. KNOW ALL MEN BY THESE PRESENTS:

That ________________________________________________________, whose principal or home office mailing address and telephone number are:

Street/P. O. Box ____________________________________________ City, State, Zip Code ________________________________________ Telephone (____)______________________ as Principal, and

___________________________, a corporation organized in the State of _____________________, and authorized to transact a commercial surety business in the State of Oklahoma, whose principal or home office mailing address is:

Street/P. O. Box ___________________________________________, City, State, Zip Code _______________________________________,

as Surety, are held and firmly bound unto the Oklahoma Turnpike Authority, in the penal sum of not less than and no/100 Dollars ($ ) in lawful money of the United States of America, said sum being equal to the estimated contract price, for the payment of which well and truly to be made, we bind ourselves and each of us, our heirs, executors, administrators, trustees, successors and assigns, jointly and severally by these presents.

DATED this _______ day of _________________________, 20____. THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

WHEREAS, said Principal entered into a written Contract with the Oklahoma Turnpike Authority dated ______________________, 20____, for the construction or performance of:

PROJECT NO.: COUNTY: TURNPIKE: LENGTH: DESCRIPTION: LOCATION:

Page 223: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

(hereinafter the “Project”) all in compliance with the Project plans, specifications and related documents, including all amendments or changes thereto, which documents are on file in the Principal office of the Oklahoma Turnpike Authority and are incorporated herein by reference.

NOW, THEREFORE, if the Principal shall properly and promptly complete the construction Project according to all the contract documents, including all subsequent amendments, changes, addenda, time extensions, alterations and supplemental agreements thereto, then this obligation shall become null and void, otherwise to remain in full force and effect. In the event the Principal is declared by the Oklahoma Turnpike Authority to be in default and the Principal’s right to proceed with the Project work is terminated by the Oklahoma Turnpike Authority or by a court of competent jurisdiction, the Surety shall have the duty to assume and complete all the Contract work and material requirements, including all the amendments, changes, addenda, time extensions, alterations and supplemental agreements thereto. In the event the Surety fully performs its obligations hereunder the Oklahoma Turnpike Authority acknowledges that by law the Surety is subrogated to all the Principal’s rights arising out of the Contract, including all deferred payments, retained percentage and credits due and owing to the Principal at the time of default and termination or to thereafter become due and owing under the contract documents. The Oklahoma Turnpike Authority may at its option offset against the contract earnings any indebtedness or liability which the Principal might have to the Oklahoma Turnpike Authority arising out of the bonded Project including but not limited to liquidated damages, site rental, progressive estimate overpayments and the like. After the Surety has been made whole, the Oklahoma Turnpike Authority may offset against any remaining contract earnings any indebtedness or liability of the Principal arising out of other contracts and dealings.

No quantity overruns, changes in the work, or alterations in or amendments to the contract work or documents, whether accomplished by change order, addenda or supplemental agreement, and no deviations in the plan or mode or procedure specified in the Contract shall have the effect of releasing the Surety from all or any part of its obligations hereunder.

IN WITNESS WHEREOF, the Principal has caused this document to be executed in its name by a duly authorized officer, agent or representative, and the Surety has caused this document to be executed in its name by an authorized attorney-in-fact or corporate officer, effective as of the day and year first above written. THE COMMISSION ON THIS BOND IS BEING PAID TO: _____________________ ______________________________.

Page 224: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

ATTEST: (Corporation) [SEAL] PRINCIPAL ____________________________ Secretary of the Corporation

By: Individual Proprietor/ Partner/Authorized Officer

SURETY

By: Authorized Attorney-in-Fact or an Authorized Officer of Surety

SUBSCRIBED by the Principal’s representative before me, a Notary Public, on this _____ day of _______________________, 20___.

Notary Public in and for the State of ___________________

My Commission Expires: _______________________ [SEAL]

Page 225: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

STATUTORY PAYMENT BOND BOND NO. KNOW ALL MEN BY THESE PRESENTS:

That ________________________________________________________, whose principal or home office mailing address and telephone number are:

Street/P. O. Box City, State, Zip Code Telephone (_____) _____________________, as Principal, and

_________________________, a corporation organized in the State of _____________________, and authorized to transact a commercial surety business in the State of Oklahoma, whose principal or home office mailing address is:

Street/P. O. Box City, State, Zip Code

as Surety, are held and firmly bound unto the State of Oklahoma and the Oklahoma Turnpike Authority, in the penal sum of not less than no/100 Dollars ($ ) in lawful money of the United States of America, said sum being equal to the estimated contract price, for the payment of which well and truly to be made, we bind ourselves and each of us, our heirs, executors, administrators, trustees, successors and assigns, jointly and severally by these presents.

DATED this _______ day of _________________________, 20____. THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

WHEREAS, said Principal entered into a written Contract with the Oklahoma Turnpike Authority dated ______________________, 20____, for the construction or performance of:

PROJECT NO.: COUNTY: TURNPIKE: LENGTH: DESCRIPTION: LOCATION:

Page 226: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

(hereinafter the “Project”) all in compliance with the Project plans, specifications and related contract documents, including all amendments or changes thereto, which documents are on file in the Principal office of the Oklahoma Turnpike Authority and are incorporated herein by reference.

NOW, THEREFORE, if the Principal shall (1) pay all Project indebtednesses incurred by

said Principal and his/her/its subcontractors and materialmen for all labor, material, rental of machinery or equipment and repair of and parts for equipment as are used and consumed in the performance of the contract; and (2) pay all (a) state and local taxes accruing as a result of the contract, (b) liquidated damages and site rental as may be provided for in the contract documents, and (c) any indebtedness of the Principal to the Oklahoma Turnpike Authority arising out of overpayments of progressive estimates, then this obligation shall be null and void, otherwise to remain in full force and effect.

The intent of the Principal and Surety is that this Statutory Payment Bond, including the benefits or coverages provided herein, all notice requirements and all suit limitations, shall be construed, governed and controlled by Title 61, Oklahoma Statutes, Sections 1 and 2, as those statutes exist on the effective date of the Contract, even though the language of this bond may be more or less restrictive than required by statute.

For value received the Surety agrees that no quantity overruns, changes in the work, or alterations in or amendments to the contract work or documents, whether accomplished by change order, addenda or supplemental agreement, and no deviations in the plan or mode or procedure specified in the Contract shall have the effect of releasing the Surety from all or any part of its obligations hereunder.

IN WITNESS WHEREOF, the Principal has caused this document to be executed in its name by a duly authorized officer, agent or representative, and the Surety has caused this document to be executed in its name by an authorized attorney-in-fact or corporate officer, effective as of the day and year first above written. THE COMMISSION ON THIS BOND IS BEING PAID TO: _____________________ ______________________________. ATTEST: (Corporation) [SEAL] PRINCIPAL ____________________________ Secretary of the Corporation

By: Individual/Proprietor/ Partner/Authorized Officer

Page 227: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

OTA LPT RFP - Appendix C2

SURETY

By: Authorized Attorney-in-Fact or an Authorized Officer of Surety

SUBSCRIBED before me, a Notary Public, by the Principal’s representative on this _____ day of _______________________, 20___.

Notary Public in and for the State of _______________________

My Commission Expires: _______________________ [SEAL]

Page 228: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  D  -­‐  OTA  PIKEPASS  Volumes

Appendix  D  -­‐  Page  1  of  1

NOTE:    Except  where  indicated  numbers  shown  are  for  ALL  Roadways  

Elm/Peoria Creek  Turnpike All  Roadways Elm/Peoria Creek  Turnpike All  RoadwaysPIKEPASS   4,164,394 33,361,879 118,049,763 PIKEPASS   2,327,609.00$                         20,947,195.00$             144,859,000.00$                    Cash 609,002 7,279,470 49,146,642 Cash 423,635.00$                               4,750,503.00$                 101,211,000.00$                    Violations 85,522 737,255 2,794,062 Violations 47,960.00$                                   408,487.00$                         1,531,297.00$                              Total   4,858,918 41,378,604 169,990,467 Total   2,799,204.00$                         26,106,185.00$             247,601,297.00$                    

Elm/Peoria Creek  Turnpike All  RoadwaysPIKEPASS 85.7% 80.6% 69.4%Cash 12.5% 17.6% 28.9%Violations 1.8% 1.8% 1.6%Total 100% 100% 100%

Calls  Received ACH  (min) %  of  Total  Calls  by  DayCustomer  Service  1 326,546 03:54 Monday 23%Payments 161,252 02:57 Tuesday 21%Violations 45,944 03:29 Wednesday 18%PIKEPASS  Cust  Violations 40,042 04:22 Thursday 18%Collections 23,185 03:45 Friday 20%Customer  Service  2 15,280 01:31 Saturday 0%Government  /  Fleet 9,828 02:17 Sunday 0%Spanish   7,037 03:34 Total 100%Recycle  /  Replace   3,706 03:41Litter  Hotline   689 01:51Customer  Service  3 210 05:32Total  Calls 633,719 03:03

Correspondence  Received USPS Fax Email TotalGeneral   22,100 23,400 13,000 58,500Violations 10,400 13,000 3,900 27,300Total 32,500 36,400 16,900 85,800

PIKEPASS  Accounts  (June  2015)   611,728

Violation  Transactions  by  State # %Oklahoma 526,443 66.7% Dollars  by  % $    Amount %  Transactions #  TransactionsTexas 137,917 17.5% Credit/Debit 58.3% 577,265$                       61% 29,444Missouri 21,357 2.7% Cash/Check 41.7% 412,831$                       39% 18,864Arkansas 15,633 2.0% Total 100% 990,096$                       100.0% 48,308Kansas 15,590 2.0%Other 72,506 9.2%

Total 789,446 100%

19%9%16%Dismissed  for  duplicate  transaction  on  account

Revenue

OTA  2014  -­‐  Volumes

Violation  Payments  by  Method

Post  to  PIKEPASS  Accounts  (Prior  to  issuance)Posted  to  PIKEPASS  Accounts  after  Issuance

Of  2,794,062  Lane  Violation  Events:

Note:  Currently  there  is  no  IVR

Market  Share

Lane  Transactions

Page 229: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

1  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

 

 

OTA  HOST  to  LPT  System    Interface  Control  Document  

 

 

 

 

 

 

Prepared  for  OTA  

Version  1.0    

5/19/2015  

   

Page 230: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

2  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

Document  History  Date   Revision   Author   Summary  of  Changes                                                            

   

Page 231: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

3  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

Table  of  Contents  Document  History  .......................................................................................................................................  2  

1  Introduction  .............................................................................................................................................  5  

1.1  Overview  ............................................................................................................................................  5  

1.2  Definitions  ..........................................................................................................................................  5  

2  General  Information  ................................................................................................................................  6  

2.1  Data  Exchange  Format  .......................................................................................................................  6  

2.2  Transfer  Protocol  ...............................................................................................................................  6  

2.3  Data  Exchanges  ..................................................................................................................................  6  

3  XML  Formatting  ........................................................................................................................................  7  

3.1  Built-­‐in  Data  Types  .............................................................................................................................  7  

3.2  Complex  Types  ...................................................................................................................................  7  

4  Web  Services  ............................................................................................................................................  8  

4.1  Processing  Guidelines  ........................................................................................................................  8  

4.2  Security  ..............................................................................................................................................  9  

4.2.1  Authentication  ............................................................................................................................  9  

4.3  Toll  (LPT)  Transaction  .........................................................................................................................  9  

4.3.1  Description  ..................................................................................................................................  9  

4.3.1.1  Image  Based  Transactions  .......................................................................................................  9  

4.3.2  Data  Flow  ....................................................................................................................................  9  

4.3.3  Data  Elements  ...........................................................................................................................  10  

4.4  Transaction  Reconciliation  ...............................................................................................................  11  

4.5  Daily  Reconciliation  ..........................................................................................................................  11  

4.5.1  Description  ................................................................................................................................  11  

4.5.2  Data  Elements  ...........................................................................................................................  11  

4.5.3  Request  Example  ......................................................................................................................  12  

<Insert  sample  XML  code>  .................................................................................................................  13  

4.6  Acknowledgement  Web  Service  ......................................................................................................  13  

4.6.1  Acknowledgement  Format  .......................................................................................................  13  

4.6.2  Acknowledgement  Ack  Code  and  Ack  Message  .......................................................................  14  

4.6.3  Acknowledgement  XSD  .............................................................................................................  14  

<Insert  sample  code>  .........................................................................................................................  14  

