35
NOTICE OF INTENT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT PRR040000/PRR04000F SEPARATE STORM SEWER SYSTEMS 2016 Submitted By: ECEDVEp 5ii MUNICIPALITY OF AGUADILLA PO Box 1008 Aguadilla, PR 00603 Submitted to: U.S. ENVIRONMENTAL PROTECTION AGENCY — REGION II CARIBBEAN ENVIRONMENTAL PROTECTION DIVISION CITY VIEW PLAZA, SUITE 7000 #48 165 RD KM 1.2 GUAYNABO, PUERTO RICO 00968 September 28, 2016

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

NOTICE OF INTENT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT

PRR040000/PRR04000F SEPARATE STORM SEWER SYSTEMS 2016

Submitted By: ECEDVEp

5ii

MUNICIPALITY OF AGUADILLA PO Box 1008

Aguadilla, PR 00603

Submitted to:

U.S. ENVIRONMENTAL PROTECTION AGENCY — REGION II CARIBBEAN ENVIRONMENTAL PROTECTION DIVISION

CITY VIEW PLAZA, SUITE 7000 #48 165 RD KM 1.2

GUAYNABO, PUERTO RICO 00968

September 28, 2016

Page 2: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

• MUNICIPIO AUT6NOMO DE AGUADILLA

Table of Content

1.0 NPDES (NOTICE OF INTENT) PERMIT APPLICATION 1 1.1 BACKGROUND 1 1.2 2016 MS4 GENERAL PERMIT 1 1.3 NOTICE OF INTENT FORM FOR MS4 IN PUERTO RICO (APPENDIX F) 2 1.3.1 Part A. General Information 2 1.3.2 Part B. Primary MS4 Program Manager Contact Information 2 1.3.3 Part C. Eligibility Determination 3 1.3.4 Part D. Map/Boundaries 3 1.3.5 Part E. MS4 Infrastructure 4 1.3.6 Part F. Bylaw/Ordinance Development 4 1.3.7 Part G. Receiving Waters 5 1.3.8 Part H. Summary of Stormwater Management Program (SWMP) under the 2006

Small MS4 General Permit 6 1.3.9 Part I. 2016 Stormwater Management Program (SWMP) Summary 14 1.3.9.1 Public Education and Outreach 14 1.3.9.2 Public Involvement 15 1.3.9.3 Illicit Discharge Detection and Elimination 16 1.3.9.4 Construction Site Stormwater Runoff Control 17 1.3.9.5 Post-Construction Stormwater Management in New Development and

Redevelopment 19 1.3.9.6 Good Housekeeping and Pollution Prevention in Municipal Operations 21 1.3.10 Part J. Application Certification and Signature 27

APPENDICES APPENDIX A — MAPS

-LOCATION/BOUNDARIES MAP

-OUTFALL MAP

APPENDIX B — ELIGIBILITY DETERMINATION

-U.S. FISH AND WILDLIFE SERVICE ENDANGERED SPECIES ACT ELIGIBILITY DETERMINATION -NATIONAL HISTORIC PRESERVATION ACT ELIGIBILITY DETERMINATION CRITERIA

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 i 28 September 2016

Page 3: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

.....„4„,..

mUNICIPIO AUTONOMO DE AGUADILLA

1.0 NPDES (NOTICE OF INTENT) PERMIT APPLICATION

1.1 BACKGROUND

In 1972, Congress amended the Clean Water Act (CWA) to prohibit the discharge of any pollutant to waters of the United States from point sources unless the discharge is authorized by a National Pollutant Discharge Elimination System (NPDES) permit. Initial efforts under the NPDES program focused on reducing pollutants in discharges of industrial process wastewater and municipal sewage. As pollution control measures have been implemented, it has become evident that diffuse sources or nonpoint sources are also contributors of water quality degradation. In 1990, the US Environmental Protection Agency (EPA) promulgated rules establishing Phase I of the NPDES storm water program. The Phase I program for MS4s requires operators of "medium" and "large" MS4s, that is, those that generally serve populations of 100,000 or greater, to implement a storm water management program as a means to control polluted discharges from these MS4s. EPA published the Storm Water Phase II Rule on December 9, 1999 which covers all small MS4s located in "urbanized areas" as defined by the U. S. Bureau of the Census.

As outlined in these regulations the Autonomous Municipality of Aguadilla was required to submit an application for permit coverage as well as a Storm Water Management Plan (SWMP). On February 5, 2007 the Municipality submitted a Notice of Intent (N01) seeking permit coverage. The EPA issued coverage under Permit Number PRR040015 on March 14, 2007. The Municipality developed and submitted its SWMP on August 2007. The Municipality is currently on Year 9 of its SWMP implementation.

1.2 2016 MS4 GENERAL PERMIT

The General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems in the Commonwealth of Puerto Rico, Permit Number PRRR040000 effective July 1, 2016 requires permitees to submit NOI within 90 days of the effective date of the permit.

"Operators of Small MS4s seeking authorization to discharge under the terms and conditions of this permit shall submit a complete and accurate NOI that contains the information identified in Appendix F. This includes operators of small MS4s that were previously authorized under the November 6, 2006 Small MS4 General Permit."

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 1 28 September 2016

Page 4: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

M UNICIPIO AUTONOMO DE AGUADILLA

1.3 NOTICE OF INTENT FORM FOR MS4 IN PUERTO Rico (APPENDIX F)

1.3.1 PART A. GENERAL INFORMATION

1. Name of Municipality or Organization: Municipality of Aguadilla

2. Type: Federal State ./ Municipality Other:

3. Existing Permittee: ✓ Yes No If yes, provide EPA NPDES Permit Number: PRR040015

4. Location Address: a. Street: Casa Alcaldia, Avenida San Carlos b. City: Aguadilla State: PR Zip Code: 00605

5. Mailing Address: a. Street: P.O. Box 1008 b. City: Aguadilla State: PR Zip Code: 00605

6. Telephone Number: (787) 891-1005 Fax: (787) 882-5435

7. E-mail: [email protected]

8. Standard Industrial Classification (SIC) Code: 9199

9. Latitude: 18°27'25"N Longitude: 67°09'45"W

a. Approximate center of the regulated portion of the MS4.

1.3.2 PART B. PRIMARY MS4 PROGRAM MANAGER CONTACT INFORMATION

1. Name: Elvin Roldan

2. Position Title: Environmental Compliance Director

3. Stormwater Management Program (SWMP) Location (web address or physical location):

Environmental Compliance Office, Planning Department, Avenida San Carlos, Aguadilla City Hall 3 rd Floor

4. Mailing Address: a. Street: PO Box 1008 b. City: Aguadilla State: PR Zip Code: 00605

5. Telephone Number: (787) 891-1005 Ext. 2097

6. E-mail: [email protected]

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016

2 28 September 2016

Page 5: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

MUNICIPIO AUTONOMO DE AGUADILLA

1.3.3 PART C. ELIGIBILITY DETERMINATION

1. Endangered Species Act (ESA) determination complete? ✓ Yes No

a. Eligibility Criteria (check all that apply): A B C D ✓ E

2. National Historic Preservation Act (NHPA) determination complete? ✓Yes No

a. Eligibility Criteria (check all that apply): viA_ B __C

1.3.4 PART D. MAP/BOUNDARIES

1. MS4/Organization Description of regulated boundaries (narrative):

The Autonomous Municipality of Aguadilla has a territorial extension of 94.8 square kilometers and a population of 60,949 inhabitants', according to the 2010 Census. Aguadilla in located in the Northwest of the Island of Puerto Rico and is bounded to the north and west with the Atlantic Ocean, to the east with the Municipalities of Isabela and Moca, to the south with the Municipality of Aguada. It has an ample seashore that runs from the Culebrinas River in the south forming an arch up to Quebrada Los Cedros in the north that limits the boundaries with Isabela. The topography is mostly level as it is part of the Coastal Plains of the West, and there is one river, Chiquito River also known as "El Parterre".

