Qualität + Erfahrung WestWood ® Reference Report Northfield, Hatfield Walkways, Stairs & Concrete Canopies Contractor: Avonside Roofing Ltd Project: Social Housing, Northfield, Hatfield, Hertfordshire Substrate: Concrete & Asphalt Size: 150m2 Material: Wecryl 298 Prmier, Wecryl 230/230thix Waterproofing Layer, Wecryl 233 Wearing Layer, Wecryl 288 Finish, Wecryl 420 Wearing Layer Specification: Full Wecryl Roof Waterproofing System Completion: Phase 1&2 Completed

Northfield, Hatfield : Walkways, Stairs & Concrete Canopies

Embed Size (px)

DESCRIPTION

WestWood Liquid Technologies Reference Report

Citation preview

Page 1: Northfield, Hatfield : Walkways, Stairs & Concrete Canopies

Qualität + ErfahrungWestWood®

Reference Report

Northfield, HatfieldWalkways, Stairs & Concrete Canopies

Contractor: Avonside Roofing LtdProject: Social Housing, Northfield, Hatfield, Hertfordshire Substrate: Concrete & AsphaltSize: 150m2Material: Wecryl 298 Prmier, Wecryl

230/230thix Waterproofing Layer, Wecryl 233 Wearing Layer, Wecryl 288 Finish, Wecryl 420 Wearing Layer

Specification: Full Wecryl Roof Waterproofing SystemCompletion: Phase 1&2 Completed

Page 2: Northfield, Hatfield : Walkways, Stairs & Concrete Canopies

2. Asphalt walkways mechanically abraded during preparation.

3. Walkways primed with Wecryl 298. 4. Wecryl 298 Primer & Wecryl 230 / 230 Thix and fleece reinforcement applied to concrete canopies.

Social Housing Accomodation

Walkways, Stairs & Concrete Canopies

5. Further canopies applied with our fleece reinforced Waterproofing Layer.

Qualität + ErfahrungWestWood®

6. Steps finished with Wecryl 230 Waterproofing, Wecryl 233 Wearing Layer & Wecryl 420 Textured Surfacing.

7. Walkways finished with Waterproofing & Wearing Layer such as a textured non-slip Finish.

WestWood Liquid Technologies Limited 16 Great Queen Street London WC2B 5AH · United Kingdom www.westwood.eu Tel: +44 800 808 5480

The client Welwyn and Hat-field Housing Trust ensured walkways, stairs and concrete canopies were waterproofed for their Social Housing Accoma-dations Project.

Water was getting into the bathrooms situated below the asphalt walkways. Water ingress was also evident at the front of the building where the asphalt to the lintels had deteriorated.

To complete the project on time and limit any disruption to the tenants, rapid curing products meant that tennants could still easily access their dwellings whilst the work was carried out.

1. Stairs and Walkways before preparation. Asphalt drip edge was removed & a new drip trim installed along with a new gutter.