NEC 3 – a legal and practical consideration Rachael Guan, senior associate 25 September 2012 Projects (Engineering & Construction) Practice

NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

  • Upload
    vukhanh

  • View
    240

  • Download
    2

Embed Size (px)

Citation preview

Page 1: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

NEC 3 –a legal and practical considerationRachael Guan, senior associate

25 September 2012

Projects (Engineering & Construction) Practice

Page 2: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 2

Overview

• Background and structure of the form

• Key differences between NEC and other standard forms

• Take up of the form – Hong Kong and elsewhere

• Clause review: Compensation Events, Option X12

Page 3: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 3

General

Page 4: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Background

• Launched in the UK in the early 1990s

• Timing: construction industry being pushed to be less adversarial

• Now in its 3rd edition

• Hong Kong government has now endorsed its use

4

Page 5: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 5

Structure: an integrated suite

• Engineering and Construction Contract –

focus on this today

• Engineering and Construction Subcontract

• Professional Services Contract

• Term Service Contract

• Short Forms

– Engineering and Construction Contract

– Subcontract

– Term Service

• Framework Contract

• Adjudicator's Contract

Page 6: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC Family of Contracts

6

Supply Contract & Supply Short Contract

PS

CP

rofe

ss

ion

al S

erv

ice

Co

ntra

ct

ECC

Engineering and Construction Contract

ECS

Engineering and Construction

Subcontract

ECSC

Engineering and Construction

Short Contract

ECSS

Engineering and Construction Short

Subcontract

TSC

Term Service Contract

TSSC

Term Service Short Contract

Supply

High

Pro

ject

Co

mp

lexity

LowStrategic

PartneringFramework Contract

Adjudicator’s Contract

DisputeResolution

business case design construction operation

Page 7: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 7

Structure : building the ECC Contract

• 9 core clauses

• 6 main option clauses

– Option A – priced with activity of schedule

– Option B – priced with bill of quantities

– Option C – target contract with activity of schedule

– Option D – target with bill of quantities

– Option E - cost reimbursable

– Option F – management contract

• 20 secondary option clauses

• Option to insert bespoke clauses ('Z' clauses)

• Contract Data, Works Information, Site Information

Page 8: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 8

Key personalities

• Employer

• Contractor

• Project manager – contract administration

• Supervisor – quality of work and defects

Page 9: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 9

Key differences with other standard

forms

Page 10: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 10

Co-operation

Clause 10.1:

"The Employer, the Contractor, the Project Manager and the Supervisor shall act as stated in this contract and in

a spirit of mutual trust and co-operation."

Page 11: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 11

Philosophy of risk allocation

NEC:

"Risks belong with those who are best able to evaluate,

control, bear the cost and benefit from their assumption."

• Risk – parties over amend the form

Page 12: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Use of clear plain English

• Non legal terms, use of present tense to impose obligations, italics for definitions

• For example:

– 20.1 The Contractor Provides the Works in accordance with the Works Information.

– 21.1 The Contractor designs the parts of the works which the Works Information states he is to design.

12

Page 13: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Flexibility

• The modular ease to use different pricing options (priced, reimbursable, target cost etc) whilst maintaining the same rigour and provision for project management

• NB predominant importance of the Works Information

13

Page 14: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Strong programme provisions

• The usual way: programme of peripheral importance

• Common mindset for employers: contractor's end date

• Common mindset for contractors: time can be made up one way or another

• Result: employer faces costs of delay, contractor faces liquidated damages

• The NEC way: programme the corner stone of the contract eg key dates, compensation events lever off it

• IGNORE AT YOUR PERIL (and use the best programming software you can get)

14

Page 15: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Early warning system

• Must be given in a party becomes aware of any matter that could:

– Increase price

– Delay completion

– Delay meeting a key date

– Impair performance of the works in use

• Sanction on contractor: assessment of compensation event cannot be any higher than it would have been, had the early warning been given

• Sanction on employer: breach of contract (damages or compensation event) if it or project manager fails to give

15

Page 16: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Compensation Events

• The time and cost impact of Compensation Events is normally to be the result of Quotations by the Contractor, once accepted not to be revisited.

