Upload
nashar
View
236
Download
2
Embed Size (px)
DESCRIPTION
ADC 273 FINAL DRAWINGS
Citation preview
Scale
Project number
Date
Drawn by
Checked by
ABBREVIATIONSMATERIAL LEGENDSYMBOL LEGEND
10
A100
4 2
3
1
A100
1
A100
A100
1
1
1
101
2
2
1
U1
CABINET UNIT HEATER
CERAMIC TILE
DEMOLISH, DEMOLITION
DUPLEX RECEPTACLE
DOUBLE HUNG
DOUBLE-ACTING
ELECTRICAL PANELBOARDENCLOSE (URE)
ELECTRIC (AL)
EACH WAY EACH FACE
EXPANSION, EXPOSEDEXPANSION JOINTEXPANSION BOLT
ELECTRIC WATER COOLER
FIRE EXTINGUISHER
FIRE HOSE CABINETFIRE HOSE STATION
FIRE HYDRANT
FINISHED FLOOR
FLUID APPLIED WATERPROOFING
FIRE EXTINGUISHER CABINET
FACE OF CONCRETE
FLUORESCENT
FACE OF FINISH
FIRE-RESISTANT COATING
CEMENTITIOUS BOARDFIBER REINFORCED
FACE OF STUD
FEET PER MINUTEFRAME (D) (ING)
FACE OF MASONRY
FEMININE NAPKIN RECEPTACLE
FLEXIBLE SHEET ROOFINGFIRE STAND PIPELINE
FINNED TUBE RADIATIONFURRED (ING)
FIRE-RETARDANT
GENERAL CONTRACT (OR)
FOCCL CENTER LINE
CSK COUNTER SINK(SUNK)
CASEMENTCAST STONECS
CSMTGCGB GRAB BAR
CEMENT PLASTER (PORTLAND)CONCRETE MASONRY UNIT
CONTINUOUS or CONTINUE
COMPRESS (ED,ION,IBLE)
COPPERCARPET
CORRIDORCOORDINATE
CONCRETECONNECTION
CONTRACT (OR)
CONSTRUCTION
CARPET TILE
CORRCPR
CONTCONTR
CONCCONNCONST
COORD
CPTTCPT
CEILING
COLUMN
CLEAN
CLEANOUT
COMBINATION
CLEAR (ANCE)
CONTRACT LIMIT LINECLG
COCOL
CLNCLR
CLL
COMBCOMP
CMPLCMU
FSPFRT
FTG
FUTFURFTR
FTFSR
GA
FOOTING
FUTURE
FOOT, FEET
GAGE, GAUGE
FOF
FPMFPL
FOSFP
FRCBFRCFR
FOM
FLOOR PLATEFIREPROOF
FASTEN (ER)FASBRICKBRK
CATCH BASIN, CORNER BEAD
CUBIC FEET PER MINUTE
CAST IN PLACE CONCRETE
CUBIC FOOT (FEET)COUNTERFLASHING
CIRCLE
CAST IRON
CONTROL JOINTCIRCUMFERENCE
CEILING HEIGHTCORNER GUARD
CF
CFMCFLG
CI
CIR
CH
CJTCIRC
CIPC
CG
CEMENT
CABINETCOURSE
BOTH WAYS
BASEMENTBOTH SIDES
BUILT-UP ROOFINGBRITISH THERMAL UNIT
BW
BS
BTUBSMT
BUR
CCABCBCEM
FHSFIN
FHC
FLUR
FNRFLX
FLGFLFJTFIXT
FINISH (ED)
FLASHING
FLEXIBLE
FLUSH JOINTFLOOR (ING)
FIXTURE
FBD
FAWP
FD
FB
FDN
FECFE
FFFGLFH
FACE BRICKFIBERBOARDFLOOR DRAINFOUNDATION
FIBERGLASS
BIT,BITUM BITUMINOUS
BUILDINGBLOCKBLOCKING
BOTTOM OF CURBBENCH MARK
BACKER ROD
BEARINGBEARING PLATEBOTTOM
BM
BLK
BOC
BLDG
BLKG
BKR
BPLBRG
BOT
BOARD
AVENUE
BETWEENBELOW
AUTOMATIC
AMERICAN SOCIETY
BRICK COURSE
ABOVE TOP OF SLABfor TESTING MATERIALS
BD
AVE
BC
ATSAUTO
ASTM
BETBEL
EXISTINGEXIST
EXPN BLT
EXH
EXPEXIST
EXT
EXP JT
FAF
EXHAUSTEXISTING
EXTERIOR
FIRE ALARMFAHRENHEIT
ELECELEVEMERENC
EQPTEQEP
EST
