1
UP Refuse Building A - Rainwater Tank - 45000l Building A - Rainwater Tank - 45000l Building A - Rainwater Tank - 45000l Building A - Rainwater Tank - 45000l Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts Building B - Rainwater Tank - 30000l Building B - Rainwater Tank - 30000l Building B - Rainwater Tank - 30000l Building B - Rainwater Tank - 30000l Cycles - 46 Cycles - 46 Cycles - 46 Cycles - 46 (45) (45) (45) (45) Loading Loading Loading Loading Cycles - 8 Cycles - 8 Cycles - 8 Cycles - 8 Building B - Rainwater Tank - 25000l Building B - Rainwater Tank - 25000l Building B - Rainwater Tank - 25000l Building B - Rainwater Tank - 25000l Loading Loading Loading Loading Cycles - 28 Cycles - 28 Cycles - 28 Cycles - 28 (27) (27) (27) (27) Loading Loading Loading Loading Sub Station Plant - A A3 Unit Store Data LV Switch Plant - B Store Plant - C LV Switch LV Switch Sprinkler Sprinkler Sprinkler Sprinkler Tank Tank Tank Tank Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Tree Pit Store Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts Lifts North 0 m 20 1:200 15 10 5 refuse +56.00 m +56.00 m +56.00 m +56.00 m +55.51 m +55.37 m +55.00 m +55.37 m +56.00 m +56.00 m +56.00 m +56.00 m +56.00 m +56.00 m +56.00 m +55.63 m +55.77 m +56.00 m +56.00 m +56.00 m +56.00 m Building A Outline Building B Outline Building C Outline +56.46 m +56.15 m +56.74 m +56.38 m Platform Lift Platform Lift Platform Lift Platform Lift LOND ON LEEDS CARD IFF NEWC ASTLE BRIST OL GLAS GOW ABER YSTWYTH NEWT OWN BRAD FORD MANC HESTER LOUG HBOROUGH d arnton 3 A R C H I T E C T U R E B CARDIFF CARDIFF CARDIFF CARDIFF 5 Callaghan Square, Cardiff, CF10 5BT Tel: 029 2034 2688 www.darntonb3.com B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY QMS INTERNATIONAL - CERTIFICATE NUMBER GB18714’ COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. CLIENT CLIENT CLIENT CLIENT PROJECT PROJECT PROJECT PROJECT DRAWING DRAWING DRAWING DRAWING DRAWN DRAWN DRAWN DRAWN CHECKED CHECKED CHECKED CHECKED c c c c CREATION DATE CREATION DATE CREATION DATE CREATION DATE DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. DARTONB3 DRAWING NO. R R RE E EV V VI I IS S SI I IO O ON N N THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS PREPARED BY CONSULTANTS AND SUB-CONTRACTORS. THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED FOR CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES THEREOF. DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS. PLOT DATE: PLOT DATE: PLOT DATE: PLOT DATE: PROJECT NO. COMPANY ZONE LEVEL TYPE ROLE NUMBER 1 : 200 F 17/05/2017 16:03:25 TAFF VALE REDEVELOPMENT Proposed Site Basement Layout MH MS RHONDDA CYNON TAFF CBC CONSULTATION CONSULTATION CONSULTATION CONSULTATION Model Ref: FILL OUT UNDER PROJECT PROPERTIES SCALE @A1 11431 - DB3 - SI - B01 - DR - A - 90109 Rev Rev Rev Rev Date Date Date Date Description Description Description Description B B By y y C C Ch h hk k k # 10/02/17 First Issue MH MS A 28/02/17 Issued to Rhomco for costing MH MS B 08/03/17 Issued to HNLA MH MS C 09/03/17 Amendments for Fire Strategy MH MS D 23/03/17 Layout amendment MH MS E 31/03/17 TENDER ISSUE MH MS F 17/05/17 CONSULTATION ISSUE NF MS

N:PROJECTSL00 sL31 - Taff Vale RedevelopmentDESIGN DATA3 ... · Title: N:PROJECTSL00_sL31 - Taff Vale RedevelopmentDESIGN DATA3 In ProgressModelL31-DB3-XX-ZZ-M3-A-00001-SiteModel_fotopo

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: N:PROJECTSL00 sL31 - Taff Vale RedevelopmentDESIGN DATA3 ... · Title: N:PROJECTSL00_sL31 - Taff Vale RedevelopmentDESIGN DATA3 In ProgressModelL31-DB3-XX-ZZ-M3-A-00001-SiteModel_fotopo

UPRefuse

Bu

ildin

g A

- R

ain

wa

ter

Ta

nk -

45

00

0l

Bu

ildin

g A

- R

ain

wa

ter

Ta

nk -

45

00

0l

Bu

ildin

g A

- R

ain

wa

ter

Ta

nk -

45

00

0l

Bu

ildin

g A

- R

ain

wa

ter

Ta

nk -

45

00

0l

LiftsLiftsLiftsLifts

LiftsLiftsLiftsLifts

Building B - Rainwater Tank - 30000lBuilding B - Rainwater Tank - 30000lBuilding B - Rainwater Tank - 30000lBuilding B - Rainwater Tank - 30000l