The municipality is composed of the urban zone, Barrio Pueblo and 15 wards, Aguacate, Arenales, Borinquen, Caimital Alto, Caimital Bajo, Camaseyes, Ceiba Alta, Ceiba Baja, Corrales, Guerrero, Maleza Alta, Maleza Baja, Montana, Palmar and Victoria.

Barrio Pueblo locates at sea level, while the remaining of the territory locates over a plateau that forms the western portion of the Jaicoa Chain of Mountains. Other urban centers are located at the former Ramey Air Force Base. The main access to Aguadilla is through State Road PR-2, which runs southeast side of the Municipality.

The Autonomous Municipality of Aguadilla operates a municipal separate storm water sewer system (MS4), which includes the old urban area, urban centers located at the former Ramey Field and rural areas within the municipality.

The Autonomous Municipality of Aguadilla MS4 in the urban areas, in general, consists of a series of catch basins, typically located within the right-of-way of

Based Census 2010 Population, Housing Units, Area, and Density Summary, Aguadilla, Puerto Rico, Http://www.censo.gobierno.pr

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 3 28 September 2016

Page 6: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

it, MUNICIPIO AUTONOMO DE AGUADILLA

municipal and Commonwealth roads, interconnected by underground concrete or PVC pipes which normally discharge to the Atlantic Ocean and surface water bodies. In the rural areas, the MS4 typically consists of a series of interconnected open channel culverts, which run parallel to municipal and Commonwealth roads, and usually discharge to a surface water body or via laminar flow to land. Interconnected to the Municipal MS4s system are the storm water sewer systems owned and operated by the Puerto Rico Department of Transportation and Public Works. Also, interconnected to the Municipal MS4s system are the discharges from NPDES (Stormwater) permitted facilities.

2. Location Map/Boundaries. A location map must be attached showing the pertinent city, town, wards, or boundaries, the boundaries of the Small MS4, including surface water body(s), and the "urbanized area" (UA) when applicable.

Is map attached? ✓ Yes No

1.3.5 PART E. MS4 INFRASTRUCTURE

1. Estimated Percent of Outfall Map Complete? (Part 4.2.3 of 2006 general permit): 100% outfall map complete

a. If 100% of 2006 requirements are not met, enter an estimated date of completion: N/A

b. Web address where MS4 map is published: Included in Appendix A-pending to be published in webpage once Municipal webpage is developed, estimated to be after the 2016 elections.

1.3.6 PART F. BYLAW/ORDINANCE DEVELOPMENT

1. Illicit Discharge Detection and Elimination (IDDE) authority adopted? ✓ Yes No

a. Effective Date or Estimated Date of Adoption: August 24, 2011 2. Construction/Erosion and Sediment Control authority adopted?

✓ Yes No a. Effective Date or Estimated Date of Adoption: August 24, 2011

3. Post-Construction Stormwater Management adopted? ✓ Yes No

a. Effective Date or Estimated Date of Adoption: October 2017

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 4 28 September 2016

Page 7: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

MUNICIPIO AUTONOMO DE AGUADILLA

1.3.7 PART G. RECEIVING WATERS

Waterbody Segment that receives flow from the MS4

Number of Outfalls into receiving

waterbody segment

Have any been

performed to outfalls? (Yes/No)

List of Pollutants) ant(s)

caus causing impairment ifpairment (

applicable)

List of TMDL

Pollutant (s) (if any)

Bahia de Aguadilla 25 no none none

Ocean° Atlantic° 10 no none none

Quebrada Las Hernandez 15 no none none

Cario Madre Vieja 11 no none none

Cafio Cacula 6 no none none

Canal Palmar 12 No None none

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 5 28 September 2016

Page 8: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

0 0

13)

> 4z Fs a) a) >

0 = X .0

• ra 0 c a o 3

CO C ■ C C.) C.

EECC

•Ct -Ca) 00

12 a) 0 as _c 4)0

u) a) a) ■ a : " E . . cf 2 F : a)

0 2

a) 2 ■2 0.) 0 2 u) 0 .T2 1-5 ca. >. F. )> To (5 as 0

a .... „,, = ._ al co v(-1 0 .— t;, > .—

ti 1:3 E

K§ 0 a) E f. .ta .c 2 2 1- 15 ca u":7) E 2c1304-: E22E as a) as c .— ■ co a- Q) •-- J V)

0 a) (5 2 - c -0 co 03 , — 4.. •-. (0 c .1■. ■

"07. cp 2 c ,C1) •C7) WI 0 © ..-. A,. — r a; .... c 20 a -0 2- 03 0 0 4... 4) C C CD CD

k : .— 0 0 0 ...- = z

0. .— 0 c 2 g 2 2 .Ei ..0""6. :a .0.:;› 21: .! ,0„,2 . o S9 tc- 23 a. —J CO .c '-EE0 0 - -0 ....,

0

Gen

era

l P

ub

lic

0

reso

urc

es.

a) 0

'ai (I a)

.0 d

E a) 22 E

a) cn 0- 0

10 a) c 47 0 0 0 0 . . ri - 0 L5. 2 a) 43.) c m ix m <

ra 0

a ca. ' W E f) ■ a) — > 0 4)(t1 0

C 0 0 .t

E> 0.(5 03 00

Sc

ho

ol c

hil

dre

n

0 co a)

TES 0 >, 0) 0 0 c E o

o =

c o 2 o

BM

P D

esc

r ip

tion

MC

M1:

PU

BL

IC E

DU

CA

TIO

N

co

PA

RT

H. S

UM

MA

RY

OF

ST

OR

MW

AT

ER

MA

NA

GE

ME

NT

PR

OG

RA

M (

SW

MP

) U

ND

ER

TH

E 2

00

6 S

MA

LL

MS

4 G

EN

ER

AL

PE

RM

IT

28 S

ep

tem

ber 2

01

6

Page 9: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28 S

ep

tem

ber 2

01

6

N.

-J a co

< O (.

¢a a C7 0 • •

W 2

7.1 u) < a

Z D 2z

Mo

difi

catio

n to

go

als

or

BM

P

for

ne

xt p

erm

it cy

cle

oN

oN

Th

is B

MP

will

be

elim

ina

ted

and

will

be

sub

st i

tute

d w

ith

the

mu

nic

ipa

l we

bp

age.

oN

Who

wa

s th

e ta

rget

ed

audi

ence

? E

xpla

in r

ea

son

fo

r no

t ac

hiev

ing

goa

l.

we

bp

age.

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Go

al w

as n

ot

reac

hed

du

e to

la

ck

of

per

son

ne

l an

d re

sou

rces

.

Gen

eral

Pu

blic

Con

tinu

ed in

ne

x t

p erm

it cy

c le

? (Y

es/N

o)

SO

A

Se

A

0 Z

Goa

l A

chi

eve

d?

(Yes

/ No)

SO

A

saA

0 Z Y

es

BM

P D

esc

r ipt

ion

BM

P-4

De

ve

lop

men

t an

d D

istr

ibu

tion

of

Sto

rm W

ate

r R

ela

ted

Ma

ter i

als

1

BM

P-5

Sto

rm W

ate

r W

eb

Pag

e

BM

P- 6

De

ve

lop

men

t o

f an

Exp

and

ed

Reg

ion

al I

nte

rac

tive

S

torm

Wa

ter

Init

iati

ve

by l

ead

ing

an

an

nu

al

mee

ting

on

SW

MP

w

ith

t he

par

tic

ipat

ion

o

f le

ad

ers

of t

he

re• i

on

I

do

0 2 0

0

2

Page 10: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28 S

ep

tem

ber

20

16

0 0

Mo

difi

catio

n to

goa

ls o

r B

MP

fo

r ne

x t p

erm

it cy

c le

MC

M2:

PU

BLI

C IN

VOLV

EMEN

T

Th

is B

MP

will

be

elim

ina

ted,

an

d w

ill b

e su

bs

t itu

ted

by

sup

po

rtin

g

loca

l org

aniz

ati

on

s an

d in

itia

tiv

es s

uc

h a

s th

e A

nn

ual B

each

Cle

anu

p

ho

ste

d b

y S

cuba

Do

gs.

