NOVELLO GTL

Natural Gas to Gasoline Production Facilities

February 2016

Page 2: Novello GTL Intro Deck Feb 2016 for Social Media-print

2                                                                            February  2016                                                                            

Novello GTL

Page 3: Novello GTL Intro Deck Feb 2016 for Social Media-print

3                                                                            February  2016                                                                            

Novello GTL

Source:  November  2015  EIA  STEO  report.  USA  YTD  2015  avg  9.1  bbl/day  gasoline  consumpIon  at  $2.43/gallon  retails  price  average.    

ProducIon  Technology  favors  Natural  Gas  over  Liquids    

Page 4: Novello GTL Intro Deck Feb 2016 for Social Media-print

4                                                                            February  2016                                                                            

Our  Business  Process  Novello GTL

We  have:  MulIple  sites  pre-­‐idenIfied,  Plant  engineering  (non-­‐site  specific),  

technology  license  rights.  

We  obtain  with  customer/partner/investor  funding:    Permits,  EPC  contract,  

CommodiIes  supply  and  sale  

agreements,  site-­‐specific  engineering  

ConstrucIon  Start  &  OperaIons:  

We  can  operate  under  opIon,  or  exit  via  sale  of  project  package  

Pre-selected sites save months and years in time for permitting and

negotiating logistical needs

First USA MTG plant successfully permitted by this team. Multiple EPCs

capable and willing to build with lump sum turn key

Flexible structures for ownership,

operations, and sale based on

stakeholder needs

Page 5: Novello GTL Intro Deck Feb 2016 for Social Media-print

5                                                                            February  2016                                                                            

Novello GTL Proven  Technology  

•  Chemistry  process  proven  for  decades.  Now  rapidly  commercializing  Nat  Gas  è  Syngas  è  Methanol  è  Gasoline  

•  Technology  is  NOT  Fischer-­‐Tropsch  (F-­‐T)  based.    Concentrated  gasoline  output  instead  of  broad  range  of  liquids  improves  profitability  

•  GTL  plants  have  historically  required  billions  of  dollars  of  capex,  but  Novello’s  design  is  highly  profitable  with  ~$200mm  of  project  cost  (well  under  $100,000  per  bpd  capacity  for  capex)  

•  Gasoline  produced  meets  all  ASTM  specs:  used  in  the  USA  &  50  other  countries    

No  Need  to  Take  Chances  When  Proven  Technologies  Exist  

Page 6: Novello GTL Intro Deck Feb 2016 for Social Media-print

6                                                                            February  2016                                                                            

Novello GTL MTG  Technology  Two  Steps  to  Gasoline  from  Natural  Gas  

*    ExxonMobil  operated  an  MTG  plant  in  New  Zealand  7  Imes  the  size  we  are  proposing  from  1985-­‐1997      

Step  1:  Standard  Methanol  Plant  Nat  Gas  è  Methanol  

Step  2:  MTG  Conversion  Methanol  è  Gasoline  

Commercial  Since:  1940s:  Worldwide  starIng  from  1970s:  First  large  plant    coal  and  natural  gas  and  now  biomass  built  and  ran  well  

 

Common  Uses:  Industrial  Chemical  ProducIon  SubsItute  for      expensive  crude  oil              

Examples:  Hundred+  plants  worldwide  *Exxon-­‐Mobil  New  Zealand      Qinghua  1&2  Inner  Mongolia      Xinjiang  Zhongji  China      Xinjian  Xinye  China      Huifeng      Hebei  Kanglida      US  DOE  USA  (Chicago)      Jincheng  Anthracite  Mining          Group  (JAMG)  

     Turkmenistan    (6x  NGTL)  under  construcWon      Several  Under  ConstrucWon  in  China      Several  Under  PermiXng  in  USA  

 

Methanol Production is

majority of project cost

Page 7: Novello GTL Intro Deck Feb 2016 for Social Media-print

7                                                                            February  2016                                                                            

Novello GTL GATOR:  Our  Unique  Design  

Autothermal  Reactor  

Gasoline  (80%+)  

OpImized  for  USA  

1.  Common  Industrial  Process  :  Autothermal  Reactors  and  Steam  Reformers  are  popular  for  smaller  industrial  plants  

2.  OpImized  for  the  USA  market  :  Permijng,  environmental,  product  specificaIons,  modular  construcIon,  and  MLP  eligible  

3.  Concentrated  Output  :    With  only  two  products  (gasoline  &  LPG),  business  simplicity  improves  profitability  and  lowers  execuIon  risk  

Gasoline  AutoThermal  OpImized  Reactor  

Page 8: Novello GTL Intro Deck Feb 2016 for Social Media-print

8                                                                            February  2016                                                                            

•  GATOR  can  be  operaIonal  in  less  than  27  months  •  AcIve  markets  for  output:  80%  output  is  87+  octane  gasoline,  20%  LPG  with  no  sulfur  or  benzene,  fully  compliant  with  EPA  2017  Tier  3  Sulfur  gasoline  requirement  

•  Long-­‐term  input  and  off-­‐take  contracts  available  to  lock  in  today’s  profitability  and  minimize  market  risks  

•  “Minor”  source  permijng  due  to  high  energy  efficiency  and  small    environmental  footprint  

 

GATOR  -­‐  Advantages  Novello GTL

Built  for  speed  to  market,  to    minimize  risk  and  reduce  costs      

Can be Modularized – Built Mostly Indoors for better schedule & cost

control

Page 9: Novello GTL Intro Deck Feb 2016 for Social Media-print

9                                                                            February  2016                                                                            

Novello GTL GATOR  Requirements  

 

Land   20  Acres  (~8  Hectares)  :  4  acres  used  for  

process  area  and  tankage.    Other  buffer.  