EWEFEWC
EQUAL
ESTIMATE
ELEVATOREMERGENCY
EQUIPMENT
ABOVE FINISHED FLOORAGG AGGREGATE
ANODIZED
ASPHALT
ALUMINUM
ASSEMBLY
ANNEALED
ACCESS PANEL
ARCHITECT (URAL)APPROXIMATE
ANCHOR, ANCHORAGEALTERNATE
AL
AP
ANC
ASPHASSEM
ANOD
ARCH
ANLD
APPROX
ALT
ACCESSACCESS FLOORACOUSTICAL PLASTER
AREA DRAIN
ADJACENTADDENDUM
ADJUSTABLEARCHITECT/ENGINEER
ACOUSTIC CEILING TILE
ACC
ACPLACFL
ADADDADJ
AFFA/EADJT
ACT
DIMENSIONDIMDR
DWGDTL
EAEF
E
ELASEL
DN
DRAWINGDETAIL
EACHEAST
ELEVATIONELASTOMERIC
EACH FACE
DOWN
CY
D
DIFFDIAG
DEPDHDIA
DEMDA
DRAIN
CUBIC YARD
DIFFUSER
DIAMETERDIAGONAL
DEPRESSED
ABOVEACOUSTICAL
ANCHOR BOLTAIR CONDITIONING
ABVAC
ABA/C CT
CTRCUHCW
COUNTER
COLD WATER
WC WATER CLOSETRAILINGRLGMETER (S)M
WATERPROOF (ING),
WATER RESISTANT
WEATHERSTRIPPINGWELDED WIRE FABRIC
EXISTING TO REMAIN
WATER REPELLANTSCHED
SHTHG
METAL
MULLIONMETAL STUD
MTL
MULLMTL ST
SMSNTSP
MARBLE
MEMBRANE
MODULAR
MEDIUM
MEMBER
MAXIMUMMASONRY
MANHOLE
MIRRORMINIMUM
MECHANIC (AL)
MACHINE BOLT
METAL FLOOR DECK
MISCELLANEOUS
METAL FURRINGMOUNT (ED) (ING)
MANUFACTURE (R)
MOLDING, MOULDING
METAL ROOF DECKMASONRY OPENING
MH
MOMLDG
MFR
MISCMIR
MRD
MIN
MTFRMT
MAR
MB
MEMB
MECHMDLMBR
MAX
MFD
MED
MAS
SF
SIMSKYLT
SFGLSHT
SECTSD
SLVSLR
RM
SSC
SCRN
RTNRWCR/W
RO
SHEET METAL
SOUND PROOFSEALANT
SHEATHING
SQUARE FOOT (FEET)SAFETY GLASS
STORM DRAIN
SIMILARSKYLIGHT
SHEET
SECTION
SLEEVESEALER
SCHEDULESOILD CORE
RAIN WATER CONDUCTORRIGHT OF WAY
ROUGH OPENINGROOM
SOUTH
SCREEN
RETURN
WRW/RWSCT
WWFWST
XTR
WAINSCOTT
WD
WHWIN
WP
WMW/O
WPT
WGLWOOD
WIRE MESH
WALL HUNGWINDOW (S)
WITHOUT
WEATHERPROOFWORKING POINT
WIRED GLASS
STAINLESS STEEL
TOP AND BOTTOM
TONGUE AND GROOVE
TERNE COATED STAINLESS
TEMPORARY, TEMPERED
TRAFFIC DECK COATING
TOP OF EXISTING SLAB
TOP OF ROOFING
TOP OF CONCRETE, CURB
TOILET TISSUE DISPENSERTOILET PAPER HOLDER
TOP OF STEEL/ TOP OF SLAB
VINYL COVE BASEVINYL COMPOSITION TILE
VAPOR BARRIER, VINYL
VAPOR RETARDER
UNLESS OTHERWISE NOTED
VINYL WALL FABRIC
PLYWD
RKD KNOCK-DOWN
KILOVOLT
KILOWATT
KITCHEN
LIMESTONELOCATION
LIVE LOAD
LAVATORY
LENGTH
LABEL
LINTELLIGHT
LOUVER
LABORATORY
LEFT HAND
KILOVOLT-AMPERE
LIGHT SWITCH
LIGHTWEIGHT CONCRETE
LIGHTPROOF, LOW POINT
LL
LOCLMS
LTLLT
LWCLVR
LSWLP
KW
KVKIT
KVA
L
LH
LAB
LBLLAV
REGREINFREM
RESREVRFGRFLRGDRH
REQD
RCB
RADRBRBTRC
REFRECPREC
RCPRD
HEIGHTHEATING
INVERTINTERIOR
JOIST
JOINT
HARDWOOD
INSIDE DIAMETER
JOINT FILLER
IRON PIPE SIZE
JUNCTION BOX
INCLUDE (D) (ING)INSULATE (D) (ION)