Page 232: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

4  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

5  File  Transfers  ...........................................................................................................................................  14  

5.1  Overview  ..........................................................................................................................................  14  

5.2  OTA  File  Server  ................................................................................................................................  14  

5.2.1  OTA  File  Server  Security  ............................................................................................................  15  

5.3  PIKEPASS  Account  Match  Lookup  ....................................................................................................  15  

5.3.1  Overview  and  Database  Access  Method  ..................................................................................  15  

5.3.2  Transfer  Protocol  ......................................................................................................................  15  

5.3.3  File  Archival  ...............................................................................................................................  15  

5.3.4  Acknowledgement  ....................................................................................................................  15  

5.3.5  Directory  Structure  ...................................................................................................................  15  

5.3.6  Data  Elements  ...........................................................................................................................  16  

5.3.7  File  Example  ..............................................................................................................................  16  

5.4  Oklahoma  License  Plate  Lookups  .....................................................................................................  16  

5.4.1  Overview  and  Database  View  Access  Method  ..........................................................................  16  

5.4.2  OK  License  Plate  Data  Security  and  Retention  ..........................................................................  16  

5.5  Texas  License  Plate  Lookups  ............................................................................................................  16  

5.5.1  Overview  and  Database  View  Access  Method  ..........................................................................  17  

5.5.2  TX  License  Plate  Data  Security  and  Retention  ..........................................................................  17  

5.6  HOT  Lists  ..........................................................................................................................................  18  

5.7  Images  ..............................................................................................................................................  18  

5.7.1  Overview  ...................................................................................................................................  18  

5.7.2  Image  Quality  and  Characteristics  ............................................................................................  18  

5.7.3  Transfer  Protocol  ......................................................................................................................  18  

5.7.4  File  Archival  ...............................................................................................................................  18  

5.7.5  Compression  .............................................................................................................................  18  

5.7.6  Naming  Convention  ..................................................................................................................  18  

 

   

Page 233: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

5  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

1  Introduction    

1.1  Overview    This  Interface  Control  Document  (ICD)  is  designed  to  manage  and  clarify  information  required  to  develop  the  interfaces  between  the  Oklahoma  Turnpike  Authority  (OTA)  Host  System  managed  by  OTA  and  the  License  Plate  Tolling  (LPT)  System  managed  by  the  LPT  Processor.  It  includes  technical  details  and  operational  information  necessary  to  ensure  proper  usage  and  support  for  service  operation.  This  document  is  intended  to  serve  as  a  basis  for  discussions  with  the  successful  Proposer  (LPT  Processor).  The  final  ICD  will  be  developed  from  this  preliminary  draft  according  to  provisions  in  the  OTA  RFP.  The  data  exchanges  and  business  rules  described  herein  are  subject  to  change,  and  this  document  is  intended  to  be  a  part  of  the  overall  change  management  process  when  system  changes  occur  that  affect  the  exchange  of  data  between  the  two  systems.      

1.2  Definitions    Word/Acronym   Definition/Term  Host   OTA  cEnterprise  –  Back  Office  Hot  List   A  list  of  license  plates  OTA  wants  to  be  informed  

about  if  read  by  the  LPT  System  ICD   Interface  Control  Document  LPT   License  Plate  Tolling  OTA   Oklahoma  Turnpike  Authority  PII   Personally  Identifiable  Information  Site  to  Site  VPN   A  secure  communication  tunnel  between  two  

public  facing  networks  configured  to  encrypt  traffic.    

Web  service   Software  designed  to  support  interoperable  system-­‐to-­‐system  interaction  over  a  network  

XML   Extensible  Markup  Language    

   

Page 234: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

6  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

2  General   Information    

2.1  Data  Exchange  Format    All  data,  with  the  exception  of  images,  will  be  specified  in  XML  format  as  defined  in  the  Second  Edition  of  XML  Schema  documented  at:  http://www.w3.org/TR/xmlschema-­‐0/.  Images  will  be  transmitted  in  Jpeg  format,  since  it  is  used  exclusively  by  the  tolling  industry.  The  LPT  Processor  can  provide  further  file  format  requirements  during  the  design  phase.      

2.2  Transfer  Protocol    The  preferred  message  protocol  is  web  services.  Bulk  data  and  images  will  be  transmitted  using  SFTP  file  transfer.    

2.3  Data  Exchanges    

Data  Exchange   Format   Push/Pull   Method/Protocol   Frequency  Toll  Transaction  (Tag  File)  

XML   OTA  Push  to  LPT   Web  Service  /  HTTPS  

Continuously  –  24/7  

Daily  Reconciliation  Report  

XML   LPT  Push  to  OTA   Web  Service  /  HTTPS  

Once  per  day  

Images   JPEG   OTA  Push  to  LPT   File  Transfer  /  SFTP  

Continuously  –  24/7  

Transaction  Disposition  

XML   LPT  Push  to  OTA   File  Transfer  /  SFTP  

TBD  –  no  less  than  once  per  day  

PIKEPASS  DB  Access  –  Account  Match  

XML   LPT  Pull  from  OTA   Web  Service  /  HTTPS  

Continuously  –  24/7  

License  Plate  DB  Access  OK  

XML   LPT  Pull  from  OTA   Web  Service  /  HTTPS  

Continuously  –  24/7  

License  Plate  DB  Access  to  TX  

XML   LPT  Pull  from  OTA   Web  Service  /  HTTPS  

Continuously  –  24/7  

License  Plate  DB  Access  to  CVIEW  

XML   LPT  Pull  from  OTA   Web  Service  /  HTTPS  

Continuously  –  24/7  

 

 

   

Page 235: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

7  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

3  XML  Formatting    XML  documents  in  this  interface  follow  the  XML  formatting  rules  as  described  in  the  Second  Edition  of  the  XML  Schema  documented  at:  http//www.w3.org/TR/xmlschema-­‐0    

3.1  Built-­‐in  Data  Types    XML  includes  data  types  called  built-­‐in  data  types.  The  following  built-­‐in  data  types  are  used  in  this  ICD:    

• int  • long  • decimal  • boolean  • date  • time  • dateTime  

The  built-­‐in  data  type  for  date,  dateTime,  and  time  allows  time  zone  to  be  specified.  For  this  interface  all  date  elements  will  be  specified  without  timezone  and  will  be  in  the  local  timezone  for  Oklahoma  City,  Oklahoma.    The  dateTime  built-­‐in  type  is:    

• Specific  instance  of  time.  ISO  8601  extended  format  • CCYY-­‐MM-­‐DDThh:mm:ss  

 Example,  to  indicate  3:20  pm  on  June  the  21st,  2001  for  Central  Standard  Time,  which  is  6  hours  behind  Coordinated  Universal  Time  (UTC):       2001-­‐06-­‐21T15:20:00-­‐06:00    

3.2  Complex  Types    XML  allows  the  definition  of  complex  data  types.  A  basic  complex  data  type  extends  a  simple  type  by  specifying  valid  values  or  ranges.      Here  is  an  example  of  a  complex  type  that  limits  the  values  to  “4”  and  “5”.  The  base  type  is  xsd:string.  The  values  are  limited  with  the  enumeration  keywords.      <xsd:simpleType  name=”TransactionTypeType”>          <xsd:restriction  base=”xsd:string”>                  <xsd:enumeration  value=”4”/>                  <xsd:enumeration  value=”5”/>        </xsd:restriction>  </xsd:simpleType>    

Page 236: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

8  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

Complex  types  may  also  be  used  to  specify  groups  of  data  elements  (traditionally  called  records).      Here  is  an  example  of  a  complex  type  that  defines  a  record:    <xsd:complexType  name="USAddress"  >                  <xsd:element  name="name"  type="xsd:string"/>                  <xsd:element  name="street"  type="xsd:string"/>                  <xsd:element  name="city"  type="xsd:string"/>                  <xsd:element  name="state"  type="xsd:string"/>                  <xsd:element  name="zip"  type="xsd:decimal"/>  </xsd:complexType>    Complex  types  are  discussed  in  detail  at  http://www.w3.org/TR/xmlschema-­‐0/.    

4  Web  Services      

4.1  Processing  Guidelines    Web  Services  will  be  provided  by  the  OTA  Host.  The  OTA  Host  calls  the  LPT  System  to  push  data  to  the  LPT  Processor  or  send  an  acknowledgement.  Web  Services  are  accessed  through  an  HTTPS  connection  over  a  Site  to  Site  IPSec  VPN  tunnel.  An  IPSec  VPN  tunnel  is  used  to  link  two  networks  over  an  insecure  channel  (the  Internet).  It  provides  a  secure  "tunnel"  from  one  network  to  the  other.    HTTPS  is  used  to  secure  communications  over  any  network,  whether  the  network  is  internal  (intranet)  or  external  (Internet).    While  it  is  not  required  (with  Category  2  data)  to  encrypt  during  transmission,  we  prefer  using  HTTPS  whenever  possible.  It  is  more  secure,  and  it  is  easier  to  manage  from  a  security  standpoint.    Using  HTTPS  should  not  introduce  additional  complexity.  It  will,  however,  introduce  extra  processing.  The  processing  load  will  be  determined  during  the  testing  phase,  at  which  point  the  architecture  might  be  modified  to  address  issues.  If  testing  proves  the  extra  processing  is  an  issue,  we  will  look  at  alternatives.    Each  Web  Service  transaction  consists  of  a  request  and  a  reply  in  a  synchronous  session.  If  the  request  is  successful,  the  reply  message  will  include  a  status  code  that  denotes  success.  If  the  request  is  not  successful,  the  reply  message  will  include  an  error  message.    The  data  exchange  preference  is  only  one  transaction  is  sent  per  request.  There  is  no  batching  of  requests.  For  example,  if  the  OTA  Host  needs  to  upload  500  transactions,  there  will  be  500  toll  transactions  for  a  total  of  500  requests  and  500  replies.  This  can  be  agreed  up  during  the  design  phase.      

Page 237: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

9  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

4.2  Security    4.2.1  Authentication    Authentication  will  be  implemented  via  Digital  Certificate.  OTA  will  generate  self-­‐signed  x.509  certificates  and  will  distribute  the  public  key  to  the  LPT  Processor.      

4.3  Toll  (LPT)  Transaction    4.3.1  Description      The  purpose  of  the  Toll  Transaction  web  service  is  to  submit  toll  transactions  (postpaid  video)  to  the  LPT  Processor  for  posting.  The  transaction  request  will  contain  all  required  transaction  data  occurring  at  the  lane  so  that  the  LPT  System  can  create  an  account  or  apply  the  transactions  to  the  appropriate  customer  account.  Toll  transactions  will  be  sent  from  the  Elm/Peoria  Toll  Lanes  via  the  OTA  Host  that  require  posting  to  a  customer  account  and  are  not  PIKEPASS  based  transactions.      4.3.1.1  Image  Based  Transactions    Image  based  transactions  (postpaid  video,  non  PIKEPASS)  will  include  at  up  to  12  image(s).  The  Image(s)  should  also  be  included,  via  SFTP,  and  corresponding  transaction  ID  built  into  the  image  name  and  sequence  numbers.    4.3.2  Data  Flow    Upon  receipt  of  the  Web  service  transaction,  the  LPT  System  will  perform  the  following  date  validation  checks:    

• Required  data  elements  have  been  specified  • Data  elements  are  of  the  proper  data  type  and  range  as  specified  in  the  XSD  • TransactionDateTime  >  current  date  –  60  days  (or  another  duration  as  negotiated  with  the  

LPT  Processor)  • No  duplicate  transaction.  The  combination  of  FacilityCode,  PlazaCode,  LanNumber,  

TransactionDateTime,  and  SequenceNumber  guarantees  uniqueness  for  transactions  at  the  lane.      

If  the  transaction  passes  data  validation  checks,  it  will  be  accepted,  and  a  success  code  will  be  returned.  It  will  be  stored  in  the  LPT  System  database  and  queued  for  further  processing,  for  example,  ROV  lookup,  and  then  later  posted  to  the  customer’s  account.  

If  the  transaction  does  not  pass  data  validation  checks,  it  will  be  rejected,  and  a  response  code  will  be  returned.  It  will  be  stored  in  the  LPT  System  database,  but  it  will  not  be  posted  to  the  customer’s  account.  It  will  be  retained  in  a  failed  transactions  table  for  later  research  and/or  reporting.  