ON

ON

ON

ON

MC

M3:

ILLI

CIT

DIS

CH

AR

GE

DET

ECTI

ON

AN

D EL

IMIN

ATI

ON

Map

sha

ll in

clu

de

ele

men

ts

req

uir

ed

in t

he 2

016

GP

S

ec. 2

. 4.4

.6

ON

ON

Who

wa

s th

e ta

rge t

ed

audi

enc

e?

Exp

lain

reaso

n fo

r no

t ac

hiev

ing

goa

l.

Gen

era

l Pu

blic

an

d S

ch

oo

l A

ged

Ch

ildre

n

Go

al w

as n

ot

reac

hed

du

e to

la

ck

of

pe

rso

nn

el a

nd

reso

urc

es.

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Con

t inue

d in

nex

t pe

rmit

cycl

e?

(Yes

/No)

ON

SO

A

SO

A

saA

saA

SO

A

SO

A

I BM

P- 3

Ed

uc

at i

on

al

Ye

s Y

es

Ou

trea

ch

Goa

l A

chi

eve

d?

(Yes

/No)

oN

SO

A

SO

A

SO

A

SeA

SO

A

SO

A

BM

P D

escr

ipt io

n

1 BM

P- 1

Sto

rm d

rain

S

tenc

iling

Pro

gra

m

1

I BM

P-2

An

nu

al

Cle

anu

p

I

1

I BM

P-3

Su

pp

ort

of

Lo

cal O

rgan

iza

t io

ns

I BM

P- 4

Att

itud

e S

urv

ey

I BM

P-5

Co

mm

un

ity

Ho

tlin

e

BM

P-1

Sto

rm

Sew

er

Sy

stem

Map

1

1

I BM

P-2

Im

ple

me

nt

Reg

ula

t io

ns

to

En

forc

e N

on

-sto

rm

wa

ter

Dis

ch

ar•

es

Page 11: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28

Sep

tem

ber 2

016

Cr,

Mo

difi

catio

n to

goa

ls o

r B

MP

fo

r ne

xt p

erm

it cy

c le

Th

e M

un

icip

alit

y w

ill

dev

elo

p a

n ID

DE

Pro

gra

m

acco

r din

g t

o r

equ

irem

ents

in

201

6 G

P s

ec.

2.4.

4.8

ON

Th

e M

un

icip

alit

y w

ill

dev

elo

p a

n ID

DE

Pro

gra

m

acco

r din

g t

o r

equ

irem

ents

in

201

6 G

P s

ec.

2.4.

4.8

Th

e M

un

icip

alit

y w

ill f

ocu

s

on f

ixin

g a

ny

pro

ble

ms

wit

h th

eir

ow

n s

ep

tic

sys t

ems

and

th

ose

rep

or t

ed

th

rou

gh

an e

nv

iro

nm

enta

l co

mp

lain

t.

Who

wa

s th

e ta

rget

ed

audi

enc

e?

Exp

lain

reaso

n f

or

not a

chi

evin

g g

oal.

Gen

era

l Pu

blic

Pro

gre

ss h

as b

een

ma

de

tow

ard

ac

hie

vin

g t h

is B

MP

bu

t no

t all

illic

it d

isc

har

ges

h

ave

bee

n d

ete

cte

d a

nd

elim

ina

ted.

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Pro

gre

ss h

as b

een

ma

de

tow

ard

ac

hie

vin

g th

is B

MP

bu

t n

ot

all

illic

it d

isc

harg

es

hav

e b

een

de

tec

ted

and

elim

ina

ted.

Gen

era

l Pu

blic

Gen

era

l Pu

blic

Th

e M

un

icip

alit

y d

oes

no

t o

ffer

the

ser

vic

e o

f em

pty

ing

se

pti

c sy

s tem

s. T

her

efo

re,

the

Mu

nic

ipa

lity

is n

ot a

war

e

of

faili

ng

sep

tic

sys t

ems.

T

hey

hav

e c

rea

ted

an

Co

ntin

ued

in n

ex

t pe

rmit

cyc l

e?

(Yes

/No)

Sa

A

seA

SS

A

SOA

Goa

l A

chi

eve

d?

(Yes

/No)

oN

Sa

A

SO

A N

o

BM

P D

escr

iptio

n

1

BM

P-4

Pro

gra

m t

o

Det

ect,

Iden

tify

an

d E

limin

ate

Ille

ga

l D

isc

har

ges

i

.

BM

P-5

Pro

gra

m t

o

Det

ect,

Iden

tify

an

d E

limin

ate

Ille

ga

l So

lid

Was

te D

um

in

.

1

BM

P-6

Pro

gra

m t

o

Det

ect,

Iden

tify

an

d E

limin

ate

Was

te

Wa

ter

Co

nn

ect i

on

s to

t h

e S

torm

Dra

in

Sy

stem

1

.

.

BM

P- 7

Pro

gra

m t

o

De t

ect

and

Elim

ina

te

San

itar

y O

ver f

low

s

i

.

.

Page 12: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

o

28 S

ep

tem

ber 2

01

6

Page 13: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28

Se

pte

mb

er

201

6

Mo

difi

catio

n to

goa

ls o

r B

MP

fo

r nex

t pe

rmit

cycl

e

oN

oN

oN

oN

Who

was

the

targ

ete

d au

die

nce

? E

xpla

in r

easo

n fo

r no

t ac

hiev

ing

goa

l.

MC

M 5

: PO

ST- C

ONS

TRUC

TIO

N

Des

ign

ers

Dev

elo

per

s C

on

trac

tors

C

on

str

uc

tion

site

op

era

tors

In

spec

tors

E

nfo

rcem

ent

per

son

ne

l

Th

e M

un

icip

alit

y h

as n

ot

ach

ieve

d it

s g

oal b

ecau

se it

is

eva

lua

ting

mec

han

ism

s to

im

ple

men

t thi

s B

MP

.

Des

ign

ers

Dev

elo

per

s C

on

trac

tors

C

on

str

uc

t ion

site

op

era

tors

In

spec

tors

E

nfo

rcem

ent

per

son

ne

l

.

Des

ign

ers

Dev

elo

per

s C

on

trac

tors

C

on

str

uc

tion

site

op

era

tors

In

spec

tors

E

nfo

rcem

ent

per

son

ne

l

.

Des

ign

ers

Dev

elo

per

s C

on

trac

tors

C

on

str

uc

tion

site

o •

era

tors

Con

tinue

d in

ne

xt

perm

it cy

cle

? (Y

es/N

o)

N a) >-

SOA

SOA

Goa

l A

chi

eve

d?

(Yes

/No)

.3 z

oN

ON

No

BM

P D

escr

iptio

n

8 a >, c..) C o ow"'c as

C :p: il 0 2 Cc a T (5

a St -c

2 -c 'al

m

5

2

BM

P- 2

Str

uc

tura

l P

rac

t ice

s

BM

P-3

No

n-

stru

c tu

ral P

rac

t ice

s

Page 14: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

WIZ g -0"17!V g

O 0

0 z O

0

z

28 S

ep

tem

ber

2016

-J

cz, < 0 a s u_ 0 0 .4-

J fn < w a 0

5 a— z o z

No

Th

is B

MP

will

be

part

of t

he

Par

ks a

nd

Op

en S

pac

es

Op

era t

ion

an

d M

ain

ten

an

ce

Pro

gra

m.

