Upload
aubrie-casey
View
221
Download
1
Tags:
Embed Size (px)
Citation preview
National Conference on National Conference on Agriculture for Rabi Agriculture for Rabi Campaign 2008-09Campaign 2008-09
22
AGRICULTURE SCENARIO IN UTTARAKHANDAGRICULTURE SCENARIO IN UTTARAKHAND
SL. SL. NO.NO. ITEMITEM HILLHILL PLAINPLAIN TOTALTOTAL
11 Reported AreaReported Area NANA NANA 55665566
22 ForestForest NANA NANA 34663466
33 Net area sownNet area sown 454454 339339 793793
44 Gross cropped areaGross cropped area 718718 532532 12501250
55 Copping intensity(%)Copping intensity(%) 158.13158.13 156.96156.96 157.55157.55
66 Net Irrigated AreaNet Irrigated Area 0.490.49 2.972.97 3.463.46
77 Gross irrigated AreaGross irrigated Area 0.910.91 4.624.62 5.535.53
88 No of Opetational holdings("000")No of Opetational holdings("000") 650650 277277 927927
99 Area if operational holding ("000")Area if operational holding ("000") 506506 353353 859859
1010 Av size of operational holding (Ha) Av size of operational holding (Ha) 0.7790.779 1.2761.276 0.9270.927
33
Crop wise Performance During Kharif Area- 000 ha. Production- 000 MTArea- 000 ha. Production- 000 MTCropcCropc 2007-08 Achievement2007-08 Achievement 2008-092008-09
areaarea productionproduction Target areaTarget area Achievement Achievement areaarea
Target Target productionproduction
1- CEREALS1- CEREALS
RiceRice 276276 550550 275275 279279 578578
MaizeMaize 2929 4343 3232 3232 4848
RagiRagi 128128 183183 135135 133133 196196
Small milletsSmall millets 6767 8686 6767 6767 8787
Other milletsOther millets 99 44 1010 0909 0505
Total Coarse Total Coarse CerealCereal
204204 274274 212212 209209 288288
Total CerealTotal Cereal 509509 866866 509509 511511 909909
2- PULSES2- PULSES
Total Pulses Total Pulses 4040 3535 4040 3636 3535
Total oodgrains Total oodgrains 549549 901901 549549 547547 944944
Total OilseedTotal Oilseed 1717 2020 1717 2323 2222
44
Crop wise Rabi ProspectsCrop wise Rabi Prospects
Area- 000 ha.Area- 000 ha. Production- 000 MTProduction- 000 MT
CropCrop 2007-08 (Achievement) 2007-08 (Achievement) 2008-09 (Target) 2008-09 (Target)
Area Area ProductionProduction Area Area ProductionProduction
1- CEREALS1- CEREALS AchievementAchievement AchievementAchievement
Wheat Wheat 397 397
814 814
398398 856 856
Barley Barley 24 24
26 26
26 26 36 36
Summer RiceSummer Rice 13 13
47 47
12 12 50 50
Total CerealTotal Cereal 434 434
887 887
436 436 942 942
2- PULSES 2- PULSES
GramGram 1.10 1.10
0.8 0.8
1.2 1.2 1.1 1.1
PeaPea 8.8 8.8
8.7 8.7
6.0 6.0 6.2 6.2
LentilLentil 12.7 12.7
5.3 5.3
16.0 16.0 11.0 11.0
Total PulsesTotal Pulses 22.6 22.6
14.8 14.8
23.2 23.2 18.3 18.3
Total Total FoodgrainsFoodgrains
456.6 456.6
901.8 901.8
459.2 459.2 960.3 960.3
OilseedsOilseeds
Rapeseed/Rapeseed/MustardMustard
14.4 14.4
8.9 8.9
18.0 18.0 13.0 13.0
Total OilseedTotal Oilseed 14.4 14.4
8.9 8.9
18.0 18.0 13.0 13.0
55
Project Approved under Project Approved under RKVYRKVY
Year-2007-08Year-2007-08
Stream 1Stream 1 Stream 2Stream 2 TotalTotal
No- of SchemesNo- of Schemes 55 22 77
Total Fund Release (in Total Fund Release (in lakh Rs)lakh Rs) 2065.782065.78 648.74648.74 2714.522714.52
Fund Utilized up to Fund Utilized up to August 08August 08 1159.591159.59 358.99358.99 1518.581518.58
Year-2008-09Year-2008-09
Total outlay Total outlay Sanctioned Sanctioned 20.6120.61
Status of District plan -Status of District plan -NIRD Hyderabad have been assigned to NIRD Hyderabad have been assigned to Prepare comprehensive district agriculture Prepare comprehensive district agriculture plan. plan.