• No final account

16

Page 17: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects in the UK

• Civil Engineering

– British Airports Authority

– UK Water Companies

– Environment Agency

– Highways Agency

– Rail eg Crossrail

– Power

17

Photo: Flickr, terminal5insider

Page 18: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects in the UK

• UK Office of Government Commerce recommends the use of the NEC 3rd edition

– Central and Local Government

– London 2012 Olympics

18

• Other– BBC – 5 year framework

contracts for professional services and construction, across the BBC's property portfolio

Page 19: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects elsewhere

• NEC say it can be used internationally

– South Africa

– New Zealand

– Australia

– Middle East

– … and Hong Kong

19

Page 20: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects in Hong Kong - Government

• Drainage Services Department

– 2009: Improvement works to the Fuk Man Road Nullah in Sai Kung (ECC Option C Target)

– Happy Valley Underground Stormwater Storage Scheme (ECC Option C Target), DSD's largest contract to be designed and managed in-house: $678m contract awarded to Chun Wo 3/9/12. Due to complete 2018

– Village sewerage in Yuen Long Kau Hui and Shap Pat Heung: $145m contract awarded to Kwan On Construction 5/9/12. Due to complete 2016

20

Page 21: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects in Hong Kong - Government

21

• Architectural Services Department

– advisory stage: design and build of new Tin Shui Wai Hospital

– 2011, for 10 years: Total Facility Management Service for graded historic buildings and declared monuments (Term Service Contract)

• Highways Department

– Tender recently closed: Pok Oi Interchange

Why not watch the HK Government's YouTube video on its experience using NEC!

http://www.youtube.com/watch?v=fDwbzFQXxeI

Page 22: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

NEC projects in Hong Kong - private

• CLP Power

– 2010: Castle Peak Power Station maintenance services (NEC3 Framework Contract (5 years) and Term Service Contract (Option C Target)

22

• HK Academy (completion mid-2013)

• Commitment from MTR

Corporation to use NEC3 on an upcoming project

Page 23: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 23

Clause review

Page 24: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 24

Compensation Events

Wide number of triggers:

– Breach of contract by the employer

– "Physical conditions" which the contractor encounters (term wider than "ground conditions")

– "Prevention" wider than typical force majeure

– Changes to the Works Information

Compensation Events deal with time AND money

The time and cost impact of Compensation Events are the result of quotations by Contractor, once accepted not to be revisited. No final account!

Time consuming rules = PRESSURE!

Page 25: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 25

Compensation Procedure

Replies & Assessment

• PM reply within 2 weeks of submission (62.3) -options for reply (revise, accept, make own assessment)

• PM assesses (64.1) if:

• Failure to submit quote or programme;

• Quote assessed wrongly;

• Programme not submitted or rejected for permitted reasons (64.2)

Quotations (fully inclusive)

• Within 3 weeks of instruction (62.3)

• Include alterations to programme if

affected by compensation event (62.2)

Response

• By PM within 1 week or longer if agreed (61.4)

• If no reply, 2 weeks notice, then deemed compensation event

• Project Manager’s decision – early warningnot complied with (61.5)

Notification of compensation event

• PM notification, with instruction (61.1)

• Contractor notification 8 weeks from “becoming aware” (61.3)

(Contractor can notify before it happens)

• Must be a separate notice (13.7)

Page 26: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 26

Option X12 Partnering

• Partnering: early formation of team that will deliver the project (client, contractor, designer, project manager) who sign up to early overarching partnering agreement

• NEC is a collaborative contract … but probably not a partnering contract

• Option X12 attempts to bridge the gap:

– If partner fails to implement decision of Core Group under its own contract … then breach its own contract plus compensation event

– Incentive payments to each partner based on key performance indicators

Page 27: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 27

Option X12 Partnering

• But…

– Still no early contractor involvement

– Not a multi-party contract: clause 12.2(6): "This option does not create a legal partnership between the Partners who are not

one of the Parties in this contract."

• Partnering breakdown?

– NEC guidance notes: "final sanction against any Partner … is for the Partner who employed them not to invite them to partner

again."

– Risk: move back towards adversarial contracting.

Page 28: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Option Z: Additional conditions of contract

• NEC guidance notes: "only when absolutely necessary"

• My experience: lots!

28

Page 29: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Legal case review

• Just a handful of cases have involved NEC contracts

– Costain v Bechtel [2005] EWHC 1018 (TCC) – obiter, arguable that when assessing sums payable to contractor, project manager must act impartially between employer and contractor

– Anglian Water v Laing O'Rourke [2010] EWHC 1529 (TCC) –NEC style of drafting "a triumph of form over substance".

