Project No. 190458
PID 94254
GRE-IR 675-00.00 (PART ONE)
Federal
Type: FOUR LANE RESURFACING
Completion Date: 6/30/2022
Award Amount: $26,101,859.59
Contract Awarded To: JOHN R JURGENSEN COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $21,707,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 1
Bid $26,101,859.59
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45055
Butler
Bidder 2
Bid $26,149,000.00
ANTHONY ALLEGA CEMENT CONTRACTOR INC
5585 CANAL RD
VALLEY VIEW, OH 44125
Cuyahoga
Bidder 3
Bid $30,281,309.72
190458 - Page 1
Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)
Awd $82,447.68$82,447.68
2 $60,000.00$60,000.00
3 $62,753.25$62,753.25
Ref #2 202E38000 GUARDRAIL REMOVED, (17451 FT)
Awd $27,921.60$1.60
2 $56,715.75$3.25
3 $29,317.68$1.68
Ref #3 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (21 EACH)
Awd $5,565.00$265.00
2 $6,300.00$300.00
3 $5,856.90$278.90
Ref #4 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (26 EACH)
Awd $4,550.00$175.00
2 $7,150.00$275.00
3 $4,788.68$184.18
Ref #5 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (24 EACH)
Awd $2,400.00$100.00
2 $4,200.00$175.00
3 $2,525.76$105.24
Ref #6 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (48 EACH)
Awd $5,280.00$110.00
2 $7,200.00$150.00
3 $5,556.96$115.77
Ref #7 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (17028 FT)
Awd $279,259.20$16.40
2 $315,018.00$18.50
3 $293,903.28$17.26
Ref #8 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016), (47 EACH)
Awd $106,690.00$2,270.00
2 $110,450.00$2,350.00
3 $112,285.35$2,389.05
Ref #9 606E26550 ANCHOR ASSEMBLY, MGS TYPE T (MASH 2016), (25 EACH)
Awd $25,625.00$1,025.00
2 $25,000.00$1,000.00
3 $26,968.75$1,078.75
Ref #10 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (42 EACH)
Awd $89,880.00$2,140.00
2 $80,850.00$1,925.00
3 $94,593.66$2,252.23
Ref #11 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (13 EACH)
Awd $6,500.00$500.00
2 $2,600.00$200.00
3 $6,840.86$526.22
Section 1 - ROADWAY (PART ONE) - Totals
Awd $636,118.48
2 $675,483.75
3 $645,391.13
190458 - Page 2
Ref #12 202E23000 PAVEMENT REMOVED, (1868 SY)
Awd $26,637.68$14.26
2 $65,380.00$35.00
3 $27,683.76$14.82
Ref #13 202E23500 WEARING COURSE REMOVED, (624 SY)
Awd $10,370.88$16.62
2 $5,304.00$8.50
3 $4,511.52$7.23
Ref #14 202E23800 BASE REMOVED, (1934 SY)
Awd $37,577.62$19.43
2 $17,406.00$9.00
3 $9,205.84$4.76
Ref #15 204E10000 SUBGRADE COMPACTION, (4248 SY)
Awd $20,730.24$4.88
2 $14,868.00$3.50
3 $14,273.28$3.36
Ref #16 204E13000 EXCAVATION OF SUBGRADE ,12" DEPTH, (1416 CY)
Awd $46,968.72$33.17
2 $84,960.00$60.00
3 $35,130.96$24.81
Ref #17 204E30020 GRANULAR MATERIAL, TYPE C, (753 CY)
Awd $49,148.31$65.27
2 $60,240.00$80.00
3 $41,550.54$55.18
Ref #18 204E50000 GEOTEXTILE FABRIC, (4248 SY)
Awd $12,361.68$2.91
2 $8,496.00$2.00
3 $7,986.24$1.88
Ref #19 253E02000 PAVEMENT REPAIR, (3300 CY)
Awd $961,950.00$291.50
2 $907,500.00$275.00
3 $1,366,728.00$414.16
Ref #20 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (D=1.50"), (579144 SY)
Awd $666,015.60$1.15
2 $579,144.00$1.00
3 $816,593.04$1.41
Ref #21 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (D=3.75"), (154162 SY)
Awd $317,573.72$2.06
2 $231,243.00$1.50
3 $311,407.24$2.02
Ref #22 301E46000 ASPHALT CONCRETE BASE, PG64-22, (467 CY)
Awd $111,262.75$238.25
2 $93,400.00$200.00
3 $182,120.66$389.98
Ref #23 304E20000 AGGREGATE BASE, (729 CY)
Awd $66,339.00$91.00
2 $61,965.00$85.00
3 $54,500.04$74.76
190458 - Page 3
Ref #24 407E10000 TACK COAT, (82484 GAL)
Awd $247,452.00$3.00
2 $247,452.00$3.00
3 $192,187.72$2.33
Ref #25 442E00100 ANTI-SEGREGATION EQUIPMENT, (25925 CY)
Awd $150,624.25$5.81
2 $272,212.50$10.50
3 $330,025.25$12.73
Ref #26 806E00100 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, (30516 CY)
Awd $5,688,792.72$186.42
2 $5,492,880.00$180.00
3 $5,844,424.32$191.52
Ref #27 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (9807 CY)
Awd $1,625,117.97$165.71
2 $1,569,120.00$160.00
3 $1,606,680.81$163.83
Ref #28 617E10100 COMPACTED AGGREGATE, (167 CY)
Awd $13,027.67$78.01
2 $17,535.00$105.00
3 $33,400.00$200.00
Ref #29 617E20000 SHOULDER PREPARATION, (1000 SY)
Awd $5,490.00$5.49
2 $4,250.00$4.25
3 $15,000.00$15.00
Ref #30 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (19 MILE)
Awd $13,775.00$725.00
2 $24,700.00$1,300.00
3 $29,068.86$1,529.94
Section 2 - PAVEMENT (PART ONE) - Totals
Awd $10,071,215.81
2 $9,758,055.50
3 $10,922,478.08
Ref #31 621E00100 RPM, (2657 EACH)
Awd $62,173.80$23.40
2 $62,173.80$23.40
3 $65,282.49$24.57
Ref #32 621E54000 RAISED PAVEMENT MARKER REMOVED, (2657 EACH)
Awd $34,647.28$13.04
2 $13,285.00$5.00
3 $19,528.95$7.35
Ref #33 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL), (110 EACH)
Awd $1,100.00$10.00
2 $1,017.50$9.25
3 $4,855.40$44.14
Ref #34 644E00104 EDGE LINE, 6", (46 MILE)
Awd $133,860.00$2,910.00
2 $133,860.00$2,910.00
3 $140,553.00$3,055.50
190458 - Page 4
Ref #35 644E00204 LANE LINE, 6", (41.75 MILE)
Awd $40,915.00$980.00
2 $40,915.00$980.00
3 $42,960.75$1,029.00
Ref #36 644E00404 CHANNELIZING LINE, 12", (16760 FT)
Awd $25,140.00$1.50
2 $25,140.00$1.50
3 $26,480.80$1.58
Ref #37 644E00500 STOP LINE, 24", (245 FT)
Awd $1,531.25$6.25
2 $1,531.25$6.25
3 $1,607.20$6.56
Ref #38 644E00600 CROSSWALK LINE, (195 FT)
Awd $828.75$4.25
2 $828.75$4.25
3 $869.70$4.46
Ref #39 644E00720 CHEVRON MARKING, (442 FT)
Awd $2,696.20$6.10
2 $2,696.20$6.10
3 $2,833.22$6.41
Ref #40 644E01300 LANE ARROW, (56 EACH)
Awd $5,600.00$100.00
2 $5,600.00$100.00
3 $5,880.00$105.00
Ref #41 644E01360 WRONG WAY ARROW, (15 EACH)
Awd $3,750.00$250.00
2 $3,750.00$250.00
3 $3,937.50$262.50
Ref #42 646E10010 EDGE LINE, 6", (6.25 MILE)
Awd $39,812.50$6,370.00
2 $39,812.50$6,370.00
3 $41,803.13$6,688.50
Ref #43 646E10110 LANE LINE, 6", (3.04 MILE)
Awd $17,297.60$5,690.00
2 $17,297.60$5,690.00
3 $18,162.48$5,974.50
Ref #44 646E10200 CENTER LINE, (0.57 MILE)
Awd $4,545.75$7,975.00
2 $4,545.75$7,975.00
3 $4,773.04$8,373.75
Ref #45 646E10310 CHANNELIZING LINE, 12", (640 FT)
Awd $3,520.00$5.50
2 $3,520.00$5.50
3 $3,699.20$5.78
Ref #46 646E20300 LANE ARROW, (6 EACH)
Awd $3,000.00$500.00
2 $3,000.00$500.00
3 $3,150.00$525.00
190458 - Page 5
Section 3 - TRAFFIC CONTROL (PART ONE) - Totals
Awd $380,418.13
2 $358,973.35
3 $386,376.86
Ref #47 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
Section 4 - EROSION CONTROL (PART ONE) - Totals
Awd $10,000.00
2 $10,000.00
3 $10,000.00
Ref #48 625E00480 CONNECTION, UNFUSED PERMANENT, (4 EACH)
Awd $183.00$45.75
2 $400.00$100.00
3 $198.44$49.61
Ref #49 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (920 FT)
Awd $2,346.00$2.55
2 $2,760.00$3.00
3 $2,548.40$2.77
Ref #50 625E25606 CONDUIT, 4", 725.052, (150 FT)
Awd $1,012.50$6.75
2 $2,250.00$15.00
3 $1,098.00$7.32
Ref #51 625E25908 CONDUIT, JACKED OR DRILLED, 725.052 ,4", (275 FT)
Awd $9,350.00$34.00
2 $11,000.00$40.00
3 $10,139.25$36.87
Ref #52 625E29000 TRENCH, (150 FT)
Awd $1,447.50$9.65
2 $1,800.00$12.00
3 $1,569.00$10.46
Ref #53 625E30706 PULL BOX, 725.08, 24", (5 EACH)
Awd $4,125.00$825.00
2 $5,000.00$1,000.00
3 $4,473.00$894.60
Ref #54 625E36000 PLASTIC CAUTION TAPE, (150 FT)
Awd $22.50$0.15
2 $150.00$1.00
3 $24.00$0.16
Section 5 - LIGHTING (PART ONE) - Totals
Awd $18,486.50
2 $23,360.00
3 $20,050.09
190458 - Page 6
Ref #56 606E16050 GUARDRAIL REBUILT, TYPE MGS, (1212 FT)
Awd $14,059.20$11.60
2 $18,786.00$15.50
3 $14,798.52$12.21
Ref #57 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (3 EACH)
Awd $6,825.00$2,275.00
2 $6,300.00$2,100.00
3 $7,182.93$2,394.31
Ref #59 614E11001 MAINTAINING TRAFFIC, AS PER PLAN (TEMPORARY SIGNAL, (LUMP SUM)
Awd $54,250.00$54,250.00
2 $48,140.00$48,140.00
3 $58,827.07$58,827.07
Ref #60 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (3000 HOUR)
Awd $210,000.00$70.00
2 $204,000.00$68.00
3 $220,500.00$73.50
Ref #61 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL, (6 EACH)
Awd $127,500.00$21,250.00
2 $48,000.00$8,000.00
3 $138,257.16$23,042.86
Ref #62 614E12337 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), AS P, (13 EACH)
Awd $29,337.10$2,256.70
2 $24,050.00$1,850.00
3 $24,963.12$1,920.24
Ref #63 614E12339 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), AS PE, (14 EACH)
Awd $31,593.80$2,256.70
2 $26,600.00$1,900.00
3 $26,883.36$1,920.24
Ref #64 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $14,100.00$14,100.00
2 $14,100.00$14,100.00
3 $14,805.00$14,805.00
Ref #65 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (6 EACH)
Awd $1,110.00$185.00
2 $1,110.00$185.00
3 $1,165.50$194.25
Ref #66 614E12740 WORK ZONE LIGHTING SYSTEM, (6 EACH)
Awd $6,000.00$1,000.00
2 $24,000.00$4,000.00
3 $6,506.22$1,084.37
Ref #67 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM, (2 EACH)
Awd $98,500.00$49,250.00
2 $76,000.00$38,000.00
3 $106,810.44$53,405.22
Ref #68 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (10407 EACH)
Awd $41,628.00$4.00
2 $143,096.25$13.75
3 $251,329.05$24.15
190458 - Page 7
Ref #69 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (200 CY)
Awd $90,194.00$450.97
2 $80,000.00$400.00
3 $89,162.00$445.81
Ref #70 614E13312 BARRIER REFLECTOR, TYPE 2 (1 WAY), (1514 EACH)
Awd $31,688.02$20.93
2 $16,654.00$11.00
3 $11,339.86$7.49
Ref #71 614E13360 OBJECT MARKER, TWO WAY, (1514 EACH)
Awd $22,346.64$14.76
2 $22,710.00$15.00
3 $25,465.48$16.82
Ref #72 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (28 SNMT)
Awd $16,800.00$600.00
2 $16,800.00$600.00
3 $27,298.04$974.93
Ref #73 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN, CON, (3.23 MILE)
Awd $4,182.85$1,295.00
2 $4,182.85$1,295.00
3 $4,391.99$1,359.75
Ref #74 614E20011 WORK ZONE LANE LINE, CLASS I, 6", AS PER PLAN, SPR, (16.25 MILE)
Awd $11,050.00$680.00
2 $11,050.00$680.00
3 $11,602.50$714.00
Ref #75 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT, (28.45 MILE)
Awd $14,225.00$500.00
2 $14,225.00$500.00
3 $14,936.25$525.00
Ref #76 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT, (35 MILE)
Awd $6,475.00$185.00
2 $6,475.00$185.00
3 $6,798.75$194.25
Ref #77 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.43 MILE)
Awd $440.75$1,025.00
2 $440.75$1,025.00
3 $462.79$1,076.26
Ref #78 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN, SPR, (16.25 MILE)
Awd $15,437.50$950.00
2 $15,437.50$950.00
3 $16,209.38$997.50
Ref #79 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT(WHITE), (21.37 MILE)
Awd $18,164.50$850.00
2 $18,164.50$850.00
3 $19,072.73$892.50
Ref #80 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT(YELLOW, (43.32 MILE)
Awd $36,822.00$850.00
2 $36,822.00$850.00
3 $38,663.10$892.50
190458 - Page 8
Ref #81 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT(WHIT, (17.5 MILE)
Awd $5,250.00$300.00
2 $5,250.00$300.00
3 $5,512.50$315.00
Ref #82 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT(YELL, (17.5 MILE)
Awd $5,250.00$300.00
2 $5,250.00$300.00
3 $5,512.50$315.00
Ref #83 614E23001 WORK ZONE CHANNELIZING LINE, CLASS I, 8", AS PER P, (5000 FT)
Awd $6,250.00$1.25
2 $6,250.00$1.25
3 $6,550.00$1.31
Ref #84 614E23011 WORK ZONE CHANNELIZING LINE, CLASS I, 12", AS PER , (1720 FT)
Awd $1,720.00$1.00
2 $1,720.00$1.00
3 $1,806.00$1.05
Ref #85 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI, (59634 FT)
Awd $38,762.10$0.65
2 $38,762.10$0.65
3 $40,551.12$0.68
Ref #86 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN, SPRAY, (2800 FT)
Awd $2,660.00$0.95
2 $2,660.00$0.95
3 $2,800.00$1.00
Ref #87 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (7511 FT)
Awd $4,506.60$0.60
2 $4,506.60$0.60
3 $4,731.93$0.63
Ref #88 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P, (511 FT)
Awd $1,149.75$2.25
2 $1,149.75$2.25
3 $1,205.96$2.36
Ref #89 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (108 FT)
Awd $270.00$2.50
2 $270.00$2.50
3 $284.04$2.63
Ref #90 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $250,804.75$250,804.75
2 $100,000.00$100,000.00
3 $125,507.32$125,507.32
Ref #91 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (8784 SY)
Awd $342,136.80$38.95
2 $351,360.00$40.00
3 $371,124.00$42.25
Ref #92 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (1284 SY)
Awd $87,196.44$67.91
2 $89,880.00$70.00
3 $132,996.72$103.58
190458 - Page 9
Ref #93 622E41011 PORTABLE BARRIER, 50", AS PER PLAN, (17040 FT)
Awd $155,575.20$9.13
2 $238,560.00$14.00
3 $287,294.40$16.86
Ref #94 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (2416 FT)
Awd $38,776.80$16.05
2 $33,824.00$14.00
3 $126,791.68$52.48
Ref #95 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (192 SNMT)
Awd $105,600.00$550.00
2 $105,600.00$550.00
3 $110,880.00$577.50
Ref #96 896E00012 PORTABLE NON-INTRUSIVE TRAFFIC SENSOR, CLASS II, (8 SNMT)
Awd $12,000.00$1,500.00
2 $12,000.00$1,500.00
3 $12,600.00$1,575.00
Ref #97 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT)
Awd $1,800.00$900.00
2 $1,800.00$900.00
3 $1,458.06$729.03
Ref #506 202E48100 CABLE BARRIER REMOVED FOR STORAGE, (11000 FT)
Awd $170,940.00$15.54
2 $236,500.00$21.50
3 $277,310.00$25.21
Ref #531 622E41000 PORTABLE BARRIER, 32", (16723 FT)
Awd $260,209.88$15.56
2 $167,230.00$10.00
3 $175,591.50$10.50
Section 6 - MAINTENANCE OF TRAFFIC (PART ONE) - Totals
Awd $2,393,587.68
2 $2,279,716.30
3 $2,827,938.97
Ref #98 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $65,000.00$65,000.00
3 $68,250.00$68,250.00
Ref #99 202E38500 BRIDGE RAILING REMOVED, (524 FT)
Awd $55,020.00$105.00
2 $104,800.00$200.00
3 $110,040.00$210.00
Ref #100 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (13716 LB)
Awd $19,202.40$1.40
2 $17,830.80$1.30
3 $18,790.92$1.37
Ref #101 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $562.50$2.25
2 $500.00$2.00
3 $525.00$2.10
190458 - Page 10
Ref #102 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1288 EACH)
Awd $18,032.00$14.00
2 $19,320.00$15.00
3 $20,286.00$15.75
Ref #103 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (12 CY)
Awd $9,000.00$750.00
2 $12,000.00$1,000.00
3 $12,600.00$1,050.00
Ref #104 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (13 CY)
Awd $18,200.00$1,400.00
2 $19,500.00$1,500.00
3 $20,475.00$1,575.00
Ref #105 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (94 CY)
Awd $141,000.00$1,500.00
2 $94,000.00$1,000.00
3 $98,700.00$1,050.00
Ref #106 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (633 SY)
Awd $12,660.00$20.00
2 $12,660.00$20.00
3 $13,628.49$21.53
Ref #107 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1314 SY)
Awd $13,797.00$10.50
2 $13,797.00$10.50
3 $15,873.12$12.08
Ref #108 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (108 FT)
Awd $48,600.00$450.00
2 $43,200.00$400.00
3 $45,360.00$420.00
Ref #109 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (35 SF)
Awd $350.00$10.00
2 $385.00$11.00
3 $404.25$11.55
Ref #110 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (500 FT)
Awd $31,250.00$62.50
2 $51,750.00$103.50
3 $39,375.00$78.75
Ref #111 607E39992 TEMPORARY VANDAL FENCE, TYPE A, (500 FT)
Awd $18,700.00$37.40
2 $21,250.00$42.50
3 $22,050.00$44.10
Section 7 - STRUCTURE REPAIR (GRE-675-0059) (PART ON - Totals
Awd $446,373.90
2 $475,992.80
3 $486,357.78
Ref #112 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $1,620.00$135.00
2 $6,000.00$500.00
3 $6,300.00$525.00
190458 - Page 11
Ref #113 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C, (110 FT)
Awd $11,050.60$100.46
2 $20,455.60$185.96
3 $23,100.00$210.00
Ref #114 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (238 LB)
Awd $833.00$3.50
2 $392.70$1.65
3 $411.74$1.73
Ref #115 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (44 EACH)
Awd $660.00$15.00
2 $660.00$15.00
3 $693.00$15.75
Ref #116 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $2,800.00$1,400.00
2 $6,000.00$3,000.00
3 $6,300.00$3,150.00
Ref #117 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (16 SY)
Awd $800.00$50.00
2 $800.00$50.00
3 $840.00$52.50
Ref #118 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1067 SY)
Awd $85,360.00$80.00
2 $96,030.00$90.00
3 $100,831.50$94.50
Ref #119 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1067 SY)
Awd $112,035.00$105.00
2 $96,030.00$90.00
3 $100,831.50$94.50
Ref #120 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (31 CY)
Awd $8,525.00$275.00
2 $9,920.00$320.00
3 $10,416.00$336.00
Ref #121 848E50000 HAND CHIPPING, (40 SY)
Awd $3,600.00$90.00
2 $9,400.00$235.00
3 $9,870.00$246.75
Ref #122 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Section 8 - STRUCTURE REPAIR (GRE-675-0148L) (PART O - Totals
Awd $228,083.60
2 $245,938.30
3 $259,856.24
Ref #123 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,820.00$235.00
2 $4,200.00$350.00
3 $4,410.00$367.50
190458 - Page 12
Ref #124 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C, (110 FT)
Awd $11,050.60$100.46
2 $20,455.60$185.96
3 $23,100.00$210.00
Ref #125 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (238 LB)
Awd $833.00$3.50
2 $392.70$1.65
3 $411.74$1.73
Ref #126 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (44 EACH)
Awd $660.00$15.00
2 $660.00$15.00
3 $693.00$15.75
Ref #127 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $2,800.00$1,400.00
2 $6,000.00$3,000.00
3 $6,300.00$3,150.00
Ref #128 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (16 SY)
Awd $800.00$50.00
2 $800.00$50.00
3 $840.00$52.50
Ref #129 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1131 SY)
Awd $90,480.00$80.00
2 $101,790.00$90.00
3 $106,879.50$94.50
Ref #130 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1131 SY)
Awd $118,755.00$105.00
2 $101,790.00$90.00
3 $106,879.50$94.50
Ref #131 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (32 CY)
Awd $8,800.00$275.00
2 $10,240.00$320.00
3 $10,752.00$336.00
Ref #132 848E50000 HAND CHIPPING, (40 SY)
Awd $3,600.00$90.00
2 $9,400.00$235.00
3 $9,870.00$246.75
Ref #133 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Section 9 - STRUCTURE REPAIR (GRE-675-0148R) (PART O - Totals
Awd $241,398.60
2 $255,978.30
3 $270,398.24
Ref #134 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $50,000.00$50,000.00
3 $52,500.00$52,500.00
190458 - Page 13
Ref #135 202E38500 BRIDGE RAILING REMOVED, (230 FT)
Awd $24,150.00$105.00
2 $46,000.00$200.00
3 $48,300.00$210.00
Ref #136 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (6657 LB)
Awd $9,319.80$1.40
2 $8,986.95$1.35
3 $9,452.94$1.42
Ref #137 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $562.50$2.25
2 $500.00$2.00
3 $525.00$2.10
Ref #138 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (616 EACH)
Awd $8,624.00$14.00
2 $7,392.00$12.00
3 $7,761.60$12.60
Ref #139 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (6 CY)
Awd $5,760.00$960.00
2 $6,000.00$1,000.00
3 $6,300.00$1,050.00
Ref #140 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (7 CY)
Awd $13,300.00$1,900.00
2 $17,500.00$2,500.00
3 $18,375.00$2,625.00
Ref #141 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (44 CY)
Awd $66,000.00$1,500.00
2 $48,400.00$1,100.00
3 $50,820.00$1,155.00
Ref #142 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (697 SY)
Awd $13,940.00$20.00
2 $13,940.00$20.00
3 $15,006.41$21.53
Ref #143 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1184 SY)
Awd $12,432.00$10.50
2 $12,432.00$10.50
3 $14,302.72$12.08
Ref #144 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (211 SY)
Awd $5,275.00$25.00
2 $5,275.00$25.00
3 $5,872.13$27.83
Ref #145 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (84 FT)
Awd $37,800.00$450.00
2 $33,600.00$400.00
3 $35,280.00$420.00
Ref #146 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (35 SF)
Awd $350.00$10.00
2 $385.00$11.00
3 $404.25$11.55
190458 - Page 14
Ref #147 519E12200 PATCHING CONCRETE BRIDGE DECK - TYPE A, (4 SY)
Awd $3,200.00$800.00
2 $5,200.00$1,300.00
3 $5,460.00$1,365.00
Ref #148 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (223 FT)
Awd $13,937.50$62.50
2 $23,080.50$103.50
3 $17,561.25$78.75
Ref #149 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (223 FT)
Awd $8,362.50$37.50
2 $9,477.50$42.50
3 $9,834.30$44.10
Ref #150 609E28000 CURB, TYPE 7, (25 FT)
Awd $1,357.25$54.29
2 $2,750.00$110.00
3 $2,887.50$115.50
Ref #151 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI, (2315 LB)
Awd $13,890.00$6.00
2 $13,890.00$6.00
3 $14,584.50$6.30
Section 10 - STRUCTURE REPAIR (GRE-675-0216) (PART ON - Totals
Awd $298,260.55
2 $304,808.95
3 $315,227.60
Ref #152 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $70,000.00$70,000.00
2 $55,000.00$55,000.00
3 $57,750.00$57,750.00
Ref #153 202E38500 BRIDGE RAILING REMOVED, (243 FT)
Awd $25,515.00$105.00
2 $48,600.00$200.00
3 $51,030.00$210.00
Ref #154 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (6592 LB)
Awd $9,228.80$1.40
2 $8,899.20$1.35
3 $9,360.64$1.42
Ref #155 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $562.50$2.25
2 $500.00$2.00
3 $525.00$2.10
Ref #156 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (672 EACH)
Awd $9,408.00$14.00
2 $7,392.00$11.00
3 $7,761.60$11.55
Ref #157 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (6 CY)
Awd $5,850.00$975.00
2 $6,000.00$1,000.00
3 $6,300.00$1,050.00
190458 - Page 15
Ref #158 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (8 CY)
Awd $21,600.00$2,700.00
2 $20,000.00$2,500.00
3 $21,000.00$2,625.00
Ref #159 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (44 CY)
Awd $66,000.00$1,500.00
2 $44,000.00$1,000.00
3 $46,200.00$1,050.00
Ref #160 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (285 SY)
Awd $5,700.00$20.00
2 $5,700.00$20.00
3 $6,136.05$21.53
Ref #161 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1357 SY)
Awd $14,248.50$10.50
2 $14,248.50$10.50
3 $16,392.56$12.08
Ref #162 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (97 FT)
Awd $44,620.00$460.00
2 $38,800.00$400.00
3 $40,740.00$420.00
Ref #163 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (18 SF)
Awd $288.00$16.00
2 $198.00$11.00
3 $207.90$11.55
Ref #164 519E12200 PATCHING CONCRETE BRIDGE DECK - TYPE A, (25 SY)
Awd $16,250.00$650.00
2 $18,750.00$750.00
3 $19,687.50$787.50
Ref #165 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (221 FT)
Awd $13,812.50$62.50
2 $22,873.50$103.50
3 $17,403.75$78.75
Ref #166 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (221 FT)
Awd $8,177.00$37.00
2 $9,392.50$42.50
3 $9,746.10$44.10
Ref #167 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI, (5000 LB)
Awd $30,000.00$6.00
2 $30,000.00$6.00
3 $31,500.00$6.30
Section 11 - STRUCTURE REPAIR (GRE-675-0309) (PART ON - Totals
Awd $341,260.30
2 $330,353.70
3 $341,741.10
Ref #168 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $55,000.00$55,000.00
3 $57,750.00$57,750.00
190458 - Page 16
Ref #169 202E38500 BRIDGE RAILING REMOVED, (243 FT)
Awd $20,655.00$85.00
2 $48,600.00$200.00
3 $51,030.00$210.00
Ref #170 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (6592 LB)
Awd $9,228.80$1.40
2 $8,899.20$1.35
3 $9,360.64$1.42
Ref #171 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $562.50$2.25
2 $500.00$2.00
3 $525.00$2.10
Ref #172 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (672 EACH)
Awd $9,408.00$14.00
2 $7,392.00$11.00
3 $7,761.60$11.55
Ref #173 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (6 CY)
Awd $5,850.00$975.00
2 $6,000.00$1,000.00
3 $6,300.00$1,050.00
Ref #174 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (8 CY)
Awd $21,600.00$2,700.00
2 $20,000.00$2,500.00
3 $21,000.00$2,625.00
Ref #175 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (44 CY)
Awd $66,000.00$1,500.00
2 $44,000.00$1,000.00
3 $46,200.00$1,050.00
Ref #176 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (285 SY)
Awd $5,700.00$20.00
2 $5,700.00$20.00
3 $6,136.05$21.53
Ref #177 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1357 SY)
Awd $14,248.50$10.50
2 $14,248.50$10.50
3 $16,392.56$12.08
Ref #178 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (97 FT)
Awd $44,620.00$460.00
2 $38,800.00$400.00
3 $40,740.00$420.00
Ref #179 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (18 SF)
Awd $288.00$16.00
2 $198.00$11.00
3 $207.90$11.55
Ref #180 519E12200 PATCHING CONCRETE BRIDGE DECK - TYPE A, (22 SY)
Awd $14,300.00$650.00
2 $16,500.00$750.00
3 $17,325.00$787.50
190458 - Page 17
Ref #181 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (221 FT)
Awd $13,812.50$62.50
2 $22,873.50$103.50
3 $17,403.75$78.75
Ref #182 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (221 FT)
Awd $8,177.00$37.00
2 $9,392.50$42.50
3 $9,746.10$44.10
Ref #183 842E10000 CORRECTING ELEVATION OF CONCRETE APPROACH SLABS WI, (5000 LB)
Awd $30,000.00$6.00
2 $30,000.00$6.00
3 $31,500.00$6.30
Section 12 - STRUCTURE REPAIR (GRE-675-0310) (PART ON - Totals
Awd $324,450.30
2 $328,103.70
3 $339,378.60
Ref #184 202E38500 BRIDGE RAILING REMOVED, (6 FT)
Awd $1,350.00$225.00
2 $3,000.00$500.00
3 $3,150.00$525.00
Ref #185 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C, (110 FT)
Awd $11,050.60$100.46
2 $20,455.60$185.96
3 $23,100.00$210.00
Ref #186 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (127 LB)
Awd $381.00$3.00
2 $171.45$1.35
3 $180.34$1.42
Ref #187 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (22 EACH)
Awd $330.00$15.00
2 $374.00$17.00
3 $392.70$17.85
Ref #188 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $2,800.00$1,400.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #189 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (8 SY)
Awd $480.00$60.00
2 $480.00$60.00
3 $504.00$63.00
Ref #190 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (224 SF)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,880.00$26.25
Ref #191 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (224 SF)
Awd $4,032.00$18.00
2 $4,032.00$18.00
3 $4,233.60$18.90
190458 - Page 18
Ref #192 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (224 SF)
Awd $2,688.00$12.00
2 $2,688.00$12.00
3 $2,822.40$12.60
Ref #193 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (224 SF)
Awd $2,240.00$10.00
2 $2,240.00$10.00
3 $2,352.00$10.50
Ref #194 519E11100 PATCHING CONCRETE STRUCTURE, (50 SF)
Awd $6,250.00$125.00
2 $8,750.00$175.00
3 $7,087.50$141.75
Ref #195 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (950 SY)
Awd $90,250.00$95.00
2 $85,500.00$90.00
3 $89,775.00$94.50
Ref #196 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1067 SY)
Awd $112,035.00$105.00
2 $96,030.00$90.00
3 $100,831.50$94.50
Ref #197 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (20 CY)
Awd $5,500.00$275.00
2 $6,400.00$320.00
3 $6,720.00$336.00
Ref #198 848E50000 HAND CHIPPING, (40 SY)
Awd $3,400.00$85.00
2 $9,400.00$235.00
3 $9,870.00$246.75
Ref #199 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Section 13 - STRUCTURE REPAIR (GRE-675-0352L) (PART O - Totals
Awd $249,186.60
2 $248,371.05
3 $260,311.54
Ref #200 202E38500 BRIDGE RAILING REMOVED, (6 FT)
Awd $1,350.00$225.00
2 $3,000.00$500.00
3 $3,150.00$525.00
Ref #201 451E32000 SPECIAL - PRESSURE RELIEF JOINT, TYPE C, (110 FT)
Awd $11,050.60$100.46
2 $20,455.60$185.96
3 $23,100.00$210.00
Ref #202 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (127 LB)
Awd $381.00$3.00
2 $171.45$1.35
3 $180.34$1.42
190458 - Page 19
Ref #203 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (22 EACH)
Awd $330.00$15.00
2 $374.00$17.00
3 $392.70$17.85
Ref #204 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #205 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (8 SY)
Awd $480.00$60.00
2 $480.00$60.00
3 $504.00$63.00
Ref #206 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (224 SF)
Awd $5,600.00$25.00
2 $5,600.00$25.00
3 $5,880.00$26.25
Ref #207 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (224 SF)
Awd $4,032.00$18.00
2 $4,032.00$18.00
3 $4,233.60$18.90
Ref #208 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (224 SF)
Awd $2,688.00$12.00
2 $2,688.00$12.00
3 $2,822.40$12.60
Ref #209 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (224 SF)
Awd $2,240.00$10.00
2 $2,240.00$10.00
3 $2,352.00$10.50
Ref #210 519E11100 PATCHING CONCRETE STRUCTURE, (50 SF)
Awd $6,250.00$125.00
2 $8,750.00$175.00
3 $7,087.50$141.75
Ref #211 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1023 SY)
Awd $97,185.00$95.00
2 $92,070.00$90.00
3 $96,673.50$94.50
Ref #212 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1067 SY)
Awd $112,035.00$105.00
2 $96,030.00$90.00
3 $100,831.50$94.50
Ref #213 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (22 CY)
Awd $6,050.00$275.00
2 $7,040.00$320.00
3 $7,392.00$336.00
Ref #214 848E50000 HAND CHIPPING, (40 SY)
Awd $3,400.00$85.00
2 $9,400.00$235.00
3 $9,870.00$246.75
190458 - Page 20
Ref #215 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Section 14 - STRUCTURE REPAIR (GRE-675-0352R) (PART O - Totals
Awd $256,871.60
2 $255,581.05
3 $267,882.04
Ref #216 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $80,000.00$80,000.00
2 $65,000.00$65,000.00
3 $68,250.00$68,250.00
Ref #217 202E38500 BRIDGE RAILING REMOVED, (524 FT)
Awd $55,020.00$105.00
2 $104,800.00$200.00
3 $110,040.00$210.00
Ref #218 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (13140 LB)
Awd $18,396.00$1.40
2 $17,739.00$1.35
3 $18,658.80$1.42
Ref #219 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $562.50$2.25
2 $500.00$2.00
3 $525.00$2.10
Ref #220 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1288 EACH)
Awd $18,032.00$14.00
2 $19,320.00$15.00
3 $20,286.00$15.75
Ref #221 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (12 CY)
Awd $11,700.00$975.00
2 $12,000.00$1,000.00
3 $12,600.00$1,050.00
Ref #222 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (13 CY)
Awd $21,060.00$1,620.00
2 $32,500.00$2,500.00
3 $34,125.00$2,625.00
Ref #223 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (94 CY)
Awd $151,340.00$1,610.00
2 $112,800.00$1,200.00
3 $118,440.00$1,260.00
Ref #224 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (633 SY)
Awd $12,660.00$20.00
2 $12,660.00$20.00
3 $13,628.49$21.53
Ref #225 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1434 SY)
Awd $15,057.00$10.50
2 $15,057.00$10.50
3 $17,322.72$12.08
190458 - Page 21
Ref #226 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (65 SF)
Awd $9,750.00$150.00
2 $9,750.00$150.00
3 $10,237.50$157.50
Ref #227 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (65 SF)
Awd $3,250.00$50.00
2 $3,250.00$50.00
3 $3,412.50$52.50
Ref #228 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (65 SF)
Awd $2,600.00$40.00
2 $2,600.00$40.00
3 $2,730.00$42.00
Ref #229 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (108 FT)
Awd $45,360.00$420.00
2 $43,200.00$400.00
3 $45,360.00$420.00
Ref #230 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (35 SF)
Awd $350.00$10.00
2 $437.50$12.50
3 $459.55$13.13
Ref #231 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $28,800.00$2,400.00
2 $36,000.00$3,000.00
3 $37,800.00$3,150.00
Ref #232 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $50,000.00$50,000.00
3 $52,500.00$52,500.00
Ref #233 519E11100 PATCHING CONCRETE STRUCTURE, (30 SF)
Awd $5,250.00$175.00
2 $10,500.00$350.00
3 $5,512.50$183.75
Ref #234 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (574 FT)
Awd $34,153.00$59.50
2 $59,409.00$103.50
3 $45,202.50$78.75
Ref #235 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (574 FT)
Awd $21,238.00$37.00
2 $24,395.00$42.50
3 $25,313.40$44.10
Section 15 - STRUCTURE REPAIR (GRE-675-0445) (PART ON - Totals
Awd $554,578.50
2 $631,917.50
3 $642,403.96
Ref #236 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
190458 - Page 22
Ref #237 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (982 LB)
Awd $1,767.60$1.80
2 $1,325.70$1.35
3 $1,394.44$1.42
Ref #238 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $200.00$4.00
2 $100.00$2.00
3 $105.00$2.10
Ref #239 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (120 EACH)
Awd $1,920.00$16.00
2 $3,840.00$32.00
3 $4,032.00$33.60
Ref #240 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #241 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (249 SY)
Awd $4,980.00$20.00
2 $4,980.00$20.00
3 $5,360.97$21.53
Ref #242 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
Ref #243 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (34 CF)
Awd $16,728.00$492.00
2 $16,697.74$491.11
3 $17,850.00$525.00
Ref #244 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (986 SY)
Awd $88,740.00$90.00
2 $78,880.00$80.00
3 $82,824.00$84.00
Ref #245 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (986 SY)
Awd $91,698.00$93.00
2 $78,880.00$80.00
3 $82,824.00$84.00
Ref #246 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (21 CY)
Awd $5,775.00$275.00
2 $6,720.00$320.00
3 $7,056.00$336.00
Ref #247 848E50000 HAND CHIPPING, (50 SY)
Awd $4,250.00$85.00
2 $8,750.00$175.00
3 $9,187.50$183.75
Ref #248 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
190458 - Page 23
Ref #500 526E90010 TYPE A INSTALLATION, (120 FT)
Awd $36,964.80$308.04
2 $21,600.00$180.00
3 $22,680.00$189.00
Ref #508 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 16 - STRUCTURE REPAIR (GRE-675-0512L) (PART O - Totals
Awd $364,163.40
2 $345,503.44
3 $363,230.41
Ref #249 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
Ref #250 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (982 LB)
Awd $1,767.60$1.80
2 $1,325.70$1.35
3 $1,394.44$1.42
Ref #251 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $200.00$4.00
2 $100.00$2.00
3 $105.00$2.10
Ref #252 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (120 EACH)
Awd $1,920.00$16.00
2 $3,840.00$32.00
3 $4,032.00$33.60
Ref #253 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #254 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (249 SY)
Awd $4,980.00$20.00
2 $4,980.00$20.00
3 $5,360.97$21.53
Ref #255 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
Ref #256 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (34 CF)
Awd $16,728.00$492.00
2 $16,697.74$491.11
3 $17,850.00$525.00
Ref #257 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (986 SY)
Awd $85,782.00$87.00
2 $78,880.00$80.00
3 $82,824.00$84.00
190458 - Page 24
Ref #258 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (986 SY)
Awd $86,768.00$88.00
2 $78,880.00$80.00
3 $82,824.00$84.00
Ref #259 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (21 CY)
Awd $5,775.00$275.00
2 $6,720.00$320.00
3 $7,056.00$336.00
Ref #260 848E50000 HAND CHIPPING, (50 SY)
Awd $4,250.00$85.00
2 $8,750.00$175.00
3 $9,187.50$183.75
Ref #261 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Ref #501 526E90010 TYPE A INSTALLATION, (120 FT)
Awd $36,964.80$308.04
2 $21,600.00$180.00
3 $22,680.00$189.00
Ref #509 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 17 - STRUCTURE REPAIR (GRE-675-0512R) (PART O - Totals
Awd $356,275.40
2 $345,503.44
3 $363,230.41
Ref #262 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
Ref #263 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (982 LB)
Awd $1,767.60$1.80
2 $1,325.70$1.35
3 $1,394.44$1.42
Ref #264 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $200.00$4.00
2 $100.00$2.00
3 $105.00$2.10
Ref #265 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (120 EACH)
Awd $1,920.00$16.00
2 $3,840.00$32.00
3 $4,032.00$33.60
Ref #266 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
190458 - Page 25
Ref #267 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (190 SY)
Awd $3,800.00$20.00
2 $3,800.00$20.00
3 $4,090.70$21.53
Ref #268 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
Ref #269 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (33 CF)
Awd $16,236.00$492.00
2 $16,206.63$491.11
3 $17,325.00$525.00
Ref #270 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1112 SY)
Awd $96,744.00$87.00
2 $88,960.00$80.00
3 $93,408.00$84.00
Ref #271 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1112 SY)
Awd $97,856.00$88.00
2 $88,960.00$80.00
3 $93,408.00$84.00
Ref #272 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (24 CY)
Awd $6,600.00$275.00
2 $7,680.00$320.00
3 $8,064.00$336.00
Ref #273 848E50000 HAND CHIPPING, (56 SY)
Awd $4,760.00$85.00
2 $9,800.00$175.00
3 $10,290.00$183.75
Ref #274 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Ref #502 526E90010 TYPE A INSTALLATION, (116 FT)
Awd $35,733.80$308.05
2 $20,880.00$180.00
3 $21,924.00$189.00
Ref #510 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 18 - STRUCTURE REPAIR (GRE-675-0520L) (PART O - Totals
Awd $376,757.40
2 $365,282.33
3 $383,957.64
Ref #275 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
190458 - Page 26
Ref #276 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (982 LB)
Awd $1,964.00$2.00
2 $1,325.70$1.35
3 $1,394.44$1.42
Ref #277 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $150.00$3.00
2 $100.00$2.00
3 $105.00$2.10
Ref #278 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (120 EACH)
Awd $1,920.00$16.00
2 $3,840.00$32.00
3 $4,032.00$33.60
Ref #279 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #280 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (190 SY)
Awd $3,800.00$20.00
2 $3,800.00$20.00
3 $4,090.70$21.53
Ref #281 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
Ref #282 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (33 CF)
Awd $16,236.00$492.00
2 $16,206.63$491.11
3 $17,671.50$535.50
Ref #283 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1112 SY)
Awd $96,744.00$87.00
2 $88,960.00$80.00
3 $93,408.00$84.00
Ref #284 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1112 SY)
Awd $97,856.00$88.00
2 $88,960.00$80.00
3 $93,408.00$84.00
Ref #285 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (24 CY)
Awd $6,600.00$275.00
2 $7,680.00$320.00
3 $8,064.00$336.00
Ref #286 848E50000 HAND CHIPPING, (56 SY)
Awd $4,760.00$85.00
2 $9,800.00$175.00
3 $10,290.00$183.75
Ref #287 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
190458 - Page 27
Ref #503 526E90010 TYPE A INSTALLATION, (116 FT)
Awd $35,733.80$308.05
2 $20,880.00$180.00
3 $21,924.00$189.00
Ref #511 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 19 - STRUCTURE REPAIR (GRE-675-0520R) (PART O - Totals
Awd $376,903.80
2 $365,282.33
3 $384,304.14
Ref #288 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
Ref #289 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (50 SY)
Awd $2,500.00$50.00
2 $7,000.00$140.00
3 $7,350.00$147.00
Ref #290 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (1031 LB)
Awd $1,443.40$1.40
2 $1,391.85$1.35
3 $1,464.02$1.42
Ref #291 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $120.00$2.40
2 $100.00$2.00
3 $105.00$2.10
Ref #292 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (125 EACH)
Awd $2,000.00$16.00
2 $4,125.00$33.00
3 $4,331.25$34.65
Ref #293 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #294 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (355 SY)
Awd $7,100.00$20.00
2 $7,100.00$20.00
3 $7,643.15$21.53
Ref #295 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (55 SY)
Awd $1,375.00$25.00
2 $1,375.00$25.00
3 $1,530.65$27.83
Ref #296 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
190458 - Page 28
Ref #297 601E21000 CONCRETE SLOPE PROTECTION, (50 SY)
Awd $4,500.00$90.00
2 $10,000.00$200.00
3 $10,500.00$210.00
Ref #298 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (36 CF)
Awd $17,712.00$492.00
2 $17,679.96$491.11
3 $19,278.00$535.50
Ref #299 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1231 SY)
Awd $107,097.00$87.00
2 $98,480.00$80.00
3 $103,404.00$84.00
Ref #300 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1231 SY)
Awd $108,328.00$88.00
2 $98,480.00$80.00
3 $103,404.00$84.00
Ref #301 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (26 CY)
Awd $7,150.00$275.00
2 $8,320.00$320.00
3 $8,736.00$336.00
Ref #302 848E50000 HAND CHIPPING, (62 SY)
Awd $5,270.00$85.00
2 $10,850.00$175.00
3 $11,392.50$183.75
Ref #303 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
Ref #504 526E90010 TYPE A INSTALLATION, (121 FT)
Awd $37,274.05$308.05
2 $21,780.00$180.00
3 $22,869.00$189.00
Ref #512 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 20 - STRUCTURE REPAIR (GRE-675-0533L) (PART O - Totals
Awd $413,009.45
2 $410,411.81
3 $431,924.07
Ref #304 202E22900 APPROACH SLAB REMOVED, (318 SY)
Awd $12,720.00$40.00
2 $19,080.00$60.00
3 $20,034.00$63.00
Ref #305 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (1031 LB)
Awd $2,062.00$2.00
2 $1,391.85$1.35
3 $1,464.02$1.42
190458 - Page 29
Ref #306 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $120.00$2.40
2 $100.00$2.00
3 $105.00$2.10
Ref #307 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (125 EACH)
Awd $2,000.00$16.00
2 $4,125.00$33.00
3 $4,331.25$34.65
Ref #308 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (2 CY)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $3,150.00$1,575.00
Ref #309 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (354 SY)
Awd $7,080.00$20.00
2 $7,080.00$20.00
3 $7,621.62$21.53
Ref #310 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (55 SY)
Awd $1,375.00$25.00
2 $1,375.00$25.00
3 $1,530.65$27.83
Ref #311 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (318 SY)
Awd $92,220.00$290.00
2 $95,400.00$300.00
3 $100,170.00$315.00
Ref #312 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (32 CF)
Awd $15,744.00$492.00
2 $15,715.52$491.11
3 $6,720.00$210.00
Ref #313 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1231 SY)
Awd $107,097.00$87.00
2 $98,480.00$80.00
3 $103,404.00$84.00
Ref #314 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1231 SY)
Awd $108,328.00$88.00
2 $98,480.00$80.00
3 $103,404.00$84.00
Ref #315 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (26 CY)
Awd $7,150.00$275.00
2 $8,320.00$320.00
3 $8,736.00$336.00
Ref #316 848E50000 HAND CHIPPING, (62 SY)
Awd $5,270.00$85.00
2 $10,850.00$175.00
3 $11,392.50$183.75
Ref #317 848E50100 TEST SLAB, (LUMP SUM)
Awd $800.00$800.00
2 $250.00$250.00
3 $262.50$262.50
190458 - Page 30
Ref #505 526E90010 TYPE A INSTALLATION, (112 FT)
Awd $34,503.84$308.07
2 $20,160.00$180.00
3 $21,168.00$189.00
Ref #513 202E38500 BRIDGE RAILING REMOVED, (12 FT)
Awd $2,400.00$200.00
2 $6,000.00$500.00
3 $6,300.00$525.00
Section 21 - STRUCTURE REPAIR (GRE-675-0533R) (PART O - Totals
Awd $401,869.84
2 $389,807.37
3 $399,793.54
Ref #318 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $2,000.00$2,000.00
3 $2,100.00$2,100.00
Ref #319 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (22298 SF)
Awd $156,086.00$7.00
2 $156,086.00$7.00
3 $163,890.30$7.35
Ref #320 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (22298 SF)
Awd $44,596.00$2.00
2 $44,596.00$2.00
3 $46,825.80$2.10
Ref #321 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (22298 SF)
Awd $37,906.60$1.70
2 $37,906.60$1.70
3 $39,913.42$1.79
Ref #322 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (22298 SF)
Awd $22,298.00$1.00
2 $22,298.00$1.00
3 $23,412.90$1.05
Ref #323 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $31,200.00$2,600.00
2 $36,000.00$3,000.00
3 $37,800.00$3,150.00
Ref #324 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $25,000.00$25,000.00
3 $26,250.00$26,250.00
Ref #514 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (30 MNHR)
Awd $4,500.00$150.00
2 $4,500.00$150.00
3 $4,725.00$157.50
Ref #515 514E10000 FINAL INSPECTION REPAIR, (18 EACH)
Awd $3,600.00$200.00
2 $3,600.00$200.00
3 $3,780.00$210.00
190458 - Page 31
Section 22 - STRUCTURE REPAIR (GRE-675-0575) (PART ON - Totals
Awd $317,186.60
2 $331,986.60
3 $348,697.42
Ref #325 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $75,000.00$75,000.00
3 $78,750.00$78,750.00
Ref #326 202E38501 BRIDGE RAILING REMOVED, AS PER PLAN, (438 FT)
Awd $74,460.00$170.00
2 $87,600.00$200.00
3 $91,980.00$210.00
Ref #327 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (9572 LB)
Awd $13,400.80$1.40
2 $12,922.20$1.35
3 $13,592.24$1.42
Ref #328 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (250 LB)
Awd $600.00$2.40
2 $500.00$2.00
3 $525.00$2.10
Ref #329 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1068 EACH)
Awd $14,952.00$14.00
2 $12,816.00$12.00
3 $13,456.80$12.60
Ref #330 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, (4 CY)
Awd $5,800.00$1,450.00
2 $4,000.00$1,000.00
3 $4,200.00$1,050.00
Ref #331 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (8 CY)
Awd $18,720.00$2,340.00
2 $20,000.00$2,500.00
3 $21,000.00$2,625.00
Ref #332 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (70 CY)
Awd $105,000.00$1,500.00
2 $77,000.00$1,100.00
3 $80,850.00$1,155.00
Ref #333 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (456 SY)
Awd $9,120.00$20.00
2 $9,120.00$20.00
3 $9,817.68$21.53
Ref #334 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (2870 SY)
Awd $30,135.00$10.50
2 $30,135.00$10.50
3 $34,669.60$12.08
Ref #335 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (38127 SF)
Awd $266,889.00$7.00
2 $266,889.00$7.00
3 $280,233.45$7.35
190458 - Page 32
Ref #336 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (38127 SF)
Awd $76,254.00$2.00
2 $76,254.00$2.00
3 $80,066.70$2.10
Ref #337 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (38127 SF)
Awd $64,815.90$1.70
2 $64,815.90$1.70
3 $68,247.33$1.79
Ref #338 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (38127 SF)
Awd $38,127.00$1.00
2 $38,127.00$1.00
3 $40,033.35$1.05
Ref #339 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (125 FT)
Awd $60,000.00$480.00
2 $55,000.00$440.00
3 $57,750.00$462.00
Ref #340 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (35 SF)
Awd $350.00$10.00
2 $385.00$11.00
3 $404.25$11.55
Ref #341 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $30,000.00$2,500.00
2 $36,000.00$3,000.00
3 $37,800.00$3,150.00
Ref #342 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $50,000.00$50,000.00
3 $52,500.00$52,500.00
Ref #343 518E62200 STRUCTURE DRAINAGE, MISC.:CLEAN DOWNSPOUTS, (4 EACH)
Awd $14,000.00$3,500.00
2 $10,800.00$2,700.00
3 $11,340.00$2,835.00
Ref #344 519E11100 PATCHING CONCRETE STRUCTURE, (1 SF)
Awd $900.00$900.00
2 $100.00$100.00
3 $1,050.00$1,050.00
Ref #345 607E39910 VANDAL PROTECTION FENCE, 8' STRAIGHT, COATED FABRI, (438 FT)
Awd $28,251.00$64.50
2 $56,502.00$129.00
3 $34,492.50$78.75
Ref #346 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (438 FT)
Awd $16,206.00$37.00
2 $18,615.00$42.50
3 $19,315.80$44.10
Ref #507 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (45 FT)
Awd $4,703.85$104.53
2 $4,275.00$95.00
3 $4,725.00$105.00
190458 - Page 33
Ref #516 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (60 MNHR)
Awd $9,000.00$150.00
2 $9,000.00$150.00
3 $9,450.00$157.50
Ref #517 514E10000 FINAL INSPECTION REPAIR, (30 EACH)
Awd $6,000.00$200.00
2 $6,000.00$200.00
3 $6,300.00$210.00
Section 23 - STRUCTURE REPAIR (GRE-675-0616) (PART ON - Totals
Awd $1,011,684.55
2 $1,021,856.10
3 $1,052,549.70
Ref #348 202E38500 BRIDGE RAILING REMOVED, (660 FT)
Awd $69,300.00$105.00
2 $132,000.00$200.00
3 $138,600.00$210.00
Ref #349 509E10000 EPOXY COATED REINFORCING STEEL, (11864 LB)