66
Agriculture ExtensionAgriculture Extension Under farmer to farmer Extension programme 670 progressive Under farmer to farmer Extension programme 670 progressive
farmer’s & 16629contact farmers has been selected.farmer’s & 16629contact farmers has been selected. 95 Farm school identified (one in each block.)95 Farm school identified (one in each block.) All officers & extension workers of the department has adopted one All officers & extension workers of the department has adopted one
village.village. Departmental extension network restructured,Departmental extension network restructured, One extension workers placed in each NYAY Panchayat under One extension workers placed in each NYAY Panchayat under
single window system.single window system. One Project Associate in ATMA is beeing placed in each district.One Project Associate in ATMA is beeing placed in each district. Kisangosthi / kisanmela/ Exhibition and farmers training were Kisangosthi / kisanmela/ Exhibition and farmers training were
organised in each NYAY Panchayat between 01.06.08 to 15.6.08 organised in each NYAY Panchayat between 01.06.08 to 15.6.08 under krishi mahotsva kharif 2008 All line Departments, NGO and under krishi mahotsva kharif 2008 All line Departments, NGO and private parties participated, provided their services and input’s to the private parties participated, provided their services and input’s to the farmer’s.farmer’s.
Kisangosthi / kisanmela/ Exhibition and farmers training are also Kisangosthi / kisanmela/ Exhibition and farmers training are also proposed to organised in each NYAY Panchayat between 01.10.08 proposed to organised in each NYAY Panchayat between 01.10.08 to 18.10.08 under krishak mahotsva Rabi 2008. to 18.10.08 under krishak mahotsva Rabi 2008.
325 Motivapors has been Selcted in cluster of traditional crop, 3227 325 Motivapors has been Selcted in cluster of traditional crop, 3227 SHG and 64 Fedaration Formd and 32351 household covered SHG and 64 Fedaration Formd and 32351 household covered under IFAD schemeunder IFAD scheme..
77
Physical Achievements of ATMA 2008-09Physical Achievements of ATMA 2008-09
upto August,08upto August,08No. of Farmers Trained 185 No. of Farmers Trained 185 No. of Demonstrations organized 232No. of Demonstrations organized 232No. of Farmers Sent on Exposure Visits 205No. of Farmers Sent on Exposure Visits 205No. of FIG s formed 35No. of FIG s formed 35No. of Beneficiaries of FLD/Kisan-gosthis 22634No. of Beneficiaries of FLD/Kisan-gosthis 22634No. of Beneficiaries of Exhibition/ Kisan mela 51634No. of Beneficiaries of Exhibition/ Kisan mela 51634
88
Certified Seed Demand and AvailabilityCertified Seed Demand and AvailabilityRabi 2008-09Rabi 2008-09 Quantity In Qtl.
Sl. No.Sl. No. CropCrop DemaDemandnd
AvailabAvailabilityility
Seed Seed
replacemreplacement ent
rate(%) rate(%) Ach Ach 2007-082007-08
Seed Seed
replacemreplacement ent
rate(%) rate(%) target target 2008-092008-09
11 WheatWheat 9626096260 99,00099,000 21.7521.75 3535
22 PeaPea 300300 260260 -- 1010
33 LentilLentil 700700 700700 -- 0505
66 Toria/ Toria/ Mustard Mustard
300300 500500 2323 2525
99
Seed TreatmentSeed TreatmentSeed Treatement Seed Treatement 2007-08 2007-08 406777 406777Kharif Targets Kharif Targets 2008-09 2008-09 275000275000
Kharif Achievements 182439Kharif Achievements 182439
Rabi Targets 2008-09 300000Rabi Targets 2008-09 300000
Seed Quality Control Target 2008-09Seed Quality Control Target 2008-09No of seed testing lab 1No of seed testing lab 1Total Target Total Target 2007-08 2007-08 450 450Achievement 2007-08 384Achievement 2007-08 384Achievement 2008-09 90Achievement 2008-09 90Non standard 3Non standard 3
1010
MarketingMarketingNew APMC Act likely to be finalized by New APMC Act likely to be finalized by March,2009.March,2009.Construction of Farmers Cllection Centre in Construction of Farmers Cllection Centre in Chamoli, Pauri and Dehradun District .Chamoli, Pauri and Dehradun District .25 Common Facilty centers for value addition and 25 Common Facilty centers for value addition and marketing of organic produce.marketing of organic produce.Construction of gravity based ropeways in remote Construction of gravity based ropeways in remote hilly areas.hilly areas.Regular Buyers-Seller meet & rate is finalized.Regular Buyers-Seller meet & rate is finalized.Organic wheat – Rs 1560/QtOrganic wheat – Rs 1560/QtOrganic basmati – Rs 2300/QtOrganic basmati – Rs 2300/Qt0 year basmati - Rs 1560/Qtv0 year basmati - Rs 1560/Qtv
1111
Fertilizer Demand and Availability 08-09Fertilizer Demand and Availability 08-09 in MTs..Kharif
S.No.S.No. FertilizersFertilizers DemandDemand Estimated Estimated Demand till Demand till August 08August 08
Availability Availability till August till August 0808
Excess/Excess/
deficitdeficit
Estimated Estimated Demand for Demand for SeptemberSeptember
11 UreaUrea 125000125000 112500112500 112851112851 +351+351 1250012500
22 DAPDAP 1500015000 1200012000 1453414534 +2534+2534 30003000
33 NPKNPK 2000020000 1737517375 2680726807 +9432+9432 36253625
44 MOPMOP 80008000 66006600 42034203 -2397-2397 14001400
State govt sanctioned Rs 364 lakhs to state co-operative marketing federation for supply of potassic fertilizer.