HOT WATER, HEADWALL
HEATING/VENTILATING/AIR CONDITIONING
KIPS (1000 LBS)
INTINV
J
IPS
JBJF
K
JT
HT
HW
ID
HVACHTG
HWD
INSULINCL
PTD
PVT
PTN
PVMTPVC
PTH
"R"
QT
PRF
PLASPLF
PNLPNT
PLPLAM
PSIPSF
VARNISHVARRADIUS, RISER
REINFORCED CONCRETE PIPE
REINFORCE (D) (ING)
REVISION (S), REVISED
REFLECT (ED) (IVE)
RIGHT HAND
REGISTER
REMOVED
RESILIENT
ROOFING
RIGID
REQUIRED
RUBBER BASE-STRAIGHT
REINFORCED CONCRETERUBBER COVE BASE
RABBET, REBATE
REFERENCE
RECESSEDRECEPTACLE
ROOF DRAIN
RADIATOR
VR
VJTVNR
VT
W
VWF
W/WB
VRM
VENEERV-JOINT (ED)
VINYL TILE
WOOD BASEWITHWEST
VERMICULITE
VC
VB
VCTVCB
VERTVEST
VIFVG
VIN
VESTIBULE
VINYL
VERTICAL
BASE-STRAIGHTVINYL COATED
VERTICAL GRAINVERIFY IN FIELD
POUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPAPER TOWEL DISPENSER
PAVER TILEPAVEMENTPOLY VINYL CHLORIDE
PAPER TOWEL HOLDER
THERMAL RESISTANCE
QUARRY TILE
PARTITION
PAINT (ED) IN FIELDPREFORMED
PLASTIC LAMINATE
POUNDS PER LINEAL FOOTPLASTER
PLYWOODPANEL
PLATE
TPH
TYPTTD
UNF
UCUNEX
VAC
UONUNFINISHED
UNDERCUT
TYPICAL
UNEXCAVATED
VACUUM
TOES
TOR
TO
TOP
TOF
TOC
TOL
THRU
TOWTOS
TOLERANCE
THROUGHTOP OF
TOP OF PLANK
TOP OF FOOTING
TOP OF WALL
HARDENED
GROUT
GRANITE
HARDWARE
HOUR
GRILLE
GLASS FIBERGALVANIZED
GLAZING COMPOUND
HOSE BIBB
HORIZONTAL
HEAD JOINT
HEAVY DUTY
HIGH POINT
HOLLOW METAL
HOLLOW COREHARDBOARD
GLAZED STRUCTURAL TILEGALVANIZED STEEL SHEET
GYPSUM WALL BOARD
HARDNHB
HDHC
HM
HRHPHOR
HJTHDW
HBD
GLFGLV
GLCOM
GTGWB
GSTGSSGRNGRL
OPNGOPP
PERPRKG
PCCPCFPCPPED
PARPBD
NOMNRC
OAOCODOFFOH
NTS
GASKET (ED)GRADE, GRADING
GLASS BLOCKGLASS, GLAZING
GD
GLGKT
GLB
N
NICN0,#
NAT
OPENING
PERIMETER
PRECAST CONCRETEPARTICLE BOARD
POUNDS PER CUBIC FOOTPRECAST CONCRETE PLANK
OPPOSITE
PARKING
PEDESTAL
PARALLEL
COEFFICIENTNOISE REDUCTION
OVERHEAD
OUTSIDE DIAMETERON CENTER (S)
NOT TO SCALE
NOMINAL
OVERALL
OFFICE
T & BTB
TEMP
TCS
T&G
TDCTEL
THKTHRESH
TC
THRESHOLD
TELEPHONE
STEEL
TEST BORING
THICK (NESS)
TERRA COTTA
STRSTL
SURF
TTAP
SYSSYNSYMSUSP
STEEL
SURFACESTRUCTURAL
SYNTHETICSYSTEM
TREADTAPERED
SYMMETRY (ICAL)SUSPENDED
NOT IN CONTRACTNUMBER
NATURALNORTH SPEC
SQSSTSTD STANDARD
SQUARESPECIFICATION
COLUMN LINE
ALUMINUM
ENLARGED DETAILPLAN OR SECTION
NEW (PROPOSED) ELEVATION
EXISTING ELEVATION
INTERIOR ELEVATION MARK
NORTH
REVISION
PARTITION TYPE
ROOM NUMBER
WINDOW TYPE
DOOR TYPE
WALL OR DETAIL SECTION
BUILDING SECTION
ELEVATION
GYPSUM WALLBOARD
CERAMIC OR
QUARRY TILE
STEEL
