58
NORTH FLATBUSH AVENUE B.I.D. MASTER PLAN  June 24 2009 Presentation

North Flatbush Avenue BID Master Plan 6/24/09

Embed Size (px)

Citation preview

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 1/58

NORTH FLATBUSH AVENUE

B.I.D. MASTER PLAN

June 24 2009 Presentation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 2/58

Presentation Overview

1. Goals and objectives : What we plan to achieve

2. Teaming with NYC Agencies and Organizations 3. Master Plan Concept : Approaches and relationships

4. Next steps : Implementation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 3/58

Traf ctoo noisy•too much traf c•want to close traf c lanes•

want to redraw street• lineswant to reduce parking•want to restrict turning•need to slow traf c, use•cameras at red lightsneed to increase police•enforcementwant to add a bus only•lane

Greeningneeds more planting•areasneeds more shade in•

summerwant to make triangles•pedestrian friendlyneeds more trees•need better trash mainte-•nancewant to extend triangles•want more seasonal•planting

Pedestrian Experienceunsafe at night•needs more seating areas•want more cafe tables•want to make this a pedestrian•destinationneeds a better transition be-•tween residential and commer-cial areaneeds more lighting•want holiday lighting•want venders in triangles•

want safer more direct cross•walk

Transportationnot enough bike parking•want neckdowns to increase•sidewalk space

want bus shelters• want bike lanes•want bike maps•needs better signage•

Address Community ConcernsGOALS AND OBJECTIVES

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 4/58

Celebrate the Grand Scale of the Flatbush AvenueGOALS AND OBJECTIVES

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 5/58

Strengthen East West ConnectionsGOALS AND OBJECTIVES

Heart of BrooklynBrooklyn Botanical GardensBrooklyn MuseumBrooklyn Public LibraryFarmers MarketProspect ParkProspect Park ZooBrooklyn Childrens Museum

using topographical, scale and character changes

Create a smooth transition along North Flatbush

Atlantic CenterBrooklyn Academy of MusicTransportation HubMark Morris Dance CenterMoMA Atlantic Paci cBRICUrban Glass

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 6/58

Strengthen North South ConnectionsGOALS AND OBJECTIVES

park slopeboreum hill

prospect heightsfort greene

Create a smooth transition across North Flatbush by using the triangles

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 7/58

Capture Opportunities of Transportation CorridorGOALS AND OBJECTIVES

2 3 B Q 4 5

Bike Lan e

Bus Route

Subw ay

4 5

2 3

B 6 7

B 4 12 3

2 3B Q

B Q

B 6 3

park slopeboreum hill

prospect heights

fort greene

grandarmyplaza

atlanticcenter

Subways, buses, cars, bicycles and pedestriansall converge on Flatbush Avenueand give it the potential of becoming a center main street

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 8/58

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 9/58

Draw attention to local businesses and neighborhoodsGOALS AND OBJECTIVES

A diverse neighborhood with diverse interests and opportunities

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 10/58

Maximize use of the TrianglesGOALS AND OBJECTIVES

Engage, improve and activate the trianglesPotential for public open spaces on Flatbush Avenue

park pl 7th ave & park pl

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 11/58

Team up with Local OrganizationsGOALS AND OBJECTIVES

Work with Downtown Brooklyn organizationsand with Heart of Brooklyn Organizations

urban art program farmers market public music gardening programs

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 12/58

Team up with NYC AgenciesGOALS AND OBJECTIVES

urban art program plaza program sheltered bike parking designated bus lane and shelter

Work with the DOT to transform the pedestrian experience

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 13/58

DOTTEAM UP WITH NYC AGENCIES

Working with the DOT we can reduce traf c lanes at intersections to 12’.This will open Flatbush Avenue to more pedestrian use.

7th ave & park pl7th ave & park pl

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 14/58

DOTTEAM UP WITH NYC AGENCIES

There are opportunities at every corner to increase pedestrian space and visibility onthe street. This additional space could make the pedestrian connection along Flatbush

Avenue stronger than the traf c connection on the intersecting streets.

dean st dean st

DOT

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 15/58

DOTTEAM UP WITH NYC AGENCIES

Decreased traf c lanes at corners will force drivers to slow down as they approachFlatbush Avenue and reduce the length of crosswalks for pedestrians

5th ave triangle 5th ave triangle

DOT

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 16/58

DOTTEAM UP WITH NYC AGENCIES

Paving organizes the street and de nes the character of different neighborhoods.Working with the DOT you can gain approvals to add a new hierarchy of

paving to the street.