Who

was

t he

targ

e te

d au

die

nce

? E

xpla

in r

ea

son

fo

r no

t ac

hiev

ing

goa

l.

Insp

ecto

rs

En

forc

emen

t p

erso

nn

el

7,'M 6

: PO

LLU

TIO

N PR

EVEN

TIO

N (

GO

OD

HO

US

EK

EE

PIN

G F

OR

MU

NIC

IPA

L O

PE

Bu

sin

esse

s

Mun

icip

al e

mp

loy

ee

En

forc

emen

t per

son

ne

l

Bu

sin

esse

s M

un

icip

al e

mp

loy

ee

En

forc

emen

t p

ers

on

ne

l

Con

tinue

d in

nex

t p e

rmit

cycl

e?

(Yes

/No)

SO

A

SO

A

SaA

No

Goa

l A

chi

eve

d?

(Yes

/No)

ON

SaA

SO

A

BM

P D

escr

iptio

n

i

!

1

BM

P-1

So

urc

e C

on

tro

l-P

et W

aste

C

olle

cti

on

_

BM

P- 2

So

urc

e C

on

tro

l-O

utr

eac

h a

nd

tra

inin

g p

rog

ram

d

irec

ted

at

bu

sin

esse

s a

nd

mun

icip

al f

lee

ts

_

1

!

1

BM

P-3

So

ur c

e C

on

tro

l-D

idac

t ic

Ma

ter i

als

.

1

!

1

Page 15: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28

Se

pte

mber

20

16

0) 1 0

0

0

2

Page 16: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

>- CC

U)

C/)

CC

0 CC O. I- z w

w O I < Z < < L2I E CC M 111

I- <

Z

2 cc Z O 0

1= <

CD (-)

0 CNA ILI - C.)

CC CO < a. 0-

<

0 0 2 0 z O I- D

0

z

28 S

ep

tem

ber

20

16

Page 17: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

MU

NIC

IPIO

AU

TO

NO

MO

DE

AG

UA

DIL

LA

28 S

ep

tem

ber

20

16

PUBLIC

INVOLVEMENT

N ci

f)

Page 18: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28 S

ep

tem

ber

20

16

Me

asu

rabl

e G

oa

l (W

ha

t is

the

en

d re

su

lt o

f t h

is

pro

gra

m?

Wh

at in

dic

ato

r w

ill d

ete

rmin

e t

he g

oa

l h

as

been m

et ?

(e.

g., a

do

pti

on o

f b

yla

ws/o

r din

ance

s, a

moun

t o

f in

ves

tiga

t ion

p

er f

orm

ed,

id

en

t ifie

d a

nd r

em

oved illic

it co

nn

ec

tio

ns,

etc

. )

Th

e m

easu

rabl

e g

oa

l will

be

me

t o

nce

th

e M

ap is

co

mp

lete

d in

its

en

t ire

ty.

Nu

mb

er o

f Ill

icit

Dis

cha

rges

de

tec

ted

an

d e

limin

ate

d

Nu

mb

er

of

Illic

it D

isc

har

ges

de

tec

ted

an

d e

limin

ate

d

Nu

mb

er o

r o

f o

utf

alls

id

ent i

fie

d a

nd

insp

ecte

d

Nu

mb

er of S

SO

s id

enti

fie

d a

nd

elim

ina

ted

Pro

gra

m D

escr

iptio

n (

Desc

r ib

e t

he

pro

gra

m a

nd h

ow

it

will

ide

nti

fy a

nd

rem

ove

illi

cit

co

nnec

t ions

from

the

MS

4,

e.g.

new

reg

ula

tion

s, in

ves

tig

atio

n p

rac

tice

s, r

em

ova

l o

f ill

icit

co

nn

ec

t ion

s,

etc.

)

Th

e M

ap w

ill in

clu

de

ele

men

ts r

equ

ire

d in

sec

tion

2.4

. 4.6

(a)

(i) o

f 20

16 G

P.

Ex

isti

ng O

r din

ance

will

be

rev

ise

d a

nd

con

t in

ue

to b

e im

ple

men

ted.

Th

e P

rog

ram

sha

ll in

clu

de

all

req

uir

emen

ts in

Sec

2. 4

. 4.8

of

20

16

GP

, in

clu

din

g c

atc

hm

ent p

rio

r ity

ran

kin

g,

inve

st i

gat

ion

an

d sa

mp

ling

p

roce

du

res.

All

ou

t fa

lls w

ill b

e id

enti

fied

and

insp

ecte

d a

cco

r din

g t

o S

ec 2

. 4.4

. 7 o

f 20

16 G

P.

SS

Os

wil

l be

insp

ecte

d a

nd

elim

ina

ted

acco

r din

g t

o S

ec 2

. 4.4

.4 o

f 20

16 G

P. A

BM

P D

esc

r ip

tion

or

BM

P ID

(e. g

. M

CM

-1)

Sto

rm S

ewer

Sy

stem

Map

Imp

lem

ent R

egu

lat i

on

s to

E

nfo

rce

No

n-s

torm

wa

ter

Dis

ch

arg

es

I Pro

gra

m t

o D

ete

ct,

Iden

tify

an

d E

limin

ate

Ille

ga

l Dis

ch

arg

es

I Ou

tfa

ll In

ven

tory

i

a) .c C)

C a) its a) 7). 0 a)

"6 a)

E (6), c

c a)

FL- 41) E

a.

U) a)

0

0

C a) E a)

E

ILLI

CIT

DI S

CH

AR

GE

DE

TEC

TIO

N A

ND

ELIM

INA

TIO

N

An

nu

al P

ub

lic M

eeti

ng

Page 19: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

CO

NS

TR

UC

TIO

N S

ITE

ST

OR

MW

AT

ER

RU

NO

FF

CO

NT

RO

L

R

• .

-a (7)

a) .0 E (I) O. E.' c" • ru • > oa E -o c as o (r) E a) cc 2a

-ci a)

E a) 75. E

4

0 0 2 0

-0

0

2

of

28 S

ep

tem

be

r 2

016

)

Mea

sura

ble

Go

al (

Wh

at is

the

en

d re

p

rog

ram

? W

ha

t in

dic

ato

r w

ill d

ete

rmin

ha

s been m

et ?

(e

.g.

, a

do

byla

ws /

ord

ina

nces

, a

mo

un

t o

f ii

per

form

ed

and

site

s a

ctiv

ely

re

gu

late

d .1

)

Th

e n

um

ber

of

reg

ula

tory

mec

han

is

cre

ate

d a

nd

the

nu

mb

er o

f p

ena

ltie

s im

po

sed.

Nu

mb

er o

f er

os

ion

co

ntr

ol p

roj e

cts

!

Nu

mb

er o

f in

spec

t io

ns

con

du

cte

d.

Pro

gra

m D

escr

iptio

n (

Des

crib

e t

he

pro

gra

m a

nd

how

it

will

he

lp c

on

tro

l st

orm

wa

ter

runo

ff a

t co

ns

tru

ctio

n s

ites,

e.

g. n

ew

reg

ulat

ions

, co

ns

truc

t ion

p rac

t ices

, insp

ectio

n p

roto

cols

, etc

.)

Th

e M

un

icip

alit

y w

ill c

on

t in

ue

to

imp

lem

ent

mu

nic

ipa

l or d

inan

ce

req

uir

ing

ero

sio

n an

d s

ed

ime

nta

t ion

co

ntr

ols

fo

r p

ollu

ted

ru

no

ff f

rom

co

ns

tru

cti

on s

ites

wit

h a

lan

d d

istu

r ban

ce o

f gre

a ter

tha

n o

r eq

ual t

o

on

e ac

re (

4,04

6.85

64 s

qu

are

me

ters

) o

r if

t he

con

str

uc

tion

ac

t iv

ity d

istu

rbs

less

tha

n o

ne

acr

e b

ut i

s p

art

of a

la

rger

co

mm

on

pla

n o

f d

eve

lop

men

t or

sale

tha

t wo

uld

dis

tur b

on

e ac

re o

r m

ore

.