– Compass Group v Mid Essex Hospital [2012] EWHC 781 (QB) -

• NEC: claims to be a form people don't litigate over

• NEC's use coincided with statutory adjudication in UK, and rise in other forms of alternative dispute resolution

29

Page 30: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com 30

Conclusion

• If you choose to use NEC, embrace the NEC approach but be aware of its most sensitive areas

Page 31: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

www.hoganlovells.com

Hogan Lovells has offices in:

Abu DhabiAlicanteAmsterdamBaltimoreBeijingBerlinBoulderBrusselsBudapest*

CaracasChicagoColorado SpringsDenverDubaiDusseldorfFrankfurtHamburgHanoi

Ho Chi Minh CityHong KongHoustonJeddah*LondonLos AngelesMadridMiamiMilan

MoscowMunichNew YorkNorthern VirginiaParisPhiladelphiaPragueRiyadh*Rome

San FranciscoShanghaiSilicon ValleySingaporeTokyoWarsawWashington DCZagreb*

"Hogan Lovells" or the "firm" refers to the international legal practice comprising Hogan Lovells International LLP, Hogan Lovells US LLP, Hogan Lovells Worldwide Group (a Swiss Verein), and their affiliated businesses, each of which is a separate legal entity. Hogan Lovells International LLP is a limited liability partnership registered in England and Wales with registered number OC323639. Registered office and principal place of business: Atlantic House, Holborn Viaduct, London EC1A 2FG. Hogan Lovells US LLP is a limited liability partnership registered in the District of Columbia.

The word "partner" is used to refer to a member of Hogan Lovells International LLP or a partner of Hogan Lovells US LLP, or an employee or consultant with equivalent standing and qualifications, and to a partner, member, employee or consultant in any of their affiliated businesses who has equivalent standing. Rankings and quotes from legal directories and other sources may refer to the former firms of Hogan & Hartson LLP and Lovells LLP. Where case studies are included, results achieved do not guarantee similar outcomes for other clients. New York State Notice: Attorney Advertising.

© Copyright Hogan Lovells 2010. All rights reserved.

* Associated offices

Hong Kong Timothy Hill [email protected]+852 2840 5023

Damon [email protected]+852 2840 5018

Beijing/ShanghaiTerence [email protected]+86 21 6138 1607

Singapore Paul [email protected]+65 6302 2559

TokyoTony [email protected]+81 3 5157 8200 /+44 (20) 7296-2604

Vietnam Nasir PKM [email protected]+84 8 3829 5100

Page 32: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

NEC 3 – A Legal and Practical Consideration

25 September 2012

Tony Kwok

Page 33: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

33

General Background

Background:

■ 1st Edition of The New Engineering Contract (NEC) issued 1993

■ Now 3rd Edition of NEC contracts issued 2005

■ Variety of projects such as airports, power plants, highways etc.

■ Extensive global coverage with success (e.g. UK, India, HK, UAE etc.)

■ Partnering contract requiring collaboration

Page 34: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

34

General Background

Background:

■ Distinct lack of case laws involving NEC

■ Successful implementation dependent on people’s behaviour

■ Philosophy is to reduce conflicts through collaborative partnering

■ Nevertheless, key practical issues often encountered on projects provide

useful lessons learnt and further improvements

Page 35: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

35

Common Pitfalls of Using NEC

� Contract Documentation

� Works Information

� Risk Register

� Programme

� Assessing the Amount Due

� Subcontractors / Suppliers

� Time Bar / Sanctions

Page 36: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

36

Contract Documentation

Potential Pitfalls

The ECC uses plain

English which can place

it at odds with common

industry terminology

used in other forms of

contract

The ECC uses plain

English which can place

it at odds with common

industry terminology

used in other forms of

contract

Incorporated into the

contract as part of the

Works Information or

BoQ

Incorporated into the

contract as part of the

Works Information or

BoQ

The terms Preliminaries,

Preambles, Provisional Sums or

Prime Cost Sums do not appear

in the ECC

The terms Preliminaries,

Preambles, Provisional Sums or

Prime Cost Sums do not appear

in the ECC

Extensive amendments

or additional conditions

Extensive amendments

or additional conditions

Page 37: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

37

Contract Documentation

Possible Solutions

Provisional Sums etc, may be accommodated by

including an assumed scope of works in the Works

Information for the Contractor to price and include a

time allowance

Provisional Sums etc, may be accommodated by

including an assumed scope of works in the Works

Information for the Contractor to price and include a

time allowance

When the scope of the works is defined, a

compensation event is issued changing the Works

Information leading to a revised cost and time

When the scope of the works is defined, a

compensation event is issued changing the Works

Information leading to a revised cost and time

Clear and accurate Works Information reduces the

need for amendments, especially when core clauses

aim to set out general obligations

Clear and accurate Works Information reduces the

need for amendments, especially when core clauses

aim to set out general obligations

Page 38: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

38

� Key document – provides the contract with the flexibility it does by leaving the

finer detail to be prescribed within the Works Information.