T ith NYC A i

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 17/58

Team up with NYC AgenciesGOALS AND OBJECTIVES

Work with the MTA to transform the commuter experience

MTA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 18/58

MTATEAM UP WITH NYC AGENCIES

Creating a relationship with the MTA will keep you abreast of their future plans forrenovation. This will give you the knowledge to know when and where we can request

the use of their new subway grates that incorporate bike parking and seating.

MTA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 19/58

MTATEAM UP WITH NYC AGENCIES

Getting approvals from the MTA to increasing signage at transportation nodes will

create a sense of arrival. These nodes can act as gateways to pedestrians. Orientingpeople to the space when they arrive will make it easier for them to navigate the streetand understand everything the businesses of Flatbush Avenue have to offer.

bergen st 7th ave & park pl grand army plaza

NYC Parks & Recreation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 20/58

NYC Parks & RecreationTEAM UP WITH NYC AGENCIES

Work with the NYC Parks & Recreation to green the streets6th ave triangle

NYC Parks & Recreation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 21/58

NYC Parks & RecreationTEAM UP WITH NYC AGENCIES

Identifying areas where new trees can be planted and taking care of existing trees will enhance greenery on the Avenue. Getting approvals from

DPR will allow you to enlarge and plant the tree pits on the Avenue.

NYC Parks & Recreation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 22/58

NYC Parks & RecreationTEAM UP WITH NYC AGENCIES

Working with DPR to incorporate signage or seating around trees is a simple,affordable way to enhance their role in the streetscape

NYC Parks & Recreation

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 23/58

NYC Parks & RecreationTEAM UP WITH NYC AGENCIES

Selecting the right kind of planter and the right kind of plants will create a characterunique to the Avenue. With a maintenance agreement, DPR will provide

training on how to care for plants.

Existing Conditions

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 24/58

Existing Conditions

Wide Street•Lots of Subway Grates•Few Trees•

Master Plan Concept

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 25/58

5th AVENUETRIANGLE 6th AVENUETRIANGLE 7th AVENUE TRIANGLE 8th AVENUETRIANGLE

2 3

2 32 3

2 3

NQ R

2 34 5

BQ

BQ

BM

D

2 32 3

2 3 2 3

Master Plan Concept

1 : Create a buffer zone between vehicles and pedestrians

2 : Engage Triangles and develop them into public open spaces

3 : Develop a family of street elements for character and identity

4 : Respond to the architecture of the Avenue

ENLARGED AREA

P a c i f

i c S t .

A t l a n

t i c A v

e .

D e a n

S t .

B e r g

e n S t

.

S t M a

r k s A v

e .

P r o s p

e c t P

l .

P a r k P

l .

S t e r l i n

g P l .

8 t h A v e .

7 t h A v e .

6 t h A v e .

5 t h A v e .

Shelter Pedestrians

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 26/58

CREATE A BUFFER ZONE

Use Street Elements

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 27/58

CREATE A BUFFER ZONE

Paving strip to define walking zone/bufferzone• Street elements relate to businesses and architecture•Blank walls are opportunities for art, signage, information maps•Make the most of existing trees•