To

co

mp

ly w

ith

thi

s B

MP

, t h

e M

un

icip

alit

y d

eve

lop

ed

an

or d

inan

ce

for

sto

rm w

ate

r ru

no

ff c

on

tro

l at

con

str

uc

tion

site

s. T

he

in

spec

tion

s t

aff

will

co

nd

uc

t the

co

ns

tru

cti

on s

ite

was

te c

on

tro

ls i

nsp

ecti

on a

nd

follo

w

up o

n t

he

corr

ect i

on o

f d

efic

ien

cie

s en

cou

nte

red

du

r ing

the

in

spec

t io

ns.

BM

P D

escr

ipt io

n o

r B

MP

ID

(e.g

. M

CM

- 1)

1

Ord

inan

ce o

r O

t he

r R

egu

lato

ry

Mec

han

ism

I

Page 20: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28

Sep

tem

ber

2016

CO

Page 21: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

PO

ST

- CO

NS

TR

UC

TIO

N S

TO

RM

WA

TE

R M

AN

AG

EM

EN

T IN

NE

W D

EV

EL

OP

ME

NT

AN

D R

ED

EV

EL

OP

ME

NT

1.34 E

0

0

0

28 S

epte

mbe

r 20

16

01

Mea

sura

ble

Goa

l (W

hat is

the

en

d re

sult

of

this

p

rog

ram

? W

ha

t in

dic

ato

r w

ill d

ete

rmin

e th

e g

oal

has

be

en

me

t ? (

e.

g., a

dop

tion o

f by

law

s/o

rdin

anc

es, a

mo

un t

o

f im

ple

men

ted

pra

c tic

es, deve

lop

men

t o

f ca

pac

ity b

uild

ing

reso

urc

es, e

tc.)

a) u >. c SI CI C 04)

c Gs i: o c 0

z ii >. .0- 8 g f-- 11 -0 ... o_ c M . 0 E .5 E 2 omm f- E ra 7.3 0 (7) .c .5) "6 ' a) CD *.-0- —1 ' ..E (7, ,„ o» a z .1.3 > a E a)

co

-a co 2 a) -a 0 -C C I— M :.C.

-a C M

.'D > E . .a +-' $- 0 ' a. ii oc 0 ,., "6' — 2 "E' ca cDo cLE ...6 o , g > .....- u 0

-o w ■ 0- . C ( ° i- .E

a) ._ $ > 112 a) .c 4 ... 8 -2 a. 0 0 ii CO a CD CI .c E

2 6 0

o 0 .47' " 6 B c 45 .2 E t. a)

a 2- E - ._ .0 a) la . a a 1- co

..- o 0

7.. 0) o .= z c ,.■

71 in' ,,- cs 2 u ..... -2 o 03 :, ■ u; aicp -ai a) a) c

13 c0 cSali fa; E r,

0 — "E) --u3 09- .t o. w .- -a

12 .° a) E E 115 = Z — z E fl)

Pro

gra

m D

escr

iptio

n (

Des

crib

e t

he

pro

gra

m a

n d h

ow

it w

ill co

n tro

l st

orm

wa

ter

run

off fro

m p

rop

ert

ies

afte

r t h

ey a

re d

eve

lop

ed, e

. g. n

ew

re

gu l

atio

ns,

pra

ctic

es, or

reso

urc

es

for c

on

trac

tors

to

use

Lo

w I

m•a

ct

Dev

elo

pme

n t (

LID

), e

tc.)

Th

e o

r din

ance

will

es

tab

lish

mec

han

ism

s to

en

sure

co

mp

lian

ce

wit

h t h

e p

os

t co

ns

tru

cti

on o

per

atio

n

and

ma

inte

nan

ce B

MP

's, i

nc

lud

ing

the

sa

nc

tio

ns

and

enfo

rcem

ent

mec

han

ism

s. T

he

po

ssib

le s

anc

tio

ns

will

inc

lud

e n

on

-mo

ne

tary

pen

alt

ies

(su

ch

a s

top

wo

rk o

r der

s) a

nd/

or

fin

es

up t

o $

500

pe

r v

iola

tion

per

day

.

Th

e im

ple

men

tat i

on w

ill in

clu

de

tra

inin

gs

to i

nsp

ecti

on s

taff

, d

eve

lop

ers,

co

ntr

acto

rs,

des

ign

ers

an

d c

on

str

uc

tio

n re

lated

BM

P D

esc

r ipt

ion

or

BM

P ID

(e. g

. M

CM

-1)

Page 22: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

46; O c Q. 0

.1'§'

>4 • ■

.01 0 MI Z

7.3 0 " a t t > 2.,3 oc 0. c O 0. o - as c.) a) co 0 cLo

E -a a) c o c

(0 ...7. o u co 0 — 0 —

CD M O. l' 0) 'Wm (t) )., CO E .= o 4- m .I■ a O 0 E 4-, 0 43 ■ .0 :5 .0 E o E E. aa .- ui c 2 a) c co g (1. C 0 c

E 1- 0 1- m

75 ,_ a ■ t ta) a as c - © vc

6 0 ca

._ E o k-) iii o c as tn.

..... -a

-a E = a) c as Ts En -6 T2

c o :03-- tr)

C 0 3 "4"..-

46. RS E .6- f; O .c CL M = M 0) 2 .t.:

.(7). -a ■ c co 2

O 2/ -0 0 0 it -6 F) *- 43 ..-. v .a a) .0 a) -Q ou) E u) a E 45 E Q. a a .0 = 4_ c a) c

0 .4i) oc :o a) a- .c 2 .c _c a i- M R'5 1- L.

a) C .c - ..... a) 10 0- t c ca -5 c ..c 'E W 0 2 Ii '51 ■ 0) t 0. -c ..t: w .•-• ■ a) 0 c c z a) ,.. a) ..c oc

0 c 1- .- 03 ;12 2 •E 6 1-,.) ,... ..... 0., (7, 8 > (5 o) E -0 46 7C..) (1) .0 1— 0 c .0 a) .6.

o 0 6 L- o 13.0 6 - ••■•

T3 ■ Cr) ■ C M .0 2 ■ ■

0 3 .0 0 .c tr. -6 0 as 47- 0)

fam..mica) a) 3 .= .0 — "0 —

2 u - 03 - c .a)_ > co - a .- 4- a) 4: 3

-a E i -a c 0 0 Cti

(2 0 0) C7) CL a. ■ 6. z t; c 0 .._ 0 ts 4C)

a) 0 a 6- o " 0. a 0.) co = o .L,' $ 4e-oo ._cu) om ii (51- ccia) g i

71.)), 030 cW 12: w co -5 5 -c -a 0

■ a 0 .t.i., .a 0 0) cu >. c > c cl) .c t a •

-a a) co — 0 " I— .c CI to — C () .EIT‘ .-> 'al o z ,..; 43 _ - ...= ▪ .F3 ! E 0 t >.. E 175 o. w .-c>. -2 t 7:9 -CC°

= -0 w 17; a. 8

t c 8

... ,„, 6.E-.. ▪ c .c c 2 .0 w ••■• 0. all r... c 0 Ca W .E.-E 0 C

.c.)- - c a V .(7) c

.E o Lc 0 ..:TE .c o 0 a) „ 3 ..; .c 2 6 c

+- 4=

E 6.- • a co ..-.

en ii. 8 0 -0 8 co2 a)

a) (no- E c a. fa

,-, 2 h- u) a / .s .2 6 co 0 C .0 c2) .c

(/) O. ....

as

▪■

V

.2 E ■

2

- • -0 t C 0 C

'0 0) 0 15 .c

(7) ZE O

U) C 10 4-•

6; 6 - 0 •-c • U) 3 C

C ci) 0 0 75 " E 41;

C Z) I> o 03 cl) E 0.) c maZol-° -61) FD 0

0 fj ■ 02 co 0 lt

E 0 oi2 73 t° 7n t° ca.ceal (1) ■ ■ U) O E 0 3 O. a) 0-c *(7) ■ Fs Ecoo6.0 4: 0 3 ■

.c7Ducpa '10 > .c c ° -6 75 >11'

-o e t)..E ■

k 2 • ,5 • _ 51 Es o z

t a) c > • tr; v = o '5 w

M D w

171 O.

M _ c 0 • E 2 2 ■ 0.

