5
KP Pulo Gadung RT 002/RW 005 Pegangsaan Dua, Kelapa Gading North Jakarta +6285892668353 [email protected] Dian Purnama Sari,ST. Telecomunication Engineer About Me Date of birth : Bandar Lampung, April 20th 1989 Gender : Female Marital Status : Single Citizenship : Indonesia Interest : Sport, Travelling, Music Religion : Moslem GPA : 3.42 (scale of 4.00) . Summary Hard worker and discipline person ; Optimistic and independent person ; ability to work in a team or independently ; Eager to learn newest and latest technologies ; good human relationship, communication and interpersonal skill ; high motivation and quick learner to develop skills, knowledge and experience ; Fluent in English ; Experience September 2016 – Present Company PT. Huawei Malaysia Position 2G and 3G RF Engineer ( Under PT. Elabram System Sdn Bhd) Project Modernization Outer Klang Valley Malaysia Celcom Axiata – Huawei Malaysia Responsibilities : Making Report submission site after Modernization Do justification/optimization for site after Modernization if KPI didn’t pass the

new cv update

Embed Size (px)

Citation preview

Page 1: new cv update

KP Pulo Gadung RT 002/RW 005 Pegangsaan Dua, Kelapa Gading

North Jakarta+6285892668353

[email protected]

Dian Purnama Sari,ST.Telecomunication Engineer

About Me

Date of birth : Bandar Lampung, April 20th 1989Gender : FemaleMarital Status : SingleCitizenship : IndonesiaInterest : Sport, Travelling, MusicReligion : MoslemGPA : 3.42 (scale of 4.00)

.

Summary

Hard worker and discipline person ; Optimistic and

independent person ; ability to work in a team or

independently ; Eager to learn newest and latest

technologies ; good human relationship, communication and interpersonal skill ; high motivation and quick learner to develop skills, knowledge

and experience ; Fluent in English ; Experienced more

than 4 years in Telecommnication

Engineering, especialy reporting and monitoring ; Familiar with Huawei and Nokia Equipment ( U2000,

Citrix, Netact) ; Familiar with data processing and reporting software (Ms. Acces, Ms. Excel

and Ms. Power Point)

Experience

September 2016 – Present

Company PT. Huawei MalaysiaPosition 2G and 3G RF Engineer ( Under PT. Elabram System Sdn Bhd)Project Modernization Outer Klang Valley Malaysia Celcom Axiata – Huawei Malaysia

Responsibilities :

Making Report submission site after Modernization Do justification/optimization for site after Modernization if KPI

didn’t pass the baseline CSSR, HOSR, IFHO, SHO, IRATHO, DCR CS/DL TBF/UL TBF,

TP/TA analysis and optimization Traffic distribution analysis Familiar with Mapinfo, U2000, PRS, Google Earth, Nastar,

Gyokov Solution

April 2016 – September 2016

Company PT. Huawei Tech InvestmentPosition Operation System Support Engineer ( under PT. Globalone Solusindo)Project LTE Rollout Medan Banjarmasin XL-Huawei

Page 2: new cv update

Skills

Languange :English (Oral and Written)

Huawei equipment :U2000, LMT, PRS, Nastar

Nokia equipment :Netact, Citrix, Netact Plan Editor, Nokia Plan Editor

Data Processing and Reporting :Ms. Acess, My SQL , Ms. Excel, Ms. Power Point

Office Package :Ms. Ofice

Cellular Network :Mapinfo, Asset Aircom, Google earth, TEMS, Atoll

Measurement Tools :Oscciloscope, Network Analyzer, Spectrum Analyzer

Computer Network :Wireshark, Packet Tracer

Electronic Design :EWB, Protel DXP , Multisim

WEB Development :PHP, HTML , Dreamweaver

Graphic/Design :Adobe Photoshop, Corel Draw, AutoCad, Ms. Visio

Opperating System :Microsot Windows, Linux

Responsibilities :

Provide daily KPI report Provide 4G and 3G CFGMML Provide NMS KPI for SSV report Execute CDD for new site integration Monitoring DT team for SSV activity Provide current alarm , history alarm and event alarm Support RAW and any request from Optim Design KPI dashboard Manage KPI dashboard for Optimization Analysis Very Familiar with U2000 , Ms. Access , Ms. Excel

October 2015- April 2016

Company PT. Huawei Tech InvestmentPosition Operation System Support Engineer ( under PT. Globalone Solusindo)Project 3rd Carrier Sumatra Kalimantan Sulawesi XL-Huawei

Responsibilities :

Get RAW KPI from U2000 and provide to daily KPI report Get daily CFGMML from FTP using filezilla and provide to daily

CGMML report using MML Extractor Provide daily Current and History Alarm from U2000 Change Parameter Request Using MML Command or Task

Management U2000 Execution Neighbor Script and default parameter for new 3rd

carrier implementation ,MOCN and rehoming site Monitoring performance after activation new site Provide daily IPPM summary Provide RAW counter for capacity monitoring weekly report Support RAW and any request from Optim Design KPI dashboard Manage KPI dashboard for Optimization Analysis Very Familiar with U2000 , Ms. Access , Ms. Excel

Juli 2013 - September 2015

Company PT. TelkomselPosition Operation System Support Engineer ( under PT

GMI )Project Local Optim Jabodetabek Telkomsel

Responsibilities :

Page 3: new cv update

References

Ray JuliusTeam Leader OKV Modernization OSS [email protected]+60-11-19708742

Andy RiadiProject Manager PT Globalone [email protected]+62-811-165918

Bramstyo Budi UtomoProject Manager PT. Gunadarma Multimedia [email protected]+62-812-0095934

Familiar with M2000 Provide All measeurment data : alarm, CFGMML Reporting daily statistics Network Running all parameter M2000 Support RAW KPI and Daily Reporting Daily Reporting 2G & 3G WPC (Worst Performance Cell) Design KPI dashboard for daily monitoring Provide 2G and 3G daily Dashboard Provide 2G and 3G monthly dashboard Provide worst cell contributor Familiar with Citrix , Netact , Netact Plan Editor Get the nokia 2G OSS Dump File by using Nokia Plan Editor Daily report Alarm , KPI and ND using Netact

June 2012 - July 2013

Company PT. XL AxiataPosition Radio Network Design Engineer (PT. Mitra Karsa Utama)

Responsibilities :

Plan Site 3G Review ESR (Engineer Survey Report) from Vendor Update database Asset Aircom Enterprise from database RND Create NBWO (New Build Work Order)and EWO(Engineering

Work Order) with SAP Check 2G and 3G weekly congestion Check and create cellbasic Update BTS Web (XL BTS website database)

June 2008 – July 2008Company PT. Telkom, Bandar Lampung, LampungPosition Internship Speedy MarketingResponsibilities :

Looking for new Speedy Internet user Manage data to database

Education

2010 - 2012

INSTITUT TEKNOLOGI TELKOM , BandungBachelor Degree of Telecommunication Engineering

Final Project :Alocation from Two Broadcast Controll Channel Become One Broadcast Controll Channel (Common BCCH) Analyzed in GSM Network , S1 Telecommunication

Page 4: new cv update

2007 - 2010

INSTITUT TEKNOLOGI TELKOM , BandungDiploma Degree of Telecommunication Engineering

Final Project :Availibility of Blood-Bags Information System Based of Web , D3 Telecommunication

2004 - 2007

SMA Negri 1 Bandar Lampung

Science Majoring