Page 238: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

10  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

 Whether  the  transaction  passes  or  fails  data  validation  checks,  it  will  be  committed  to  the  LPT  System  database  before  the  web  service  sends  an  acknowledgement.  The  transactions  that  pass  data  validation  will  be  posted  to  the  appropriate  account.  Those  that  fail  will  be  retained  in  a  “failed  transactions”  table,  but  they  will  not  be  posted  to  a  customer’s  account.    

4.3.3  Data  Elements    Tag  Name   Required   Data  Type   Notes  FacilityCode   Required   String   Identifies  the  tolling  facility.  

Domain:  Facility  codes  

PlazaCode   Required   String   Code  assigned  to  the  plaza  or  tolling  zone.  Domain:  Plaza  codes  

LaneNumber   Required   int   Identifies  the  lane  within  the  plaza  or  tolling  zone.    Range:  1  to  99  

TransactionDateTime   Required   dateTime   Toll  Transaction  dateTime  in  the  local  time  zone.  Fractions  of  seconds  are  required.    Cannot  be  in  the  future  or  more  than  60  days  in  the  past.  

SequenceNumber   Required   Long   This  number  along  with  the  PlazaCode,  Facility  Code,  LaneNumber,  and  TransactionDateTime  guarantees  uniqueness  for  transactions  at  the  lane.    

TransactionType   Optional   String   Identifies  the  transaction  type  photo-­‐enforced  post  paid.    Domain:  TransactionTypes  

AVCClassification   Required   String   Vehicle  classification  as  indentified  by  Automatic  Vehicle  Classification  system  in  the  lane.    Domain:  VehicleClassTypes  

ImageList   Required   ImageListType   The  facility  is  required  to  provide  images  for  all  transactions  

AxleCount   Optional   int   Range:  0  to  15    

   

Page 239: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

11  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

 

4.4  Transaction  Reconciliation    A  methodology  will  be  developed  such  that  the  OTA  Host  receives  an  indication,  at  the  transaction  level,  as  to  the  disposition  of  the  transaction.  Disposition  status  will  include,  but  not  be  limited  to,  paid  and  rejected.  In  the  event  that  a  transaction  is  rejected  a  reason  code  will  be  provided  indicating  the  reason  for  the  rejection.    

4.5  Daily  Reconciliation    4.5.1  Description    The  Daily  Reconciliation  web  service  will  be  executed  by  the  OTA  Host  once  a  day  to  provide  reconciliation  information  to  the  LPT  System.    The  summary  level  information  will  be  compared  to  the  data  received  by  the  LPT  Processor  in  a  LPT  System  Report.  The  discrepancies  will  be  highlighted  to  help  identify  missing  data.  For  example,  if  the  daily  reconciliation  web  service  states  that  the  OTA  Host  transmitted  1,000  transactions,  but  the  LPT  System  can  only  find  500  transactions,  there  are  apparently  500  transactions  missing.  In  this  case,  the  LPT  Processor  will  work  with  OTA  to  not  only  find  the  missing  transactions,  but  also  find  the  cause  for  the  exclusion.    The  Daily  Reconciliation  web  service  includes  the  From  and  To  Date/Time  range  to  clearly  identify  the  reporting  period  of  the  data  included  in  the  summary  data.    The  OTA  Host  should  send  summary  information  for  the  LPT  facilities,  plazas,  lanes,  transaction  types,  and  AVC  classifications,  even  if  the  transaction  counts  are  zero.  This  is  needed  to  ensure  that  all  data  has  been  reported.        

4.5.2  Data  Elements    TagName   Required?   Data  Type   Notes  FromDateTime   Requried   dateTime   Starting  date/time  of  the  reporting  period  ToDateTime   Required   dateTime   Ending  date/time  of  the  reporting  period  ArrayList   Required   ComplexType   ArrayElement  minOccurs=”1”  

maxOccurs=”unbounded”  FacilityCode   Required   String   Identifies  the  tolling  facility.  

Domain:  FacilityCodes  PlazaCode   Required   String   Code  assigned  to  the  plaza  or  tolling  region.    

Domain:  PlazaCodes  LaneNumber   Required   int   Identifies  the  lane  within  the  plaza  or  tolling  

zone.    Range:  1  to  99  

Page 240: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

12  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

TransactionType   Optional   String   Domain:  Transaction  Types  AVCClassification   Required   String   Vehicle  classification  as  indentified  by  

Automatic  Vehicle  Classification  system  in  the  lane.    Domain:  VehicleClassTypes  

TransactionCount   Required   Long   Count  of  transactions    

The  following  are  other  reconciliation  codes  that  will  need  to  be  developed  during  the  design  phase.    

• Interim  –  Transaction  received  by  the  License  Plate  Tolling  Processor    • Rejected  –  Duplicate  transaction  • Rejected  –  Unable  to  send  to  DMV/ROV  source  for  lookup  • Rejected  –  Rejected  by  DMV/ROV  source  • Rejected  –  Addressee  unknown  • Rejected  –  No  DMV  reciprocity  • Dismissed  –  OTA  request  • Dismissed  –  No  longer  own  vehicle  • Interim  –  In  image  review  • Interim  –  In  DMV  look  up  • Interim  –  2nd  time  through  DMV  lookup  • Interim  –  Image  re-­‐review  required  • Interim  –  Transaction  pre-­‐invoiced;  awaiting  invoice  cycle  • Interim  –  Invoiced  • Interim  –  Past  due  invoice  • Interim  –  Past  due  30  days  • Interim  –  Past  due  60  days  • Interim  –  Violation  • Interim  –  Partial  Paid  • Interim  –  Administrative  review  • Interim  –  CC  chargeback  • Interim  –  NSF  check  • Interim  –  In  skip  tracing  • Interim  –  TOR  • Final  –  Dismissed  for  PIKEPASS  conversion    • Final  –  Paid  Invoice  • Final  –  Paid  Past  Due  • Final  –  Paid  Violation    

 4.5.3  Request  Example    

Page 241: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

13  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

<Insert  sample  XML  code>      

4.6  Acknowledgement  Web  Service    The  LPT  System  will  provide  a  web  service  to  accept  acknowledgement  from  the  OTA  Host.  The  intent  of  this  web  service  is  to  provide  a  generic  Ack/Nak  service  for  all  OTA  to  LPT  interfaces,  including  PIKEPASS  VTol,  OK  and  TX  License  Plate  lookups.      4.6.1  Acknowledgement  Format    Field/Element   Data  Type   Required   Notes  AckData/AckCode   xs:int   Y   Code  of  Ack  returned.  

Valid  Range:  0-­‐999  AckMessage   xs:string   Y   The  actual  Ack  message.  (example:  “File  Name  is  

missing”,  “No  file  is  received  in  the  past  hour”,  etc…)  Valid  Range:  String  

FacilityCodes   xs:string   Y   Indicates  the  OTA  facility  that  sends  the  request.  Valid  Range:  TBD  

FileName   xs:string   N   This  is  the  same  file  name  in  the  file  sent  out  to  OTA.  This  field  is  used  to  match  an  acknowledgement  to  the  file  sent  out.  Valid  Range:  -­‐PIKEPASS  Account  Match:  YYYYMMDDHHMMSS_Full_PPVT_XML.ZIP  -­‐For  OK  License  Plate  lookup:  YYYYMMDDHHMMSS_OKLPU_XML.ZIP  -­‐For  TX  License  Plate  Lookup:  YYYYMMDDHHMMSS_TXLPU_XML.ZIP  

InterfaceName   xs:string   Y   It  indicates  which  interface,  either  PIKEPASS  Account  Match,  OK  LPU,  TX  LPU,  TTXFER  (toll  transaction)  

 

   

Page 242: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

14  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

4.6.2  Acknowledgement  Ack  Code  and  Ack  Message    Ack  Code   Ack  Message  0   File  Received  Successfully  11   File  cannot  be  unzipped  12   File  cannot  be  processed  13   File  format  is  not  correct  101   Record  is  blank  102   TheTransponderValidationList  is  missing  103   The  FileGenerateTime  is  missing  104   The  TotalRecordCount  is  missing    

0   Success  1-­‐100   File  transfer  error  101-­‐200   OK  LPLU  errors  201-­‐300   TX  LPLU  errors  999   Unknown  Error  –  Contact  Maintenance  Group    4.6.3  Acknowledgement  XSD    <Insert  sample  code>    

5  File  Transfers    

5.1  Overview    File  transfers  are  used  instead  of  web  services  when  bulk  data  or  images  must  be  transmitted.    

• Bulk  data  can  be  transmitted  more  efficiently  with  a  file  drop  architecture  than  with  web  services.  Web  services  tend  to  work  better  when  small  amounts  of  data  are  needed  quickly  such  as  when  transactions  are  streamed  to  the  LPT  System.  

• Images  are  a  special  type  of  bulk  data.  Jpeg  images  can  be  embedded  in  XML,  but  the  process  is  difficult  and  it  has  a  significant  amount  of  risk.  Images  can  be  transferred  very  easily,  however,  with  file  drop  architecture.    

5.2  OTA  File  Server    OTA  will  be  responsible  for  providing  a  file  server  with  SFTP  access  provided  to  the  LPT  Processor.  The  file  server  will  be  used  for  the  files  being  transferred  between  OTA  and  the  LPT  System.  OTA  will  size  and  secure  the  server  with  respect  to  its  traffic  volume  specifications.  Other  files  such  as  daily  reconciliation  files  and  any  transaction  disposition  files  will  also  be  transferred  as  required.    

Page 243: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

15  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

5.2.1  OTA  File  Server  Security    Data  residing  on  the  OTA  File  Server  is  classified  as  category  2.  Category  2  data  does  not  require  encryption,  but  it  does  require  authentication  for  access.    SFTP  is  not  required  for  this  security  classification,  but  for  simplicity  sake,  all  file  transfers  to  and  from  the  LPT  System  is  accomplished  with  SFTP.  FTP  is  not  allowed.    Authentication  and  encryption  will  be  accomplished  with  SSH  v2  public  key  /  private  key  pairs.      

5.3  PIKEPASS  Account  Match  Lookup    5.3.1  Overview  and  Database  Access  Method    OTA  maintains  the  PIKEPASS  system  via  the  Host.  It  contains  all  active/inactive  PIKEPASS  customers.    OTA  will  provide  the  LPT  Processor  with  access  to  a  read-­‐only  database  view,  or  result  set  of  a  stored  query  of  the  PIKEPASS  data,  so  that  the  LPT  System  can  compare  the  License  Plate  number  and  jurisdiction  against  the  PIKEPASS  customer  database.  Any  processed  license  plates  found  to  be  PIKEPASS  customers  will  not  be  processed  by  the  LPT  System.  The  LPT  System  will  send  a  file  with  a  list  of  Toll  Transaction  IDs  and  Image  IDs  that  were  found  to  be  PIKEPASS  matches.  The  security  will  be  determined  during  the  design  phase.  The  Database  Access  Method  will  be  determined  during  the  design  phase  examples  are  ODBC  or  web  services.  The  PIKEPASS  Account  Match  file  will  be  sent  daily  from  LPT  System  to  the  OTA  Host.      5.3.2  Transfer  Protocol    SFTP  will  be  used  for  all  PIKEPASS  Account  Match  file  transfers  between  the  LPT  System  and  the  OTA  Host  File  Server.      5.3.3  File  Archival    PIKEPASS  Account  Match  files  should  be  retained  on  the  LPT  System  for  a  period  of  30  days.  The  retention  period  is  optional  for  the  OTA  Host.  It  is  suggested  in  order  to  support  data  analysis  in  the  event  there  are  issues  with  the  data.  The  LPT  System  is  responsible  or  purging  PIKEPASS  Account  Match  files  older  than  30  days.      

5.3.4  Acknowledgement    After  receiving  the  PIKEPASS  Account  Match  file,  OTA  will  send  and  Ack/Nak  to  the  LPT  System  by  calling  the  LPT  System’s  web  service.    

 

5.3.5  Directory  Structure    

Page 244: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

16  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

The  first  level  of  the  directory  structure  will  be  PIKEPASSAM  (AM  =  Account  Match).  The  second  level  will  be  INBOUND  and  PROCESSED.  When  Account  Match  files  are  processed  they  will  be  moved  to  be  processed  by  OTA.    5.3.6  Data  Elements    TagName   Required?   Data  Type   Notes  TransactionID   Y   ComplexType   Exact  match  of  the  TransactionID  must  be  used  

to  ensure  OTA  can  match  it  with  a  stored  TransactionID  from  the  Sent  queue  of  Transactions  sent  by  the  OTA  web  service.    