Awd $16,609.60$1.40
2 $15,423.20$1.30
3 $16,253.68$1.37
Ref #350 509E20000 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $240.00$2.40
2 $200.00$2.00
3 $210.00$2.10
Ref #351 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1440 EACH)
Awd $20,160.00$14.00
2 $17,280.00$12.00
3 $18,144.00$12.60
Ref #352 511E53014 CLASS QC3 CONCRETE, MISC.:SUPERSTRUCTURE CONCRETE , (100 CY)
Awd $150,000.00$1,500.00
2 $120,000.00$1,200.00
3 $126,000.00$1,260.00
Ref #353 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (737 SY)
Awd $14,740.00$20.00
2 $14,740.00$20.00
3 $15,477.00$21.00
Ref #354 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN, (25 FT)
Awd $3,125.00$125.00
2 $5,625.00$225.00
3 $5,906.25$236.25
Ref #355 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1651 SY)
Awd $17,335.50$10.50
2 $17,335.50$10.50
3 $19,944.08$12.08
Ref #356 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (25 SF)
Awd $325.00$13.00
2 $275.00$11.00
3 $288.75$11.55
190458 - Page 34
Ref #357 518E62200 STRUCTURE DRAINAGE, MISC.: CLEAN DOWNSPOUTS, (6 EACH)
Awd $2,700.00$450.00
2 $450.00$75.00
3 $472.50$78.75
Ref #358 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (610 FT)
Awd $37,515.00$61.50
2 $63,135.00$103.50
3 $48,037.50$78.75
Ref #359 607E39994 TEMPORARY VANDAL FENCE, TYPE B, (610 FT)
Awd $22,448.00$36.80
2 $25,925.00$42.50
3 $26,901.00$44.10
Section 24 - STRUCTURE REPAIR (GRE-675-0737) (PART ON - Totals
Awd $354,498.10
2 $412,388.70
3 $416,234.76
Ref #360 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1883 SY)
Awd $19,771.50$10.50
2 $19,771.50$10.50
3 $22,746.64$12.08
Section 25 - STRUCTURE REPAIR (GRE-675-0822) (PART ON - Totals
Awd $19,771.50
2 $19,771.50
3 $22,746.64
Ref #361 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (2564 SY)
Awd $26,922.00$10.50
2 $26,922.00$10.50
3 $30,973.12$12.08
Section 26 - STRUCTURE REPAIR (GRE-675-0823) (PART ON - Totals
Awd $26,922.00
2 $26,922.00
3 $30,973.12
Ref #362 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1085 SY)
Awd $11,392.50$10.50
2 $11,392.50$10.50
3 $13,106.80$12.08
Ref #363 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (48 SF)
Awd $4,800.00$100.00
2 $4,800.00$100.00
3 $5,040.00$105.00
Ref #364 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (48 SF)
Awd $3,840.00$80.00
2 $3,840.00$80.00
3 $4,032.00$84.00
190458 - Page 35
Ref #365 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (48 SF)
Awd $3,360.00$70.00
2 $3,360.00$70.00
3 $3,528.00$73.50
Ref #366 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (48 SF)
Awd $2,400.00$50.00
2 $2,400.00$50.00
3 $2,520.00$52.50
Section 27 - STRUCTURE REPAIR (GRE-675-1025 L) (PART - Totals
Awd $25,792.50
2 $25,792.50
3 $28,226.80
Ref #367 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1159 SY)
Awd $12,169.50$10.50
2 $12,169.50$10.50
3 $14,000.72$12.08
Ref #368 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (48 SF)
Awd $4,800.00$100.00
2 $4,800.00$100.00
3 $5,040.00$105.00
Ref #369 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (48 SF)
Awd $3,840.00$80.00
2 $3,840.00$80.00
3 $4,032.00$84.00
Ref #370 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (48 SF)
Awd $3,360.00$70.00
2 $3,360.00$70.00
3 $3,528.00$73.50
Ref #371 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (48 SF)
Awd $2,400.00$50.00
2 $2,400.00$50.00
3 $2,520.00$52.50
Section 28 - STRUCTURE REPAIR (GRE-675-1025R) (PART O - Totals
Awd $26,569.50
2 $26,569.50
3 $29,120.72
Ref #372 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (918 SY)
Awd $9,639.00$10.50
2 $9,639.00$10.50
3 $11,089.44$12.08
Ref #373 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 705.04, H, (80 FT)
Awd $1,880.00$23.50
2 $1,880.00$23.50
3 $2,100.00$26.25
190458 - Page 36
Section 29 - STRUCTURE REPAIR (GRE-675-1193 L) (PART - Totals
Awd $11,519.00
2 $11,519.00
3 $13,189.44
Ref #374 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1016 SY)
Awd $10,668.00$10.50
2 $10,668.00$10.50
3 $12,273.28$12.08
Ref #375 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 705.04, H, (80 FT)
Awd $1,880.00$23.50
2 $1,880.00$23.50
3 $2,100.00$26.25
Section 30 - STRUCTURE REPAIR (GRE-675-1193R) (PART O - Totals
Awd $12,548.00
2 $12,548.00
3 $14,373.28
Ref #376 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (547 SY)
Awd $5,743.50$10.50
2 $5,743.50$10.50
3 $6,607.76$12.08
Section 31 - STRUCTURE REPAIR (GRE-675-1340E) (PART O - Totals
Awd $5,743.50
2 $5,743.50
3 $6,607.76
Ref #377 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (771 SY)
Awd $8,095.50$10.50
2 $8,095.50$10.50
3 $9,313.68$12.08
Section 32 - STRUCTURE REPAIR (GRE-675-1340L) (PART O - Totals
Awd $8,095.50
2 $8,095.50
3 $9,313.68
Ref #378 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (771 SY)
Awd $8,095.50$10.50
2 $8,095.50$10.50
3 $9,313.68$12.08
Section 33 - STRUCTURE REPAIR (GRE-675-1340R) (PART O - Totals
Awd $8,095.50
2 $8,095.50
3 $9,313.68
190458 - Page 37
Ref #379 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (805 SY)
Awd $8,452.50$10.50
2 $8,452.50$10.50
3 $9,724.40$12.08
Section 34 - STRUCTURE REPAIR (GRE-675-1449L) (PART O - Totals
Awd $8,452.50
2 $8,452.50
3 $9,724.40
Ref #380 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (805 SY)
Awd $8,452.50$10.50
2 $8,452.50$10.50
3 $9,724.40$12.08
Section 35 - STRUCTURE REPAIR (GRE-675-1449R) (PART O - Totals
Awd $8,452.50
2 $8,452.50
3 $9,724.40
Ref #381 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (979 SY)
Awd $10,279.50$10.50
2 $10,279.50$10.50
3 $11,826.32$12.08
Section 36 - STRUCTURE REPAIR (GRE-675-1522E) (PART O - Totals
Awd $10,279.50
2 $10,279.50
3 $11,826.32
Ref #382 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1564 SY)
Awd $16,422.00$10.50
2 $16,422.00$10.50
3 $18,893.12$12.08
Section 37 - STRUCTURE REPAIR (GRE-675-1522L) (PART O - Totals
Awd $16,422.00
2 $16,422.00
3 $18,893.12
Ref #383 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1564 SY)
Awd $16,422.00$10.50
2 $16,422.00$10.50
3 $24,633.00$15.75
Ref #384 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (7 SY)
Awd $4,900.00$700.00
2 $5,250.00$750.00
3 $5,512.50$787.50
190458 - Page 38
Section 38 - STRUCTURE REPAIR (GRE-675-1522R) (PART O - Totals
Awd $21,322.00
2 $21,672.00
3 $30,145.50
Ref #385 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1387 SY)
Awd $14,563.50$10.50
2 $14,563.50$10.50
3 $16,754.96$12.08
Section 39 - STRUCTURE REPAIR (GRE-675-1522W) (PART O - Totals
Awd $14,563.50
2 $14,563.50
3 $16,754.96
Ref #386 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $9,000.00$9,000.00
2 $2,500.00$2,500.00
3 $10,500.00$10,500.00
Ref #387 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1101 SY)
Awd $11,560.50$10.50
2 $11,560.50$10.50
3 $13,300.08$12.08
Ref #388 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (18 CF)
Awd $8,856.00$492.00
2 $8,839.98$491.11
3 $9,450.00$525.00
Section 40 - STRUCTURE REPAIR (GRE-675-1540L) (PART O - Totals
Awd $29,416.50
2 $22,900.48
3 $33,250.08
Ref #389 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1100 SY)
Awd $11,550.00$10.50
2 $11,550.00$10.50
3 $13,288.00$12.08
Section 41 - STRUCTURE REPAIR (GRE-675-1540R) (PART O - Totals
Awd $11,550.00
2 $11,550.00
3 $13,288.00
Ref #391 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (825 SY)
Awd $8,662.50$10.50
2 $8,662.50$10.50
3 $9,966.00$12.08
190458 - Page 39
Section 42 - STRUCTURE REPAIR (GRE-675-1600L) (PART O - Totals
Awd $8,662.50
2 $8,662.50
3 $9,966.00
Ref #392 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (826 SY)
Awd $8,673.00$10.50
2 $8,673.00$10.50
3 $9,978.08$12.08
Ref #393 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (6 SY)
Awd $6,000.00$1,000.00
2 $6,600.00$1,100.00
3 $6,930.00$1,155.00
Section 43 - STRUCTURE REPAIR (GRE-675-1600R) (PART O - Totals
Awd $14,673.00
2 $15,273.00
3 $16,908.08
Ref #394 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (697 SY)
Awd $7,318.50$10.50
2 $7,318.50$10.50
3 $8,419.76$12.08
Section 44 - STRUCTURE REPAIR (GRE-675-1640L) (PART O - Totals
Awd $7,318.50
2 $7,318.50
3 $8,419.76
Ref #395 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (608 SY)
Awd $6,384.00$10.50
2 $6,384.00$10.50
3 $7,344.64$12.08
Section 45 - STRUCTURE REPAIR (GRE-675-1640R) (PART O - Totals
Awd $6,384.00
2 $6,384.00
3 $7,344.64
Ref #396 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (2202 SY)
Awd $23,121.00$10.50
2 $23,121.00$10.50
3 $26,600.16$12.08
Ref #397 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (8 SY)
Awd $5,600.00$700.00
2 $6,000.00$750.00
3 $6,300.00$787.50
190458 - Page 40
Section 46 - STRUCTURE REPAIR (GRE-675-1720L) (PART O - Totals
Awd $28,721.00
2 $29,121.00
3 $32,900.16
Ref #398 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1890 SY)
Awd $19,845.00$10.50
2 $19,845.00$10.50
3 $22,831.20$12.08
Ref #399 519E11100 PATCHING CONCRETE STRUCTURE, (45 SF)
Awd $5,625.00$125.00
2 $5,625.00$125.00
3 $6,378.75$141.75
Ref #400 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (29 SY)
Awd $18,878.42$650.98
2 $20,300.00$700.00
3 $21,315.00$735.00
Ref #524 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY , (LUMP SUM)
Awd $6,062.32$6,062.32
2 $8,073.66$8,073.66
3 $10,000.00$10,000.00
Section 47 - STRUCTURE REPAIR (GRE-675-1720R) (PART O - Totals
Awd $50,410.74
2 $53,843.66
3 $60,524.95
Ref #401 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1154 SY)
Awd $12,117.00$10.50
2 $12,117.00$10.50
3 $13,940.32$12.08
Section 48 - STRUCTURE REPAIR (GRE-675-1753L) (PART O - Totals
Awd $12,117.00
2 $12,117.00
3 $13,940.32
Ref #402 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1154 SY)
Awd $12,117.00$10.50
2 $12,117.00$10.50
3 $13,940.32$12.08
Ref #403 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (3 SY)
Awd $3,600.00$1,200.00
2 $3,900.00$1,300.00
3 $4,095.00$1,365.00
190458 - Page 41
Section 49 - STRUCTURE REPAIR (GRE-675-1753R) (PART O - Totals
Awd $15,717.00
2 $16,017.00
3 $18,035.32
Ref #404 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (76100 SF)
Awd $532,700.00$7.00
2 $532,700.00$7.00
3 $559,335.00$7.35
Ref #405 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (76100 SF)
Awd $152,200.00$2.00
2 $152,200.00$2.00
3 $159,810.00$2.10
Ref #406 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (76100 SF)
Awd $129,370.00$1.70
2 $129,370.00$1.70
3 $136,219.00$1.79
Ref #407 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (76100 SF)
Awd $76,100.00$1.00
2 $76,100.00$1.00
3 $79,905.00$1.05
Ref #525 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (120 MNHR)
Awd $18,000.00$150.00
2 $18,000.00$150.00
3 $18,900.00$157.50
Ref #526 514E10000 FINAL INSPECTION REPAIR, (136 EACH)
Awd $27,200.00$200.00
2 $27,200.00$200.00
3 $28,560.00$210.00
Section 50 - STRUCTURE REPAIR (GRE-35-0055R) (PART ON - Totals
Awd $935,570.00
2 $935,570.00
3 $982,729.00
Ref #408 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (55400 SF)
Awd $387,800.00$7.00
2 $387,800.00$7.00
3 $407,190.00$7.35
Ref #409 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (55400 SF)
Awd $110,800.00$2.00
2 $110,800.00$2.00
3 $116,340.00$2.10
Ref #410 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (55400 SF)
Awd $94,180.00$1.70
2 $94,180.00$1.70
3 $99,166.00$1.79
190458 - Page 42
Ref #411 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (55400 SF)
Awd $55,400.00$1.00
2 $55,400.00$1.00
3 $58,170.00$1.05
Section 51 - STRUCTURE REPAIR (GRE-35-0055L) (PART ON - Totals
Awd $648,180.00
2 $648,180.00
3 $680,866.00
Ref #412 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (40650 SF)
Awd $284,550.00$7.00
2 $284,550.00$7.00
3 $298,777.50$7.35
Ref #413 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (40650 SF)
Awd $81,300.00$2.00
2 $81,300.00$2.00
3 $85,365.00$2.10
Ref #414 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (40650 SF)
Awd $69,105.00$1.70
2 $69,105.00$1.70
3 $72,763.50$1.79
Ref #415 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (40650 SF)
Awd $40,650.00$1.00
2 $40,650.00$1.00
3 $42,682.50$1.05
Section 52 - STRUCTURE REPAIR (GRE-35-0055N) (PART ON - Totals
Awd $475,605.00
2 $475,605.00
3 $499,588.50
Ref #416 202E23010 PAVEMENT REMOVED, ASPHALT, (24 SY)
Awd $1,082.88$45.12
2 $2,160.00$90.00
3 $4,078.08$169.92
Ref #417 202E58201 INLET REMOVED, AS PER PLAN, (7 EACH)
Awd $12,795.09$1,827.87
2 $70,000.00$10,000.00
3 $5,618.13$802.59
Section 53 - ROADWAY (PART TWO) - Totals
Awd $13,877.97
2 $72,160.00
3 $9,696.21
Ref #418 832E30000 EROSION CONTROL, (1 EACH)
Awd $1.00$1.00
2 $1.00$1.00
3 $1.00$1.00
190458 - Page 43
Section 54 - EROSION CONTROL (PART TWO) - Totals
Awd $1.00
2 $1.00
3 $1.00
Ref #419 202E35100 PIPE REMOVED, 24" AND UNDER, (48 FT)
Awd $3,084.96$64.27
2 $3,600.00$75.00
3 $4,078.08$84.96
Ref #420 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER, (742 FT)
Awd $49,558.18$66.79
2 $22,260.00$30.00
3 $3,895.50$5.25
Ref #421 611E05900 15" CONDUIT, TYPE B, 706.02, (48 FT)
Awd $5,090.88$106.06
2 $15,120.00$315.00
3 $19,022.40$396.30
Ref #422 611E98791 INLET, NO. 3A, AS PER PLAN, (7 EACH)
Awd $81,980.36$11,711.48
2 $140,000.00$20,000.00
3 $59,497.55$8,499.65
Ref #423 613E41200 LOW STRENGTH MORTAR BACKFILL, (7 CY)
Awd $5,899.18$842.74
2 $1,400.00$200.00
3 $770.00$110.00
Section 55 - DRAINAGE (PART TWO) - Totals
Awd $145,613.56
2 $182,380.00
3 $87,263.53
Ref #424 301E46000 ASPHALT CONCRETE BASE, PG64-22, 3", (2 CY)
Awd $5,271.12$2,635.56
2 $1,500.00$750.00
3 $2,529.60$1,264.80
Ref #425 304E20000 AGGREGATE BASE, 6", (5 CY)
Awd $1,296.45$259.29
2 $2,600.00$520.00
3 $2,136.85$427.37
Ref #426 407E10000 TACK COAT, (3 GAL)
Awd $9.00$3.00
2 $9.00$3.00
3 $8.73$2.91
Ref #427 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (2 CY)
Awd $3,245.84$1,622.92
2 $1,500.00$750.00
3 $3,341.26$1,670.63
190458 - Page 44
Section 56 - PAVEMENT (PART TWO) - Totals
Awd $9,822.41
2 $5,609.00
3 $8,016.44
Ref #428 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)
Awd $13,000.00$65.00
2 $13,600.00$68.00
3 $14,700.00$73.50
Ref #429 614E12350 WORK ZONE IMPACT ATTENUATOR, (2 EACH)
Awd $4,513.40$2,256.70
2 $3,800.00$1,900.00
3 $4,101.40$2,050.70
Ref #430 614E13310 BARRIER REFLECTOR, TYPE 1 , 1-WAY, (50 EACH)
Awd $861.50$17.23
2 $500.00$10.00
3 $967.50$19.35
Ref #431 614E13350 OBJECT MARKER, ONE WAY, (50 EACH)
Awd $799.00$15.98
2 $650.00$13.00
3 $1,419.50$28.39
Ref #432 614E18030 MAINTAINING TRAFFIC, MISC.: RUMBLE STRIP MILLED/FI, (1170 FT)
Awd $14,847.30$12.69
2 $11,700.00$10.00
3 $24,570.00$21.00
Ref #433 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT, (2 MILE)
Awd $4,880.00$2,440.00
2 $4,880.00$2,440.00
3 $5,124.00$2,562.00
Ref #434 622E41000 PORTABLE BARRIER, 32", (5000 FT)
Awd $38,200.00$7.64
2 $77,500.00$15.50
3 $81,400.00$16.28
Section 57 - MAINTENANCE OF TRAFFIC (PART TWO) - Totals
Awd $77,101.20
2 $112,630.00
3 $132,282.40
Ref #435 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $243,582.84$243,582.84
2 $50,122.49$50,122.49
3 $221,723.12$221,723.12
Ref #436 108E10000 CPM PROGRESS SCHEDULE(PART ONE AND PART TWO), (LUMP SUM)
Awd $33,497.59$33,497.59
2 $7,000.00$7,000.00
3 $5,978.00$5,978.00
190458 - Page 45
Ref #437 614E11000 MAINTAINING TRAFFIC(PART ONE AND PART TWO), (LUMP SUM)
Awd $881,276.46$881,276.46
2 $1,700,000.00$1,700,000.00
3 $3,113,273.51$3,113,273.51
Ref #438 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART ONE , (LUMP SUM)
Awd $95,573.23$95,573.23
2 $76,000.00$76,000.00
3 $39,666.56$39,666.56
Ref #439 624E10000 MOBILIZATION(PART ONE AND PART TWO), (LUMP SUM)
Awd $800,000.00$800,000.00
2 $430,000.00$430,000.00
3 $800,000.00$800,000.00
Section 58 - INCIDENTALS - Totals
Awd $2,053,930.12
2 $2,263,122.49
3 $4,180,641.19
Ref #440 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (7000 DLR)
Awd $910,000.00$130.00
2 $875,000.00$125.00
3 $1,085,000.00$155.00
Section 59 - PART B - Totals
Awd $910,000.00
2 $875,000.00
3 $1,085,000.00
190458 - Page 46
Project No. 190470
PID 88084
LUC-IR 475 Intchng & Wdn Phase 3 (PART 1, 2, 3)
Federal
Type: MAJOR RECONSTRUCTION
Completion Date: 10/31/2021
Award Amount: $45,261,787.42
Contract Awarded To: MILLER BROS CONST INC
Letting Date: 10/10/2019
Engineer's Estimate: $50,735,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MILLER BROS CONST INC
1613 S DEFIANCE ST P O BOX 30
ARCHBOLD, OH 43502
Fulton
Bidder 1
Bid $45,261,787.42
BEAVER EXCAVATING COMPANY
P O BOX 6059
CANTON, OH 44706
Stark
Bidder 2
Bid $48,563,057.17
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 3
Bid $53,482,653.90
190470 - Page 47
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $250,000.00$250,000.00
2 $75,000.00$75,000.00
3 $175,000.00$175,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (19294 SY)
Awd $115,764.00$6.00
2 $46,305.60$2.40
3 $72,352.50$3.75
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (219 FT)
Awd $3,285.00$15.00
2 $3,285.00$15.00
3 $3,285.00$15.00
Ref #4 202E38000 GUARDRAIL REMOVED, (10562 FT)
Awd $21,124.00$2.00
2 $21,124.00$2.00
3 $21,124.00$2.00
Ref #5 202E42206 ANCHOR ASSEMBLY REMOVED, (13 EACH)
Awd $2,405.00$185.00
2 $2,405.00$185.00
3 $2,405.00$185.00
Ref #6 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (14 EACH)
Awd $1,750.00$125.00
2 $1,750.00$125.00
3 $1,750.00$125.00
Ref #7 202E58100 CATCH BASIN REMOVED, (12 EACH)
Awd $4,200.00$350.00
2 $2,400.00$200.00
3 $4,800.00$400.00
Ref #8 202E75001 FENCE REMOVED, AS PER PLAN, (6460 FT)
Awd $15,504.00$2.40
2 $15,504.00$2.40
3 $15,504.00$2.40
Ref #9 203E10000 EXCAVATION, (46147 CY)
Awd $323,029.00$7.00
2 $692,205.00$15.00
3 $646,058.00$14.00
Ref #10 203E20000 EMBANKMENT, (40458 CY)
Awd $283,206.00$7.00
2 $161,832.00$4.00
3 $242,748.00$6.00
Ref #11 203E35110 GRANULAR MATERIAL, TYPE B, (682 CY)
Awd $25,234.00$37.00
2 $23,870.00$35.00
3 $25,916.00$38.00
Ref #12 203E35130 GRANULAR MATERIAL, TYPE D, (2002 CY)
Awd $66,066.00$33.00
2 $64,064.00$32.00
3 $88,088.00$44.00
190470 - Page 48
Ref #14 204E45000 PROOF ROLLING, (11 HOUR)
Awd $1,705.00$155.00
2 $2,200.00$200.00
3 $2,200.00$200.00
Ref #15 206E10500 CEMENT, (2358 TON)
Awd $318,330.00$135.00
2 $334,836.00$142.00
3 $334,836.00$142.00
Ref #16 206E11000 CURING COAT, (68049 SY)
Awd $51,036.75$0.75
2 $51,036.75$0.75
3 $68,049.00$1.00
Ref #17 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP, (68049 SY)
Awd $157,193.19$2.31
2 $207,549.45$3.05
3 $272,196.00$4.00
Ref #18 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $25,000.00$25,000.00
3 $18,455.00$18,455.00
Ref #19 606E15050 GUARDRAIL, TYPE MGS, (63 FT)
Awd $1,134.00$18.00
2 $1,134.00$18.00
3 $1,134.00$18.00
Ref #20 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN, (150 FT)
Awd $2,940.00$19.60
2 $2,940.00$19.60
3 $2,940.00$19.60
Ref #21 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN, (4000 FT)
Awd $85,600.00$21.40
2 $85,600.00$21.40
3 $85,600.00$21.40
Ref #22 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING, (25 FT)
Awd $645.00$25.80
2 $645.00$25.80
3 $645.00$25.80
Ref #23 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS, (338 FT)
Awd $10,545.60$31.20
2 $10,545.60$31.20
3 $10,545.60$31.20
Ref #24 606E26050 ANCHOR ASSEMBLY, MGS TYPE B - MASH, (5 EACH)
Awd $9,375.00$1,875.00
2 $9,375.00$1,875.00
3 $9,375.00$1,875.00
Ref #25 606E26150 ANCHOR ASSEMBLY, MGS TYPE E - MASH, (9 EACH)
Awd $21,420.00$2,380.00
2 $21,420.00$2,380.00
3 $21,420.00$2,380.00
190470 - Page 49
Ref #26 606E26550 ANCHOR ASSEMBLY, MGS TYPE T - MASH, (8 EACH)
Awd $8,320.00$1,040.00
2 $8,320.00$1,040.00
3 $8,320.00$1,040.00
Ref #27 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (11 EACH)
Awd $25,025.00$2,275.00
2 $25,025.00$2,275.00
3 $25,025.00$2,275.00
Ref #28 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (3 EACH)
Awd $1,500.00$500.00
2 $1,500.00$500.00
3 $1,500.00$500.00
Ref #29 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO, (15797 FT)
Awd $217,998.60$13.80
2 $217,998.60$13.80
3 $217,998.60$13.80
Ref #30 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY TERMINAL, (8 EACH)
Awd $26,280.00$3,285.00
2 $26,280.00$3,285.00
3 $26,280.00$3,285.00
Ref #31 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL), (3 EACH)
Awd $12,960.00$4,320.00
2 $12,960.00$4,320.00
3 $12,960.00$4,320.00
Ref #32 607E23000 FENCE, TYPE CLT, (95 FT)
Awd $7,505.00$79.00
2 $7,505.00$79.00
3 $7,505.00$79.00
Ref #33 607E61200 GATE, TYPE CLT 4 FT WIDE, (19 EACH)
Awd $14,915.00$785.00
2 $14,915.00$785.00
3 $14,915.00$785.00
Ref #34 607E98000 FENCE, MISC.: TEMPORARY FENCE, (6460 FT)
Awd $74,290.00$11.50
2 $32,300.00$5.00
3 $74,290.00$11.50
Ref #35 609E24000 CURB, TYPE 4-A, (234 FT)
Awd $7,378.02$31.53
2 $1,404.00$6.00
3 $9,126.00$39.00
Ref #36 611E98010 CONCRETE BARRIER (TYPE D) INLET, (8 EACH)
Awd $80.00$10.00
2 $32,000.00$4,000.00
3 $33,600.00$4,200.00
Ref #37 622E24001 CONCRETE BARRIER, TYPE D, AS PER PLAN, (5340 FT)
Awd $272,340.00$51.00
2 $384,480.00$72.00
3 $283,020.00$53.00
190470 - Page 50
Ref #38 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (5 EACH)
Awd $14,825.00$2,965.00
2 $21,500.00$4,300.00
3 $11,500.00$2,300.00
Ref #39 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (5 EACH)
Awd $15,250.00$3,050.00
2 $21,500.00$4,300.00
3 $15,000.00$3,000.00
Ref #40 623E38500 MONUMENT ASSEMBLY, (4 EACH)
Awd $2,780.00$695.00
2 $4,400.00$1,100.00
3 $2,600.00$650.00
Ref #41 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET, (19 EACH)
Awd $5,225.00$275.00
2 $20,900.00$1,100.00
3 $8,550.00$450.00
Section 1 - ROADWAY (PART 1) - Totals
Awd $2,495,163.16
2 $2,695,014.00
3 $2,878,615.70
Ref #42 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (21 SY)
Awd $1,113.00$53.00
2 $3,150.00$150.00
3 $1,575.00$75.00
Ref #43 659E00100 SOIL ANALYSIS TEST, (5 EACH)
Awd $50.00$10.00
2 $50.00$10.00
3 $50.00$10.00
Ref #44 659E00300 TOPSOIL, (4953 CY)
Awd $49,530.00$10.00
2 $74,295.00$15.00
3 $39,624.00$8.00
Ref #45 659E10000 SEEDING AND MULCHING, (40631 SY)
Awd $19,502.88$0.48
2 $19,502.88$0.48
3 $19,502.88$0.48
Ref #46 659E14000 REPAIR SEEDING AND MULCHING, (2033 SY)
Awd $975.84$0.48
2 $975.84$0.48
3 $975.84$0.48
Ref #47 659E15000 INTER-SEEDING, (2032 SY)
Awd $203.20$0.10
2 $203.20$0.10
3 $203.20$0.10
Ref #48 659E20000 COMMERCIAL FERTILIZER, (5.08 TON)
Awd $2,844.80$560.00
2 $2,844.80$560.00
3 $2,844.80$560.00
190470 - Page 51
Ref #49 659E31000 LIME, (3.66 ACRE)
Awd $0.04$0.01
2 $0.04$0.01
3 $0.04$0.01
Ref #50 659E35000 WATER, (322 MGAL)
Awd $322.00$1.00
2 $322.00$1.00
3 $322.00$1.00
Ref #51 659E40000 MOWING, (191 MSF)
Awd $401.10$2.10
2 $401.10$2.10
3 $401.10$2.10
Ref #52 660E25000 SODDING STAKED, (1148 SY)
Awd $9,069.20$7.90
2 $9,069.20$7.90
3 $9,069.20$7.90
Ref #53 670E00700 DITCH EROSION PROTECTION, (2834 SY)
Awd $4,251.00$1.50
2 $4,251.00$1.50
3 $4,251.00$1.50
Ref #54 671E15040 EROSION CONTROL MAT, TYPE E, (21482 SY)
Awd $36,519.40$1.70
2 $36,519.40$1.70
3 $36,519.40$1.70
Ref #55 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $5,000.00$5,000.00
3 $2,000.00$2,000.00
Ref #56 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $67,500.00$67,500.00
2 $3,500.00$3,500.00
3 $12,001.20$12,001.20
Ref #57 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $5,500.00$5,500.00
2 $5,500.00$5,500.00
3 $7,500.00$7,500.00
Ref #58 832E30000 EROSION CONTROL, (184549 EACH)
Awd $184,549.00$1.00
2 $184,549.00$1.00
3 $184,549.00$1.00
Ref #59 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $250,000.00$250,000.00
3 $60,000.00$60,000.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $413,331.46
2 $600,133.46
3 $381,388.66
190470 - Page 52
Ref #60 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (17 CY)
Awd $4,845.00$285.00
2 $2,550.00$150.00
3 $2,465.00$145.00
Ref #61 602E20000 CONCRETE MASONRY, (3.5 CY)
Awd $2,992.50$855.00
2 $7,000.00$2,000.00
3 $7,000.00$2,000.00
Ref #62 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, (66228 FT)
Awd $529,824.00$8.00
2 $529,824.00$8.00
3 $463,596.00$7.00
Ref #63 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F, (7856 FT)
Awd $145,728.80$18.55
2 $78,560.00$10.00
3 $98,200.00$12.50
Ref #64 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (950 FT)
Awd $22,800.00$24.00
2 $17,100.00$18.00
3 $21,850.00$23.00
Ref #65 611E00900 6" CONDUIT, TYPE B, (758 FT)
Awd $26,530.00$35.00
2 $18,950.00$25.00
3 $21,982.00$29.00
Ref #67 611E05900 15" CONDUIT, TYPE B, (116 FT)
Awd $12,064.00$104.00
2 $9,280.00$80.00
3 $17,400.00$150.00
Ref #68 611E06100 15" CONDUIT, TYPE C, (544 FT)
Awd $30,736.00$56.50
2 $24,480.00$45.00
3 $35,360.00$65.00
Ref #69 611E96601 CONDUIT, BORED OR JACKED, AS PER PLAN ,15", (432 FT)
Awd $110,160.00$255.00
2 $90,720.00$210.00
3 $99,360.00$230.00
Ref #70 611E98410 CATCH BASIN, NO. 8, (10 EACH)
Awd $35,000.00$3,500.00
2 $30,000.00$3,000.00
3 $41,000.00$4,100.00
Ref #71 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (9 EACH)
Awd $26,550.00$2,950.00
2 $4,050.00$450.00
3 $15,750.00$1,750.00
Ref #72 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, (8 EACH)
Awd $88,000.00$11,000.00
2 $32,000.00$4,000.00
3 $38,400.00$4,800.00
190470 - Page 53
Ref #73 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (11 EACH)
Awd $2,035.00$185.00
2 $3,630.00$330.00
3 $4,950.00$450.00
Section 3 - DRAINAGE (PART 1) - Totals
Awd $1,037,265.30
2 $848,144.00
3 $867,313.00
Ref #74 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 3 1/4", (223144 SY)
Awd $256,615.60$1.15
2 $256,615.60$1.15
3 $421,742.16$1.89
Ref #75 302E46000 ASPHALT CONCRETE BASE, PG64-22, (18235 CY)
Awd $2,068,578.40$113.44
2 $1,932,910.00$106.00
3 $2,014,967.50$110.50
Ref #76 304E20000 AGGREGATE BASE, (11006 CY)
Awd $387,961.50$35.25
2 $462,252.00$42.00
3 $495,270.00$45.00
Ref #77 407E10000 TACK COAT, (40530 GAL)
Awd $81,060.00$2.00
2 $81,060.00$2.00
3 $87,139.50$2.15
Ref #78 806E00100 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, (11762 CY)
Awd $1,705,490.00$145.00
2 $1,705,490.00$145.00
3 $1,881,920.00$160.00
Ref #79 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (13707 CY)
Awd $1,918,980.00$140.00
2 $1,918,980.00$140.00
3 $1,946,394.00$142.00
Ref #80 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE, (127 CY)
Awd $20,955.00$165.00
2 $20,955.00$165.00
3 $31,750.00$250.00
Ref #81 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (77208 FT)
Awd $14,669.52$0.19
2 $14,669.52$0.19
3 $14,669.52$0.19
Ref #82 875E10000 LONGITUDINAL JOINT ADHESIVE, (44416 LB)
Awd $26,649.60$0.60
2 $26,649.60$0.60
3 $4,441.60$0.10
Ref #1002 617E10100 COMPACTED AGGREGATE, (115 CY)
Awd $4,945.00$43.00
2 $9,775.00$85.00
3 $9,775.00$85.00
190470 - Page 54
Ref #1015 442E00100 ANTI-SEGREGATION EQUIPMENT, (7283 CY)
Awd $58,264.00$8.00
2 $58,264.00$8.00
3 $32,773.50$4.50
Section 4 - PAVEMENT (PART 1) - Totals
Awd $6,544,168.62
2 $6,487,620.72
3 $6,940,842.78
Ref #83 625E00450 CONNECTION, FUSED PULL APART, (202 EACH)
Awd $19,412.20$96.10
2 $19,573.80$96.90
3 $19,594.00$97.00
Ref #84 625E00480 CONNECTION, UNFUSED PERMANENT, (57 EACH)
Awd $5,167.05$90.65
2 $5,206.95$91.35
3 $5,187.00$91.00
Ref #85 625E10490 LIGHT POLE, CONVENTIONAL A12B38, (24 EACH)
Awd $51,918.48$2,163.27
2 $52,639.92$2,193.33
3 $52,800.00$2,200.00
Ref #86 625E10490 LIGHT POLE, CONVENTIONAL AT21B42, (77 EACH)
Awd $212,397.57$2,758.41
2 $215,553.03$2,799.39
3 $215,600.00$2,800.00
Ref #87 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN, (77 EACH)
Awd $97,944.00$1,272.00
2 $98,406.00$1,278.00
3 $100,100.00$1,300.00
Ref #88 625E14307 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP, AS PER PLA, (24 EACH)
Awd $90,954.00$3,789.75
2 $59,166.00$2,465.25
3 $105,600.00$4,400.00
Ref #89 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE, (6230 FT)
Awd $14,515.90$2.33
2 $14,640.50$2.35
3 $14,640.50$2.35
Ref #90 625E23410 NO. 12 AWG POLE AND BRACKET CABLE, (18153 FT)
Awd $31,586.22$1.74
2 $31,767.75$1.75
3 $31,767.75$1.75
Ref #91 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C, (17904 FT)
Awd $102,768.96$5.74
2 $104,022.24$5.81
3 $107,424.00$6.00
Ref #92 625E25500 CONDUIT, 3", 725.04, (200 FT)
Awd $3,672.00$18.36
2 $3,722.00$18.61
3 $3,800.00$19.00
190470 - Page 55
Ref #93 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3", (383 FT)
Awd $15,274.04$39.88
2 $15,369.79$40.13
3 $15,320.00$40.00
Ref #94 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (101 EACH)
Awd $49,797.04$493.04
2 $50,516.16$500.16
3 $50,500.00$500.00
Ref #95 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL, (12 EACH)
Awd $13,897.44$1,158.12
2 $14,117.76$1,176.48
3 $14,400.00$1,200.00
Ref #96 625E29000 TRENCH, (16558 FT)
Awd $100,175.90$6.05
2 $100,341.48$6.06
3 $99,348.00$6.00
Ref #97 625E30706 PULL BOX, 725.08, 24", (13 EACH)
Awd $10,561.20$812.40
2 $10,654.80$819.60
3 $10,660.00$820.00
Ref #98 625E31510 PULL BOX REMOVED, (7 EACH)
Awd $735.00$105.00
2 $735.00$105.00
3 $735.00$105.00
Ref #99 625E32000 GROUND ROD, (103 EACH)
Awd $15,867.15$154.05
2 $15,959.85$154.95
3 $15,965.00$155.00
Ref #100 625E34001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $12,375.00$6,187.50
2 $12,525.00$6,262.50
3 $12,500.00$6,250.00
Ref #101 625E36000 PLASTIC CAUTION TAPE, (16558 FT)
Awd $3,642.76$0.22
2 $3,642.76$0.22
3 $3,642.76$0.22
Ref #102 625E75351 LIGHT TOWER REMOVED, AS PER PLAN, (16 EACH)
Awd $26,880.00$1,680.00
2 $26,880.00$1,680.00
3 $27,200.00$1,700.00
Ref #103 625E75400 LIGHT POLE REMOVED, (36 EACH)
Awd $15,120.00$420.00
2 $15,120.00$420.00
3 $15,300.00$425.00
Ref #104 625E75506 LUMINAIRE REMOVED, (24 EACH)
Awd $1,260.00$52.50
2 $1,260.00$52.50
3 $1,260.00$52.50
190470 - Page 56
Ref #105 625E75510 POWER SERVICE REMOVED, (2 EACH)
Awd $1,260.00$630.00
2 $1,260.00$630.00
3 $1,400.00$700.00
Ref #106 625E75540 LIGHT TOWER FOUNDATION REMOVED, (16 EACH)
Awd $9,272.00$579.50
2 $9,288.00$580.50
3 $9,600.00$600.00
Ref #1011 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $50,750.00$50,750.00
2 $51,800.00$51,800.00
3 $55,000.00$55,000.00
Section 5 - LIGHTING (PART 1) - Totals
Awd $957,203.91
2 $934,168.79
3 $989,344.01
Ref #1016 809E65990 ITS DEVICE, MISC.: REMOVE AND RESET CAMERA, I-475 , (1 EACH)
Awd $19,203.50$19,203.50
2 $19,276.50$19,276.50
3 $19,500.00$19,500.00
Ref #1017 809E65990 ITS DEVICE, MISC.: REMOVE AND RESET CAMERA, I-475 , (1 EACH)
Awd $19,203.50$19,203.50
2 $19,276.50$19,276.50
3 $19,500.00$19,500.00
Section 6 - TRAFFIC SURVEILLANCE (PART 1) - Totals
Awd $38,407.00
2 $38,553.00
3 $39,000.00
Ref #108 621E00100 RPM, (1151 EACH)
Awd $27,393.80$23.80
2 $27,393.80$23.80
3 $27,393.80$23.80
Ref #109 621E54000 RAISED PAVEMENT MARKER REMOVED, (649 EACH)
Awd $3,894.00$6.00
2 $9,410.50$14.50
3 $9,086.00$14.00
Ref #110 625E32000 GROUND ROD, (2 EACH)
Awd $308.10$154.05
2 $309.90$154.95
3 $550.00$275.00
Ref #111 626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY, (75 EACH)
Awd $600.00$8.00
2 $562.50$7.50
3 $562.50$7.50
190470 - Page 57
Ref #112 626E00116 BARRIER REFLECTOR, TYPE 5, 1 WAY, (79 EACH)
Awd $632.00$8.00
2 $671.50$8.50
3 $671.50$8.50
Ref #113 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (250 FT)
Awd $3,000.00$12.00
2 $3,000.00$12.00
3 $3,000.00$12.00
Ref #114 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8, (1 EACH)
Awd $38,650.00$38,650.00
2 $38,650.00$38,650.00
3 $38,650.00$38,650.00
Ref #115 630E75000 SIGN ATTACHMENT ASSEMBLY, (18 EACH)
Awd $6,300.00$350.00
2 $6,300.00$350.00
3 $6,300.00$350.00
Ref #116 630E80100 SIGN, FLAT SHEET, (178 SF)
Awd $2,136.00$12.00
2 $2,136.00$12.00
3 $2,136.00$12.00
Ref #117 630E80224 SIGN, OVERHEAD EXTRUSHEET, (320 SF)
Awd $4,800.00$15.00
2 $4,800.00$15.00
3 $4,800.00$15.00
Ref #118 630E81100 SIGN ERECTED, FLAT SHEET, (178 SF)
Awd $890.00$5.00
2 $890.00$5.00
3 $890.00$5.00
Ref #119 630E81200 SIGN ERECTED, EXTRUSHEET, (320 SF)
Awd $1,600.00$5.00
2 $1,600.00$5.00
3 $1,600.00$5.00
Ref #120 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (2 EACH)
Awd $10,300.00$5,150.00
2 $10,300.00$5,150.00
3 $10,300.00$5,150.00
Ref #121 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (35 EACH)
Awd $350.00$10.00
2 $350.00$10.00
3 $350.00$10.00
Ref #122 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $65.00$65.00
2 $65.00$65.00
3 $65.00$65.00
Ref #123 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO, (1 EACH)
Awd $225.00$225.00
2 $225.00$225.00
3 $225.00$225.00
190470 - Page 58
Ref #124 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (19 EACH)
Awd $285.00$15.00
2 $285.00$15.00
3 $285.00$15.00
Ref #125 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $950.00$475.00
2 $950.00$475.00
3 $950.00$475.00
Ref #126 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $780.00$260.00
2 $780.00$260.00
3 $780.00$260.00
Ref #127 630E97700 SIGNING, MISC.: REMOVAL OF BARRIER MOUNTED SIGN, (2 EACH)
Awd $450.00$225.00
2 $450.00$225.00
3 $450.00$225.00
Ref #128 630E97700 SIGNING, MISC.:REMOVAL OF WOOD POST, (2 EACH)
Awd $550.00$275.00
2 $550.00$275.00
3 $550.00$275.00
Ref #129 630E97900 SIGNING, MISC.: 4" X 6" SOLID WOOD POST, (24 FT)
Awd $1,080.00$45.00
2 $1,080.00$45.00
3 $1,080.00$45.00
Ref #130 642E00094 EDGE LINE, 6", (15.51 MILE)
Awd $10,857.00$700.00
2 $12,563.10$810.00
3 $10,857.00$700.00
Ref #131 642E00194 LANE LINE, 6", (17.05 MILE)
Awd $9,377.50$550.00
2 $7,502.00$440.00
3 $9,377.50$550.00
Ref #132 642E30000 REMOVAL OF PAVEMENT MARKING, (1091 FT)
Awd $3,818.50$3.50
2 $6,327.80$5.80
3 $2,836.60$2.60
Ref #133 644E00404 CHANNELIZING LINE, 12", (1406 FT)
Awd $2,812.00$2.00
2 $2,109.00$1.50
3 $2,812.00$2.00
Ref #134 644E01350 LANE REDUCTION ARROW, (8 EACH)
Awd $2,000.00$250.00
2 $4,000.00$500.00
3 $2,000.00$250.00
Ref #135 644E01510 DOTTED LINE, 6", (5888 FT)
Awd $8,832.00$1.50
2 $8,243.20$1.40
3 $8,832.00$1.50
190470 - Page 59
Section 7 - TRAFFIC CONTROL (PART 1) - Totals
Awd $142,935.90
2 $151,504.30
3 $147,389.90
Ref #136 606E10000 SPECIAL - NOISE BARRIER, (180080 SF)
Awd $4,186,860.00$23.25
2 $5,042,240.00$28.00
3 $5,402,400.00$30.00
Section 8 - NOISE BARRIERS (PART 1) - Totals
Awd $4,186,860.00
2 $5,042,240.00
3 $5,402,400.00
Ref #137 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $175,000.00$175,000.00
2 $250,000.00$250,000.00
3 $125,000.00$125,000.00
Ref #138 202E22900 APPROACH SLAB REMOVED, (134 SY)
Awd $4,288.00$32.00
2 $5,762.00$43.00
3 $5,360.00$40.00
Ref #139 202E23500 WEARING COURSE REMOVED, (932 SY)
Awd $3,961.00$4.25
2 $3,961.00$4.25
3 $3,961.00$4.25
Ref #140 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $100,000.00$100,000.00
3 $60,000.00$60,000.00
Ref #141 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (727 CY)
Awd $7,270.00$10.00
2 $59,614.00$82.00
3 $32,715.00$45.00
Ref #142 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $50,000.00$50,000.00
3 $5,000.00$5,000.00
Ref #143 507E00100 STEEL PILES HP10X42, FURNISHED, (1720 FT)
Awd $43,000.00$25.00
2 $44,720.00$26.00
3 $60,200.00$35.00
Ref #144 507E00150 STEEL PILES HP10X42, DRIVEN, (1610 FT)
Awd $12,880.00$8.00
2 $38,640.00$24.00
3 $19,320.00$12.00
190470 - Page 60
Ref #145 507E93300 STEEL POINTS OR SHOES, (22 EACH)
Awd $2,200.00$100.00
2 $2,090.00$95.00
3 $2,750.00$125.00
Ref #146 509E10000 EPOXY COATED REINFORCING STEEL, (43508 LB)
Awd $78,314.40$1.80
2 $52,209.60$1.20
3 $67,437.40$1.55
Ref #147 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $250.00$5.00
3 $125.00$2.50
Ref #148 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (246 EACH)
Awd $4,428.00$18.00
2 $5,658.00$23.00
3 $3,936.00$16.00
Ref #149 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)
Awd $4,500.00$2,250.00
2 $4,000.00$2,000.00
3 $5,600.00$2,800.00
Ref #150 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (380 CY)
Awd $294,500.00$775.00
2 $296,400.00$780.00
3 $380,000.00$1,000.00
Ref #151 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (70 CY)
Awd $40,250.00$575.00
2 $35,000.00$500.00
3 $65,800.00$940.00
Ref #152 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (68 CY)
Awd $64,600.00$950.00
2 $54,400.00$800.00
3 $88,400.00$1,300.00
Ref #153 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (110 CY)
Awd $57,750.00$525.00
2 $66,000.00$600.00
3 $90,200.00$820.00
Ref #154 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (18 CY)
Awd $7,650.00$425.00
2 $8,100.00$450.00
3 $9,900.00$550.00
Ref #155 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS , (832 SY)
Awd $16,640.00$20.00
2 $23,895.04$28.72
3 $19,552.00$23.50
Ref #156 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN, (42 FT)
Awd $3,150.00$75.00
2 $4,714.50$112.25
3 $4,620.00$110.00
190470 - Page 61
Ref #157 512E33000 TYPE 2 WATERPROOFING, (40 SY)
Awd $1,000.00$25.00
2 $1,320.00$33.00
3 $1,400.00$35.00
Ref #158 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (109 SY)
Awd $1,635.00$15.00
2 $3,353.93$30.77
3 $2,398.00$22.00
Ref #159 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (257567 LB)
Awd $424,985.55$1.65
2 $515,134.00$2.00
3 $502,255.65$1.95
Ref #160 513E20000 WELDED STUD SHEAR CONNECTORS, (7560 EACH)
Awd $21,546.00$2.85
2 $30,240.00$4.00
3 $37,800.00$5.00
Ref #161 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (3690 SF)
Awd $40,590.00$11.00
2 $30,110.40$8.16
3 $29,520.00$8.00
Ref #162 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (3690 SF)
Awd $40,590.00$11.00
2 $24,464.70$6.63
3 $23,985.00$6.50
Ref #163 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)
Awd $127.50$7.50
2 $187.00$11.00
3 $161.50$9.50
Ref #164 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (56 SF)
Awd $420.00$7.50
2 $672.00$12.00
3 $588.00$10.50
Ref #165 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (159 FT)
Awd $3,975.00$25.00
2 $4,770.00$30.00
3 $4,611.00$29.00
Ref #166 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $23,600.00$1,475.00
2 $16,000.00$1,000.00
3 $20,960.00$1,310.00
Ref #167 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $19,600.00$1,225.00
2 $12,800.00$800.00
3 $15,840.00$990.00
Ref #168 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (82 CY)
Awd $6,560.00$80.00
2 $5,330.00$65.00
3 $7,790.00$95.00
190470 - Page 62
Ref #169 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (154 FT)
Awd $1,155.00$7.50
2 $2,156.00$14.00
3 $1,540.00$10.00
Ref #170 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (120 FT)
Awd $1,680.00$14.00
2 $1,440.00$12.00
3 $2,400.00$20.00
Ref #171 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (20 SF)
Awd $2,800.00$140.00
2 $4,081.60$204.08
3 $3,100.00$155.00
Ref #172 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (352 SY)
Awd $84,480.00$240.00
2 $81,664.00$232.00
3 $102,080.00$290.00
Ref #173 526E90010 TYPE A INSTALLATION, (127 FT)
Awd $17,145.00$135.00
2 $12,065.00$95.00
3 $30,480.00$240.00
Ref #174 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (103 CY)
Awd $8,240.00$80.00
2 $9,064.00$88.00
3 $11,845.00$115.00
Ref #175 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (97 SY)
Awd $5,626.00$58.00
2 $6,790.00$70.00
3 $7,275.00$75.00
Ref #176 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (23192 FT)
Awd $15,306.72$0.66
2 $23,192.00$1.00
3 $23,423.92$1.01
Ref #177 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (29654 FT)
Awd $26,095.52$0.88
2 $29,654.00$1.00
3 $38,846.74$1.31
Ref #178 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (63762 FT)
Awd $62,486.76$0.98
2 $100,106.34$1.57
3 $110,308.26$1.73
Section 9 - STRUCTURE OVER 20 FOOT SPAN (LUC-475-064 - Totals
Awd $1,657,125.45
2 $2,020,009.11
3 $2,028,484.47
Ref #179 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $175,000.00$175,000.00
2 $250,000.00$250,000.00
3 $125,000.00$125,000.00
190470 - Page 63
Ref #180 202E22900 APPROACH SLAB REMOVED, (134 SY)
Awd $4,288.00$32.00
2 $4,690.00$35.00
3 $5,360.00$40.00
Ref #181 202E23500 WEARING COURSE REMOVED, (932 SY)
Awd $3,961.00$4.25
2 $3,728.00$4.00
3 $3,961.00$4.25
Ref #182 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $100,000.00$100,000.00
3 $60,000.00$60,000.00
Ref #183 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (727 CY)
Awd $7,270.00$10.00
2 $58,472.61$80.43
3 $32,715.00$45.00
Ref #184 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $50,000.00$50,000.00
3 $5,000.00$5,000.00
Ref #185 507E00100 STEEL PILES HP10X42, FURNISHED, (1720 FT)
Awd $43,000.00$25.00
2 $43,000.00$25.00
3 $60,200.00$35.00
Ref #186 507E00150 STEEL PILES HP10X42, DRIVEN, (1610 FT)
Awd $12,880.00$8.00
2 $38,640.00$24.00
3 $19,320.00$12.00
Ref #187 507E93300 STEEL POINTS OR SHOES, (22 EACH)
Awd $2,200.00$100.00
2 $2,090.00$95.00
3 $2,750.00$125.00
Ref #188 509E10000 EPOXY COATED REINFORCING STEEL, (43357 LB)
Awd $78,042.60$1.80
2 $52,028.40$1.20
3 $67,203.35$1.55
Ref #189 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $200.00$4.00
3 $125.00$2.50
Ref #190 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (246 EACH)
Awd $4,428.00$18.00
2 $5,658.00$23.00
3 $3,936.00$16.00
Ref #191 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)
Awd $4,500.00$2,250.00
2 $4,000.00$2,000.00
3 $5,600.00$2,800.00
190470 - Page 64
Ref #192 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (381 CY)
Awd $295,275.00$775.00
2 $297,180.00$780.00
3 $381,000.00$1,000.00
Ref #193 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (70 CY)
Awd $40,250.00$575.00
2 $35,000.00$500.00
3 $65,800.00$940.00
Ref #194 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (67 CY)
Awd $63,650.00$950.00
2 $54,605.00$815.00
3 $87,100.00$1,300.00
Ref #195 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (110 CY)
Awd $57,750.00$525.00
2 $66,000.00$600.00
3 $90,200.00$820.00
Ref #196 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (18 CY)
Awd $7,650.00$425.00
2 $8,100.00$450.00
3 $9,900.00$550.00
Ref #197 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS , (848 SY)
Awd $16,960.00$20.00
2 $24,354.56$28.72
3 $19,928.00$23.50
Ref #198 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN, (46 FT)
Awd $3,450.00$75.00
2 $5,163.50$112.25
3 $5,060.00$110.00
Ref #199 512E33000 TYPE 2 WATERPROOFING, (40 SY)
Awd $1,000.00$25.00
2 $1,320.00$33.00
3 $1,400.00$35.00
Ref #200 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (97 SY)
Awd $1,455.00$15.00
2 $2,984.69$30.77
3 $2,134.00$22.00
Ref #201 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (257567 LB)
Awd $424,985.55$1.65
2 $515,134.00$2.00
3 $502,255.65$1.95
Ref #202 513E20000 WELDED STUD SHEAR CONNECTORS, (7560 EACH)
Awd $21,546.00$2.85
2 $24,192.00$3.20
3 $37,800.00$5.00
Ref #203 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (3690 SF)
Awd $40,590.00$11.00
2 $30,110.40$8.16
3 $29,520.00$8.00
190470 - Page 65
Ref #204 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (3690 SF)
Awd $40,590.00$11.00
2 $24,464.70$6.63
3 $23,985.00$6.50
Ref #205 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)
Awd $127.50$7.50
2 $187.00$11.00
3 $161.50$9.50
Ref #206 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (56 SF)
Awd $420.00$7.50
2 $672.00$12.00
3 $588.00$10.50
Ref #207 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (159 FT)
Awd $3,975.00$25.00
2 $5,724.00$36.00
3 $4,611.00$29.00
Ref #208 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $23,600.00$1,475.00
2 $16,000.00$1,000.00
3 $20,960.00$1,310.00
Ref #209 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $19,600.00$1,225.00
2 $12,800.00$800.00
3 $15,840.00$990.00
Ref #210 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (82 CY)
Awd $6,560.00$80.00
2 $5,330.00$65.00
3 $7,790.00$95.00
Ref #211 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (154 FT)
Awd $1,155.00$7.50
2 $2,156.00$14.00
3 $1,540.00$10.00
Ref #212 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (120 FT)
Awd $1,680.00$14.00
2 $1,680.00$14.00
3 $2,400.00$20.00
Ref #213 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (35 SF)
Awd $4,900.00$140.00
2 $7,142.80$204.08
3 $5,425.00$155.00
Ref #214 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (352 SY)
Awd $84,480.00$240.00
2 $84,480.00$240.00
3 $102,080.00$290.00
Ref #215 526E90010 TYPE A INSTALLATION, (127 FT)
Awd $17,145.00$135.00
2 $12,065.00$95.00
3 $30,480.00$240.00
190470 - Page 66
Ref #216 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (103 CY)
Awd $8,240.00$80.00
2 $9,064.00$88.00
3 $11,845.00$115.00
Ref #217 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (97 SY)
Awd $5,626.00$58.00
2 $7,081.00$73.00
3 $7,275.00$75.00
Ref #218 606E10930 SPECIAL - NOISE BARRIER, MISC.; FIBERGLASS PANEL S, (229 FT)
Awd $80,150.00$350.00
2 $98,396.72$429.68
3 $137,400.00$600.00
Ref #219 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (23192 FT)
Awd $15,306.72$0.66
2 $23,192.00$1.00
3 $23,423.92$1.01
Ref #220 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (29654 FT)
Awd $26,095.52$0.88
2 $29,654.00$1.00
3 $38,846.74$1.31
Ref #221 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (63762 FT)
Awd $62,486.76$0.98
2 $95,643.00$1.50
3 $110,308.26$1.73
Section 10 - STRUCTURE OVER 20 FOOT SPAN (LUC-475-064 - Totals
Awd $1,739,368.65
2 $2,112,383.38
3 $2,168,227.42
Ref #222 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $175,000.00$175,000.00
2 $250,000.00$250,000.00
3 $125,000.00$125,000.00
Ref #223 202E22900 APPROACH SLAB REMOVED, (134 SY)
Awd $4,288.00$32.00
2 $4,690.00$35.00
3 $5,360.00$40.00
Ref #224 202E23500 WEARING COURSE REMOVED, (932 SY)
Awd $3,961.00$4.25
2 $3,728.00$4.00
3 $3,961.00$4.25
Ref #225 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $100,000.00$100,000.00
3 $60,000.00$60,000.00
Ref #226 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (727 CY)
Awd $7,270.00$10.00
2 $59,614.00$82.00
3 $32,715.00$45.00
190470 - Page 67
Ref #227 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $50,000.00$50,000.00
3 $5,000.00$5,000.00
Ref #228 507E00100 STEEL PILES HP10X42, FURNISHED, (1610 FT)
Awd $40,250.00$25.00
2 $41,860.00$26.00
3 $56,350.00$35.00
Ref #229 507E00150 STEEL PILES HP10X42, DRIVEN, (1500 FT)
Awd $12,000.00$8.00
2 $36,000.00$24.00
3 $18,000.00$12.00
Ref #230 507E93300 STEEL POINTS OR SHOES, (22 EACH)
Awd $2,200.00$100.00
2 $2,090.00$95.00
3 $2,750.00$125.00
Ref #231 509E10000 EPOXY COATED REINFORCING STEEL, (47246 LB)
Awd $85,042.80$1.80
2 $66,144.40$1.40
3 $73,231.30$1.55
Ref #232 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $200.00$4.00
3 $125.00$2.50
Ref #233 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (246 EACH)
Awd $4,428.00$18.00
2 $5,658.00$23.00
3 $3,936.00$16.00
Ref #234 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)
Awd $4,500.00$2,250.00
2 $4,000.00$2,000.00
3 $5,600.00$2,800.00
Ref #235 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (381 CY)
Awd $295,275.00$775.00
2 $297,180.00$780.00
3 $381,000.00$1,000.00
Ref #236 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (73 CY)
Awd $67,525.00$925.00
2 $54,750.00$750.00
3 $91,250.00$1,250.00
Ref #237 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (71 CY)
Awd $65,675.00$925.00
2 $55,380.00$780.00
3 $92,300.00$1,300.00
Ref #238 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (127 CY)
Awd $66,675.00$525.00
2 $78,740.00$620.00
3 $104,140.00$820.00
190470 - Page 68
Ref #239 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (18 CY)
Awd $7,650.00$425.00
2 $8,100.00$450.00
3 $9,900.00$550.00
Ref #240 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (90 SY)
Awd $990.00$11.00
2 $1,350.00$15.00