1212
Fertilizer Demand 08-09Fertilizer Demand 08-09 in MTs..Rabi
Sl.NSl.No.o.
MonthMonth UreaUrea DAPDAP NPKNPK MOPMOP
11 Oct 07Oct 07 25002500 40004000 90009000 20002000
22 Nov 07Nov 07 1800018000 50005000 1000010000 30003000
33 Dec 07Dec 07 3000030000 22002200 25002500 10001000
44 Jan 07Jan 07 3000030000 25002500 10001000 500500
55 Feb 07Feb 07 1550015500 43004300 15001500 20002000
66 March 07March 07 90009000 20002000 10001000 15001500
TotalTotal 105000105000 2000020000 2500025000 1000010000
1313
Bio-Fertilizer DistributionBio-Fertilizer Distribution
YearYear Distribution of Bio-Distribution of Bio-fertilizer (M.T)fertilizer (M.T)
2005-062005-06 2424
2006-072006-07 6666
2007-082007-08 100100
2008-09 2008-09 TargetTarget
120120
Distribution of Bio-fertilizer (M.T)
050
100150
2005
- 06
2006
- 07
2007
- 08
2008
- 09Ta
rget
YEAR
DIST
RIBU
TION
(MT)
Distribution of Bio-fertilizer (M.T)
1414
Micronutrient DistributionMicronutrient Distribution YearYear Distribution of Distribution of
Micronutrient Micronutrient (M.T)(M.T)
2005-062005-06 11631163
2006-072006-07 15621562
2007-082007-08 20002000
2008-09 2008-09 TargetTarget
24002400
Distribution of Micronutrient (M.T)
0
1000
2000
3000
2005-06 2006-07 2007-08 2008-09Target
YEAR
DIST
(MT)
Distribution ofMicronutrient (M.T)
1515
Green ManuringGreen ManuringYearYear Area covered Area covered
under green under green manuringmanuring
(Ha)(Ha)
2005-062005-06 25002500
2006-072006-07 40004000
2007-082007-08 2000020000
2008-092008-09 2200022000
Area covered under green manuring (Ha)
0
5000
10000
15000
20000
25000
2005-06 2006-07 2007-08 2008-09YEAR
AREA Area covered
under greenmanuring (Ha)
1616
Quality control of fertilizerQuality control of fertilizer (A) Sample analyzed and found non-standard during 2008-09(A) Sample analyzed and found non-standard during 2008-09
Year Year No. of No. of Laboratory Laboratory
Annual Annual capacitycapacity
ReceivedReceived Analyzed Analyzed Number of sample found non Number of sample found non standard in standard in
NutrientNutrient Physical Physical Parameters & Parameters & Immurities Immurities
Total Total
2008-092008-09 22 400400 9191 8181 99 00 99
(B) Product-wise details 2008-09(B) Product-wise details 2008-09
S.NoS.No..