Cycles - 46Cycles - 46Cycles - 46Cycles - 46(45)(45)(45)(45)

LoadingLoadingLoadingLoading

Cycles - 8Cycles - 8Cycles - 8Cycles - 8

Building B - Rainwater Tank - 25000lBuilding B - Rainwater Tank - 25000lBuilding B - Rainwater Tank - 25000lBuilding B - Rainwater Tank - 25000l

LoadingLoadingLoadingLoading

Cycles - 28Cycles - 28Cycles - 28Cycles - 28(27)(27)(27)(27)

LoadingLoadingLoadingLoading

Sub Station

Plant - A

A3 Unit

Store

Data

LV Switch

Plant - B

Store

Plant - C

LV Switch

LV Switch

SprinklerSprinklerSprinklerSprinklerTankTankTankTank

Tree PitTree PitTree PitTree Pit

Tree PitTree PitTree PitTree Pit

Tree PitTree PitTree PitTree Pit

Tree PitTree PitTree PitTree Pit

Tree PitTree PitTree PitTree Pit

Tree PitTree PitTree PitTree Pit

Store

LiftsLiftsLiftsLifts LiftsLiftsLiftsLifts

LiftsLiftsLiftsLifts

North

0

m

20

1:200

15105

refuse

+56.00 m +56.00 m +56.00 m +56.00 m

+55.51 m

+55.37 m

+55.00 m

+55.37 m

+56.00 m +56.00 m +56.00 m

+56.00 m

+56.00 m

+56.00 m

+56.00 m

+55.63 m

+55.77 m

+56.00 m

+56.00 m

+56.00 m

+56.00 m

Bu

ild

ing

A

Ou

tlin

e

Bu

ild

ing

B

Ou

tlin

e

Bu

ild

ing

C

Ou

tlin

e

+56.46 m

+56.15 m

+56.74 m

+56.38 m

Platform LiftPlatform LiftPlatform LiftPlatform Lift

LO

ND

ON

LE

ED

SC

AR

DIF

FN

EW

CA

STLE

BR

ISTO

LG

LA

SG

OW

AB

ER

YS

TW

YTH

NE

WTO

WN

BR

AD

FO

RD

MA

NC

HE

STE

RLO

UG

HB

OR

OU

GH

darnton 3A R C H I T E C T U R E

BCARDIFFCARDIFFCARDIFFCARDIFF

5 Callaghan Square, Cardiff, CF10 5BT

Tel: 029 2034 2688 www.darntonb3.com

B3 ARCHITECTS WORK TO A MANAGEMENT SYSTEM WHICH IS APPROVED TO ISO-9001 BY

QMS INTERNATIONAL - CERTIFICATE NUMBER GB18714’

COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED.

CLIENTCLIENTCLIENTCLIENT

PROJECTPROJECTPROJECTPROJECT

DRAWINGDRAWINGDRAWINGDRAWING

DRAWNDRAWNDRAWNDRAWN CHECKEDCHECKEDCHECKEDCHECKED

c c c c

CREATION DATECREATION DATECREATION DATECREATION DATE

DARTONB3 DRAWING NO.DARTONB3 DRAWING NO.DARTONB3 DRAWING NO.DARTONB3 DRAWING NO. RRRREEEEVVVVIIIISSSSIIIIOOOONNNN

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT

DRAWINGS PREPARED BY CONSULTANTS AND SUB-CONTRACTORS.

THIS DRAWING MUST NOT BE USED FOR CONSTRUCTION UNLESS ISSUED

FOR CONSTRUCTION.

REPORT ANY DISCREPANCIES TO THE ARCHITECT OR REPRESENTATIVES

THEREOF.

DO NOT SCALE FROM THIS DRAWING. WORK ONLY TO THE PRINTED DIMENSIONS.

PLOT DATE:PLOT DATE:PLOT DATE:PLOT DATE:

PROJECT NO. COMPANY ZONE LEVEL TYPE ROLE NUMBER

1 : 200

F

17/05/2017 16:03:25

TAFF VALE REDEVELOPMENT

Proposed Site Basement Layout

MH MS

RHONDDA CYNON TAFF CBC

CONSULTATIONCONSULTATIONCONSULTATIONCONSULTATION

Model Ref: FILL OUT UNDER PROJECT PROPERTIES

SCALE @A1

11431 - DB3 - SI - B01 - DR - A - 90109

RevRevRevRev DateDateDateDate Description Description Description Description BBBByyyy CCCChhhhkkkk

# 10/02/17 First Issue MH MS

A 28/02/17 Issued to Rhomco for costing MH MS

B 08/03/17 Issued to HNLA MH MS

C 09/03/17 Amendments for Fire Strategy MH MS

D 23/03/17 Layout amendment MH MS

E 31/03/17 TENDER ISSUE MH MS

F 17/05/17 CONSULTATION ISSUE NF MS