Pave
Pat
hway
to B
arn
(Tas
k 3d
)
Pave
Pat
hway
to
Base
men
t Acc
ess
(Tas
k 3c
)
Pave
New
Park
ing
Area
(Tas
k 3b
)
Rain
Gar
dens
(n
ot in
clud
edin
pro
ject
scop
e)Rec
onstruct
Baske
tball
Court (Ta
sk 2)
Pave
Ext
Gra
vel
Path
way
(Tas
k 3a
)
Reco
nstru
ct Te
nnis
Cour
ts as
Tenn
is/
Pick
leball
/Can
eball
Cour
ts (Ta
sk 1
)
030
60N
N.T.
S
Schm
ansk
a Pa
rk
Site
Impr
ovem
ents
Prep
ared
by
Max
Mad
alin
ski
Asso
ciat
e Pa
rks P
roje
ct C
oord
inat
orm
mad
alin
ski@
burli
ngto
nvt.g
ov80
2-88
1-40
00Ja
nuar
y 16
th, 2
018
Sh
eet 2
of 8
- Ex
istin
g Co
nditi
ons O
verv
iew
Sch
man
ska
Par
k B
asem
ap0
6012
030
Feet¯
Grove St
Callarco
Ct
Colches
ter Ct
Bask
etba
ll Co
urt
Ext.
Park
ing
Lot
Tenn
is C
ourt
s
Bayb
erry
Com
mon
sDe
velo
pmen
t
Gre
enm
ount
Ce
met
ery
Ext. ADA-Compli a
nt
Pathway
N0
3060
120 Fe
et
Barn
Ext.
Path
way
to B
arn
(Tas
k 3d
)Ext.
Asph
alt a
ndBa
sket
ball
Cour
t to
be
rem
oved
(Tas
k 2)
Ext.
Gra
vel
Path
way
(Tas
k 3a
)
(Tas
k 1
)
030
60N
N.T.
S
Prep
ared
by
Max
Mad
alin
ski
Asso
ciat
e Pa
rks P
roje
ct C
oord
inat
orm
mad
alin
ski@
burli
ngto
nvt.g
ov80
2-88
1-40
00Ja
nuar
y 16
th, 2
018
Schm
ansk
a Pa
rk
Site
Impr
ovem
ents
Sh
eet 3
of 8
- Ba
sket
ball
Cour
t Site
Pla
n
5’5’
15’
5’
50 feet
96 feet
5’
10’
8’
R-10’
R-10’
10’
9’
6’
18’
9’
R-min.
10’
R-min.
10’
10’
Install Removable BollardTRAFFICGUARD® LOCKING KEY
LOCK SERIES [RP3503L]
New Parking Area2-Accessible spaces9’x18’ w/6’ painted buffer between (typ.)
Ext. Asphalt to be removed
Ext. path to remain
Ext. Gravel path to be paved
Appx. 180’L x 8-10’ W(width varies)
New Asphalt Pathway
Ext. 8” Corrugated Stormwater Pipe to remain
Catch basins to be covered with Coir mat/silt barrier during construction
Ext. Fence to remain
Ext. catch basin
w/grate
5’
5’
Widened to 8’ min.
Line painting layout and siting of standards to be
provided by court construction contractor
5’8’
Ext. Asphalt to be removed
Match asphalt to width of ext.
basement access24’
Remove ext. gravel path and replace with
asphalt path Max running slope 5%
Ext. timber retaining wall to remain
Ext. steps to remain
Ext. Barn
Ext. Deck to remain
5’
7’
Ext. catch basin
w/grate
0 20feet
1”= 20 feet10’ contours
N
Prep
ared
by
Max
Mad
alin
ski
Asso
ciat
e Pa
rks P
roje
ct C
oord
inat
orm
mad
alin
ski@
burli
ngto
nvt.g
ov80
2-88
1-40
00Ja
nuar
y 16
th, 2
018
Schm
ansk
a Pa
rk
Site
Impr
ovem
ents
Sh
eet 4
of 8
- Ba
sket
ball
Cour
t Col
or/D
rain
age
Plan
0 20feet
1”= 20 feet10’ contours
N
Ext. 8” Corrugated Stormwater Pipe to remain
Ext. catch basin
w/grate
Ext. catch basin
w/grate
Courts to
be painted
Dark Green w
ith w
hite lin
e paint
Use zones t
o be painted Maroon
.8-1% slope max.
.8-1% slope max.
2%
Grade Grass Swale to
existing Catch Basin
Grade Gras
s Swale
to
existing C
atch Basi
n
Grade Gras
s Swale
to
existing C
atch Basi
n
2%
2%
2%Crown new pathways at 2%
in either direction
Crown new pathway 2% in either direction
Grade 6” wide grass
swale as needed
Prep
ared
by
Max
Mad
alin
ski
Asso
ciat
e Pa
rks P
roje
ct C
oord
inat
orm
mad
alin
ski@
burli
ngto
nvt.g
ov80
2-88
1-40
00Ja
nuar
y 16
th, 2
018
Schm
ansk
a Pa
rk
Site
Impr
ovem
ents
Sh
eet 5
of 8
- Te
nnis
Cou
rts S
ite P
lan
0 20feet
1”= 20 feet
N
8’
21’
21’
44’
44’
78’
16’
36’
20’
10’
12’
8’
17’
8.5’
8.5’Ext. Courts surface and
base to be removedAppx. 99’x120’.
Install 4-6” topsoil,seed, and mulch
over approximately 4’x120’ section of removed court.
Install new 10’-tallvinyl-coated, black,
chain link fencewith gates as shown
Appx. edge ofext. woods
4’ gate
8’ gatecentered on
use zone
4’ gateNew Tennis Court
New Pickleball Court
New Caneball Court
Provide Tree protection for ext. trees and landscaping
Clear and Grub brush
10’
20’
0.8-1% slope
0.8-1% slope
Court Construction Contractor to provide line layout for all courts and site net posts.
Court colors to match color plan of basketball courts (see Sheet 4).Courts to be dark green with white line paint and maroon use zones
Prep
ared
by
Max
Mad
alin
ski
Asso
ciat
e Pa
rks P
roje
ct C
oord
inat
orm
mad
alin
ski@
burli
ngto
nvt.g
ov80
2-88
1-40
00Ja
nuar
y 16
th, 2
018
Schm
ansk
a Pa
rk
Site
Impr
ovem
ents
Sh
eet 6
of 8
-Cou
rt C
onst
ruct
ion
Det
ails
Standard Court Reconstruction SectionN.T.S.
Net-Post Footing Detail (USTA specification)N.T.S.
Net Anchor Detail (USTA specification)N.T.S