ImageID   Y   ComplexType   Exact  match  of  the  ImageID  must  be  used  to  ensure  OTA  can  match  the  ImageID  with  the  TransactionID  from  the  Sent  queue  of  Images  sent  via  SFTP  by  OTA.      

         5.3.7  File  Example    <Insert  PIKEPASS  Account  Match  file  data>      

5.4  Oklahoma  License  Plate  Lookups    5.4.1  Overview  and  Database  View  Access  Method    OTA  will  be  providing  the  LPT  Processor  with  read-­‐only  access  to  the  Oklahoma  License  Plate  database  that  it  maintains  from  the  Oklahoma  Tax  Authority.  The  LPT  System  is  required  to  do  an  ROV  lookup  for  every  OK  LPT  transaction  to  ensure  it  has  up  to  date  information  for  LPT  billing,  so  this  data  shall  be  available  24/7/365  and  will  be  kept  up  to  date  at  a  set  OTA  interval.  OTA  will  maintain  a  read-­‐only  database  view,  or  result  set  of  a  stored  query  of  the  Oklahoma  license  plate  data,  on  an  Internet  accessible  server  via  secure  connection  over  Site  to  Site  VPN.  

 5.4.2  OK  License  Plate  Data  Security  and  Retention    The  LPT  Processor  shall  take  every  precaution  in  securing  the  OK  license  plate  ROV  data  once  the  queries  to  the  database  view  become  data  in  the  LPT  System.  This  data  shall  be  treated  as  Personally  Identifiable  Information  (PII)  and  shall  be  protected  using  ISO  27001  and  the  OTA  Security  Policy  as  guidelines  for  preventing  unauthorized  access  to  this  data.    OTA  will  provide  the  LPT  Processor  with  specific  data  retention  schedules  for  OK  license  plate  data  that  is  connected  with  LPT  Customers.      

5.5  Texas  License  Plate  Lookups    

Page 245: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

17  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

5.5.1  Overview  and  Database  View  Access  Method    OTA  will  be  providing  the  LPT  Processor  with  read-­‐only  access  to  the  Texas  License  Plate  database  that  it  maintains  from  the  Texas  DMV.  The  LPT  System  is  required  to  do  an  ROV  lookup  for  every  TX  LPT  transaction  to  ensure  it  has  up  to  date  information  for  LPT  billing,  so  this  data  shall  be  available  24/7/365  and  will  be  kept  up  to  date  at  a  set  OTA  interval.      OTA  will  maintain  a  read-­‐only  database  view,  or  result  set  of  a  stored  query  of  the  Texas  license  plate  data,  on  an  Internet  accessible  server  via  secure  connection  over  Site  to  Site  VPN.    5.5.2  TX  License  Plate  Data  Security  and  Retention    The  LPT  Processor  shall  take  every  precaution  in  securing  the  OK  license  plate  ROV  data  once  the  queries  to  the  database  view  become  data  in  the  LPT  System.  This  data  shall  be  treated  as  Personally  Identifiable  Information  (PII)  and  shall  be  protected  using  ISO  27001  and  the  OTA  Security  Policy  as  guidelines  for  preventing  unauthorized  access  to  this  data.      OTA  will  provide  the  LPT  Processor  with  specific  data  retention  schedules  for  OK  license  plate  data  that  is  connected  with  LPT  Customers.    

5.6  CVIEW  Database  Access    5.6.1  Overview  and  CVIEW  Access  Method    OTA  will  be  providing  the  LPT  Processor  with  read-­‐only  access  to  the  CVIEW  database  that  it  maintains  from  a  commercial  vehicle  registration  vendor.  The  LPT  System  is  required  to  do  an  ROV  lookup  for  every  Commercial  LPT  transaction  to  ensure  it  has  up  to  date  information  for  LPT  billing,  so  this  data  shall  be  available  24/7/365  and  will  be  kept  up  to  date  at  a  set  OTA  interval.      OTA  will  maintain  a  read-­‐only  database  view,  or  result  set  of  a  stored  query  of  the  CVIEW  license  plate  data,  on  an  Internet  accessible  server  via  secure  connection  over  Site  to  Site  VPN.    

5.6.2  CVIEW  Data  Security  and  Retention    The  LPT  Processor  shall  take  every  precaution  in  securing  the  CVIEW  license  plate  ROV  data  once  the  queries  to  the  database  view  become  data  in  the  LPT  System.  This  data  shall  be  treated  as  Personally  Identifiable  Information  (PII)  and  shall  be  protected  using  ISO  27001  and  the  OTA  Security  Policy  as  guidelines  for  preventing  unauthorized  access  to  this  data.      OTA  will  provide  the  LPT  Processor  with  specific  data  retention  schedules  for  CVIEW  license  plate  data  that  is  connected  with  LPT  Customers.    

Page 246: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

18  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

5.7  HOT  Lists    OTA  will  use  the  agreed  upon  file  transfer  method  to  send  the  LPT  Processor  Hot  List  files.  The  LPT  System  shall  process  the  Hot  List  files  and  compare  license  plates  in  the  list  to  processed  license  plate  image  results  to  look  for  matches.  When  matches  occur,  the  LPT  System  shall  send  a  web  service  call  to  the  OTA  Host  to  transmit  the  matches.  The  OTA  Host  will  send  an  acknowledgement  confirming  it  has  received  the  Hot  List  matches.        

5.8  Images    5.8.1  Overview    The  OTA  lane  hardware  will  collect  video  images  of  vehicles  on  the  Oklahoma  Turnpike  at  Elm/Peoria.  These  images  are  used  for  license  plate  tolls.  Detailed  information  about  the  images  is  recorded  in  the  toll  transaction  data  exchange.  Images  will  be  pushed  to  the  LPT  System  from  the  OTA  Host  File  Server.    5.8.2  Image  Quality  and  Characteristics    Images  received  from  the  OTA  Host  will  be  subject  to  Optical  Character  Recognition  (OCR)  (for  quality  assurance)  and  may  be  used  on  customer  notices.  For  OCR  purposes,  the  OTA  provided  image  is  expected  to  have  a  uniform  pixel  density  of  not  less  than  150  dots  per  inch  across  the  license  plate  region.  The  image  shall  be  crisply  focused  and  display  sufficient  contrast  to  facilitate  OCR.    

5.8.3  Transfer  Protocol    Secure  File  Transfer  Protocol  (SFTP)  will  be  used  to  push  images  from  the  OTA  Host  file  server  to  the  LPT  System.  

5.8.4  File  Archival    Images  must  be  retained  and  purged  in  accordance  with  the  Data  Retention  requirements  in  the  LPT  Scope  of  Services  and  Functional  Requirements.      Images  must  be  retained  in  the  LPT  System  for  at  least  3  years.  The  LPT  Processor  is  responsible  for  purging  images  within  3  months  after  the  required  retention  timeframe  is  reached.    

5.8.5  Compression    Images  will  not  be  compressed.  Jpeg  images  do  not  benefit  from  compression.    

5.8.6  Naming  Convention    

Page 247: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

RFP  Appendix  E  -­‐  OTA  DRAFT  HOST  to  LPT  System  ICD    

19  

Oklahoma  Turnpike  Authority  4401  West  Memorial  Road,  Suite  130  Oklahoma  City,  OK    73134-­‐1798  

Images  will  be  named  in  a  unique  manner  by  the  OTA  Host.  The  image  names  will  be  specified  in  the  toll  transaction.    In  order  to  ensure  image  names  are  unique,  the  following  data  elements  will  be  specified:    

Page 248: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  F  -­‐  OTA  LPT  Performance  Standards

Appendix  F  -­‐  Page  1  of  5

 

Impacted  PriceCategory

Performance  Standards(All  Standards  are  Measured  on  a  Monthly  Basis  Except  as  Noted)

Adjustment  Threshold

0-­‐5%  below  Threshold

Above  5%  but  less  than  15%  below  Threshold

15%  or  more  below  

Threshold

Compliance  Measurement(based  on  LPT  Processor  reports)

    Invoice  &  Violation  Notice  Issuance

1aInvoice  Mailed

(paper)Paper    invoices  (sent  via  1st  Class  Mail)  shall  be  mailed  within  2  business  days  of  the  end  of  the  billing  cycle  date. 98% 5% 7% 10%

Invoices  mailed  within  standard/  total  invoices  which  reach  the  billing  cycle  for  the  month  

1bInvoice  Mailed

(paper)Paper    invoices  (sent  via  1st  Class  Mail)  shall  be  mailed  within  4  business  days  of  the  end  of  the  billing  cycle  date. 100% 5% 7% 10%

Invoices  mailed  within  standard/  total  invoices  which  reach  the  billing  cycle  for  the  month  

2aViolations  

Notices  MailedViolation  Notices  (sent  via  Certified  Mail)  shall  be  mailed  within  3  business  days  of  the  end  of  the  billing  cycle  date. 98% 5% 7% 10%

Violation  Notices  mailed  within  standard/  total  invoices  which  reach  the  billing  cycle  for  the  month  

2bViolations  

Notices  MailedViolation  Notices  (sent  via  Certified  Mail)  shall  be  mailed  within  5  business  days  of  the  end  of  the  billing  cycle  date. 100% 5% 7% 10%

Violation  Notices  mailed  within  standard/  total  invoices  which  reach  the  billing  cycle  for  the  month  

3UPA  -­‐  Account  Maintenance  

The  LPT  Processor  shall  notify  OTA  of  any  license  plates  that  match  the  PIKEPASS  license  plate  database  with  12  hours  of  identification  of  the  license  plate  number  and  jurisdiction.

100% 5% 7% 10%Comparison  of  LPT  Processor  report  of  license  plates  matching  or  not  matching  plates  on  the  PIKEPASS  database  to  the  report  of  all  readable  images.  

4UPA  -­‐  Account  Maintenance  

All  transactions  received  by  the  LPT  Processor  shall  be  queued  for  invoicing  on  an  LPT  account  within  12  hours  of  identification  of  Name  and  Address  ROV  information.  

100% 5% 7% 10%Comparison  of  LPT  Processor  report  detailing  transactions  received  from  OTA  to  receipt  of  ROV  information    

5UPA  -­‐  Account  Maintenance  

The  LPT  Processor  shall  transmit  to  the  OTA  Host  any  changes  in  transaction  reconciliation  code  status  within  24  hours  of  the  change. 100% 5% 7% 10%

Comparison  of  LPT  Processor  report  detailing  transaction  status  changes  to  the  transmission  of  status  code  changes  to  OTA    

6aUPA  -­‐  Account  Maintenance  

Name  and  address  look-­‐ups  shall  be  initiated  with  the  DMV/OTA/3rd  party  service  within  1  business  day  of  the  completion  of  Image  Review. 98% 5% 7% 10%

Comparison  of  the  date  a  license  plate  is  identified  (end  of  the  image  review  process)  to  the  date  the  ROV  look-­‐up  process  is  initiated.

6b UPA  -­‐  Account  Maintenance  

Name  and  address  look-­‐ups  shall  be  initiated  with  the  DMV/OTA/3rd  party  service  within  3  business  day  of  the  completion  of  Image  Review.

100% 5% 7% 10%Comparison  of  the  date  a  license  plate  is  identified  (end  of  the  image  review  process)  to  the  date  the  ROV  look-­‐up  process  is  initiated.

Payments  Processing

All  cash/check  payments  received  shall  be  deposited  into  the  designated  OTA  bank  account  within  3  business  days.  

Notes:1) Compliance  with  this  standard  will  be  determined  on  a  Daily  basis.

2) Compliance  related  to  payments  received  will  be  based  on  the  number  of  payments,  not  the  dollar  value  of  the  payments.  

Adjustment  Percentages(Reduction  for  Non-­‐Compliance)

Comparison  of  LPT  Processor  payment  report  to  bank  deposits  dates

#

N/A 100% $5,000  per  deposit  for  each  day  the  standard  is  not  achieved.