Integrate MTA grates

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 28/58

g gCREATE A BUFFER ZONE

Use Street Elements

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 29/58

CREATE A BUFFER ZONE

Prototypical Block

Overall Scheme

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 30/58

Engage the Triangles

STREETELEMENTS/ RYTHM

EXISTINGTREE

POTENTIAL TREE

BIKE RACKS

SUBWAY ENTRANCE

BUSSTOP

AMENITIESSTRIP/SIDEWALK EXTENSION

5th AVENUE TRIANGLE 6th AVENUE TRIANGLE 7th AVENUE TRIANGLE 8th AVENUE TRIANGLE

2 3

2 32 3

2 3

B Q

B Q

2 32 3

2 3 2 3

Triangles are Opportunities to Green Flatbush Avenue

Overall Scheme

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 31/58

Engage the Triangles

5th AVENUE TRIANGLE 6th AVENUE TRIANGLE

2 32 3

2 3 2 3

7th AVENUETRIANGLE

B Q

B Q

8th AVENUETRIANGLE

2 3

2 3

5th Ave Triangle

Pavillion

6th Ave Triangle

Plaza

7th Ave Triangle

Garden

8th Ave Triangle

Extended Park

Each Triangle has a Unique Character

Lead people into the trianglesENGAGE THE TRIANGLES

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 32/58

ENGAGE THE TRIANGLES

P A R K P

L

C A R L T O N A V E

7 T H A V E

5th Avenue TriangleENGAGE THE TRIANGLES PAVILLION

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 33/58

ENGAGE THE TRIANGLES - PAVILLION

2 4 ’ 1

2 ’

5th Avenue TriangleENGAGE THE TRIANGLES PAVILLION

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 34/58

ENGAGE THE TRIANGLES - PAVILLION

5th Avenue TriangleENGAGE THE TRIANGLES PAVILLION

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 35/58

BuferZone

Pavillion Building Extension BikeLane

ExtensionDean St Sidewalk Sidewalk Sidewalk Flatbush Ave

ENGAGE THE TRIANGLES - PAVILLION

Temporary Concept

5th Avenue TriangleENGAGE THE TRIANGLES - PAVILLION

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 36/58

BuferZone

BuferZone

BuferZone

Pavillion Building BikeLane

Dean St Sidewalk Sidewalk Sidewalk Flatbush Ave

ENGAGE THE TRIANGLES - PAVILLION

Permanent Concept

6th Avenue TriangleENGAGE THE TRIANGLES - PLAZA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 37/58

2 4 ’ 1

2 ’

6th Avenue TriangleENGAGE THE TRIANGLES - PLAZA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 38/58

6th Avenue TriangleENGAGE THE TRIANGLES - PLAZA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 39/58

Plaza St Marks Ave Sidewalk Flatbush Ave

Temporary Concept

6th Avenue TriangleENGAGE THE TRIANGLES - PLAZA

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 40/58

Plaza St Marks Ave Sidewalk Flatbush Ave

Permanent Concept

7th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 41/58

3 3 ’

1 2 ’

7th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 42/58

7th Avenue Triangle - Shelter pedestrians from carsENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 43/58

7th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 44/58

Planter Path Extension ExtensionPlanter Park Pl. Sidewalk Flatbush Ave

Temporary Concept

7th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 45/58

Planter Path Planter Park Pl. Sidewalk Flatbush Ave

Permanent Concept

8th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 46/58

1 2 ’

8th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 47/58

8th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 48/58

Planter Path Planter Promenade Sidewalk Flatbush AveSt Johns Pl.

Temporary Concept

8th Avenue TriangleENGAGE THE TRIANGLES - GARDEN ON THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 49/58

Planter Path Planter PlanterPath PathSt Johns Pl.

Sidewalk Flatbush Ave

Permanent Concept

StandardsDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 50/58

trash kiosk 5x5 concrete pavinglighting bus shelter street treecityracks

Standard NYC street elements are provided by the city upon request

Traditional Elements: StreetscapeDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 51/58

Contemporary Elements: StreetscapeDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 52/58

Traditional Elements: TriangleDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 53/58

Contemporary Elements: TriangleDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 54/58

Extras with Approvals and Maintenance AgreementsDEVELOP A FAMILY OF STREET ELEMENTS

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 55/58

paving greening lighting signage furniturevehicularpedestrianbike paths

treesshrubsvines

ground coversseasonalstorm water

polesbollardspoint source

way ndingtraf ceducational

point of interestbannersidentity signageenvironment

seatingtablesbicycle racks

plantersbus sheltersshade structurestrash receptaclefences

public artsculpturesmuralssurfaces

signage

These additional street elements need to be provided by private entities

Highlight Rythm and CharacterRESPOND TO THE ARCHITECTURE OF THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 56/58

Highlight Rythm and CharacterRESPOND TO THE ARCHITECTURE OF THE AVENUE

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 57/58

Next Steps

8/8/2019 North Flatbush Avenue BID Master Plan 6/24/09

http://slidepdf.com/reader/full/north-flatbush-avenue-bid-master-plan-62409 58/58

1. Prioritize Goals & Objectives 2. Team up with agencies 3. Team up with organizations 4. Secure funding 5. Proceed to Implementation