'C 0

■ E

3 8- c

Ok-0 • E a. 2 a m

ts" ■

a. I'S 2 (1) C > O ID C

28

Sep

tem

ber

2016

Page 23: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

.

2 .:42 D) cis a) ° vi 0, (Dt s,-, c a) cus .,- as •- ,...: ---„,_,

iii (.)" :E_ o ffg- - E us 1... _0 ‘- . (1) 0 E2 •- Cr_ I'D ° t 0_ - ts - -- "e1) Q) X ....;

— — > (f) • — Q) . — 0_ CD C CI) C1- 1.5 2 .- ° a . .5asTz a_cE as 0 ...-E .- Tu s ol

O c .77) 1-5,_ :0°- (7)0. RS2 c ,- a =

**•=7 0 ;1. • E in c a ._ _c = a) - =

tilt) 73E2 : 1 .14 s; :1;E 1 :2: "E " 6. . - - '25

cm c 2, a

E2 Et. 15 -.......° i) cm 0, E To CI_ ca. in- o .c 8 o_" 'Lis "-a) 2 2 8 t 7; E 41 c 7.i

6.) a) 0 CL 2

8

0 — 0 -

20 m

co 12 3 a) as 8 co 13 7/5 a) a) .T6 .c o ._ t s - o c ■ .c _ c co 0 a) c :- c o. ... ...: .- a) asso cuc,...2 To 2 g )c) ):: 1,= o cts rn. ■ 1-7; u c .c

-F0 a) "0 u O 4 2 ed—; E as _CE 4D ... CD c MI ca 8 c sw .c.- cp s a) a_ CO -0 ..--... -

e w c L- 0 , 'cic 2 " E - in v Y■ ..... MC 5 E± 3) ° co° 2 0. .0;13 16 a) 6 g

▪ 0 cn .2 E 2 IT) , ots 0- c E 0 --- o_ 71 0. > RS 0 63 ro u)

c CD 13 CD 03 c 0 E 2 co .2, as -, .- 4e-o oc w c.) ., .c a) .v) .2 2 w 7.7. .c .— 0) c - w -a ...- , .... As - 0 4-• RS 0 >

2 -

11:5) -c ci m 8 k, -6 ..c 0 (I) a) C Ch 43. 4

.. L 0 0 :W D) 13 a) 0 a) o 0 2 0" c t 0- 3 McD 0 03 48 .... c ..- .2 co 7, 0. .2 o c 0- . c .-

0_ ..0 ..- .- a) o c 6 c-) _ ... as es (.) 'Es

• -

ci --cna)T.T.:)E z aj c13 80EE 0c o. 2 .2 .2 = a. > 0 II mc .0 2 w - ... c — 0. - a)

zETD07,57:6 -0 V 4E. '17 4-. C° c CD = 0

>‘() Ea cto C > CDca c 0t CO 0 w .c 0

63 0 4 o -a -.F. (...) -a 1- .c •--' E -aw a m 2 E-- necessary

ac

t iv

itie

s.

GO

OD

HO

US

EK

EE

PIN

G A

ND

PO

LL

UT

ION

PR

EV

EN

TIO

N IN

MU

NIC

IPA

L O

PE

RA

TIO

NS

(7,

28 S

ep

tem

ber

20

16

Page 24: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

5 oat, -I a <

MU

NIC

IPI O

AU

TO

NO

MO

DE

A

28 S

ep

tem

ber

201

6

CV

Th

e n

um

ber o

f fa

cili

t ies

sto

rin

g h

azar

do

us

m

ate

ria

ls o

r w

aste

s;

Th

e fr

equ

ency

of

insp

ecti

on

and

ma

inte

nan

ce

vis

its t

o s

tora

ge

fac

ilit i

es;

Th

e n

um

ber

of p

ers

on

ne

l tra

ine

d in

h

azar

do

us

ma

teri

al a

nd

was

te h

and

ling

an

d s t

ora

ge;

an

d

Inve

nto

ry o

f m

un

icip

al f

acili

t ies

;

Th

e n

um

be

r o

f o

per

ati

on

and

ma

inte

nan

ce

pro

cedu

res

dev

elo

pe

d;

Th

e fr

equ

ency

of

insp

ecti

on a

nd

ma

inte

nan

ce

vis

its t

o f

acili

t ies

;

Th

e n

um

ber

of p

erso

nn

el t

rain

ed

0 &

M

pro

ced

ure

s; a

nd

The

nu

mbe

r o

f edu

cat i

ona

l ma

ter i

als

ui a) .- >-• "- c C :1-, 0 4-, • 0.)

> (1) a) al —,, ,,„ a. ,co > E v cww•--woc (,3 u) > .._,0 0 &- .....5.. ■

E aiT) g -..s _ . >. 2>

a)- E n ,_ = r 7- • .0. — ° 43w ei) > .- = 4- ■ ..... 0. a- 4-

0 0 ..,...- c .c u) 0 2 2 ty C '- 0 ' E) .0 CD 0. = o .,42 -El ds z ' *6 = 0- co c 0 v 0 = •g E

0 0 0 .r., 0 7-.) 0 .._ ,-," a) c)vuoz 2,-. " .c 0- ,..) c,

.- I- C.) a- 13 L. Ts 0 = CD CS 0. 2 = 0 cr)

c m ou)c • co al E 0- -13 c) .- 5 CD 6 a) 0 (1) " O. "ci; .- ,_ • — > co cm737.)00.-Ncn.=

-0 .0 , t; > a' 43 15 E 2 0 ,_0=a) c .c 03

c.) c Z ID 1:3 tm °c.o. 0— 0*- +e• .c ,_ .c (1„..•••0',3 0 w O. 0 0. CL Ta -5 .0 0

co m- ,._ c _ (.0 13 0 w .= 0 — C

A- 4.1:: .63 - a) .in c c 10 .

°a) — 0 cl) ° 4-, CO a) 1 1 ._CO M (j) 0

7.5 3 4- I' E 0 0 0 c 0 — 63 2 0 8 0 (DOCL 8. ., 4_, ,_ &_ ..„

". >7, c co 0 a ,- ■ E " ■ c .c 0 -0 • - (1) > •,_- ,,,- 3 >. .0 C 8 " `d ... ,, .co E .- 0 0 13 13 6 `e. co 0 "c5 73 .2 E gi 0

.- 0 = = 0 ." a) =°Ectia) - 4-•c>. .- - c (7) 0 0 co a) 75 a) .4,- al 0 FT —,„

Ir, 0; = .,- -- E 0 ,_ o wzal oE 03 E &- " 0 0) 0

= .05cric 0 0) g cti c 0 ..- .- Cr) 0 .- c To .- c.-. 0 .E .E. m cna).->c)(5034E;

as "E' 4; 2 c c., °c4-. 0. cl.. 2csasca, c n 13, if; Z RE E E .c .c Fs E Iii T

he

mu

nic

ipa

lity

will

dev

elo

p a

n

inve

nto

ry o

f a

ll fa

cili

ties

an

d r

evie

w t

his

inve

nto

ry a

nn

ua

lly a

nd

up

da

te a

s n

eces

sary

. In

ad

dit

ion,

the

mu

nic

ipa

lity

will

dev

elo

p w

r itt

en o

per

ati

on

s an

d m

ain

ten

ance

pro

ced

ure

s fo

r th

e m

unic

ipa

l ac

tiv

itie

s lis

ted

be

low

: a.