3 $1,890.00$21.00
Ref #241 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS , (769 SY)
Awd $15,380.00$20.00
2 $22,085.68$28.72
3 $18,071.50$23.50
Ref #242 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN, (21 FT)
Awd $1,575.00$75.00
2 $2,357.04$112.24
3 $2,310.00$110.00
Ref #243 512E33000 TYPE 2 WATERPROOFING, (40 SY)
Awd $1,000.00$25.00
2 $1,320.00$33.00
3 $1,400.00$35.00
Ref #244 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (115 SY)
Awd $1,725.00$15.00
2 $3,538.55$30.77
3 $2,530.00$22.00
Ref #245 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (257567 LB)
Awd $424,985.55$1.65
2 $515,134.00$2.00
3 $502,255.65$1.95
Ref #246 513E20000 WELDED STUD SHEAR CONNECTORS, (7560 EACH)
Awd $21,546.00$2.85
2 $24,192.00$3.20
3 $37,800.00$5.00
Ref #247 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (4571 SF)
Awd $50,281.00$11.00
2 $37,299.36$8.16
3 $36,568.00$8.00
Ref #248 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (4571 SF)
Awd $50,281.00$11.00
2 $30,305.73$6.63
3 $29,711.50$6.50
Ref #249 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)
Awd $127.50$7.50
2 $187.00$11.00
3 $161.50$9.50
Ref #250 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (56 SF)
Awd $420.00$7.50
2 $672.00$12.00
3 $588.00$10.50
190470 - Page 69
Ref #251 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (159 FT)
Awd $3,975.00$25.00
2 $5,724.00$36.00
3 $4,611.00$29.00
Ref #252 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $23,600.00$1,475.00
2 $16,000.00$1,000.00
3 $20,800.00$1,300.00
Ref #253 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $19,600.00$1,225.00
2 $12,800.00$800.00
3 $15,840.00$990.00
Ref #254 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (92 CY)
Awd $7,360.00$80.00
2 $5,980.00$65.00
3 $8,740.00$95.00
Ref #255 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (154 FT)
Awd $1,155.00$7.50
2 $2,156.00$14.00
3 $1,540.00$10.00
Ref #256 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (120 FT)
Awd $1,680.00$14.00
2 $1,680.00$14.00
3 $2,400.00$20.00
Ref #257 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (25 SF)
Awd $3,500.00$140.00
2 $5,102.00$204.08
3 $3,875.00$155.00
Ref #258 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (352 SY)
Awd $84,480.00$240.00
2 $84,480.00$240.00
3 $102,080.00$290.00
Ref #259 526E90010 TYPE A INSTALLATION, (127 FT)
Awd $17,145.00$135.00
2 $12,065.00$95.00
3 $30,480.00$240.00
Ref #260 530E00600 SPECIAL - STRUCTURESMISC.: GLASS FIBER REINFORCED , (1408 SF)
Awd $38,016.00$27.00
2 $42,240.00$30.00
3 $33,792.00$24.00
Ref #261 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (103 CY)
Awd $8,240.00$80.00
2 $9,064.00$88.00
3 $11,845.00$115.00
Ref #262 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (90 SY)
Awd $5,220.00$58.00
2 $6,570.00$73.00
3 $6,750.00$75.00
190470 - Page 70
Ref #263 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (23192 FT)
Awd $15,306.72$0.66
2 $23,192.00$1.00
3 $23,423.92$1.01
Ref #264 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (29654 FT)
Awd $26,095.52$0.88
2 $29,654.00$1.00
3 $38,846.74$1.31
Ref #265 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (63762 FT)
Awd $62,486.76$0.98
2 $95,643.00$1.50
3 $110,308.26$1.73
Section 11 - STRUCTURE OVER 20 FOOT SPAN (LUC-478-075 - Totals
Awd $1,755,010.85
2 $2,108,925.76
3 $2,119,236.37
Ref #266 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $175,000.00$175,000.00
2 $250,000.00$250,000.00
3 $125,000.00$125,000.00
Ref #267 202E22900 APPROACH SLAB REMOVED, (134 SY)
Awd $4,288.00$32.00
2 $4,690.00$35.00
3 $5,360.00$40.00
Ref #268 202E23500 WEARING COURSE REMOVED, (932 SY)
Awd $3,961.00$4.25
2 $3,961.00$4.25
3 $3,961.00$4.25
Ref #269 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $100,000.00$100,000.00
3 $60,000.00$60,000.00
Ref #270 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (727 CY)
Awd $7,270.00$10.00
2 $59,614.00$82.00
3 $32,715.00$45.00
Ref #271 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $50,000.00$50,000.00
3 $5,000.00$5,000.00
Ref #272 507E00100 STEEL PILES HP10X42, FURNISHED, (1610 FT)
Awd $40,250.00$25.00
2 $41,860.00$26.00
3 $56,350.00$35.00
Ref #273 507E00150 STEEL PILES HP10X42, DRIVEN, (1500 FT)
Awd $12,000.00$8.00
2 $36,000.00$24.00
3 $18,000.00$12.00
190470 - Page 71
Ref #274 507E93300 STEEL POINTS OR SHOES, (22 EACH)
Awd $2,200.00$100.00
2 $2,090.00$95.00
3 $2,750.00$125.00
Ref #275 509E10000 EPOXY COATED REINFORCING STEEL, (47415 LB)
Awd $85,347.00$1.80
2 $66,381.00$1.40
3 $73,493.25$1.55
Ref #276 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $100.00$2.00
2 $200.00$4.00
3 $125.00$2.50
Ref #277 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (246 EACH)
Awd $4,428.00$18.00
2 $5,658.00$23.00
3 $3,936.00$16.00
Ref #278 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE, (2 EACH)
Awd $4,500.00$2,250.00
2 $4,000.00$2,000.00
3 $5,600.00$2,800.00
Ref #279 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (381 CY)
Awd $295,275.00$775.00
2 $297,180.00$780.00
3 $381,000.00$1,000.00
Ref #280 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (73 CY)
Awd $87,600.00$1,200.00
2 $54,750.00$750.00
3 $91,250.00$1,250.00
Ref #281 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (71 CY)
Awd $65,675.00$925.00
2 $55,380.00$780.00
3 $92,300.00$1,300.00
Ref #282 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (127 CY)
Awd $66,675.00$525.00
2 $78,740.00$620.00
3 $104,140.00$820.00
Ref #283 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (18 CY)
Awd $7,650.00$425.00
2 $8,280.00$460.00
3 $9,900.00$550.00
Ref #284 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (90 SY)
Awd $990.00$11.00
2 $1,350.00$15.00
3 $1,890.00$21.00
Ref #285 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS , (769 SY)
Awd $15,380.00$20.00
2 $22,085.68$28.72
3 $18,071.50$23.50
190470 - Page 72
Ref #286 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN, (27 FT)
Awd $2,025.00$75.00
2 $3,030.48$112.24
3 $2,970.00$110.00
Ref #287 512E33000 TYPE 2 WATERPROOFING, (40 SY)
Awd $1,000.00$25.00
2 $1,320.00$33.00
3 $1,400.00$35.00
Ref #288 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (115 SY)
Awd $1,725.00$15.00
2 $3,538.55$30.77
3 $2,530.00$22.00
Ref #289 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (257567 LB)
Awd $424,985.55$1.65
2 $515,134.00$2.00
3 $502,255.65$1.95
Ref #290 513E20000 WELDED STUD SHEAR CONNECTORS, (7560 EACH)
Awd $21,546.00$2.85
2 $24,192.00$3.20
3 $37,800.00$5.00
Ref #291 514E00061 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (4571 SF)
Awd $50,281.00$11.00
2 $37,299.36$8.16
3 $36,568.00$8.00
Ref #292 514E00067 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (4571 SF)
Awd $50,281.00$11.00
2 $30,305.73$6.63
3 $29,711.50$6.50
Ref #293 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (17 SF)
Awd $127.50$7.50
2 $187.00$11.00
3 $161.50$9.50
Ref #294 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (56 SF)
Awd $420.00$7.50
2 $672.00$12.00
3 $588.00$10.50
Ref #295 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (159 FT)
Awd $3,975.00$25.00
2 $5,724.00$36.00
3 $4,611.00$29.00
Ref #296 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $23,600.00$1,475.00
2 $16,000.00$1,000.00
3 $20,800.00$1,300.00
Ref #297 516E43300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (16 EACH)
Awd $19,600.00$1,225.00
2 $12,800.00$800.00
3 $15,840.00$990.00
190470 - Page 73
Ref #298 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (92 CY)
Awd $7,360.00$80.00
2 $5,980.00$65.00
3 $8,740.00$95.00
Ref #299 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (154 FT)
Awd $1,155.00$7.50
2 $2,152.92$13.98
3 $1,540.00$10.00
Ref #300 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (120 FT)
Awd $1,680.00$14.00
2 $1,680.00$14.00
3 $2,400.00$20.00
Ref #301 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (74 SF)
Awd $9,250.00$125.00
2 $15,101.92$204.08
3 $11,470.00$155.00
Ref #302 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (352 SY)
Awd $84,480.00$240.00
2 $84,480.00$240.00
3 $102,080.00$290.00
Ref #303 526E90010 TYPE A INSTALLATION, (127 FT)
Awd $17,145.00$135.00
2 $12,192.00$96.00
3 $30,480.00$240.00
Ref #304 530E00600 SPECIAL - STRUCTURESMISC.: GLASS FIBER REINFORCED , (1408 SF)
Awd $38,016.00$27.00
2 $42,240.00$30.00
3 $33,792.00$24.00
Ref #305 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (103 CY)
Awd $8,240.00$80.00
2 $9,064.00$88.00
3 $11,845.00$115.00
Ref #306 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (90 SY)
Awd $5,220.00$58.00
2 $6,570.00$73.00
3 $6,750.00$75.00
Ref #307 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (23192 FT)
Awd $15,306.72$0.66
2 $23,192.00$1.00
3 $23,423.92$1.01
Ref #308 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (29654 FT)
Awd $26,095.52$0.88
2 $29,654.00$1.00
3 $38,846.74$1.31
Ref #309 690E98100 SPECIAL - STRUCTURES - GLASS FIBER REINFORCED POLY, (63762 FT)
Awd $62,486.76$0.98
2 $89,266.80$1.40
3 $110,308.26$1.73
190470 - Page 74
Section 12 - STRUCTURE OVER 20 FOOT SPAN (LUC-478-075 - Totals
Awd $1,781,590.05
2 $2,113,996.44
3 $2,127,753.32
Ref #310 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 3 1/4", (1141 SY)
Awd $6,275.50$5.50
2 $6,275.50$5.50
3 $21,838.74$19.14
Ref #311 304E20000 AGGREGATE BASE, (1971 CY)
Awd $82,782.00$42.00
2 $128,115.00$65.00
3 $90,666.00$46.00
Ref #312 407E10000 TACK COAT, (171 GAL)
Awd $342.00$2.00
2 $342.00$2.00
3 $367.65$2.15
Ref #313 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (47 CY)
Awd $10,575.00$225.00
2 $10,575.00$225.00
3 $10,951.00$233.00
Ref #314 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (56 CY)
Awd $12,320.00$220.00
2 $12,320.00$220.00
3 $10,080.00$180.00
Ref #315 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (1000 HOUR)
Awd $55,000.00$55.00
2 $70,000.00$70.00
3 $70,000.00$70.00
Ref #316 614E11630 INCREASED BARRIER DELINEATION, (4120 FT)
Awd $4,120.00$1.00
2 $8,240.00$2.00
3 $1,236.00$0.30
Ref #317 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (8 EACH)
Awd $15,360.00$1,920.00
2 $19,200.00$2,400.00
3 $29,600.00$3,700.00
Ref #318 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (6 EACH)
Awd $1,500.00$250.00
2 $600.00$100.00
3 $3,000.00$500.00
Ref #319 614E12500 REPLACEMENT SIGN, (10 EACH)
Awd $1,500.00$150.00
2 $1,350.00$135.00
3 $3,500.00$350.00
Ref #320 614E12600 REPLACEMENT DRUM, (200 EACH)
Awd $12,000.00$60.00
2 $8,000.00$40.00
3 $14,000.00$70.00
190470 - Page 75
Ref #321 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (1557 EACH)
Awd $44,763.75$28.75
2 $36,433.80$23.40
3 $34,254.00$22.00
Ref #322 614E13310 BARRIER REFLECTOR, TYPE 1, 1 WAY, (790 EACH)
Awd $3,950.00$5.00
2 $11,850.00$15.00
3 $3,950.00$5.00
Ref #323 614E13318 BARRIER REFLECTOR, TYPE 5, 1 WAY, (287 EACH)
Awd $2,296.00$8.00
2 $4,305.00$15.00
3 $4,018.00$14.00
Ref #324 614E13350 OBJECT MARKER, ONE WAY, (1153 EACH)
Awd $11,530.00$10.00
2 $23,060.00$20.00
3 $12,683.00$11.00
Ref #325 614E18000 MAINTAINING TRAFFIC, MISC.: EMERGENCY PULL-OFF INS, (2 EACH)
Awd $40,000.00$20,000.00
2 $10,100.00$5,050.00
3 $4,200.00$2,100.00
Ref #326 614E18000 MAINTAINING TRAFFIC, MISC.:EMERGENCY PULL-OFF OUTS, (2 EACH)
Awd $6,000.00$3,000.00
2 $9,300.00$4,650.00
3 $3,900.00$1,950.00
Ref #327 614E20210 WORK ZONE LANE LINE, CLASS I, 6", 740.06, TYPE I, (4.72 MILE)
Awd $16,520.00$3,500.00
2 $16,675.76$3,533.00
3 $27,376.00$5,800.00
Ref #328 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (11.76 MILE)
Awd $76,440.00$6,500.00
2 $81,496.80$6,930.00
3 $101,136.00$8,600.00
Ref #329 614E23410 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 740.06,, (8589 FT)
Awd $25,767.00$3.00
2 $13,742.40$1.60
3 $25,767.00$3.00
Ref #330 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (660 FT)
Awd $1,320.00$2.00
2 $442.20$0.67
3 $1,650.00$2.50
Ref #331 616E10000 WATER, (389 MGAL)
Awd $25,285.00$65.00
2 $15,560.00$40.00
3 $38,900.00$100.00
Ref #332 622E41000 PORTABLE BARRIER, 32", (40890 FT)
Awd $408,900.00$10.00
2 $408,900.00$10.00
3 $357,787.50$8.75
190470 - Page 76
Ref #333 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (1550 FT)
Awd $32,612.00$21.04
2 $31,000.00$20.00
3 $40,300.00$26.00
Ref #334 630E80300 SIGN, TEMPORARY OVERLAY, (139 SF)
Awd $3,058.00$22.00
2 $3,475.00$25.00
3 $3,058.00$22.00
Ref #335 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (126 SNMT)
Awd $63,000.00$500.00
2 $107,100.00$850.00
3 $53,550.00$425.00
Ref #1003 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT, (4.34 MILE)
Awd $2,821.00$650.00
2 $2,821.00$650.00
3 $2,821.00$650.00
Ref #1004 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT, (10.02 MILE)
Awd $8,517.00$850.00
2 $7,515.00$750.00
3 $8,517.00$850.00
Ref #1005 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI, (6270 FT)
Awd $3,135.00$0.50
2 $9,405.00$1.50
3 $3,135.00$0.50
Ref #1006 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (660 FT)
Awd $660.00$1.00
2 $660.00$1.00
3 $660.00$1.00
Section 13 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $978,349.25
2 $1,058,859.46
3 $982,901.89
Ref #336 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $400,000.00$400,000.00
2 $250,000.00$250,000.00
3 $225,000.00$225,000.00
Ref #337 202E20010 HEADWALL REMOVED, (3 EACH)
Awd $675.00$225.00
2 $3,900.00$1,300.00
3 $4,500.00$1,500.00
Ref #338 202E23000 PAVEMENT REMOVED, (1625 SY)
Awd $13,812.50$8.50
2 $19,500.00$12.00
3 $17,875.00$11.00
Ref #339 202E23010 PAVEMENT REMOVED, ASPHALT, (25912 SY)
Awd $94,578.80$3.65
2 $116,604.00$4.50
3 $215,846.96$8.33
190470 - Page 77
Ref #340 202E30000 WALK REMOVED, (8342 SF)
Awd $5,839.40$0.70
2 $12,513.00$1.50
3 $8,342.00$1.00
Ref #341 202E32000 CURB REMOVED, (1421 FT)
Awd $3,197.25$2.25
2 $2,842.00$2.00
3 $1,421.00$1.00
Ref #342 202E35100 PIPE REMOVED, 24" AND UNDER, (14410 FT)
Awd $374,660.00$26.00
2 $216,150.00$15.00
3 $691,680.00$48.00
Ref #343 202E35200 PIPE REMOVED, OVER 24", (596 FT)
Awd $26,820.00$45.00
2 $14,304.00$24.00
3 $45,296.00$76.00
Ref #344 202E53100 MAILBOX REMOVED, (45 EACH)
Awd $2,344.05$52.09
2 $2,025.00$45.00
3 $6,750.00$150.00
Ref #345 202E58000 MANHOLE REMOVED, (26 EACH)
Awd $16,900.00$650.00
2 $18,200.00$700.00
3 $20,800.00$800.00
Ref #346 202E58100 CATCH BASIN REMOVED, (30 EACH)
Awd $10,500.00$350.00
2 $6,000.00$200.00
3 $21,000.00$700.00
Ref #347 202E58700 MANHOLE ABANDONED, (1 EACH)
Awd $115.00$115.00
2 $800.00$800.00
3 $1,000.00$1,000.00
Ref #348 202E75000 FENCE REMOVED, (8203 FT)
Awd $19,687.20$2.40
2 $19,687.20$2.40
3 $19,687.20$2.40
Ref #349 202E75610 VALVE BOX REMOVED, (16 EACH)
Awd $3,200.00$200.00
2 $1,920.00$120.00
3 $2,800.00$175.00
Ref #350 203E10000 EXCAVATION, (87691 CY)
Awd $482,300.50$5.50
2 $1,315,365.00$15.00
3 $1,315,365.00$15.00
Ref #351 203E20000 EMBANKMENT, (85936 CY)
Awd $472,648.00$5.50
2 $429,680.00$5.00
3 $601,552.00$7.00
190470 - Page 78
Ref #352 203E35120 GRANULAR MATERIAL, TYPE C, (36 CY)
Awd $2,160.00$60.00
2 $1,080.00$30.00
3 $3,240.00$90.00
Ref #353 203E65000 SPECIAL - SETTLEMENT PLATFORM, (8 EACH)
Awd $20,000.00$2,500.00
2 $8,000.00$1,000.00
3 $6,000.00$750.00
Ref #354 204E10000 SUBGRADE COMPACTION, (4530 SY)
Awd $2,718.00$0.60
2 $9,060.00$2.00
3 $9,060.00$2.00
Ref #355 204E13000 EXCAVATION OF SUBGRADE, (4556 CY)
Awd $43,282.00$9.50
2 $45,560.00$10.00
3 $109,344.00$24.00
Ref #356 204E30020 GRANULAR MATERIAL, TYPE C, (4556 CY)
Awd $118,456.00$26.00
2 $136,680.00$30.00
3 $173,128.00$38.00
Ref #357 204E45000 PROOF ROLLING, (41 HOUR)
Awd $6,355.00$155.00
2 $8,200.00$200.00
3 $8,200.00$200.00
Ref #358 204E50000 GEOTEXTILE FABRIC, (4530 SY)
Awd $4,530.00$1.00
2 $5,662.50$1.25
3 $5,662.50$1.25
Ref #359 205E20000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS, (LUMP SUM)
Awd $19,000.00$19,000.00
2 $35,000.00$35,000.00
3 $29,234.00$29,234.00
Ref #360 206E10500 CEMENT, (2588 TON)
Awd $349,380.00$135.00
2 $367,496.00$142.00
3 $367,496.00$142.00
Ref #361 206E11000 CURING COAT, (85729 SY)
Awd $64,296.75$0.75
2 $64,296.75$0.75
3 $85,729.00$1.00
Ref #362 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP, (85729 SY)
Awd $198,033.99$2.31
2 $254,615.13$2.97
3 $342,916.00$4.00
Ref #363 606E15050 GUARDRAIL, TYPE MGS, (563 FT)
Awd $9,908.80$17.60
2 $9,908.80$17.60
3 $9,908.80$17.60
190470 - Page 79
Ref #364 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP 350/MASH 2016, (6 EACH)
Awd $14,160.00$2,360.00
2 $14,160.00$2,360.00
3 $14,160.00$2,360.00
Ref #365 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (4 EACH)
Awd $3,900.00$975.00
2 $3,900.00$975.00
3 $3,900.00$975.00
Ref #366 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH)
Awd $4,550.00$2,275.00
2 $4,550.00$2,275.00
3 $4,550.00$2,275.00
Ref #367 607E15000 FENCE, TYPE 47, (8340 FT)
Awd $80,064.00$9.60
2 $80,064.00$9.60
3 $80,064.00$9.60
Ref #368 607E98000 FENCE, MISC.:ORNAMENTAL STEEL FENCE, (643 FT)
Awd $72,980.50$113.50
2 $72,980.50$113.50
3 $72,980.50$113.50
Ref #369 607E98100 FENCE, MISC.:ORNAMENTAL - 8' WIDE STEEL GATE, (2 EACH)
Awd $8,920.00$4,460.00
2 $8,920.00$4,460.00
3 $8,920.00$4,460.00
Ref #370 608E10000 4" CONCRETE WALK, (46705 SF)
Awd $242,866.00$5.20
2 $256,877.50$5.50
3 $326,935.00$7.00
Ref #371 608E10001 4" CONCRETE WALK, AS PER PLAN, DECORATIVE STAMPED, (26558 SF)
Awd $175,282.80$6.60
2 $192,545.50$7.25
3 $239,022.00$9.00
Ref #372 608E15000 8" CONCRETE WALK, (4471 SF)
Awd $31,297.00$7.00
2 $31,297.00$7.00
3 $53,652.00$12.00
Ref #373 608E52000 CURB RAMP, (2888 SF)
Awd $35,233.60$12.20
2 $38,988.00$13.50
3 $46,208.00$16.00
Ref #374 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (765 FT)
Awd $63,495.00$83.00
2 $61,200.00$80.00
3 $107,100.00$140.00
Ref #375 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA, (488 FT)
Awd $29,280.00$60.00
2 $29,280.00$60.00
3 $40,992.00$84.00
190470 - Page 80
Ref #376 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (9 EACH)
Awd $27,045.00$3,005.00
2 $25,200.00$2,800.00
3 $20,700.00$2,300.00
Ref #377 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN, (4 EACH)
Awd $12,420.00$3,105.00
2 $11,200.00$2,800.00
3 $12,800.00$3,200.00
Ref #378 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (2 EACH)
Awd $6,410.00$3,205.00
2 $5,600.00$2,800.00
3 $6,000.00$3,000.00
Ref #379 623E12000 PRIMARY PROJECT CONTROL MONUMENT, TYPE A, (3 EACH)
Awd $1,962.00$654.00
2 $3,300.00$1,100.00
3 $1,950.00$650.00
Ref #380 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (1 EACH)
Awd $505.00$505.00
2 $800.00$800.00
3 $400.00$400.00
Ref #381 651E10000 TOPSOIL STOCKPILED, (9000 CY)
Awd $1,800.00$0.20
2 $90,000.00$10.00
3 $18,000.00$2.00
Ref #382 652E10000 PLACING STOCKPILED TOPSOIL, (9000 CY)
Awd $45,000.00$5.00
2 $135,000.00$15.00
3 $108,000.00$12.00
Ref #383 654E11000 COMMERCIAL FERTILIZER, (12.89 TON)
Awd $7,218.40$560.00
2 $7,218.40$560.00
3 $9,667.50$750.00
Ref #384 690E12020 SPECIAL - GEOGRID GRASS PAVER POROUS PAVING SYSTEM, (68 SY)
Awd $6,800.00$100.00
2 $8,160.00$120.00
3 $10,200.00$150.00
Ref #385 690E50600 SPECIAL - BOLLARD DECORATIVE LIGHTED, (55 EACH)
Awd $275,330.00$5,006.00
2 $280,170.00$5,094.00
3 $297,000.00$5,400.00
Ref #386 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (2 TON)
Awd $1,020.00$510.00
2 $700.00$350.00
3 $350.00$175.00
Ref #387 690E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER, (500 GAL)
Awd $2,000.00$4.00
2 $3,500.00$7.00
3 $5,000.00$10.00
190470 - Page 81
Ref #388 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (500 GAL)
Awd $2,500.00$5.00
2 $7,500.00$15.00
3 $6,500.00$13.00
Ref #389 690E98100 SPECIAL - BIKE RAILING, (280 FT)
Awd $52,780.00$188.50
2 $53,200.00$190.00
3 $52,780.00$188.50
Ref #390 690E98200 SPECIAL - CONCRETE BRICK PAVER, (10155 SF)
Awd $180,759.00$17.80
2 $37,573.50$3.70
3 $203,100.00$20.00
Ref #391 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (4530 SY)
Awd $9,060.00$2.00
2 $11,325.00$2.50
3 $9,060.00$2.00
Ref #392 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $70,000.00$70,000.00
2 $300,000.00$300,000.00
3 $130,000.00$130,000.00
Section 14 - ROADWAY (PART 2) - Totals
Awd $4,230,036.54
2 $5,150,258.78
3 $6,238,824.46
Ref #393 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (131 SY)
Awd $15,720.00$120.00
2 $13,100.00$100.00
3 $13,755.00$105.00
Ref #394 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL, (183.28 CY)
Awd $46,186.56$252.00
2 $27,492.00$150.00
3 $29,324.80$160.00
Ref #395 659E00100 SOIL ANALYSIS TEST, (8 EACH)
Awd $80.00$10.00
2 $80.00$10.00
3 $80.00$10.00
Ref #396 659E00300 TOPSOIL, (10606 CY)
Awd $212,120.00$20.00
2 $159,090.00$15.00
3 $100,757.00$9.50
Ref #397 659E00530 SEEDING AND MULCHING, CLASS 3B, (965 SY)
Awd $463.20$0.48
2 $463.20$0.48
3 $463.20$0.48
Ref #398 659E00560 SEEDING AND MULCHING, CLASS 4B, (17707 SY)
Awd $8,499.36$0.48
2 $8,499.36$0.48
3 $8,499.36$0.48
190470 - Page 82
Ref #399 659E10000 SEEDING AND MULCHING, (95546 SY)
Awd $45,862.08$0.48
2 $45,862.08$0.48
3 $45,862.08$0.48
Ref #400 659E14000 REPAIR SEEDING AND MULCHING, (4777 SY)
Awd $2,292.96$0.48
2 $2,292.96$0.48
3 $2,292.96$0.48
Ref #401 659E15000 INTER-SEEDING, (4777 SY)
Awd $477.70$0.10
2 $477.70$0.10
3 $477.70$0.10
Ref #402 659E20000 COMMERCIAL FERTILIZER, (13.24 TON)
Awd $7,414.40$560.00
2 $7,414.40$560.00
3 $7,414.40$560.00
Ref #403 659E31000 LIME, (19.74 ACRE)
Awd $0.20$0.01
2 $0.20$0.01
3 $0.20$0.01
Ref #404 659E35000 WATER, (516 MGAL)
Awd $516.00$1.00
2 $516.00$1.00
3 $516.00$1.00
Ref #405 659E40000 MOWING, (215 MSF)
Awd $451.50$2.10
2 $451.50$2.10
3 $451.50$2.10
Ref #406 670E00700 DITCH EROSION PROTECTION, (12 SY)
Awd $18.00$1.50
2 $18.00$1.50
3 $18.00$1.50
Ref #407 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $2,600.00$2,600.00
2 $5,000.00$5,000.00
3 $2,000.00$2,000.00
Ref #408 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $68,000.00$68,000.00
2 $3,500.00$3,500.00
3 $12,001.20$12,001.20
Ref #409 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $5,300.00$5,300.00
2 $5,500.00$5,500.00
3 $7,500.00$7,500.00
Ref #410 832E30000 EROSION CONTROL, (275000 EACH)
Awd $275,000.00$1.00
2 $275,000.00$1.00
3 $275,000.00$1.00
190470 - Page 83
Section 15 - EROSION CONTROL (PART 2) - Totals
Awd $691,001.96
2 $554,757.40
3 $506,413.40
Ref #411 602E20000 CONCRETE MASONRY, (40.4 CY)
Awd $50,500.00$1,250.00
2 $60,600.00$1,500.00
3 $80,800.00$2,000.00
Ref #412 602E98300 MASONRY, MISC.: AS PER PLAN; PIER TYPE A, (2 EACH)
Awd $173,200.00$86,600.00
2 $230,000.00$115,000.00
3 $170,000.00$85,000.00
Ref #413 602E98300 MASONRY, MISC.: AS PER PLAN; PIER TYPE B, (1 EACH)
Awd $58,600.00$58,600.00
2 $85,000.00$85,000.00
3 $85,000.00$85,000.00
Ref #414 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, (19859 FT)
Awd $228,378.50$11.50
2 $158,872.00$8.00
3 $178,731.00$9.00
Ref #415 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (500 FT)
Awd $6,000.00$12.00
2 $6,000.00$12.00
3 $9,500.00$19.00
Ref #416 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F, (726 FT)
Awd $15,972.00$22.00
2 $8,712.00$12.00
3 $9,075.00$12.50
Ref #417 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F, (280 FT)
Awd $4,200.00$15.00
2 $3,360.00$12.00
3 $3,920.00$14.00
Ref #418 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, 7, (23861 FT)
Awd $226,679.50$9.50
2 $167,027.00$7.00
3 $214,749.00$9.00
Ref #419 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (3156 FT)
Awd $72,588.00$23.00
2 $50,496.00$16.00
3 $72,588.00$23.00
Ref #420 611E00900 6" CONDUIT, TYPE B, (17 FT)
Awd $935.00$55.00
2 $680.00$40.00
3 $2,380.00$140.00
Ref #421 611E01500 6" CONDUIT, TYPE F, (100 FT)
Awd $2,200.00$22.00
2 $1,500.00$15.00
3 $2,300.00$23.00
190470 - Page 84
Ref #422 611E01800 8" CONDUIT, TYPE B, (110 FT)
Awd $11,880.00$108.00
2 $2,200.00$20.00
3 $19,250.00$175.00
Ref #423 611E01800 8" CONDUIT, TYPE B, FOR DRAINAGE CONNECTION, (50 FT)
Awd $1,350.00$27.00
2 $750.00$15.00
3 $1,050.00$21.00
Ref #424 611E01800 8" CONDUIT, TYPE B, FOR SANITARY CONNECTION, (50 FT)
Awd $2,400.00$48.00
2 $1,000.00$20.00
3 $1,100.00$22.00
Ref #425 611E02000 8" CONDUIT, TYPE C, (24 FT)
Awd $816.00$34.00
2 $360.00$15.00
3 $1,152.00$48.00
Ref #426 611E02000 8" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION, (50 FT)
Awd $950.00$19.00
2 $750.00$15.00
3 $950.00$19.00
Ref #427 611E02000 8" CONDUIT, TYPE C, FOR SANITARY CONNECTION, (50 FT)
Awd $2,000.00$40.00
2 $1,000.00$20.00
3 $1,000.00$20.00
Ref #428 611E02500 8" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION, (50 FT)
Awd $875.00$17.50
2 $750.00$15.00
3 $950.00$19.00
Ref #429 611E02600 8" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION, (50 FT)
Awd $1,100.00$22.00
2 $750.00$15.00
3 $950.00$19.00
Ref #430 611E04400 12" CONDUIT, TYPE B, (4323 FT)
Awd $324,225.00$75.00
2 $194,535.00$45.00
3 $371,778.00$86.00
Ref #431 611E04600 12" CONDUIT, TYPE C, (101 FT)
Awd $10,605.00$105.00
2 $5,555.00$55.00
3 $15,150.00$150.00
Ref #432 611E05900 15" CONDUIT, TYPE B, (1530 FT)
Awd $122,400.00$80.00
2 $76,500.00$50.00
3 $214,200.00$140.00
Ref #433 611E06100 15" CONDUIT, TYPE C, (503 FT)
Awd $36,719.00$73.00
2 $22,635.00$45.00
3 $40,240.00$80.00
190470 - Page 85
Ref #434 611E07400 18" CONDUIT, TYPE B, (429 FT)
Awd $38,181.00$89.00
2 $25,740.00$60.00
3 $55,770.00$130.00
Ref #435 611E07600 18" CONDUIT, TYPE C, (35 FT)
Awd $3,430.00$98.00
2 $1,750.00$50.00
3 $2,800.00$80.00
Ref #436 611E08900 21" CONDUIT, TYPE B, (221 FT)
Awd $30,277.00$137.00
2 $18,785.00$85.00
3 $30,940.00$140.00
Ref #437 611E09100 21" CONDUIT, TYPE C, (356 FT)
Awd $45,568.00$128.00
2 $26,700.00$75.00
3 $44,500.00$125.00
Ref #438 611E10400 24" CONDUIT, TYPE B, (553 FT)
Awd $57,512.00$104.00
2 $44,240.00$80.00
3 $85,715.00$155.00
Ref #439 611E10600 24" CONDUIT, TYPE C, (617 FT)
Awd $43,190.00$70.00
2 $43,190.00$70.00
3 $61,700.00$100.00
Ref #440 611E11900 27" CONDUIT, TYPE B, (221 FT)
Awd $28,951.00$131.00
2 $23,205.00$105.00
3 $44,200.00$200.00
Ref #441 611E13400 30" CONDUIT, TYPE B, (130 FT)
Awd $19,630.00$151.00
2 $11,050.00$85.00
3 $27,950.00$215.00
Ref #442 611E13600 30" CONDUIT, TYPE C, (133 FT)
Awd $10,374.00$78.00
2 $9,975.00$75.00
3 $15,960.00$120.00
Ref #443 611E16400 36" CONDUIT, TYPE B, (2294 FT)
Awd $314,278.00$137.00
2 $275,280.00$120.00
3 $504,680.00$220.00
Ref #444 611E19200 42" CONDUIT, TYPE A, 706.02, (24 FT)
Awd $4,920.00$205.00
2 $4,440.00$185.00
3 $6,000.00$250.00
Ref #445 611E19400 42" CONDUIT, TYPE B, (1387 FT)
Awd $195,567.00$141.00
2 $180,310.00$130.00
3 $332,880.00$240.00
190470 - Page 86
Ref #446 611E20900 48" CONDUIT, TYPE B, (552 FT)
Awd $77,280.00$140.00
2 $88,320.00$160.00
3 $146,280.00$265.00
Ref #447 611E53300 53" X 83" CONDUIT, TYPE A, 706.04, (74 FT)
Awd $63,270.00$855.00
2 $37,000.00$500.00
3 $51,800.00$700.00
Ref #448 611E96600 CONDUIT, BORED OR JACKED, 21" TYPE B, (66 FT)
Awd $26,400.00$400.00
2 $18,150.00$275.00
3 $23,100.00$350.00
Ref #449 611E98150 CATCH BASIN, NO. 3, (24 EACH)
Awd $74,400.00$3,100.00
2 $81,600.00$3,400.00
3 $103,200.00$4,300.00
Ref #450 611E98180 CATCH BASIN, NO. 3A, (68 EACH)
Awd $159,800.00$2,350.00
2 $170,000.00$2,500.00
3 $224,400.00$3,300.00
Ref #451 611E98230 CATCH BASIN, NO. 4, (1 EACH)
Awd $3,800.00$3,800.00
2 $3,000.00$3,000.00
3 $5,200.00$5,200.00
Ref #452 611E98370 CATCH BASIN, NO. 6, (2 EACH)
Awd $5,000.00$2,500.00
2 $3,300.00$1,650.00
3 $5,400.00$2,700.00
Ref #453 611E98390 CATCH BASIN, NO. 7, (2 EACH)
Awd $3,000.00$1,500.00
2 $3,000.00$1,500.00
3 $4,000.00$2,000.00
Ref #454 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $1,750.00$1,750.00
2 $1,600.00$1,600.00
3 $3,900.00$3,900.00
Ref #455 611E98820 INLET, NO. 3D, (4 EACH)
Awd $42,400.00$10,600.00
2 $24,000.00$6,000.00
3 $35,600.00$8,900.00
Ref #456 611E98821 INLET, NO. 3D, AS PER PLAN, (2 EACH)
Awd $21,800.00$10,900.00
2 $12,000.00$6,000.00
3 $17,800.00$8,900.00
Ref #458 611E99574 MANHOLE, NO. 3, (73 EACH)
Awd $194,910.00$2,670.00
2 $292,000.00$4,000.00
3 $408,800.00$5,600.00
190470 - Page 87
Ref #459 611E99654 MANHOLE ADJUSTED TO GRADE, (22 EACH)
Awd $29,700.00$1,350.00
2 $6,600.00$300.00
3 $17,600.00$800.00
Ref #460 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (30 EACH)
Awd $4,650.00$155.00
2 $15,000.00$500.00
3 $13,500.00$450.00
Ref #461 611E99854 WATER QUALITY BASIN, DETENTION, (2 EACH)
Awd $5,000.00$2,500.00
2 $7,000.00$3,500.00
3 $15,000.00$7,500.00
Ref #462 611E99900 DRAINAGE STRUCTURE, MISC.:RUBBER CHECK VALVE FOR 2, (1 EACH)
Awd $15,000.00$15,000.00
2 $10,000.00$10,000.00
3 $15,000.00$15,000.00
Ref #463 611E99900 DRAINAGE STRUCTURE, MISC.:RUBBER CHECK VALVE FOR 3, (1 EACH)
Awd $21,000.00$21,000.00
2 $15,000.00$15,000.00
3 $20,000.00$20,000.00
Section 16 - DRAINAGE (PART 2) - Totals
Awd $2,895,611.00
2 $2,531,267.00
3 $3,820,488.00
Ref #464 302E46000 ASPHALT CONCRETE BASE, PG64-22, (10229 CY)
Awd $1,166,106.00$114.00
2 $1,166,106.00$114.00
3 $1,074,045.00$105.00
Ref #465 304E20000 AGGREGATE BASE, (15096 CY)
Awd $649,882.80$43.05
2 $679,320.00$45.00
3 $800,088.00$53.00
Ref #466 407E20000 NON-TRACKING TACK COAT, (6956 GAL)
Awd $13,912.00$2.00
2 $13,912.00$2.00
3 $14,955.40$2.15
Ref #467 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (17 CY)
Awd $9,350.00$550.00
2 $9,350.00$550.00
3 $9,265.00$545.00
Ref #468 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (17 CY)
Awd $5,525.00$325.00
2 $5,525.00$325.00
3 $8,755.00$515.00
Ref #469 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (2343 CY)
Awd $386,595.00$165.00
2 $386,595.00$165.00
3 $384,252.00$164.00
190470 - Page 88
Ref #470 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (2742 CY)
Awd $383,880.00$140.00
2 $383,880.00$140.00
3 $394,848.00$144.00
Ref #471 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (174 SY)
Awd $12,214.80$70.20
2 $6,968.70$40.05
3 $21,750.00$125.00
Ref #472 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (142 SY)
Awd $10,295.00$72.50
2 $6,773.40$47.70
3 $12,780.00$90.00
Ref #473 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS, (2010 SY)
Awd $178,287.00$88.70
2 $150,750.00$75.00
3 $201,000.00$100.00
Ref #474 452E16020 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 WI, (17093 SY)
Awd $1,379,405.10$80.70
2 $1,452,905.00$85.00
3 $1,623,835.00$95.00
Ref #475 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (10241 FT)
Awd $165,904.20$16.20
2 $184,338.00$18.00
3 $286,748.00$28.00
Ref #476 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (327 FT)
Awd $5,529.57$16.91
2 $6,213.00$19.00
3 $14,388.00$44.00
Ref #477 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, , (954 FT)
Awd $17,076.60$17.90
2 $19,080.00$20.00
3 $37,206.00$39.00
Ref #478 609E14000 CURB, TYPE 2-A, (3721 FT)
Awd $24,930.70$6.70
2 $55,815.00$15.00
3 $48,373.00$13.00
Ref #479 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN, , (1465 FT)
Awd $42,485.00$29.00
2 $39,555.00$27.00
3 $67,390.00$46.00
Ref #480 609E24510 CURB, TYPE 4-C, (1780 FT)
Awd $19,580.00$11.00
2 $30,260.00$17.00
3 $44,500.00$25.00
Ref #481 609E26000 CURB, TYPE 6, (3629 FT)
Awd $41,733.50$11.50
2 $43,548.00$12.00
3 $79,838.00$22.00
190470 - Page 89
Ref #482 609E98000 CURB, MISC.: CONCRETE LANDSCAPE CURB, (310 FT)
Awd $7,750.00$25.00
2 $7,440.00$24.00
3 $13,950.00$45.00
Ref #483 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (4658 FT)
Awd $5,356.70$1.15
2 $5,356.70$1.15
3 $5,356.70$1.15
Ref #484 875E10000 LONGITUDINAL JOINT ADHESIVE, (4015 LB)
Awd $2,409.00$0.60
2 $2,409.00$0.60
3 $4,617.25$1.15
Ref #1008 253E01000 PAVEMENT REPAIR, (450 SY)
Awd $27,900.00$62.00
2 $47,520.00$105.60
3 $60,750.00$135.00
Section 17 - PAVEMENT (PART 2) - Totals
Awd $4,556,107.97
2 $4,703,619.80
3 $5,208,690.35
Ref #485 638E04901 1" COPPER SERVICE BRANCH, AS PER PLAN, (1238 FT)
Awd $24,760.00$20.00
2 $86,660.00$70.00
3 $23,522.00$19.00
Ref #486 638E05001 1-1/2" COPPER SERVICE BRANCH, AS PER PLAN, (92 FT)
Awd $2,484.00$27.00
2 $6,440.00$70.00
3 $2,944.00$32.00
Ref #487 638E06700 16" STEEL PIPE ENCASEMENT, OPEN CUT, (177 FT)
Awd $31,860.00$180.00
2 $25,665.00$145.00
3 $29,205.00$165.00
Ref #488 638E07470 4" GATE VALVE, (1 EACH)
Awd $1,525.00$1,525.00
2 $750.00$750.00
3 $950.00$950.00
Ref #489 638E07490 8" GATE VALVE, (30 EACH)
Awd $60,000.00$2,000.00
2 $45,000.00$1,500.00
3 $55,500.00$1,850.00
Ref #490 638E10201 6" FIRE HYDRANT, AS PER PLAN, (21 EACH)
Awd $96,600.00$4,600.00
2 $103,425.00$4,925.00
3 $105,000.00$5,000.00
Ref #491 638E10480 FIRE HYDRANT REMOVED, (14 EACH)
Awd $11,410.00$815.00
2 $4,200.00$300.00
3 $9,100.00$650.00
190470 - Page 90
Ref #492 638E98000 WATER WORK, MISC.: 2" BLOWOFF VALVE, (17 EACH)
Awd $5,100.00$300.00
2 $17,000.00$1,000.00
3 $7,650.00$450.00
Ref #493 638E98000 WATER WORK, MISC.: 8"X6" REDUCER, (4 EACH)
Awd $1,200.00$300.00
2 $2,600.00$650.00
3 $1,700.00$425.00
Ref #494 638E98000 WATER WORK, MISC.: DIRECTIONAL BORE FOR WATERLINE , (14 EACH)
Awd $36,400.00$2,600.00
2 $20,300.00$1,450.00
3 $37,800.00$2,700.00
Ref #495 638E98000 WATER WORK, MISC.: WATER MANHOLE - 5' DIA, (15 EACH)
Awd $33,000.00$2,200.00
2 $37,500.00$2,500.00
3 $69,000.00$4,600.00
Ref #496 638E98600 WATER WORK, MISC.:4" WATER MAIN DUCTILE IRON PIPE , (111 FT)
Awd $17,205.00$155.00
2 $12,432.00$112.00
3 $26,640.00$240.00
Ref #497 638E98600 WATER WORK, MISC.:8" WATER MAIN DUCTILE IRON PIPE , (6931 FT)
Awd $644,583.00$93.00
2 $596,066.00$86.00
3 $831,720.00$120.00
Ref #1000 638E98000 WATER WORK, MISC.: WATER MANHOLE - 4' DIA, (15 EACH)
Awd $35,250.00$2,350.00
2 $37,500.00$2,500.00
3 $55,500.00$3,700.00
Ref #1012 638E07900 8" GATE VALVE AND VALVE BOX, (1 EACH)
Awd $2,200.00$2,200.00
2 $1,500.00$1,500.00
3 $2,050.00$2,050.00
Section 18 - WATER WORK (PART 2) - Totals
Awd $1,003,577.00
2 $997,038.00
3 $1,258,281.00
Ref #498 625E00450 CONNECTION, FUSED PULL APART, (54 EACH)
Awd $5,189.40$96.10
2 $5,232.60$96.90
3 $5,238.00$97.00
Ref #499 625E00460 CONNECTION, UNFUSED PULL APART, (54 EACH)
Awd $4,895.10$90.65
2 $4,932.90$91.35
3 $4,968.00$92.00
Ref #500 625E00480 CONNECTION, UNFUSED PERMANENT, (88 EACH)
Awd $7,977.20$90.65
2 $8,038.80$91.35
3 $8,096.00$92.00
190470 - Page 91
Ref #501 625E10490 LIGHT POLE, CONVENTIONAL, A10B40, (6 EACH)
Awd $12,803.04$2,133.84
2 $12,980.16$2,163.36
3 $12,990.00$2,165.00
Ref #502 625E10490 LIGHT POLE, CONVENTIONAL, AT21B40, (11 EACH)
Awd $29,898.88$2,718.08
2 $30,341.52$2,758.32
3 $30,250.00$2,750.00
Ref #503 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DAVIT, POWD, (15 EACH)
Awd $38,302.35$2,553.49
2 $38,860.65$2,590.71
3 $38,850.00$2,590.00
Ref #504 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DAVIT, POWD, (14 EACH)
Awd $37,061.22$2,647.23
2 $37,606.38$2,686.17
3 $37,660.00$2,690.00
Ref #505 625E10502 LIGHT POLE (INSTALLATION ONLY), (14 EACH)
Awd $8,494.50$606.75
2 $8,515.50$608.25
3 $8,540.00$610.00
Ref #506 625E13204 LIGHT TOWER, BBBB110, (3 EACH)
Awd $57,546.15$19,182.05
2 $58,370.85$19,456.95
3 $58,500.00$19,500.00
Ref #507 625E13404 LIGHT TOWER, BBBBBB110, (1 EACH)
Awd $19,283.42$19,283.42
2 $19,560.18$19,560.18
3 $19,500.00$19,500.00
Ref #508 625E13406 LIGHT TOWER, BBBBBB120, (5 EACH)
Awd $97,692.40$19,538.48
2 $99,099.60$19,819.92
3 $100,000.00$20,000.00
Ref #509 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN, (40 EACH)
Awd $36,100.00$902.50
2 $36,300.00$907.50
3 $36,400.00$910.00
Ref #510 625E14201 LIGHT POLE FOUNDATION, 24" X 10' DEEP, AS PER PLAN, (14 EACH)
Awd $14,868.00$1,062.00
2 $14,952.00$1,068.00
3 $14,980.00$1,070.00
Ref #511 625E14307 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP, AS PER PLA, (6 EACH)
Awd $22,575.00$3,762.50
2 $14,622.00$2,437.00
3 $21,000.00$3,500.00
Ref #512 625E15201 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, AS PER PLA, (4 EACH)
Awd $43,512.00$10,878.00
2 $43,848.00$10,962.00
3 $44,000.00$11,000.00
190470 - Page 92
Ref #513 625E15301 LIGHT TOWER FOUNDATION, 36" X 30' DEEP, AS PER PLA, (5 EACH)
Awd $63,535.00$12,707.00
2 $64,065.00$12,813.00
3 $65,000.00$13,000.00
Ref #514 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE, (2325 FT)
Awd $9,579.00$4.12
2 $9,695.25$4.17
3 $2,790.00$1.20
Ref #515 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (20205 FT)
Awd $50,916.60$2.52
2 $51,320.70$2.54
3 $50,512.50$2.50
Ref #516 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE, (3138 FT)
Awd $5,334.60$1.70
2 $5,334.60$1.70
3 $5,334.60$1.70
Ref #517 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (6945 FT)
Awd $13,542.75$1.95
2 $13,612.20$1.96
3 $13,890.00$2.00
Ref #518 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C, (12364 FT)
Awd $64,540.08$5.22
2 $65,405.56$5.29
3 $64,911.00$5.25
Ref #519 625E25200 CONDUIT, 1-1/4", 725.04, (314 FT)
Awd $1,833.76$5.84
2 $1,855.74$5.91
3 $1,884.00$6.00
Ref #520 625E25400 CONDUIT, 2", 725.04, (2020 FT)
Awd $14,847.00$7.35
2 $15,049.00$7.45
3 $15,150.00$7.50
Ref #521 625E25500 CONDUIT, 3", 725.04, (3061 FT)
Awd $41,445.94$13.54
2 $42,119.36$13.76
3 $42,547.90$13.90
Ref #522 625E25600 CONDUIT, 4", 725.04, (40 FT)
Awd $721.20$18.03
2 $733.20$18.33
3 $740.00$18.50
Ref #523 625E25900 CONDUIT, JACKED OR DRILLED, 3", 725.04, (170 FT)
Awd $5,550.50$32.65
2 $5,587.90$32.87
3 $5,610.00$33.00
Ref #524 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (7 EACH)
Awd $3,367.35$481.05
2 $3,415.65$487.95
3 $3,430.00$490.00
190470 - Page 93
Ref #525 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (14 EACH)
Awd $6,902.56$493.04
2 $7,002.24$500.16
3 $7,000.00$500.00
Ref #526 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (9 EACH)
Awd $4,437.36$493.04
2 $4,501.44$500.16
3 $4,500.00$500.00
Ref #527 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (5 EACH)
Awd $2,405.25$481.05
2 $2,439.75$487.95
3 $2,450.00$490.00
Ref #528 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (17 EACH)
Awd $8,381.68$493.04
2 $8,502.72$500.16
3 $8,500.00$500.00
Ref #529 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (12 EACH)
Awd $5,916.48$493.04
2 $6,001.92$500.16
3 $6,000.00$500.00
Ref #530 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL, (34 EACH)
Awd $36,114.80$1,062.20
2 $36,679.20$1,078.80
3 $36,720.00$1,080.00
Ref #531 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL, (18 EACH)
Awd $19,119.60$1,062.20
2 $19,418.40$1,078.80
3 $19,440.00$1,080.00
Ref #532 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL, (8 EACH)
Awd $5,872.88$734.11
2 $5,957.52$744.69
3 $6,000.00$750.00
Ref #533 625E27600 LUMINAIRE, MISC.: 78 WATT, 240 VOLT LED FLOODLIGHT, (4 EACH)
Awd $5,213.00$1,303.25
2 $5,247.00$1,311.75
3 $5,280.00$1,320.00
Ref #534 625E29002 TRENCH, 24" DEEP, (16809 FT)
Awd $84,045.00$5.00
2 $84,213.09$5.01
3 $84,045.00$5.00
Ref #535 625E29900 JUNCTION BOX, (20 EACH)
Awd $11,997.00$599.85
2 $12,063.00$603.15
3 $12,000.00$600.00
Ref #536 625E29930 MEDIAN JUNCTION BOX, (1 EACH)
Awd $2,963.55$2,963.55
2 $1,635.45$1,635.45
3 $1,650.00$1,650.00
190470 - Page 94
Ref #537 625E30700 PULL BOX, 725.08, 18", (23 EACH)
Awd $17,181.00$747.00
2 $17,319.00$753.00
3 $17,250.00$750.00
Ref #538 625E30706 PULL BOX, 725.08, 24", (21 EACH)
Awd $17,060.40$812.40
2 $17,211.60$819.60
3 $17,010.00$810.00
Ref #539 625E32000 GROUND ROD, (104 EACH)
Awd $18,751.20$180.30
2 $18,844.80$181.20
3 $18,720.00$180.00
Ref #540 625E34001 POWER SERVICE, AS PER PLAN, (4 EACH)
Awd $25,590.00$6,397.50
2 $25,890.00$6,472.50
3 $25,800.00$6,450.00
Ref #541 625E36000 PLASTIC CAUTION TAPE, (16809 FT)
Awd $6,219.33$0.37
2 $6,387.42$0.38
3 $6,723.60$0.40
Ref #542 625E37100 SERVICE TO UNDERPASS LIGHTING, (4 EACH)
Awd $29,630.00$7,407.50
2 $29,850.00$7,462.50
3 $30,000.00$7,500.00
Ref #543 625E38000 HIGH VOLTAGE TEST, (LUMP SUM)
Awd $2,520.00$2,520.00
2 $2,520.00$2,520.00
3 $1,550.00$1,550.00
Ref #544 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $124,840.00$124,840.00
2 $125,940.00$125,940.00
3 $126,000.00$126,000.00
Ref #545 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (2 EACH)
Awd $1,999.00$999.50
2 $2,001.00$1,000.50
3 $2,000.00$1,000.00
Ref #546 625E75351 LIGHT TOWER REMOVED, AS PER PLAN, (7 EACH)
Awd $15,081.50$2,154.50
2 $15,088.50$2,155.50
3 $15,050.00$2,150.00
Ref #547 625E75410 LIGHT POLE REMOVED FOR REUSE, (14 EACH)
Awd $4,410.00$315.00
2 $4,410.00$315.00
3 $4,410.00$315.00
Ref #548 625E75500 LIGHT POLE FOUNDATION REMOVED, (14 EACH)
Awd $5,880.00$420.00
2 $5,880.00$420.00
3 $5,880.00$420.00
190470 - Page 95
Ref #549 625E75506 LUMINAIRE REMOVED, (18 EACH)
Awd $1,890.00$105.00
2 $1,890.00$105.00
3 $1,890.00$105.00
Ref #550 625E75510 POWER SERVICE REMOVED, (1 EACH)
Awd $262.50$262.50
2 $262.50$262.50
3 $265.00$265.00
Ref #551 625E75540 LIGHT TOWER FOUNDATION REMOVED, (7 EACH)
Awd $2,940.00$420.00
2 $2,940.00$420.00
3 $2,940.00$420.00
Ref #552 625E98000 LIGHTING, MISC.: 125V POST MOUNTED RECEPTACLE, (4 EACH)
Awd $2,241.00$560.25
2 $2,259.00$564.75
3 $2,260.00$565.00
Section 19 - LIGHTING (PART 2) - Totals
Awd $1,181,277.53
2 $1,183,810.85
3 $1,184,105.60
Ref #553 620E70000 DELINEATOR, MISC.:HIGH INTENSITY RETROREFLECTIVE B, (4 EACH)
Awd $2,000.00$500.00
2 $2,700.00$675.00
3 $2,100.00$525.00
Ref #554 621E00100 RPM, (742 EACH)
Awd $19,329.10$26.05
2 $19,329.10$26.05
3 $19,329.10$26.05
Ref #555 621E54000 RAISED PAVEMENT MARKER REMOVED, (33 EACH)
Awd $528.00$16.00
2 $495.00$15.00
3 $462.00$14.00
Ref #556 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (378 FT)
Awd $3,780.00$10.00
2 $3,780.00$10.00
3 $3,780.00$10.00
Ref #557 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (1157 FT)
Awd $31,239.00$27.00
2 $13,884.00$12.00
3 $13,884.00$12.00
Ref #558 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (198 FT)
Awd $5,346.00$27.00
2 $5,346.00$27.00
3 $5,346.00$27.00
Ref #559 630E08004 ONE WAY SUPPORT, NO. 3 POST, (120 FT)
Awd $1,440.00$12.00
2 $1,440.00$12.00
3 $1,440.00$12.00
190470 - Page 96
Ref #560 630E08302 GROUND MOUNTED WOODEN BOX BEAM SUPPORT, TYPE M BEA, (32 FT)
Awd $3,040.00$95.00
2 $3,040.00$95.00
3 $3,040.00$95.00
Ref #561 630E08601 SIGN POST REFLECTOR, AS PER PLAN, (194 EACH)
Awd $7,760.00$40.00
2 $7,760.00$40.00
3 $7,760.00$40.00
Ref #562 630E10802 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 8, (3 EACH)
Awd $25,950.00$8,650.00
2 $25,950.00$8,650.00
3 $25,950.00$8,650.00
Ref #563 630E11202 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 12, (2 EACH)
Awd $23,100.00$11,550.00
2 $23,100.00$11,550.00
3 $23,100.00$11,550.00
Ref #564 630E11206 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 13, (2 EACH)
Awd $25,600.00$12,800.00
2 $25,600.00$12,800.00
3 $25,600.00$12,800.00
Ref #565 630E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4, (2 EACH)
Awd $22,280.00$11,140.00
2 $22,280.00$11,140.00
3 $22,280.00$11,140.00
Ref #566 630E20600 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 6, (2 EACH)
Awd $27,700.00$13,850.00
2 $27,700.00$13,850.00
3 $27,700.00$13,850.00
Ref #567 630E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8, (2 EACH)
Awd $33,500.00$16,750.00
2 $33,500.00$16,750.00
3 $33,500.00$16,750.00
Ref #568 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10, (1 EACH)
Awd $23,400.00$23,400.00
2 $23,400.00$23,400.00
3 $23,400.00$23,400.00
Ref #569 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8, (1 EACH)
Awd $34,350.00$34,350.00
2 $34,350.00$34,350.00
3 $34,350.00$34,350.00
Ref #570 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (10 EACH)
Awd $1,750.00$175.00
2 $1,750.00$175.00
3 $1,750.00$175.00
Ref #571 630E80100 SIGN, FLAT SHEET, (1644 SF)
Awd $24,660.00$15.00
2 $24,660.00$15.00
3 $24,660.00$15.00
190470 - Page 97
Ref #572 630E80100 SIGN, FLAT SHEET, AS PER PLAN, (48 SF)
Awd $768.00$16.00
2 $768.00$16.00
3 $768.00$16.00
Ref #573 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (254 SF)
Awd $4,826.00$19.00
2 $4,826.00$19.00
3 $4,826.00$19.00
Ref #574 630E80224 SIGN, OVERHEAD EXTRUSHEET, (1140 SF)
Awd $22,344.00$19.60
2 $22,344.00$19.60
3 $22,344.00$19.60
Ref #575 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (8 EACH)
Awd $6,800.00$850.00
2 $6,800.00$850.00
3 $6,800.00$850.00
Ref #576 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (18 EACH)
Awd $85,500.00$4,750.00
2 $85,500.00$4,750.00
3 $85,500.00$4,750.00
Ref #577 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (12 EACH)
Awd $120.00$10.00
2 $120.00$10.00
3 $120.00$10.00
Ref #578 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER, (36 EACH)
Awd $720.00$20.00
2 $720.00$20.00
3 $720.00$20.00
Ref #579 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER, (7 EACH)
Awd $140.00$20.00
2 $140.00$20.00
3 $140.00$20.00
Ref #580 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (36 EACH)
Awd $540.00$15.00
2 $540.00$15.00
3 $540.00$15.00
Ref #581 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (3 EACH)
Awd $660.00$220.00
2 $660.00$220.00
3 $660.00$220.00
Ref #582 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $1,180.00$295.00
2 $1,180.00$295.00
3 $1,180.00$295.00
Ref #583 630E87510 REMOVAL OF POLE MOUNTED SIGN AND STORAGE, CITY OF , (12 EACH)
Awd $420.00$35.00
2 $420.00$35.00
3 $420.00$35.00
190470 - Page 98
Ref #584 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, (1 EACH)
Awd $2,160.00$2,160.00
2 $2,160.00$2,160.00
3 $2,160.00$2,160.00
Ref #585 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL, (26 EACH)
Awd $130,958.10$5,036.85
2 $132,759.90$5,106.15
3 $154,570.00$5,945.00
Ref #586 646E10000 EDGE LINE, 4", (3.02 MILE)
Awd $9,120.40$3,020.00
2 $9,120.40$3,020.00
3 $9,120.40$3,020.00
Ref #587 646E10010 EDGE LINE, 6", (2.88 MILE)
Awd $11,347.20$3,940.00
2 $11,347.20$3,940.00
3 $11,347.20$3,940.00
Ref #588 646E10100 LANE LINE, 4", (1.49 MILE)
Awd $3,486.60$2,340.00
2 $3,486.60$2,340.00
3 $3,486.60$2,340.00
Ref #589 646E10110 LANE LINE, 6", (0.03 MILE)
Awd $97.80$3,260.00
2 $97.80$3,260.00
3 $97.80$3,260.00
Ref #590 646E10200 CENTER LINE, (0.93 MILE)
Awd $4,301.25$4,625.00
2 $4,301.25$4,625.00
3 $4,301.25$4,625.00
Ref #591 646E10300 CHANNELIZING LINE, 8", (11187 FT)
Awd $16,780.50$1.50
2 $16,780.50$1.50
3 $16,780.50$1.50
Ref #592 646E10400 STOP LINE, (231 FT)
Awd $2,113.65$9.15
2 $2,113.65$9.15
3 $2,113.65$9.15
Ref #593 646E10500 CROSSWALK LINE, AS PER PLAN, CITY OF TOLEDO, (900 FT)
Awd $4,770.00$5.30
2 $4,770.00$5.30
3 $4,770.00$5.30
Ref #594 646E10500 CROSSWALK LINE, AS PER PLAN, LUCAS COUNTY, (450 FT)
Awd $3,262.50$7.25
2 $3,262.50$7.25
3 $3,262.50$7.25
Ref #595 646E10500 CROSSWALK LINE, AS PER PLAN, ODOT, (630 FT)
Awd $4,567.50$7.25
2 $4,567.50$7.25
3 $4,567.50$7.25
190470 - Page 99
Ref #596 646E10600 TRANSVERSE/DIAGONAL LINE, (931 FT)
Awd $6,749.75$7.25
2 $6,749.75$7.25
3 $6,749.75$7.25
Ref #597 646E10620 CHEVRON MARKING, (1056 FT)
Awd $7,656.00$7.25
2 $7,656.00$7.25
3 $7,656.00$7.25
Ref #598 646E10900 HANDICAP SYMBOL MARKING, (1 EACH)
Awd $250.00$250.00
2 $250.00$250.00
3 $250.00$250.00
Ref #599 646E20200 PARKING LOT STALL MARKING, (196 FT)
Awd $980.00$5.00
2 $980.00$5.00
3 $980.00$5.00
Ref #600 646E20300 LANE ARROW, (69 EACH)
Awd $10,350.00$150.00
2 $10,350.00$150.00
3 $10,350.00$150.00
Ref #601 646E20320 WRONG WAY ARROW, (2 EACH)
Awd $400.00$200.00
2 $400.00$200.00
3 $400.00$200.00
Ref #602 646E20350 LANE REDUCTION ARROW, (9 EACH)
Awd $2,250.00$250.00
2 $2,250.00$250.00
3 $2,250.00$250.00
Ref #603 646E20400 WORD ON PAVEMENT, 72", (17 EACH)
Awd $2,975.00$175.00
2 $2,975.00$175.00
3 $2,975.00$175.00