Name of Name of Fertilizer Fertilizer
No. of Sample No. of Sample Details of non-standard falling in Details of non-standard falling in
Analyzed Analyzed Non Non standard standard
Nutrient Nutrient content content
Physical parameter & Physical parameter & Impurities Impurities
Total Total
11 Urea/AS/An ch.Urea/AS/An ch. 4242 00 00 00 00
22 DAPDAP 1515 22 22 00 22
33 NPK Complex NPK Complex 1212 00 00 00 00
44 SSP SSP 33 33 33 00 33
55 MOP MOP 55 22 22 00 22
66 NPK mixtures NPK mixtures 11 11 11 00 11
77 Others Others 33 11 11 00 11
Total Total 8181 99 99 00 99
1717
(c) Action taken in respect or non-standard fertilizer (c) Action taken in respect or non-standard fertilizer samples during the year 2008-09samples during the year 2008-09
2008-092008-09
1.1. No. of sample detected non-standard No. of sample detected non-standard 0909
2.2. No. of case of other violation of FCONo. of case of other violation of FCO 00
3.3. No. of registration certified cancelled No. of registration certified cancelled 00
4.4. No.of registration certified suspendedNo.of registration certified suspended 55
5.5. No. of warning issued No. of warning issued 00
6.6. No. of seizure of stocksNo. of seizure of stocks 00
7.7. No. of cases in which other action taken No. of cases in which other action taken (give details of action taken) (give details of action taken)
00
88 No. of referee samples found non-No. of referee samples found non-standard standard
44
1818
Quality Control- PesticideQuality Control- PesticideAchievement 2007-08 274Achievement 2007-08 274
Total TARGET 2008-09 300 Total TARGET 2008-09 300 Achievement 35Achievement 35
Non standard 2Non standard 2
Soil TestingSoil TestingTarget-2008-09 85000 Target-2008-09 85000 Achievement (Aug 08) 23656Achievement (Aug 08) 23656
1919
Best ProacticesBest Proactices1.1. Promotion of high yielding pigeon pea in hills in collaboration with Promotion of high yielding pigeon pea in hills in collaboration with
ICRISAT. Average yield of pigeon pea increased from 5.45 to 7.79 Qt/Ha ICRISAT. Average yield of pigeon pea increased from 5.45 to 7.79 Qt/Ha & max 18.00Qt/Ha& max 18.00Qt/Ha
2.2. Plantation of Napier grass in agriculture fields in watershed areas.Plantation of Napier grass in agriculture fields in watershed areas.3.3. Promotion of Traditional Crops in clusters under organic condition Promotion of Traditional Crops in clusters under organic condition 4.4. Promotion of SRI method of paddy cultivation in hilly areas & covering 10 Promotion of SRI method of paddy cultivation in hilly areas & covering 10
thousand farmers thousand farmers 5.5. Integrated package of green manuring micronutrients & weed control Integrated package of green manuring micronutrients & weed control
measure has resulted in increase of 5 & 6Qt average yield of wheat in U.S measure has resulted in increase of 5 & 6Qt average yield of wheat in U.S nagar and Nanital districts in 2007-08 This Package is being intensively nagar and Nanital districts in 2007-08 This Package is being intensively replicated in other area’s also.replicated in other area’s also.
6.6. Recently an MOU has been done between Dairy deptt & Divya pharmacy Recently an MOU has been done between Dairy deptt & Divya pharmacy Haridwar (Baba Ram Dev), for cow urine distillate @ Rs 25/lit. Haridwar (Baba Ram Dev), for cow urine distillate @ Rs 25/lit. Uttarakhand state has about 19.5 lac non discript deshi breed of cow. At Uttarakhand state has about 19.5 lac non discript deshi breed of cow. At present 2 center are supplying this distillate to the said pharmacy. On an present 2 center are supplying this distillate to the said pharmacy. On an average farmer’s are getting 5-7Rs/lit of cow urine & about 600 farmer’s average farmer’s are getting 5-7Rs/lit of cow urine & about 600 farmer’s getting benefit/day . The distillation machine is costing only Rs 1.75 lakh’s. getting benefit/day . The distillation machine is costing only Rs 1.75 lakh’s. Upto August 2008, 25000lit distillate have been supplied to Divya Upto August 2008, 25000lit distillate have been supplied to Divya pharmacy Haridwar. A plan to establishe distillation plant in each naya pharmacy Haridwar. A plan to establishe distillation plant in each naya panchayat in hill district. panchayat in hill district.
2020
1. In the chairmanship of DG - ICAR 19th zonal meeting was held at Almora during 5th & 6th April 2005. In this meeting it was decided to develop farming system modules for different agro-ecological situation especially for hilly district of state but till date nothing is reported .
2. Proposal for strengthening of one existing seed lab & establishment of one new seed lab is pending under Govt of India.
OTHER’S
2121