7

OTA  LPTPERFORMANCE  STANDARD/THRESHOLDS/ADJUSTMENTS

Transaction  Processing  

Page 249: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  F  -­‐  OTA  LPT  Performance  Standards

Appendix  F  -­‐  Page  2  of  5

 

Impacted  PriceCategory

Performance  Standards(All  Standards  are  Measured  on  a  Monthly  Basis  Except  as  Noted)

Adjustment  Threshold

0-­‐5%  below  Threshold

Above  5%  but  less  than  15%  below  Threshold

15%  or  more  below  

Threshold

Compliance  Measurement(based  on  LPT  Processor  reports)

Call  Center

8aUPA  -­‐  Account  Maintenance  

Calls  shall  be  answered  by  CSRs  within  1  minute  of    the  customers'  request  to  speak  to  a  CSR. 80% 5% 7% 10%

Total  number  of  calls  answered  by  a  CSR  within  1  minute  of  the  customer  selecting  the  IVR  options  to  speak  to  a  CSR  /  Total  number  of  calls  in  which  a  customer  selecting  the  IVR  option  to  speak  to  a  CSR

8b UPA  -­‐  Account  Maintenance  

Calls  shall  be  answered  by  CSRs  within  5  minutes  of    the  customers'  request  to  speak  to  a  CSR.

95% 5% 7% 10%

Total  number  of  calls  answered  by  a  CSR  within  5  minutes  of  the  customer  selecting  the  IVR  options  to  speak  to  a  CSR  /  Total  number  of  calls  in  which  a  customer  selecting  the  IVR  option  to  speak  to  a  CSR

9aUPA  -­‐  Account  Maintenance  

The  LPT  Processor  shall  answer  all  customer  calls  requesting  to  speak  to  a  CSR.  

Note:  Calls  which  are  abandoned  within  the  first  30  seconds  are  not  considered  abandoned  calls)

96% 5% 7% 10%Total  calls  answered  by  a  CSR/Total  calls  requested  to  be  placed  in  the  CSR  IVR  queue  

9bUPA  -­‐  Account  Maintenance  

The  LPT  Processor  shall  answer  all  customer  calls  requesting  to  speak  to  a  CSR

Note:  Calls  which  are  abandoned  within  the  first  30  seconds  are  not  considered  abandoned  calls)

93% 5% 7% 10%Total  calls  answered  by  a  CSR/Total  calls  requested  to  be  placed  in  the  CSR  IVR  queue  

10UPA  -­‐  Account  Maintenance   All  incoming  customer  calls  shall  be  placed  in  the  IVR  system.   99.5% 5% 7% 10%

Total  calls  handled  by  the  IVR  (system  or  CSR)  /  Total  incoming  customer  calls    

11UPA  -­‐  Account  Maintenance  

One  percent  of  the  total  CSR  customer  call  interactions  shall  be  monitored  and  evaluated  by  the  LPT  Processor  supervisors  each  month,  with  every  CSR  having  a  minimum  of  5  customer  interactions  monitored  per  month.      

100% 5% 7% 10%Total  calls  monitored/evaluated  for  each  CSR/Total  calls  answered  for  each  CSR.    Verification  of  a  minimum  of  5  calls  monitored/evaluated  for  CSR.

Reporting    &  Research

12 N/A The  LPT  Processor  shall  make  all  scheduled  reports  available  by  8AM  on  the  day  scheduled.    

100% Comparison  of  report  schedule  to  actual  report  availability  to  users.

13 N/AThe  LPT  Processor  shall  submit  a  remediation  plan  for  OTA's  approval  for  all  PCI  audit  compliance  exceptions  within  10  business  days  of  receipt  of  the  audit  report.

100%Comparison  of  the  date  the  audit  report  is  issued  to  the  date  the  remediation  plan  is  provided  to  OTA  for  review  and  approval.

14 N/A The  LPT  Processor  shall  resolve  all  PCI  audit  compliance  exceptions  within  the  timeframe  approved  by  OTA  in  the  remediation  plan.  

100%Comparison  of  the  date  the  exception  is  resolved  (subject  to  OTA  verification)  to  the  approved  resolution  date  in  the  remediation  plan.

15 N/AThe  LPT  Processor  shall  submit  a  remediation  plan  for  OTA's  approval  for  all  SSAE  16  compliance  exceptions  within  10  business  days  of  receipt  of  the  audit  report.  

100%Comparison  of  the  date  the  audit  report  is  issued  to  the  date  the  remediation  plan  is  provided  to  OTA  for  review  and  approval.

16 N/AThe  LPT  Processor  shall  resolve  all  SSAE  16  exceptions  within  the  timeframe  approved  by  OTA  in  the  remediation  plan.   100%

Comparison  of  the  date  the  exception  is  resolved  (subject  to  OTA  verification)  to  the  approved  resolution  date  in  the  remediation  plan.

17 N/A Subpoenas  &  Freedom  of  Information  Act  requests  shall  be  completed  and  provided  to  OTA  within  10  business  days  of  the  request  from  OTA.

100% Comparison  of  the  date  the  OTA  request  is  made  to  the  date  the  complete  data  is  provided  to  OTA.

Adjustment  Percentages(Reduction  for  Non-­‐Compliance)

$1,000  per  request  for  each  day  the  standard  is  not  achieved.

$1,000  for  each  day  the  standard  is  not  achieved.

$1,000  for  each  day  the  standard  is  not  achieved.

$1,000  for  each  day  the  standard  is  not  achieved.

$200  per  report  for  each  day  the  standard  is  not  achieved.

#

$1,000  for  each  day  the  standard  is  not  achieved.

Page 250: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  F  -­‐  OTA  LPT  Performance  Standards

Appendix  F  -­‐  Page  3  of  5

 

Impacted  PriceCategory

Performance  Standards(All  Standards  are  Measured  on  a  Monthly  Basis  Except  as  Noted)

Adjustment  Threshold

0-­‐5%  below  Threshold

Above  5%  but  less  than  15%  below  Threshold

15%  or  more  below  

Threshold

Compliance  Measurement(based  on  LPT  Processor  reports)

System  Availability  &  ResponseThe  LPT  System  shall  be  available  to  users  with  full  functionality  24  hours  a  day,  7  days  a  week.  This  Performance  Standard  will  be  measured  on  a  quarterly  basis.    Any  invoice  adjustment  shall  be  applied  to  the  last  month  of  the  quarter  being  measured.

An available LPT System is defined as the overall LPT System, components, andprocesses provided by the LPT Processor including the LPT System hardware, LPTSystem Software and network communications that are properly functioningand available to collect revenue, exchange data with the Host, properly processthe  data,  reconcile  the  data,  and  provide  customer  service.  

The LPT System shall be considered unavailable (LPT System downtime) if theLPT System is severely degraded causing loss of functionality, application errorsfor multiple users, or prevents access to staff and users. A failure of the IVRsystem or web site not related to the LPT System will not be included in the LPTSystem  availability  calculation.

Scheduled,  approved  maintenance  that  does  not  exceed  3  hours  per  quarter  will  not  be  counted  toward  downtime.

Availability  =  100%  -­‐  ([Total  number  of  hours  of  downtime  in  the  calendar  quarter/  Total  number  of  hours  in  the  calendar  quarter]  x  100)The  IVR  system  shall  be  available  to  customers  with  full  functionality  24  hours  a  day,  7  days  a  week.    This  Performance  Standard  will  be  measured  on  a  quarterly  basis.    Any  invoice  adjustment  shall  be  applied  to  the  last  month  of  the  quarter  being  measured.

An  available  IVR  system  is  defined  as  an  operating  integrated  phone  system  that  is  properly  functioning  and  available  for  use  by  customers  to  properly  access  and  manage  accounts,  talk  to  CSRs,  receive  and  respond  to  telephone  calls.

The  IVR  system  shall  be  considered  unavailable  (IVR  System  downtime)  if  customers  are  unable  to  access  account  information  or  manage  their  account  via  the  IVR.

 IVR  downtime  resulting  from  the  unavailability  of  the  LPT  System  components  that  support  the  IVR  shall  not  be  included  in  the  IVR  downtime.  

Scheduled,  approved  maintenance  that  does  not  exceed  3hours  per  quarter  will  not  be  counted  toward  downtime.

Availability  =  100%  -­‐  ([Total  number  of  hours  of  downtime  in  the  calendar  quarter/  Total  number  of  hours  in  the  calendar  quarter]  x  100)

#

Adjustment  Percentages(Reduction  for  Non-­‐Compliance)

5%Availability  =  100%  -­‐  ([Total  number  of  hours  of  

downtime  in  the  calendar  quarter/  Total  number  of  hours  in  the  calendar  quarter]  x  100)

Availability  =  100%  -­‐  ([Total  number  of  hours  of  downtime  in  the  calendar  quarter/  Total  number  of  

hours  in  the  calendar  quarter]  x  100)

UPA  -­‐  Account  Maintenance  

18 99.80%

19 99.80% 7%UPA  -­‐  Account  Maintenance   10%

7% 10%

5%

Page 251: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  F  -­‐  OTA  LPT  Performance  Standards

Appendix  F  -­‐  Page  4  of  5

 

Impacted  PriceCategory

Performance  Standards(All  Standards  are  Measured  on  a  Monthly  Basis  Except  as  Noted)

Adjustment  Threshold

0-­‐5%  below  Threshold

Above  5%  but  less  than  15%  below  Threshold

15%  or  more  below  

Threshold

Compliance  Measurement(based  on  LPT  Processor  reports)

The  website  shall  be  available  to  users  with  full  functionality  24  hours/day,  7  days/week  excluding  approved,  routine,  scheduled  maintenance.    This  Performance  Standard  will  be  measured  on  a  quarterly  basis.    Any  invoice  adjustment  shall  be  applied  to  the  last  month  of  the  quarter  being  measured.

An available website is defined as an operating and properly functioningwebsite  that  is  available  for  use  and  access  by  the  public  with  full  functionality.  

The website shall be considered unavailable (website downtime) if customersare unable to access account information via the website, perform all accountfunctions  correctly  or  if  the  public  are  unable  to  access  information  online.

Website  downtime  resulting  from  the  unavailability  of  the  LPT  System  components  that  support  the  website  shall  not  be  included  in  the  website  downtime.

Scheduled, approved maintenance that does not exceed 3 hours per quarter willnot  be  counted  toward  downtime.

Availability  =  100%  -­‐  ([Total  number  of  hours  of  downtime  in  the  calendar  quarter/  Total  number  of  hours  in  the  calendar  quarter]  x  100)

21 UPA  -­‐  Account  Maintenance  

The  IVR  System  shall  respond  to  interactive  customer  specific  inquiry  from  the  database  within  3  seconds  of  the  customer  requests  for  specific  information.    

98% 5% 7% 10% Compariosn    of  the  response  time  within  3  seconds  to  the  total  number  of  requested  responses

22UPA  -­‐  Account  Maintenance  

The  LPT  System  shall  produce  requested  information  within  3  seconds  of  user  requests.   98% 5% 7% 10%

Compariosn    of  the  response  time  within  3  seconds  to  the  total  number  of  requested  responses

Image  Review

23 Image  Review

The  LPT  Processor  shall  either  determine  the  license  plate  number,  jurisdiction  and  plate  type,  or  reject  as  unreadable,    all  license  plate  images  provided  by  OTA  within  3  business  days  of  the  images  being  available  to  the  LPT  Processor  for  review.  

98% 5% 10% 15%

Comparison  of  the  date  license  plates  are  identified  or  rejected  as  unreadable  to  the  date  the  license  plate  images  were  submitted  to  the  LPT  Processor  for  processing.

24 Image  Review

The  LPT  Processor  shall  either  determine  the  license  plate  number,  jurisdiction  and  plate  type,  or  reject  as  unreadable,    all  license  plate  images  provided  by  OTA  within  5  business  days  of  the  images  being  available  to  the  LPT  Processor  for  review.  

100% 5% 10% 15%

Comparison  of  the  date  license  plates  are  identified  or  rejected  as  unreadable  to  the  date  the  license  plate  images  were  submitted  to  the  LPT  Processor  for  processing.

25 Image  Review

Rejected  license  plate  images  shall  be  categorized  to  the  correct  established  rejection  code.  

98% 5% 7% 10% Compliance  shall  be  determined  by  OTA  based  on  a  sample  audit.