Ref #604 646E20504 DOTTED LINE, 6", (4517 FT)
Awd $6,323.80$1.40
2 $6,323.80$1.40
3 $6,323.80$1.40
Ref #605 646E20510 DOTTED LINE, 12", (436 FT)
Awd $632.20$1.45
2 $632.20$1.45
3 $610.40$1.40
Ref #606 646E20800 YIELD LINE, (200 FT)
Awd $3,000.00$15.00
2 $3,000.00$15.00
3 $3,000.00$15.00
Section 20 - TRAFFIC CONTROL (PART 2) - Totals
Awd $675,302.35
2 $660,416.15
3 $681,571.45
190470 - Page 100
Ref #607 632E64021 PEDESTAL FOUNDATION, AS PER PLAN, (26 EACH)
Awd $18,713.50$719.75
2 $18,856.50$725.25
3 $26,000.00$1,000.00
Section 21 - TRAFFIC SIGNALS (PART 2) - Totals
Awd $18,713.50
2 $18,856.50
3 $26,000.00
Ref #608 661E13000 GROUNDCOVER AND VINES, 2 YEAR, POTTEDSCHIZACHYRIUM, (140 EACH)
Awd $3,788.40$27.06
2 $3,788.40$27.06
3 $3,788.40$27.06
Ref #609 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: ACER TATA, (20 EACH)
Awd $13,360.00$668.00
2 $13,360.00$668.00
3 $13,360.00$668.00
Ref #610 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: CORNUS KO, (10 EACH)
Awd $7,938.00$793.80
2 $7,938.00$793.80
3 $7,938.00$793.80
Ref #611 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: CRATAEGUS, (14 EACH)
Awd $8,176.00$584.00
2 $8,176.00$584.00
3 $8,176.00$584.00
Ref #612 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: MAGNOLIA , (7 EACH)
Awd $3,808.00$544.00
2 $3,808.00$544.00
3 $3,808.00$544.00
Ref #613 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: MALUS ' I, (25 EACH)
Awd $14,200.00$568.00
2 $14,200.00$568.00
3 $14,200.00$568.00
Ref #614 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: ACER , (7 EACH)
Awd $5,404.00$772.00
2 $5,404.00$772.00
3 $5,404.00$772.00
Ref #615 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: NYSSA, (7 EACH)
Awd $7,028.00$1,004.00
2 $7,028.00$1,004.00
3 $7,028.00$1,004.00
Ref #616 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: QUERC, (10 EACH)
Awd $9,040.00$904.00
2 $9,040.00$904.00
3 $9,040.00$904.00
Ref #617 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: QUERC, (6 EACH)
Awd $4,762.80$793.80
2 $4,762.80$793.80
3 $4,762.80$793.80
190470 - Page 101
Ref #618 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: QUERC, (12 EACH)
Awd $10,848.00$904.00
2 $10,848.00$904.00
3 $10,848.00$904.00
Ref #619 661E40101 DECIDUOUS TREE, 2-1/2" CALIPER, AS PER PLAN: ULMUS, (4 EACH)
Awd $3,344.00$836.00
2 $3,344.00$836.00
3 $3,344.00$836.00
Ref #620 661E99900 PLANTING, MISC.: 8' HEIGHT; CERCIS CANADENSIS, EAS, (14 EACH)
Awd $8,075.20$576.80
2 $8,075.20$576.80
3 $8,075.20$576.80
Ref #621 661E99900 PLANTING, MISC.: 8' HEIGHT; CRATAEGUS PUNCTATA X ', (19 EACH)
Awd $11,172.00$588.00
2 $11,172.00$588.00
3 $11,172.00$588.00
Ref #622 661E99900 PLANTING, MISC.:10' HEIGHT: BETULA NIGRA, RIVER BI, (12 EACH)
Awd $7,200.00$600.00
2 $7,200.00$600.00
3 $7,200.00$600.00
Ref #623 661E99920 PLANTING, MISC.: PLANTING BED PREPERATION, (140 SF)
Awd $420.00$3.00
2 $420.00$3.00
3 $420.00$3.00
Section 22 - LANDSCAPING (PART 2) - Totals
Awd $118,564.40
2 $118,564.40
3 $118,564.40
Ref #624 606E10920 SPECIAL - NOISE BARRIER (REFLECTIVE), (29640 SF)
Awd $711,360.00$24.00
2 $829,920.00$28.00
3 $844,740.00$28.50
Section 23 - NOISE BARRIERS (PART 2) - Totals
Awd $711,360.00
2 $829,920.00
3 $844,740.00
Ref #625 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (3225 CY)
Awd $112,875.00$35.00
2 $145,125.00$45.00
3 $161,250.00$50.00
Ref #626 614E12500 REPLACEMENT SIGN, (20 EACH)
Awd $3,000.00$150.00
2 $2,700.00$135.00
3 $7,000.00$350.00
190470 - Page 102
Ref #627 614E12600 REPLACEMENT DRUM, (50 EACH)
Awd $3,000.00$60.00
2 $2,000.00$40.00
3 $3,500.00$70.00
Ref #628 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (100 CY)
Awd $25,150.00$251.50
2 $20,000.00$200.00
3 $19,500.00$195.00
Ref #629 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN, (132 SNMT)
Awd $92,400.00$700.00
2 $105,600.00$800.00
3 $79,200.00$600.00
Ref #630 614E22000 WORK ZONE EDGE LINE, CLASS I, 4", WHITE, (1.95 MILE)
Awd $2,925.00$1,500.00
2 $2,925.00$1,500.00
3 $2,925.00$1,500.00
Ref #631 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (1526 SY)
Awd $73,248.00$48.00
2 $79,352.00$52.00
3 $57,225.00$37.50
Ref #1001 616E10000 WATER, (800 MGAL)
Awd $40,000.00$50.00
2 $32,000.00$40.00
3 $80,000.00$100.00
Ref #1009 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $50,000.00$50,000.00
3 $12,000.00$12,000.00
Section 24 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $367,598.00
2 $439,702.00
3 $422,600.00
Ref #632 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $50,000.00$50,000.00
3 $10,000.00$10,000.00
Ref #633 202E20010 HEADWALL REMOVED, (3 EACH)
Awd $705.00$235.00
2 $900.00$300.00
3 $750.00$250.00
Ref #634 202E23010 PAVEMENT REMOVED, ASPHALT, (11919 SY)
Awd $47,676.00$4.00
2 $46,245.72$3.88
3 $79,261.35$6.65
Ref #635 202E30000 WALK REMOVED, (5804 SF)
Awd $5,804.00$1.00
2 $8,706.00$1.50
3 $5,804.00$1.00
190470 - Page 103
Ref #636 202E30800 TRAFFIC ISLAND REMOVED, (49 SY)
Awd $735.00$15.00
2 $1,225.00$25.00
3 $661.50$13.50
Ref #637 202E32500 CURB AND GUTTER REMOVED, (655 FT)
Awd $1,735.75$2.65
2 $3,275.00$5.00
3 $4,257.50$6.50
Ref #638 202E35100 PIPE REMOVED, 24" AND UNDER, (2238 FT)
Awd $51,474.00$23.00
2 $33,570.00$15.00
3 $60,426.00$27.00
Ref #639 202E35200 PIPE REMOVED, OVER 24", (479 FT)
Awd $17,244.00$36.00
2 $11,496.00$24.00
3 $50,295.00$105.00
Ref #640 202E38000 GUARDRAIL REMOVED, (66 FT)
Awd $165.00$2.50
2 $132.00$2.00
3 $165.00$2.50
Ref #641 202E53100 MAILBOX REMOVED, (13 EACH)
Awd $715.00$55.00
2 $585.00$45.00
3 $1,950.00$150.00
Ref #642 202E58000 MANHOLE REMOVED, (6 EACH)
Awd $4,500.00$750.00
2 $4,200.00$700.00
3 $4,800.00$800.00
Ref #643 202E58100 CATCH BASIN REMOVED, (16 EACH)
Awd $5,600.00$350.00
2 $3,200.00$200.00
3 $5,600.00$350.00
Ref #644 202E75000 FENCE REMOVED, (997 FT)
Awd $2,392.80$2.40
2 $2,392.80$2.40
3 $2,392.80$2.40
Ref #645 202E75250 GATE REMOVED, (1 EACH)
Awd $130.00$130.00
2 $130.00$130.00
3 $130.00$130.00
Ref #646 202E75610 VALVE BOX REMOVED, (4 EACH)
Awd $800.00$200.00
2 $480.00$120.00
3 $700.00$175.00
Ref #647 203E10000 EXCAVATION, (8928 CY)
Awd $147,312.00$16.50
2 $238,020.48$26.66
3 $205,344.00$23.00
190470 - Page 104
Ref #648 203E20000 EMBANKMENT, (1281 CY)
Awd $21,136.50$16.50
2 $5,124.00$4.00
3 $3,843.00$3.00
Ref #649 206E10500 CEMENT, (548 TON)
Awd $73,980.00$135.00
2 $77,816.00$142.00
3 $77,816.00$142.00
Ref #650 206E11000 CURING COAT, (18150 SY)
Awd $13,612.50$0.75
2 $13,612.50$0.75
3 $18,150.00$1.00
Ref #651 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP, (18150 SY)
Awd $73,507.50$4.05
2 $59,350.50$3.27
3 $72,600.00$4.00
Ref #652 607E20000 FENCE, TYPE CL, (390 FT)
Awd $11,056.50$28.35
2 $11,056.50$28.35
3 $11,056.50$28.35
Ref #653 607E50900 GATE, TYPE CL, (1 EACH)
Awd $2,780.00$2,780.00
2 $2,780.00$2,780.00
3 $2,780.00$2,780.00
Ref #654 608E10000 4" CONCRETE WALK, (5254 SF)
Awd $27,320.80$5.20
2 $28,897.00$5.50
3 $43,345.50$8.25
Ref #655 608E10001 4" CONCRETE WALK, AS PER PLAN, DECORATIVE STAMPED, (6185 SF)
Awd $38,965.50$6.30
2 $44,841.25$7.25
3 $80,405.00$13.00
Ref #656 608E13000 6" CONCRETE WALK, (300 SF)
Awd $1,800.00$6.00
2 $1,800.00$6.00
3 $2,400.00$8.00
Ref #657 608E15000 8" CONCRETE WALK, (5596 SF)
Awd $39,172.00$7.00
2 $39,172.00$7.00
3 $61,556.00$11.00
Ref #658 608E52001 CURB RAMP, AS PER PLAN, (704 SF)
Awd $9,856.00$14.00
2 $8,448.00$12.00
3 $11,264.00$16.00
Ref #659 623E12000 PRIMARY PROJECT CONTROL MONUMENT, TYPE A, (6 EACH)
Awd $3,990.00$665.00
2 $6,600.00$1,100.00
3 $3,900.00$650.00
190470 - Page 105
Ref #660 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (6 EACH)
Awd $3,060.00$510.00
2 $4,800.00$800.00
3 $2,400.00$400.00
Ref #661 690E50000 SPECIAL - MAILBOX SUPPORT, (13 EACH)
Awd $2,405.00$185.00
2 $1,495.00$115.00
3 $3,250.00$250.00
Ref #662 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO, (2 TON)
Awd $890.00$445.00
2 $700.00$350.00
3 $350.00$175.00
Ref #663 690E65022 SPECIAL - WORK INVOLVING NON-REGULATED WATER, (500 GAL)
Awd $3,750.00$7.50
2 $3,500.00$7.00
3 $5,000.00$10.00
Ref #664 690E65024 SPECIAL - WORK INVOLVING REGULATED WATER, (500 GAL)
Awd $3,750.00$7.50
2 $7,500.00$15.00
3 $6,500.00$13.00
Section 25 - ROADWAY (PART 3) - Totals
Awd $718,020.85
2 $722,050.75
3 $839,153.15
Ref #665 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA, (10 CY)
Awd $2,550.00$255.00
2 $2,000.00$200.00
3 $1,500.00$150.00
Ref #667 659E00300 TOPSOIL, (1459 CY)
Awd $68,573.00$47.00
2 $14,590.00$10.00
3 $18,237.50$12.50
Ref #668 659E00530 SEEDING AND MULCHING, CLASS 3B, (183 SY)
Awd $87.84$0.48
2 $87.84$0.48
3 $87.84$0.48
Ref #669 659E10000 SEEDING AND MULCHING, (13145 SY)
Awd $6,309.60$0.48
2 $6,309.60$0.48
3 $6,309.60$0.48
Ref #670 659E14000 REPAIR SEEDING AND MULCHING, (657 SY)
Awd $315.36$0.48
2 $315.36$0.48
3 $315.36$0.48
Ref #671 659E15000 INTER-SEEDING, (657 SY)
Awd $65.70$0.10
2 $65.70$0.10
3 $65.70$0.10
190470 - Page 106
Ref #672 659E20000 COMMERCIAL FERTILIZER, (1.77 TON)
Awd $991.20$560.00
2 $991.20$560.00
3 $991.20$560.00
Ref #673 659E31000 LIME, (2.72 ACRE)
Awd $0.03$0.01
2 $0.03$0.01
3 $0.03$0.01
Ref #674 659E35000 WATER, (71 MGAL)
Awd $71.00$1.00
2 $71.00$1.00
3 $71.00$1.00
Ref #675 659E40000 MOWING, (30 MSF)
Awd $63.00$2.10
2 $63.00$2.10
3 $63.00$2.10
Ref #676 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $1,400.00$1,400.00
2 $2,500.00$2,500.00
3 $950.00$950.00
Ref #677 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $3,500.00$3,500.00
3 $5,000.00$5,000.00
Ref #678 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $5,500.00$5,500.00
2 $5,500.00$5,500.00
3 $7,500.00$7,500.00
Ref #679 832E30000 EROSION CONTROL, (50000 EACH)
Awd $50,000.00$1.00
2 $50,000.00$1.00
3 $50,000.00$1.00
Section 26 - EROSION CONTROL (PART 3) - Totals
Awd $175,926.73
2 $85,993.73
3 $91,091.23
Ref #680 605E11100 6" SHALLOW PIPE UNDERDRAINS, (3214 FT)
Awd $24,908.50$7.75
2 $38,568.00$12.00
3 $32,140.00$10.00
Ref #681 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (941 FT)
Awd $11,292.00$12.00
2 $11,292.00$12.00
3 $6,587.00$7.00
Ref #682 605E14000 6" BASE PIPE UNDERDRAINS, (398 FT)
Awd $4,378.00$11.00
2 $3,980.00$10.00
3 $2,786.00$7.00
190470 - Page 107
Ref #683 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (230 FT)
Awd $5,750.00$25.00
2 $4,140.00$18.00
3 $5,290.00$23.00
Ref #684 611E04400 12" CONDUIT, TYPE B, (587 FT)
Awd $55,765.00$95.00
2 $26,415.00$45.00
3 $96,855.00$165.00
Ref #685 611E04600 12" CONDUIT, TYPE C, (386 FT)
Awd $27,020.00$70.00
2 $16,212.00$42.00
3 $38,600.00$100.00
Ref #686 611E05900 15" CONDUIT, TYPE B, (192 FT)
Awd $13,440.00$70.00
2 $9,024.00$47.00
3 $30,720.00$160.00
Ref #687 611E06100 15" CONDUIT, TYPE C, (148 FT)
Awd $9,768.00$66.00
2 $6,660.00$45.00
3 $11,100.00$75.00
Ref #688 611E19400 42" CONDUIT, TYPE B, (246 FT)
Awd $40,836.00$166.00
2 $31,980.00$130.00
3 $79,950.00$325.00
Ref #689 611E19600 42" CONDUIT, TYPE C, (338 FT)
Awd $40,898.00$121.00
2 $43,940.00$130.00
3 $67,600.00$200.00
Ref #690 611E98180 CATCH BASIN, NO. 3A, (13 EACH)
Awd $29,900.00$2,300.00
2 $32,500.00$2,500.00
3 $42,900.00$3,300.00
Ref #691 611E98470 CATCH BASIN, NO. 2-2B, (11 EACH)
Awd $16,500.00$1,500.00
2 $14,300.00$1,300.00
3 $20,900.00$1,900.00
Ref #692 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $2,400.00$2,400.00
2 $1,600.00$1,600.00
3 $3,700.00$3,700.00
Ref #693 611E98540 CATCH BASIN, NO. 2-4, (2 EACH)
Awd $4,600.00$2,300.00
2 $4,800.00$2,400.00
3 $8,400.00$4,200.00
Ref #694 611E99574 MANHOLE, NO. 3, (17 EACH)
Awd $42,500.00$2,500.00
2 $51,000.00$3,000.00
3 $69,700.00$4,100.00
190470 - Page 108
Ref #695 611E99654 MANHOLE ADJUSTED TO GRADE, (10 EACH)
Awd $13,500.00$1,350.00
2 $3,000.00$300.00
3 $8,000.00$800.00
Ref #1013 602E20000 CONCRETE MASONRY, (1 CY)
Awd $1,700.00$1,700.00
2 $3,000.00$3,000.00
3 $2,000.00$2,000.00
Ref #1014 611E98511 CATCH BASIN, NO. 2-3, AS PER PLAN, (1 EACH)
Awd $2,550.00$2,550.00
2 $3,000.00$3,000.00
3 $3,200.00$3,200.00
Section 27 - DRAINAGE (PART 3) - Totals
Awd $347,705.50
2 $305,411.00
3 $530,428.00
Ref #696 302E46000 ASPHALT CONCRETE BASE, PG64-22, (2563 CY)
Awd $292,182.00$114.00
2 $292,182.00$114.00
3 $269,115.00$105.00
Ref #697 304E20000 AGGREGATE BASE, (3251 CY)
Awd $157,673.50$48.50
2 $146,295.00$45.00
3 $172,303.00$53.00
Ref #698 407E20000 NON-TRACKING TACK COAT, (1751 GAL)
Awd $3,502.00$2.00
2 $3,502.00$2.00
3 $3,764.65$2.15
Ref #699 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (49 CY)
Awd $15,925.00$325.00
2 $15,925.00$325.00
3 $15,190.00$310.00
Ref #700 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (60 CY)
Awd $16,800.00$280.00
2 $16,800.00$280.00
3 $15,600.00$260.00
Ref #701 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (638 CY)
Awd $111,650.00$175.00
2 $111,650.00$175.00
3 $108,460.00$170.00
Ref #702 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (744 CY)
Awd $107,880.00$145.00
2 $107,880.00$145.00
3 $111,600.00$150.00
Ref #703 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (410 SY)
Awd $27,265.00$66.50
2 $19,557.00$47.70
3 $34,850.00$85.00
190470 - Page 109
Ref #704 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, AS, (486 SY)
Awd $43,983.00$90.50
2 $36,450.00$75.00
3 $48,600.00$100.00
Ref #705 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (1099 FT)
Awd $20,331.50$18.50
2 $19,232.50$17.50
3 $42,861.00$39.00
Ref #706 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, , (223 FT)
Awd $4,237.00$19.00
2 $4,460.00$20.00
3 $10,035.00$45.00
Ref #707 609E14000 CURB, TYPE 2-A, (63 FT)
Awd $756.00$12.00
2 $378.00$6.00
3 $1,386.00$22.00
Ref #708 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN, (324 FT)
Awd $6,642.00$20.50
2 $7,452.00$23.00
3 $16,200.00$50.00
Ref #709 609E24510 CURB, TYPE 4-C, (702 FT)
Awd $9,126.00$13.00
2 $11,934.00$17.00
3 $23,166.00$33.00
Ref #710 609E26000 CURB, TYPE 6, (1256 FT)
Awd $15,762.80$12.55
2 $15,072.00$12.00
3 $36,424.00$29.00
Ref #711 609E54000 6" CONCRETE TRAFFIC ISLAND, (21 SY)
Awd $1,575.00$75.00
2 $1,470.00$70.00
3 $1,260.00$60.00
Section 28 - PAVEMENT (PART 3) - Totals
Awd $835,290.80
2 $810,239.50
3 $910,814.65
Ref #712 638E01200 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PUS, (648 FT)
Awd $79,056.00$122.00
2 $90,720.00$140.00
3 $106,920.00$165.00
Ref #713 638E02400 12" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, PU, (590 FT)
Awd $81,420.00$138.00
2 $85,550.00$145.00
3 $132,750.00$225.00
Ref #714 638E04901 1" COPPER SERVICE BRANCH, AS PER PLAN, (261 FT)
Awd $8,613.00$33.00
2 $18,270.00$70.00
3 $7,830.00$30.00
190470 - Page 110
Ref #715 638E07490 8" GATE VALVE, (2 EACH)
Awd $3,800.00$1,900.00
2 $3,000.00$1,500.00
3 $3,700.00$1,850.00
Ref #716 638E07500 12" GATE VALVE, (1 EACH)
Awd $2,800.00$2,800.00
2 $2,450.00$2,450.00
3 $3,200.00$3,200.00
Ref #717 638E10201 6" FIRE HYDRANT, AS PER PLAN, (7 EACH)
Awd $40,600.00$5,800.00
2 $34,475.00$4,925.00
3 $42,000.00$6,000.00
Ref #718 638E10480 FIRE HYDRANT REMOVED, (5 EACH)
Awd $3,500.00$700.00
2 $1,500.00$300.00
3 $3,250.00$650.00
Ref #719 638E98000 WATER WORK, MISC.: 12"X8" REDUCER, (1 EACH)
Awd $425.00$425.00
2 $650.00$650.00
3 $1,250.00$1,250.00
Ref #720 638E98000 WATER WORK, MISC.: 2" BLOWOFF VALVE, (4 EACH)
Awd $1,000.00$250.00
2 $4,000.00$1,000.00
3 $1,800.00$450.00
Ref #721 638E98000 WATER WORK, MISC.: DIRECTIONAL BORE FOR WATERLINE , (5 EACH)
Awd $12,750.00$2,550.00
2 $8,700.00$1,740.00
3 $16,500.00$3,300.00
Ref #722 638E98000 WATER WORK, MISC.: WATER MANHOLE - 4' DIA, (3 EACH)
Awd $6,900.00$2,300.00
2 $7,500.00$2,500.00
3 $11,100.00$3,700.00
Ref #1007 638E05001 1-1/2" COPPER SERVICE BRANCH, AS PER PLAN, (43 FT)
Awd $2,365.00$55.00
2 $2,580.00$60.00
3 $2,580.00$60.00
Section 29 - WATER WORK (PART 3) - Totals
Awd $243,229.00
2 $259,395.00
3 $332,880.00
Ref #723 625E00450 CONNECTION, FUSED PULL APART, (19 EACH)
Awd $1,825.90$96.10
2 $1,841.10$96.90
3 $1,596.00$84.00
Ref #724 625E00460 CONNECTION, UNFUSED PULL APART, (19 EACH)
Awd $1,722.35$90.65
2 $1,735.65$91.35
3 $1,710.00$90.00
190470 - Page 111
Ref #725 625E00480 CONNECTION, UNFUSED PERMANENT, (10 EACH)
Awd $906.50$90.65
2 $913.50$91.35
3 $870.00$87.00
Ref #726 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, DAVIT, POWD, (11 EACH)
Awd $30,658.21$2,787.11
2 $31,093.59$2,826.69
3 $31,350.00$2,850.00
Ref #727 625E14101 LIGHT POLE FOUNDATION, 24" X 8' DEEP, AS PER PLAN, (11 EACH)
Awd $10,527.00$957.00
2 $10,593.00$963.00
3 $10,593.00$963.00
Ref #728 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE, (1287 FT)
Awd $5,302.44$4.12
2 $5,366.79$4.17
3 $5,341.05$4.15
Ref #729 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (4104 FT)
Awd $10,342.08$2.52
2 $10,424.16$2.54
3 $10,260.00$2.50
Ref #730 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE, (1116 FT)
Awd $1,897.20$1.70
2 $1,897.20$1.70
3 $1,897.20$1.70
Ref #731 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (1485 FT)
Awd $2,895.75$1.95
2 $2,910.60$1.96
3 $2,910.60$1.96
Ref #732 625E25500 CONDUIT, 3", 725.04, (1464 FT)
Awd $29,953.44$20.46
2 $30,319.44$20.71
3 $30,319.44$20.71
Ref #733 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (7 EACH)
Awd $3,367.35$481.05
2 $3,415.65$487.95
3 $3,416.00$488.00
Ref #734 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (4 EACH)
Awd $1,924.20$481.05
2 $1,951.80$487.95
3 $1,952.00$488.00
Ref #735 625E27600 LUMINAIRE, MISC.: 78 WATT, 240 VOLT LED FLOODLIGHT, (4 EACH)
Awd $4,591.00$1,147.75
2 $4,629.00$1,157.25
3 $4,632.00$1,158.00
Ref #736 625E30700 PULL BOX, 725.08, 18", (8 EACH)
Awd $5,976.00$747.00
2 $6,024.00$753.00
3 $6,000.00$750.00
190470 - Page 112
Ref #737 625E32000 GROUND ROD, (31 EACH)
Awd $4,775.55$154.05
2 $4,803.45$154.95
3 $4,805.00$155.00
Ref #738 625E36000 PLASTIC CAUTION TAPE, (1464 FT)
Awd $849.12$0.58
2 $863.76$0.59
3 $878.40$0.60
Ref #739 625E98000 LIGHTING, MISC.: 125V POST MOUNTED RECEPTACLE, (4 EACH)
Awd $1,914.00$478.50
2 $1,926.00$481.50
3 $1,600.00$400.00
Section 30 - LIGHTING (PART 3) - Totals
Awd $119,428.09
2 $120,708.69
3 $120,130.69
Ref #740 621E00100 RPM, (195 EACH)
Awd $7,410.00$38.00
2 $7,410.00$38.00
3 $7,410.00$38.00
Ref #741 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (537 FT)
Awd $6,444.00$12.00
2 $6,444.00$12.00
3 $6,444.00$12.00
Ref #742 630E08601 SIGN POST REFLECTOR, AS PER PLAN, (48 EACH)
Awd $1,920.00$40.00
2 $1,920.00$40.00
3 $1,920.00$40.00
Ref #743 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN, (32 EACH)
Awd $5,600.00$175.00
2 $5,600.00$175.00
3 $5,600.00$175.00
Ref #744 630E80100 SIGN, FLAT SHEET, (390 SF)
Awd $5,850.00$15.00
2 $5,850.00$15.00
3 $5,850.00$15.00
Ref #745 630E80101 SIGN, FLAT SHEET, AS PER PLAN, (19 SF)
Awd $304.00$16.00
2 $304.00$16.00
3 $304.00$16.00
Ref #746 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER, (22 EACH)
Awd $440.00$20.00
2 $440.00$20.00
3 $440.00$20.00
Ref #747 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (16 EACH)
Awd $240.00$15.00
2 $240.00$15.00
3 $240.00$15.00
190470 - Page 113
Ref #748 630E97700 SIGNING, MISC.: SOLAR POWERED RECTANGULAR RAPID FL, (16 EACH)
Awd $80,589.60$5,036.85
2 $81,698.40$5,106.15
3 $95,120.00$5,945.00
Ref #749 644E00100 EDGE LINE, 4", (1.31 MILE)
Awd $3,930.00$3,000.00
2 $8,809.75$6,725.00
3 $3,930.00$3,000.00
Ref #750 644E00200 LANE LINE, 4", (0.11 MILE)
Awd $220.00$2,000.00
2 $616.00$5,600.00
3 $220.00$2,000.00
Ref #751 644E00300 CENTER LINE, (0.3 MILE)
Awd $1,800.00$6,000.00
2 $2,542.50$8,475.00
3 $1,800.00$6,000.00
Ref #752 644E00400 CHANNELIZING LINE, 8", (2138 FT)
Awd $3,207.00$1.50
2 $5,772.60$2.70
3 $3,207.00$1.50
Ref #753 644E00601 CROSSWALK LINE, AS PER PLAN, (570 FT)
Awd $3,420.00$6.00
2 $6,184.50$10.85
3 $3,420.00$6.00
Ref #754 644E00720 CHEVRON MARKING, (295 FT)
Awd $1,770.00$6.00
2 $1,829.00$6.20
3 $1,770.00$6.00
Ref #755 644E01300 LANE ARROW, (12 EACH)
Awd $1,200.00$100.00
2 $1,200.00$100.00
3 $1,200.00$100.00
Ref #756 644E01350 LANE REDUCTION ARROW, (6 EACH)
Awd $1,500.00$250.00
2 $3,000.00$500.00
3 $1,500.00$250.00
Ref #757 644E01511 DOTTED LINE, 6", AS PER PLAN, (1736 FT)
Awd $3,472.00$2.00
2 $4,600.40$2.65
3 $3,472.00$2.00
Ref #758 644E20801 YIELD LINE, AS PER PLAN, (60 FT)
Awd $480.00$8.00
2 $693.00$11.55
3 $480.00$8.00
Section 31 - TRAFFIC CONTROL (PART 3) - Totals
Awd $129,796.60
2 $145,154.15
3 $144,327.00
190470 - Page 114
Ref #759 632E64021 PEDESTAL FOUNDATION, AS PER PLAN, (16 EACH)
Awd $11,516.00$719.75
2 $11,604.00$725.25
3 $16,000.00$1,000.00
Ref #760 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)
Awd $5,359.00$5,359.00
2 $5,361.00$5,361.00
3 $10,393.00$10,393.00
Section 32 - TRAFFIC SIGNALS (PART 3) - Totals
Awd $16,875.00
2 $16,965.00
3 $26,393.00
Ref #761 661E40081 DECIDUOUS TREE, 2" CALIPER, AS PER PLAN: CRAETUGUS, (5 EACH)
Awd $2,920.00$584.00
2 $2,920.00$584.00
3 $2,920.00$584.00
Section 33 - LANDSCAPING (PART 3) - Totals
Awd $2,920.00
2 $2,920.00
3 $2,920.00
Ref #763 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (662 CY)
Awd $23,170.00$35.00
2 $29,790.00$45.00
3 $39,720.00$60.00
Ref #764 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (27 CY)
Awd $8,640.00$320.00
2 $5,400.00$200.00
3 $5,265.00$195.00
Ref #765 614E22000 WORK ZONE EDGE LINE, CLASS I, 4", (1.77 MILE)
Awd $2,655.00$1,500.00
2 $2,655.00$1,500.00
3 $2,655.00$1,500.00
Ref #766 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (139 SY)
Awd $6,950.00$50.00
2 $8,611.05$61.95
3 $13,900.00$100.00
Ref #767 616E10000 WATER, (50 MGAL)
Awd $3,250.00$65.00
2 $2,000.00$40.00
3 $5,000.00$100.00
Ref #1010 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $25,000.00$25,000.00
3 $2,500.00$2,500.00
190470 - Page 115
Section 35 - MAINTENANCE OF TRAFFIC (PART 3) - Totals
Awd $54,665.00
2 $73,456.05
3 $69,040.00
Ref #768 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $300,000.00$300,000.00
3 $324,000.00$324,000.00
Ref #769 108E10000 CPM PROGRESS SCHEDULE, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $25,000.00$25,000.00
3 $10,000.00$10,000.00
Ref #770 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $665,000.00$665,000.00
2 $700,000.00$700,000.00
3 $994,300.00$994,300.00
Ref #771 619E16020 FIELD OFFICE, TYPE C, (32 MNTH)
Awd $112,000.00$3,500.00
2 $96,000.00$3,000.00
3 $144,000.00$4,500.00
Ref #772 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $255,000.00$255,000.00
2 $300,000.00$300,000.00
3 $360,000.00$360,000.00
Ref #773 624E10000 MOBILIZATION, (LUMP SUM)
Awd $1,200,000.00$1,200,000.00
2 $1,200,000.00$1,200,000.00
3 $1,200,000.00$1,200,000.00
Section 36 - INCIDENTALS (PARTS 1, 2, 3) - Totals
Awd $2,442,000.00
2 $2,621,000.00
3 $3,032,300.00
190470 - Page 116
Project No. 190496
PID 94112
ATB-SR 534-25.26
Federal
Type: TWO LANE RESURFACING
Completion Date: 6/30/2020
Award Amount: $532,501.12
Contract Awarded To: CHAGRIN VALLEY PAVING INC
Letting Date: 10/10/2019
Engineer's Estimate: $537,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 1
Bid $532,501.12
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 2
Bid $537,492.53
KOSKI CONSTRUCTION CO
P O BOX 1038
ASHTABULA, OH 44005-1038
Bidder 3
Bid $565,263.70
RONYAK PAVING INC
14376 N CHESHIRE ST
BURTON, OH 44021
Geauga
Bidder 4
Bid $670,675.35
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 5
Bid $756,088.97
190496 - Page 117
Ref #1 202E38000 GUARDRAIL REMOVED, (300 FT)
Awd $540.00$1.80
2 $540.00$1.80
3 $600.00$2.00
4 $540.00$1.80
5 $600.00$2.00
Ref #2 203E40000 BORROW, (10 CY)
Awd $875.00$87.50
2 $875.00$87.50
3 $1,000.00$100.00
4 $875.00$87.50
5 $875.00$87.50
Ref #3 209E60200 LINEAR GRADING, (94 STA)
Awd $2,350.00$25.00
2 $3,760.00$40.00
3 $4,700.00$50.00
4 $5,640.00$60.00
5 $2,350.00$25.00
Ref #4 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING, (91 STA)
Awd $2,275.00$25.00
2 $910.00$10.00
3 $910.00$10.00
4 $2,275.00$25.00
5 $6,825.00$75.00
Ref #5 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (100 FT)
Awd $3,440.00$34.40
2 $3,440.00$34.40
3 $3,500.00$35.00
4 $3,440.00$34.40
5 $3,440.00$34.40
Ref #6 606E26100 ANCHOR ASSEMBLY, TYPE E (MASH), (4 EACH)
Awd $9,980.00$2,495.00
2 $9,980.00$2,495.00
3 $10,000.00$2,500.00
4 $9,980.00$2,495.00
5 $9,980.00$2,495.00
Ref #7 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $750.00$750.00
2 $580.00$580.00
3 $1,250.00$1,250.00
4 $580.00$580.00
5 $580.00$580.00
Section 1 - ROADWAY - Totals
Awd $20,210.00
2 $20,085.00
3 $21,960.00
4 $23,330.00
5 $24,650.00
190496 - Page 118
Ref #8 659E10000 SEEDING AND MULCHING, (5355 SY)
Awd $9,906.75$1.85
2 $6,961.50$1.30
3 $5,355.00$1.00
4 $9,906.75$1.85
5 $6,961.50$1.30
Ref #9 659E20000 COMMERCIAL FERTILIZER, (0.95 TON)
Awd $225.15$237.00
2 $760.00$800.00
3 $237.50$250.00
4 $225.15$237.00
5 $760.00$800.00
Ref #10 659E31000 LIME, (1.12 ACRE)
Awd $84.00$75.00
2 $1.12$1.00
3 $112.00$100.00
4 $84.00$75.00
5 $1.12$1.00
Ref #11 659E35000 WATER, (29.1 MGAL)
Awd $29.10$1.00
2 $1.46$0.05
3 $29.10$1.00
4 $29.10$1.00
5 $29.10$1.00
Ref #12 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $11,245.00
2 $8,724.08
3 $6,733.60
4 $11,245.00
5 $8,751.72
Ref #13 611E98630 CATCH BASIN ADJUSTED TO GRADE, (2 EACH)
Awd $3,000.00$1,500.00
2 $3,400.00$1,700.00
3 $4,000.00$2,000.00
4 $3,400.00$1,700.00
5 $3,400.00$1,700.00
Ref #14 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (6 EACH)
Awd $7,500.00$1,250.00
2 $8,250.00$1,375.00
3 $8,100.00$1,350.00
4 $8,250.00$1,375.00
5 $8,250.00$1,375.00
190496 - Page 119
Section 3 - DRAINAGE - Totals
Awd $10,500.00
2 $11,650.00
3 $12,100.00
4 $11,650.00
5 $11,650.00
Ref #15 203E10000 EXCAVATION (FOR PAVEMENT REPAIR), (50 CY)
Awd $500.00$10.00
2 $807.50$16.15
3 $2,750.00$55.00
4 $1,750.00$35.00
5 $1,000.00$20.00
Ref #16 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441), (750 SY)
Awd $18,000.00$24.00
2 $24,225.00$32.30
3 $27,750.00$37.00
4 $36,000.00$48.00
5 $18,750.00$25.00
Ref #17 252E01500 FULL DEPTH PAVEMENT SAWING, (1800 FT)
Awd $450.00$0.25
2 $90.00$0.05
3 $450.00$0.25
4 $1,800.00$1.00
5 $3,600.00$2.00
Ref #18 253E01000 PAVEMENT REPAIR, (300 SY)
Awd $22,500.00$75.00
2 $29,400.00$98.00
3 $33,000.00$110.00
4 $21,600.00$72.00
5 $18,000.00$60.00
Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2"), (15206 SY)
Awd $24,329.60$1.60
2 $10,644.20$0.70
3 $25,089.90$1.65
4 $28,131.10$1.85
5 $30,412.00$2.00
Ref #20 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR), (50 CY)
Awd $2,500.00$50.00
2 $1,750.00$35.00
3 $2,750.00$55.00
4 $3,500.00$70.00
5 $2,500.00$50.00
Ref #21 407E20000 NON-TRACKING TACK COAT, (1918 GAL)
Awd $5,754.00$3.00
2 $4,603.20$2.40
3 $5,082.70$2.65
4 $7,672.00$4.00
5 $6,713.00$3.50
190496 - Page 120
Ref #22 408E10001 PRIME COAT, AS PER PLAN, (808 GAL)
Awd $2,424.00$3.00
2 $2,787.60$3.45
3 $2,828.00$3.50
4 $3,232.00$4.00
5 $4,040.00$5.00
Ref #23 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (528 CY)
Awd $96,096.00$182.00
2 $98,208.00$186.00
3 $83,688.00$158.50
4 $87,120.00$165.00
5 $118,800.00$225.00
Ref #24 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (740 CY)
Awd $103,600.00$140.00
2 $107,300.00$145.00
3 $100,640.00$136.00
4 $100,640.00$136.00
5 $129,500.00$175.00
Ref #25 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (2 CY)
Awd $1,500.00$750.00
2 $290.00$145.00
3 $2,000.00$1,000.00
4 $3,700.00$1,850.00
5 $1,000.00$500.00
Ref #26 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T = 2"), (113 CY)
Awd $8,475.00$75.00
2 $7,910.00$70.00
3 $7,910.00$70.00
4 $9,605.00$85.00
5 $8,475.00$75.00
Ref #27 875E10000 LONGITUDINAL JOINT ADHESIVE, (909 LB)
Awd $2,727.00$3.00
2 $1,818.00$2.00
3 $3,181.50$3.50
4 $2,272.50$2.50
5 $2,727.00$3.00
Section 4 - PAVEMENT - Totals
Awd $288,855.60
2 $289,833.50
3 $297,120.10
4 $307,022.60
5 $345,517.00
Ref #28 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (4 EACH)
Awd $3,000.00$750.00
2 $2,200.00$550.00
3 $1,400.00$350.00
4 $2,200.00$550.00
5 $2,200.00$550.00
190496 - Page 121
Section 5 - WATER WORK - Totals
Awd $3,000.00
2 $2,200.00
3 $1,400.00
4 $2,200.00
5 $2,200.00
Ref #29 626E00102 BARRIER REFLECTOR, TYPE 1 (TWO-WAY), (8 EACH)
Awd $60.00$7.50
2 $60.00$7.50
3 $80.00$10.00
4 $60.00$7.50
5 $60.00$7.50
Ref #30 646E10010 EDGE LINE, 6", (1.78 MILE)
Awd $7,324.70$4,115.00
2 $8,010.00$4,500.00
3 $8,010.00$4,500.00
4 $5,518.00$3,100.00
5 $5,518.00$3,100.00
Ref #31 646E10200 CENTER LINE, (0.89 MILE)
Awd $4,102.90$4,610.00
2 $5,963.00$6,700.00
3 $6,230.00$7,000.00
4 $4,628.00$5,200.00
5 $4,628.00$5,200.00
Ref #32 646E10300 CHANNELIZING LINE, 8", (75 FT)
Awd $187.50$2.50
2 $135.00$1.80
3 $150.00$2.00
4 $142.50$1.90
5 $142.50$1.90
Ref #33 646E10500 CROSSWALK LINE, (56 FT)
Awd $476.00$8.50
2 $308.00$5.50
3 $336.00$6.00
4 $336.00$6.00
5 $336.00$6.00
Ref #34 646E10800 ISLAND MARKING, (50 SF)
Awd $400.00$8.00
2 $275.00$5.50
3 $300.00$6.00
4 $350.00$7.00
5 $350.00$7.00
Ref #35 646E20300 LANE ARROW, (3 EACH)
Awd $750.00$250.00
2 $525.00$175.00
3 $600.00$200.00
4 $525.00$175.00
5 $525.00$175.00
190496 - Page 122
Section 6 - TRAFFIC CONTROL - Totals
Awd $13,301.10
2 $15,276.00
3 $15,706.00
4 $11,559.50
5 $11,559.50
Ref #36 614E12460 WORK ZONE MARKING SIGN, (36 EACH)
Awd $2,340.00$65.00
2 $2,340.00$65.00
3 $3,600.00$100.00
4 $2,340.00$65.00
5 $2,700.00$75.00
Ref #37 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $3,000.00$300.00
2 $2,492.10$249.21
3 $1,500.00$150.00
4 $2,400.00$240.00
5 $2,000.00$200.00
Ref #38 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (1.78 MILE)
Awd $2,225.00$1,250.00
2 $2,225.00$1,250.00
3 $2,670.00$1,500.00
4 $1,869.00$1,050.00
5 $1,869.00$1,050.00
Ref #39 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.89 MILE)
Awd $1,201.50$1,350.00
2 $1,201.50$1,350.00
3 $890.00$1,000.00
4 $934.50$1,050.00
5 $934.50$1,050.00
Ref #40 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT, (1.78 MILE)
Awd $1,246.00$700.00
2 $1,246.00$700.00
3 $1,780.00$1,000.00
4 $1,112.50$625.00
5 $1,112.50$625.00
Ref #41 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN, (150 FT)
Awd $300.00$2.00
2 $300.00$2.00
3 $300.00$2.00
4 $142.50$0.95
5 $142.50$0.95
Ref #42 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (75 FT)
Awd $150.00$2.00
2 $150.00$2.00
3 $150.00$2.00
4 $71.25$0.95
5 $71.25$0.95
190496 - Page 123
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $10,462.50
2 $9,954.60
3 $10,890.00
4 $8,869.75
5 $8,829.75
Ref #43 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,008.00$1,008.00
2 $3,000.00$3,000.00
3 $4,000.00$4,000.00
4 $3,000.00$3,000.00
5 $2,000.00$2,000.00
Ref #44 202E23500 WEARING COURSE REMOVED, (123 SY)
Awd $615.00$5.00
2 $104.55$0.85
3 $246.00$2.00
4 $6,765.00$55.00
5 $3,075.00$25.00
Ref #45 202E98200 REMOVAL MISC.: CHANNEL CLEANOUT, (45 FT)
Awd $2,250.00$50.00
2 $2,250.00$50.00
3 $2,250.00$50.00
4 $2,250.00$50.00
5 $2,250.00$50.00
Ref #46 407E13900 TACK COAT, 702.13, (45 GAL)
Awd $135.00$3.00
2 $108.00$2.40
3 $450.00$10.00
4 $225.00$5.00
5 $112.50$2.50
Ref #47 407E20000 NON-TRACKING TACK COAT, (28 GAL)
Awd $84.00$3.00
2 $67.20$2.40
3 $280.00$10.00
4 $140.00$5.00
5 $98.00$3.50
Ref #48 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (30 CY)
Awd $6,000.00$200.00
2 $5,580.00$186.00
3 $7,500.00$250.00
4 $10,950.00$365.00
5 $7,500.00$250.00
Ref #49 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (436 SY)
Awd $4,325.12$9.92
2 $6,540.00$15.00
3 $6,540.00$15.00
4 $6,540.00$15.00
5 $9,592.00$22.00
190496 - Page 124
Ref #50 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $13,695.00$91.30
2 $18,750.00$125.00
3 $18,750.00$125.00
4 $18,750.00$125.00
5 $18,750.00$125.00
Ref #51 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C, (7 SY)
Awd $6,895.00$985.00
2 $4,900.00$700.00
3 $4,900.00$700.00
4 $4,900.00$700.00
5 $5,075.00$725.00
Ref #52 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA, (55 CY)
Awd $9,405.00$171.00
2 $11,000.00$200.00
3 $11,000.00$200.00
4 $11,000.00$200.00
5 $13,750.00$250.00
Ref #53 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $135.00$9.00
2 $135.00$9.00
3 $150.00$10.00
4 $135.00$9.00
5 $6,750.00$450.00
Ref #54 630E80100 SIGN, FLAT SHEET, (2 SF)
Awd $32.00$16.00
2 $32.00$16.00
3 $40.00$20.00
4 $32.00$16.00
5 $30.00$15.00
Ref #55 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
4 $50.00$25.00
5 $110.00$55.00
Ref #56 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
4 $50.00$25.00
5 $20.00$10.00
Ref #57 646E10010 EDGE LINE, 6", (0.04 MILE)
Awd $164.60$4,115.00
2 $360.00$9,000.00
3 $360.00$9,000.00
4 $1,400.00$35,000.00
5 $1,400.00$35,000.00
190496 - Page 125
Ref #58 646E10200 CENTER LINE, (0.02 MILE)
Awd $92.20$4,610.00
2 $180.00$9,000.00
3 $180.00$9,000.00
4 $1,500.00$75,000.00
5 $1,500.00$75,000.00
Ref #59 646E50300 REMOVAL OF PAVEMENT MARKING, (0.06 MILE)
Awd $2,407.20$40,120.00
2 $900.00$15,000.00
3 $3,900.00$65,000.00
4 $2,700.00$45,000.00
5 $2,700.00$45,000.00
Ref #60 856E10000 BRIDGE DECK WATERPROOFING ASPHALT CONCRETE, (25 CY)
Awd $15,750.00$630.00
2 $32,500.00$1,300.00
3 $24,000.00$960.00
4 $58,750.00$2,350.00
5 $75,000.00$3,000.00
Section 8 - STRUCTURE REPAIR (ATB-534-2525) - Totals
Awd $63,093.12
2 $86,506.75
3 $84,646.00
4 $129,137.00
5 $149,712.50
Ref #61 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,008.00$1,008.00
2 $3,000.00$3,000.00
3 $4,000.00$4,000.00
4 $3,000.00$3,000.00
5 $2,000.00$2,000.00
Ref #62 202E23500 WEARING COURSE REMOVED, (220 SY)
Awd $1,100.00$5.00
2 $198.00$0.90
3 $440.00$2.00
4 $9,900.00$45.00
5 $5,500.00$25.00
Ref #63 407E13900 TACK COAT, 702.13, (18 GAL)
Awd $54.00$3.00
2 $43.20$2.40
3 $180.00$10.00
4 $90.00$5.00
5 $45.00$2.50
Ref #64 407E20000 NON-TRACKING TACK COAT, (11 GAL)
Awd $33.00$3.00
2 $26.40$2.40
3 $110.00$10.00
4 $55.00$5.00
5 $38.50$3.50
190496 - Page 126
Ref #65 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (8 CY)
Awd $1,600.00$200.00
2 $1,488.00$186.00
3 $2,000.00$250.00
4 $7,400.00$925.00
5 $2,000.00$250.00
Ref #66 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $9,130.00$91.30
2 $12,500.00$125.00
3 $12,500.00$125.00
4 $12,500.00$125.00
5 $12,500.00$125.00
Ref #67 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C, (3 SY)
Awd $2,955.00$985.00
2 $3,000.00$1,000.00
3 $3,000.00$1,000.00
4 $3,000.00$1,000.00
5 $2,175.00$725.00
Ref #68 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $135.00$9.00
2 $135.00$9.00
3 $150.00$10.00
4 $135.00$9.00
5 $150.00$10.00
Ref #69 630E80100 SIGN, FLAT SHEET, (2 SF)
Awd $32.00$16.00
2 $32.00$16.00
3 $40.00$20.00
4 $32.00$16.00
5 $30.00$15.00
Ref #70 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
4 $50.00$25.00
5 $110.00$55.00
Ref #71 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
4 $50.00$25.00
5 $20.00$10.00
Ref #72 646E10010 EDGE LINE, 6", (0.04 MILE)
Awd $164.60$4,115.00
2 $360.00$9,000.00
3 $360.00$9,000.00
4 $1,400.00$35,000.00
5 $1,400.00$35,000.00
190496 - Page 127
Ref #73 646E10200 CENTER LINE, (0.02 MILE)
Awd $92.20$4,610.00
2 $180.00$9,000.00
3 $18.00$900.00
4 $1,500.00$75,000.00
5 $2,000.00$100,000.00
Ref #74 856E10000 BRIDGE DECK WATERPROOFING ASPHALT CONCRETE, (11 CY)
Awd $6,930.00$630.00
2 $14,300.00$1,300.00
3 $10,560.00$960.00
4 $25,850.00$2,350.00
5 $33,000.00$3,000.00
Section 9 - STRUCTURE REPAIR (ATB-534-2562) - Totals
Awd $23,333.80
2 $35,362.60
3 $33,458.00
4 $64,962.00
5 $60,968.50
Ref #75 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,000.00$2,000.00
3 $5,000.00$5,000.00
4 $5,000.00$5,000.00
5 $20,000.00$20,000.00
Ref #76 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $34,000.00$34,000.00
3 $48,500.00$48,500.00
4 $48,590.00$48,590.00
5 $50,000.00$50,000.00
Ref #77 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $3,000.00$1,000.00
2 $6,000.00$2,000.00
3 $6,000.00$2,000.00
4 $4,500.00$1,500.00
5 $2,250.00$750.00
Ref #78 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $500.00$500.00
2 $900.00$900.00
3 $1,750.00$1,750.00
4 $3,610.00$3,610.00
5 $10,000.00$10,000.00
Ref #79 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $15,000.00$15,000.00
3 $20,000.00$20,000.00
4 $38,999.50$38,999.50
5 $50,000.00$50,000.00
190496 - Page 128
Section 10 - INCIDENTALS - Totals
Awd $88,500.00
2 $57,900.00
3 $81,250.00
4 $100,699.50
5 $132,250.00
190496 - Page 129
Project No. 190497
PID 106819
ATH-US 33-14.03 L&R
Federal
Type: BRIDGE REPAIR
Completion Date: 10/15/2020
Award Amount: $689,296.03
Contract Awarded To: BRIDGE SPECIALISTS INC
Letting Date: 10/10/2019
Engineer's Estimate: $626,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BRIDGE SPECIALISTS INC
860 Boardman-Canfield Road Suite 203
Boardman, OH 44512
Mahoning
Bidder 1
Bid $689,296.03
DOUBLE Z CONSTRUCTION COMPANY
2550 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 2
Bid $712,983.94
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $769,943.10
BCC OHIO INC
P O BOX 229
NEW LONDON, OH 44851
Huron
Bidder 4
Bid $776,867.73
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 5
Bid $811,128.08
190497 - Page 130
Ref #1 202E38000 GUARDRAIL REMOVED, (218 FT)
Awd $545.00$2.50
2 $1,090.00$5.00
3 $1,090.00$5.00
4 $573.34$2.63
5 $730.30$3.35
Ref #2 606E13000 GUARDRAIL, TYPE 5, (212.5 FT)
Awd $5,270.00$24.80
2 $5,312.50$25.00
3 $5,312.50$25.00
4 $5,533.50$26.04
5 $5,004.38$23.55
Ref #3 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (4 EACH)
Awd $3,780.00$945.00
2 $3,200.00$800.00
3 $3,240.00$810.00
4 $3,969.00$992.25
5 $4,380.00$1,095.00
Section 1 - ROADWAY - Totals
Awd $9,595.00
2 $9,602.50
3 $9,642.50
4 $10,075.84
5 $10,114.68
Ref #4 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/4" DEPTH), (667 SY)
Awd $5,336.00$8.00
2 $9,584.79$14.37
3 $9,338.00$14.00
4 $4,168.75$6.25
5 $7,503.75$11.25
Ref #5 407E20000 NON-TRACKING TACK COAT, (60 GAL)
Awd $2,100.00$35.00
2 $300.00$5.00
3 $180.00$3.00
4 $189.00$3.15
5 $207.00$3.45
Ref #6 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (24 CY)
Awd $18,000.00$750.00
2 $12,000.00$500.00
3 $18,000.00$750.00
4 $18,900.00$787.50
5 $15,840.00$660.00
Section 2 - PAVEMENT - Totals
Awd $25,436.00
2 $21,884.79
3 $27,518.00
4 $23,257.75
5 $23,550.75
190497 - Page 131
Ref #7 621E54000 RAISED PAVEMENT MARKER REMOVED, (8 EACH)
Awd $200.00$25.00
2 $80.00$10.00
3 $120.00$15.00
4 $192.00$24.00
5 $160.00$20.00
Ref #8 642E00094 EDGE LINE, 6", (1.79 MILE)
Awd $2,461.25$1,375.00
2 $2,461.25$1,375.00
3 $2,506.00$1,400.00
4 $3,185.70$1,779.72
5 $2,461.25$1,375.00
Ref #9 642E00194 LANE LINE, 6", (0.74 MILE)
Awd $969.40$1,310.00
2 $969.40$1,310.00
3 $973.10$1,315.00
4 $1,048.95$1,417.50
5 $969.40$1,310.00
Ref #10 642E00290 CENTER LINE, (0.17 MILE)
Awd $637.50$3,750.00
2 $637.50$3,750.00
3 $646.00$3,800.00
4 $3,376.33$19,860.76
5 $637.50$3,750.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $4,268.15
2 $4,148.15
3 $4,245.10
4 $7,802.98
5 $4,228.15
Ref #11 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (4 EACH)
Awd $10,800.00$2,700.00
2 $9,000.00$2,250.00
3 $7,800.00$1,950.00
4 $7,770.00$1,942.50
5 $9,000.00$2,250.00
Ref #12 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $10,800.00$2,700.00
2 $9,000.00$2,250.00
3 $8,400.00$2,100.00
4 $7,980.00$1,995.00
5 $9,000.00$2,250.00
Ref #13 614E13310 BARRIER REFLECTOR, TYPE 1 (1WAY), (60 EACH)
Awd $1,680.00$28.00
2 $600.00$10.00
3 $360.00$6.00
4 $630.00$10.50
5 $1,680.00$28.00
190497 - Page 132
Ref #14 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL), (29 EACH)
Awd $1,015.00$35.00
2 $348.00$12.00
3 $174.00$6.00
4 $334.95$11.55
5 $1,015.00$35.00
Ref #15 614E13350 OBJECT MARKER, ONE WAY, (60 EACH)
Awd $2,280.00$38.00
2 $780.00$13.00
3 $840.00$14.00
4 $819.00$13.65
5 $2,280.00$38.00
Ref #16 614E13360 OBJECT MARKER, TWO WAY, (29 EACH)
Awd $1,015.00$35.00
2 $406.00$14.00
3 $435.00$15.00
4 $456.75$15.75
5 $1,015.00$35.00
Ref #17 614E22000 WORK ZONE EDGE LINE, CLASS I, 4", (2.74 MILE)
Awd $3,973.00$1,450.00
2 $3,973.00$1,450.00
3 $4,110.00$1,500.00
4 $4,660.74$1,701.00
5 $3,973.00$1,450.00
Ref #18 614E24000 WORK ZONE DOTTED LINE, CLASS I, (3519 FT)
Awd $1,759.50$0.50
2 $1,759.50$0.50
3 $1,759.50$0.50
4 $2,041.02$0.58
5 $1,759.50$0.50
Ref #19 614E26000 WORK ZONE STOP LINE, CLASS I, (20 FT)
Awd $250.00$12.50
2 $250.00$12.50
3 $260.00$13.00
4 $2,100.00$105.00
5 $250.00$12.50
Ref #20 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $5,500.00$5,500.00
3 $6,000.00$6,000.00
4 $4,170.00$4,170.00
5 $25,000.00$25,000.00
Ref #21 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER , (185 SY)
Awd $23,125.00$125.00
2 $10,175.00$55.00
3 $16,650.00$90.00
4 $19,280.70$104.22
5 $23,125.00$125.00
190497 - Page 133
Ref #22 622E41000 PORTABLE BARRIER, 32", (1090 FT)
Awd $15,260.00$14.00
2 $16,350.00$15.00
3 $18,530.00$17.00
4 $13,167.20$12.08
5 $12,535.00$11.50
Ref #23 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (920 FT)
Awd $13,800.00$15.00
2 $18,400.00$20.00
3 $18,400.00$20.00
4 $12,079.60$13.13
5 $11,500.00$12.50
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $89,257.50
2 $76,541.50
3 $83,718.50
4 $75,489.96
5 $102,132.50
Ref #24 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $400.00$4.00
3 $100.00$1.00
4 $277.00$2.77
5 $500.00$5.00
Ref #25 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (203 SY)
Awd $7,308.00$36.00
2 $4,567.50$22.50
3 $4,567.50$22.50
4 $5,338.90$26.30
5 $4,567.50$22.50
Ref #26 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (118 FT)
Awd $2,301.00$19.50
2 $2,478.00$21.00
3 $2,950.00$25.00
4 $1,510.40$12.80
5 $2,891.00$24.50
Ref #27 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT, (1001 SY)
Awd $67,067.00$67.00
2 $96,096.00$96.00
3 $80,080.00$80.00
4 $86,366.28$86.28
5 $115,115.00$115.00
Ref #28 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1001 SY)
Awd $57,057.00$57.00
2 $60,060.00$60.00
3 $90,090.00$90.00
4 $67,097.03$67.03
5 $95,095.00$95.00
190497 - Page 134
Ref #29 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES, (30 CY)
Awd $24,000.00$800.00
2 $21,000.00$700.00
3 $15,000.00$500.00
4 $29,025.00$967.50
5 $22,500.00$750.00
Ref #30 848E50000 HAND CHIPPING, (151 SY)
Awd $11,325.00$75.00
2 $8,305.00$55.00
3 $9,060.00$60.00
4 $19,932.00$132.00
5 $11,325.00$75.00
Ref #31 848E50100 TEST SLAB, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,500.00$1,500.00
3 $2,400.00$2,400.00
4 $3,049.50$3,049.50
5 $500.00$500.00
Ref #32 848E50200 FULL-DEPTH REPAIR, (10 CY)
Awd $3,000.00$300.00
2 $5,000.00$500.00
3 $6,300.00$630.00
4 $14,555.60$1,455.56
5 $6,500.00$650.00
Section 5 - STRUCTURE REPAIR (ATH-33-1402 LT) - Totals
Awd $174,758.00
2 $199,406.50
3 $210,547.50
4 $227,151.71
5 $258,993.50
Ref #33 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $400.00$4.00
3 $100.00$1.00
4 $277.00$2.77
5 $500.00$5.00
Ref #34 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (203 SY)
Awd $7,308.00$36.00
2 $4,567.50$22.50
3 $4,567.50$22.50
4 $5,338.90$26.30
5 $4,567.50$22.50
Ref #35 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (78 FT)
Awd $1,521.00$19.50
2 $1,638.00$21.00
3 $1,950.00$25.00
4 $1,002.30$12.85
5 $1,911.00$24.50
190497 - Page 135
Ref #36 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT, (661 SY)
Awd $44,287.00$67.00
2 $76,015.00$115.00
3 $68,744.00$104.00
4 $78,685.44$119.04
5 $76,015.00$115.00
Ref #37 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (661 SY)
Awd $37,677.00$57.00
2 $39,660.00$60.00
3 $66,100.00$100.00
4 $50,044.31$75.71
5 $62,795.00$95.00
Ref #38 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES, (20 CY)
Awd $16,000.00$800.00
2 $14,000.00$700.00
3 $10,000.00$500.00
4 $19,350.00$967.50
5 $15,000.00$750.00
Ref #39 848E50000 HAND CHIPPING, (100 SY)
Awd $7,500.00$75.00
2 $5,500.00$55.00
3 $6,000.00$60.00
4 $13,200.00$132.00
5 $7,500.00$75.00
Ref #40 848E50100 TEST SLAB, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,500.00$1,500.00
3 $2,200.00$2,200.00
4 $3,049.50$3,049.50
5 $500.00$500.00
Ref #41 848E50200 FULL-DEPTH REPAIR, (7 CY)
Awd $2,100.00$300.00
2 $3,500.00$500.00
3 $5,600.00$800.00
4 $10,188.92$1,455.56
5 $4,550.00$650.00
Section 6 - STRUCTURE REPAIR (ATH-33-1402 RT) - Totals
Awd $119,093.00
2 $146,780.50
3 $165,261.50
4 $181,136.37
5 $173,338.50
Ref #42 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $400.00$4.00
3 $100.00$1.00
4 $277.00$2.77
5 $500.00$5.00
190497 - Page 136
Ref #43 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (60 FT)
Awd $1,170.00$19.50
2 $1,260.00$21.00
3 $1,500.00$25.00
4 $768.00$12.80
5 $1,470.00$24.50
Ref #44 518E22300 SPECIAL - STEEL DRIP STRIP, (550 FT)
Awd $9,350.00$17.00
2 $8,525.00$15.50
3 $8,800.00$16.00
4 $5,335.00$9.70
5 $8,525.00$15.50
Ref #45 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (17 CF)
Awd $16,951.38$997.14
2 $14,790.00$870.00
3 $13,600.00$800.00
4 $5,996.58$352.74
5 $15,725.00$925.00
Ref #46 847E10100 LATEX MODIFIED CONCRETE OVERLAY(1 1/4" THICK), (701 SY)
Awd $46,967.00$67.00
2 $80,615.00$115.00
3 $105,150.00$150.00
4 $104,925.68$149.68
5 $105,150.00$150.00
Ref #47 847E20100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES, (21 CY)
Awd $16,800.00$800.00
2 $14,700.00$700.00
3 $10,500.00$500.00
4 $20,317.50$967.50
5 $15,750.00$750.00
Ref #48 847E30000 TEST SLAB, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,500.00$1,500.00
3 $2,400.00$2,400.00
4 $3,049.50$3,049.50
5 $500.00$500.00
Ref #49 847E30200 FULL DEPTH REPAIR, (8 CY)
Awd $2,400.00$300.00
2 $4,000.00$500.00
3 $5,600.00$700.00
4 $10,188.96$1,273.62
5 $5,200.00$650.00
Ref #50 847E50000 HAND CHIPPING, (106 SY)
Awd $7,950.00$75.00
2 $5,830.00$55.00
3 $6,360.00$60.00
4 $13,992.00$132.00
5 $7,950.00$75.00
190497 - Page 137
Section 7 - STRUCTURE REPAIR (ATH-278-0294) - Totals
Awd $104,288.38
2 $131,620.00
3 $154,010.00
4 $164,850.22
5 $160,770.00
Ref #51 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,700.00$15,700.00
2 $8,000.00$8,000.00
3 $10,000.00$10,000.00
4 $9,805.00$9,805.00
5 $8,000.00$8,000.00
Ref #52 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $73,125.00$73,125.00
2 $95,000.00$95,000.00
3 $85,000.00$85,000.00
4 $25,714.50$25,714.50
5 $50,000.00$50,000.00
Ref #53 624E10000 MOBILIZATION, (LUMP SUM)
Awd $73,775.00$73,775.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $51,583.40$51,583.40
5 $20,000.00$20,000.00
Section 8 - INCIDENTALS - Totals
Awd $162,600.00
2 $123,000.00
3 $115,000.00
4 $87,102.90
5 $78,000.00
190497 - Page 138
Project No. 190498
PID 102978
CLA-SR 72-00.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/31/2020
Award Amount: $719,335.25
Contract Awarded To: SHELLY COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $732,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $719,335.25
A & B ASPHALT CORPORATION
1780 ENON RD
SPRINGFIELD, OH 45502
Clark
Bidder 2
Bid $763,820.76
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45055
Butler
Bidder 3
Bid $850,321.00
190498 - Page 139
Ref #1 202E23500 WEARING COURSE REMOVED, (1120 SY)
Awd $6,720.00$6.00
2 $6,014.40$5.37
3 $14,560.00$13.00
Ref #2 202E30000 WALK REMOVED, (262 SF)
Awd $3,930.00$15.00
2 $1,789.46$6.83
3 $2,620.00$10.00
Ref #3 608E10000 4" CONCRETE WALK, (262 SF)
Awd $8,908.00$34.00
2 $3,885.46$14.83
3 $3,144.00$12.00
Ref #4 608E53020 DETECTABLE WARNING, (32 SF)
Awd $1,760.00$55.00
2 $1,024.00$32.00
3 $1,920.00$60.00
Ref #5 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (2 EACH)
Awd $350.00$175.00
2 $970.00$485.00
3 $350.00$175.00
Section 1 - ROADWAY - Totals
Awd $21,668.00
2 $13,683.32
3 $22,594.00