Nat  Gas  Source   Pipeline  or  field  gathering  lines  supplying  

20,000  Dekatherms/day  (20  Billion  BTUs)  

Nat  Gas  Quality   950+  BTU  per  Cu  Ft  containing  low  sulfur  

Transport  of  Gasoline  &  LPG  

Roads  for  14  truck  runs  per  day  or  barge,  

rail,  pipeline  

Electricity   <  11  MW  with  ASU.  <2MW  without  ASU  

Environmental   Low  water  consumpIon  at  <  150  gpm,  

depending  on  final  site  and  design.    Low  

emissions  and  “minor”  permits  required.    

Catalysts  reclaimed.    Low  water  discharge.      

Employees   30  local,  full-­‐Ime  for  operaIons  and  rouIne  

maintenance.    Contract  crar  technicians  and  

inspectors  for  turnarounds.  

Small Capex, little water usage, and low emissions

Page 10: Novello GTL Intro Deck Feb 2016 for Social Media-print

10                                                                            February  2016                                                                            

Novello GTL

Engineering  RendiWon  

 of  a  Permi\ed  Project        

 

Photo  of  a  Similar  OperaWng  Plant  

Plant  RepresentaWve  Images  

Page 11: Novello GTL Intro Deck Feb 2016 for Social Media-print

11                                                                            February  2016                                                                            

 

GATOR  –  Clean  Products  Novello GTL

The  GATOR  process  produces  just  three  clean  products  lowering  business  execuIon  risk:      1.  80%+  of  the  liquids  output  of  about  2300  bbl/d  is  midgrade,  87+  octane  

gasoline.    This  product  meets  all  ASTM  D-­‐4814  specificaIons.    It  has  no  sulfur,  low  benzene  and  low  olefins  which  makes  it  a  premium  blending  component  for  motor  fuel.    It  is  fully  compliant  with  new  EPA  2017  EPA  Tier  3  gasoline  requirements.  

           Product  has  been  tested  for  blending  with  10%  Ethanol.                      2.  Approx.  20%  of  the  output  is  clean,  LPGs.    Of  this,  roughly  80%  is  butane  and  

20%  is  propane.  3.  The  process  produces  medium  to  high  pressure  and  high  temperature  steam.    

This  steam  can  be  used  to  generate  electrical  power  or  be  provided  via  pipeline  to  a  local  industrial  user.    The  steam  condensate  is  recycled  and  used  again.                                                                                                  

Page 12: Novello GTL Intro Deck Feb 2016 for Social Media-print

12                                                                            February  2016                                                                            

Novello GTL Management  

Paul  Hamilton,  President  –  Former  long-­‐Ime  senior  execuIve  of  Shell  Oil.  Over  3  decades  of  technical  and  operaIonal  experIse  while  serving  as  Shell  VP  Engineering,  CEO  of  Global  SoluIons  USA,  Head  of  Refinery  Maintenance  USA,  and  many  other  posiIons.  Shell  has  created  and  operated  the  world’s  largest  natural  gas  to  liquids  producIon  faciliIes  in  the  world.  Environmental  Engineering  graduate  degree  and  combined  working  experience  allow  Novello  GTL  to  have  the  most  advanced,  economically  efficient,  and  environmentally  sound  processes  and  technologies.  

Albert  Lin,  CEO  –  Serial  Entrepreneur  in  technology  and  financial  industries.  InnovaIons  in  USA  permijng,  financial  services,  and  technology  commercializaIon  fit  Novello’s  market  posiIon  well.  Public  and  private  company  governance  experience  through  various  company  board  of  directorships.  

Rick  Imig,  COO–  Engineering,  refinery  operaIons,  and  IT  at  energy  companies  like  Shell  Oil.  Control  Systems  and  IT  experience  spanning  3  decades  puts  operaIng  a  Novello  facility  well  within  the  experience  profile.  

Bill  Douglas,  Corporate  General  Counsel  –  Experience  in  the  energy  business  in  the  USA,  Mexico,  and  China  in  a  number  of  roles.    Served  as  the  President  of  EmberClear  Hong  Kong,  LTD.    Industry  experience  in  commodity  trading,  power  infrastructure,  complex  negoIaIons  and  contracts.    

Page 13: Novello GTL Intro Deck Feb 2016 for Social Media-print

13                                                                            February  2016                                                                            

Novello GTL Contact  InformaWon  

Albert  Lin  CEO  [email protected]  (415)  409-­‐9150