12
https://northernlightsccs.com

Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

https://northernlightsccs.com

Page 2: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Page 3: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Open 27 June 2018

Sleipner CCS operational since 1996

Snøhvit CCS operational since 2008

CO2 test center (TCM) operational since 2012

➢ 24 years of operational experience

➢ Approx. 24 mill tons CO2 stored

CCS in Norway – 24 years of successful industrial experience

Northern Lights CCS. FID in 2020, operational from 2024

3

Page 4: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Internal 25 April 2019

Source: https://markets.businessinsider.com/commodities/co2-european-emission-allowances

1. What will the ETS price do in the future?

2. Availability of subsidies?

3. Is there a market for decarbonized end

products? (Steel, cement, power, etc.)

Page 5: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM
Page 6: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Internal

CO2 Capture Sites

• CO2 captured and liquified

• Storage volumes at each site required to

account for ship arrival every four days

plus a buffer for any upsets in the overall

chain

• High purity > 99% CO2

Ship(s)

• One ship per

capture site

• 7,500m3 of LCO2

per ship

• Pressure 15 barg

at equilibrium

temperature

(approx. -30 ºC)

Onshore facilities

• One jetty for ship mooring

• Tank volume based on ship cargo

size

• Pump system to provide required

export pressure

Pipeline

• 110km un-

insulated

pipeline

• 12 ¼ inch

• Single phase

(liquid) CO2

Subsea facilities

• Connecting pipeline,

umbilical and well(s)

• Water depth ~300m

• Connection for future

step-out

Subsea injection

well

• Injection of CO2

into reservoir at

~2-3000m depth

• Pressure in

reservoir

~2-300bar

• Temperature in

reservoir ~100 ºC

2 x shipOnshore facilities Pipeline

1 x injection

well (tbc)

+ pump capacity

+ heater capacity

+ jetty

+ tanks?

+ ship(s)

Capacity (Mt/y)5

1.5

1 x ship

Storage complex

• Saline aquifer (Johansen formation) south

of Troll (“Aurora”)

+ well(s)

Umbilical to Oseberg

Connection

from Oseberg-field

providing power

and signal from

DC/FO and fluids through

umbilical system

Phase 2: 3.5 mtpa incremental

Phase 1b spare cap.: 0.7 or 1.1 mtpa

Page 7: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Sectors with the largest potential

• Waste incineration / WtE

• Cement

• Biomass and biofuel

• Refineries

• Steel

• Natural gas

• Hydrogen

• Electricity

• Fertilizers

• Data centers

• DAC

Each dot reprsenents at least 0.1 mtpa, most much more

Page 8: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Sectors with the largest potential

• Waste incineration / WtE

• Cement

• Biomass and biofuel

• Refineries

• Steel

• Natural gas

• Hydrogen

• Electricity

• Fertilizers

• Data centers

• DAC

Each dot reprsenents at least 0.1 mtpa, most much moreEach dot reprsenents at least 0.1 mtpa, most much more

Page 9: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Internal

Timing highly notional

Subject to stand-alone investment decision

Page 10: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

Page 11: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

2050

Approx. 75 mtpa

Page 12: Northern Lights CCS - Norges forskningsråd · 2020. 10. 19. · Northern Lights CCS Author: Kjetil Wilhelmsen Created Date: 10/19/2020 1:21:24 PM

o

o

o

- A ship-based solution means access for