CyrusOne Enterprise Data Centers | 855-564-3198 | CyrusOne.com CyrusOne Data Center Northern Virginia – Sterling II 21111 Ridgetop Circle | Sterling, VA 20166 220,000 square feet This Northern Virginia data center is an enterprise-class 220,000 square-foot facility located in Sterling, Virginia. With direct access to one of the largest Internet Exchange points in the U.S., superior fiber connectivity makes this data center ideal for colocation of high performance computing. New State-of-the-Art Facility The new facility: • Accommodate a shell of approximately 220,000 square feet • Provide up to 120,000 colocation square feet(CSF) • Offer 6,624 square feet of Class A office space • Deliver up to 30 megawatts of critical load. Mission-Critical Security A full perimeter-fence surrounds the site, which is secured by up to seven layers of physical security and features benefits that include: • 24/7 year-round onsite data center security guards • Video surveillance and recording of exteriors and interiors • Biometric and key card security for strict access control • Turn style and other secure doors to prevent tail gating • Reinforced physical infrastructure that can include concrete bollards, steel-lined walls, and bullet resistant glass • Dedicated data halls, suites and cages to minimize traffic. Massively Modular ® Engineering CyrusOne’s Massively Modular data center engineering is specifically designed to achieve optimal flexibility for even the largest scale deployment and build out. CyrusOne can build out new data halls in just 12-16 weeks through aggressive sourcing and a just-in-time focus to meet customer demand. The Massively Modular model frees customers from being confined by time, space, and/or flexibility constraints often found in other data center providers.

Northern Virginia – Sterling II · by up to seven layers of physical security and features benefits that include: • 24/7 year-round onsite data center security guards • Video

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Northern Virginia – Sterling II · by up to seven layers of physical security and features benefits that include: • 24/7 year-round onsite data center security guards • Video

CyrusOne Enterprise Data Centers | 855-564-3198 | CyrusOne.com

CyrusOne Data Center

Northern Virginia – Sterling II21111 Ridgetop Circle | Sterling, VA 20166

220,000 square feet This Northern Virginia data center is an enterprise-class 220,000 square-foot facility located in Sterling, Virginia. With direct access to one of the largest Internet Exchange points in the U.S., superior fiber connectivity makes this data center ideal for colocation of high performance computing.

New State-of-the-Art FacilityThe new facility:

• Accommodate a shell of approximately 220,000 square feet

• Provide up to 120,000 colocation square feet(CSF)

• Offer 6,624 square feet of Class A office space

• Deliver up to 30 megawatts of critical load.

Mission-Critical SecurityA full perimeter-fence surrounds the site, which is secured by up to seven layers of physical security and features benefits that include:

• 24/7 year-round onsite data center security guards

• Video surveillance and recording of exteriors and interiors

• Biometric and key card security for strict access control

• Turn style and other secure doors to prevent tail gating

• Reinforced physical infrastructure that can include concrete bollards, steel-lined walls, and bullet resistant glass

• Dedicated data halls, suites and cages to minimize traffic.

Massively Modular® EngineeringCyrusOne’s Massively Modular data center engineering is specifically designed to achieve optimal flexibility for even the largest scale deployment and build out.

CyrusOne can build out new data halls in just 12-16 weeks through aggressive sourcing and a just-in-time focus to meet customer demand.

The Massively Modular model frees customers from being confined by time, space, and/or flexibility constraints often found in other data center providers.

Page 2: Northern Virginia – Sterling II · by up to seven layers of physical security and features benefits that include: • 24/7 year-round onsite data center security guards • Video

Cooling• 36-inch raised floor design

• Utilizing Stulz 200-ton CRAH units with electronically commutated (EC) variable-speed fans

• Highly-efficient 500-ton Trane chillers with rapid restart and adaptive controlled microprocessors

• Ability to scale as density increases in an N+1 central plant design and an N+2 air-side design.

Security• Reinforced physical structure including perimeter fence

with sliding entry and exit gates

• Secure entry with man traps and security monitoring area comprised of steel-lined walls for security, and bullet resistant glass

• Video surveillance and recording of the exterior and interior

• On-site security guards 24/7 year-round

• Man traps, biometric and key card (color-coded) security for rigid access control

• Cabinet and cage security options include individual locks and biometric scanners.

Fire Protection• Very Early Smoke Detection Apparatus (VESDA) system,

sampling air in parts per million coupled with a zoned dual-action, interlocking dry-pipe sprinkler system.

Location• Conveniently located near dozens of hotels, restaurants and

other amenities

• Ten minutes from Dulles International Airport and 30 minutes from Ronald Reagan Washington Airport.

General• 420,000 square feet campus at full build / 220,000 square

feet Phase 2

• Planned – SSAE 16 (SOC I type II), PCI DSS (sec 9 & 12), HIPAA, ISO 27001, FISMA

• CyrusOne Facilities are designed to meet TIA-942 requirements for electrical and mechanical

• High Performance Computing (HPC) capable, supports 200 watts/sf with the ability to support over 1,000 watts/sf

• Efficient, divisible floor plates

• Carrier-neutral facility

• 100% Uptime service level agreement on power

• 24/7 year-round staffed NOCC and remote hands support

• Dedicated cages and private suite options available

Power• Up to 30 MW of total capacity

• 30 MW of critical power at N and 22.5 MW at distributed redundant for Sterling II

• Multiple levels of redundancy available within the same foot-print (i.e. N, Distributed Redundant, 2N, or a combination)

• Dual-Input PDUs with Static Transfer Switches (STS’s)

• 85.5MW dedicated diesel generators

• 6,800-gallon belly tanks for each generator (supports critical load for 48-hours) with diverse refueling agreements.