� Is more than just a specification and drawings and is cross-referenced

throughout the core clauses, examples:

11.2(2) Completion is when the Contractor has done all the work which the Works Information states he is to do…

11.2(25) Disallowed Cost is cost which … was incurred only because the Contractor did not follow … an acceptance or procurement procedure stated in the Works Information

21.1 The Contractor designs the parts of the works which the Works Information states he is to design

27.4 The Contractor acts in accordance with the health and safety requirements stated in the Works Information

40.1 Tests and inspections required by the Works Information…

Works Information

Page 39: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

39

Works Information

� Incomplete in terms of coverage, with a lack of clarity

� Included as addition conditions of contract (Z clauses)

� Duplication with the contract provisions

� Often based on standard documentation taken from previous projects which were

not ECC based, conflicts in terminology and referencing

Potential Pitfalls

Page 40: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

40

Works Information

� Put sufficient time and team effort into drafting accurate and complete Works

Information

� Ensure that all the Works Information requirements have been covered

� Ensure that there is no duplication with other contract provisions

� Check for the use of terminology and referencing that is not compatible with the

ECC

� Review the ECC to identify each clause that refers to Works Information

� Responsibility for design is to be identified in Works Information

Possible Solutions

Page 41: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

41

Risk Register

Cl. 11.2(14)

� ‘The Risk Register is a register of the risks which are listed in the Contract Data

and the risks which the Project Manager or the Contractor has notified as an early

warning matter. It includes a description of the risk and description of the actions

which are to be taken to avoid or reduce the risk.’

Page 42: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

42

Risk Register

Cl. 16

� The Contractor and the Project Manager give an early warning by notifying the

other as soon as either becomes aware of any matter that could

� increase the total of the Prices,

� delay Completion

� Delay meeting a Key Date or

� Impair the performance of the works in use.

� The Contractor may give an early warning by notifying the Project Manager of any

matter which could increase his total cost. The Project Manager enters early

warning matters in the Risk Register.

Page 43: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

43

Risk Register

� The “contractual” Risk Register is in effect for information only

� Misunderstand that this allows the reallocation of risk or the quantification of risk

values or probabilities

� Some people use the project risk register* as the “contractual” Risk Register

Potential Pitfalls

Page 44: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

44

Risk Register

Possible Solutions

Do not use the project risk

register as the “contractual” Risk

Register

Do not use the project risk

register as the “contractual” Risk

Register

Ensure that the Risk Register only

contains the two columns stated in

the contract – a description of the

risk and the measures to be taken

to reduce the risk

Ensure that the Risk Register only

contains the two columns stated in

the contract – a description of the

risk and the measures to be taken

to reduce the risk

Must not contain owners of

risk or values this is covered

by the contract

Must not contain owners of

risk or values this is covered

by the contract

Risk transfer done by choice of

options and amending the

standard contract through Z

Clauses

Risk transfer done by choice of

options and amending the

standard contract through Z

Clauses

Page 45: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

45

Programme Cl. 31.2 The Contractor shows on each programme:

� the starting date, access dates, Key Dates and Completion Date,

� planned Completion,

� the order and timing of the operations,

� the dates when the Contractor plans to meet each Condition stated for the Key Dates and to complete other work needed to allow the Employer and Others to do their work,

� provisions for float, time risk allowances, health and safety requirements and the procedures set out in this contract

� the dates when the Contractor will need

� access to a part of the Site if later than its access date,

� acceptances,

� Plant and Materials and other things to be provided by the Employer and Information from Others

� for each operation, a statement of how the Contractor plans to do the work

� Other information which the Works Information requires.

Page 46: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

46

Programme

Potential Pitfalls

The ECC promotes best practice, through

extensive programme requirements

The ECC promotes best practice, through

extensive programme requirements

Substantial resources required to

continually update programme

Substantial resources required to

continually update programme

Project Manager has to proactively drive

and accept the programme

Project Manager has to proactively drive

and accept the programme

A pragmatic approach is taken to a lower

level of information and to less frequent

updates of the programme

A pragmatic approach is taken to a lower

level of information and to less frequent

updates of the programme ECC does not ask for a critical

path and logic linked

programme

ECC does not ask for a critical

path and logic linked

programme

Page 47: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

47

Programme

Request critical path

and logic linked

programmes in the

Works Information

Contract is amended

to simplify programme

requirements

Balance the costs

expended against the

benefits provided

Need to decide the

approach to a

particular project

Project Manager and

Contractor meet at the

earliest opportunity

Open dialogue, challenge

& joint production

of the programme

Right type and

level of resource

Possible

Solutions

Page 48: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

48

Assessing the Amount Due

� The Project Manager assesses the amount due at each assessment date (Cl.