#

Adjustment  Percentages(Reduction  for  Non-­‐Compliance)

Availability  =  100%  -­‐  ([Total  number  of  hours  of  downtime  in  the  calendar  quarter/  Total  number  of  

hours  in  the  calendar  quarter]  x  100)20 UPA  -­‐  Account  

Maintenance  99.80% 5% 7% 10%

Page 252: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  F  -­‐  OTA  LPT  Performance  Standards

Appendix  F  -­‐  Page  5  of  5

 

Impacted  PriceCategory

Performance  Standards Adjustment  Threshold

0-­‐2%  below  Threshold

Above  2%  but  less  than  4%  below  Threshold

4%  or  more  below  

Threshold

Compliance  Measurement(based  on  LPT  Processor  reports)

License  Plates,  which  are  provided  by  OTA,  shall  be  correctly  identified  as  to  plate  number,  jurisdiction  and  plate  type  by  the  LPT  Processor  or  correctly  rejected  to  the  appropriate  reject  code  

99.95%

Determination  of  Compliance:The  LPT  Processor  shall  audit  a  random,  representative  sample  of  transactions  to  determine  whether  it  has  met  the  image  review  accuracy  standard.    The  representative  sample  size  shall  be  such  that  it  ensures  a  confidence  level  of  99%  and  a  confidence  interval  (margin  of  error)  of  1%.

Quarterly,  OTA  may  review  the  LPT  Processor's  audit  by  selecting  a  random  sample  of  the  transactions  in  the  LPT  Processor's  monthly  audits  for  the  quarter.    OTA  will  choose  a  sample  size  that  ensures  a  confidence  level  of  99%  and  a  confidence  interval  (margin  of  error)  of  1%.  

In  the  event  that  the  OTA  audit  discloses  an  error  rate  in  the  LPT  Processor  audit  of  greater  than  2%,  an  invoice  reduction  of    10  %  of  the  invoiced  line  item  will  be  made.

Note:  An  error  in  the  determination  of  plate  numbers/letter,  plate  type  and/or  jurisdiction  of  issuance,  and  incorrect  rejections  of  images  as  unreadable  shall  be  considered  failures  under  this  standard.

15% 35%25%  See  -­‐  Determination  of  Compliance  in  Performance  Standard  column

NOTE:  CHANGE  IN  ADJUSTMENT  PERCENTAGES  FOR  #  26

(Reduction  for  Non-­‐Compliance)

#

26 Image  Review

Page 253: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

ENGROSSED HOUSE BILL NO. 1568 By: Mulready of the House and Newberry of the Senate

An Act relating to motor vehicles; amending 47 O.S. 2011, Section 11-1401.2, as last amended by Section 28, Chapter 15, O.S.L. 2013 (47 O.S. Supp. 2014, Section 11-1401.2), which relates to the Oklahoma Electronic Toll Collection Act; changing certain definitions; defining terms; providing that certain penalty is in addition to toll charges; providing for a video toll collection system; providing certain notice requirements and information; limiting disclosure of certain information; and providing an effective date.

BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:

SECTION 1. AMENDATORY 47 O.S. 2011, Section 11-1401.2,

as last amended by Section 28, Chapter 15, O.S.L. 2013 (47 O.S.

Supp. 2014, Section 11-1401.2), is amended to read as follows:

Section 11-1401.2 A. For purposes of this section:

1. "Authority" means the Oklahoma Turnpike Authority;

2. "Commission" means the Oklahoma Tax Commission;

3. "Electronic toll collection system" means a system of

collecting tolls or charges which is capable of charging an account

holder the appropriate toll or charge by transmission of information

Appendix G - Oklahoma Legislation_HB1568

jeffreyweiss
Typewritten Text
Page 254: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 2

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

from an electronic device on a motor vehicle to the toll lane, which

information is used to charge the account the appropriate toll or

charge;

4. "Owner" means any person, corporation, partnership, firm,

agency, association, or organization who, at the time of the

violation and with respect to the vehicle identified in the notice

of toll evasion violation:

a. is the beneficial or equitable owner of the vehicle,

b. has title to the vehicle,

c. is the registrant or coregistrant of the vehicle which

is registered with the Oklahoma Tax Commission or

similar registering agency of any other state,

territory, district, province, nation or other

jurisdiction,

d. subject to the liability limitations set forth in

paragraph 12 of subsection B of this section, uses the

vehicle in its vehicle renting and/or leasing

businesses, or

e. is a person entitled to the use and possession of a

vehicle subject to a security interest in another

person;

5. "Photo-monitoring system" means a vehicle sensor installed

to work in conjunction with a toll collection facility which

automatically produces one or more photographs, one or more

Appendix G - Oklahoma Legislation_HB1568

jeffreyweiss
Typewritten Text
jeffreyweiss
Typewritten Text
jeffreyweiss
Typewritten Text
Page 255: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 3

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

microphotographs, a videotape or other recorded images of each

vehicle at the time it is used or operated in violation of toll

collection regulations on the turnpikes under the Authority's

jurisdiction;

6. "Toll collection regulations" means those rules and

regulations of the Oklahoma Turnpike Authority or statutes providing

for and requiring the payment of tolls and/or charges prescribed by

the Authority for the use of turnpikes under its jurisdiction or

those rules and regulations of the Authority or statutes making it

unlawful to refuse to pay or to evade or to attempt to evade the

payment of all or part of any toll and/or charge for the use of

turnpikes under the jurisdiction of the Authority; and

7. "Toll evasion violation" means a failure to comply with the

Authority's toll collection regulations, including the failure to

pay an invoice submitted by the Authority via its video toll

collection system;

8. "Vehicle" means every device in, upon or by which a person

or property is or may be transported or drawn upon a highway, except

devices used exclusively upon stationary rails or tracks; and

9. "Video toll collection system" means a photo-monitoring

system used to charge and collect tolls from owners of vehicles

imaged using the turnpike system. The owner of a vehicle imaged by

the photo-monitoring system may or may not be an Authority account

holder.

Appendix G - Oklahoma Legislation_HB1568

jeffreyweiss
Typewritten Text
jeffreyweiss
Typewritten Text
Page 256: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 4

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

B. 1. Notwithstanding any other provision of law, there shall

be imposed monetary liability on the owner of a vehicle for failure

of an operator thereof to comply with the toll collection

regulations of the Oklahoma Turnpike Authority in accordance with

the provisions of this section.

2. The owner of a vehicle shall be liable for a civil penalty

imposed pursuant to this section if the vehicle was used or operated

with the permission of the owner, express or implied, in violation

of the toll collection regulations, and such violation is evidence

by information obtained from a photo-monitoring system. However, no

owner of a vehicle shall be liable for a penalty imposed pursuant to

this section where the operator of the vehicle has been convicted of

a violation of toll collection regulations for the same incident.

3. A certificate, sworn to or affirmed by an agent of the

Authority, or facsimile thereof, based upon inspection of

photographs, microphotographs, videotape or other recorded images

produced by a photo-monitoring system shall be prima facie evidence

of the facts contained therein and shall be admissible in any

proceeding charging a violation of toll collection regulations. The

photographs, microphotographs, videotape or other recorded images

evidencing such a violation shall be available for inspection and

admission into evidence in any proceeding to adjudicate the

liability for the violation. Each photo-monitoring system shall be

checked bi-monthly bimonthly for accuracy, and shall be maintained,

Appendix G - Oklahoma Legislation_HB1568

Page 257: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 5

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

adjusted or replaced if necessary to ensure the systems are

operating properly.

4. An owner found liable for a violation of toll collection

regulations pursuant to this section shall be liable for a monetary

penalty of Twenty-five Dollars ($25.00) for each violation.

Liability for this monetary penalty does not abrogate an owner's

obligation to pay toll charges associated with the violation, and

the Authority may pursue collection of such unpaid toll charges

pursuant to this section.

5. An imposition of liability pursuant to this section shall be

based upon a preponderance of evidence as submitted. An imposition

of liability pursuant to this section shall not be deemed a

conviction as an operator and shall not be made part of the motor

vehicle operating record of the person upon whom such liability is

imposed nor shall it be used for insurance purposes in the provision

of motor vehicle insurance coverage.

6. a. A notice of toll evasion violation shall be sent by

regular first-class mail to each person alleged to be

liable as an owner for a violation of toll collection

regulations. The notice shall be mailed no later than

forty-five (45) days after the alleged violation. A

manual or automatic record of mailing prepared in the

ordinary course of business shall be prima facie

evidence of the receipt of the notice.

Appendix G - Oklahoma Legislation_HB1568

Page 258: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 6

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

b. A notice of toll evasion violation shall contain the

name and address of the person alleged to be liable as

an owner for a violation of toll collection

regulations pursuant to this section, the registration

or the license tag number of the vehicle involved in

the violation, the location where the violation took

place photo-monitoring system recorded the vehicle's

image, the date and time of the violation and image,

the identification number of the photo-monitoring

system which recorded the violation image or other

document locator number and the nature of the

violation.

c. Notice of toll evasion violation shall be prepared and

mailed by the Authority or its agents and shall

contain information advising the person of the

applicable monetary penalty and method of payment

thereof and the manner and the time in which the

person may contest the liability alleged in the

notice. The notice of toll evasion violation shall

contain, or be accompanied with, an affidavit of

nonliability and information of what constitutes

nonliability, information as to the effect of

executing the affidavit and instructions for returning

the affidavit to the Authority and shall also contain

Appendix G - Oklahoma Legislation_HB1568

Page 259: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 7

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

a warning to advise the persons charged that failure

to contest in the manner and time provided shall be

deemed an admission of liability and that the penalty

shall be imposed and may be collected as authorized by

law. In addition to the notice required by

subparagraph a of this paragraph, the Authority may

elect to send a subsequent notice of toll evasion

violation by certified mail. Such notice shall

contain a statement to the registered owner that,

unless the registered owner pays the toll evasion

penalty or contests the notice within twenty-one (21)

days after receipt of the certified mail notice of

toll evasion violation or completes and files the

affidavit of nonliability, the renewal of the vehicle

registration shall be contingent upon compliance with

the notice of toll evasion violation.

d. If the toll evasion penalty is received by the

Authority and there is no contest as to that toll

evasion violation, the proceedings under this section

shall terminate.

e. If the registered owner fails to pay the toll evasion

penalty as required in this section, or fails to

contest the notice of toll evasion violation issued

pursuant to subparagraph c of this paragraph as

Appendix G - Oklahoma Legislation_HB1568

Page 260: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 8

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

provided in subparagraph a of paragraph 7 of this

subsection, the registered owner shall be deemed

liable for the violation by operation of law. The

toll evasion penalty and any administrative fees or

charges shall be considered a debt due and owing the

Authority by the registered owner and the Authority

may proceed to collect such penalty, fees or charges

under paragraph 9 of this subsection.

7. a. Within twenty-one (21) days after receipt of a notice

of toll evasion violation a person may contest a

notice of toll evasion violation. In that case, the

Authority shall do the following:

(1) the Authority shall investigate the circumstances

of the notice with respect to the contestant's

written explanation of reasons for contesting the

toll evasion violation. If, based upon the

results of the investigation, the Authority is

satisfied that the violation did not occur or

that the registered owner was not responsible for

the violation, the Authority shall maintain an

adequate record of the findings of the

investigation. Within thirty (30) days of

receipt of a notice of contest the Authority

shall complete such investigation and mail the

Appendix G - Oklahoma Legislation_HB1568

Page 261: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 9

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

results of the investigation to the person who

contested the notice of toll evasion violation,

and

(2) if the person contesting a notice of toll evasion

violation is not satisfied with the results of

the investigation provided for in division (1) of

this subparagraph, the person may, within fifteen

(15) days of the mailing of the results of the

investigation, deposit the amount of the toll

evasion penalty and request an administrative

review. An administrative review shall be held

within ninety (90) calendar days following the

receipt of a request for an administrative

review, excluding any continuance time. The

person requesting the review may request and

shall be allowed one continuance, not to exceed

twenty-one (21) calendar days.

b. The administrative review procedure shall consist of

the following:

(1) the person requesting an administrative review

shall indicate to the Authority his or her

election for a review by mail or personal

conference and may provide materials in support

Appendix G - Oklahoma Legislation_HB1568

Page 262: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 10

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

of the contest of the results of the

investigation,

(2) upon ten (10) days' written notice mailed to the

contestant, the administrative review shall be

conducted before an examiner designated to

conduct review by the Authority's governing body

or Director of the Oklahoma Turnpike Authority.

