no: 3 CEMSIS wp6_beg022_v0_4_intro slides.ppt ‘Stakeholders’ in CEMSIS u Nuclear Plant Operator l British Energy (co-ord.)UKelectricity generation l Electricite de FranceFelectricity generation l British Nuclear FuelsUKnuclear fuel processing u Suppliers & System Integrators l Framatome ANPDEI&C supplier l Sycon InternationalSEsystem developer u Safety Authorities & Assessors l AV NuclearBinspection and licensing l AdelardUKsafety consultancy l SKI (Sycon subcontract)SEinspection and licensing u IT Research l TU LundSEresearch & education
Citation preview
wp6_beg022_v0_4_intro slides.ppt
no: 1 CEMSIS
CEMSISFIKS-CT-2000-00109
CCost-ost-EEffective ffective MModernisation of odernisation of SSystems ystems IImportant to mportant to SSafetyafety
Deryk Pavey,Deryk Pavey,
wp6_beg022_v0_4_intro slides.ppt
no: 2 CEMSIS
CEMSIS Objectives Programmable Instrumentation and Control (I&C)
safety systems (e.g. protection) safety-related systems (e.g. control, data presentation)
Common approach to development and safety justification maximise safety minimise cost
Modernisation/Refurbishment analogue/discrete logic replacement with computer-based systems
wp6_beg022_v0_4_intro slides.ppt
no: 3 CEMSIS
‘Stakeholders’ in CEMSIS Nuclear Plant Operator
British Energy (co-ord.) UK electricity generation Electricite de France F electricity generation British Nuclear Fuels UK nuclear fuel processing
Suppliers & System Integrators Framatome ANP DE I&C supplier Sycon International SE system developer
Safety Authorities & Assessors AV Nuclear B inspection and licensing Adelard UK safety consultancy SKI (Sycon subcontract) SE inspection and licensing
IT Research TU Lund SE research & education
wp6_beg022_v0_4_intro slides.ppt
no: 4 CEMSIS
Key Issues
Harmonisation & Structuring of Safety Justification approaches
Definition of Requirements for Systems Important to Safety
Use of Pre-Existing Software in Systems Important to Safety
potentially including class A systems
Use of Languages and Tools in Systems Important to Safety
wp6_beg022_v0_4_intro slides.ppt
no: 5 CEMSIS
CEMSIS Modernisation Context
Utility
Supplier
Regulator
Project viability
User requirements
process
Requirementsdocument
SISrequirementsspecification
Tenderingprocess
Test andVerification
SWDevelopment
SIS ImplementationDecomposition
& Design
Final Licensing /Approval
Approval
Normal operation and maintenance
Acceptance &Phased
Introduction
ValidationInstallation
& Site Commissioning
Negotiation &Acceptance
Pre-qualification(independent assessor)
Amended SISrequirements
Safety Justification
Plan
4
4
4
4
4
44
4
Key:= Work Package Number
Discuss/Agree
3
3
Safety Justification1
1
Regular communication and informed comment
2
2
2
2
wp6_beg022_v0_4_intro slides.ppt
no: 6 CEMSIS
Work Package TasksSafety Justification
Survey and FrameworkSafety Justification
FrameworkWP1
Requirements CaptureSurvey and Lifecycle
Requirements CaptureGuidelinesW
P2
Pre-Existing S/WStrategy & Techniques
Pre-Existing S/WGuidelinesW
P3
Languages & ToolsReview and Evaluate
Languages & ToolsReportW
P4
WP0,6
Management and Dissemination
Case Studies:UK: fuel reprocessing
F: PWR I&C replacementSE: safety monitoring
+ Public Domain ExampleWP5