Ref #6 659E10001 SEEDING AND MULCHING, AS PER PLAN, (50 SY)
Awd $1,250.00$25.00
2 $1,000.00$20.00
3 $500.00$10.00
Section 2 - EROSION CONTROL - Totals
Awd $1,250.00
2 $1,000.00
3 $500.00
Ref #7 253E01001 PAVEMENT REPAIR, AS PER PLAN, (800 SY)
Awd $33,600.00$42.00
2 $40,136.00$50.17
3 $43,200.00$54.00
Ref #8 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN, (10 CY)
Awd $3,250.00$325.00
2 $4,815.10$481.51
3 $4,000.00$400.00
Ref #9 407E20000 NON-TRACKING TACK COAT, (10853 GAL)
Awd $26,047.20$2.40
2 $10,853.00$1.00
3 $32,559.00$3.00
190498 - Page 140
Ref #10 617E10100 COMPACTED AGGREGATE, (424 CY)
Awd $26,288.00$62.00
2 $33,741.92$79.58
3 $36,040.00$85.00
Ref #11 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE), (5.88 MILE)
Awd $4,939.20$840.00
2 $8,673.00$1,475.00
3 $11,201.40$1,905.00
Ref #12 860E10000 THINLAY ASPHALT CONCRETE, TYPE MED, (2664 CY)
Awd $415,584.00$156.00
2 $459,833.04$172.61
3 $474,192.00$178.00
Ref #13 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (1/2", (119693 SY)
Awd $59,846.50$0.50
2 $95,754.40$0.80
3 $95,754.40$0.80
Ref #14 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, Var. , (597 SY)
Awd $597.00$1.00
2 $477.60$0.80
3 $7,761.00$13.00
Ref #15 897E02001 PATCHING PLANED SURFACE, AS PER PLAN, (100 SY)
Awd $1,000.00$10.00
2 $2,699.00$26.99
3 $600.00$6.00
Ref #100 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE), (2.94 MILE)
Awd $2,131.50$725.00
2 $2,131.50$725.00
3 $5,924.10$2,015.00
Section 3 - PAVEMENT - Totals
Awd $573,283.40
2 $659,114.56
3 $711,231.90
Ref #16 621E00100 RPM, (513 EACH)
Awd $12,696.75$24.75
2 $12,312.00$24.00
3 $10,516.50$20.50
Ref #17 621E54000 RAISED PAVEMENT MARKER REMOVED, (508 EACH)
Awd $12,700.00$25.00
2 $8,463.28$16.66
3 $6,096.00$12.00
Ref #18 642E00094 EDGE LINE, 6", (12.84 MILE)
Awd $8,923.80$695.00
2 $7,704.00$600.00
3 $7,704.00$600.00
Ref #19 642E00290 CENTER LINE, (6.95 MILE)
Awd $4,204.75$605.00
2 $4,239.50$610.00
3 $4,239.50$610.00
190498 - Page 141
Ref #20 644E00400 CHANNELIZING LINE, 8", (296 FT)
Awd $532.80$1.80
2 $473.60$1.60
3 $473.60$1.60
Ref #21 644E00500 STOP LINE, (97 FT)
Awd $528.65$5.45
2 $494.70$5.10
3 $494.70$5.10
Ref #22 644E00700 TRANSVERSE/DIAGONAL LINE, (496 FT)
Awd $2,628.80$5.30
2 $2,455.20$4.95
3 $2,455.20$4.95
Ref #23 644E00900 ISLAND MARKING, (203 SF)
Awd $609.00$3.00
2 $598.85$2.95
3 $598.85$2.95
Ref #24 644E01300 LANE ARROW, (12 EACH)
Awd $1,104.00$92.00
2 $1,200.00$100.00
3 $1,200.00$100.00
Ref #25 644E01510 DOTTED LINE, 6", (190 FT)
Awd $427.50$2.25
2 $294.50$1.55
3 $294.50$1.55
Section 4 - TRAFFIC CONTROL - Totals
Awd $44,356.05
2 $38,235.63
3 $34,072.85
Ref #26 614E12460 WORK ZONE MARKING SIGN, (56 EACH)
Awd $5,880.00$105.00
2 $5,880.00$105.00
3 $5,880.00$105.00
Ref #27 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (13.9 MILE)
Awd $9,938.50$715.00
2 $15,846.00$1,140.00
3 $15,846.00$1,140.00
Ref #28 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (592 FT)
Awd $384.80$0.65
2 $325.60$0.55
3 $325.60$0.55
Ref #29 614E24610 WORK ZONE DOTTED LINE, CLASS III, 4", 642 PAINT, (380 FT)
Awd $361.00$0.95
2 $190.00$0.50
3 $190.00$0.50
Ref #30 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (194 FT)
Awd $533.50$2.75
2 $485.00$2.50
3 $485.00$2.50
190498 - Page 142
Ref #31 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (24 EACH)
Awd $1,680.00$70.00
2 $1,320.00$55.00
3 $1,320.00$55.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $18,777.80
2 $24,046.60
3 $24,046.60
Ref #32 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $1,919.17$1,919.17
3 $5,375.65$5,375.65
Ref #33 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $31,000.00$31,000.00
2 $18,228.15$18,228.15
3 $37,500.00$37,500.00
Ref #34 624E10000 MOBILIZATION, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $7,593.33$7,593.33
3 $15,000.00$15,000.00
Section 6 - INCIDENTALS - Totals
Awd $60,000.00
2 $27,740.65
3 $57,875.65
190498 - Page 143
Project No. 190499
PID 109054
D03-GR FY2020(A)
Federal
Type: GUARDRAIL REBUILDING
Completion Date: 1/31/2021
Award Amount: $487,520.00
Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $546,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALK ROAD
NORWALK, OH 44857
Huron
Bidder 1
Bid $487,520.00
CUYAHOGA FENCE LLC
5814 HIGHLAND ROAD
CLEVELAND, OH 44143
Cuyahoga
Bidder 2
Bid $856,717.26
190499 - Page 144
Ref #1 202E32000 CURB REMOVED, (775 FT)
Awd $6,200.00$8.00
2 $32,162.50$41.50
Ref #2 202E38000 GUARDRAIL REMOVED, (9400 FT)
Awd $11,280.00$1.20
2 $18,800.00$2.00
Ref #3 202E38200 GUARDRAIL REMOVED FOR REUSE, (4900 FT)
Awd $8,820.00$1.80
2 $12,250.00$2.50
Ref #4 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (68 EACH)
Awd $16,660.00$245.00
2 $22,100.00$325.00
Ref #5 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (14 EACH)
Awd $1,400.00$100.00
2 $2,800.00$200.00
Ref #6 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (64 EACH)
Awd $6,400.00$100.00
2 $12,800.00$200.00
Ref #7 203E20001 EMBANKMENT, AS PER PLAN, (200 CY)
Awd $13,800.00$69.00
2 $13,600.00$68.00
Ref #8 209E15000 RESHAPING UNDER GUARDRAIL, (170 STA)
Awd $5,950.00$35.00
2 $17,000.00$100.00
Ref #9 606E13000 GUARDRAIL, TYPE 5, (93.75 FT)
Awd $1,500.00$16.00
2 $1,546.88$16.50
Ref #10 606E13000 GUARDRAIL, TYPE 5 (10' RADIUS), (25 FT)
Awd $500.00$20.00
2 $475.00$19.00
Ref #11 606E15050 GUARDRAIL, TYPE MGS, (6825 FT)
Awd $101,010.00$14.80
2 $109,200.00$16.00
Ref #12 606E15050 GUARDRAIL, TYPE MGS (10' RADIUS), (75 FT)
Awd $1,350.00$18.00
2 $1,425.00$19.00
Ref #13 606E16500 GUARDRAIL REBUILT, TYPE 5, (5300 FT)
Awd $41,340.00$7.80
2 $65,720.00$12.40
Ref #14 606E26100 ANCHOR ASSEMBLY, TYPE E, (21 EACH)
Awd $40,950.00$1,950.00
2 $47,250.00$2,250.00
Ref #15 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016), (41 EACH)
Awd $91,225.00$2,225.00
2 $92,250.00$2,250.00
Ref #16 606E26500 ANCHOR ASSEMBLY, TYPE T, (12 EACH)
Awd $8,640.00$720.00
2 $10,500.00$875.00
190499 - Page 145
Ref #17 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (7 EACH)
Awd $5,950.00$850.00
2 $6,475.00$925.00
Ref #18 606E32500 BRIDGE TERMINAL ASSEMBLY, TYPE F, (20 EACH)
Awd $23,000.00$1,150.00
2 $85,000.00$4,250.00
Ref #19 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (32 EACH)
Awd $12,800.00$400.00
2 $20,000.00$625.00
Ref #20 606E35170 BRIDGE TERMINAL ASSEMBLY, TYPE BR-1, (12 EACH)
Awd $19,440.00$1,620.00
2 $22,200.00$1,850.00
Ref #21 606E98000 GUARDRAIL, MISC.: RAIL ELEMENT, (862.5 FT)
Awd $5,175.00$6.00
2 $7,546.88$8.75
Section 1 - ROADWAY - Totals
Awd $423,390.00
2 $601,101.26
Ref #22 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #23 609E26000 CURB, TYPE 6, (1100 FT)
Awd $49,500.00$45.00
2 $126,500.00$115.00
Section 3 - PAVEMENT - Totals
Awd $49,500.00
2 $126,500.00
Ref #24 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL), (188 EACH)
Awd $1,410.00$7.50
2 $1,316.00$7.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $1,410.00
2 $1,316.00
Ref #25 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,380.00$2,380.00
2 $12,800.00$12,800.00
190499 - Page 146
Ref #26 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $77,000.00$77,000.00
Ref #27 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,840.00$1,840.00
2 $5,000.00$5,000.00
Ref #28 624E10000 MOBILIZATION, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $32,000.00$32,000.00
Section 5 - INCIDENTALS - Totals
Awd $12,220.00
2 $126,800.00
190499 - Page 147
Project No. 190500
PID 102533
D05-DS FY2020
Federal
Type: BRIDGE REPAIR
Completion Date: 10/31/2020
Award Amount: $939,076.01
Contract Awarded To: BCC OHIO INC
Letting Date: 10/10/2019
Engineer's Estimate: $1,126,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BCC OHIO INC
P O BOX 229
NEW LONDON, OH 44851
Huron
Bidder 1
Bid $939,076.01
BECDIR CONSTRUCTION COMPANY
15764 W AKRON-CANFIELD RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 2
Bid $1,096,206.80
RIGHTER COMPANY INC
2424 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 3
Bid $1,238,423.11
190500 - Page 148
Ref #1 646E10010 EDGE LINE, 6", (1.9 MILE)
Awd $55,660.50$29,295.00
2 $32,300.00$17,000.00
3 $14,877.00$7,830.00
Ref #2 646E10110 LANE LINE, 6", (0.97 MILE)
Awd $27,377.28$28,224.00
2 $15,520.00$16,000.00
3 $4,092.43$4,219.00
Ref #3 646E10200 CENTER LINE, (0.69 MILE)
Awd $20,155.59$29,211.00
2 $12,075.00$17,500.00
3 $7,672.11$11,119.00
Ref #4 646E10400 STOP LINE, (49 FT)
Awd $977.55$19.95
2 $1,274.00$26.00
3 $796.25$16.25
Ref #5 646E10600 TRANSVERSE/DIAGONAL LINE, (315 FT)
Awd $4,630.50$14.70
2 $5,040.00$16.00
3 $2,913.75$9.25
Ref #6 646E20300 LANE ARROW, (15 EACH)
Awd $2,079.00$138.60
2 $3,975.00$265.00
3 $3,000.00$200.00
Ref #7 646E20410 WORD ON PAVEMENT, 96", (5 EACH)
Awd $231.00$46.20
2 $1,575.00$315.00
3 $1,050.00$210.00
Ref #200 646E10310 CHANNELIZING LINE, 12", (480 FT)
Awd $1,574.40$3.28
2 $2,520.00$5.25
3 $1,704.00$3.55
Section 1 - TRAFFIC CONTROL - Totals
Awd $112,685.82
2 $74,279.00
3 $36,105.54
Ref #8 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (936 SY)
Awd $10,661.04$11.39
2 $12,870.00$13.75
3 $12,121.20$12.95
Ref #9 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (194 FT)
Awd $2,483.20$12.80
2 $1,746.00$9.00
3 $3,492.00$18.00
190500 - Page 149
Section 2 - STRUCTURE REPAIR (COS-83-1836) - Totals
Awd $13,144.24
2 $14,616.00
3 $15,613.20
Ref #10 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (399 SY)
Awd $4,544.61$11.39
2 $6,184.50$15.50
3 $5,167.05$12.95
Ref #11 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (11 SY)
Awd $207.57$18.87
2 $517.00$47.00
3 $715.00$65.00
Ref #12 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (118 FT)
Awd $1,510.40$12.80
2 $3,776.00$32.00
3 $2,950.00$25.00
Ref #13 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (295 SF)
Awd $25,517.50$86.50
2 $23,010.00$78.00
3 $40,571.35$137.53
Section 3 - STRUCTURE REPAIR (FAI-22-1536) - Totals
Awd $31,780.08
2 $33,487.50
3 $49,403.40
Ref #14 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1899 SY)
Awd $21,629.61$11.39
2 $27,535.50$14.50
3 $24,592.05$12.95
Section 4 - STRUCTURE REPAIR (FAI-33-0640) - Totals
Awd $21,629.61
2 $27,535.50
3 $24,592.05
Ref #15 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (444 SY)
Awd $5,057.16$11.39
2 $9,768.00$22.00
3 $5,749.80$12.95
Ref #16 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (11 SY)
Awd $207.57$18.87
2 $517.00$47.00
3 $715.00$65.00
Ref #17 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (194 FT)
Awd $2,483.20$12.80
2 $2,522.00$13.00
3 $3,492.00$18.00
190500 - Page 150
Section 5 - STRUCTURE REPAIR (FAI-188-1494) - Totals
Awd $7,747.93
2 $12,807.00
3 $9,956.80
Ref #18 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (974 SY)
Awd $11,093.86$11.39
2 $15,097.00$15.50
3 $12,613.30$12.95
Section 6 - STRUCTURE REPAIR (FAI-33-0637A) - Totals
Awd $11,093.86
2 $15,097.00
3 $12,613.30
Ref #19 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1686 SY)
Awd $19,203.54$11.39
2 $24,868.50$14.75
3 $21,833.70$12.95
Section 7 - STRUCTURE REPAIR (GUE-723-0040) - Totals
Awd $19,203.54
2 $24,868.50
3 $21,833.70
Ref #20 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (855 SY)
Awd $9,738.45$11.39
2 $12,611.25$14.75
3 $11,072.25$12.95
Ref #21 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (94 FT)
Awd $1,203.20$12.80
2 $2,068.00$22.00
3 $2,350.00$25.00
Section 8 - STRUCTURE REPAIR (GUE-209-0983) - Totals
Awd $10,941.65
2 $14,679.25
3 $13,422.25
Ref #22 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1683 SY)
Awd $19,169.37$11.39
2 $29,873.25$17.75
3 $21,794.85$12.95
Section 9 - STRUCTURE REPAIR (GUE-723-0059) - Totals
Awd $19,169.37
2 $29,873.25
3 $21,794.85
190500 - Page 151
Ref #23 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (2507 SY)
Awd $28,554.73$11.39
2 $22,563.00$9.00
3 $32,465.65$12.95
Section 10 - STRUCTURE REPAIR (LIC-16-1718) - Totals
Awd $28,554.73
2 $22,563.00
3 $32,465.65
Ref #24 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1186 SY)
Awd $13,508.54$11.39
2 $15,418.00$13.00
3 $15,358.70$12.95
Ref #25 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (221 FT)
Awd $2,828.80$12.80
2 $1,768.00$8.00
3 $3,315.00$15.00
Ref #26 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (20 SF)
Awd $1,730.00$86.50
2 $2,100.00$105.00
3 $7,000.00$350.00
Section 11 - STRUCTURE REPAIR (MUS-16-0028L) - Totals
Awd $18,067.34
2 $19,286.00
3 $25,673.70
Ref #27 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1167 SY)
Awd $13,292.13$11.39
2 $14,587.50$12.50
3 $15,112.65$12.95
Ref #28 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (219 FT)
Awd $2,803.20$12.80
2 $1,752.00$8.00
3 $3,285.00$15.00
Ref #29 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (15 SF)
Awd $1,297.50$86.50
2 $1,725.00$115.00
3 $5,250.00$350.00
Section 12 - STRUCTURE REPAIR (MUS-16-0029R) - Totals
Awd $17,392.83
2 $18,064.50
3 $23,647.65
Ref #30 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1526 SY)
Awd $17,381.14$11.39
2 $28,231.00$18.50
3 $19,761.70$12.95
190500 - Page 152
Ref #31 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (378 SY)
Awd $7,132.86$18.87
2 $1,134.00$3.00
3 $11,340.00$30.00
Ref #32 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (251 FT)
Awd $3,212.80$12.80
2 $3,263.00$13.00
3 $6,275.00$25.00
Section 13 - STRUCTURE REPAIR (MUS-586-0311) - Totals
Awd $27,726.80
2 $32,628.00
3 $37,376.70
Ref #33 202E38200 GUARDRAIL REMOVED FOR REUSE, (25 FT)
Awd $73.50$2.94
2 $400.00$16.00
3 $625.00$25.00
Ref #34 304E20000 AGGREGATE BASE, (0.7 CY)
Awd $243.18$347.40
2 $245.00$350.00
3 $700.00$1,000.00
Ref #35 509E25001 REINFORCING STEEL, AS PER PLAN, (802 LB)
Awd $2,221.54$2.77
2 $2,566.40$3.20
3 $4,010.00$5.00
Ref #36 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (256 EACH)
Awd $5,378.56$21.01
2 $7,424.00$29.00
3 $8,960.00$35.00
Ref #37 511E53012 CLASS QC2 CONCRETE, MISC.: SELF CONSOLIDATING CONC, (27 CY)
Awd $34,036.47$1,260.61
2 $18,900.00$700.00
3 $20,250.00$750.00
Ref #38 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (662 SY)
Awd $7,540.18$11.39
2 $7,944.00$12.00
3 $8,572.90$12.95
Ref #39 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (24 SY)
Awd $452.88$18.87
2 $1,392.00$58.00
3 $1,200.00$50.00
Ref #40 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 1" PRECOM, (4.25 FT)
Awd $373.19$87.81
2 $569.50$134.00
3 $850.00$200.00
Ref #41 516E31001 JOINT SEALER, AS PER PLAN, (3 FT)
Awd $38.40$12.80
2 $120.00$40.00
3 $450.00$150.00
190500 - Page 153
Ref #42 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (238 FT)
Awd $3,046.40$12.80
2 $1,666.00$7.00
3 $3,808.00$16.00
Ref #43 519E11100 PATCHING CONCRETE STRUCTURE, (80 SF)
Awd $6,920.00$86.50
2 $14,000.00$175.00
3 $16,000.00$200.00
Ref #44 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (1.2 CY)
Awd $310.20$258.50
2 $810.00$675.00
3 $900.00$750.00
Ref #45 602E20000 CONCRETE MASONRY, (0.21 CY)
Awd $729.00$3,471.43
2 $567.00$2,700.00
3 $1,050.00$5,000.00
Ref #46 606E16000 GUARDRAIL REBUILT, (25 FT)
Awd $1,564.50$62.58
2 $925.00$37.00
3 $1,000.00$40.00
Ref #47 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN, (15 FT)
Awd $1,321.65$88.11
2 $3,375.00$225.00
3 $2,550.00$170.00
Ref #48 611E04600 12" CONDUIT, TYPE C, (38 FT)
Awd $2,429.34$63.93
2 $4,180.00$110.00
3 $4,750.00$125.00
Ref #49 611E98180 CATCH BASIN, NO. 3A, (1 EACH)
Awd $3,000.00$3,000.00
2 $3,650.00$3,650.00
3 $4,000.00$4,000.00
Ref #50 659E00530 SEEDING AND MULCHING, CLASS 3B, (150 SY)
Awd $756.00$5.04
2 $750.00$5.00
3 $1,050.00$7.00
Section 14 - STRUCTURE REPAIR (MUS-16-0262L) - Totals
Awd $70,434.99
2 $69,483.90
3 $80,725.90
Ref #51 202E38200 GUARDRAIL REMOVED FOR REUSE, (25 FT)
Awd $73.50$2.94
2 $400.00$16.00
3 $625.00$25.00
Ref #52 304E20000 AGGREGATE BASE, (0.7 CY)
Awd $243.18$347.40
2 $245.00$350.00
3 $700.00$1,000.00
190500 - Page 154
Ref #53 509E25001 REINFORCING STEEL, AS PER PLAN, (802 LB)
Awd $2,221.54$2.77
2 $2,566.40$3.20
3 $4,010.00$5.00
Ref #54 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (256 EACH)
Awd $5,378.56$21.01
2 $7,424.00$29.00
3 $8,960.00$35.00
Ref #55 511E53012 CLASS QC2 CONCRETE, MISC.: SELF CONSOLIDATING CONC, (26 CY)
Awd $32,818.50$1,262.25
2 $18,200.00$700.00
3 $19,500.00$750.00
Ref #56 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (662 SY)
Awd $7,540.18$11.39
2 $7,944.00$12.00
3 $8,572.90$12.95
Ref #57 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (24 SY)
Awd $452.88$18.87
2 $1,392.00$58.00
3 $1,200.00$50.00
Ref #58 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 1" PRECOM, (4.25 FT)
Awd $373.19$87.81
2 $569.50$134.00
3 $850.00$200.00
Ref #59 516E31001 JOINT SEALER, AS PER PLAN, (3 FT)
Awd $38.40$12.80
2 $123.00$41.00
3 $450.00$150.00
Ref #60 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (238 FT)
Awd $3,046.40$12.80
2 $1,666.00$7.00
3 $3,808.00$16.00
Ref #61 519E11100 PATCHING CONCRETE STRUCTURE, (50 SF)
Awd $4,325.00$86.50
2 $8,950.00$179.00
3 $12,500.00$250.00
Ref #62 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (1.2 CY)
Awd $310.20$258.50
2 $780.00$650.00
3 $900.00$750.00
Ref #63 602E20000 CONCRETE MASONRY, (0.21 CY)
Awd $729.00$3,471.43
2 $567.00$2,700.00
3 $1,050.00$5,000.00
Ref #64 606E16000 GUARDRAIL REBUILT, (25 FT)
Awd $1,564.50$62.58
2 $925.00$37.00
3 $1,000.00$40.00
190500 - Page 155
Ref #65 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN, (15 FT)
Awd $1,321.65$88.11
2 $3,375.00$225.00
3 $2,625.00$175.00
Ref #66 611E04600 12" CONDUIT, TYPE C, (52 FT)
Awd $3,280.68$63.09
2 $6,552.00$126.00
3 $7,280.00$140.00
Ref #67 611E98180 CATCH BASIN, NO. 3A, (1 EACH)
Awd $3,000.00$3,000.00
2 $3,500.00$3,500.00
3 $4,000.00$4,000.00
Ref #68 659E00530 SEEDING AND MULCHING, CLASS 3B, (200 SY)
Awd $892.00$4.46
2 $1,000.00$5.00
3 $1,200.00$6.00
Section 15 - STRUCTURE REPAIR (MUS-16-0263R) - Totals
Awd $67,609.36
2 $66,178.90
3 $79,230.90
Ref #69 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (3153 SY)
Awd $35,912.67$11.39
2 $34,683.00$11.00
3 $40,831.35$12.95
Ref #70 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (113 SY)
Awd $2,132.31$18.87
2 $4,068.00$36.00
3 $5,085.00$45.00
Ref #71 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (90 FT)
Awd $1,152.00$12.80
2 $1,800.00$20.00
3 $2,700.00$30.00
Section 16 - STRUCTURE REPAIR (MUS-16-0370R) - Totals
Awd $39,196.98
2 $40,551.00
3 $48,616.35
Ref #72 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (3153 SY)
Awd $35,912.67$11.39
2 $34,683.00$11.00
3 $40,831.35$12.95
Ref #73 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (113 SY)
Awd $2,132.31$18.87
2 $4,068.00$36.00
3 $5,085.00$45.00
190500 - Page 156
Ref #74 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (90 FT)
Awd $1,152.00$12.80
2 $1,800.00$20.00
3 $2,700.00$30.00
Section 17 - STRUCTURE REPAIR (MUS-16-0370L) - Totals
Awd $39,196.98
2 $40,551.00
3 $48,616.35
Ref #75 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (600 SY)
Awd $6,834.00$11.39
2 $7,500.00$12.50
3 $7,770.00$12.95
Ref #76 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (13 SY)
Awd $245.31$18.87
2 $520.00$40.00
3 $845.00$65.00
Ref #77 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 1" PRECOM, (8.5 FT)
Awd $577.24$67.91
2 $1,139.00$134.00
3 $1,487.50$175.00
Ref #78 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM, (9.5 FT)
Awd $870.01$91.58
2 $1,567.50$165.00
3 $1,805.00$190.00
Ref #79 516E31001 JOINT SEALER, AS PER PLAN, (6 FT)
Awd $76.80$12.80
2 $384.00$64.00
3 $660.00$110.00
Ref #80 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (243 FT)
Awd $3,110.40$12.80
2 $1,701.00$7.00
3 $6,075.00$25.00
Ref #81 519E11100 PATCHING CONCRETE STRUCTURE, (8.3 SF)
Awd $717.95$86.50
2 $2,946.50$355.00
3 $8,300.00$1,000.00
Ref #82 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (20 SF)
Awd $718.00$35.90
2 $2,300.00$115.00
3 $14,000.00$700.00
Section 18 - STRUCTURE REPAIR (MUS-16-0429L) - Totals
Awd $13,149.71
2 $18,058.00
3 $40,942.50
190500 - Page 157
Ref #83 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (602 SY)
Awd $6,856.78$11.39
2 $7,525.00$12.50
3 $7,795.90$12.95
Ref #84 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (13 SY)
Awd $245.31$18.87
2 $520.00$40.00
3 $845.00$65.00
Ref #85 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 1" PRECOM, (8.5 FT)
Awd $577.24$67.91
2 $1,139.00$134.00
3 $1,445.00$170.00
Ref #86 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 2" PRECOM, (9.5 FT)
Awd $870.01$91.58
2 $1,567.50$165.00
3 $1,805.00$190.00
Ref #87 516E31001 JOINT SEALER, AS PER PLAN, (6 FT)
Awd $76.80$12.80
2 $384.00$64.00
3 $659.82$109.97
Ref #88 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (243 FT)
Awd $3,110.40$12.80
2 $1,701.00$7.00
3 $6,075.00$25.00
Ref #89 519E11100 PATCHING CONCRETE STRUCTURE, (7.5 SF)
Awd $648.75$86.50
2 $2,475.00$330.00
3 $9,375.00$1,250.00
Ref #90 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (10 SF)
Awd $865.00$86.50
2 $1,550.00$155.00
3 $9,500.00$950.00
Section 19 - STRUCTURE REPAIR (MUS-16-0431R) - Totals
Awd $13,250.29
2 $16,861.50
3 $37,500.72
Ref #91 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1430 SY)
Awd $16,287.70$11.39
2 $17,875.00$12.50
3 $18,518.50$12.95
Ref #92 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (40 SY)
Awd $754.80$18.87
2 $1,320.00$33.00
3 $2,600.00$65.00
Ref #93 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (232 FT)
Awd $2,969.60$12.80
2 $3,480.00$15.00
3 $3,480.00$15.00
190500 - Page 158
Section 20 - STRUCTURE REPAIR (MUS-16-0510) - Totals
Awd $20,012.10
2 $22,675.00
3 $24,598.50
Ref #94 202E23010 PAVEMENT REMOVED, ASPHALT, (86 SY)
Awd $19,491.04$226.64
2 $6,450.00$75.00
3 $4,300.00$50.00
Ref #95 202E38200 GUARDRAIL REMOVED FOR REUSE, (125 FT)
Awd $367.50$2.94
2 $2,000.00$16.00
3 $1,250.00$10.00
Ref #96 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE, (2 EACH)
Awd $283.50$141.75
2 $260.00$130.00
3 $700.00$350.00
Ref #97 304E20000 AGGREGATE BASE, (7 CY)
Awd $751.80$107.40
2 $1,925.00$275.00
3 $1,750.00$250.00
Ref #98 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (2467 SY)
Awd $28,099.13$11.39
2 $30,837.50$12.50
3 $31,947.65$12.95
Ref #99 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (38 SY)
Awd $717.06$18.87
2 $1,292.00$34.00
3 $2,470.00$65.00
Ref #100 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: 3" PRECOM, (206 FT)
Awd $12,329.10$59.85
2 $13,802.00$67.00
3 $17,510.00$85.00
Ref #101 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (211 FT)
Awd $2,700.80$12.80
2 $3,903.50$18.50
3 $3,376.00$16.00
Ref #102 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (5 SF)
Awd $432.50$86.50
2 $1,135.00$227.00
3 $3,750.00$750.00
Ref #103 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (5 CY)
Awd $1,267.80$253.56
2 $1,500.00$300.00
3 $1,250.00$250.00
Ref #104 602E20000 CONCRETE MASONRY, (0.42 CY)
Awd $1,458.00$3,471.43
2 $1,134.00$2,700.00
3 $2,100.00$5,000.00
190500 - Page 159
Ref #105 606E16000 GUARDRAIL REBUILT, (125 FT)
Awd $4,147.50$33.18
2 $3,250.00$26.00
3 $1,875.00$15.00
Ref #106 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1, (2 EACH)
Awd $4,116.00$2,058.00
2 $3,200.00$1,600.00
3 $700.00$350.00
Ref #107 609E23001 COMBINATION CURB AND GUTTER, TYPE 4, AS PER PLAN, (116 FT)
Awd $4,801.24$41.39
2 $17,400.00$150.00
3 $12,760.00$110.00
Ref #108 611E04600 12" CONDUIT, TYPE C, (180 FT)
Awd $11,197.80$62.21
2 $16,920.00$94.00
3 $15,300.00$85.00
Ref #109 611E98180 CATCH BASIN, NO. 3A, (2 EACH)
Awd $5,232.00$2,616.00
2 $7,000.00$3,500.00
3 $8,000.00$4,000.00
Ref #110 659E00530 SEEDING AND MULCHING, CLASS 3B, (1300 SY)
Awd $5,395.00$4.15
2 $3,575.00$2.75
3 $2,600.00$2.00
Ref #111 690E98300 SPECIAL - PRESSURE RELIEF JOINT REPAIR, (92 SY)
Awd $20,471.84$222.52
2 $38,640.00$420.00
3 $36,800.00$400.00
Section 21 - STRUCTURE REPAIR (MUS-16-0600) - Totals
Awd $123,259.61
2 $154,224.00
3 $148,438.65
Ref #112 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (1371 SY)
Awd $15,615.69$11.39
2 $12,339.00$9.00
3 $17,754.45$12.95
Section 22 - STRUCTURE REPAIR (MUS-83-0138) - Totals
Awd $15,615.69
2 $12,339.00
3 $17,754.45
Ref #113 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $11,593.00$11,593.00
2 $23,000.00$23,000.00
3 $25,000.00$25,000.00
190500 - Page 160
Ref #114 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $74,131.50$74,131.50
2 $218,000.00$218,000.00
3 $285,000.00$285,000.00
Ref #115 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (500 HOUR)
Awd $28,875.00$57.75
2 $31,500.00$63.00
3 $32,500.00$65.00
Ref #116 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $600.00$600.00
2 $3,000.00$3,000.00
3 $5,000.00$5,000.00
Ref #117 624E10000 MOBILIZATION, (LUMP SUM)
Awd $83,013.00$83,013.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
Section 23 - INCIDENTALS - Totals
Awd $198,212.50
2 $315,500.00
3 $387,500.00
190500 - Page 161
Project No. 190501
PID 105587
ERI-Deck Overlay
Federal
Type: BRIDGE REPAIR
Completion Date: 10/15/2020
Award Amount: $496,038.27
Contract Awarded To: BCC OHIO INC
Letting Date: 10/10/2019
Engineer's Estimate: $529,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BCC OHIO INC
P O BOX 229
NEW LONDON, OH 44851
Huron
Bidder 1
Bid $496,038.27
OHIO CONCRETE PAVING LLC
1364 ECHO GLEN
GATES MILLS, OH 44040
Cuyahoga
Bidder 2
Bid $549,571.80
BRIDGE SPECIALISTS INC
860 Boardman-Canfield Road Suite 203
Boardman, OH 44512
Mahoning
Bidder 3
Bid $611,028.15
GREAT LAKES CONSTRUCTION CO
2608 GREAT LAKES WAY
HINCKLEY, OH 44233
Medina
Bidder 4
Bid $687,658.00
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 5
Bid $697,429.00
PERK COMPANY INC
8100 GRAND AVE SUITE 300
CLEVELAND, OH 44104-3110
Bidder 6
Bid $721,782.40
190501 - Page 162
Ref #1 202E38000 GUARDRAIL REMOVED, (137.5 FT)
Awd $288.75$2.10
2 $687.50$5.00
3 $275.00$2.00
4 $275.00$2.00
5 $275.00$2.00
6 $1,375.00$10.00
Ref #2 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (6 EACH)
Awd $1,669.50$278.25
2 $1,710.00$285.00
3 $1,590.00$265.00
4 $1,590.00$265.00
5 $1,590.00$265.00
6 $2,100.00$350.00
Ref #3 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $546.00$136.50
2 $600.00$150.00
3 $520.00$130.00
4 $520.00$130.00
5 $520.00$130.00
6 $400.00$100.00
Ref #4 209E15000 RESHAPING UNDER GUARDRAIL, (25.25 STA)
Awd $2,525.00$100.00
2 $3,787.50$150.00
3 $9,468.75$375.00
4 $16,665.00$660.00
5 $2,525.00$100.00
6 $12,625.00$500.00
Ref #5 606E15050 GUARDRAIL, TYPE MGS, (50 FT)
Awd $1,848.00$36.96
2 $2,000.00$40.00
3 $1,760.00$35.20
4 $1,600.00$32.00
5 $1,760.00$35.20
6 $1,500.00$30.00
Ref #6 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016), (4 EACH)
Awd $11,319.00$2,829.75
2 $11,200.00$2,800.00
3 $10,780.00$2,695.00
4 $10,000.00$2,500.00
5 $10,780.00$2,695.00
6 $10,000.00$2,500.00
Ref #7 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (2 EACH)
Awd $2,478.00$1,239.00
2 $2,600.00$1,300.00
3 $2,360.00$1,180.00
4 $2,100.00$1,050.00
5 $2,360.00$1,180.00
6 $2,100.00$1,050.00
190501 - Page 163
Ref #8 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $4,998.00$1,249.50
2 $5,200.00$1,300.00
3 $4,760.00$1,190.00
4 $9,400.00$2,350.00
5 $4,760.00$1,190.00
6 $9,400.00$2,350.00
Ref #9 626E00102 BARRIER REFLECTOR, TYPE 1 , BI-DIRECTIONAL, (6 EACH)
Awd $47.28$7.88
2 $90.00$15.00
3 $45.00$7.50
4 $51.00$8.50
5 $45.00$7.50
6 $60.00$10.00
Section 1 - ROADWAY - Totals
Awd $25,719.53
2 $27,875.00
3 $31,558.75
4 $42,201.00
5 $24,615.00
6 $39,560.00
Ref #10 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
5 $2,000.00$1.00
6 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,000.00
2 $2,000.00
3 $2,000.00
4 $2,000.00
5 $2,000.00
6 $2,000.00
Ref #11 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (, (2606 SY)
Awd $19,154.10$7.35
2 $19,545.00$7.50
3 $23,454.00$9.00
4 $18,242.00$7.00
5 $18,242.00$7.00
6 $22,151.00$8.50
Ref #12 407E10000 TACK COAT, (84 GAL)
Awd $88.20$1.05
2 $100.80$1.20
3 $84.00$1.00
4 $84.00$1.00
5 $84.00$1.00
6 $210.00$2.50
190501 - Page 164
Ref #13 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (36 CY)
Awd $20,790.00$577.50
2 $20,700.00$575.00
3 $19,800.00$550.00
4 $19,800.00$550.00
5 $19,800.00$550.00
6 $17,100.00$475.00
Section 3 - PAVEMENT - Totals
Awd $40,032.30
2 $40,345.80
3 $43,338.00
4 $38,126.00
5 $38,126.00
6 $39,461.00
Ref #14 646E10010 EDGE LINE, 6", (0.3 MILE)
Awd $10,395.00$34,650.00
2 $5,700.00$19,000.00
3 $5,389.50$17,965.00
4 $5,389.50$17,965.00
5 $5,389.50$17,965.00
6 $5,400.00$18,000.00
Ref #15 646E10200 CENTER LINE, (0.15 MILE)
Awd $5,197.50$34,650.00
2 $3,000.00$20,000.00
3 $2,766.75$18,445.00
4 $2,766.75$18,445.00
5 $2,766.75$18,445.00
6 $2,775.00$18,500.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $15,592.50
2 $8,700.00
3 $8,156.25
4 $8,156.25
5 $8,156.25
6 $8,175.00
Ref #16 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $3,675.00$3,675.00
2 $7,500.00$7,500.00
3 $7,875.00$7,875.00
4 $4,875.00$4,875.00
5 $4,875.00$4,875.00
6 $10,000.00$10,000.00
Ref #17 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.15 MILE)
Awd $2,527.20$16,848.00
2 $4,050.00$27,000.00
3 $3,966.75$26,445.00
4 $3,996.75$26,645.00
5 $3,996.75$26,645.00
6 $4,050.00$27,000.00
190501 - Page 165
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $6,202.20
2 $11,550.00
3 $11,841.75
4 $8,871.75
5 $8,871.75
6 $14,050.00
Ref #18 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (465 SY)
Awd $11,057.70$23.78
2 $10,695.00$23.00
3 $18,135.00$39.00
4 $6,975.00$15.00
5 $9,300.00$20.00
6 $18,600.00$40.00
Ref #19 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1002 SY)
Awd $8,797.56$8.78
2 $15,030.00$15.00
3 $35,170.20$35.10
4 $12,024.00$12.00
5 $20,040.00$20.00
6 $20,040.00$20.00
Ref #20 519E11100 PATCHING CONCRETE STRUCTURE, (500 SF)
Awd $43,250.00$86.50
2 $30,000.00$60.00
3 $15,650.00$31.30
4 $42,500.00$85.00
5 $50,000.00$100.00
6 $25,000.00$50.00
Section 6 - STRUCTURE REPAIR (ERI-2-14.06) - Totals
Awd $63,105.26
2 $55,725.00
3 $68,955.20
4 $61,499.00
5 $79,340.00
6 $63,640.00
Ref #21 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (4 CY)
Awd $7,680.00$1,920.00
2 $16,000.00$4,000.00
3 $29,200.00$7,300.00
4 $12,660.00$3,165.00
5 $10,000.00$2,500.00
6 $17,600.00$4,400.00
Ref #22 202E98200 REMOVAL MISC.: JOINT SEAL, (72 FT)
Awd $124.56$1.73
2 $1,080.00$15.00
3 $1,404.00$19.50
4 $4,176.00$58.00
5 $1,440.00$20.00
6 $3,456.00$48.00
190501 - Page 166
Ref #23 511E53012 CLASS QC2 CONCRETE, MISC.: APPROACH SLAB REPAIR, (3 CY)
Awd $4,177.14$1,392.38
2 $6,000.00$2,000.00
3 $5,100.00$1,700.00
4 $2,610.00$870.00
5 $7,500.00$2,500.00
6 $8,025.00$2,675.00
Ref #24 511E53012 CLASS QC2 CONCRETE, MISC.:BACKWALL REPAIR, (2 CY)
Awd $3,409.12$1,704.56
2 $4,000.00$2,000.00
3 $3,400.00$1,700.00
4 $3,530.00$1,765.00
5 $5,000.00$2,500.00
6 $4,400.00$2,200.00
Ref #25 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (14 SY)
Awd $332.92$23.78
2 $700.00$50.00
3 $546.00$39.00
4 $700.00$50.00
5 $700.00$50.00
6 $1,330.00$95.00
Ref #26 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT, (72 FT)
Awd $8,102.16$112.53
2 $7,488.00$104.00
3 $9,360.00$130.00
4 $12,240.00$170.00
5 $18,000.00$250.00
6 $12,600.00$175.00
Ref #27 516E31000 JOINT SEALER, (152 FT)
Awd $1,945.60$12.80
2 $2,736.00$18.00
3 $2,964.00$19.50
4 $2,736.00$18.00
5 $3,040.00$20.00
6 $8,816.00$58.00
Ref #28 519E11100 PATCHING CONCRETE STRUCTURE, (PARAPETS), (120 SF)
Awd $10,380.00$86.50
2 $9,600.00$80.00
3 $15,600.00$130.00
4 $10,200.00$85.00
5 $12,000.00$100.00
6 $16,800.00$140.00
Ref #29 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (932 SY)
Awd $43,198.20$46.35
2 $58,716.00$63.00
3 $37,559.60$40.30
4 $68,968.00$74.00
5 $46,600.00$50.00
6 $45,202.00$48.50
190501 - Page 167
Ref #30 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (932 SY)
Awd $44,931.72$48.21
2 $34,484.00$37.00
3 $47,979.36$51.48
4 $79,220.00$85.00
5 $93,200.00$100.00
6 $60,580.00$65.00
Ref #31 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (10 CY)
Awd $2,175.00$217.50
2 $3,500.00$350.00
3 $2,500.00$250.00
4 $1,650.00$165.00
5 $4,000.00$400.00
6 $1,900.00$190.00
Ref #32 848E50000 HAND CHIPPING, (65 SY)
Awd $6,864.00$105.60
2 $7,800.00$120.00
3 $4,875.00$75.00
4 $12,350.00$190.00
5 $6,500.00$100.00
6 $9,750.00$150.00
Ref #33 848E50100 TEST SLAB, (LUMP SUM)
Awd $1,279.50$1,279.50
2 $500.00$500.00
3 $1,000.00$1,000.00
4 $500.00$500.00
5 $1,500.00$1,500.00
6 $1,765.00$1,765.00
Ref #100 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (25 LB)
Awd $29.75$1.19
2 $125.00$5.00
3 $50.00$2.00
4 $100.00$4.00
5 $250.00$10.00
6 $125.00$5.00
Section 7 - STRUCTURE REPAIR (ERI-2-23.32) - Totals
Awd $134,629.67
2 $152,729.00
3 $161,537.96
4 $211,640.00
5 $209,730.00
6 $192,349.00
Ref #34 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (4 CY)
Awd $7,680.00$1,920.00
2 $16,000.00$4,000.00
3 $29,200.00$7,300.00
4 $12,660.00$3,165.00
5 $10,000.00$2,500.00
6 $17,600.00$4,400.00
190501 - Page 168
Ref #35 202E98200 REMOVAL MISC.: JOINT SEAL, (78 FT)
Awd $134.94$1.73
2 $1,170.00$15.00
3 $1,170.00$15.00
4 $4,524.00$58.00
5 $1,560.00$20.00
6 $3,744.00$48.00
Ref #36 511E53012 CLASS QC2 CONCRETE, MISC.: APPROACH SLAB REPAIR, (3 CY)
Awd $4,177.14$1,392.38
2 $6,000.00$2,000.00
3 $5,100.00$1,700.00
4 $2,610.00$870.00
5 $7,500.00$2,500.00
6 $8,025.00$2,675.00
Ref #37 511E53012 CLASS QC2 CONCRETE, MISC.:BACKWALL REPAIR, (2 CY)
Awd $3,409.12$1,704.56
2 $4,000.00$2,000.00
3 $3,400.00$1,700.00
4 $3,530.00$1,765.00
5 $5,000.00$2,500.00
6 $4,424.00$2,212.00
Ref #38 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (56 SY)
Awd $1,331.68$23.78
2 $2,240.00$40.00
3 $2,184.00$39.00
4 $2,800.00$50.00
5 $2,800.00$50.00
6 $4,799.20$85.70
Ref #39 516E11800 VERTICAL EXTENSION OF STRUCTURAL EXPANSION JOINT, (78 FT)
Awd $6,527.04$83.68
2 $8,112.00$104.00
3 $7,800.00$100.00
4 $13,260.00$170.00
5 $19,500.00$250.00
6 $13,650.00$175.00
Ref #40 516E31000 JOINT SEALER, (164 FT)
Awd $2,099.20$12.80
2 $2,460.00$15.00
3 $2,460.00$15.00
4 $2,952.00$18.00
5 $3,280.00$20.00
6 $9,397.20$57.30
Ref #41 519E11100 PATCHING CONCRETE STRUCTURE, (PARAPETS), (504 SF)
Awd $43,596.00$86.50
2 $40,320.00$80.00
3 $25,200.00$50.00
4 $42,840.00$85.00
5 $50,400.00$100.00
6 $70,560.00$140.00
190501 - Page 169
Ref #42 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1008 SY)
Awd $46,478.88$46.11
2 $63,504.00$63.00
3 $40,622.40$40.30
4 $71,568.00$71.00
5 $50,400.00$50.00
6 $48,888.00$48.50
Ref #43 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1008 SY)
Awd $47,960.64$47.58
2 $37,296.00$37.00
3 $51,891.84$51.48
4 $85,680.00$85.00
5 $100,800.00$100.00
6 $65,520.00$65.00
Ref #44 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (10 CY)
Awd $2,175.00$217.50
2 $3,500.00$350.00
3 $2,500.00$250.00
4 $1,650.00$165.00
5 $4,000.00$400.00
6 $1,900.00$190.00
Ref #45 848E50000 HAND CHIPPING, (71 SY)
Awd $7,497.60$105.60
2 $8,520.00$120.00
3 $5,325.00$75.00
4 $13,490.00$190.00
5 $7,100.00$100.00
6 $10,650.00$150.00
Ref #46 848E50100 TEST SLAB, (LUMP SUM)
Awd $1,279.50$1,279.50
2 $500.00$500.00
3 $1,000.00$1,000.00
4 $500.00$500.00
5 $1,500.00$1,500.00
6 $1,765.00$1,765.00
Ref #101 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (25 LB)
Awd $29.75$1.19
2 $125.00$5.00
3 $50.00$2.00
4 $100.00$4.00
5 $250.00$10.00
6 $125.00$5.00
Section 8 - STRUCTURE REPAIR (ERI-2-25.16) - Totals
Awd $174,376.49
2 $193,747.00
3 $177,903.24
4 $258,164.00
5 $264,090.00
6 $261,047.40
190501 - Page 170
Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,123.00$6,123.00
2 $5,500.00$5,500.00
3 $15,500.00$15,500.00
4 $7,000.00$7,000.00
5 $7,000.00$7,000.00
6 $8,500.00$8,500.00
Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,032.00$4,032.00
2 $11,000.00$11,000.00
3 $9,737.00$9,737.00
4 $22,000.00$22,000.00
5 $20,000.00$20,000.00
6 $50,000.00$50,000.00
Ref #49 619E16000 FIELD OFFICE, TYPE A, (7 MNTH)
Awd $8,542.52$1,220.36
2 $8,400.00$1,200.00
3 $10,500.00$1,500.00
4 $7,000.00$1,000.00
5 $10,500.00$1,500.00
6 $14,000.00$2,000.00
Ref #50 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $630.00$630.00
2 $4,000.00$4,000.00
3 $2,500.00$2,500.00
4 $1,000.00$1,000.00
5 $5,000.00$5,000.00
6 $4,000.00$4,000.00
Ref #51 624E10000 MOBILIZATION, (LUMP SUM)
Awd $15,052.80$15,052.80
2 $28,000.00$28,000.00
3 $67,500.00$67,500.00
4 $20,000.00$20,000.00
5 $20,000.00$20,000.00
6 $25,000.00$25,000.00
Section 9 - INCIDENTALS - Totals
Awd $34,380.32
2 $56,900.00
3 $105,737.00
4 $57,000.00
5 $62,500.00
6 $101,500.00
190501 - Page 171
Project No. 190503
PID 99827
FRA-Whitehall Signals Intercon
Federal
Type: SIGNALIZATION
Completion Date: 10/31/2020
Award Amount: $1,199,262.40
Contract Awarded To: COMPLETE GENERAL CONSTRUCTION COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $1,596,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 1
Bid $1,199,262.40
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 2
Bid $1,340,340.00
GUDENKAUF CORPORATION
2679 MC KINLEY AVE
COLUMBUS, OH 43204
Franklin
Bidder 3
Bid $1,617,497.02
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 4
Bid $2,212,500.00
190503 - Page 172
Ref #1 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $10,000.00
2 $10,000.00
3 $10,000.00
4 $10,000.00
Ref #2 625E25409 CONDUIT, 2", 725.051, AS PER PLAN , SCH 80, (98 FT)
Awd $882.00$9.00
2 $303.80$3.10
3 $135.24$1.38
4 $1,764.00$18.00
Ref #3 625E25505 CONDUIT, 3", 725.051, AS PER PLAN , SCH 80, (2784 FT)
Awd $27,840.00$10.00
2 $10,022.40$3.60
3 $5,846.40$2.10
4 $64,032.00$23.00
Ref #4 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN ,, (117 FT)
Awd $1,989.00$17.00
2 $2,193.75$18.75
3 $5,031.00$43.00
4 $4,563.00$39.00
Ref #5 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN ,, (18947 FT)
Awd $341,046.00$18.00
2 $395,044.95$20.85
3 $824,194.50$43.50
4 $852,615.00$45.00
Ref #6 625E29000 TRENCH, (2882 FT)
Awd $23,056.00$8.00
2 $29,252.30$10.15
3 $38,907.00$13.50
4 $63,404.00$22.00
Ref #7 625E31506 PULL BOX REMOVED AND REPLACED, (1 EACH)
Awd $2,200.00$2,200.00
2 $2,660.00$2,660.00
3 $2,250.00$2,250.00
4 $1,500.00$1,500.00
Ref #8 625E31600 PULL BOX, MISC.: 725.08, 27" CONCRETE ROUND, (17 EACH)
Awd $44,455.00$2,615.00
2 $45,135.00$2,655.00
3 $34,231.20$2,013.60
4 $64,175.00$3,775.00
Ref #9 625E31600 PULL BOX, MISC.: 725.08, 32" CONCRETE ROUND, (54 EACH)
Awd $145,800.00$2,700.00
2 $150,390.00$2,785.00
3 $110,700.00$2,050.00
4 $267,570.00$4,955.00
190503 - Page 173
Ref #10 632E62810 INTERCONNECT CABLE, MISC.: REMOVE INTERCONNECT CAB, (3656 FT)
Awd $4,021.60$1.10
2 $3,838.80$1.05
3 $4,021.60$1.10
4 $9,140.00$2.50
Ref #11 633E99000 CONTROLLER ITEM, MISC.: CENTRAL SYSTEM SOFTWARE, (1 EACH)
Awd $86,125.00$86,125.00
2 $81,205.00$81,205.00
3 $93,750.00$93,750.00
4 $76,000.00$76,000.00
Ref #12 633E99000 CONTROLLER ITEM, MISC.: ETHERNET TRANSCEIVER, SHOR, (58 EACH)
Awd $31,320.00$540.00
2 $14,790.00$255.00
3 $16,992.84$292.98
4 $23,200.00$400.00
Ref #13 633E99000 CONTROLLER ITEM, MISC.: LAYER 2 ETHERNET SWITCH, (30 EACH)
Awd $75,000.00$2,500.00
2 $69,300.00$2,310.00
3 $80,078.40$2,669.28
4 $75,000.00$2,500.00
Ref #14 633E99000 CONTROLLER ITEM, MISC.: REPLACE CONTROLLER, (1 EACH)
Awd $5,350.00$5,350.00
2 $3,450.00$3,450.00
3 $3,776.04$3,776.04
4 $3,600.00$3,600.00
Ref #15 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $565.00$565.00
3 $16,375.00$16,375.00
4 $15,000.00$15,000.00
Ref #16 804E35001 FUSION SPLICE, AS PER PLAN, (1560 EACH)
Awd $62,400.00$40.00
2 $70,356.00$45.10
3 $62,400.00$40.00
4 $85,800.00$55.00
Ref #17 804E98000 FIBER OPTIC CABLE, MISC.: FIBER OPTIC CABLE, 12 F, (2320 FT)
Awd $4,640.00$2.00
2 $7,656.00$3.30
3 $4,640.00$2.00
4 $6,960.00$3.00
Ref #18 804E98000 FIBER OPTIC CABLE, MISC.: FIBER OPTIC CABLE, 144 , (30568 FT)
Awd $97,817.60$3.20
2 $181,879.60$5.95
3 $97,817.60$3.20
4 $198,692.00$6.50
Ref #19 804E98000 FIBER OPTIC CABLE, MISC.: FIBER OPTIC CABLE, 24 F, (4462 FT)
Awd $9,370.20$2.10
2 $13,832.20$3.10
3 $9,370.20$2.10
4 $17,848.00$4.00
190503 - Page 174
Ref #20 804E98100 FIBER OPTIC CABLE, MISC.: FIBER OPTIC SPLICE ENCL, (24 EACH)
Awd $28,800.00$1,200.00
2 $35,160.00$1,465.00
3 $28,800.00$1,200.00
4 $44,400.00$1,850.00
Ref #21 804E98100 FIBER OPTIC CABLE, MISC.: FIBER OPTIC SPLICE ENCL, (2 EACH)
Awd $2,400.00$1,200.00
2 $4,040.00$2,020.00
3 $2,400.00$1,200.00
4 $4,400.00$2,200.00
Ref #22 804E98100 FIBER OPTIC CABLE, MISC.: TERMINATION PANEL, 24 FI, (32 EACH)
Awd $24,800.00$775.00
2 $68,000.00$2,125.00
3 $24,800.00$775.00
4 $56,000.00$1,750.00
Ref #100 632E90400 SIGNALIZATION, MISC.:REMOVE SIGNAL POLE AND CABINE, (1 EACH)
Awd $1,500.00$1,500.00
2 $2,530.00$2,530.00
3 $2,500.00$2,500.00
4 $1,400.00$1,400.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $1,026,812.40
2 $1,191,604.80
3 $1,469,017.02
4 $1,937,063.00
Ref #23 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)
Awd $16,200.00$81.00
2 $7,000.00$35.00
3 $20,000.00$100.00
4 $16,000.00$80.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $16,200.00
2 $7,000.00
3 $20,000.00
4 $16,000.00
Ref #24 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $18,025.00$18,025.00
3 $18,750.00$18,750.00
4 $17,882.00$17,882.00
Ref #25 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $57,000.00$57,000.00
2 $21,535.20$21,535.20
3 $25,000.00$25,000.00
4 $99,355.00$99,355.00
190503 - Page 175
Ref #26 619E16010 FIELD OFFICE, TYPE B, (12 MNTH)
Awd $28,200.00$2,350.00
2 $30,000.00$2,500.00
3 $36,000.00$3,000.00
4 $14,400.00$1,200.00
Ref #27 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1,895.00$1,895.00
3 $10,000.00$10,000.00
4 $5,800.00$5,800.00
Ref #28 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $20,000.00$20,000.00
4 $100,000.00$100,000.00
Section 4 - INCIDENTALS - Totals
Awd $137,700.00
2 $111,455.20
3 $109,750.00
4 $237,437.00
Ref #101 202E30001 WALK REMOVED, AS PER PLAN, (600 SF)
Awd $2,250.00$3.75
2 $12,990.00$21.65
3 $1,530.00$2.55
4 $2,400.00$4.00
Ref #102 608E10001 4" CONCRETE WALK, AS PER PLAN, (600 SF)
Awd $6,300.00$10.50
2 $7,290.00$12.15
3 $7,200.00$12.00
4 $9,600.00$16.00
Section 5 - ROADWAY - Totals
Awd $8,550.00
2 $20,280.00
3 $8,730.00
4 $12,000.00
190503 - Page 176
Project No. 190504
PID 107656
HAR-SR 67-01.59
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/1/2020
Award Amount: $1,395,452.30
Contract Awarded To: SHELLY COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $1,510,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,395,452.30
190504 - Page 177
Ref #1 202E23500 WEARING COURSE REMOVED, (1671 SY)
Awd $16,710.00$10.00
Ref #2 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (4 EACH)
Awd $1,300.00$325.00
Section 1 - ROADWAY - Totals
Awd $18,010.00
Ref #3 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
Ref #4 253E02000 PAVEMENT REPAIR, (800 CY)
Awd $148,000.00$185.00
Ref #5 407E20000 NON-TRACKING TACK COAT, (17391 GAL)
Awd $43,477.50$2.50
Ref #6 617E10100 COMPACTED AGGREGATE, (2254 CY)
Awd $108,192.00$48.00
Ref #7 860E10010 THINLAY ASPHALT CONCRETE, TYPE LT, (5685 CY)
Awd $875,490.00$154.00
Ref #8 875E10000 LONGITUDINAL JOINT ADHESIVE, (11704 LB)
Awd $12,289.20$1.05
Section 3 - PAVEMENT - Totals
Awd $1,187,448.70
Ref #9 621E00100 RPM, (886 EACH)
Awd $20,555.20$23.20
Ref #10 621E54000 RAISED PAVEMENT MARKER REMOVED, (886 EACH)
Awd $14,176.00$16.00
Ref #11 642E00094 EDGE LINE, 6", (26.96 MILE)
Awd $15,771.60$585.00
Ref #12 642E00290 CENTER LINE, (13.48 MILE)
Awd $7,953.20$590.00
Ref #13 644E00500 STOP LINE, (106 FT)
Awd $2,639.40$24.90
Section 4 - TRAFFIC CONTROL - Totals
Awd $61,095.40
Ref #14 614E12460 WORK ZONE MARKING SIGN, (130 EACH)
Awd $13,650.00$105.00
Ref #15 614E21000 WORK ZONE CENTER LINE, CLASS I, (13.48 MILE)
Awd $14,356.20$1,065.00
190504 - Page 178
Ref #16 614E21400 WORK ZONE CENTER LINE, CLASS II, (26.96 MILE)
Awd $5,392.00$200.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $33,398.20
Ref #17 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,000.00$7,000.00
Ref #18 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $52,500.00$52,500.00
Ref #19 624E10000 MOBILIZATION, (LUMP SUM)
Awd $35,000.00$35,000.00
Section 6 - INCIDENTALS - Totals
Awd $94,500.00
190504 - Page 179
Project No. 190505
PID 101668
HOC-CR VAR GR FY2020
Federal
Type: GUARDRAIL REBUILDING
Completion Date: 6/30/2020
Award Amount: $476,373.75
Contract Awarded To: M P DORY CO
Letting Date: 10/10/2019
Engineer's Estimate: $512,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 1
Bid $476,373.75
PDK CONSTRUCTION INC
34070 CREW RD P O BOX 683
POMEROY, OH 45769
Meigs
Bidder 2
Bid $489,738.50
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALK ROAD
NORWALK, OH 44857
Huron
Bidder 3
Bid $491,840.00
190505 - Page 180
Ref #1 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN, (375 FT)
Awd $937.50$2.50
2 $1,125.00$3.00
3 $1,200.00$3.20
Ref #2 606E13011 GUARDRAIL, TYPE 5 WITH TUBULAR BACKUP, AS PER PLAN, (325 FT)
Awd $26,650.00$82.00
2 $31,525.00$97.00
3 $26,000.00$80.00
Ref #3 606E15050 GUARDRAIL, TYPE MGS, (9187.5 FT)
Awd $142,406.25$15.50
2 $145,162.50$15.80
3 $139,650.00$15.20
Ref #4 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (275 FT)
Awd $4,812.50$17.50
2 $5,005.00$18.20
3 $4,840.00$17.60
Ref #5 606E18501 GUARDRAIL POST, 9 FEET, AS PER PLAN, (749 EACH)
Awd $11,235.00$15.00
2 $7,864.50$10.50
3 $14,980.00$20.00
Ref #6 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (31 EACH)
Awd $30,380.00$980.00
2 $31,000.00$1,000.00
3 $30,845.00$995.00
Ref #7 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (12 EACH)
Awd $9,900.00$825.00
2 $9,600.00$800.00
3 $11,340.00$945.00
Ref #8 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN, (20 EACH)
Awd $13,000.00$650.00
2 $10,000.00$500.00
3 $18,000.00$900.00
Ref #9 606E50000 SPECIAL - RESHAPING BERM, (5000 FT)
Awd $750.00$0.15
2 $500.00$0.10
3 $1,000.00$0.20
Section 1 - ROADWAY - Totals
Awd $240,071.25
2 $241,782.00
3 $247,855.00
Ref #10 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN (ADDITI, (137.5 FT)
Awd $343.75$2.50
2 $412.50$3.00
3 $440.00$3.20
Ref #11 606E13011 GUARDRAIL, TYPE 5 WITH TUBULAR BACKUP, AS PER PLAN, (100 FT)
Awd $8,200.00$82.00
2 $9,700.00$97.00
3 $8,000.00$80.00
190505 - Page 181
Ref #12 606E15050 GUARDRAIL, TYPE MGS' (ADDITIVE ALTERNATE 1), (1062.5 FT)
Awd $16,468.75$15.50
2 $16,787.50$15.80
3 $16,150.00$15.20
Ref #13 606E18501 GUARDRAIL POST, 9 FEET, AS PER PLAN' (ADDITIVE ALT, (38 EACH)
Awd $570.00$15.00
2 $399.00$10.50
3 $760.00$20.00
Ref #14 606E25550 ANCHOR ASSEMBLY, MGS TYPE A' (ADDITIVE ALTERNATE 1, (6 EACH)
Awd $5,880.00$980.00
2 $6,150.00$1,025.00
3 $5,970.00$995.00
Ref #15 606E26550 ANCHOR ASSEMBLY, MGS TYPE T' (ADDITIVE ALTERNATE 1, (1 EACH)
Awd $825.00$825.00
2 $800.00$800.00
3 $920.00$920.00
Ref #16 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN' (AD, (5 EACH)
Awd $3,250.00$650.00
2 $2,500.00$500.00
3 $4,500.00$900.00
Ref #17 606E50000 SPECIAL - RESHAPING BERM' (ADDITIVE ALTERNATE 1), (450 FT)
Awd $67.50$0.15
2 $112.50$0.25
3 $180.00$0.40
Ref #18 614E11000 MAINTAINING TRAFFIC' (ADDITIVE ALTERNATE 1), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $500.00$500.00
Ref #19 624E10000 MOBILIZATION' (ADDITIVE ALTERNATE 1), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $250.00$250.00
Section 2 - ROADWAY ADDITIVE ALTERNATE 1: CR 2 - Totals
Awd $36,005.00
2 $37,861.50
3 $37,670.00