MARBLE, GRANITE
PLYWOOD
RIGID INSULATION
BLUSTONE
FLAGGINGSOAP STONE
(GRAVEL, STONE)POROUS FILL
SLATE
RUBBLE STONE
EARTH
BATT INSULATION
SHIM
WOOD, ROUGH
CONCRETE
CMU
BRICK
WOOD, FINISHED
LOCATION MAP
DRAWING LIST
TOWNHOUSE-COLTAMNE 119th St & Coltman RdCleveland, OH 44106
12" = 1'-0"
8/20
/201
3 7:
32:1
3 P
M
A001
COVER SHEET
Project NumberIssue Date
AuthorM.T
No. Description Date
Sheet ListSheet
Number Sheet Name Sheet Issue DateA002 FLOOR PLANS 08/20/13A003 FLOOR PLANS 08/20/13A004 ELEVATIONS 08/08/13A005 ELEVATIONS 08/08/13A006 SECTIONS 08/08/13A007 SECTIONS 08/08/13A008 SECTION AND DETAIL 08/08/13A009 SCHEDULE 08/08/13A001 COVER SHEET 08/07/13A010 CEILING PLANS 08/08/13A011 PROSPECTIVE VIEWS 08/08/13A013 ENERGY MODELING 08/14/13
TOWNHOUSECOLTMAN
UP
DN
UP
1 2
A
C
B
20' - 6"
19' -
10"
21' -
4"
2-CAR GARAGE1
MECH. ROOM2 STORAGE
3
COAT CLOSET4
WORK STUDIO6
STAIR
1A006
2A006
2A007
1A007
1A008
3
6
4
1 2
59
MAIN ENTRY22
1 2
A
C
B
20' - 6"
19' -
10"
21' -
4"
CHEF'S KITCHEN7
LIVING / DINNINGROOM
8
STAIR
1A006
2A006
2A007
1A007
PANTRY20
POWDER ROOM21
9 2
8
7
1
24
2424
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:1
5 PM
A002
FLOOR PLANS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 GROUND FLOOR 1/4" = 1'-0"2 FIRST FLOOR
TOWNHOUSECOLTMAN
DN
UP
1 2
A
C
B
20' - 6"
19' -
10"
21' -
4"
BEDROOM-29
CLOSET10
BEDROOM-311
D/W12
LINEN13
Room14
MASTER CLOSET15
MASTERBEDROOM
16
MASTERBATHROOM
17
CLOSET18
HALL19
STAIR
1A006
2A006
2A007
1A007
1A008
13 10 12
1411
15
16
17
18
37
22 27
242424 24 2
1 2
A
C
B
1A006
2A006
2A007
1A007
20' - 6"
19' -
10"
21' -
4"
42
28
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:2
1 PM
A003
FLOOR PLANS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 SECOND FLOOR 1/4" = 1'-0"2 ROOF PLAN
TOWNHOUSECOLTMAN
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
AC B
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
19' - 10" 21' - 4"
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
12
TOP ROOF LEVEL40' - 0"
20' - 6"
TOP OF FOOTING-2' - 0"
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:2
2 PM
A004
ELEVATIONS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 East 1/4" = 1'-0"2 North
TOWNHOUSECOLTMAN
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
1 2
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
20' - 6"
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
A CB1
A0062
A0062
A007