In addition to any other requirements of

employment, an examiner shall demonstrate those

qualifications, training, and objectivity

prescribed by the Authority's governing body or

Director as are necessary and which are

consistent with the duties and responsibilities

set forth in this section and Section 11-1401.1

et seq. of this title,

(3) the officer or person authorized to issue a

notice of toll evasion violation shall be

required to participate in an administrative

review. The Authority shall not be required to

produce any evidence other than the notice of

toll evasion violation or copy thereof, a

photograph of the rear of the vehicle,

information received from the Commission

identifying the registered owner of the vehicle,

Appendix G - Oklahoma Legislation_HB1568

Page 263: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 11

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

and a notarized statement from the person

reporting the violations. The documentation in

proper form shall be considered prima facie

evidence of the violation, and

(4) the review shall be conducted in accordance with

paragraph 5 of this subsection and in accordance

with the written procedure established by the

Authority which shall ensure fair and impartial

review of contested toll evasion violations. The

examiner's final decision shall be in writing and

shall be delivered personally or by registered

mail to the contestant within ten (10) days of

the review. A manual or automatic record of

mailing prepared in the ordinary course of

business shall be prima facie evidence of the

receipt of such decision.

8. a. Within twenty (20) days after receipt of the final

decision described in division (4) of subparagraph b

of paragraph 7 of this subsection, the contestant may

seek review by filing an appeal to the district court

having jurisdiction in the county in which the

contestant lives, where the same shall be heard on the

record. A copy of the notice of appeal shall be

served in person or by first-class mail upon the

Appendix G - Oklahoma Legislation_HB1568

Page 264: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 12

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Authority by the contestants. For purposes of

computing the twenty-day period, the Code of Civil

Procedure, Section 2006 of Title 12 of the Oklahoma

Statutes, shall be applicable.

b. The conduct of the hearing on appeal under this

section is a subordinate judicial duty which may be

performed by referees, masters or other subordinate

judicial officials at the direction of the district

court.

c. If no notice of appeal of the Authority's decision is

filed within the period set forth in subparagraph a of

this paragraph, the examiner's decision shall be

deemed final.

9. Except as otherwise provided in paragraphs 10 and 11 of this

subsection, the Authority shall proceed under one or more of the

following options to collect an unpaid toll evasion penalty:

a. the Authority may file an itemization of unpaid toll

evasion penalties and administrative and service fees

with the Commission for collection at the time of

registration of the vehicle pursuant to paragraph 17

of this subsection, or

b. the Authority may contract with a collection agency to

collect unpaid toll evasion penalties, fees, and

charges.

Appendix G - Oklahoma Legislation_HB1568

Page 265: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 13

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

10. The Authority shall not file a civil judgment with the

district court relating to a toll evasion violation which has been

filed with the Commission unless the Authority has determined that

the registration of the vehicle has not been renewed for sixty (60)

days beyond the renewal date and the notice has not been mailed by

the Commission pursuant to paragraph 17 of this subsection.

11. If an owner receives a notice of toll evasion violation

pursuant to this paragraph for any time period during which the

vehicle was reported to the police department as having been stolen,

it shall be a valid defense to an allegation of liability for a

violation of toll collection regulations that the vehicle had been

reported to the police as stolen prior to the time the violation

occurred and had not been recovered by such time. If an owner

receives a notice of toll evasion violation pursuant to this

paragraph for any time period during which the vehicle was stolen,

but not yet reported to the police as having been stolen, it shall

be a valid defense to an allegation of liability for a violation of

toll collection regulations pursuant to this paragraph that the

vehicle was reported as stolen within two (2) hours after the

discovery of the theft by the owner. For purposes of asserting the

defense provided by this subsection it shall be sufficient that a

certified copy of the police report of the stolen vehicle be sent by

first-class mail to the Authority and the district court having

jurisdiction.

Appendix G - Oklahoma Legislation_HB1568

Page 266: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 14

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

12. An owner of a vehicle to which a notice of toll evasion

violation was issued pursuant to paragraph 6 of this subsection

shall not be liable for the violation of the toll collection

regulations provided that the owner sends to the Authority the

affidavit of nonliability described in paragraph 6 of this

subsection, within twenty-one (21) days after receiving the original

notice of toll evasion violation. Failure to send such information

within the time period shall render the owner liable for the penalty

prescribed by this section. If the owner complies with the

provisions of this subsection, the operator of the vehicle on the

date of the violation shall be subject to liability for the

violation of toll collection regulations, provided that the

Authority mails a notice of toll evasion violation to the operator

within ten (10) days after receipt of such information.

13. In connection with the preparation and mailing of a notice

of toll evasion violation, the Authority shall ensure adequate and

timely notice to all video toll collection system and electronic

toll collection system account holders to inform them when their

accounts are delinquent. An owner who is an account holder under

the video toll collection system or electronic toll collection

system shall not be found liable for a violation of this section

unless the Authority has first sent a notice of delinquency to the

account holder and the account holder was in fact delinquent at the

time of the violation.

Appendix G - Oklahoma Legislation_HB1568

Page 267: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 15

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

14. Nothing in this section shall be construed to limit the

liability of an operator of a vehicle for any violation of toll

collection laws or regulations.

15. Notwithstanding any other provision of law, all

photographs, microphotographs, videotape or other recorded images

prepared pursuant to this section shall be for the exclusive use of

the Authority in the discharge of its duties under this section and

shall not be open to the public nor be used in any court in any

action or proceeding pending therein unless the action or proceeding

relates to the imposition of or indemnification for liability

pursuant to this section. The Authority shall not sell, distribute

or make available in any way, the names and addresses of video toll

collection system and electronic toll collection system account

holders or Authority patrons, without the consent of the account

holders or patrons, to any entity that will use the information for

any commercial purpose.

16. a. Except as provided in subparagraph c of this

paragraph, the Commission shall refuse to renew the

registration of any vehicle if the registered owner or

lessee has been mailed by certified mail a notice of

toll evasion violation as provided in subparagraph c

of paragraph 6 of this subsection, the Authority has

transmitted to the Commission an itemization of unpaid

toll evasion penalties, including administrative fees,

Appendix G - Oklahoma Legislation_HB1568

Page 268: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 16

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

pursuant to paragraph 9 of this subsection, and the

toll evasion penalty and administrative fee have not

been paid pursuant to paragraph 8 of this subsection,

unless the full amount of all outstanding toll evasion

penalties and administrative fees, as shown by records

of the Commission are paid to the Commission at the

time of application for renewal.

b. The Authority shall issue a notice of disposition of

toll evasion violation to a lessor, if the lessor

provides the Authority with the name, address, and

driver's license number of the lessee at the time of

the occurrence of the toll evasion violation.

c. The Commission shall renew the registration of any

vehicle if the applicant provides the Commission with

the notice of disposition of toll evasion violation

issued pursuant to subparagraph b of this paragraph

for clearing all outstanding toll evasion penalties,

fees and assessments, as shown by the records of the

Commission, and the applicant has met all other

requirements for registration.

17. The Commission shall include on each vehicle registration

renewal notice issued for use at the time of renewal, or on an

accompanying document, an itemization of unpaid toll evasion

penalties, fees and assessments, showing the amount thereof and the

Appendix G - Oklahoma Legislation_HB1568

Page 269: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 17

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

date of toll evasion relating thereto, which the registered owner or

lessee is required to pay pursuant to paragraph 16 of this

subsection.

18. a. Except as provided in subparagraph b of this

paragraph, the Commission shall remit all toll evasion

penalties, fees and assessments collected, after

deducting the administrative fee authorized by

paragraph 19 of this subsection, for each notice of

toll evasion violation for which toll evasion

penalties, fees and assessments have been collected

pursuant to paragraph 16 of this subsection, to the

Authority. Within forty-five (45) days from the time

penalties, fees and assessments are paid to the

Commission, the Commission shall inform the Authority

which of its notices of toll evasion violation have

been collected.

b. For each notice of toll evasion violation for which

toll evasion penalties, fees and assessments have been

collected by the Commission pursuant to paragraph 16

of this subsection, the Authority is due an amount

equal to the sum of the unpaid toll, administrative

fees, other costs incurred by the Authority that are

related to toll evasion, process service fees, and

fees and collection costs related to civil debt

Appendix G - Oklahoma Legislation_HB1568

Page 270: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 18

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

collection. After deducting the Commission's

administrative fee authorized by paragraph 19 of this

subsection, the Commission shall promptly pay to the

Authority the amounts due the Authority for unpaid

tolls, administrative fees, other costs incurred by

the Authority that are related to toll evasion,

process service fees, and fees and collection costs

related to civil debt collection.

19. The Commission shall assess a fee for the recording of the

notice of toll evasion violation, which is given to the Commission

pursuant to paragraph 9 of this subsection, in an amount, as

determined by the Commission, that is sufficient to provide a total

amount equal to at least its actual costs of administering

paragraphs 16, 17 and 20 of this subsection.

20. Whenever a vehicle is transferred or not renewed for two

(2) renewal periods and the former registered owner or lessee of the

vehicle owes a toll evasion penalty and administrative fees for a

notice of toll evasion violation filed with the Commission pursuant

to paragraph 9 of this subsection, the Commission shall notify the

Authority of that fact and is not required thereafter to attempt

collection of the toll evasion penalty and administrative fees.

This legislation shall not be construed to affect in any way the

power which the Oklahoma Turnpike Authority possesses to establish

tolls and other charges in connection with their turnpike

Appendix G - Oklahoma Legislation_HB1568

Page 271: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

ENGR. H. B. NO. 1568 Page 19

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

facilities, including the authority to establish a one-way toll

collection system for any of its facilities or a toll discount

structure for certain classes of patrons using any of its

facilities.

SECTION 2. This act shall become effective November 1, 2015.

Passed the House of Representatives the 9th day of March, 2015.

Presiding Officer of the House of Representatives

Passed the Senate the ___ day of __________, 2015.

Presiding Officer of the Senate

Appendix G - Oklahoma Legislation_HB1568

Page 272: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

PHYSICAL SECURITY Section: Physical Security

Effective Date: 06-01-2011

Policy Number: IS-005

Date Last Approved by ITSC: 5/21/2015

Prior Policy Number: N/A

Department: All Departments

Initial Policy Date: 06-01-2011

Prior Effective Date: FIRST RELEASE

Purpose Securing physical access to sensitive information and systems is the first step in limiting potential compromise of company data. This policy details the standards that must be implemented to prevent unauthorized access, damage and interference to Oklahoma Turnpike Authority facilities and operations to include unauthorized access to sensitive systems.

Policy Statement Physical access to facilities, data centers, systems, networks and data at Oklahoma Turnpike Authority will be limited to those authorized personnel who require access to perform assigned duties. Where systems are deployed in areas where controls may not completely restrict access to only authorized personnel, monitoring controls will be deployed to identify unauthorized access to systems, network, and data. In addition to access controls, physical safeguards will be deployed to protect sensitive systems and data from fire, theft or other hazard.

Applicability The policy applies to all Oklahoma Turnpike Authority employees, contractors, vendors, and any other person using or accessing Oklahoma Turnpike Authority information or information systems. Exceptions to this policy must be documented and approved by the OTA Leadership or designated representatives.

Standards The following standards will be implemented to mitigate risk of unauthorized access to sensitive Oklahoma Turnpike Authority systems and data. Specific guidelines for the physical security of Oklahoma Turnpike Authority are outlined in the IT Facility Security Plan. BUILDING PERIMETER SECURITY

• All external doors except for the front door into the lobby will be locked at all times and require keys to enter.

• All visitors obtaining access to Oklahoma Turnpike Authority facilities must register at the lobby and remain supervised when on the premises. An IT department representative must accompany all visitors, vendors, contractors and staff while accessing the computer room.

• If not escorted, visitors will be assigned a badge that clearly identifies them as a visitor. INTERNAL SECURITY

• Access to all infrastructure computing/networking devices (i.e., routers, hubs, firewalls, servers, network jacks, etc.) must be restricted to only Oklahoma Turnpike Authority employees with a demonstrated need for recurring access. Separate physical control and access verification must be provided for these devices.

• Access to other network infrastructure components, such as network cables, will be controlled by Oklahoma Turnpike Authority to prevent unauthorized intrusion into our network.

Page 273: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

• When employment is terminated, all physical access to Oklahoma Turnpike Authority facilities must be revoked immediately and all physical access tokens (i.e., IDs, keys, magnetic stripe cards, etc.) must be recovered.

• Physical access to wireless access points, gateways and handheld devices will be restricted. Access will be granted only to specific IT personnel or as approved by the IT Leadership.

• Network jacks will be enabled only when required by authorized employees • Video cameras will be used to monitor the entry/exit points of the data center and other

sensitive areas where sensitive data is stored or present. Video cameras will be placed inside the data center to inhibit tampering and must directly monitor systems which store aggregated payment card data. This video will be kept for a minimum of 90 days.