Ref #20 606E15050 GUARDRAIL, TYPE MGS (ADDITIVE ALTERNATE 2), (1950 FT)
Awd $30,225.00$15.50
2 $30,810.00$15.80
3 $29,640.00$15.20
Ref #21 606E25550 ANCHOR ASSEMBLY, MGS TYPE A (ADDITIVE ALTERNATE 2), (5 EACH)
Awd $4,900.00$980.00
2 $5,125.00$1,025.00
3 $4,975.00$995.00
Ref #22 606E26550 ANCHOR ASSEMBLY, MGS TYPE T (ADDITIVE ALTERNATE 2), (7 EACH)
Awd $5,775.00$825.00
2 $5,600.00$800.00
3 $6,440.00$920.00
190505 - Page 182
Ref #23 606E50000 SPECIAL - RESHAPING BERM (ADDITIVE ALTERNATE 2), (550 FT)
Awd $82.50$0.15
2 $137.50$0.25
3 $220.00$0.40
Ref #24 614E11000 MAINTAINING TRAFFIC (ADDITIVE ALTERNATE 2), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $500.00$500.00
Ref #25 624E10000 MOBILIZATION (ADDITIVE ALTERNATE 2), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $250.00$250.00
Section 3 - ROADWAY ADDITIVE ALTERNATE 2: CR 14 - Totals
Awd $41,382.50
2 $42,672.50
3 $42,025.00
Ref #26 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN (ADDITI, (25 FT)
Awd $62.50$2.50
2 $75.00$3.00
3 $80.00$3.20
Ref #27 606E15050 GUARDRAIL, TYPE MGS (ADDITIVE ALTERNATE 3), (1037.5 FT)
Awd $16,081.25$15.50
2 $16,392.50$15.80
3 $15,770.00$15.20
Ref #28 606E25550 ANCHOR ASSEMBLY, MGS TYPE A (ADDITIVE ALTERNATE 3), (1 EACH)
Awd $980.00$980.00
2 $1,025.00$1,025.00
3 $995.00$995.00
Ref #29 606E50000 SPECIAL - RESHAPING BERM (ADDITIVE ALTERNATE 3), (400 FT)
Awd $60.00$0.15
2 $100.00$0.25
3 $160.00$0.40
Ref #30 614E11000 MAINTAINING TRAFFIC (ADDITIVE ALTERNATE 3), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $500.00$500.00
Ref #31 624E10000 MOBILIZATION (ADDITIVE ALTERNATE 3), (LUMP SUM)
Awd $200.00$200.00
2 $500.00$500.00
3 $250.00$250.00
Section 4 - ROADWAY ADDITIVE ALTERNATE 3: CR 72 - Totals
Awd $17,583.75
2 $18,592.50
3 $17,755.00
190505 - Page 183
Ref #32 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN (ADDITI, (150 FT)
Awd $375.00$2.50
2 $450.00$3.00
3 $480.00$3.20
Ref #33 606E13011 GUARDRAIL, TYPE 5 WITH TUBULAR BACKUP, AS PER PLAN, (150 FT)
Awd $12,300.00$82.00
2 $15,000.00$100.00
3 $12,000.00$80.00
Ref #34 606E15050 GUARDRAIL, TYPE MGS (ADDITIVE ALTERNATE 4), (5512.5 FT)
Awd $85,443.75$15.50
2 $87,097.50$15.80
3 $83,790.00$15.20
Ref #35 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS (ADDITIVE , (43.75 FT)
Awd $4,375.00$100.00
2 $3,500.00$80.00
3 $7,875.00$180.00
Ref #36 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN (ADDITIVE ALTERNATE, (100 FT)
Awd $1,750.00$17.50
2 $1,820.00$18.20
3 $1,560.00$15.60
Ref #37 606E25550 ANCHOR ASSEMBLY, MGS TYPE A (ADDITIVE ALTERNATE 4), (20 EACH)
Awd $19,600.00$980.00
2 $20,000.00$1,000.00
3 $19,900.00$995.00
Ref #38 606E26550 ANCHOR ASSEMBLY, MGS TYPE T (ADDITIVE ALTERNATE 4), (6 EACH)
Awd $4,950.00$825.00
2 $4,800.00$800.00
3 $5,520.00$920.00
Ref #39 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN (ADD, (8 EACH)
Awd $5,200.00$650.00
2 $4,000.00$500.00
3 $7,200.00$900.00
Ref #40 606E50000 SPECIAL - RESHAPING BERM (ADDITIVE ALTERNATE 4), (2250 FT)
Awd $337.50$0.15
2 $562.50$0.25
3 $900.00$0.40
Ref #41 614E11000 MAINTAINING TRAFFIC (ADDITIVE ALTERNATE 4), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $600.00$600.00
3 $500.00$500.00
Ref #42 624E10000 MOBILIZATION (ADDITIVE ALTERNATE 4), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $500.00$500.00
3 $250.00$250.00
Section 5 - ROADWAY ADDITIVE ALTERNATE 4: CR 1 - Totals
Awd $136,331.25
2 $138,330.00
3 $139,975.00
190505 - Page 184
Ref #43 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,200.00$3,200.00
3 $2,410.00$2,410.00
Ref #44 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,800.00$3,800.00
3 $2,000.00$2,000.00
Ref #45 624E10000 MOBILIZATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,500.00$3,500.00
3 $2,150.00$2,150.00
Section 6 - INCIDENTALS - Totals
Awd $5,000.00
2 $10,500.00
3 $6,560.00
190505 - Page 185
Project No. 190507
PID 103823
LOG-SR 235/SR 540-04.75/01.65
Federal
Type: BRIDGE REPAIR
Completion Date: 7/15/2020
Award Amount: $966,677.64
Contract Awarded To: EAGLE BRIDGE CO
Letting Date: 10/10/2019
Engineer's Estimate: $799,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 1
Bid $966,677.64
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 2
Bid $997,396.05
190507 - Page 186
Ref #1 202E23500 WEARING COURSE REMOVED, (3119 SY)
Awd $21,833.00$7.00
2 $18,714.00$6.00
Section 1 - ROADWAY - Totals
Awd $21,833.00
2 $18,714.00
Ref #2 832E30000 EROSION CONTROL, (2500 EACH)
Awd $2,500.00$1.00
2 $2,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,500.00
2 $2,500.00
Ref #3 407E10000 TACK COAT, (250 GAL)
Awd $250.00$1.00
2 $250.00$1.00
Ref #4 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (257 CY)
Awd $83,717.75$325.75
2 $83,525.00$325.00
Ref #5 617E10100 COMPACTED AGGREGATE, (20 CY)
Awd $2,400.00$120.00
2 $1,700.00$85.00
Section 3 - PAVEMENT - Totals
Awd $86,367.75
2 $85,475.00
Ref #6 621E00100 RPM, (1 EACH)
Awd $2,791.41$2,791.41
2 $1,670.00$1,670.00
Ref #7 621E54000 RAISED PAVEMENT MARKER REMOVED, (1 EACH)
Awd $25.00$25.00
2 $100.00$100.00
Ref #8 642E00094 EDGE LINE, 6", (0.15 MILE)
Awd $1,380.17$9,201.13
2 $149.25$995.00
Ref #9 642E00290 CENTER LINE, (0.08 MILE)
Awd $747.31$9,341.38
2 $56.00$700.00
Ref #10 642E30000 REMOVAL OF PAVEMENT MARKING, (1440 FT)
Awd $3,024.00$2.10
2 $4,320.00$3.00
Ref #11 644E30000 REMOVAL OF PAVEMENT MARKING, (839 FT)
Awd $2,902.94$3.46
2 $2,517.00$3.00
190507 - Page 187
Ref #12 646E10010 EDGE LINE, 6", (0.14 MILE)
Awd $2,129.39$15,209.93
2 $1,876.00$13,400.00
Ref #13 646E10200 CENTER LINE, (0.15 MILE)
Awd $2,523.54$16,823.60
2 $3,299.85$21,999.00
Ref #105 646E10110 LANE LINE, 6", (0.07 MILE)
Awd $1,017.33$14,533.29
2 $520.45$7,435.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $16,541.09
2 $14,508.55
Ref #14 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $6,000.00$75.00
2 $6,240.00$78.00
Ref #15 614E12337 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), AS P, (5 EACH)
Awd $9,521.85$1,904.37
2 $9,500.00$1,900.00
Ref #16 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $11,650.00$11,650.00
Ref #17 614E12500 REPLACEMENT SIGN, (3 EACH)
Awd $751.74$250.58
2 $375.00$125.00
Ref #18 614E12600 REPLACEMENT DRUM, (5 EACH)
Awd $626.45$125.29
2 $250.00$50.00
Ref #19 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL, (16 EACH)
Awd $160.00$10.00
2 $176.00$11.00
Ref #20 614E13360 OBJECT MARKER, TWO WAY, (16 EACH)
Awd $224.00$14.00
2 $240.00$15.00
Ref #21 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT)
Awd $2,000.00$1,000.00
2 $1,800.00$900.00
Ref #22 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.2 MILE)
Awd $2,600.00$13,000.00
2 $2,200.00$11,000.00
Ref #23 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (0.65 MILE)
Awd $5,850.00$9,000.00
2 $4,290.00$6,600.00
Ref #24 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (66 SY)
Awd $13,200.00$200.00
2 $33,000.00$500.00
190507 - Page 188
Ref #25 622E41000 PORTABLE BARRIER, 32", (1480 FT)
Awd $23,680.00$16.00
2 $19,980.00$13.50
Ref #101 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I, (210 FT)
Awd $367.50$1.75
2 $525.00$2.50
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $79,981.54
2 $90,226.00
Ref #26 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $27,500.00$27,500.00
2 $75,000.00$75,000.00
Ref #27 512E33011 TYPE 3 WATERPROOFING, AS PER PLAN, (1110 SY)
Awd $38,850.00$35.00
2 $32,745.00$29.50
Ref #28 515E30000 HIGH EARLY STRENGTH KEYWAY GROUT REPAIR, (100 FT)
Awd $2,000.00$20.00
2 $17,500.00$175.00
Ref #29 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (179 FT)
Awd $3,580.00$20.00
2 $4,475.00$25.00
Ref #30 518E22300 SPECIAL - STEEL DRIP STRIP, AS PER PLAN, (573 FT)
Awd $8,022.00$14.00
2 $11,460.00$20.00
Ref #31 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (104 SF)
Awd $11,960.00$115.00
2 $13,520.00$130.00
Ref #32 601E26000 DUMPED ROCK FILL, TYPE B, (7 CY)
Awd $1,645.00$235.00
2 $1,400.00$200.00
Section 6 - STRUCTURE REPAIR (LOG-235-0475) - Totals
Awd $93,557.00
2 $156,100.00
Ref #33 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $95,000.00$95,000.00
2 $60,000.00$60,000.00
Ref #34 509E10000 EPOXY COATED REINFORCING STEEL, (872 LB)
Awd $2,616.00$3.00
2 $4,360.00$5.00
Ref #35 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $150.00$3.00
2 $250.00$5.00
Ref #36 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (102 EACH)
Awd $1,530.00$15.00
2 $2,040.00$20.00
190507 - Page 189
Ref #37 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (10 CY)
Awd $20,000.00$2,000.00
2 $20,000.00$2,000.00
Ref #38 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (10 CY)
Awd $20,000.00$2,000.00
2 $40,000.00$4,000.00
Ref #39 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (205 SY)
Awd $4,817.50$23.50
2 $4,817.50$23.50
Ref #40 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (9 SY)
Awd $675.00$75.00
2 $675.00$75.00
Ref #41 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (4634 LB)
Awd $16,219.00$3.50
2 $11,585.00$2.50
Ref #42 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (1222 SF)
Awd $36,745.54$30.07
2 $36,660.00$30.00
Ref #43 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME, (1222 SF)
Awd $24,501.10$20.05
2 $24,440.00$20.00
Ref #44 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (1222 SF)
Awd $12,244.44$10.02
2 $12,220.00$10.00
Ref #45 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (1222 SF)
Awd $6,122.22$5.01
2 $6,110.00$5.00
Ref #46 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (2 MNHR)
Awd $400.92$200.46
2 $400.00$200.00
Ref #47 514E10000 FINAL INSPECTION REPAIR, (2 EACH)
Awd $601.38$300.69
2 $600.00$300.00
Ref #48 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (149 FT)
Awd $74,500.00$500.00
2 $67,050.00$450.00
Ref #49 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (142 FT)
Awd $2,556.00$18.00
2 $3,550.00$25.00
Ref #50 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (16 EACH)
Awd $28,000.00$1,750.00
2 $16,000.00$1,000.00
Ref #51 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $21,000.00$21,000.00
2 $15,000.00$15,000.00
Ref #52 517E76300 RAILING, MISC.: BARRIER REPLACED, AS PER PLAN, (16 FT)
Awd $12,000.00$750.00
2 $5,200.00$325.00
190507 - Page 190
Ref #53 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (17 SF)
Awd $4,250.00$250.00
2 $3,400.00$200.00
Ref #54 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1488 SY)
Awd $74,400.00$50.00
2 $74,400.00$50.00
Ref #55 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER , (1488 SY)
Awd $93,000.00$62.50
2 $111,600.00$75.00
Ref #56 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (38 CY)
Awd $7,980.00$210.00
2 $7,600.00$200.00
Ref #57 848E50000 HAND CHIPPING, (45 SY)
Awd $3,375.00$75.00
2 $3,375.00$75.00
Ref #58 848E50100 TEST SLAB, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,500.00$2,500.00
Ref #59 848E50200 FULL-DEPTH REPAIR, (2 CY)
Awd $2,700.00$1,350.00
2 $400.00$200.00
Section 7 - STRUCTURE REPAIR (LOG-540-0165) - Totals
Awd $566,384.10
2 $534,232.50
Ref #60 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $10,000.00$10,000.00
Ref #61 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $49,500.00$49,500.00
2 $50,000.00$50,000.00
Ref #62 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,000.00$3,000.00
Ref #63 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
Ref #100 619E16010 FIELD OFFICE, TYPE B, (2 MNTH)
Awd $7,000.00$3,500.00
2 $2,400.00$1,200.00
Section 8 - INCIDENTALS - Totals
Awd $94,000.00
2 $85,400.00
Ref #102 625E00480 CONNECTION, UNFUSED PERMANENT, (4 EACH)
Awd $541.24$135.31
2 $1,000.00$250.00
190507 - Page 191
Ref #103 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (584 FT)
Awd $2,341.84$4.01
2 $2,920.00$5.00
Ref #104 625E25400 CONDUIT, 2", 725.04, (16 FT)
Awd $2,630.08$164.38
2 $6,320.00$395.00
Section 9 - LIGHTING - Totals
Awd $5,513.16
2 $10,240.00
190507 - Page 192
Project No. 190508
PID 94140
MAH-IR 76/VAR-01.30/VAR
Federal
Type: TWO LANE RESURFACING
Completion Date: 8/31/2020
Award Amount: $4,218,144.18
Contract Awarded To: SHELLY COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $4,252,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $4,218,144.18
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 2
Bid $4,335,671.41
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $4,580,402.80
190508 - Page 193
Ref #1 203E10000 EXCAVATION, (3293 CY)
Awd $47,748.50$14.50
2 $39,516.00$12.00
3 $115,255.00$35.00
Ref #2 209E60200 LINEAR GRADING, (404 STA)
Awd $16,160.00$40.00
2 $14,140.00$35.00
3 $8,080.00$20.00
Ref #3 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING, (1234 STA)
Awd $12,340.00$10.00
2 $20,978.00$17.00
3 $32,084.00$26.00
Ref #4 606E55010 SPECIAL - CABLE BARRIER WITH CONCRETE LINE POST FO, (41893 FT)
Awd $565,555.50$13.50
2 $527,851.80$12.60
3 $527,851.80$12.60
Ref #5 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY, (42 EACH)
Awd $126,630.00$3,015.00
2 $126,630.00$3,015.00
3 $126,630.00$3,015.00
Ref #6 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (18 EACH)
Awd $10,440.00$580.00
2 $10,440.00$580.00
3 $10,440.00$580.00
Section 1 - ROADWAY - Totals
Awd $778,874.00
2 $739,555.80
3 $820,340.80
Ref #7 659E10000 SEEDING AND MULCHING, (22445 SY)
Awd $16,833.75$0.75
2 $22,445.00$1.00
3 $16,833.75$0.75
Ref #8 659E20000 COMMERCIAL FERTILIZER, (3.02 TON)
Awd $2,995.48$991.88
2 $2,416.00$800.00
3 $3,020.00$1,000.00
Ref #9 659E31000 LIME, (4.64 ACRE)
Awd $440.80$95.00
2 $4.64$1.00
3 $440.80$95.00
Ref #10 659E35000 WATER, (122 MGAL)
Awd $97.60$0.80
2 $6.10$0.05
3 $122.00$1.00
Ref #11 832E30000 EROSION CONTROL, (3000 EACH)
Awd $3,000.00$1.00
2 $3,000.00$1.00
3 $3,000.00$1.00
190508 - Page 194
Section 2 - EROSION CONTROL - Totals
Awd $23,367.63
2 $27,871.74
3 $23,416.55
Ref #12 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (2 EACH)
Awd $2,750.00$1,375.00
2 $2,750.00$1,375.00
3 $2,750.00$1,375.00
Section 3 - DRAINAGE - Totals
Awd $2,750.00
2 $2,750.00
3 $2,750.00
Ref #13 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441), (9470 SY)
Awd $175,195.00$18.50
2 $170,460.00$18.00
3 $255,690.00$27.00
Ref #14 253E01000 PAVEMENT REPAIR, (200 SY)
Awd $15,000.00$75.00
2 $13,600.00$68.00
3 $23,800.00$119.00
Ref #15 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1"), (108170 SY)
Awd $81,127.50$0.75
2 $73,555.60$0.68
3 $124,395.50$1.15
Ref #16 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2"), (49190 SY)
Awd $36,892.50$0.75
2 $33,449.20$0.68
3 $73,785.00$1.50
Ref #17 255E20000 FULL DEPTH PAVEMENT SAWING, (1100 FT)
Awd $2,200.00$2.00
2 $55.00$0.05
3 $110.00$0.10
Ref #18 301E46000 ASPHALT CONCRETE BASE, PG64-22, (1630 CY)
Awd $228,200.00$140.00
2 $255,910.00$157.00
3 $237,980.00$146.00
Ref #19 304E20000 AGGREGATE BASE, (34 CY)
Awd $1,700.00$50.00
2 $2,448.00$72.00
3 $1,802.00$53.00
Ref #20 304E20000 AGGREGATE BASE(T= 3"), (1630 CY)
Awd $157,295.00$96.50
2 $161,370.00$99.00
3 $138,550.00$85.00
190508 - Page 195
Ref #21 407E20000 NON-TRACKING TACK COAT, (20011 GAL)
Awd $57,031.35$2.85
2 $49,026.95$2.45
3 $60,033.00$3.00
Ref #22 408E10001 PRIME COAT, AS PER PLAN, (14827 GAL)
Awd $51,894.50$3.50
2 $50,411.80$3.40
3 $44,481.00$3.00
Ref #23 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P, (1154 CY)
Awd $201,950.00$175.00
2 $220,414.00$191.00
3 $242,340.00$210.00
Ref #24 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (5518 CY)
Awd $855,290.00$155.00
2 $938,060.00$170.00
3 $949,096.00$172.00
Ref #25 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (2424 CY)
Awd $278,760.00$115.00
2 $327,240.00$135.00
3 $344,208.00$142.00
Ref #26 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (77 CY)
Awd $30,800.00$400.00
2 $21,560.00$280.00
3 $35,035.00$455.00
Ref #27 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T = 2"), (2061 CY)
Awd $92,745.00$45.00
2 $49,464.00$24.00
3 $138,087.00$67.00
Ref #28 875E10000 LONGITUDINAL JOINT ADHESIVE, (10117 LB)
Awd $16,187.20$1.60
2 $20,234.00$2.00
3 $6,070.20$0.60
Ref #29 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1 1, (1561 SY)
Awd $1,170.75$0.75
2 $1,436.12$0.92
3 $1,795.15$1.15
Ref #30 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1"), (31757 SY)
Awd $23,817.75$0.75
2 $26,993.45$0.85
3 $33,344.85$1.05
Ref #200 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE), (9 MILE)
Awd $9,450.00$1,050.00
2 $6,435.00$715.00
3 $8,100.00$900.00
Section 4 - PAVEMENT - Totals
Awd $2,316,706.55
2 $2,422,123.12
3 $2,718,702.70
190508 - Page 196
Ref #31 621E00100 RPM, (905 EACH)
Awd $22,172.50$24.50
2 $22,172.50$24.50
3 $22,172.50$24.50
Ref #32 621E54000 RAISED PAVEMENT MARKER REMOVED, (724 EACH)
Awd $2,896.00$4.00
2 $1,448.00$2.00
3 $3,620.00$5.00
Ref #33 648E00104 EDGE LINE, 6", (23.54 MILE)
Awd $27,188.70$1,155.00
2 $25,894.00$1,100.00
3 $25,894.00$1,100.00
Ref #34 648E00300 CENTER LINE, (11.77 MILE)
Awd $15,477.55$1,315.00
2 $19,126.25$1,625.00
3 $19,126.25$1,625.00
Ref #35 648E00400 CHANNELIZING LINE, 8", (85 FT)
Awd $425.00$5.00
2 $63.75$0.75
3 $63.75$0.75
Ref #36 644E00500 STOP LINE, (129 FT)
Awd $2,122.05$16.45
2 $767.55$5.95
3 $767.55$5.95
Ref #37 644E01300 LANE ARROW, (2 EACH)
Awd $400.00$200.00
2 $230.00$115.00
3 $230.00$115.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $70,681.80
2 $69,702.05
3 $71,874.05
Ref #38 633E99300 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,400.00$2,400.00
3 $2,400.00$2,400.00
Ref #39 809E69000 ADVANCE RADAR DETECTION, (6 EACH)
Awd $45,000.00$7,500.00
2 $46,500.00$7,750.00
3 $46,500.00$7,750.00
Ref #40 809E69100 STOP LINE RADAR DETECTION, (4 EACH)
Awd $32,000.00$8,000.00
2 $29,800.00$7,450.00
3 $29,800.00$7,450.00
190508 - Page 197
Section 6 - TRAFFIC SIGNALS - Totals
Awd $78,000.00
2 $78,700.00
3 $78,700.00
Ref #41 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (300 HOUR)
Awd $19,500.00$65.00
2 $19,500.00$65.00
3 $19,500.00$65.00
Ref #42 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $3,800.00$3,800.00
2 $3,800.00$3,800.00
3 $3,800.00$3,800.00
Ref #43 614E12460 WORK ZONE MARKING SIGN, (50 EACH)
Awd $2,500.00$50.00
2 $2,500.00$50.00
3 $2,500.00$50.00
Ref #44 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $1,500.00$150.00
2 $2,250.00$225.00
3 $1,200.00$120.00
Ref #45 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)
Awd $10,800.00$900.00
2 $600.00$50.00
3 $10,800.00$900.00
Ref #46 614E21000 WORK ZONE CENTER LINE, CLASS I, (11.77 MILE)
Awd $10,593.00$900.00
2 $10,887.25$925.00
3 $10,887.25$925.00
Ref #47 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (3.11 MILE)
Awd $3,110.00$1,000.00
2 $2,876.75$925.00
3 $2,876.75$925.00
Ref #48 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (11.77 MILE)
Awd $10,593.00$900.00
2 $9,416.00$800.00
3 $9,416.00$800.00
Ref #49 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT, (23.54 MILE)
Awd $8,239.00$350.00
2 $11,770.00$500.00
3 $11,770.00$500.00
Ref #50 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8", (85 FT)
Awd $85.00$1.00
2 $63.75$0.75
3 $63.75$0.75
Ref #51 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (85 FT)
Awd $85.00$1.00
2 $63.75$0.75
3 $63.75$0.75
190508 - Page 198
Ref #52 614E26000 WORK ZONE STOP LINE, CLASS I, (129 FT)
Awd $258.00$2.00
2 $387.00$3.00
3 $387.00$3.00
Ref #53 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (24 FT)
Awd $48.00$2.00
2 $72.00$3.00
3 $72.00$3.00
Ref #54 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (129 FT)
Awd $258.00$2.00
2 $387.00$3.00
3 $387.00$3.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $71,369.00
2 $64,573.50
3 $73,723.50
Ref #55 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #56 203E40000 BORROW, (5 CY)
Awd $1,000.00$200.00
2 $1,000.00$200.00
3 $1,000.00$200.00
Ref #57 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (680 SY)
Awd $10,200.00$15.00
2 $10,200.00$15.00
3 $10,200.00$15.00
Ref #58 601E27000 DUMPED ROCK FILL, TYPE C, (5 CY)
Awd $1,500.00$300.00
2 $1,500.00$300.00
3 $1,500.00$300.00
Ref #59 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #60 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #61 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #62 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
190508 - Page 199
Ref #63 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 8 - STRUCTURE REPAIR (MAH-45-0263) - Totals
Awd $16,560.00
2 $16,560.00
3 $16,560.00
Ref #64 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #65 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (275 SY)
Awd $5,500.00$20.00
2 $5,500.00$20.00
3 $5,500.00$20.00
Ref #66 518E22300 SPECIAL - STEEL DRIP STRIP, (8 FT)
Awd $160.00$20.00
2 $160.00$20.00
3 $160.00$20.00
Ref #67 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C, (1 SY)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
Ref #68 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #69 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #70 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #71 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #72 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
190508 - Page 200
Section 9 - STRUCTURE REPAIR (MAH-45-0383) - Totals
Awd $10,520.00
2 $10,520.00
3 $10,520.00
Ref #73 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #74 203E40000 BORROW, (5 CY)
Awd $1,000.00$200.00
2 $1,000.00$200.00
3 $1,000.00$200.00
Ref #75 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (265 SY)
Awd $7,950.00$30.00
2 $7,950.00$30.00
3 $7,950.00$30.00
Ref #76 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (265 SY)
Awd $5,300.00$20.00
2 $5,300.00$20.00
3 $5,300.00$20.00
Ref #77 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL, (88 FT)
Awd $1,760.00$20.00
2 $1,760.00$20.00
3 $1,760.00$20.00
Ref #78 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING, (113 FT)
Awd $9,763.20$86.40
2 $9,763.20$86.40
3 $9,763.20$86.40
Ref #79 518E22300 SPECIAL - STEEL DRIP STRIP, (210 FT)
Awd $4,200.00$20.00
2 $4,200.00$20.00
3 $4,200.00$20.00
Ref #80 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (150 SF)
Awd $18,750.00$125.00
2 $18,750.00$125.00
3 $18,750.00$125.00
Ref #81 601E27000 DUMPED ROCK FILL, TYPE C, (5 CY)
Awd $1,500.00$300.00
2 $1,500.00$300.00
3 $1,500.00$300.00
Ref #82 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #83 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
190508 - Page 201
Ref #84 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #85 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #86 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Ref #87 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (614 SY)
Awd $58,330.00$95.00
2 $58,330.00$95.00
3 $58,330.00$95.00
Ref #88 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER , (614 SY)
Awd $49,120.00$80.00
2 $49,120.00$80.00
3 $49,120.00$80.00
Ref #89 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (11 CY)
Awd $2,200.00$200.00
2 $2,200.00$200.00
3 $2,200.00$200.00
Ref #90 848E50000 HAND CHIPPING, (186 SY)
Awd $26,040.00$140.00
2 $26,040.00$140.00
3 $26,040.00$140.00
Ref #91 848E50100 TEST SLAB, (LUMP SUM)
Awd $750.00$750.00
2 $750.00$750.00
3 $750.00$750.00
Ref #92 848E50201 FULL DEPTH REPAIR, AS PER PLAN, (1 CY)
Awd $500.00$500.00
2 $500.00$500.00
3 $500.00$500.00
Ref #93 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (99 SY)
Awd $1,980.00$20.00
2 $1,980.00$20.00
3 $1,980.00$20.00
Section 10 - STRUCTURE REPAIR (MAH-45-0580) - Totals
Awd $193,003.20
2 $193,003.20
3 $193,003.20
Ref #94 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
190508 - Page 202
Ref #95 203E40000 BORROW, (2 CY)
Awd $400.00$200.00
2 $400.00$200.00
3 $400.00$200.00
Ref #96 601E27000 DUMPED ROCK FILL, TYPE C, (4 CY)
Awd $1,200.00$300.00
2 $1,200.00$300.00
3 $1,200.00$300.00
Ref #97 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (5 CY)
Awd $1,750.00$350.00
2 $1,750.00$350.00
3 $1,750.00$350.00
Ref #98 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #99 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #100 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #101 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #102 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 11 - STRUCTURE REPAIR (MAH-45-0847) - Totals
Awd $7,210.00
2 $7,210.00
3 $7,210.00
Ref #103 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #104 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
Ref #105 203E40000 BORROW, (5 CY)
Awd $1,000.00$200.00
2 $1,000.00$200.00
3 $1,000.00$200.00
190508 - Page 203
Ref #106 601E27000 DUMPED ROCK FILL, TYPE C, (5 CY)
Awd $1,500.00$300.00
2 $1,500.00$300.00
3 $1,500.00$300.00
Ref #107 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (10 CY)
Awd $3,500.00$350.00
2 $3,500.00$350.00
3 $3,500.00$350.00
Ref #108 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #109 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #110 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #111 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #112 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 12 - STRUCTURE REPAIR (MAH-45-0895) - Totals
Awd $10,860.00
2 $10,860.00
3 $10,860.00
Ref #113 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #114 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
Ref #115 203E40000 BORROW, (4 CY)
Awd $800.00$200.00
2 $800.00$200.00
3 $800.00$200.00
Ref #116 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (221 SY)
Awd $6,630.00$30.00
2 $6,630.00$30.00
3 $6,630.00$30.00
190508 - Page 204
Ref #117 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (221 SY)
Awd $4,420.00$20.00
2 $4,420.00$20.00
3 $4,420.00$20.00
Ref #118 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $15,000.00$150.00
2 $15,000.00$150.00
3 $15,000.00$150.00
Ref #119 601E27000 DUMPED ROCK FILL, TYPE C, (4 CY)
Awd $1,200.00$300.00
2 $1,200.00$300.00
3 $1,200.00$300.00
Ref #120 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (5 CY)
Awd $1,750.00$350.00
2 $1,750.00$350.00
3 $1,750.00$350.00
Ref #121 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #122 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #123 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #124 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #125 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 13 - STRUCTURE REPAIR (MAH-45-1279) - Totals
Awd $34,660.00
2 $34,660.00
3 $34,660.00
Ref #126 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #127 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
190508 - Page 205
Ref #128 203E40000 BORROW, (4 CY)
Awd $800.00$200.00
2 $800.00$200.00
3 $800.00$200.00
Ref #129 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (237 SY)
Awd $7,110.00$30.00
2 $7,110.00$30.00
3 $7,110.00$30.00
Ref #130 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (237 SY)
Awd $4,740.00$20.00
2 $4,740.00$20.00
3 $4,740.00$20.00
Ref #131 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (100 SF)
Awd $15,000.00$150.00
2 $15,000.00$150.00
3 $15,000.00$150.00
Ref #132 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (4 CY)
Awd $1,400.00$350.00
2 $1,400.00$350.00
3 $1,400.00$350.00
Ref #133 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #134 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #135 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $32.00$16.00
2 $32.00$16.00
3 $32.00$16.00
Ref #136 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #137 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 14 - STRUCTURE REPAIR (MAH-45-1289) - Totals
Awd $33,902.00
2 $33,902.00
3 $33,902.00
Ref #138 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
190508 - Page 206
Ref #139 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (42 FT)
Awd $378.00$9.00
2 $378.00$9.00
3 $378.00$9.00
Ref #140 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $192.00$16.00
2 $192.00$16.00
3 $192.00$16.00
Ref #141 630E80100 SIGN, FLAT SHEET, 730.20, (2 SF)
Awd $40.00$20.00
2 $40.00$20.00
3 $40.00$20.00
Ref #142 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)
Awd $150.00$25.00
2 $150.00$25.00
3 $150.00$25.00
Ref #143 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $100.00$25.00
2 $100.00$25.00
3 $100.00$25.00
Section 15 - STRUCTURE REPAIR (MAH-45-1317) - Totals
Awd $3,860.00
2 $3,860.00
3 $3,860.00
Ref #144 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #145 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (988 SY)
Awd $29,640.00$30.00
2 $29,640.00$30.00
3 $29,640.00$30.00
Ref #146 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (990 SY)
Awd $11,880.00$12.00
2 $11,880.00$12.00
3 $11,880.00$12.00
Ref #147 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (988 SY)
Awd $19,760.00$20.00
2 $19,760.00$20.00
3 $19,760.00$20.00
Ref #148 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (300 SF)
Awd $37,500.00$125.00
2 $37,500.00$125.00
3 $37,500.00$125.00
Ref #149 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C, (6 SY)
Awd $4,500.00$750.00
2 $4,500.00$750.00
3 $4,500.00$750.00
190508 - Page 207
Ref #150 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $189.00$9.00
2 $189.00$9.00
3 $189.00$9.00
Ref #151 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $96.00$16.00
2 $96.00$16.00
3 $96.00$16.00
Ref #152 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #153 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $75.00$25.00
2 $75.00$25.00
3 $75.00$25.00
Ref #154 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
Section 16 - STRUCTURE REPAIR (MAH-76-0762L) - Totals
Awd $106,710.00
2 $106,710.00
3 $106,710.00
Ref #155 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
Ref #156 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (976 SY)
Awd $29,280.00$30.00
2 $29,280.00$30.00
3 $29,280.00$30.00
Ref #157 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (990 SY)
Awd $11,880.00$12.00
2 $11,880.00$12.00
3 $11,880.00$12.00
Ref #158 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (976 SY)
Awd $19,520.00$20.00
2 $19,520.00$20.00
3 $19,520.00$20.00
Ref #159 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (300 SF)
Awd $37,500.00$125.00
2 $37,500.00$125.00
3 $37,500.00$125.00
Ref #160 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C, (6 SY)
Awd $4,500.00$750.00
2 $4,500.00$750.00
3 $4,500.00$750.00
190508 - Page 208
Ref #161 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (21 FT)
Awd $189.00$9.00
2 $189.00$9.00
3 $189.00$9.00
Ref #162 630E80100 SIGN, FLAT SHEET, (6 SF)
Awd $96.00$16.00
2 $96.00$16.00
3 $96.00$16.00
Ref #163 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $20.00$20.00
2 $20.00$20.00
3 $20.00$20.00
Ref #164 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $75.00$25.00
2 $75.00$25.00
3 $75.00$25.00
Ref #165 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $50.00$25.00
2 $50.00$25.00
3 $50.00$25.00
Section 17 - STRUCTURE REPAIR (MAH-76-0762R) - Totals
Awd $106,110.00
2 $106,110.00
3 $106,110.00
Ref #166 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,750.00$20,750.00
2 $40,000.00$40,000.00
3 $14,500.00$14,500.00
Ref #167 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $215,000.00$215,000.00
2 $230,000.00$230,000.00
3 $126,000.00$126,000.00
Ref #168 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $12,000.00$2,000.00
2 $12,000.00$2,000.00
3 $12,000.00$2,000.00
Ref #169 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,250.00$5,250.00
2 $5,000.00$5,000.00
3 $15,000.00$15,000.00
Ref #170 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $120,000.00$120,000.00
3 $100,000.00$100,000.00
190508 - Page 209
Project No. 190509
PID 102016
MUS-US 22-05.25
Federal
Type: SLIDE REPAIR
Completion Date: 5/30/2020
Award Amount: $925,267.05
Contract Awarded To: GEORGE J IGEL & CO INC
Letting Date: 10/10/2019
Engineer's Estimate: $1,382,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
GEORGE J IGEL & CO INC
2040 ALUM CREEK DR
COLUMBUS, OH 43207
Franklin
Bidder 1
Bid $925,267.05
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 2
Bid $1,137,232.15
TUCSON INC
3497 UNIVERSITY DR NE
NEW PHILADELPHIA, OH 44663
Tuscarawas
Bidder 3
Bid $1,171,340.20
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 4
Bid $1,215,336.14
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 5
Bid $1,261,862.80
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 6
Bid $1,274,298.00
190509 - Page 211
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $14,000.00$14,000.00
2 $12,454.50$12,454.50
3 $30,000.00$30,000.00
4 $25,000.00$25,000.00
5 $65,000.00$65,000.00
6 $55,000.00$55,000.00
Ref #2 690E98400 SPECIAL - MISC.: ROADWAY PRESERVATION, (LUMP SUM)
Awd $60,000.00$60,000.00
2 $7,500.00$7,500.00
3 $58,000.00$58,000.00
4 $70,000.00$70,000.00
5 $60,000.00$60,000.00
6 $50,000.00$50,000.00
Section 1 - ROADWAY - Totals
Awd $74,000.00
2 $19,954.50
3 $88,000.00
4 $95,000.00
5 $125,000.00
6 $105,000.00
Ref #3 304E20000 AGGREGATE BASE, (10 CY)
Awd $620.00$62.00
2 $1,170.00$117.00
3 $920.00$92.00
4 $1,500.00$150.00
5 $1,070.00$107.00
6 $450.00$45.00
Ref #4 407E10000 TACK COAT, (25 GAL)
Awd $283.75$11.35
2 $50.00$2.00
3 $125.00$5.00
4 $125.00$5.00
5 $50.00$2.00
6 $25.00$1.00
Ref #5 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (10 CY)
Awd $3,250.00$325.00
2 $8,875.00$887.50
3 $3,450.00$345.00
4 $6,750.00$675.00
5 $5,820.00$582.00
6 $1,200.00$120.00
Ref #6 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)
Awd $5,195.00$5,195.00
2 $14,500.00$14,500.00
3 $5,600.00$5,600.00
4 $8,412.59$8,412.59
5 $6,330.00$6,330.00
6 $8,500.00$8,500.00
190509 - Page 212
Ref #7 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (8 SNMT)
Awd $5,600.00$700.00
2 $7,560.00$945.00
3 $13,200.00$1,650.00
4 $8,000.00$1,000.00
5 $12,000.00$1,500.00
6 $3,200.00$400.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,948.75
2 $32,155.00
3 $23,295.00
4 $24,787.59
5 $25,270.00
6 $13,375.00
Ref #8 203E10000 EXCAVATION, (52 CY)
2 $9,702.16$186.58
6 $6,500.00$125.00
Ref #9 659E00510 SEEDING AND MULCHING, CLASS 2, (1436 SY)
2 $1,148.80$0.80
6 $3,590.00$2.50
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)
2 $132.50$662.50
6 $130.00$650.00
Ref #11 659E31000 LIME, (0.3 ACRE)
2 $22.26$74.20
6 $60.00$200.00
Ref #12 659E35000 WATER, (8 MGAL)
2 $8.48$1.06
6 $8.00$1.00
Ref #13 832E30000 EROSION CONTROL, (3000 EACH)
2 $3,000.00$1.00
6 $3,000.00$1.00
Ref #14 862E00500 SCALING, (200 HOUR)
2 $96,740.00$483.70
6 $85,000.00$425.00
Ref #15 862E00600 SLOPE DRAPE, LT SIDE - TECCO MESH OR EQUIVALENT, (1544 SY)
2 $202,186.80$130.95
6 $270,200.00$175.00
Ref #16 862E00600 SLOPE DRAPE, RT SIDE - SPIDER MESH OR EQUIVALENT, (3127 SY)
2 $326,396.26$104.38
6 $469,050.00$150.00
Ref #17 862E00610 EXCAVATION, (2703 CY)
2 $144,772.68$53.56
6 $108,120.00$40.00
Ref #18 862E00700 TRIM BLASTING, (2351 SF)
2 $176,419.04$75.04
6 $35,265.00$15.00
190509 - Page 213
Section 3 - ITEMS OF WORK OPTION 1 - SLOPE DRAPES - Totals
2 $960,528.98
6 $980,923.00
Ref #19 203E10000 EXCAVATION, (61825 CY)
Awd $661,527.50$10.70
3 $834,637.50$13.50
4 $896,462.50$14.50
5 $927,375.00$15.00
Ref #20 208E10000 PRE-BLAST CONDITION SURVEY, (LUMP SUM)
Awd $2,500.00$2,500.00
3 $2,700.00$2,700.00
4 $5,125.00$5,125.00
5 $2,500.00$2,500.00
Ref #21 208E13000 AIR BLAST AND NOISE CONTROL, (LUMP SUM)
Awd $2,100.00$2,100.00
3 $1,700.00$1,700.00
4 $2,000.00$2,000.00
5 $2,800.00$2,800.00
Ref #22 208E14000 VIBRATION CONTROL AND MONITORING, (LUMP SUM)
Awd $2,100.00$2,100.00
3 $1,700.00$1,700.00
4 $2,000.00$2,000.00
5 $2,800.00$2,800.00
Ref #23 208E15000 PRESPLITTING, (3827 SY)
Awd $59,318.50$15.50
3 $84,194.00$22.00
4 $62,188.75$16.25
5 $63,145.50$16.50
Ref #24 208E16000 HYDROLOGIST, (LUMP SUM)
Awd $12,000.00$12,000.00
3 $9,000.00$9,000.00
4 $14,000.00$14,000.00
5 $7,200.00$7,200.00
Ref #25 659E00510 SEEDING AND MULCHING, CLASS 2, (17881 SY)
Awd $13,410.75$0.75
3 $28,609.60$1.60
4 $13,410.75$0.75
5 $13,410.75$0.75
Ref #26 659E20000 COMMERCIAL FERTILIZER, (2.41 TON)
Awd $1,506.25$625.00
3 $1,530.35$635.00
4 $1,506.25$625.00
5 $1,506.25$625.00
Ref #27 659E31000 LIME, (3.69 ACRE)
Awd $258.30$70.00
3 $276.75$75.00
4 $258.30$70.00
5 $258.30$70.00
190509 - Page 214
Ref #28 659E35000 WATER, (97 MGAL)
Awd $97.00$1.00
3 $97.00$1.00
4 $97.00$1.00
5 $97.00$1.00
Ref #29 690E98400 SPECIAL - BLASTING CONSULTANT, (LUMP SUM)
Awd $7,500.00$7,500.00
3 $8,100.00$8,100.00
4 $7,500.00$7,500.00
5 $7,500.00$7,500.00
Ref #30 832E30000 EROSION CONTROL, (6000 EACH)
Awd $6,000.00$1.00
3 $6,000.00$1.00
4 $6,000.00$1.00
5 $6,000.00$1.00
Section 4 - ITEMS OF WORK OPTION 2 - BENCHING - Totals
Awd $768,318.30
3 $978,545.20
4 $1,010,548.55
5 $1,034,592.80
Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $29,500.00$29,500.00
3 $13,500.00$13,500.00
4 $5,000.00$5,000.00
5 $7,500.00$7,500.00
6 $15,000.00$15,000.00
Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $19,950.00$19,950.00
2 $9,500.00$9,500.00
3 $11,000.00$11,000.00
4 $20,000.00$20,000.00
5 $4,500.00$4,500.00
6 $15,000.00$15,000.00
Ref #33 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $21,550.00$21,550.00
2 $22,775.66$22,775.66
3 $12,000.00$12,000.00
4 $20,000.00$20,000.00
5 $25,000.00$25,000.00
6 $20,000.00$20,000.00
Ref #34 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $62,818.01$62,818.01
3 $45,000.00$45,000.00
4 $40,000.00$40,000.00
5 $40,000.00$40,000.00
6 $125,000.00$125,000.00
190509 - Page 215
Section 5 - INCIDENTALS - Totals
Awd $68,000.00
2 $124,593.67
3 $81,500.00
4 $85,000.00
5 $77,000.00
6 $175,000.00
190509 - Page 216
Project No. 190510
PID 106088
PIK-SR 220-12.24 OH17-01
Federal
Type: SLIDE REPAIR
Completion Date: 8/31/2020
Award Amount: $145,594.46
Contract Awarded To: ALLARD EXCAVATION LLC
Letting Date: 10/10/2019
Engineer's Estimate: $192,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ALLARD EXCAVATION LLC
8336 BENNETT SCHOOL HOUSE RD
SOUTH WEBSTER, OH 45682
Scioto
Bidder 1
Bid $145,594.46
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 2
Bid $155,564.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $186,939.00
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 4
Bid $205,294.87
SKEENS EXCAVATING INC
680 GREAT MEADOW RD
WHEELERSBURG, OH 45695
Vinton
Bidder 5
Bid $206,593.00
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 6
Bid $217,044.16
COOPERS EXCAVATING LLC
7251 BETHLEHEM ROAD
WINCHESTER, OH 45697
Adams
Bidder 7
Bid $224,622.90
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 8
Bid $225,272.70
BEAVER EXCAVATING COMPANY
P O BOX 6059
CANTON, OH 44706
Stark
Bidder 9
Bid $253,071.45
190510 - Page 217
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,600.00$3,600.00
2 $11,000.00$11,000.00
3 $2,500.00$2,500.00
4 $2,705.03$2,705.03
5 $5,000.00$5,000.00
6 $9,500.00$9,500.00
7 $5,000.00$5,000.00
8 $2,500.00$2,500.00
9 $20,150.00$20,150.00
Ref #2 202E38000 GUARDRAIL REMOVED, (225 FT)
Awd $598.50$2.66
2 $225.00$1.00
3 $1,125.00$5.00
4 $742.50$3.30
5 $3,375.00$15.00
6 $1,125.00$5.00
7 $2,587.50$11.50
8 $1,125.00$5.00
9 $405.00$1.80
Ref #3 203E10000 EXCAVATION, (988 CY)
Awd $15,047.24$15.23
2 $17,290.00$17.50
3 $19,760.00$20.00
4 $15,966.08$16.16
5 $19,760.00$20.00
6 $17,290.00$17.50
7 $29,640.00$30.00
8 $24,700.00$25.00
9 $19,760.00$20.00
Ref #4 203E20000 EMBANKMENT, (105 CY)
Awd $1,942.50$18.50
2 $2,625.00$25.00
3 $1,575.00$15.00
4 $630.00$6.00
5 $3,150.00$30.00
6 $1,680.00$16.00
7 $3,675.00$35.00
8 $2,100.00$20.00
9 $2,520.00$24.00
Ref #5 203E35001 GRANULAR EMBANKMENT, AS PER PLAN, (2 CY)
Awd $474.00$237.00
2 $500.00$250.00
3 $90.00$45.00
4 $368.34$184.17
5 $100.00$50.00
6 $279.00$139.50
7 $2,000.00$1,000.00
8 $120.00$60.00
9 $810.00$405.00
190510 - Page 218
Ref #6 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (225 FT)
Awd $5,456.25$24.25
2 $6,075.00$27.00
3 $5,512.50$24.50
4 $6,750.00$30.00
5 $6,300.00$28.00
6 $5,512.50$24.50
7 $6,772.50$30.10
8 $12,375.00$55.00
9 $5,220.00$23.20
Ref #7 623E38500 MONUMENT ASSEMBLY, (2 EACH)
Awd $920.00$460.00
2 $1,200.00$600.00
3 $3,000.00$1,500.00
4 $1,067.24$533.62
5 $1,600.00$800.00
6 $2,007.00$1,003.50
7 $1,500.00$750.00
8 $1,100.00$550.00
9 $2,762.00$1,381.00
Ref #8 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL, (2 EACH)
Awd $26.00$13.00
2 $30.00$15.00
3 $26.00$13.00
4 $16.00$8.00
5 $100.00$50.00
6 $27.00$13.50
7 $20.00$10.00
8 $20.00$10.00
9 $15.00$7.50
Section 1 - ROADWAY - Totals
Awd $28,064.49
2 $38,945.00
3 $33,588.50
4 $28,245.19
5 $39,385.00
6 $37,420.50
7 $51,195.00
8 $44,040.00
9 $51,642.00
Ref #9 204E50000 GEOTEXTILE FABRIC, (356 SY)
Awd $890.00$2.50
2 $890.00$2.50
3 $534.00$1.50
4 $566.04$1.59
5 $2,848.00$8.00
6 $1,068.00$3.00
7 $1,335.00$3.75
8 $1,780.00$5.00
9 $1,246.00$3.50
190510 - Page 219
Ref #10 601E26000 DUMPED ROCK FILL, TYPE B, (1146 CY)
Awd $50,424.00$44.00
2 $50,424.00$44.00
3 $53,862.00$47.00
4 $81,732.72$71.32
5 $66,468.00$58.00
6 $61,884.00$54.00
7 $68,760.00$60.00
8 $97,410.00$85.00
9 $63,660.30$55.55
Ref #11 659E00300 TOPSOIL, (35 CY)
Awd $773.50$22.10
2 $525.00$15.00
3 $700.00$20.00
4 $2,074.10$59.26
5 $1,750.00$50.00
6 $1,925.00$55.00
7 $2,625.00$75.00
8 $1,750.00$50.00
9 $3,386.25$96.75
Ref #12 659E10000 SEEDING AND MULCHING, (313 SY)
Awd $1,565.00$5.00
2 $1,878.00$6.00
3 $2,191.00$7.00
4 $3,286.50$10.50
5 $1,252.00$4.00
6 $2,191.00$7.00
7 $2,191.00$7.00
8 $3,130.00$10.00
9 $2,191.00$7.00
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.04 TON)
Awd $20.00$500.00
2 $26.00$650.00
3 $25.00$625.00
4 $20.00$500.00
5 $20.00$500.00
6 $25.00$625.00
7 $25.00$625.00
8 $48.00$1,200.00
9 $25.00$625.00
Ref #14 659E31000 LIME, (0.06 ACRE)
Awd $30.00$500.00
2 $4.80$80.00
3 $4.20$70.00
4 $12.00$200.00
5 $30.00$500.00
6 $4.20$70.00
7 $4.20$70.00
8 $48.00$800.00
9 $4.20$70.00
190510 - Page 220
Ref #15 659E35000 WATER, (1.7 MGAL)
Awd $1.70$1.00
2 $1.70$1.00
3 $1.70$1.00
4 $1.70$1.00
5 $170.00$100.00
6 $1.70$1.00
7 $1.70$1.00
8 $1.70$1.00
9 $1.70$1.00
Ref #16 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
5 $5,000.00$1.00
6 $5,000.00$1.00
7 $5,000.00$1.00
8 $5,000.00$1.00
9 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $58,704.20
2 $58,749.50
3 $62,317.90
4 $92,693.06
5 $77,538.00
6 $72,098.90
7 $79,941.90
8 $109,167.70
9 $75,514.45
Ref #17 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (30 FT)
Awd $208.50$6.95
2 $900.00$30.00
3 $990.00$33.00
4 $321.60$10.72
5 $2,400.00$80.00
6 $300.00$10.00
7 $600.00$20.00
8 $750.00$25.00
9 $555.00$18.50
Ref #18 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (1 EACH)
Awd $250.00$250.00
2 $200.00$200.00
3 $450.00$450.00
4 $410.48$410.48
5 $1,500.00$1,500.00
6 $231.00$231.00
7 $500.00$500.00
8 $250.00$250.00
9 $2,000.00$2,000.00
190510 - Page 221
Ref #19 690E12010 SPECIAL - GEOTEXTILE FABRIC, (13 SY)
Awd $81.25$6.25
2 $65.00$5.00
3 $221.00$17.00
4 $20.93$1.61
5 $780.00$60.00
6 $32.50$2.50
7 $520.00$40.00
8 $130.00$10.00
9 $234.00$18.00
Section 3 - DRAINAGE - Totals
Awd $539.75
2 $1,165.00
3 $1,661.00
4 $753.01
5 $4,680.00
6 $563.50
7 $1,620.00
8 $1,130.00
9 $2,789.00
Ref #20 304E20000 AGGREGATE BASE, (23 CY)
Awd $1,317.90$57.30
2 $1,610.00$70.00
3 $1,472.00$64.00
4 $2,177.41$94.67
5 $1,840.00$80.00
6 $2,714.00$118.00
7 $3,105.00$135.00
8 $1,725.00$75.00
9 $3,565.00$155.00
Section 4 - PAVEMENT - Totals
Awd $1,317.90
2 $1,610.00
3 $1,472.00
4 $2,177.41
5 $1,840.00
6 $2,714.00
7 $3,105.00
8 $1,725.00
9 $3,565.00
Ref #21 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (30 HOUR)
Awd $2,250.00$75.00
2 $1,200.00$40.00
3 $2,040.00$68.00
4 $1,950.00$65.00
5 $1,950.00$65.00
6 $2,055.00$68.50
7 $2,250.00$75.00
8 $1,500.00$50.00
9 $1,800.00$60.00
190510 - Page 222
Ref #22 614E11630 INCREASED BARRIER DELINEATION, (130 FT)
Awd $296.40$2.28
2 $325.00$2.50
3 $130.00$1.00
4 $325.00$2.50
5 $2,600.00$20.00
6 $260.00$2.00
7 $325.00$2.50
8 $1,300.00$10.00
9 $325.00$2.50
Ref #23 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (3 EACH)
Awd $4,800.00$1,600.00
2 $3,000.00$1,000.00
3 $7,500.00$2,500.00
4 $5,850.00$1,950.00
5 $10,800.00$3,600.00
6 $5,985.00$1,995.00
7 $5,700.00$1,900.00
8 $6,000.00$2,000.00
9 $5,700.00$1,900.00
Ref #24 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (2 CY)
Awd $460.00$230.00
2 $300.00$150.00
3 $550.00$275.00
4 $1,865.52$932.76
5 $2,000.00$1,000.00
6 $562.00$281.00
7 $1,000.00$500.00
8 $40.00$20.00
9 $500.00$250.00
Ref #25 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL), (6 EACH)
Awd $72.00$12.00
2 $90.00$15.00
3 $90.00$15.00
4 $66.00$11.00
5 $300.00$50.00
6 $315.00$52.50
7 $66.00$11.00
8 $60.00$10.00
9 $66.00$11.00
Ref #26 614E13360 OBJECT MARKER, TWO WAY, (8 EACH)
Awd $96.00$12.00
2 $120.00$15.00
3 $160.00$20.00
4 $120.00$15.00
5 $400.00$50.00
6 $420.00$52.50
7 $120.00$15.00
8 $160.00$20.00
9 $120.00$15.00
190510 - Page 223
Ref #27 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I, (0.1 MILE)
Awd $102.96$1,029.60
2 $700.00$7,000.00
3 $1,029.60$10,296.00
4 $650.00$6,500.00
5 $4,000.00$40,000.00
6 $682.50$6,825.00
7 $650.00$6,500.00
8 $1,250.00$12,500.00
9 $650.00$6,500.00
Ref #28 614E26000 WORK ZONE STOP LINE, CLASS I, (60 FT)
Awd $840.00$14.00
2 $720.00$12.00
3 $840.00$14.00
4 $540.00$9.00
5 $1,200.00$20.00
6 $570.00$9.50
7 $540.00$9.00
8 $3,000.00$50.00
9 $540.00$9.00
Ref #29 622E41000 PORTABLE BARRIER, 32", (420 FT)
Awd $5,880.00$14.00
2 $2,940.00$7.00
3 $9,660.00$23.00
4 $8,610.00$20.50
5 $12,600.00$30.00
6 $9,030.00$21.50
7 $8,610.00$20.50
8 $10,500.00$25.00
9 $25,200.00$60.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,797.36
2 $9,395.00
3 $21,999.60
4 $19,976.52
5 $35,850.00
6 $19,879.50
7 $19,261.00
8 $23,810.00
9 $34,901.00
Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,870.76$1,870.76
2 $8,700.00$8,700.00
3 $1,500.00$1,500.00
4 $1,478.11$1,478.11
5 $3,500.00$3,500.00
6 $7,200.00$7,200.00
7 $18,000.00$18,000.00
8 $7,500.00$7,500.00
9 $1,050.00$1,050.00
190510 - Page 224
Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $16,600.00$16,600.00
2 $22,000.00$22,000.00
3 $41,400.00$41,400.00
4 $33,025.00$33,025.00
5 $25,000.00$25,000.00
6 $47,667.76$47,667.76
7 $35,000.00$35,000.00
8 $20,000.00$20,000.00
9 $57,610.00$57,610.00
Ref #32 619E16000 FIELD OFFICE, TYPE A, (4 MNTH)
Awd $4,800.00$1,200.00
2 $2,000.00$500.00
3 $10,000.00$2,500.00
4 $6,106.44$1,526.61
5 $400.00$100.00
6 $3,000.00$750.00
7 $4,000.00$1,000.00
8 $400.00$100.00
9 $6,000.00$1,500.00
Ref #33 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,900.00$2,900.00
2 $2,000.00$2,000.00
3 $9,000.00$9,000.00
4 $6,440.00$6,440.00
5 $8,000.00$8,000.00
6 $8,500.00$8,500.00
7 $2,500.00$2,500.00
8 $7,500.00$7,500.00
9 $10,000.00$10,000.00
Ref #34 624E10000 MOBILIZATION, (LUMP SUM)
Awd $16,000.00$16,000.00
2 $11,000.00$11,000.00
3 $4,000.00$4,000.00
4 $14,400.13$14,400.13
5 $10,400.00$10,400.00
6 $18,000.00$18,000.00
7 $10,000.00$10,000.00
8 $10,000.00$10,000.00
9 $10,000.00$10,000.00
Section 6 - INCIDENTALS - Totals
Awd $42,170.76
2 $45,700.00
3 $65,900.00
4 $61,449.68
5 $47,300.00
6 $84,367.76
7 $69,500.00
8 $45,400.00
9 $84,660.00
190510 - Page 225
Project No. 190511
PID 100963
POR-CHIP FY2020
Federal
Type: CHIP SEAL
Completion Date: 7/31/2020
Award Amount: $449,870.00
Contract Awarded To: RONYAK PAVING INC
Letting Date: 10/10/2019
Engineer's Estimate: $492,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RONYAK PAVING INC