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
21' - 4" 19' - 10"
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:2
4 PM
A005
ELEVATIONS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 South 1/4" = 1'-0"2 West
TOWNHOUSECOLTMAN
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
1 2
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
20' - 6"
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
12
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
20' - 6"
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:2
5 PM
A006
SECTIONS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 SECTION A-A 1/4" = 1'-0"2 SECTION B-B TOWNHOUSE
COLTMAN
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
A CB
TOP ROOF LEVEL40' - 0"
TOP OF FOOTING-2' - 0"
21' - 4" 19' - 10"
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
12
TOP OF FOOTING-2' - 0"
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:2
6 PM
A007
SECTIONS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 SECTION D-D 1/4" = 1'-0"2 SECTION C-C
TOWNHOUSECOLTMAN
GROUND FLOOR0' - 0"
FIRST FLOOR10' - 0"
SECOND FLOOR20' - 0"
ROOF PLAN30' - 0"
AC B
TOP OF FOOTING-2' - 0"
A0082
19' - 10" 21' - 4"
GROUND FLOOR0' - 0"
A
TOP OF FOOTING-2' - 0"
Gypsum board
Vinyl base
Wood flooring
Concerte slabon grade
Mortar/ fillingmaterial
Footing padreinforcment
Concrete block
Glass fiber battinsulation and vaporretarder
Concretekey
Reinforcing bars
Earth
Continuous stripfooting
Reinforcing bars
6" stone
Scale
Project number
Date
Drawn by
Checked by
As indicated
8/20
/201
3 7:
32:3
1 PM
A008
SECTION ANDDETAIL
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 SECTION E-E 3/4" = 1'-0"2 Callout of SECTION E-E
TOWNHOUSECOLTMAN
Scale
Project number
Date
Drawn by
Checked by
8/20
/201
3 7:
32:3
2 PM
A009
SCHEDULE
Project NumberIssue Date
NASHARM.T
No. Description Date
Window Schedule
Family and Type Head Height Height Width LevelSill
Height Type Count Type MarkCurtain Wall Awning: Curtain Wall Awning 1' - 9" 4' - 9 1/8" FIRST FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 1' - 9" 3' - 9 1/2" FIRST FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 1' - 9" 9' - 2 23/32" FIRST FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 1' - 9" 4' - 4 19/32" FIRST FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 3' - 2" 1' - 10 27/32" SECOND FLOOR Curtain Wall Awning 1 24