WORKSTATION SECURITY

• User workstations must not be left unattended when logged into sensitive systems or data. Automatic log off and password screen savers will be deployed to enforce this requirement.

• All equipment that contains customer information will be secured to deter theft. In the case of mobile computing devices, all sensitive data must be encrypted when removed from organizational premises.

• Workstation monitors and system terminals will be positioned to limit inadvertent viewing by visitors and other unauthorized system users.

DATA CENTER SECURITY

• Oklahoma Turnpike Authority datacenters will be partitioned by full walls to ensure all access can be monitored.

• The door key system must record date, time and user entering the room and must verify that only authorized users gain access to restricted data rooms.

• Data center walls, doors, and windows will be constructed with sufficient strength to deter entry by an intruder.

• Each critical device will be served by dual power sources. In the event one power source fails the second power source will continue operations for at least 15 minutes.

• Before the addition of any new equipment, the IT department must assure that rack capacity, electrical capacity and bandwidth capacity are sufficiently available.

• All flows of air, gas, and water into the computing facility must have shutoff valves and provide positive drains.

• Multiple layers of protection will be instituted to protect access to the Data Center. Access to the Data Center will require an additional keys or tokens approved by the Information Security Officer.

• Emergency lighting will be maintained in both the computer room and other areas of the organization where sensitive information is stored.

VISITORS It is essential that all persons who enter Oklahoma Turnpike Authority facilities are authorized and that an audit trail exists for all non-Oklahoma Turnpike Authority staff entering Oklahoma Turnpike Authority facilities. Generally, this would be the Guest Check-in log at the receptionist, and/or the Visitation log in the Data Center. Visitor logs will be retained for a minimum of three months. The following special requirements apply for visitors:

• Management or designee must authorize any visitors prior to entering areas where cardholder data is processed or maintained within Oklahoma Turnpike Authority facilities.

• Managers responsible for specific internal space with additional controls must approve visitor access to those areas.

• Visitors will be given a physical token (e.g., badge or access device) that expires, and that identifies them as non-employees.

• Visitors will be required to surrender badges before leaving the facility or on the date of expiration.

• Visitors will be required to sign the Visitor’s Log at the receptionist. Visitor logs will be retained for a minimum of three months.

Page 274: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

IDENTIFICATION BADGES Everyone is required to visibly display an identification badge while within Oklahoma Turnpike Authority premises. Employees must challenge anyone not displaying a badge. Particular care must be taken to ensure all persons have authorized badges when entering the facility. Persons without proper access authorizations must be escorted or directed to the security group/receptionist at their site. All lost badges must be reported to Facilities Security as soon as they are discovered missing. All employees are expected to use their own identification badge for access into the building as well as any restricted areas.

References 1. ISO 27002 Section 9 Physical and Environmental Security 2. FFIEC IS Handbook Physical Access 3. GLBA Part 208.3 III C 1 b Access Restrictions 4. Payment Card Industry (PCI) Data Security Standard, Requirement 8.1.8: If a session has been idle for more

than 15 minutes, require the user to re-authenticate to re-activate the terminal or session. 5. Payment Card Industry (PCI) Data Security Standard, Requirement 9.1: Use appropriate facility entry controls

to limit and monitor physical access to systems in the cardholder data environment. 6. Payment Card Industry (PCI) Data Security Standard, Requirement 9.2: Develop procedures to easily

distinguish between osite personnel and visitors, to include identifying new onsite personnel or visitors (for example, assigning badges), changes to access requirements, revoking or terminating onsite personnel and expired visitor identification (such as ID badges).

7. Payment Card Industry (PCI) Data Security Standard, Requirement 9.3: Control physical access for onsite personnel to the sensitive areas as follows: access must be authorizied and based on job function, access revoked immediately upon termination and all physical access mechanisms, such as keys, access cards, etc., are returned or disabled.

8. Payment Card Industry (PCI) Data Security Standard, Requirement 9.4: Implement procedures to identify and authorize visitors. Visitors are authorized before entering, and escorted at all times within areas where cardholder data is processed or maintained. Visitors are identified and given a badge or other identification that expores and that visibly distinguishes the visitors from onsite personnel. Visitors are asked to surrender gthe badge or identification before leaving the facility or at the date of exporation. Use a visitor log to maintain a physical audit trail of visitor activity. Document the visitor’s name, the firm represented, and the employee authorizing physical access on the log. Retain this log for a minimum of three months, unless otherwise restricted by law

9. Payment Card Industry (PCI) Data Security Standard, Requirement 9.10: Ensure that security policies and operational procedures for restricting physical accesss to cardholder data are documented, in use, and known to all affected parties.

Page 275: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

PHYSICAL SECURITY Section: Physical Security

Effective Date: 06-01-2011

Policy Number: IS-005

Date Last Approved by ITSC: 5/21/2015

Prior Policy Number: N/A

Department: All Departments

Initial Policy Date: 06-01-2011

Prior Effective Date: FIRST RELEASE

Purpose Securing physical access to sensitive information and systems is the first step in limiting potential compromise of company data. This policy details the standards that must be implemented to prevent unauthorized access, damage and interference to Oklahoma Turnpike Authority facilities and operations to include unauthorized access to sensitive systems.

Policy Statement Physical access to facilities, data centers, systems, networks and data at Oklahoma Turnpike Authority will be limited to those authorized personnel who require access to perform assigned duties. Where systems are deployed in areas where controls may not completely restrict access to only authorized personnel, monitoring controls will be deployed to identify unauthorized access to systems, network, and data. In addition to access controls, physical safeguards will be deployed to protect sensitive systems and data from fire, theft or other hazard.

Applicability The policy applies to all Oklahoma Turnpike Authority employees, contractors, vendors, and any other person using or accessing Oklahoma Turnpike Authority information or information systems. Exceptions to this policy must be documented and approved by the OTA Leadership or designated representatives.

Standards The following standards will be implemented to mitigate risk of unauthorized access to sensitive Oklahoma Turnpike Authority systems and data. Specific guidelines for the physical security of Oklahoma Turnpike Authority are outlined in the IT Facility Security Plan. BUILDING PERIMETER SECURITY

• All external doors except for the front door into the lobby will be locked at all times and require keys to enter.

• All visitors obtaining access to Oklahoma Turnpike Authority facilities must register at the lobby and remain supervised when on the premises. An IT department representative must accompany all visitors, vendors, contractors and staff while accessing the computer room.

• If not escorted, visitors will be assigned a badge that clearly identifies them as a visitor. INTERNAL SECURITY

• Access to all infrastructure computing/networking devices (i.e., routers, hubs, firewalls, servers, network jacks, etc.) must be restricted to only Oklahoma Turnpike Authority employees with a demonstrated need for recurring access. Separate physical control and access verification must be provided for these devices.

• Access to other network infrastructure components, such as network cables, will be controlled by Oklahoma Turnpike Authority to prevent unauthorized intrusion into our network.

Page 276: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

• When employment is terminated, all physical access to Oklahoma Turnpike Authority facilities must be revoked immediately and all physical access tokens (i.e., IDs, keys, magnetic stripe cards, etc.) must be recovered.

• Physical access to wireless access points, gateways and handheld devices will be restricted. Access will be granted only to specific IT personnel or as approved by the IT Leadership.

• Network jacks will be enabled only when required by authorized employees • Video cameras will be used to monitor the entry/exit points of the data center and other

sensitive areas where sensitive data is stored or present. Video cameras will be placed inside the data center to inhibit tampering and must directly monitor systems which store aggregated payment card data. This video will be kept for a minimum of 90 days.

WORKSTATION SECURITY

• User workstations must not be left unattended when logged into sensitive systems or data. Automatic log off and password screen savers will be deployed to enforce this requirement.

• All equipment that contains customer information will be secured to deter theft. In the case of mobile computing devices, all sensitive data must be encrypted when removed from organizational premises.

• Workstation monitors and system terminals will be positioned to limit inadvertent viewing by visitors and other unauthorized system users.

DATA CENTER SECURITY

• Oklahoma Turnpike Authority datacenters will be partitioned by full walls to ensure all access can be monitored.

• The door key system must record date, time and user entering the room and must verify that only authorized users gain access to restricted data rooms.

• Data center walls, doors, and windows will be constructed with sufficient strength to deter entry by an intruder.

• Each critical device will be served by dual power sources. In the event one power source fails the second power source will continue operations for at least 15 minutes.

• Before the addition of any new equipment, the IT department must assure that rack capacity, electrical capacity and bandwidth capacity are sufficiently available.

• All flows of air, gas, and water into the computing facility must have shutoff valves and provide positive drains.

• Multiple layers of protection will be instituted to protect access to the Data Center. Access to the Data Center will require an additional keys or tokens approved by the Information Security Officer.

• Emergency lighting will be maintained in both the computer room and other areas of the organization where sensitive information is stored.

VISITORS It is essential that all persons who enter Oklahoma Turnpike Authority facilities are authorized and that an audit trail exists for all non-Oklahoma Turnpike Authority staff entering Oklahoma Turnpike Authority facilities. Generally, this would be the Guest Check-in log at the receptionist, and/or the Visitation log in the Data Center. Visitor logs will be retained for a minimum of three months. The following special requirements apply for visitors:

• Management or designee must authorize any visitors prior to entering areas where cardholder data is processed or maintained within Oklahoma Turnpike Authority facilities.

• Managers responsible for specific internal space with additional controls must approve visitor access to those areas.

• Visitors will be given a physical token (e.g., badge or access device) that expires, and that identifies them as non-employees.

• Visitors will be required to surrender badges before leaving the facility or on the date of expiration.

• Visitors will be required to sign the Visitor’s Log at the receptionist. Visitor logs will be retained for a minimum of three months.

Page 277: Oklahoma!Turnpike!Authority! RequestforProposal15:002 ... Licens… · Oklahoma!Turnpike!Authority!–!Request!for!Proposal!! 2015!! 5!! Oklahoma!City,!OK!73107!! PROPOSAL!DUE!DATE:!12:00!p.m.!Central!Daylight!Time,!July!24,2015!

Appendix  H  –  OTA  Physical  Security  Policy    

IDENTIFICATION BADGES Everyone is required to visibly display an identification badge while within Oklahoma Turnpike Authority premises. Employees must challenge anyone not displaying a badge. Particular care must be taken to ensure all persons have authorized badges when entering the facility. Persons without proper access authorizations must be escorted or directed to the security group/receptionist at their site. All lost badges must be reported to Facilities Security as soon as they are discovered missing. All employees are expected to use their own identification badge for access into the building as well as any restricted areas.

References 1. ISO 27002 Section 9 Physical and Environmental Security 2. FFIEC IS Handbook Physical Access 3. GLBA Part 208.3 III C 1 b Access Restrictions 4. Payment Card Industry (PCI) Data Security Standard, Requirement 8.1.8: If a session has been idle for more

than 15 minutes, require the user to re-authenticate to re-activate the terminal or session. 5. Payment Card Industry (PCI) Data Security Standard, Requirement 9.1: Use appropriate facility entry controls

to limit and monitor physical access to systems in the cardholder data environment. 6. Payment Card Industry (PCI) Data Security Standard, Requirement 9.2: Develop procedures to easily

distinguish between osite personnel and visitors, to include identifying new onsite personnel or visitors (for example, assigning badges), changes to access requirements, revoking or terminating onsite personnel and expired visitor identification (such as ID badges).

7. Payment Card Industry (PCI) Data Security Standard, Requirement 9.3: Control physical access for onsite personnel to the sensitive areas as follows: access must be authorizied and based on job function, access revoked immediately upon termination and all physical access mechanisms, such as keys, access cards, etc., are returned or disabled.

8. Payment Card Industry (PCI) Data Security Standard, Requirement 9.4: Implement procedures to identify and authorize visitors. Visitors are authorized before entering, and escorted at all times within areas where cardholder data is processed or maintained. Visitors are identified and given a badge or other identification that expores and that visibly distinguishes the visitors from onsite personnel. Visitors are asked to surrender gthe badge or identification before leaving the facility or at the date of exporation. Use a visitor log to maintain a physical audit trail of visitor activity. Document the visitor’s name, the firm represented, and the employee authorizing physical access on the log. Retain this log for a minimum of three months, unless otherwise restricted by law

9. Payment Card Industry (PCI) Data Security Standard, Requirement 9.10: Ensure that security policies and operational procedures for restricting physical accesss to cardholder data are documented, in use, and known to all affected parties.