14376 N CHESHIRE ST
BURTON, OH 44021
Geauga
Bidder 1
Bid $449,870.00
SPECIALIZED CONSTRUCTION INC
711 HARVARD AVE
CLEVELAND, OH 44105
Cuyahoga
Bidder 2
Bid $499,861.14
190511 - Page 226
Ref #1 886E11000 FOG SEAL, (11226 GAL)
Awd $33,116.70$2.95
2 $44,904.00$4.00
Section 1 - ROADWAY - Totals
Awd $33,116.70
2 $44,904.00
Ref #2 832E30000 EROSION CONTROL, (3000 EACH)
Awd $3,000.00$1.00
2 $3,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $3,000.00
2 $3,000.00
Ref #3 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441), (5000 SY)
Awd $120,000.00$24.00
2 $133,500.00$26.70
Ref #4 422E10001 SINGLE CHIP SEAL, TYPE A, AS PER PLAN, (74836 SY)
Awd $138,446.60$1.85
2 $168,381.00$2.25
Section 3 - PAVEMENT - Totals
Awd $258,446.60
2 $301,881.00
Ref #5 621E00100 RPM (YELLOW/YELLOW), (380 EACH)
Awd $9,120.00$24.00
2 $10,222.00$26.90
Ref #6 621E54000 RAISED PAVEMENT MARKER REMOVED, (306 EACH)
Awd $3,060.00$10.00
2 $7,646.94$24.99
Ref #7 642E00094 EDGE LINE, 6", (10.28 MILE)
Awd $8,330.30$810.34
2 $6,476.40$630.00
Ref #8 642E00290 CENTER LINE, (5.05 MILE)
Awd $4,494.50$890.00
2 $4,923.75$975.00
Ref #9 642E00490 STOP LINE, (84 FT)
Awd $504.00$6.00
2 $294.00$3.50
Ref #10 644E30000 REMOVAL OF PAVEMENT MARKING, (84 FT)
Awd $151.20$1.80
2 $168.00$2.00
Ref #11 644E30030 REMOVAL OF PAVEMENT MARKING, (15.33 MILE)
Awd $23,253.00$1,516.83
2 $24,837.05$1,620.16
190511 - Page 227
Section 4 - TRAFFIC CONTROL - Totals
Awd $48,913.00
2 $54,568.14
Ref #12 614E12460 WORK ZONE MARKING SIGN, (10 EACH)
Awd $550.00$55.00
2 $550.00$55.00
Ref #13 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (15.15 MILE)
Awd $11,514.00$760.00
2 $12,120.00$800.00
Ref #14 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT, (10.28 MILE)
Awd $5,448.40$530.00
2 $6,682.00$650.00
Ref #15 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (252 FT)
Awd $756.00$3.00
2 $756.00$3.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $18,268.40
2 $20,108.00
Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $4,000.00$4,000.00
Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $39,000.00$39,000.00
2 $30,000.00$30,000.00
Ref #18 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $7,500.00$1,250.00
2 $12,000.00$2,000.00
Ref #19 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,125.30$3,125.30
2 $1,400.00$1,400.00
Ref #20 624E10000 MOBILIZATION, (LUMP SUM)
Awd $34,000.00$34,000.00
2 $28,000.00$28,000.00
Section 6 - INCIDENTALS - Totals
Awd $88,125.30
2 $75,400.00
190511 - Page 228
Project No. 190512
PID 94405
RIC-US 42-03.48
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/31/2020
Award Amount: $1,749,894.48
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 10/10/2019
Engineer's Estimate: $1,661,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,749,894.48
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 2
Bid $1,793,504.21
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $1,843,022.18
190512 - Page 229
Ref #1 202E30000 WALK REMOVED, (1672 SF)
Awd $6,771.60$4.05
2 $3,494.48$2.09
3 $3,494.48$2.09
Ref #2 202E32000 CURB REMOVED, (50 FT)
Awd $437.50$8.75
2 $599.50$11.99
3 $599.50$11.99
Ref #3 202E38000 GUARDRAIL REMOVED, (256.25 FT)
Awd $410.00$1.60
2 $410.00$1.60
3 $410.00$1.60
Ref #4 202E38200 GUARDRAIL REMOVED FOR REUSE, (87.5 FT)
Awd $175.00$2.00
2 $175.00$2.00
3 $175.00$2.00
Ref #5 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (2 EACH)
Awd $530.00$265.00
2 $530.00$265.00
3 $530.00$265.00
Ref #6 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (4 EACH)
Awd $600.00$150.00
2 $600.00$150.00
3 $600.00$150.00
Ref #7 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (7 EACH)
Awd $875.00$125.00
2 $875.00$125.00
3 $875.00$125.00
Ref #8 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (8 EACH)
Awd $760.00$95.00
2 $760.00$95.00
3 $760.00$95.00
Ref #9 203E20001 EMBANKMENT, AS PER PLAN, (1 CY)
Awd $160.00$160.00
2 $160.00$160.00
3 $160.00$160.00
Ref #10 209E15000 RESHAPING UNDER GUARDRAIL, (10.88 STA)
Awd $544.00$50.00
2 $544.00$50.00
3 $544.00$50.00
Ref #11 209E60500 LINEAR GRADING, (0.1 MILE)
Awd $500.00$5,000.00
2 $140.00$1,400.00
3 $145.00$1,450.00
Ref #12 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (4.66 MILE)
Awd $6,990.00$1,500.00
2 $6,524.00$1,400.00
3 $6,757.00$1,450.00
190512 - Page 230
Ref #13 209E80000 GRADING MAILBOX APPROACHES, (7 EACH)
Awd $560.00$80.00
2 $175.00$25.00
3 $875.00$125.00
Ref #14 606E13000 GUARDRAIL, TYPE 5, (162.5 FT)
Awd $2,665.00$16.40
2 $2,665.00$16.40
3 $2,665.00$16.40
Ref #15 606E15050 GUARDRAIL, TYPE MGS, (225 FT)
Awd $3,870.00$17.20
2 $3,870.00$17.20
3 $3,870.00$17.20
Ref #16 606E16500 GUARDRAIL REBUILT, TYPE 5, (87.5 FT)
Awd $840.00$9.60
2 $840.00$9.60
3 $840.00$9.60
Ref #17 606E17000 RAISING TYPE 5 GUARDRAIL, (137.5 FT)
Awd $990.00$7.20
2 $990.00$7.20
3 $990.00$7.20
Ref #18 606E26100 ANCHOR ASSEMBLY, TYPE E, (2 EACH)
Awd $4,240.00$2,120.00
2 $4,240.00$2,120.00
3 $4,240.00$2,120.00
Ref #19 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016), (4 EACH)
Awd $8,720.00$2,180.00
2 $8,720.00$2,180.00
3 $8,720.00$2,180.00
Ref #20 606E26500 ANCHOR ASSEMBLY, TYPE T, (1 EACH)
Awd $820.00$820.00
2 $820.00$820.00
3 $820.00$820.00
Ref #21 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (7 EACH)
Awd $6,825.00$975.00
2 $6,825.00$975.00
3 $6,825.00$975.00
Ref #22 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH)
Awd $4,080.00$2,040.00
2 $4,080.00$2,040.00
3 $4,080.00$2,040.00
Ref #23 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (1 EACH)
Awd $465.00$465.00
2 $465.00$465.00
3 $465.00$465.00
Ref #24 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (1 EACH)
Awd $475.00$475.00
2 $475.00$475.00
3 $475.00$475.00
190512 - Page 231
Ref #25 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (4 EACH)
Awd $2,780.00$695.00
2 $2,780.00$695.00
3 $2,780.00$695.00
Ref #26 608E10000 4" CONCRETE WALK, (786 SF)
Awd $8,646.00$11.00
2 $5,934.30$7.55
3 $5,934.30$7.55
Ref #27 608E52000 CURB RAMP (TYPE A2), (107 SF)
Awd $1,177.00$11.00
2 $1,582.53$14.79
3 $1,582.53$14.79
Ref #28 608E52000 CURB RAMP (TYPE B1), (91 SF)
Awd $1,001.00$11.00
2 $1,409.59$15.49
3 $1,409.59$15.49
Ref #29 608E52000 CURB RAMP (TYPE B2), (387 SF)
Awd $4,257.00$11.00
2 $5,143.23$13.29
3 $5,143.23$13.29
Ref #30 608E52000 CURB RAMP (TYPE C1), (275 SF)
Awd $3,025.00$11.00
2 $3,352.25$12.19
3 $3,352.25$12.19
Ref #31 608E52000 CURB RAMP (TYPE C2), (78 SF)
Awd $858.00$11.00
2 $1,138.02$14.59
3 $1,138.02$14.59
Ref #32 608E53020 DETECTABLE WARNING, (88 SF)
Awd $1,760.00$20.00
2 $4,615.60$52.45
3 $4,615.60$52.45
Ref #33 620E70010 DELINEATOR, MISC.: REMOVAL AND REERECTED, (16 FT)
Awd $1,720.00$107.50
2 $1,720.00$107.50
3 $1,720.00$107.50
Ref #34 623E39601 MONUMENT BOX RECONSTRUCTED TO GRADE, AS PER PLAN, (4 EACH)
Awd $6,000.00$1,500.00
2 $3,320.00$830.00
3 $7,196.00$1,799.00
Ref #35 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (3 EACH)
Awd $405.00$135.00
2 $405.00$135.00
3 $405.00$135.00
Section 1 - ROADWAY - Totals
Awd $84,932.10
2 $80,377.50
3 $85,191.50
190512 - Page 232
Ref #36 832E30000 EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,500.00
2 $1,500.00
3 $1,500.00
Ref #37 611E98630 CATCH BASIN ADJUSTED TO GRADE, (20 EACH)
Awd $10,000.00$500.00
2 $7,600.00$380.00
3 $15,700.00$785.00
Ref #38 611E99150 INLET ADJUSTED TO GRADE, (29 EACH)
Awd $17,400.00$600.00
2 $12,760.00$440.00
3 $22,301.00$769.00
Ref #39 611E99654 MANHOLE ADJUSTED TO GRADE, (20 EACH)
Awd $8,000.00$400.00
2 $7,000.00$350.00
3 $9,100.00$455.00
Section 3 - DRAINAGE - Totals
Awd $35,400.00
2 $27,360.00
3 $47,101.00
Ref #40 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA, (575 CY)
Awd $126,500.00$220.00
2 $143,750.00$250.00
3 $132,250.00$230.00
Ref #41 253E02000 PAVEMENT REPAIR, (60 CY)
Awd $15,000.00$250.00
2 $21,000.00$350.00
3 $10,500.00$175.00
Ref #42 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50"), (43925 SY)
Awd $39,532.50$0.90
2 $50,513.75$1.15
3 $52,710.00$1.20
Ref #43 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.00"), (36600 SY)
Awd $73,200.00$2.00
2 $47,580.00$1.30
3 $75,030.00$2.05
Ref #44 254E01600 PATCHING PLANED SURFACE, (794 SY)
Awd $2,382.00$3.00
2 $992.50$1.25
3 $397.00$0.50
190512 - Page 233
Ref #45 407E20000 NON-TRACKING TACK COAT, (9653 GAL)
Awd $25,580.45$2.65
2 $27,511.05$2.85
3 $26,545.75$2.75
Ref #46 408E10001 PRIME COAT, AS PER PLAN, (2234 GAL)
Awd $7,595.60$3.40
2 $7,595.60$3.40
3 $8,377.50$3.75
Ref #47 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (2768 CY)
Awd $442,880.00$160.00
2 $470,560.00$170.00
3 $467,792.00$169.00
Ref #48 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (46 CY)
Awd $7,360.00$160.00
2 $7,820.00$170.00
3 $7,452.00$162.00
Ref #49 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (48 CY)
Awd $7,680.00$160.00
2 $8,160.00$170.00
3 $7,968.00$166.00
Ref #50 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (3875 CY)
Awd $523,125.00$135.00
2 $503,750.00$130.00
3 $546,375.00$141.00
Ref #51 617E10100 COMPACTED AGGREGATE, (329 CY)
Awd $13,818.00$42.00
2 $19,740.00$60.00
3 $23,030.00$70.00
Ref #52 617E20000 SHOULDER PREPARATION, (117 SY)
Awd $468.00$4.00
2 $11.70$0.10
3 $175.50$1.50
Ref #53 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE), (3.94 MILE)
Awd $9,259.00$2,350.00
2 $6,481.30$1,645.00
3 $5,910.00$1,500.00
Section 4 - PAVEMENT - Totals
Awd $1,294,380.55
2 $1,315,465.90
3 $1,364,512.75
Ref #54 621E00100 RPM, (247 EACH)
Awd $7,335.90$29.70
2 $7,335.90$29.70
3 $9,386.00$38.00
Ref #55 621E54000 RAISED PAVEMENT MARKER REMOVED, (240 EACH)
Awd $720.00$3.00
2 $720.00$3.00
3 $600.00$2.50
190512 - Page 234
Ref #56 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL), (28 EACH)
Awd $196.00$7.00
2 $196.00$7.00
3 $196.00$7.00
Ref #57 642E00104 EDGE LINE, 6", TYPE 1, (4.76 MILE)
Awd $2,927.40$615.00
2 $2,927.40$615.00
3 $2,927.40$615.00
Ref #58 642E00204 LANE LINE, 6", TYPE 1, (0.26 MILE)
Awd $130.00$500.00
2 $130.00$500.00
3 $130.00$500.00
Ref #59 642E00300 CENTER LINE, TYPE 1, (4.21 MILE)
Awd $3,999.50$950.00
2 $3,999.50$950.00
3 $3,999.50$950.00
Ref #60 644E00404 CHANNELIZING LINE, 12", (1790 FT)
Awd $3,311.50$1.85
2 $3,311.50$1.85
3 $3,311.50$1.85
Ref #61 644E00500 STOP LINE, (730 FT)
Awd $4,343.50$5.95
2 $4,343.50$5.95
3 $4,343.50$5.95
Ref #62 644E00600 CROSSWALK LINE, (781 FT)
Awd $2,928.75$3.75
2 $2,928.75$3.75
3 $2,928.75$3.75
Ref #63 644E00700 TRANSVERSE/DIAGONAL LINE, (276 FT)
Awd $1,518.00$5.50
2 $1,518.00$5.50
3 $1,518.00$5.50
Ref #64 644E01200 PARKING LOT STALL MARKING, (230 FT)
Awd $402.50$1.75
2 $402.50$1.75
3 $402.50$1.75
Ref #65 644E01300 LANE ARROW, (48 EACH)
Awd $4,080.00$85.00
2 $4,080.00$85.00
3 $4,080.00$85.00
Ref #66 644E01410 WORD ON PAVEMENT, 96", (3 EACH)
Awd $900.00$300.00
2 $900.00$300.00
3 $900.00$300.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $32,793.05
2 $32,793.05
3 $34,723.15
190512 - Page 235
Ref #67 632E26501 DETECTOR LOOP, AS PER PLAN, (10 EACH)
Awd $12,000.00$1,200.00
2 $12,000.00$1,200.00
3 $12,000.00$1,200.00
Section 6 - TRAFFIC SIGNALS - Totals
Awd $12,000.00
2 $12,000.00
3 $12,000.00
Ref #68 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,800.00$70.00
2 $2,400.00$60.00
3 $2,600.00$65.00
Ref #69 614E12460 WORK ZONE MARKING SIGN, (60 EACH)
Awd $3,000.00$50.00
2 $3,000.00$50.00
3 $3,000.00$50.00
Ref #70 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)
Awd $6,250.00$250.00
2 $11,250.00$450.00
3 $5,000.00$200.00
Ref #71 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT, (2.08 MILE)
Awd $1,040.00$500.00
2 $1,040.00$500.00
3 $1,040.00$500.00
Ref #72 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (11.22 MILE)
Awd $10,378.50$925.00
2 $10,378.50$925.00
3 $10,378.50$925.00
Ref #73 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P, (5370 FT)
Awd $4,027.50$0.75
2 $4,027.50$0.75
3 $4,027.50$0.75
Ref #74 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642, (276 FT)
Awd $1,380.00$5.00
2 $1,380.00$5.00
3 $1,380.00$5.00
Ref #75 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (730 FT)
Awd $2,190.00$3.00
2 $2,190.00$3.00
3 $2,190.00$3.00
Ref #76 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (781 FT)
Awd $2,343.00$3.00
2 $2,343.00$3.00
3 $2,343.00$3.00
Ref #77 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (48 EACH)
Awd $2,640.00$55.00
2 $2,640.00$55.00
3 $2,640.00$55.00
190512 - Page 236
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $36,049.00
2 $40,649.00
3 $34,599.00
Ref #78 202E98200 REMOVAL MISC.: JOINT SEAL, (24 FT)
Awd $96.00$4.00
2 $593.28$24.72
3 $96.00$4.00
Ref #79 202E98200 REMOVAL MISC.: POLYMER MODIFIED ASPHALT EXPANSION , (104 FT)
Awd $3,872.96$37.24
2 $10,400.00$100.00
3 $3,872.96$37.24
Ref #80 516E31000 JOINT SEALER, (24 FT)
Awd $712.32$29.68
2 $1,260.48$52.52
3 $712.32$29.68
Ref #81 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (65 CF)
Awd $23,068.50$354.90
2 $10,400.00$160.00
3 $23,068.50$354.90
Section 8 - STRUCTURE REPAIR (RIC-42-0431 SFN 700265 - Totals
Awd $27,749.78
2 $22,653.76
3 $27,749.78
Ref #82 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN, (50 FT)
Awd $570.00$11.40
2 $570.00$11.40
3 $570.00$11.40
Section 9 - STRUCTURE REPAIR (RIC-42-0503 SFN 700273 - Totals
Awd $570.00
2 $570.00
3 $570.00
Ref #83 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,500.00$8,500.00
2 $8,000.00$8,000.00
3 $10,000.00$10,000.00
Ref #84 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $158,770.00$158,770.00
2 $199,885.00$199,885.00
3 $135,000.00$135,000.00
Ref #85 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $8,000.00$2,000.00
2 $5,000.00$1,250.00
3 $8,400.00$2,100.00
190512 - Page 237
Ref #86 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,000.00$2,000.00
3 $1,800.00$1,800.00
Ref #87 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $70,000.00$70,000.00
Section 10 - INCIDENTALS - Totals
Awd $218,270.00
2 $254,885.00
3 $225,200.00
Ref #100 638E10800 VALVE BOX ADJUSTED TO GRADE, (25 EACH)
Awd $6,250.00$250.00
2 $5,250.00$210.00
3 $9,875.00$395.00
Section 11 - WATER WORK - Totals
Awd $6,250.00
2 $5,250.00
3 $9,875.00
190512 - Page 238
Project No. 190513
PID 100863
ROS-US 35-25.02 / JAC-US 35-01.79
Federal
Type: MICROSURFACING
Completion Date: 7/31/2020
Award Amount: $2,722,253.29
Contract Awarded To: AMERICAN PAVEMENTS INC
Letting Date: 10/10/2019
Engineer's Estimate: $2,543,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
AMERICAN PAVEMENTS INC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 1
Bid $2,722,253.29
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $2,813,772.84
MICROSURFACING CONTRACTORS LLC
13940 ST CHARLES ROCK RD
BRIDGETON, MO 63044
Bidder 3
Bid $3,275,016.81
190513 - Page 239
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $2,000.00$2,000.00
Section 1 - ROADWAY - Totals
Awd $500.00
2 $500.00
3 $2,000.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #3 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN, (7000 SY)
Awd $504,000.00$72.00
2 $539,000.00$77.00
3 $525,000.00$75.00
Ref #4 254E01600 PATCHING PLANED SURFACE, (425 SY)
Awd $8,500.00$20.00
2 $8,925.00$21.00
3 $42,500.00$100.00
Ref #5 421E10010 MICROSURFACING, SURFACE COURSE, (395351 SY)
Awd $766,980.94$1.94
2 $806,516.04$2.04
3 $988,377.50$2.50
Ref #6 421E10020 MICROSURFACING, LEVELING COURSE, (265155 SY)
Awd $360,610.80$1.36
2 $304,928.25$1.15
3 $490,536.75$1.85
Ref #7 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (0.4 MILE)
Awd $4,200.00$10,500.00
2 $7,777.41$19,443.52
3 $6,150.00$15,375.00
Ref #8 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, 0.75", (4224 SY)
Awd $25,344.00$6.00
2 $46,928.64$11.11
3 $8,025.60$1.90
Ref #9 897E01011 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, AS PE, (10000 SY)
Awd $90,000.00$9.00
2 $133,300.00$13.33
3 $72,500.00$7.25
190513 - Page 240
Section 3 - PAVEMENT - Totals
Awd $1,759,635.74
2 $1,847,375.34
3 $2,133,089.85
Ref #10 621E00100 RPM, (1437 EACH)
Awd $31,614.00$22.00
2 $31,930.14$22.22
3 $33,051.00$23.00
Ref #11 621E54000 RAISED PAVEMENT MARKER REMOVED, (1437 EACH)
Awd $24,429.00$17.00
2 $10,059.00$7.00
3 $28,740.00$20.00
Ref #12 644E00104 EDGE LINE, 6", (36.69 MILE)
Awd $107,428.32$2,928.00
2 $110,070.00$3,000.00
3 $107,501.70$2,930.00
Ref #13 644E00204 LANE LINE, 6", (18.79 MILE)
Awd $23,863.30$1,270.00
2 $24,427.00$1,300.00
3 $21,420.60$1,140.00
Ref #14 644E00404 CHANNELIZING LINE, 12", (3696 FT)
Awd $6,652.80$1.80
2 $6,689.76$1.81
3 $5,544.00$1.50
Ref #15 644E01510 DOTTED LINE, 6", (3566 FT)
Awd $3,387.70$0.95
2 $3,423.36$0.96
3 $4,457.50$1.25
Ref #16 644E30000 REMOVAL OF PAVEMENT MARKING, (7262 FT)
Awd $3,485.76$0.48
2 $3,703.62$0.51
3 $7,262.00$1.00
Ref #17 644E30030 REMOVAL OF PAVEMENT MARKING, (53.68 MILE)
Awd $83,365.04$1,553.00
2 $85,888.00$1,600.00
3 $85,029.12$1,584.00
Ref #18 646E10010 EDGE LINE, 6", (1.14 MILE)
Awd $10,558.68$9,262.00
2 $10,639.62$9,333.00
3 $20,577.00$18,050.00
Ref #19 646E10110 LANE LINE, 6", (0.57 MILE)
Awd $3,532.86$6,198.00
2 $3,609.81$6,333.00
3 $9,752.70$17,110.00
Ref #20 646E10310 CHANNELIZING LINE, 12", (260 FT)
Awd $663.00$2.55
2 $663.00$2.55
3 $1,300.00$5.00
190513 - Page 241
Ref #21 646E20504 DOTTED LINE, 6", (552 FT)
Awd $910.80$1.65
2 $921.84$1.67
3 $2,484.00$4.50
Ref #22 646E50100 REMOVAL OF PAVEMENT MARKING, (812 FT)
Awd $389.76$0.48
2 $397.88$0.49
3 $812.00$1.00
Ref #23 646E50300 REMOVAL OF PAVEMENT MARKING, (1.71 MILE)
Awd $2,655.63$1,553.00
2 $2,736.00$1,600.00
3 $2,708.64$1,584.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $302,936.65
2 $295,159.03
3 $330,640.26
Ref #24 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,800.00$70.00
2 $3,080.00$77.00
3 $2,600.00$65.00
Ref #25 614E12460 WORK ZONE MARKING SIGN, (17 EACH)
Awd $1,700.00$100.00
2 $1,717.00$101.00
3 $1,785.00$105.00
Ref #26 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (43 EACH)
Awd $6,665.00$155.00
2 $7,166.81$166.67
3 $7,955.00$185.00
Ref #27 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $1,000.00$20.00
2 $6,000.00$120.00
3 $6,250.00$125.00
Ref #28 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)
Awd $10,800.00$900.00
2 $11,556.00$963.00
3 $10,800.00$900.00
Ref #29 614E20410 WORK ZONE LANE LINE, CLASS II, 6", (36.68 MILE)
Awd $17,056.20$465.00
2 $17,092.88$466.00
3 $29,894.20$815.00
Ref #30 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I, (1.14 MILE)
Awd $5,985.00$5,250.00
2 $6,332.70$5,555.00
3 $7,638.00$6,700.00
Ref #31 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P, (3956 FT)
Awd $3,758.20$0.95
2 $3,995.56$1.01
3 $3,956.00$1.00
190513 - Page 242
Ref #32 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I, (5280 FT)
Awd $3,168.00$0.60
2 $3,432.00$0.65
3 $10,560.00$2.00
Ref #33 616E10000 WATER, (1 MGAL)
Awd $500.00$500.00
2 $100.00$100.00
3 $1,000.00$1,000.00
Ref #34 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (44 SNMT)
Awd $27,500.00$625.00
2 $31,108.00$707.00
3 $37,400.00$850.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $80,932.40
2 $91,580.95
3 $119,838.20
Ref #35 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (77 SY)
Awd $1,540.00$20.00
2 $1,578.50$20.50
3 $1,540.00$20.00
Ref #36 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (61 SY)
Awd $732.00$12.00
2 $762.50$12.50
3 $732.00$12.00
Ref #37 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (607 SY)
Awd $4,249.00$7.00
2 $4,291.49$7.07
3 $4,249.00$7.00
Ref #38 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (77 SY)
Awd $1,809.50$23.50
2 $1,881.88$24.44
3 $1,809.50$23.50
Ref #39 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (7 SF)
Awd $945.00$135.00
2 $987.00$141.00
3 $945.00$135.00
Section 6 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2604 - Totals
Awd $9,275.50
2 $9,501.37
3 $9,275.50
Ref #40 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (77 SY)
Awd $1,540.00$20.00
2 $1,578.50$20.50
3 $1,540.00$20.00
190513 - Page 243
Ref #41 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (61 SY)
Awd $732.00$12.00
2 $762.50$12.50
3 $732.00$12.00
Ref #42 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (607 SY)
Awd $4,249.00$7.00
2 $4,291.49$7.07
3 $4,249.00$7.00
Ref #43 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (77 SY)
Awd $1,809.50$23.50
2 $1,881.88$24.44
3 $1,809.50$23.50
Section 7 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2604 - Totals
Awd $8,330.50
2 $8,514.37
3 $8,330.50
Ref #44 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (162 SY)
Awd $3,240.00$20.00
2 $3,321.00$20.50
3 $3,240.00$20.00
Ref #45 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (103 SY)
Awd $1,236.00$12.00
2 $1,287.50$12.50
3 $1,236.00$12.00
Ref #46 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1022 SY)
Awd $7,154.00$7.00
2 $7,225.54$7.07
3 $7,154.00$7.00
Ref #47 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (162 SY)
Awd $3,807.00$23.50
2 $3,959.28$24.44
3 $3,807.00$23.50
Ref #48 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (15 SF)
Awd $2,025.00$135.00
2 $2,115.00$141.00
3 $2,025.00$135.00
Section 8 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2727 - Totals
Awd $17,462.00
2 $17,908.32
3 $17,462.00
Ref #49 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (162 SY)
Awd $3,240.00$20.00
2 $3,321.00$20.50
3 $3,240.00$20.00
190513 - Page 244
Ref #50 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (103 SY)
Awd $1,236.00$12.00
2 $1,287.50$12.50
3 $1,236.00$12.00
Ref #51 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1022 SY)
Awd $7,154.00$7.00
2 $7,225.54$7.07
3 $7,154.00$7.00
Ref #52 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (162 SY)
Awd $3,807.00$23.50
2 $3,959.28$24.44
3 $3,807.00$23.50
Ref #53 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (15 SF)
Awd $2,025.00$135.00
2 $2,115.00$141.00
3 $2,025.00$135.00
Section 9 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2727 - Totals
Awd $17,462.00
2 $17,908.32
3 $17,462.00
Ref #54 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (57 SY)
Awd $1,140.00$20.00
2 $1,168.50$20.50
3 $1,140.00$20.00
Ref #55 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (56 SY)
Awd $672.00$12.00
2 $700.00$12.50
3 $672.00$12.00
Ref #56 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (556 SY)
Awd $3,892.00$7.00
2 $3,930.92$7.07
3 $3,892.00$7.00
Ref #57 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (57 SY)
Awd $1,339.50$23.50
2 $1,393.08$24.44
3 $1,339.50$23.50
Ref #58 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (2 SY)
Awd $3,200.00$1,600.00
2 $3,400.00$1,700.00
3 $3,200.00$1,600.00
Ref #59 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (5 SF)
Awd $675.00$135.00
2 $705.00$141.00
3 $675.00$135.00
190513 - Page 245
Section 10 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2849 - Totals
Awd $10,918.50
2 $11,297.50
3 $10,918.50
Ref #60 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (57 SY)
Awd $1,140.00$20.00
2 $1,168.50$20.50
3 $1,140.00$20.00
Ref #61 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (56 SY)
Awd $672.00$12.00
2 $700.00$12.50
3 $672.00$12.00
Ref #62 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (556 SY)
Awd $3,892.00$7.00
2 $3,930.92$7.07
3 $3,892.00$7.00
Ref #63 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (57 SY)
Awd $1,339.50$23.50
2 $1,393.08$24.44
3 $1,339.50$23.50
Section 11 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2849 - Totals
Awd $7,043.50
2 $7,192.50
3 $7,043.50
Ref #64 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (202 SY)
Awd $4,040.00$20.00
2 $4,141.00$20.50
3 $4,040.00$20.00
Ref #65 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (127 SY)
Awd $1,524.00$12.00
2 $1,587.50$12.50
3 $1,524.00$12.00
Ref #66 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1265 SY)
Awd $8,855.00$7.00
2 $8,943.55$7.07
3 $8,855.00$7.00
Ref #67 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (202 SY)
Awd $4,747.00$23.50
2 $4,936.88$24.44
3 $4,747.00$23.50
Section 12 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2953 - Totals
Awd $19,166.00
2 $19,608.93
3 $19,166.00
190513 - Page 246
Ref #68 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (202 SY)
Awd $4,040.00$20.00
2 $4,141.00$20.50
3 $4,040.00$20.00
Ref #69 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (127 SY)
Awd $1,524.00$12.00
2 $1,587.50$12.50
3 $1,524.00$12.00
Ref #70 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1265 SY)
Awd $8,855.00$7.00
2 $8,943.55$7.07
3 $8,855.00$7.00
Ref #71 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (202 SY)
Awd $4,747.00$23.50
2 $4,936.88$24.44
3 $4,747.00$23.50
Section 13 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-2953 - Totals
Awd $19,166.00
2 $19,608.93
3 $19,166.00
Ref #72 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (116 SY)
Awd $2,320.00$20.00
2 $2,378.00$20.50
3 $2,320.00$20.00
Ref #73 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (85 SY)
Awd $1,020.00$12.00
2 $1,062.50$12.50
3 $1,020.00$12.00
Ref #74 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (845 SY)
Awd $5,915.00$7.00
2 $5,974.15$7.07
3 $5,915.00$7.00
Ref #75 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (116 SY)
Awd $2,726.00$23.50
2 $2,835.04$24.44
3 $2,726.00$23.50
Section 14 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3006 - Totals
Awd $11,981.00
2 $12,249.69
3 $11,981.00
Ref #76 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (116 SY)
Awd $2,320.00$20.00
2 $2,378.00$20.50
3 $2,320.00$20.00
190513 - Page 247
Ref #77 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (85 SY)
Awd $1,020.00$12.00
2 $1,062.50$12.50
3 $1,020.00$12.00
Ref #78 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (845 SY)
Awd $5,915.00$7.00
2 $5,974.15$7.07
3 $5,915.00$7.00
Ref #79 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (116 SY)
Awd $2,726.00$23.50
2 $2,835.04$24.44
3 $2,726.00$23.50
Ref #80 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (15 SF)
Awd $2,025.00$135.00
2 $2,115.00$141.00
3 $2,025.00$135.00
Section 15 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3006 - Totals
Awd $14,006.00
2 $14,364.69
3 $14,006.00
Ref #81 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (145 SY)
Awd $2,900.00$20.00
2 $2,972.50$20.50
3 $2,900.00$20.00
Ref #82 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (94 SY)
Awd $1,128.00$12.00
2 $1,175.00$12.50
3 $1,128.00$12.00
Ref #83 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (938 SY)
Awd $6,566.00$7.00
2 $6,631.66$7.07
3 $6,566.00$7.00
Ref #84 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (145 SY)
Awd $3,407.50$23.50
2 $3,543.80$24.44
3 $3,407.50$23.50
Ref #85 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (10 SF)
Awd $1,350.00$135.00
2 $1,410.00$141.00
3 $1,350.00$135.00
Section 16 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3343 - Totals
Awd $15,351.50
2 $15,732.96
3 $15,351.50
190513 - Page 248
Ref #86 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (145 SY)
Awd $2,900.00$20.00
2 $2,972.50$20.50
3 $2,900.00$20.00
Ref #87 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (94 SY)
Awd $1,128.00$12.00
2 $1,175.00$12.50
3 $1,128.00$12.00
Ref #88 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (938 SY)
Awd $6,566.00$7.00
2 $6,631.66$7.07
3 $6,566.00$7.00
Ref #89 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (145 SY)
Awd $3,407.50$23.50
2 $3,543.80$24.44
3 $3,407.50$23.50
Section 17 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3343 - Totals
Awd $14,001.50
2 $14,322.96
3 $14,001.50
Ref #90 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (213 SY)
Awd $4,260.00$20.00
2 $4,366.50$20.50
3 $4,260.00$20.00
Ref #91 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (109 SY)
Awd $1,308.00$12.00
2 $1,362.50$12.50
3 $1,308.00$12.00
Ref #92 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1088 SY)
Awd $7,616.00$7.00
2 $7,692.16$7.07
3 $7,616.00$7.00
Ref #93 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (213 SY)
Awd $5,005.50$23.50
2 $5,205.72$24.44
3 $5,005.50$23.50
Section 18 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3402 - Totals
Awd $18,189.50
2 $18,626.88
3 $18,189.50
Ref #94 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (271 SY)
Awd $5,420.00$20.00
2 $5,555.50$20.50
3 $5,420.00$20.00
190513 - Page 249
Ref #95 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (241 SY)
Awd $2,892.00$12.00
2 $3,012.50$12.50
3 $2,892.00$12.00
Ref #96 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (2405 SY)
Awd $16,835.00$7.00
2 $17,003.35$7.07
3 $16,835.00$7.00
Ref #97 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (271 SY)
Awd $6,368.50$23.50
2 $6,623.24$24.44
3 $6,368.50$23.50
Section 19 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3418 - Totals
Awd $31,515.50
2 $32,194.59
3 $31,515.50
Ref #98 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (271 SY)
Awd $5,420.00$20.00
2 $5,555.50$20.50
3 $5,420.00$20.00
Ref #99 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (197 SY)
Awd $2,364.00$12.00
2 $2,462.50$12.50
3 $2,364.00$12.00
Ref #100 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1961 SY)
Awd $13,727.00$7.00
2 $13,864.27$7.07
3 $13,727.00$7.00
Ref #101 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (271 SY)
Awd $6,368.50$23.50
2 $6,623.24$24.44
3 $6,368.50$23.50
Section 20 - STRUCTURE OVER 20 FOOT SPAN (ROS-35-3418 - Totals
Awd $27,879.50
2 $28,505.51
3 $27,879.50
Ref #102 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $10,500.00$10,500.00
3 $3,500.00$3,500.00
Ref #103 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $190,000.00$190,000.00
3 $130,000.00$130,000.00
190513 - Page 250
Ref #104 619E16000 FIELD OFFICE, TYPE A, (6 MNTH)
Awd $3,000.00$500.00
2 $11,700.00$1,950.00
3 $7,200.00$1,200.00
Ref #105 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $500.00$500.00
2 $2,100.00$2,100.00
3 $1,000.00$1,000.00
Ref #106 624E10000 MOBILIZATION, (LUMP SUM)
Awd $115,000.00$115,000.00
2 $116,320.00$116,320.00
3 $305,000.00$305,000.00
Section 21 - INCIDENTALS - Totals
Awd $335,500.00
2 $330,620.00
3 $446,700.00
190513 - Page 251
Project No. 190514
PID 108341
WAS-SR 7-07.25
Federal
Type: SIGNALIZATION
Completion Date: 6/30/2020
Award Amount: $233,835.00
Contract Awarded To: PERRAM ELECTRIC INC
Letting Date: 10/10/2019
Engineer's Estimate: $236,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 1
Bid $233,835.00
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 2
Bid $244,300.00
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 3
Bid $270,547.50
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 4
Bid $276,149.00
190514 - Page 252
Ref #1 608E52001 CURB RAMP, AS PER PLAN, (330 SF)
Awd $8,250.00$25.00
2 $14,850.00$45.00
3 $21,450.00$65.00
4 $21,450.00$65.00
Section 1 - ROADWAY - Totals
Awd $8,250.00
2 $14,850.00
3 $21,450.00
4 $21,450.00
Ref #2 659E10000 SEEDING AND MULCHING, (40 SY)
Awd $634.00$15.85
2 $80.00$2.00
3 $300.00$7.50
4 $880.00$22.00
Ref #3 832E30000 EROSION CONTROL, (750 EACH)
Awd $750.00$1.00
2 $750.00$1.00
3 $750.00$1.00
4 $750.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,384.00
2 $830.00
3 $1,050.00
4 $1,630.00
Ref #4 630E80511 SIGN, STREET NAME, AS PER PLAN, (4 EACH)
Awd $1,240.00$310.00
2 $2,800.00$700.00
3 $3,600.00$900.00
4 $3,100.00$775.00
Ref #5 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, (1 EACH)
Awd $25.00$25.00
2 $40.00$40.00
3 $25.00$25.00
4 $25.00$25.00
Ref #6 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE, (1 EACH)
Awd $50.00$50.00
2 $20.00$20.00
3 $150.00$150.00
4 $50.00$50.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $1,315.00
2 $2,860.00
3 $3,775.00
4 $3,175.00
190514 - Page 253
Ref #7 625E18200 BRACKET ARM, 15', (2 EACH)
Awd $1,430.00$715.00
2 $1,900.00$950.00
3 $1,680.00$840.00
4 $2,600.00$1,300.00
Ref #8 625E25600 CONDUIT, 4", 725.04, (45 FT)
Awd $1,959.75$43.55
2 $1,800.00$40.00
3 $2,250.00$50.00
4 $2,250.00$50.00
Ref #9 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4", (215 FT)
Awd $14,405.00$67.00
2 $12,900.00$60.00
3 $14,405.00$67.00
4 $15,050.00$70.00
Ref #10 625E29000 TRENCH, (45 FT)
Awd $933.75$20.75
2 $810.00$18.00
3 $1,125.00$25.00
4 $540.00$12.00
Ref #11 625E29400 TRENCH IN PAVED AREA, (25 FT)
Awd $3,375.00$135.00
2 $875.00$35.00
3 $1,500.00$60.00
4 $4,000.00$160.00
Ref #12 625E30706 PULL BOX, 725.08, 24", (6 EACH)
Awd $9,690.00$1,615.00
2 $6,600.00$1,100.00
3 $8,550.00$1,425.00
4 $6,000.00$1,000.00
Ref #13 625E31510 PULL BOX REMOVED, (18 EACH)
Awd $5,940.00$330.00
2 $900.00$50.00
3 $8,280.00$460.00
4 $5,760.00$320.00
Ref #14 625E32000 GROUND ROD, (6 EACH)
Awd $1,560.00$260.00
2 $1,590.00$265.00
3 $1,920.00$320.00
4 $1,200.00$200.00
Ref #15 632E04911 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS,, (12 EACH)
Awd $8,160.00$680.00
2 $16,800.00$1,400.00
3 $10,320.00$860.00
4 $10,560.00$880.00
Ref #16 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, (8 EACH)
Awd $3,280.00$410.00
2 $4,000.00$500.00
3 $4,640.00$580.00
4 $4,000.00$500.00
190514 - Page 254
Ref #17 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (12 EACH)
Awd $120.00$10.00
2 $600.00$50.00
3 $1,200.00$100.00
4 $384.00$32.00
Ref #18 632E26000 PEDESTRIAN PUSHBUTTON, (8 EACH)
Awd $1,800.00$225.00
2 $960.00$120.00
3 $2,640.00$330.00
4 $2,160.00$270.00
Ref #19 632E26500 DETECTOR LOOP, (5 EACH)
Awd $7,325.00$1,465.00
2 $6,250.00$1,250.00
3 $9,750.00$1,950.00
4 $10,000.00$2,000.00
Ref #20 632E27004 LOOP DETECTOR UNIT, (4 EACH)
Awd $640.00$160.00
2 $640.00$160.00
3 $680.00$170.00
4 $720.00$180.00
Ref #21 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (2045 FT)
Awd $4,090.00$2.00
2 $6,135.00$3.00
3 $7,771.00$3.80
4 $5,112.50$2.50
Ref #22 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (690 FT)
Awd $1,380.00$2.00
2 $2,277.00$3.30
3 $2,760.00$4.00
4 $1,897.50$2.75
Ref #23 632E43300 SIGNAL CABLE, MISC.: 6 CONDUCTOR, NO. 20 AWG (SMAR, (1135 FT)
Awd $3,121.25$2.75
2 $3,405.00$3.00
3 $1,135.00$1.00
4 $3,405.00$3.00
Ref #24 632E64010 SIGNAL SUPPORT FOUNDATION, (4 EACH)
Awd $20,480.00$5,120.00
2 $25,400.00$6,350.00
3 $21,160.00$5,290.00
4 $20,000.00$5,000.00
Ref #25 632E65200 LOOP DETECTOR LEAD-IN CABLE, (2155 FT)
Awd $4,094.50$1.90
2 $2,155.00$1.00
3 $5,387.50$2.50
4 $5,387.50$2.50
Ref #26 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG, (170 FT)
Awd $493.00$2.90
2 $170.00$1.00
3 $629.00$3.70
4 $977.50$5.75
190514 - Page 255
Ref #27 632E70001 POWER SERVICE, AS PER PLAN, (3 EACH)
Awd $4,515.00$1,505.00
2 $4,800.00$1,600.00
3 $2,550.00$850.00
4 $6,000.00$2,000.00
Ref #28 632E80302 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3, (2 EACH)
Awd $9,520.00$4,760.00
2 $7,700.00$3,850.00
3 $11,400.00$5,700.00
4 $11,000.00$5,500.00
Ref #29 632E80402 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, (2 EACH)
Awd $11,330.00$5,665.00
2 $9,200.00$4,600.00
3 $13,340.00$6,670.00
4 $13,000.00$6,500.00
Ref #30 632E90103 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE, (3 EACH)
Awd $2,100.00$700.00
2 $4,500.00$1,500.00
3 $6,300.00$2,100.00
4 $7,200.00$2,400.00
Ref #31 632E90500 SIGNALIZATION, MISC.:UNLASH AND RELASH MESSENGER W, (840 FT)
Awd $3,150.00$3.75
2 $3,360.00$4.00
3 $2,940.00$3.50
4 $3,360.00$4.00
Ref #32 633E67500 UNINTERRUPTIBLE POWER SUPPLY (UPS), BATTERY REPLAC, (2 EACH)
Awd $2,430.00$1,215.00
2 $2,300.00$1,150.00
3 $2,680.00$1,340.00
4 $3,000.00$1,500.00
Ref #33 633E74000 UNINTERRUPTIBLE POWER SUPPLY (UPS), (1 EACH)
Awd $5,265.00$5,265.00
2 $4,000.00$4,000.00
3 $3,780.00$3,780.00
4 $3,600.00$3,600.00
Ref #34 809E69000 ADVANCE RADAR DETECTION, (4 EACH)
Awd $32,260.00$8,065.00
2 $32,000.00$8,000.00
3 $30,920.00$7,730.00
4 $28,800.00$7,200.00
Ref #35 900E11000 SPECIAL - REMOVAL OF "PREPARE TO STOP WHEN FLASHIN, (4 EACH)
Awd $6,460.00$1,615.00
2 $1,200.00$300.00
3 $6,280.00$1,570.00
4 $2,600.00$650.00
Section 4 - TRAFFIC SIGNALS - Totals
Awd $171,307.25
2 $165,227.00
3 $187,972.50
4 $180,564.00
190514 - Page 256
Ref #39 AA2 633E01541 CONTROLLER UNIT, TYPE TS2/A2, AS PER PLAN, (ECONOL, (2 EACH)
Awd $10,360.00$5,180.00
2 $9,100.00$4,550.00
3 $15,000.00$7,500.00
4 $9,400.00$4,700.00
Ref #40 AA2 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)
Awd $13,050.00$13,050.00
2 $12,750.00$12,750.00
3 $17,950.00$17,950.00
4 $15,500.00$15,500.00
Ref #41 AA2 633E99000 CONTROLLER ITEM, MISC.:CONFLICT MONITOR, (ECONOLIT, (2 EACH)
Awd $1,980.00$990.00
2 $2,200.00$1,100.00
3 $2,000.00$1,000.00
4 $5,000.00$2,500.00
Section 5 - TRAFFIC SIGNALS ALTERNATES - Totals
Awd $25,390.00
2 $24,050.00
3 $34,950.00
4 $29,900.00
Ref #42 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $11,180.00$11,180.00
2 $20,620.00$20,620.00
3 $4,000.00$4,000.00
4 $10,000.00$10,000.00
Ref #43 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (30 HOUR)
Awd $1,950.00$65.00
2 $2,550.00$85.00
3 $2,550.00$85.00
4 $2,430.00$81.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $13,130.00
2 $23,170.00
3 $6,550.00
4 $12,430.00
Ref #44 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,558.75$2,558.75
2 $1,713.00$1,713.00
3 $1,800.00$1,800.00
4 $2,500.00$2,500.00
Ref #45 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $500.00$500.00
2 $1,600.00$1,600.00
3 $3,000.00$3,000.00
4 $1,000.00$1,000.00
190514 - Page 257
Ref #46 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $23,500.00$23,500.00
Section 7 - INCIDENTALS - Totals
Awd $13,058.75
2 $13,313.00
3 $14,800.00
4 $27,000.00
190514 - Page 258
Project No. 190515
PID 99451
D01-SIGN FY20
Non-Federal
Type: SIGNING
Completion Date: 10/31/2020
Award Amount: $927,850.00
Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $1,075,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALK ROAD
NORWALK, OH 44857
Huron
Bidder 1
Bid $927,850.00
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 2
Bid $1,048,905.65
190515 - Page 259
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #2 625E32000 GROUND ROD, (9 EACH)
Awd $2,250.00$250.00
2 $3,150.00$350.00
Ref #3 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (3650 FT)
Awd $29,090.50$7.97
2 $31,937.50$8.75
Ref #4 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7, (1139.3 FT)
Awd $15,950.20$14.00
2 $11,962.65$10.50
Ref #5 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (514.4 FT)
Awd $7,716.00$15.00
2 $5,915.60$11.50
Ref #6 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (654.6 FT)
Awd $17,674.20$27.00
2 $13,092.00$20.00
Ref #7 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22, (998 FT)
Awd $33,932.00$34.00
2 $23,453.00$23.50
Ref #8 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (920.9 FT)
Awd $17,497.10$19.00
2 $12,892.60$14.00
Ref #9 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30, (1016.1 FT)
Awd $45,724.50$45.00
2 $32,515.20$32.00
Ref #10 630E08600 SIGN POST REFLECTOR, (41 EACH)
Awd $1,435.00$35.00
2 $1,496.50$36.50
Ref #11 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (182 EACH)
Awd $65,520.00$360.00
2 $63,700.00$350.00
Ref #12 630E20400 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 4, (2 EACH)
Awd $22,250.00$11,125.00
2 $21,000.00$10,500.00
Ref #13 630E20500 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 5, (1 EACH)
Awd $12,500.00$12,500.00
2 $11,500.00$11,500.00
Ref #14 630E35500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 6, (1 EACH)
Awd $23,850.00$23,850.00
2 $26,500.00$26,500.00
190515 - Page 260
Ref #15 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8, (2 EACH)
Awd $64,600.00$32,300.00
2 $65,000.00$32,500.00
Ref #16 630E75000 SIGN ATTACHMENT ASSEMBLY, (22 EACH)
Awd $32,450.00$1,475.00
2 $9,900.00$450.00
Ref #17 630E80100 SIGN, FLAT SHEET, (1315.4 SF)
Awd $14,469.40$11.00
2 $17,757.90$13.50
Ref #18 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (14191.8 SF)
Awd $205,781.10$14.50
2 $234,164.70$16.50
Ref #19 630E80224 SIGN, OVERHEAD EXTRUSHEET, (2085 SF)
Awd $31,275.00$15.00
2 $37,530.00$18.00
Ref #20 630E82000 SIGN BACKING ASSEMBLY, (33 EACH)
Awd $4,125.00$125.00
2 $3,300.00$100.00
Ref #21 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (240 EACH)
Awd $150,000.00$625.00
2 $168,000.00$700.00
Ref #22 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (15 EACH)
Awd $18,750.00$1,250.00
2 $87,750.00$5,850.00
Ref #23 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (392 EACH)
Awd $3,920.00$10.00
2 $4,704.00$12.00
Ref #24 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (118 EACH)
Awd $14,750.00$125.00
2 $11,800.00$100.00
Ref #25 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (256 EACH)
Awd $2,560.00$10.00
2 $3,584.00$14.00
Ref #26 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (234 EACH)
Awd $39,780.00$170.00
2 $64,350.00$275.00
Ref #27 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (33 EACH)
Awd $6,600.00$200.00
2 $4,950.00$150.00
Ref #28 630E89400 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T, (3 EACH)
Awd $5,550.00$1,850.00
2 $18,000.00$6,000.00
Ref #29 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (4 EACH)
Awd $4,200.00$1,050.00
2 $5,000.00$1,250.00
190515 - Page 261
Section 2 - TRAFFIC CONTROL - Totals
Awd $894,200.00
2 $994,905.65
Ref #30 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (60 HOUR)
Awd $3,900.00$65.00
2 $4,500.00$75.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,900.00
2 $4,500.00
Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,600.00$4,600.00
2 $7,500.00$7,500.00
Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $9,500.00$9,500.00
2 $1,000.00$1,000.00
Ref #33 624E10000 MOBILIZATION, (LUMP SUM)
Awd $14,650.00$14,650.00
2 $40,000.00$40,000.00
Section 4 - INCIDENTALS - Totals
Awd $28,750.00
2 $48,500.00
190515 - Page 262
Project No. 190516
PID 106366
D07-BS FY20
Non-Federal
Type: BRIDGE REPAIR
Completion Date: 9/30/2020
Award Amount: $789,533.00
Contract Awarded To: A & A PAINTING LLC
Letting Date: 10/10/2019
Engineer's Estimate: $992,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
A & A PAINTING LLC
74 CREED CIRCLE
CAMPBELL, OH 44405
Mahoning
Bidder 1
Bid $789,533.00
AAD CONTRACTING INC
89 N. MAIN STREET SUITE B
POLAND, OH 44514
Mahoning
Bidder 2
Bid $817,903.60
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 3
Bid $974,670.00
CORROSION RESISTANCE LTD
4524 HUDSON DR
STOW, OH 44224
Summit
Bidder 4
Bid $1,684,232.66
190516 - Page 263
Ref #1 832E30000 EROSION CONTROL, (6 EACH)
Awd $6.00$1.00
2 $6.00$1.00
3 $6.00$1.00
4 $6.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $6.00
2 $6.00
3 $6.00
4 $6.00
Ref #2 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (600 HOUR)
Awd $30,000.00$50.00
2 $6,000.00$10.00
3 $48,000.00$80.00
4 $45,000.00$75.00
Ref #3 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $35,000.00$35,000.00
3 $25,000.00$25,000.00
4 $15,000.00$15,000.00
Ref #4 614E12500 REPLACEMENT SIGN, (5 EACH)
Awd $125.00$25.00
2 $500.00$100.00
3 $1,000.00$200.00
4 $625.00$125.00
Ref #5 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $50.00$5.00
2 $500.00$50.00
3 $1,000.00$100.00
4 $500.00$50.00
Ref #6 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (6 SNMT)
Awd $3,000.00$500.00
2 $3,000.00$500.00
3 $12,000.00$2,000.00
4 $5,400.00$900.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $58,175.00
2 $45,000.00
3 $87,000.00
4 $66,525.00
Ref #7 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2231 SY)
Awd $14,501.50$6.50
2 $16,063.20$7.20
3 $17,848.00$8.00
4 $24,541.00$11.00
190516 - Page 264
Section 3 - STRUCTURE REPAIR (CLA-070-00.16) - Totals
Awd $14,501.50
2 $16,063.20
3 $17,848.00
4 $24,541.00
Ref #8 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1940 SY)
Awd $12,610.00$6.50
2 $13,968.00$7.20
3 $15,520.00$8.00
4 $23,280.00$12.00
Section 4 - STRUCTURE REPAIR (CLA-070-01.56) - Totals
Awd $12,610.00
2 $13,968.00
3 $15,520.00
4 $23,280.00
Ref #9 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (6825 SY)
Awd $44,362.50$6.50
2 $49,140.00$7.20
3 $54,600.00$8.00
4 $59,855.25$8.77
Section 5 - STRUCTURE REPAIR (CLA-070-01.73) - Totals
Awd $44,362.50
2 $49,140.00
3 $54,600.00
4 $59,855.25
Ref #10 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1631 SY)
Awd $10,601.50$6.50
2 $11,743.20$7.20
3 $13,048.00$8.00
4 $22,100.05$13.55
Section 6 - STRUCTURE REPAIR (CLA-070-02.65) - Totals
Awd $10,601.50
2 $11,743.20
3 $13,048.00
4 $22,100.05
Ref #11 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (4031 SY)
Awd $26,201.50$6.50
2 $29,023.20$7.20
3 $32,248.00$8.00
4 $30,837.15$7.65
190516 - Page 265
Section 7 - STRUCTURE REPAIR (CLA-070-06.34L) - Totals
Awd $26,201.50
2 $29,023.20
3 $32,248.00
4 $30,837.15
Ref #12 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (3566 SY)
Awd $23,179.00$6.50
2 $25,675.20$7.20
3 $28,528.00$8.00
4 $29,062.90$8.15
Section 8 - STRUCTURE REPAIR (CLA-070-06.34R) - Totals
Awd $23,179.00
2 $25,675.20
3 $28,528.00
4 $29,062.90
Ref #13 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (980 SY)
Awd $6,370.00$6.50
2 $7,056.00$7.20
3 $7,840.00$8.00
4 $14,210.00$14.50
Section 9 - STRUCTURE REPAIR (CLA-070-06.57L) - Totals
Awd $6,370.00
2 $7,056.00
3 $7,840.00
4 $14,210.00
Ref #14 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (959 SY)
Awd $6,233.50$6.50
2 $6,904.80$7.20
3 $7,672.00$8.00
4 $13,905.50$14.50
Section 10 - STRUCTURE REPAIR (CLA-070-06.57R) - Totals
Awd $6,233.50
2 $6,904.80
3 $7,672.00
4 $13,905.50
Ref #15 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1231 SY)
Awd $8,001.50$6.50
2 $8,863.20$7.20
3 $9,848.00$8.00
4 $15,325.95$12.45
190516 - Page 266
Section 11 - STRUCTURE REPAIR (CLA-070-15.76L) - Totals
Awd $8,001.50
2 $8,863.20
3 $9,848.00
4 $15,325.95
Ref #16 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1334 SY)
Awd $8,671.00$6.50
2 $9,604.80$7.20
3 $10,672.00$8.00
4 $16,448.22$12.33
Section 12 - STRUCTURE REPAIR (CLA-070-15.76R) - Totals
Awd $8,671.00
2 $9,604.80
3 $10,672.00
4 $16,448.22
Ref #17 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (228 SY)
Awd $1,482.00$6.50
2 $1,641.60$7.20
3 $1,824.00$8.00
4 $8,892.00$39.00
Section 13 - STRUCTURE REPAIR (CLA-070-16.99L) - Totals
Awd $1,482.00
2 $1,641.60
3 $1,824.00
4 $8,892.00
Ref #18 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (228 SY)
Awd $1,482.00$6.50
2 $1,641.60$7.20
3 $1,824.00$8.00
4 $8,892.00$39.00
Section 14 - STRUCTURE REPAIR (CLA-070-16.99R) - Totals
Awd $1,482.00
2 $1,641.60
3 $1,824.00
4 $8,892.00
Ref #19 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (310 SY)
Awd $2,015.00$6.50
2 $2,232.00$7.20
3 $2,480.00$8.00
4 $9,300.00$30.00
190516 - Page 267
Section 15 - STRUCTURE REPAIR (CLA-070-18.32L) - Totals
Awd $2,015.00
2 $2,232.00
3 $2,480.00
4 $9,300.00
Ref #20 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (325 SY)
Awd $2,112.50$6.50
2 $2,340.00$7.20
3 $2,600.00$8.00
4 $9,343.75$28.75
Section 16 - STRUCTURE REPAIR (CLA-070-18.32R) - Totals
Awd $2,112.50
2 $2,340.00
3 $2,600.00
4 $9,343.75
Ref #21 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (150 SY)
Awd $975.00$6.50
2 $1,080.00$7.20
3 $1,200.00$8.00
4 $9,159.00$61.06
Section 17 - STRUCTURE REPAIR (CLA-070-18.98L) - Totals
Awd $975.00
2 $1,080.00
3 $1,200.00
4 $9,159.00
Ref #22 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (150 SY)
Awd $975.00$6.50
2 $1,080.00$7.20