NAS Fixed: 91" x 3'-0" 7' - 6" 4' - 6" 7' - 0" SECOND FLOOR 3' - 0" 91" x 3'-0" 1 22NAS Fixed: 46" x 3'-0" 7' - 6" 4' - 6" 3' - 10" SECOND FLOOR 3' - 0" 46" x 3'-0" 1 27
Curtain Wall Awning: Curtain Wall Awning 2' - 11 1/2" 3' - 1 3/4" SECOND FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 2' - 11 1/2" 3' - 6 7/8" SECOND FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 2' - 11 1/2" 3' - 4 1/2" SECOND FLOOR Curtain Wall Awning 1 24Curtain Wall Awning: Curtain Wall Awning 2' - 11 1/2" 2' - 11 27/32" SECOND FLOOR Curtain Wall Awning 1 24
Fixed: 36" x 48" 7' - 0" 4' - 0" 3' - 0" FIRST FLOOR 3' - 0" 36" x 48" 1 1Fixed: 36" x 72" 7' - 6" 4' - 6" 7' - 7" GROUND FLOOR 3' - 0" 36" x 72" 1 9Fixed: 24" x 48" 7' - 0" 4' - 0" 2' - 0" FIRST FLOOR 3' - 0" 24" x 48" 1 2Fixed: 24" x 48" 7' - 0" 4' - 0" 2' - 0" SECOND FLOOR 3' - 0" 24" x 48" 1 2
Fixed: 4 4 6' - 11" 4' - 0" 5' - 0" ROOF PLAN 2' - 11" 4 4 1 28
Door ScheduleFamily and Type Head Height Height Width Level Sill Height Type Count Type Mark
Single-Flush: 32" x 84" 7' - 0" 7' - 0" 2' - 8" GROUND FLOOR 0' - 0" 32" x 84" 1 3Single-Flush: 32" x 84" 7' - 0" 7' - 0" 2' - 8" GROUND FLOOR 0' - 0" 32" x 84" 1 3Single-Flush: 34" x 84" 7' - 0" 7' - 0" 2' - 10" GROUND FLOOR 0' - 0" 34" x 84" 1 2Single-Flush: 34" x 84" 7' - 0" 7' - 0" 2' - 10" GROUND FLOOR 0' - 0" 34" x 84" 1 2
Double-Flush: 48" x 84" 2 7' - 0" 7' - 0" 4' - 0" GROUND FLOOR 0' - 0" 48" x 84" 2 1 13Single-Flush: 30" x 84" 7' - 0" 7' - 0" 2' - 6" FIRST FLOOR 0' - 0" 30" x 84" 1 4Single-Flush: 30" x 84" 7' - 0" 7' - 0" 2' - 6" FIRST FLOOR 0' - 0" 30" x 84" 1 4Single-Flush: 32" x 84" 7' - 0" 7' - 0" 2' - 8" SECOND FLOOR 0' - 0" 32" x 84" 1 3Single-Flush: 32" x 84" 7' - 0" 7' - 0" 2' - 8" SECOND FLOOR 0' - 0" 32" x 84" 1 3Single-Flush: 32" x 84" 7' - 0" 7' - 0" 2' - 8" SECOND FLOOR 0' - 0" 32" x 84" 1 3Single-Flush: 30" x 84" 7' - 0" 7' - 0" 2' - 6" SECOND FLOOR 0' - 0" 30" x 84" 1 4Single-Flush: 30" x 84" 17' - 0" 7' - 0" 2' - 6" FIRST FLOOR 10' - 0" 30" x 84" 1 4Single-Flush: 18"x 84" 17' - 0" 7' - 0" 1' - 6" FIRST FLOOR 10' - 0" 18"x 84" 1 15Single-Flush: 28"x 84" 17' - 0" 7' - 0" 2' - 4" FIRST FLOOR 10' - 0" 28"x 84" 1 16Single-Flush: 34" x 84" 17' - 0" 7' - 0" 2' - 10" FIRST FLOOR 10' - 0" 34" x 84" 1 2Single-Flush: 30" x 84" 17' - 0" 7' - 0" 2' - 6" FIRST FLOOR 10' - 0" 30" x 84" 1 4Double-Flush: 56" x 84" 7' - 0" 7' - 0" 4' - 8" SECOND FLOOR 0' - 0" 56" x 84" 1 17