Par

ks a

nd

op

en s

pac

es-

i. D

eve

lop

pro

ced

ure

s to

ad

dre

ss

t he

pro

per

use

, s

tora

ge,

an

d d

isp

osa

l of

pes

tic

ides

, h

erb

icid

es,

fer t

ilize

rs, l

awn

clip

pin

gs

and

Z a) E ■ 0) co c al 2 0

—63 ,, . ■■'. ;:

c) r 2 2 Q. i

Page 25: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

5

MU

NIC

IPIO

AU

TO

NO

MO

DE

AG

UA

DI

28 S

ep

tem

be

r 2

016

ta t E v) RE lij _ c .c u) c as CI) 0 2 o 3

4... 8 $2 a) ',1,- 3 w

c TD o c 2 To `; ..... ...

an .c t. c3

as as a) w

0 (5 0

8 ca. ,_ 6

c

To 0 Ts c 4- c - a ...S += o . a) -c.... a) ..- c c .0- c..) c = 0 c 8 g 2 2 .

0 0 ID I°. ' 0 4- C 1 0 c 8 0 me E a) c m

.... 0 8. zu 4-• ..c ,_ u a) 0 0 as .E E) 7; a; cm) u) ca. as o o _ .., = as s- 7 0 CU) 'CI V

4. ..... (XI 4(7) .0 CO a) a) co 4- tno.4-ctE 0 c„,c m u) u) O 0 w a .a 0 cn 130 0 co c a)

112 2 r) 7, 0 :c. 0 1,2o4D0E-0 .1:2-- MC CD "' a)

E V. 4- 6 2 2 8 Eo i E 8 7'2

a) -0 ic .S2 15 = cm al cr ' _ c .- _ c z is .61) .7.,&- 0 > 4.. ....

2 2 E z 4-' CI •-•• 0 CL.CO0C M ,v

.4.7.> oa) "5 Ti

(L) 03 X CD 1:3 0 0

4-, 0 O. — V 03 .C) V V CD CL —

crM c..9 E -C CD CD E oa 2

C.) 0 .0 0 13 Tr

. u Lii o -0,_ >$3) 2 2 0 -0 41..) a) . o. g 1) 75 20_ a) u "- -0 2 co 0 E 71) 'D

:',. E c% LD 13c CL a a 0- (5 a) 0 1- 0 0 o c .,_ c as c). as .,_.

Elg 730 03 (/) 0 0, >... c c.) u c ) o. 0- ..,. - 0 a -9 0 o. a) 0. o. c). ,_ 0 ._ a) o. 0 > 0 a) R

2S C.) CO 0 12 0 co S; 5 a E 00 15 0 0'5 0 0 (1) RI " t; 2 0 7.; RS

Cl. w

itzr) 7, as cr) (,) o 0) c Zca..0 , —a)' 0 47.)=• g37.)a).-Tu 0 -= 02 > a. c as . c- V > Q'

> s- C > CO > C,) 4T• 0) > •- .0 w CIS 'a E .., ii s ..6 t 8 2 o ,D> &- CU w 0. .C.) w 0 Z 0 12 0 "FD .y.. w ) sv yg! .a w T..) co

5 o E o. CI =— 0 V = -6 5/50.700 ° E0M.COMEOCCIO>V .tiECASE

03 a1- ._ > . C E :' .

Page 26: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

28

Sep

tem

ber

201

6

Inve

nto

ry o

f m

un

icip

al f

acili

ties

at ri

sk

for

spill

s;

Th

e n

um

ber

of

pre

ven

tat i

ve m

ain

ten

ance

p

roce

du

res

pe

rfo

rme

d o

n ta

nks

, va

lves

, p

um

ps,

pip

es, a

nd

oth

er e

qu

ipm

en

t;

Dev

elo

pm

ent o

f a s

pill

res

po

nse

pla

n fo

r m

un

icip

al f

acili

t ies

;

Th

e n

um

ber o

f pe

rso

nn

el t

rain

ed

in s

pill

re

spo

nse

an

d p

reve

nti

on t

ec

hniq

ues

; an

d

Th

e n

um

ber

of

ed

uca

tio

na

l ma

teri

als

d

istr

ibu

ted

to

mu

nic

ipa

l em

plo

yee

s w

ith

info

rma

tion

of

spill

res

po

nse

an

d p

reve

nt i

on

plan

s.

redu

ce t

he

dis

ch

arg

e o

f p

ollu

tan

ts

fro

m t

he

MS

4

ii.

De

velo

p s

che

dule

fo

r th

e fr

equ

ency

of

rou

tine

cle

an

ing

an

d in

spec

tio

ns

tha

t will

en

sure

tha

t no

ca

tch

bas

in a

t an

yti

me

will

be

mo

re t

han

50

pe

rce

nt f

ull.

iii.

De

velo

p p

roce

du

res

for

sw

eep

ing

an

d/o

r c

lean

ing

str

eets

, an

d m

unic

ipa

l-o

wn

ed

pa

rkin

g l

ots

. D

eve

lop

pro

ce

dure

s fo

r p

rop

er

sto

rag

e a

nd

dis

po

sal o

f ca

tch

bas

in c

lean

ing

s an

d s

tree

t sw

eep

ing

s w

aste

to

en

sure

it d

oes

n

ot d

isc

har

ge

to r

ece

ivin

g w

ate

rs.

Th

e M

un

icip

alit

y s

hall

de

velo

p

pro

cedu

res

for

spill

res

po

nse

an

d p

reve

nti

on p

lan

s th

at s

hall

sta

te h

ow

to

st

op

, co

nta

in, c

lean

up

, dis

po

se o

f co

nta

min

ate

d m

ate

ria

ls, a

nd

tra

in

per

son

ne

l to

pre

ven

t an

d c

on

tro

l fu

ture

sp

ills.

Th

is p

lan

sha

ll b

e ap

plic

ab

le t

o

all

site

s w

her

e h

azar

do

us

ma

teri

als

are

st

ore

d o

r u

sed.

Mu

nic

ipa

l em

plo

yee

s w

ill b

e tr

ain

at

leas

t o

nce

a y

ear

ab

ou

t sp

ill r

esp

on

se

and

pre

vent

ion

tec

hniq

ues

. R

eco

rds

of

t he

tra

inin

gs

off

ere

d to

em

plo

yee

s w

ill

be

reta

ined

for

a p

er i

od

of

5 y

ears

.

C O

:.= C G) > EL2 a C 63 0) N C O Q

u(D' E cc 112 = 0) • 0 - 0.

Cl- cn t-

•i

O

O

O

Page 27: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

Sta

ff T

rain

ing

Pro

gra

m

0

0

TS' .0.

0

O a a-

m 0- > c

3 2 o c

E

0 0

a) o a) z 8 c E >. a. ..E us .c.

E *E r .7.. C.)

1- C •-

C 0 41) - 0 1:3 4". 2 - 3 72

'rt.! 03 2 co T. 0i ui -c ,7,- 0 - o .

a:' - 03 7.2 4-* CD 0 C .0 -0 '0 ..; > 69 E C .0 O. cn-. 460 fr, .c ■-• = i5 co i/3 , 5 w .... 4-,

15 CD :1754) 5 E Ts. - :°- 0) a '0 '0 22 u)— .005.c ; Eu) lc - c= c ' = 0;

4-42) E 0. .1- 4-• o 0 u c co S u) 0 ..# 2 -0 0 6 o a as 03 z c `" ui > . Gs +5 c .2 —0 .1_ . E> as

(-) t' to. a) o ..- c :c_oca in ww-ccenc > >. 0 a) I- = E

CD -0 (13 - c 0 a c = o 3 a 5 c.) '0 ..... o 2 c'3 >. 0

) e a 0-8 u;

-0 0 0 0 117: 0 Z' 48 2 03C 'C.D. :C -C"C1) 0C° a") 0 .- " = ca. " 0- 2 .c (7) -0 0 0 E Ti 0 4'

t co E 6' 8" cv 03 E Ts 6- 0 .-

_,, c 122 CD ° — ' - C ai UCD 0" -.7..