3 $1,200.00$8.00
4 $2,175.00$14.50
Section 18 - STRUCTURE REPAIR (CLA-070-18.98R) - Totals
Awd $975.00
2 $1,080.00
3 $1,200.00
4 $2,175.00
Ref #23 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2248 SY)
Awd $14,612.00$6.50
2 $16,185.60$7.20
3 $17,984.00$8.00
4 $24,390.80$10.85
190516 - Page 268
Section 19 - STRUCTURE REPAIR (CLA-070-20.79L) - Totals
Awd $14,612.00
2 $16,185.60
3 $17,984.00
4 $24,390.80
Ref #24 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2774 SY)
Awd $18,031.00$6.50
2 $19,972.80$7.20
3 $22,192.00$8.00
4 $26,353.00$9.50
Section 20 - STRUCTURE REPAIR (CLA-070-20.79R) - Totals
Awd $18,031.00
2 $19,972.80
3 $22,192.00
4 $26,353.00
Ref #25 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (428 SY)
Awd $2,782.00$6.50
2 $3,081.60$7.20
3 $3,424.00$8.00
4 $12,412.00$29.00
Section 21 - STRUCTURE REPAIR (CLA-070-20.93F) - Totals
Awd $2,782.00
2 $3,081.60
3 $3,424.00
4 $12,412.00
Ref #26 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1104 SY)
Awd $7,176.00$6.50
2 $7,948.80$7.20
3 $8,832.00$8.00
4 $14,848.80$13.45
Section 22 - STRUCTURE REPAIR (CLA-070-20.93L) - Totals
Awd $7,176.00
2 $7,948.80
3 $8,832.00
4 $14,848.80
Ref #27 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1209 SY)
Awd $7,858.50$6.50
2 $8,704.80$7.20
3 $9,672.00$8.00
4 $15,172.95$12.55
190516 - Page 269
Section 23 - STRUCTURE REPAIR (CLA-070-20.93R) - Totals
Awd $7,858.50
2 $8,704.80
3 $9,672.00
4 $15,172.95
Ref #28 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (467 SY)
Awd $3,035.50$6.50
2 $3,362.40$7.20
3 $3,736.00$8.00
4 $9,807.00$21.00
Section 24 - STRUCTURE REPAIR (CLA-070-27.13L) - Totals
Awd $3,035.50
2 $3,362.40
3 $3,736.00
4 $9,807.00
Ref #29 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (466 SY)
Awd $3,029.00$6.50
2 $3,355.20$7.20
3 $3,728.00$8.00
4 $9,786.00$21.00
Section 25 - STRUCTURE REPAIR (CLA-070-27.13R) - Totals
Awd $3,029.00
2 $3,355.20
3 $3,728.00
4 $9,786.00
Ref #30 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (547 SY)
Awd $3,555.50$6.50
2 $3,938.40$7.20
3 $4,376.00$8.00
4 $12,799.80$23.40
Section 26 - STRUCTURE REPAIR (CLA-675-00.61L) - Totals
Awd $3,555.50
2 $3,938.40
3 $4,376.00
4 $12,799.80
Ref #31 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (547 SY)
Awd $3,555.50$6.50
2 $3,938.40$7.20
3 $4,376.00$8.00
4 $12,799.80$23.40
190516 - Page 270
Section 27 - STRUCTURE REPAIR (CLA-675-00.61R) - Totals
Awd $3,555.50
2 $3,938.40
3 $4,376.00
4 $12,799.80
Ref #32 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (525 SY)
Awd $3,412.50$6.50
2 $3,780.00$7.20
3 $4,200.00$8.00
4 $9,975.00$19.00
Section 28 - STRUCTURE REPAIR (MIA-075-06.23L) - Totals
Awd $3,412.50
2 $3,780.00
3 $4,200.00
4 $9,975.00
Ref #33 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (525 SY)
Awd $3,412.50$6.50
2 $3,780.00$7.20
3 $4,200.00$8.00
4 $9,975.00$19.00
Section 29 - STRUCTURE REPAIR (MIA-075-06.23R) - Totals
Awd $3,412.50
2 $3,780.00
3 $4,200.00
4 $9,975.00
Ref #34 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (545 SY)
Awd $3,542.50$6.50
2 $3,924.00$7.20
3 $4,360.00$8.00
4 $10,082.50$18.50
Section 30 - STRUCTURE REPAIR (MIA-075-07.93C) - Totals
Awd $3,542.50
2 $3,924.00
3 $4,360.00
4 $10,082.50
Ref #35 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (434 SY)
Awd $2,821.00$6.50
2 $3,124.80$7.20
3 $3,472.00$8.00
4 $9,699.90$22.35
190516 - Page 271
Section 31 - STRUCTURE REPAIR (MIA-075-07.93D) - Totals
Awd $2,821.00
2 $3,124.80
3 $3,472.00
4 $9,699.90
Ref #36 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (763 SY)
Awd $4,959.50$6.50
2 $5,493.60$7.20
3 $6,104.00$8.00
4 $10,872.75$14.25
Section 32 - STRUCTURE REPAIR (MIA-075-07.93L) - Totals
Awd $4,959.50
2 $5,493.60
3 $6,104.00
4 $10,872.75
Ref #37 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (763 SY)
Awd $4,959.50$6.50
2 $5,493.60$7.20
3 $6,104.00$8.00
4 $10,872.75$14.25
Section 33 - STRUCTURE REPAIR (MIA-075-07.93R) - Totals
Awd $4,959.50
2 $5,493.60
3 $6,104.00
4 $10,872.75
Ref #38 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2361 SY)
Awd $15,346.50$6.50
2 $16,999.20$7.20
3 $18,888.00$8.00
4 $24,790.50$10.50
Section 34 - STRUCTURE REPAIR (MIA-075-12.90L) - Totals
Awd $15,346.50
2 $16,999.20
3 $18,888.00
4 $24,790.50
Ref #39 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2211 SY)
Awd $14,371.50$6.50
2 $15,919.20$7.20
3 $17,688.00$8.00
4 $24,321.00$11.00
190516 - Page 272
Section 35 - STRUCTURE REPAIR (MIA-075-12.90R) - Totals
Awd $14,371.50
2 $15,919.20
3 $17,688.00
4 $24,321.00
Ref #40 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1272 SY)
Awd $8,268.00$6.50
2 $9,158.40$7.20
3 $10,176.00$8.00
4 $16,205.28$12.74
Section 36 - STRUCTURE REPAIR (MIA-075-13.15L) - Totals
Awd $8,268.00
2 $9,158.40
3 $10,176.00
4 $16,205.28
Ref #41 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1761 SY)
Awd $11,446.50$6.50
2 $12,679.20$7.20
3 $14,088.00$8.00
4 $17,169.75$9.75
Section 37 - STRUCTURE REPAIR (MIA-075-13.15R) - Totals
Awd $11,446.50
2 $12,679.20
3 $14,088.00
4 $17,169.75
Ref #42 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2404 SY)
Awd $15,626.00$6.50
2 $17,308.80$7.20
3 $19,232.00$8.00
4 $24,881.40$10.35
Section 38 - STRUCTURE REPAIR (MIA-075-13.29L) - Totals
Awd $15,626.00
2 $17,308.80
3 $19,232.00
4 $24,881.40
Ref #43 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2410 SY)
Awd $15,665.00$6.50
2 $17,352.00$7.20
3 $19,280.00$8.00
4 $24,943.50$10.35
190516 - Page 273
Section 39 - STRUCTURE REPAIR (MIA-075-13.29R) - Totals
Awd $15,665.00
2 $17,352.00
3 $19,280.00
4 $24,943.50
Ref #44 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1181 SY)
Awd $7,676.50$6.50
2 $8,503.20$7.20
3 $9,448.00$8.00
4 $15,872.64$13.44
Section 40 - STRUCTURE REPAIR (MIA-075-16.20L) - Totals
Awd $7,676.50
2 $8,503.20
3 $9,448.00
4 $15,872.64
Ref #45 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1538 SY)
Awd $9,997.00$6.50
2 $11,073.60$7.20
3 $12,304.00$8.00
4 $16,379.70$10.65
Section 41 - STRUCTURE REPAIR (MIA-075-16.20R) - Totals
Awd $9,997.00
2 $11,073.60
3 $12,304.00
4 $16,379.70
Ref #46 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (915 SY)
Awd $5,947.50$6.50
2 $6,588.00$7.20
3 $7,320.00$8.00
4 $11,437.50$12.50
Section 42 - STRUCTURE REPAIR (MIA-075-16.35L) - Totals
Awd $5,947.50
2 $6,588.00
3 $7,320.00
4 $11,437.50
Ref #47 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (702 SY)
Awd $4,563.00$6.50
2 $5,054.40$7.20
3 $5,616.00$8.00
4 $11,217.96$15.98
190516 - Page 274
Section 43 - STRUCTURE REPAIR (MIA-075-16.35R) - Totals
Awd $4,563.00
2 $5,054.40
3 $5,616.00
4 $11,217.96
Ref #48 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1665 SY)
Awd $10,822.50$6.50
2 $11,988.00$7.20
3 $13,320.00$8.00
4 $16,899.75$10.15
Section 44 - STRUCTURE REPAIR (MIA-075-17.59L) - Totals
Awd $10,822.50
2 $11,988.00
3 $13,320.00
4 $16,899.75
Ref #49 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1665 SY)
Awd $10,822.50$6.50
2 $11,988.00$7.20
3 $13,320.00$8.00
4 $16,899.75$10.15
Section 45 - STRUCTURE REPAIR (MIA-075-17.59R) - Totals
Awd $10,822.50
2 $11,988.00
3 $13,320.00
4 $16,899.75
Ref #50 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (903 SY)
Awd $5,869.50$6.50
2 $6,501.60$7.20
3 $7,224.00$8.00
4 $13,996.50$15.50
Section 46 - STRUCTURE REPAIR (MIA-075-17.77L) - Totals
Awd $5,869.50
2 $6,501.60
3 $7,224.00
4 $13,996.50
Ref #51 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (903 SY)
Awd $5,869.50$6.50
2 $6,501.60$7.20
3 $7,224.00$8.00
4 $13,996.50$15.50
190516 - Page 275
Section 47 - STRUCTURE REPAIR (MIA-075-17.77R) - Totals
Awd $5,869.50
2 $6,501.60
3 $7,224.00
4 $13,996.50
Ref #52 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (989 SY)
Awd $6,428.50$6.50
2 $7,120.80$7.20
3 $7,912.00$8.00
4 $14,340.50$14.50
Section 48 - STRUCTURE REPAIR (MOT-70-02.95L) - Totals
Awd $6,428.50
2 $7,120.80
3 $7,912.00
4 $14,340.50
Ref #53 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (989 SY)
Awd $6,428.50$6.50
2 $7,120.80$7.20
3 $7,912.00$8.00
4 $14,340.50$14.50
Section 49 - STRUCTURE REPAIR (MOT-70-02.95R) - Totals
Awd $6,428.50
2 $7,120.80
3 $7,912.00
4 $14,340.50
Ref #54 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (909 SY)
Awd $5,908.50$6.50
2 $6,544.80$7.20
3 $7,272.00$8.00
4 $14,853.06$16.34
Section 50 - STRUCTURE REPAIR (MOT-70-06.72) - Totals
Awd $5,908.50
2 $6,544.80
3 $7,272.00
4 $14,853.06
Ref #55 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1373 SY)
Awd $8,924.50$6.50
2 $9,885.60$7.20
3 $10,984.00$8.00
4 $21,350.15$15.55
190516 - Page 276
Section 51 - STRUCTURE REPAIR (MOT-70-07.19) - Totals
Awd $8,924.50
2 $9,885.60
3 $10,984.00
4 $21,350.15
Ref #56 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2025 SY)
Awd $13,162.50$6.50
2 $14,580.00$7.20
3 $16,200.00$8.00
4 $23,692.50$11.70
Section 52 - STRUCTURE REPAIR (MOT-70-11.30) - Totals
Awd $13,162.50
2 $14,580.00
3 $16,200.00
4 $23,692.50
Ref #57 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (3828 SY)
Awd $24,882.00$6.50
2 $27,561.60$7.20
3 $30,624.00$8.00
4 $37,208.16$9.72
Section 53 - STRUCTURE REPAIR (MOT-70-11.92) - Totals
Awd $24,882.00
2 $27,561.60
3 $30,624.00
4 $37,208.16
Ref #58 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1978 SY)
Awd $12,857.00$6.50
2 $14,241.60$7.20
3 $15,824.00$8.00
4 $24,586.54$12.43
Section 54 - STRUCTURE REPAIR (MOT-70-12.19) - Totals
Awd $12,857.00
2 $14,241.60
3 $15,824.00
4 $24,586.54
Ref #59 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (631 SY)
Awd $4,101.50$6.50
2 $4,543.20$7.20
3 $5,048.00$8.00
4 $13,093.25$20.75
190516 - Page 277
Section 55 - STRUCTURE REPAIR (MOT-70-12.67 ) - Totals
Awd $4,101.50
2 $4,543.20
3 $5,048.00
4 $13,093.25
Ref #60 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2234 SY)
Awd $14,521.00$6.50
2 $16,084.80$7.20
3 $17,872.00$8.00
4 $24,350.60$10.90
Section 56 - STRUCTURE REPAIR (MOT-70-16.07) - Totals
Awd $14,521.00
2 $16,084.80
3 $17,872.00
4 $24,350.60
Ref #61 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (633 SY)
Awd $4,114.50$6.50
2 $4,557.60$7.20
3 $5,064.00$8.00
4 $13,103.10$20.70
Section 57 - STRUCTURE REPAIR (MOT-70-16.07E) - Totals
Awd $4,114.50
2 $4,557.60
3 $5,064.00
4 $13,103.10
Ref #62 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (841 SY)
Awd $5,466.50$6.50
2 $6,055.20$7.20
3 $6,728.00$8.00
4 $13,876.50$16.50
Section 58 - STRUCTURE REPAIR (MOT-70-16.14) - Totals
Awd $5,466.50
2 $6,055.20
3 $6,728.00
4 $13,876.50
Ref #63 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2388 SY)
Awd $15,522.00$6.50
2 $17,193.60$7.20
3 $19,104.00$8.00
4 $24,954.60$10.45
190516 - Page 278
Section 59 - STRUCTURE REPAIR (MOT-70-16.20) - Totals
Awd $15,522.00
2 $17,193.60
3 $19,104.00
4 $24,954.60
Ref #64 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (651 SY)
Awd $4,231.50$6.50
2 $4,687.20$7.20
3 $5,208.00$8.00
4 $13,182.75$20.25
Section 60 - STRUCTURE REPAIR (MOT-70-16.20E) - Totals
Awd $4,231.50
2 $4,687.20
3 $5,208.00
4 $13,182.75
Ref #65 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (892 SY)
Awd $5,798.00$6.50
2 $6,422.40$7.20
3 $7,136.00$8.00
4 $14,049.00$15.75
Section 61 - STRUCTURE REPAIR (MOT-70-16.22) - Totals
Awd $5,798.00
2 $6,422.40
3 $7,136.00
4 $14,049.00
Ref #66 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (6102 SY)
Awd $39,663.00$6.50
2 $43,934.40$7.20
3 $48,816.00$8.00
4 $54,918.00$9.00
Section 62 - STRUCTURE REPAIR (MOT-70-17.34) - Totals
Awd $39,663.00
2 $43,934.40
3 $48,816.00
4 $54,918.00
Ref #67 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2094 SY)
Awd $13,611.00$6.50
2 $15,076.80$7.20
3 $16,752.00$8.00
4 $23,766.90$11.35
190516 - Page 279
Section 63 - STRUCTURE REPAIR (MOT-70-20.97) - Totals
Awd $13,611.00
2 $15,076.80
3 $16,752.00
4 $23,766.90
Ref #68 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1148 SY)
Awd $7,462.00$6.50
2 $8,265.60$7.20
3 $9,184.00$8.00
4 $14,924.00$13.00
Section 64 - STRUCTURE REPAIR (SHE-75-03.72L) - Totals
Awd $7,462.00
2 $8,265.60
3 $9,184.00
4 $14,924.00
Ref #69 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1148 SY)
Awd $7,462.00$6.50
2 $8,265.60$7.20
3 $9,184.00$8.00
4 $14,924.00$13.00
Section 65 - STRUCTURE REPAIR (SHE-75-03.72R) - Totals
Awd $7,462.00
2 $8,265.60
3 $9,184.00
4 $14,924.00
Ref #70 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $4,000.00$4,000.00
3 $10,000.00$10,000.00
4 $36,000.00$36,000.00
Ref #71 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $110,000.00$110,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $300,000.00$300,000.00
Ref #72 624E10000 MOBILIZATION, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $5,000.00$5,000.00
3 $40,000.00$40,000.00
4 $160,000.00$160,000.00
190516 - Page 280
Section 66 - INCIDENTALS - Totals
Awd $132,000.00
2 $109,000.00
3 $150,000.00
4 $496,000.00
190516 - Page 281
Project No. 190517
PID 100624
D11-CS FY2020
Non-Federal
Type: CRACK SEALING
Completion Date: 10/31/2020
Award Amount: $286,346.42
Contract Awarded To: BITUMINOUS PAVEMENT SYSTEMS
Letting Date: 10/10/2019
Engineer's Estimate: $335,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BITUMINOUS PAVEMENT SYSTEMS
1595 FRANK RD
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $286,346.42
SCODELLER CONSTRUCTION INC
51722 GRAND RIVER AVE
WIXOM, MI 48393-2303
Bidder 2
Bid $291,713.43
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 3
Bid $348,318.37
DOT CONSTRUCTION CORP
535 NORTH BROAD ST STE 5
CANFIELD, OH 44406
Mahoning
Bidder 4
Bid $361,633.55
190517 - Page 282
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
Ref #2 423E00220 CRACK SEALING, TYPE II OR TYPE III, (786006 SY)
Awd $212,221.62$0.27
2 $220,081.68$0.28
3 $212,221.62$0.27
4 $235,801.80$0.30
Section 2 - PAVEMENT - Totals
Awd $212,221.62
2 $220,081.68
3 $212,221.62
4 $235,801.80
Ref #3 642E00104 EDGE LINE, 6", TYPE 1, (1.22 MILE)
Awd $17,067.80$13,990.00
2 $16,701.80$13,690.00
3 $16,701.80$13,690.00
4 $16,701.80$13,690.00
Ref #4 642E00204 LANE LINE, 6", TYPE 1, (1.03 MILE)
Awd $14,059.50$13,650.00
2 $13,750.50$13,350.00
3 $13,750.50$13,350.00
4 $13,750.50$13,350.00
Ref #5 642E00300 CENTER LINE, TYPE 1, (0.19 MILE)
Awd $2,660.00$14,000.00
2 $2,641.95$13,905.00
3 $2,641.95$13,905.00
4 $2,641.95$13,905.00
Ref #6 642E00400 CHANNELIZING LINE, 8", TYPE 1, (100 FT)
Awd $100.00$1.00
2 $200.00$2.00
3 $100.00$1.00
4 $100.00$1.00
Ref #7 642E00404 CHANNELIZING LINE, 12", TYPE 1, (990 FT)
Awd $1,237.50$1.25
2 $1,237.50$1.25
3 $1,237.50$1.25
4 $1,237.50$1.25
190517 - Page 283
Section 3 - TRAFFIC CONTROL - Totals
Awd $35,124.80
2 $34,531.75
3 $34,431.75
4 $34,431.75
Ref #8 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $5,600.00$70.00
2 $5,600.00$70.00
3 $5,600.00$70.00
4 $6,400.00$80.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $5,600.00
2 $5,600.00
3 $5,600.00
4 $6,400.00
Ref #9 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,900.00$1,900.00
2 $4,500.00$4,500.00
3 $2,500.00$2,500.00
4 $4,000.00$4,000.00
Ref #10 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,500.00$20,500.00
2 $12,000.00$12,000.00
3 $72,565.00$72,565.00
4 $60,000.00$60,000.00
Ref #11 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $14,000.00$14,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $32,400.00
2 $30,500.00
3 $95,065.00
4 $84,000.00
190517 - Page 284
Project No. 190518
PID 100325
D11-PM-FY2020(A)
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 11/15/2020
Award Amount: $432,109.87
Contract Awarded To: DURA MARK INC
Letting Date: 10/10/2019
Engineer's Estimate: $411,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
DURA MARK INC
2940 PROGRESS PARK DR
STOW, OH 44224
Summit
Bidder 1
Bid $432,109.87
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 2
Bid $461,582.30
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 3
Bid $482,496.72
190518 - Page 285
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 642E00400 CHANNELIZING LINE, 8", TYPE 1, (73112 FT)
Awd $27,782.56$0.38
2 $21,933.60$0.30
3 $26,320.32$0.36
Ref #3 642E00404 CHANNELIZING LINE, 12", TYPE 1, (150908 FT)
Awd $60,363.20$0.40
2 $60,363.20$0.40
3 $67,908.60$0.45
Ref #4 642E00500 STOP LINE, TYPE 1, (18128 FT)
Awd $49,852.00$2.75
2 $38,975.20$2.15
3 $58,009.60$3.20
Ref #5 642E00600 CROSSWALK LINE, TYPE 1, (4400 FT)
Awd $5,500.00$1.25
2 $5,720.00$1.30
3 $7,920.00$1.80
Ref #6 642E00601 CROSSWALK LINE, TYPE 1, AS PER PLAN, (169 FT)
Awd $211.25$1.25
2 $219.70$1.30
3 $507.00$3.00
Ref #7 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1, (48438 FT)
Awd $58,125.60$1.20
2 $38,750.40$0.80
3 $61,516.26$1.27
Ref #8 642E00701 TRANSVERSE/DIAGONAL LINE, TYPE 1, AS PER PLAN, (140 FT)
Awd $168.00$1.20
2 $105.00$0.75
3 $392.00$2.80
Ref #9 642E00720 CHEVRON MARKING, TYPE 1, (2438 FT)
Awd $4,876.00$2.00
2 $1,950.40$0.80
3 $4,266.50$1.75
Ref #10 642E00800 CURB MARKING, TYPE 1, (19052 FT)
Awd $14,289.00$0.75
2 $19,052.00$1.00
3 $18,099.40$0.95
Ref #11 642E00900 ISLAND MARKING, TYPE 1, (5083 SF)
Awd $3,812.25$0.75
2 $6,607.90$1.30
3 $4,828.85$0.95
190518 - Page 286
Ref #12 642E01000 RAILROAD SYMBOL MARKING, TYPE 1, (75 EACH)
Awd $15,000.00$200.00
2 $13,125.00$175.00
3 $16,125.00$215.00
Ref #13 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1, (65 EACH)
Awd $13,000.00$200.00
2 $11,375.00$175.00
3 $14,625.00$225.00
Ref #14 642E01124 SCHOOL SYMBOL MARKING, 120", TYPE 1, (6 EACH)
Awd $1,500.00$250.00
2 $1,200.00$200.00
3 $1,710.00$285.00
Ref #15 642E01200 PARKING LOT STALL MARKING, TYPE 1, (7386 FT)
Awd $5,539.50$0.75
2 $7,386.00$1.00
3 $5,022.48$0.68
Ref #16 642E01300 LANE ARROW, TYPE 1, (1204 EACH)
Awd $48,160.00$40.00
2 $48,160.00$40.00
3 $56,588.00$47.00
Ref #17 642E01312 LANE REDUCTION ARROW, TYPE 1, (8 EACH)
Awd $1,600.00$200.00
2 $2,000.00$250.00
3 $1,840.00$230.00
Ref #18 642E01320 WRONG WAY ARROW, (169 EACH)
Awd $16,055.00$95.00
2 $50,700.00$300.00
3 $19,435.00$115.00
Ref #19 642E01510 DOTTED LINE, 6", TYPE 1, (83427 FT)
Awd $37,542.15$0.45
2 $58,398.90$0.70
3 $60,901.71$0.73
Ref #20 642E01602 BIKE LANE SYMBOL MARKING, TYPE 1, (75 EACH)
Awd $3,750.00$50.00
2 $3,000.00$40.00
3 $3,000.00$40.00
Ref #21 642E01650 BIKE LANE ARROW, TYPE 1, (75 EACH)
Awd $3,750.00$50.00
2 $3,000.00$40.00
3 $3,000.00$40.00
Ref #22 642E01702 HANDICAP SYMBOL MARKING, TYPE 1, (11 EACH)
Awd $550.00$50.00
2 $1,100.00$100.00
3 $660.00$60.00
Ref #23 642E20000 TWO-WAY RADIO EQUIPMENT, (LUMP SUM)
Awd $1.00$1.00
2 $10.00$10.00
3 $1.00$1.00
190518 - Page 287
Ref #24 642E20802 YIELD LINE, TYPE 1, (48 FT)
Awd $240.00$5.00
2 $240.00$5.00
3 $384.00$8.00
Ref #25 642E30001 REMOVAL OF PAVEMENT MARKING, AS PER PLAN, (300 FT)
Awd $450.00$1.50
2 $300.00$1.00
3 $900.00$3.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $372,117.51
2 $393,672.30
3 $433,960.72
Ref #26 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,000.00$50.00
2 $2,000.00$50.00
3 $2,000.00$50.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $2,000.00
2 $2,000.00
3 $2,000.00
Ref #27 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,758.00$1,758.00
2 $3,325.00$3,325.00
3 $3,100.00$3,100.00
Ref #28 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $37,734.36$37,734.36
2 $51,585.00$51,585.00
3 $31,936.00$31,936.00
Ref #29 624E10000 MOBILIZATION, (LUMP SUM)
Awd $17,500.00$17,500.00
2 $10,000.00$10,000.00
3 $10,500.00$10,500.00
Section 4 - INCIDENTALS - Totals
Awd $56,992.36
2 $64,910.00
3 $45,536.00
190518 - Page 288
Project No. 190519
PID 100326
D11-PM-FY2020(B)
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 7/31/2020
Award Amount: $1,676,767.76
Contract Awarded To: DURA MARK INC
Letting Date: 10/10/2019
Engineer's Estimate: $1,432,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
DURA MARK INC
2940 PROGRESS PARK DR
STOW, OH 44224
Summit
Bidder 1
Bid $1,676,767.76
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 2
Bid $1,771,889.40
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 3
Bid $1,801,223.10
190519 - Page 289
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 642E00104 EDGE LINE, 6", TYPE 1, (1759.06 MILE)
Awd $1,104,689.68$628.00
2 $1,178,570.20$670.00
3 $1,099,412.50$625.00
Ref #3 642E00204 LANE LINE, 6", TYPE 1, (166.24 MILE)
Awd $53,196.80$320.00
2 $41,560.00$250.00
3 $60,677.60$365.00
Ref #4 642E00300 CENTER LINE, TYPE 1, (666.76 MILE)
Awd $468,732.28$703.00
2 $496,736.20$745.00
3 $466,732.00$700.00
Ref #5 642E20000 TWO-WAY RADIO EQUIPMENT, (LUMP SUM)
Awd $1.00$1.00
2 $1.00$1.00
3 $1.00$1.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $1,626,619.76
2 $1,716,867.40
3 $1,626,823.10
Ref #6 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $1,600.00$40.00
2 $2,000.00$50.00
3 $2,000.00$50.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $1,600.00
2 $2,000.00
3 $2,000.00
Ref #7 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,548.00$8,548.00
2 $9,800.00$9,800.00
3 $11,400.00$11,400.00
Ref #8 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $29,000.00$29,000.00
2 $32,500.00$32,500.00
3 $120,000.00$120,000.00
190519 - Page 290
Ref #9 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $9,722.00$9,722.00
3 $40,000.00$40,000.00
Section 4 - INCIDENTALS - Totals
Awd $47,548.00
2 $52,022.00
3 $171,400.00
190519 - Page 291
Project No. 190520
PID 107800
FAY-SR 729/SR 734 Chipseal FY20
Non-Federal
Type: CHIP SEAL
Completion Date: 9/15/2020
Award Amount: $1,074,559.67
Contract Awarded To: SHELLY COMPANY
Letting Date: 10/10/2019
Engineer's Estimate: $1,069,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,074,559.67
HENRY W BERGMAN INC
218 E NINTH ST
GENOA, OH 43430
Ottawa
Bidder 2
Bid $1,089,737.33
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 3
Bid $1,505,866.65
190520 - Page 292
Ref #1 209E60500 LINEAR GRADING, (43.72 MILE)
Awd $19,674.00$450.00
2 $14,209.00$325.00
3 $32,571.40$745.00
Section 1 - ROADWAY - Totals
Awd $19,674.00
2 $14,209.00
3 $32,571.40
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #3 251E01041 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA, (6500 SY)
Awd $256,750.00$39.50
2 $299,000.00$46.00
3 $422,500.00$65.00
Ref #4 422E10001 SINGLE CHIP SEAL, TYPE A, AS PER PLAN, (264511 SY)
Awd $441,733.37$1.67
2 $404,701.83$1.53
3 $449,668.70$1.70
Ref #5 617E10100 COMPACTED AGGREGATE, (1311 CY)
Awd $73,416.00$56.00
2 $58,995.00$45.00
3 $121,923.00$93.00
Ref #6 617E25000 WATER, (2 MGAL)
Awd $10.00$5.00
2 $200.00$100.00
3 $100.00$50.00
Section 3 - PAVEMENT - Totals
Awd $771,909.37
2 $762,896.83
3 $994,191.70
Ref #7 621E00101 RPM, AS PER PLAN, (1618 EACH)
Awd $36,405.00$22.50
2 $40,450.00$25.00
3 $36,405.00$22.50
Ref #8 621E54000 RAISED PAVEMENT MARKER REMOVED, (1618 EACH)
Awd $16,584.50$10.25
2 $12,944.00$8.00
3 $34,787.00$21.50
190520 - Page 293
Ref #9 642E00094 EDGE LINE, 6", (40.7 MILE)
Awd $25,885.20$636.00
2 $26,455.00$650.00
3 $23,809.50$585.00
Ref #10 642E00290 CENTER LINE, (20.35 MILE)
Awd $13,878.70$682.00
2 $15,262.50$750.00
3 $12,108.25$595.00
Ref #11 644E00500 STOP LINE, (84 FT)
Awd $1,335.60$15.90
2 $1,680.00$20.00
3 $2,381.40$28.35
Ref #100 644E30000 REMOVAL OF PAVEMENT MARKING, (84 FT)
Awd $625.80$7.45
2 $3,360.00$40.00
3 $3,200.40$38.10
Section 4 - TRAFFIC CONTROL - Totals
Awd $94,714.80
2 $100,151.50
3 $112,691.55
Ref #12 614E12461 WORK ZONE MARKING SIGN, AS PER PLAN, (340 EACH)
Awd $27,200.00$80.00
2 $35,700.00$105.00
3 $35,700.00$105.00
Ref #13 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (40.7 MILE)
Awd $23,809.50$585.00
2 $24,420.00$600.00
3 $21,164.00$520.00
Ref #14 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (84 FT)
Awd $252.00$3.00
2 $3,360.00$40.00
3 $3,108.00$37.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $51,261.50
2 $63,480.00
3 $59,972.00
Ref #15 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,500.00$7,500.00
2 $8,000.00$8,000.00
3 $9,500.00$9,500.00
Ref #16 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $80,000.00$80,000.00
3 $180,550.00$180,550.00
190520 - Page 294
Ref #17 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $10,000.00$10,000.00
3 $2,500.00$2,500.00
Ref #18 624E10000 MOBILIZATION, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $50,000.00$50,000.00
3 $112,890.00$112,890.00
Section 6 - INCIDENTALS - Totals
Awd $136,000.00
2 $148,000.00
3 $305,440.00
190520 - Page 295
Project No. 190521
PID 103927
OTT-Magee Marsh Resurf
Non-Federal
Type: PARKING AREAS
Completion Date: 9/1/2020
Award Amount: $494,433.63
Contract Awarded To: ERIE BLACKTOP INC
Letting Date: 10/10/2019
Engineer's Estimate: $562,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ERIE BLACKTOP INC
4507 TIFFIN AVE
SANDUSKY, OH 44870
Erie
Bidder 1
Bid $494,433.63
HENRY W BERGMAN INC
218 E NINTH ST
GENOA, OH 43430
Ottawa
Bidder 2
Bid $556,858.00
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 3
Bid $566,256.10
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 4
Bid $577,080.60
CRESTLINE PAVING & EXCAVATING CO INC
1913 NEBRASKA AVE
TOLEDO, OH 43607
Lucas
Bidder 5
Bid $619,305.00
190521 - Page 296
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $10,000.00$10,000.00
3 $3,600.00$3,600.00
4 $6,250.00$6,250.00
5 $600.00$600.00
Ref #2 202E30000 WALK REMOVED, (64 SF)
Awd $896.00$14.00
2 $320.00$5.00
3 $822.40$12.85
4 $822.40$12.85
5 $832.00$13.00
Ref #3 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET, (292 EACH)
Awd $11,096.00$38.00
2 $10,220.00$35.00
3 $18,980.00$65.00
4 $10,512.00$36.00
5 $10,220.00$35.00
Ref #4 203E01890 SPECIAL - SOIL STERILANT, (6200 SY)
Awd $930.00$0.15
2 $6,200.00$1.00
3 $5,890.00$0.95
4 $6,820.00$1.10
5 $3,100.00$0.50
Ref #5 209E60501 LINEAR GRADING, AS PER PLAN, (4.6 MILE)
Awd $32,200.00$7,000.00
2 $13,800.00$3,000.00
3 $50,600.00$11,000.00
4 $39,100.00$8,500.00
5 $38,272.00$8,320.00
Ref #6 608E10000 4" CONCRETE WALK, (64 SF)
Awd $2,012.80$31.45
2 $960.00$15.00
3 $1,664.00$26.00
4 $1,664.00$26.00
5 $1,952.00$30.50
Ref #7 608E53020 DETECTABLE WARNING, (22 SF)
Awd $1,149.50$52.25
2 $2,200.00$100.00
3 $1,210.00$55.00
4 $1,210.00$55.00
5 $1,210.00$55.00
Section 1 - ROADWAY - Totals
Awd $50,784.30
2 $43,700.00
3 $82,766.40
4 $66,378.40
5 $56,186.00
190521 - Page 297
Ref #8 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER, (1111 CY)
Awd $67,771.00$61.00
2 $73,326.00$66.00
3 $75,548.00$68.00
4 $75,548.00$68.00
5 $79,992.00$72.00
Section 2 - EROSION CONTROL - Totals
Awd $67,771.00
2 $73,326.00
3 $75,548.00
4 $75,548.00
5 $79,992.00
Ref #9 253E01001 PAVEMENT REPAIR, AS PER PLAN, (900 SY)
Awd $44,100.00$49.00
2 $40,500.00$45.00
3 $45,000.00$50.00
4 $67,500.00$75.00
5 $43,200.00$48.00
Ref #10 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T=1 1/2"), (10138 SY)
Awd $32,948.50$3.25
2 $20,276.00$2.00
3 $27,879.50$2.75
4 $22,303.60$2.20
5 $30,414.00$3.00
Ref #11 407E20000 NON-TRACKING TACK COAT, (3697 GAL)
Awd $7,763.70$2.10
2 $18,485.00$5.00
3 $8,133.40$2.20
4 $8,133.40$2.20
5 $18,485.00$5.00
Ref #12 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P, (956 CY)
Awd $179,728.00$188.00
2 $191,200.00$200.00
3 $188,332.00$197.00
4 $194,068.00$203.00
5 $254,296.00$266.00
Ref #13 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (463 CY)
Awd $84,266.00$182.00
2 $79,636.00$172.00
3 $87,970.00$190.00
4 $94,915.00$205.00
5 $98,619.00$213.00
Ref #14 886E11000 FOG SEAL, (3336 GAL)
Awd $6,672.00$2.00
2 $10,008.00$3.00
3 $9,007.20$2.70
4 $9,007.20$2.70
5 $12,176.40$3.65
190521 - Page 298
Section 3 - PAVEMENT - Totals
Awd $355,478.20
2 $360,105.00
3 $366,322.10
4 $395,927.20
5 $457,190.40
Ref #15 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (4 EACH)
Awd $630.00$157.50
2 $600.00$150.00
3 $1,120.00$280.00
4 $1,000.00$250.00
5 $600.00$150.00
Ref #16 642E00290 CENTER LINE, (2.6 MILE)
Awd $2,600.00$1,000.00
2 $2,340.00$900.00
3 $2,301.00$885.00
4 $2,340.00$900.00
5 $2,470.00$950.00
Ref #17 642E00691 TRANSVERSE/DIAGONAL LINE, AS PER PLAN, (939 FT)
Awd $328.65$0.35
2 $1,408.50$1.50
3 $1,126.80$1.20
4 $1,408.50$1.50
5 $1,878.00$2.00
Ref #18 642E01190 PARKING LOT STALL MARKING, (3089 FT)
Awd $1,142.93$0.37
2 $4,633.50$1.50
3 $3,706.80$1.20
4 $4,633.50$1.50
5 $3,089.00$1.00
Ref #19 642E01290 LANE ARROW, (3 EACH)
Awd $77.55$25.85
2 $195.00$65.00
3 $240.00$80.00
4 $195.00$65.00
5 $180.00$60.00
Ref #20 642E01700 HANDICAP SYMBOL MARKING, (11 EACH)
Awd $121.00$11.00
2 $550.00$50.00
3 $825.00$75.00
4 $550.00$50.00
5 $715.00$65.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $4,900.13
2 $9,727.00
3 $9,319.60
4 $10,127.00
5 $8,932.00
190521 - Page 299
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $5,000.00$5,000.00
3 $3,000.00$3,000.00
4 $2,500.00$2,500.00
5 $4,400.00$4,400.00
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $30,000.00$30,000.00
3 $9,300.00$9,300.00
4 $6,600.00$6,600.00
5 $4,475.00$4,475.00
Ref #23 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $35,000.00$35,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
5 $8,129.60$8,129.60
Section 5 - INCIDENTALS - Totals
Awd $15,500.00
2 $70,000.00
3 $32,300.00
4 $29,100.00
5 $17,004.60
190521 - Page 300
Project No. 191042
PID 107985
D02-LG FY2020
Non-Federal
Type: LIGHTING
Completion Date: 12/31/2020
Award Amount: $367,880.00
Contract Awarded To: J RANCK ELECTRIC INC
Letting Date: 10/10/2019
Engineer's Estimate: $405,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
J RANCK ELECTRIC INC
1993 GOVER PARKWAY
MT PLEASANT, MI 48858
Bidder 1
Bid $367,880.00
U S UTILITY CONTRACTOR COMPANY
3592 GENOA RD
PERRYSBURG, OH 43551
Wood
Bidder 2
Bid $386,685.00
191042 - Page 301
Ref #1 625E00480 CONNECTION, UNFUSED PERMANENT, (20 EACH)
Awd $1,100.00$55.00
2 $1,400.00$70.00
Ref #2 625E02803 TRANSFORMER BASE, MISC.:ALLUMINUM TRANSFORMER BASE, (35 EACH)
Awd $4,375.00$125.00
2 $5,250.00$150.00
Ref #3 625E10500 LIGHT POLE, MISC.:ERECTING REUSABLE DOWNED LIGHT P, (20 EACH)
Awd $2,700.00$135.00
2 $2,300.00$115.00
Ref #4 625E10500 LIGHT POLE, MISC.:LIGHT POLE (725.21) 30 FT. HEIGH, (2 EACH)
Awd $3,200.00$1,600.00
2 $2,000.00$1,000.00
Ref #5 625E10500 LIGHT POLE, MISC.:LIGHT POLE (725.21) 33'-6" HEIGH, (5 EACH)
Awd $6,750.00$1,350.00
2 $5,000.00$1,000.00
Ref #6 625E10500 LIGHT POLE, MISC.:LIGHT POLE (725.21) 50 FT. HEIGH, (1 EACH)
Awd $2,300.00$2,300.00
2 $1,900.00$1,900.00
Ref #7 625E10500 LIGHT POLE, MISC.:LIGHT POLE (725.21), VGCS, 20'-5, (2 EACH)
Awd $3,000.00$1,500.00
2 $500.00$250.00
Ref #8 625E13400 LIGHT TOWER, BBBBBB100, (1 EACH)
Awd $21,500.00$21,500.00
2 $9,500.00$9,500.00
Ref #9 625E14401 LIGHT POLE FOUNDATION REPAIR, AS PER PLAN, (10 EACH)
Awd $1,150.00$115.00
2 $1,250.00$125.00
Ref #10 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN, (2 EACH)
Awd $1,550.00$775.00
2 $1,000.00$500.00
Ref #11 625E15200 LIGHT TOWER FOUNDATION, 36" X 25' DEEP, (1 EACH)
Awd $8,500.00$8,500.00
2 $8,000.00$8,000.00
Ref #12 625E18600 BRACKET ARM, MISC.:BRACKET ARM, AS PER PLAN, (6 EACH)
Awd $3,900.00$650.00
2 $3,600.00$600.00
Ref #13 625E19101 BALLAST FOR TOWER LIGHT FIXTURE, AS PER PLAN, (50 EACH)
Awd $5,500.00$110.00
2 $5,500.00$110.00
Ref #14 625E23201 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA, (4000 FT)
Awd $4,000.00$1.00
2 $3,000.00$0.75
Ref #15 625E23301 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA, (1000 FT)
Awd $2,250.00$2.25
2 $1,750.00$1.75
Ref #16 625E23401 NO. 10 AWG POLE AND BRACKET CABLE, AS PER PLAN, (3000 FT)
Awd $750.00$0.25
2 $990.00$0.33
191042 - Page 302
Ref #17 625E24101 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB, (1000 FT)
Awd $2,000.00$2.00
2 $1,750.00$1.75
Ref #18 625E24301 1-1/2" DUCT CABLE WITH TWO NO. 2 AWG 2400 VOLT CAB, (500 FT)
Awd $2,250.00$4.50
2 $1,875.00$3.75
Ref #19 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C, (1000 FT)
Awd $6,000.00$6.00
2 $4,250.00$4.25
Ref #20 625E24400 DUCT CABLE, MISC.:1-1/2" DUCT CABLE WITH FOUR (4) , (50 FT)
Awd $350.00$7.00
2 $212.50$4.25
Ref #21 625E25300 CONDUIT, 1-1/2", 725.04, (25 FT)
Awd $375.00$15.00
2 $137.50$5.50
Ref #22 625E25400 CONDUIT, 2", 725.04, (20 FT)
Awd $300.00$15.00
2 $170.00$8.50
Ref #23 625E25402 CONDUIT, 2", 725.05, (20 FT)
Awd $100.00$5.00
2 $90.00$4.50
Ref #24 625E25500 CONDUIT, 3", 725.04, (20 FT)
Awd $600.00$30.00
2 $440.00$22.00
Ref #25 625E25502 CONDUIT, 3", 725.05, (20 FT)
Awd $100.00$5.00
2 $150.00$7.50
Ref #26 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3", (50 FT)
Awd $1,500.00$30.00
2 $1,250.00$25.00
Ref #27 625E25920 CONDUIT, MISC.:CONDUIT WALL MOUNTED 2", AS PER PLA, (20 FT)
Awd $400.00$20.00
2 $350.00$17.50
Ref #28 625E26260 LUMINAIRE, HIGH MAST, 400 WATT, HPS, ON 30'-50' PO, (1 EACH)
Awd $500.00$500.00
2 $550.00$550.00
Ref #29 625E27600 LUMINAIRE, MISC.:100 WATT HIGH PRESSURE SODIUM FIX, (20 EACH)
Awd $2,000.00$100.00
2 $600.00$30.00
Ref #30 625E27600 LUMINAIRE, MISC.:1000 WATT HIGH PRESSURE SODIUM FI, (3 EACH)
Awd $1,200.00$400.00
2 $255.00$85.00
Ref #31 625E27600 LUMINAIRE, MISC.:150 WATT HIGH PRESSURE SODIUM FIX, (53 EACH)
Awd $3,975.00$75.00
2 $2,385.00$45.00
Ref #32 625E27600 LUMINAIRE, MISC.:180 DEGREE RED NAVIGATION LIGHT F, (2 EACH)
Awd $150.00$75.00
2 $1,300.00$650.00
191042 - Page 303
Ref #33 625E27600 LUMINAIRE, MISC.:200 WATT HIGH PRESSURE SODIUM FIX, (46 EACH)
Awd $3,450.00$75.00
2 $2,760.00$60.00
Ref #34 625E27600 LUMINAIRE, MISC.:200 WATT SOLID STATE (LED), OES-2, (2 EACH)
Awd $150.00$75.00
2 $100.00$50.00
Ref #35 625E27600 LUMINAIRE, MISC.:200 WATT SOLID STATE (LED), OES-3, (1 EACH)
Awd $75.00$75.00
2 $50.00$50.00
Ref #36 625E27600 LUMINAIRE, MISC.:200 WATT, 240 VOLT, LED, TYPE 2 D, (1 EACH)
Awd $75.00$75.00
2 $50.00$50.00
Ref #37 625E27600 LUMINAIRE, MISC.:200 WATT, SOLID STATE (LED), OES-, (1 EACH)
Awd $75.00$75.00
2 $50.00$50.00
Ref #38 625E27600 LUMINAIRE, MISC.:250 WATT HIGH PRESSURE SODIUM FIX, (55 EACH)
Awd $4,125.00$75.00
2 $2,750.00$50.00
Ref #39 625E27600 LUMINAIRE, MISC.:250 WATT METAL HALIDE FIXTURE, (5 EACH)
Awd $375.00$75.00
2 $125.00$25.00
Ref #40 625E27600 LUMINAIRE, MISC.:310 WATT HIGH PRESSURE SODIUM FIX, (65 EACH)
Awd $4,875.00$75.00
2 $5,200.00$80.00
Ref #41 625E27600 LUMINAIRE, MISC.:360 DEGREE GREEN NAVIGATION LIGHT, (1 EACH)
Awd $250.00$250.00
2 $500.00$500.00
Ref #42 625E27600 LUMINAIRE, MISC.:400 WATT HIGH PRESSURE SODIUM FIX, (40 EACH)
Awd $3,000.00$75.00
2 $3,600.00$90.00
Ref #43 625E27600 LUMINAIRE, MISC.:400 WATT HIGH PRESSURE SODIUM FIX, (153 EACH)
Awd $11,475.00$75.00
2 $14,535.00$95.00
Ref #44 625E27600 LUMINAIRE, MISC.:400 WATT METAL HALIDE FIXTURE, (10 EACH)
Awd $750.00$75.00
2 $500.00$50.00
Ref #45 625E27600 LUMINAIRE, MISC.:HPS 100 WATT, (725.11), (1 EACH)
Awd $75.00$75.00
2 $30.00$30.00
Ref #46 625E27600 LUMINAIRE, MISC.:HPS 100 WATT, UNDERPASS TYPE, (72, (3 EACH)
Awd $225.00$75.00
2 $90.00$30.00
Ref #47 625E27600 LUMINAIRE, MISC.:HPS 1000 WATT, TOWER LIGHTING, (7, (1 EACH)
Awd $400.00$400.00
2 $560.00$560.00
Ref #48 625E27600 LUMINAIRE, MISC.:HPS 150 WATT, (725.11), (2 EACH)
Awd $150.00$75.00
2 $180.00$90.00
191042 - Page 304
Ref #49 625E27600 LUMINAIRE, MISC.:HPS 200 WATT, (725.11), (40 EACH)
Awd $3,000.00$75.00
2 $3,800.00$95.00
Ref #50 625E27600 LUMINAIRE, MISC.:HPS 250 WATT, (725.11), (55 EACH)
Awd $4,125.00$75.00
2 $5,225.00$95.00
Ref #51 625E27600 LUMINAIRE, MISC.:HPS 310 WATT, (725.11), (55 EACH)
Awd $4,125.00$75.00
2 $5,225.00$95.00
Ref #52 625E27600 LUMINAIRE, MISC.:HPS 400 WATT, (725.11), AS PER PL, (20 EACH)
Awd $1,500.00$75.00
2 $2,000.00$100.00
Ref #53 625E27600 LUMINAIRE, MISC.:HPS 400 WATT, TOWER LIGHTING, (72, (5 EACH)
Awd $2,000.00$400.00
2 $2,000.00$400.00
Ref #54 625E27600 LUMINAIRE, MISC.:NAVIGATION LIGHT, 180 DEGREES RED, (1 EACH)
Awd $250.00$250.00
2 $650.00$650.00
Ref #55 625E27600 LUMINAIRE, MISC.:NAVIGATIONAL LIGHT, 360 DEGREES G, (1 EACH)
Awd $250.00$250.00
2 $650.00$650.00
Ref #56 625E27600 LUMINAIRE, MISC.:VGCS, 150 WATT, HPS, (2 EACH)
Awd $1,200.00$600.00
2 $500.00$250.00
Ref #57 625E27600 LUMINAIRE, MISC.:VGCS, 310 WATT, HPS, (5 EACH)
Awd $3,000.00$600.00
2 $1,500.00$300.00
Ref #58 625E27600 LUMINAIRE, MISC.:VGCS, 400 WATT, MH, (5 EACH)
Awd $3,500.00$700.00
2 $1,250.00$250.00
Ref #59 625E27800 BALLAST, MISC.:HPS, 100 WATT (725.11), (1 EACH)
Awd $75.00$75.00
2 $5.00$5.00
Ref #60 625E27800 BALLAST, MISC.:HPS, 150 WATT (725.11), (1 EACH)
Awd $75.00$75.00
2 $75.00$75.00
Ref #61 625E27800 BALLAST, MISC.:HPS, 200 WATT (725.11), (1 EACH)
Awd $75.00$75.00
2 $75.00$75.00
Ref #62 625E27800 BALLAST, MISC.:HPS, 250 WATT (725.11), (10 EACH)
Awd $750.00$75.00
2 $750.00$75.00
Ref #63 625E27800 BALLAST, MISC.:HPS, 310 WATT (725.11), (30 EACH)
Awd $2,250.00$75.00
2 $2,250.00$75.00
Ref #64 625E27800 BALLAST, MISC.:HPS, 400 WATT (725.11), (40 EACH)
Awd $3,000.00$75.00
2 $3,000.00$75.00
191042 - Page 305
Ref #65 625E28001 GLARE SHIELD, AS PER PLAN, (2 EACH)
Awd $180.00$90.00
2 $50.00$25.00
Ref #66 625E29001 TRENCH, AS PER PLAN, (1000 FT)
Awd $1,500.00$1.50
2 $2,000.00$2.00
Ref #67 625E29901 JUNCTION BOX, AS PER PLAN, (1 EACH)
Awd $275.00$275.00
2 $150.00$150.00
Ref #68 625E30701 PULL BOX, 725.08, 18", AS PER PLAN, (5 EACH)
Awd $1,750.00$350.00
2 $1,225.00$245.00
Ref #69 625E30707 PULL BOX, 725.08, 24", AS PER PLAN, (5 EACH)
Awd $2,000.00$400.00
2 $1,625.00$325.00
Ref #70 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN, 18" (7, (2 EACH)
Awd $800.00$400.00
2 $800.00$400.00
Ref #71 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN, 24", (2 EACH)
Awd $900.00$450.00
2 $850.00$425.00
Ref #72 625E32001 GROUND ROD, AS PER PLAN, (725.16), (2 EACH)
Awd $150.00$75.00
2 $100.00$50.00
Ref #73 625E33100 CIRCUIT BREAKER, TOWER LIGHTING, 30 AMP, 480 VAC, (5 EACH)
Awd $750.00$150.00
2 $500.00$100.00
Ref #74 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN, 100, (1 EACH)
Awd $1,100.00$1,100.00
2 $1,250.00$1,250.00
Ref #75 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN, 30 , (1 EACH)
Awd $750.00$750.00
2 $500.00$500.00
Ref #76 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN, 60 , (1 EACH)
Awd $900.00$900.00
2 $1,200.00$1,200.00
Ref #77 625E35011 REMOVE AND REERECT EXISTING LIGHT POLE, AS PER PLA, (1 EACH)
Awd $500.00$500.00
2 $350.00$350.00
Ref #78 625E50000 REPAIRING UNDERGROUND BREAK OF CABLE IN DUCT OR CO, (20 EACH)
Awd $1,800.00$90.00
2 $2,000.00$100.00
Ref #79 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU, (200 EACH)
Awd $2,000.00$10.00
2 $15,000.00$75.00
Ref #80 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO, (1 EACH)
Awd $125.00$125.00
2 $100.00$100.00
191042 - Page 306
Ref #81 625E50451 SECONDARY SURGE PROTECTOR, AS PER PLAN, (LIGHTING , (1 EACH)
Awd $250.00$250.00
2 $100.00$100.00
Ref #82 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA, (20 EACH)
Awd $3,000.00$150.00
2 $4,000.00$200.00
Ref #83 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA, (1 EACH)
Awd $500.00$500.00
2 $250.00$250.00
Ref #84 625E70001 LIGHTING CONTACTOR, AS PER PLAN, 100 AMP, (2 EACH)
Awd $200.00$100.00
2 $200.00$100.00
Ref #85 625E70001 LIGHTING CONTACTOR, AS PER PLAN, 60 AMP, (2 EACH)
Awd $180.00$90.00
2 $200.00$100.00
Ref #86 625E75503 PORTION OF LIGHT POLE FOUNDATION REMOVED, AS PER P, (1 EACH)
Awd $135.00$135.00
2 $100.00$100.00
Ref #87 625E98000 LIGHTING, MISC.:ANNUAL OPERATION AND INSPECTION OF, (322 EACH)
Awd $32,200.00$100.00
2 $35,420.00$110.00
Ref #88 625E98000 LIGHTING, MISC.:CIRCUIT LOCATING, (100 EACH)
Awd $20,000.00$200.00
2 $21,500.00$215.00
Ref #89 625E98000 LIGHTING, MISC.:DISCONNECT SWITCH, 30 AMP, (1 EACH)
Awd $200.00$200.00
2 $200.00$200.00
Ref #90 625E98000 LIGHTING, MISC.:DISCONNECT SWITCH, 60 AMP, (1 EACH)
Awd $250.00$250.00
2 $200.00$200.00
Ref #91 625E98000 LIGHTING, MISC.:DISCONNECT SWITCH, MATCH EXISTING, (1 EACH)
Awd $200.00$200.00
2 $200.00$200.00
Ref #92 625E98000 LIGHTING, MISC.:H-O-A SWITCH, AS PER PLAN, (1 EACH)
Awd $135.00$135.00
2 $100.00$100.00
Ref #93 625E98000 LIGHTING, MISC.:LIGHTNING ROD REPAIR, (1 EACH)
Awd $75.00$75.00
2 $50.00$50.00
Ref #94 625E98000 LIGHTING, MISC.:PHOTOCELL TRANSFORMER, 30 AMP, (1 EACH)
Awd $50.00$50.00
2 $50.00$50.00
Ref #95 625E98000 LIGHTING, MISC.:PHOTOCELL TRANSFORMER, 60 AMP, (2 EACH)
Awd $150.00$75.00
2 $100.00$50.00
Ref #96 625E98000 LIGHTING, MISC.:REPAIRING UNDERGROUND BREAK OF DIR, (1 EACH)
Awd $450.00$450.00
2 $325.00$325.00
191042 - Page 307
Ref #97 632E89301 WOOD POLE, AS PER PLAN, (2 EACH)
Awd $400.00$200.00
2 $350.00$175.00
Section 1 - LIGHTING - Totals
Awd $226,880.00
2 $219,785.00
Ref #98 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $1,000.00$25.00
2 $1,400.00$35.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $1,000.00
2 $1,400.00
Ref #99 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $5,500.00$5,500.00
Ref #100 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $115,000.00$115,000.00
Ref #101 624E10000 MOBILIZATION, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $45,000.00$45,000.00
Section 3 - INCIDENTALS - Totals
Awd $140,000.00
2 $165,500.00
191042 - Page 308
Project No. 194028
PID 93829
PIK-SR 124-09.46
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 8/31/2020
Award Amount: $597,864.23
Contract Awarded To: ECLIPSE CO LLC
Letting Date: 10/10/2019
Engineer's Estimate: $503,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 1
Bid $597,864.23
AXIS CIVIL CONSTRUCTION LLC
5715 WESTBOURNE AVENUE
COLUMBUS, OH 43213
Franklin
Bidder 2
Bid $664,980.71
194028 - Page 309
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $4,466.63$4,466.63
2 $10,000.00$10,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (378 SY)
Awd $4,536.00$12.00
2 $5,670.00$15.00
Ref #3 202E38000 GUARDRAIL REMOVED, (250 FT)
Awd $687.50$2.75
2 $650.00$2.60
Ref #4 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (4 EACH)
Awd $1,200.00$300.00
2 $1,180.00$295.00
Ref #5 203E10000 EXCAVATION, (412 CY)
Awd $6,180.00$15.00
2 $10,300.00$25.00
Ref #6 203E20000 EMBANKMENT, (535 CY)
Awd $8,025.00$15.00
2 $13,375.00$25.00
Ref #7 204E10000 SUBGRADE COMPACTION, (482 SY)
Awd $723.00$1.50
2 $964.00$2.00
Ref #8 623E40500 REFERENCE MONUMENT, (4 EACH)
Awd $1,700.00$425.00
2 $1,400.00$350.00
Ref #9 623E40520 RIGHT-OF-WAY MONUMENT, (2 EACH)
Awd $850.00$425.00
2 $1,000.00$500.00
Section 1 - ROADWAY - Totals
Awd $28,368.13
2 $44,539.00
Ref #10 659E10000 SEEDING AND MULCHING, (2329 SY)
Awd $3,493.50$1.50
2 $4,075.75$1.75
Ref #11 659E14000 REPAIR SEEDING AND MULCHING, (116 SY)
Awd $174.00$1.50
2 $116.00$1.00
Ref #12 659E20000 COMMERCIAL FERTILIZER, (0.31 TON)
Awd $217.00$700.00
2 $155.00$500.00
Ref #13 659E31000 LIME, (0.48 ACRE)
Awd $48.00$100.00
2 $96.00$200.00
Ref #14 659E35000 WATER, (12.6 MGAL)
Awd $12.60$1.00
2 $12.60$1.00
194028 - Page 310
Ref #15 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $5,945.10
2 $6,455.35
Ref #16 605E31100 AGGREGATE DRAINS, (53 FT)
Awd $1,060.00$20.00
2 $954.00$18.00
Section 3 - DRAINAGE - Totals
Awd $1,060.00
2 $954.00
Ref #17 252E01500 FULL DEPTH PAVEMENT SAWING, (248 FT)
Awd $1,240.00$5.00
2 $992.00$4.00
Ref #18 301E46000 ASPHALT CONCRETE BASE, PG64-22, (103 CY)
Awd $30,282.00$294.00
2 $29,870.00$290.00
Ref #19 304E20000 AGGREGATE BASE, (81 CY)
Awd $4,455.00$55.00
2 $10,935.00$135.00
Ref #20 407E10000 TACK COAT, (172 GAL)
Awd $344.00$2.00
2 $1,001.04$5.82
Ref #21 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (105 CY)
Awd $28,665.00$273.00
2 $32,550.00$310.00
Section 4 - PAVEMENT - Totals
Awd $64,986.00
2 $75,348.04
Ref #22 621E00100 RPM, (9 EACH)
Awd $3,060.00$340.00
2 $3,600.00$400.00
Ref #23 621E54000 RAISED PAVEMENT MARKER REMOVED, (9 EACH)
Awd $225.00$25.00
2 $450.00$50.00
Ref #24 642E00094 EDGE LINE, 6", (0.28 MILE)
Awd $1,288.00$4,600.00
2 $1,226.40$4,380.00
Ref #25 642E00290 CENTER LINE, (0.33 MILE)
Awd $1,584.00$4,800.00
2 $1,503.15$4,555.00
194028 - Page 311
Section 5 - TRAFFIC CONTROL - Totals
Awd $6,157.00
2 $6,779.55
Ref #26 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $1,040.00$65.00
2 $1,280.00$80.00
Ref #27 614E11630 INCREASED BARRIER DELINEATION, (600 FT)
Awd $1,590.00$2.65
2 $1,800.00$3.00
Ref #28 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $8,000.00$2,000.00
2 $9,600.00$2,400.00
Ref #29 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL), (11 EACH)
Awd $137.50$12.50
2 $132.00$12.00
Ref #30 614E13314 BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL), (12 EACH)
Awd $150.00$12.50
2 $144.00$12.00
Ref #31 614E13360 OBJECT MARKER, TWO WAY, (23 EACH)
Awd $368.00$16.00
2 $345.00$15.00
Ref #32 614E21600 WORK ZONE CENTER LINE, CLASS II, 740.06, TYPE I, (0.18 MILE)
Awd $945.00$5,250.00
2 $900.00$5,000.00
Ref #33 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", (0.35 MILE)
Awd $3,377.50$9,650.00
2 $3,218.25$9,195.00
Ref #34 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (24 FT)
Awd $216.00$9.00
2 $204.00$8.50
Ref #35 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $18,000.00$18,000.00
Ref #36 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (756 SY)
Awd $60,480.00$80.00
2 $49,140.00$65.00
Ref #37 616E10000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $643.52$643.52
Ref #38 622E41000 PORTABLE BARRIER, 32", (600 FT)
Awd $10,200.00$17.00
2 $10,800.00$18.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $98,505.00
2 $96,206.77
194028 - Page 312
Ref #39 202E11000 STRUCTURE REMOVED, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $20,000.00$20,000.00
Ref #40 202E23500 WEARING COURSE REMOVED, (44 SY)
Awd $2,200.00$50.00
2 $1,320.00$30.00
Ref #41 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)
Awd $75,000.00$75,000.00
2 $38,000.00$38,000.00
Ref #42 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $22,000.00$22,000.00
Ref #43 509E10000 EPOXY COATED REINFORCING STEEL, (4182 LB)
Awd $10,455.00$2.50
2 $8,364.00$2.00
Ref #44 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI, (49 SY)
Awd $26,950.00$550.00
2 $41,650.00$850.00
Ref #45 511E46510 CLASS QC1 CONCRETE, FOOTING, (57 CY)
Awd $22,800.00$400.00
2 $25,650.00$450.00
Ref #46 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (78 SY)
Awd $5,850.00$75.00
2 $2,340.00$30.00
Ref #47 512E33000 TYPE 2 WATERPROOFING, (200 SY)
Awd $4,000.00$20.00
2 $3,600.00$18.00
Ref #48 512E33010 TYPE 3 WATERPROOFING, (176 SY)
Awd $5,280.00$30.00
2 $7,040.00$40.00
Ref #49 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (53 SF)
Awd $318.00$6.00
2 $265.00$5.00
Ref #50 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (29 CY)
Awd $3,190.00$110.00
2 $6,525.00$225.00
Ref #51 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL, (98 CY)
Awd $9,800.00$100.00
2 $7,644.00$78.00
Ref #52 611E96331 14' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN, (88 FT)
Awd $121,000.00$1,375.00
2 $162,800.00$1,850.00
Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (PIK-12 - Totals
Awd $308,843.00
2 $347,198.00
194028 - Page 313
Ref #53 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $5,000.00$5,000.00
Ref #54 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $38,000.00$38,000.00
2 $45,000.00$45,000.00
Ref #55 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $3,000.00$1,000.00
2 $4,500.00$1,500.00
Ref #56 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $8,000.00$8,000.00
Ref #57 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $25,000.00$25,000.00
Section 8 - INCIDENTALS - Totals
Awd $84,000.00
2 $87,500.00
194028 - Page 314