Curtain Wall Sgl Glass: Curtain WallSgl Glass_1
7' - 3" 3' - 9 1/2" FIRST FLOOR Curtain WallSgl Glass_1
1 25
Curtain Wall Sgl Glass: wood panel 7' - 2 1/4" 2' - 9 3/4" GROUND FLOOR wood panel 1 26Single-Flush: 30" x 80" 6' - 8" 6' - 8" 2' - 6" ROOF PLAN 0' - 0" 30" x 80" 1 5
Overhead-Rolling: 8' x 6'-6" 6' - 6" 6' - 6" 18' - 0" GROUND FLOOR 0' - 0" 8' x 6'-6" 1 27
TOWNHOUSECOLTMAN
1 2
A
C
B
1A006
2A006
2A007
1A007
1A008
20' - 6"
21' -
4"
19' -
10"
1 2
A
C
B
1A006
2A006
2A007
1A007
1A008
20' - 6"
21' -
4"
19' -
10"
9 Lighting - Dwelling Unit
1 2
A
C
B
1A006
2A006
2A007
1A007
1A008
20' - 6"
21' -
4"
19' -
10"
9 Lighting - Dwelling Unit
Scale
Project number
Date
Drawn by
Checked by
1/4" = 1'-0"
8/20
/201
3 7:
32:3
3 PM
A010
CEILING PLANS
Project NumberIssue Date
NASHARM.T
No. Description Date
1/4" = 1'-0"1 GROUND FLOOR 1/4" = 1'-0"2 FIRST FLOOR
1/4" = 1'-0"3 SECOND FLOOR
TOWNHOUSECOLTMAN
Scale
Project number
Date
Drawn by
Checked by
12" = 1'-0"
8/20
/201
3 7:
32:3
4 PM
A011
PROSPECTIVEVIEWS
Project NumberIssue Date
NASHARM.T
No. Description Date
12" = 1'-0"1 View_1_master bedroom
TOWNHOUSECOLTMAN
12" = 1'-0"2 3D View 5_1
12" = 1'-0"3 3D View 6_1 12" = 1'-0"4 3D View 11_1
Scale
Project number
Date
Drawn by
Checked by
8/20
/201
3 7:
32:3
6 PM
A013
ENERGY MODELING
Project NumberIssue Date
NASHARM.T
No. Description Date
TOTAL ANNUAL SAVING (1) $ 19,640 (2) $18,166
ENERGY MODELING ROUND -1 ENERGY MODELING ROUND -2
Fuel (Natural Gas)Fuel (Natural Gas)
ElectricityElectricity
Total EnergyTotal Energy
TOTAL ANNUAL SAVING (1) $ $282,523 (2) 162,425
TOTAL ANNUAL SAVING (1) $ 4,324 (2) $1,004
SECTIONS
MASTERBEDROOM
FLOOR PLAN’S
SITE LOCALTION
ENERGY MODELING
TOWNHOUSES WERE CONSTRUCTED ON THIS RECLAIMED INNER-CITY SITE LOCATED NEAR THE HEART OF CLEVELAND’S VIBRANT LITTLE ITALY NEIGHBOR-
HOOD. EACH COMPACT RESIDENCE FEATURES THE OPTION OF A “GREEN” ROOF TERRACE WITH TRELLIS, AS WELL AS SHIELDED INSULATED GLASS FA-
CADES THAT FRAME DRAMATIC VIEWS OF LITTLE ITALY AND THE UNIVERSITY CIRCLE NEIGHBORHOOD SURROUNDING THE URBAN SITE. THIS PROJECT IS DI-
VEDED INTO A, B, C, D, E RESIDENCE AND I DID RESIDENCE C. RESIDENCE C = 2,247 S.F LEVEL- 1 = 427 S.F LEVEL-2 = 864 S.F LEVEL-3 = BEDROOMS 875
S.F LEVEL-4 ROOF DECK = 81 S.F
VIEW-002 3D VIEW OF STAIR CASE
VIEW-003
VIEW-004
VIEW-001
TWONHOUSE-COLTMAN BY DIMIT ARCHITEXCTS NAHSAR TARIQ ADC-273 8/22/13
FRONT & REAR ELEVATIONS