E

o = co "5 A3 ja 0- tj -C N C .._ u) 0 E as cal 2 0 .01.-- :E >. 4E' y 1- -C —

0 0 03 0 4 8 -0 (L) = 75 CD 0. 4-. .._ 4r1; 0 0. 4-. 0. C.) E t; .c a) -0 02 a) .-0 = c 13 1::1 73 RS Ti cr) C 0 .0 4... M 4-

000. _0-m0CnO (5 0 CE 0- E 0 0 ..E. E 0 0 4i-i .0 -a 0) .- ..- '4= c Cl) -0 0 c- .- ''' o '5 ..- © c g a) 8 2 .0 .E c 46. .° a c a) 0 c cn U) al 0 E 1 7) 76'4- as"?' a 1 Za) E m `1) E c

a) a) ao 0 c a. .° a) a) = c 't .c-cca)twoEa" Ts '40 c cu

O T2 cc') c̀') ..-5, E a) E$ 0c E f2) )... 030) 72 0 0>'• mu a) 1:3_ .0) a > 4- ._ _ -- cu -0 a E c o .> c 2 ,E '- 5 2 - t3

... _ co 03 12 a Cn .0 O. CD 0 C > 7...) CU 0) Es := 0 --u) 0 .ca' .717 IT= r al E E ° 1.- CO 0 'CS ■C 2 •c as E cu .. .-. i' 2 (i) . ° 1- 4= ..... .c as E .c 3 a) .. m

easu

re.

Sto

rmw

ate

r P

ollu

tion

P

reve

ntio

n P

rog

ram

s (S

WP

PP

)

28

Sep

tem

ber 2

016

Page 28: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

. o

_ c a. a. :.= a. c c . al

Ts 711 U) 0 3 a) o. _ )_ ._ 0 a co 2 a. o ..... ._ )_ a) -0

> 'E U) -13

a) c

0 > c its. o co

E o • I.'. E a a)

6 o

•'E ' 70 m c .c. TD C— o

a. o 0 o -a 5)). 0. a)

0. c r73 cl- ED. 0. 0 o 0 5 E isi (L) = *E = Cl) ..- o a -0 = C.

"6 o is= 0.

4) (g)

1

>. = 6 8 o 6 6 4' c.) ts c a, (5

)_ ++0 0 .S a) -0 c E c 0 0 a. ,,(0 cr 0. E E ms( o :y, 2 .5 c 1.) :L=

c ..... E c -0 E • c .— u) c > .— 0 a) -0 CD to' o oz, a) (-) .c n .c

0 m 1— E 1.- as iE '5 7E Z.

0 C (i) E N L c CO 0 = w ,- 211 =

E o

c' 4" CU .12 4" C) U) *I■ 4m.

4) 0 28

Sep

tem

ber

2016

Page 29: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

MUNICIPIO AUTONOMO DE AGUADILLA

1.3.10 PART J. APPLICATION CERTIFICATION AND SIGNATURE

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Signature of Mayor/Elected Official:

Hon. Carlos Mendez Martinez Print Name of Mayor/Elected Official:

Title: Mayor of Aguadilla

Date:

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 27 28 September 2016

Page 30: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

APPENDIX A - MAPS

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 26 September 2016

Page 31: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

Figure 1Urbanized AreasNotice of Intent - NPDES MS4 PRR040000Municipality of Aguadilla

ACEITUN~S

CAIMITAL BAJO

NW.ES

Legend

Urbanized Areas (U.S. Census 2010)

Urbanized Areas

o Wards

-- Waterbodies

Municipality

Cl Aguadilla

Source:us Census Bureau TIGER data, 2010 Census

Projection:State Plane Coordinate System - Puerto RicoHorizontal Datum - NAD83

1 0 1 2km

11111111111 I I

1 0 1 miles

Page 32: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

0.2 o 0.2 0.4 0.6 0.8kmNota General: Imprimir en papel ANSI B (11 x 17).Fuentes: Municipio Aut6nomo de Aguadilla, USGS

1:50,009

t

Municipio Aut6nomo deAguadilla

Mapa de Desagi.ies(Outfalls)

tluqJgl~lg

Page 33: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

APPENDIX B - ELIGIBILITY DETERMINATION

MUNICIPALITY OF AGUADILLA NOI NPDES MS4 GP-2016 28 September 2016

Page 34: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

Edwin E. Mufti Field Supervisor

United States Department of the Interior

FISH AND WILDLIFE SERVICE Caribbean Ecological Services

Field Office P.O. Box 491

Boqueron, PR 00622 In Reply Refer To: FWS/R4/CESFO/72-005-GEN JUL 27 2016

Mrs. Keila Pacheco Consultant ACE Environmental, Inc. Po Box 19895 San Juan, Puerto Rico 00910-9895

Re: Aguadilla NPDES MS4-2014 Permit

Dear Mrs. Pacheco:

We have reviewed your request for information about endangered and threatened species and their habitats for the above referenced project. Our comments are provided under the Endangered Species Act (Act) of 1973, as amended (87 Stat. 884, as amended; 16 United States Code 1531 et m.).

The Municipality of Aguadilla, Puerto Rico is requesting coverage under the 2014 NPDES (National Pollutant Discharge Elimination System) General Permit for the MS4 (Municipal Separate Storm Sewer System). The MS4 collected storm water discharge into the Atlantic Ocean, the Madre Vieja creek and the Hernandez creek.

Based on the information provided and the nature of the permit we believe that the storm water discharge is not likely to adversely affect federally listed threatened or endangered species or their designated critical habitat(s) under our purview. Therefore, no further consultation is required. Nevertheless, if the project is modified or if information on impacts to listed species becomes available this office should be contacted concerning the need for the initiation of consultation under section 7 of the Act.

Sincerely yours,

agcs

cc Municipality of Aguadilla EPA, San Juan

Page 35: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL

adilla "Jardin del Atlantico"

Office of Urbanism and Land-Use + Economic

Development, Statistics and GIS

Certification

The Autonomous Municipality of Aguadilla is currently in the process of requesting coverage under the 2014 NPDES (National Pollutant Discharge Elimination System) General Permit for MS4 (Municipal Separate Storm Sewer System). As such, it must determine its eligibility with regard to the protection of historic properties prior to submitting a notice of intent (N01) for permit coverage.

The Municipality of Aguadilla does not have any stormwater infrastructure projects planned within the area of potential effects (APE) of the historic properties or properties eligible for listing in the National Register of Historic Places. The Municipality is therefore determining eligibility under Criterion A: "There is no potential of an adverse effect on historic properties because there will be no new ground disturbing control measures constructed or installed."

If any municipal infrastructure projects were to take place that could affect any of the above mentioned properties the Municipality will request a consultation under section 106 of the National Historic Preservation Act (NHPA).

9/12/16 Date

Signature

Plan. Manuel A.G. Hidalgo Name

Director Position

ESTADO LIBRE ASOCIADO DE PUERTO RICO! MUNICIPIO AUTONOMO DE AGUADILLA P.O. Box 1008 A uadilla, Puerto Rico 00605 787 891-1005 Ext. 2096 Fax 787 819-1040

www.A uaddla.cit ,

Aprobado por In Comision Estatal de Elecciones CEE-SA-16-1162