50.1)

� In assessing the amount due, the Project Manager considers any application for

payment the Contractor has submitted on or before the assessment date (Clause

50.4).

Cl. 50

Page 49: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

49

Assessing the Amount Due

� No requirement for the Contractor to submit an application

� The Project Manager has to make assessment even if the Contractor does not

submit an application

� Failure to certify by the due date will lead to potential claims for interest on late

payment and possible enforcement notices

Potential Pitfalls

Page 50: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

50

Assessing the Amount Due

Assessment Date

Within 7 days

Project Managerissues payment certificate; Contractor submits invoices

Within 21 days

Final date of payment: payment takes place

Potential Pitfalls – Default NEC Payment Timeline

Page 51: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

51

Assessing the Amount Due

Assessment Date

Within 14 days

Project Managerissues payment certificate; Contractor submits invoices

Within 21 days

Final date of payment: payment takes place

Possible Solutions – Amended NEC Payment Timeline

Contractorsubmits payment application

No later than 5 days before

Page 52: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

52

Assessing the Amount Due

Possible Solutions

Amend the

contract to make

the submission of

an application a

condition

precedent for

payment

Amend the

contract to make

the submission of

an application a

condition

precedent for

payment

Amend the

contract to set

the period for

certification as

14 days after the

Assessment Date

Amend the

contract to set

the period for

certification as

14 days after the

Assessment Date

Page 53: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

53

Subcontractors and Suppliers

� Defined Cost includes only amounts calculated using rates and percentages stated

in the Contract Data and other amounts at open market or competitively tendered

prices with deductions for all discounts, rebates and taxes which can be recovered.

Cl. 52.1

� Sets out the general conditions against which subcontractors shall be procured.

� Procedures governing subcontract procurement.

Cl. 26

Page 54: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

54

Subcontractors and Suppliers

� Cl. 52.1 imposes a general obligation to seek competitive quotes, but also allow

the Contractor to use open market prices as an alternative

� This has led to debate with the Contractor as to what level of competitive tendering

is required and what constitutes open market rates

� Payments from Main Contractor to Subcontractors need to be transparent and

clearly linked to the respective Subcontract works

Potential Pitfalls

Page 55: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

55

Subcontractors and Suppliers

� Additional clauses to make competitive tendering a mandatory requirement

� Employer’s approval over Contractor’s supply chain processes

� Ensure target cost is competitive in the first instance ensuring Contractor has to

effectively manage the supply chain

� Financial threshold for obtaining 3 quotes

� Regular review of the key Subcontractors (IPA’s etc.)

Possible Solutions

Page 56: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

56

The procedure relating to compensation event follows a logical chain as follows:

Time bar / Sanctions

Notification (8 weeks)

Decision on Validity / Instruction to

Quote

(1 week)

Quotation (3 weeks)

Reply (2 weeks)

Implementation

Cl. 61.3 Contractor notification

tests – 8 weeks time bar

Cl. 61.4 Default acceptance of

compensation event if no

response from the Project

Manager within the timescales (1

week + 2 weeks)

Cl. 62.6 Default acceptance of

quotation if no response from the

Project Manger within the

timescales (2 weeks + 2 weeks)

Page 57: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

57

Time bar / Sanctions

Internal procedures not aligned with

contractual timescales

Understand and comply with the

contractual timescales

Sanctions apply to both the

Contractor and the Project Manager

– potential for either party to suffer

loss if the sanctions are enforced

Commit sufficient resources; otherwise

amend the contract to extend timescales

Need a clear, quick and accountable

decision making process in client

organisations

Mix up of early warning notice and

compensation event notice

Keep compensation event notices from

other communications

Possible Solutio

ns

Possible Solutio

nsP

ossible Pitfalls

Possible Pitfalls

Page 58: NEC 3 – a legal and practical consideration · PDF file NEC Family of Contracts 6 Supply Contract & Supply Short Contract PSC Professional Service Contract ECC Engineering and Construction

58

Summary

� In order to delivers its benefits users must understand the NEC is a fundamentally

different form of contract requiring intensive management and a different approach

by the parties in terms of both documentation and management requirements

� Users must understand these issues and invest the time and resources required to

overcome these potential problems and deliver the benefits the contract can offer

� It is the people who ultimately drives the success of a project – whichever contract

form is adopted

� NEC helps by providing a framework against which people should behave