Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
SWF04 (Sc reta n Burn)
SWF03 (Beec hwood Burn)
SWF05
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF10 (T ower Burn)
SWF09
SWF 08 - Ca irnla w BurnRea c h/SEPA ID: Ca irnla w Burn (ID: 20241)Overa ll Status: Mod era teOvera ll Ec ology: Mod era tePhysic o-Chem ic a l sta tus: HighSp ec ific Polluta nts: No d a taHyd rom orp hology sta tus: Ba d (d a ta rec eived in c onsulta tion (June 2018) from SEPA)
SWF02 (Inshes Burn)
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF07
SWF06
SEPA ID: Mora y Firth (ID: 200440)Overa ll Status: GoodOvera ll Ec ology: GoodPhysic o-Chem ic a l sta tus: HighSp ec ific Polluta nts: No d a taHyd rom orp hology sta tus: High
SWF08 (Ca irnla w Burn)
SWF11
SWF12 (Kenneth's Bla c k Well)
SWF01 (Mill Burn)
SWF08 (Ca irnla w Burn)
SWF 01 - Mill BurnRea c h/SEPA ID: Mill Burn - Hiltonto sourc e (ID: 20240)Overa ll Status: PoorOvera ll Ec ology: PoorPhysic o-Chem ic a l sta tus: HighSp ec ific Polluta nts: No d a taHyd rom orp hology sta tus: Good
C08
C09
C04
C07
C03
C02
C05 C06
C01C10
A9
INV ERNESS
HIGHL AND MAIN L INE RA
IL WAY
SMIT HT ON
CU L L ODEN
A96
INSHES
INV ERNESS CAMPU S
ABERDEEN T O INV ERNESSRAIL WAY L INE
MORAY FIRT H
CRADL EHAL L
RESAU RIE
ST RAT T ONC1032 BARN CHU RCH ROAD
B9006 CU L L ODENROAD
RAIGMOREINT ERCHANGE
U 1124 CAU L FIEL DROAD
INV ERNESS RET AILAND BU SINESS PARK
U 1058 CAU L FIEL DROAD NORT H
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure 13.1
L egendA96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesScottish Water MainsCulvert Crossing
Client
Project A9/A96 Inshes to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000www.jacobs.com
Rev
Drawing title
Scale
Drawing numberJacobs No.
DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No. Figure 13.1
DMRB Sta ge 3 EIARSurfa c e Water Features
C00
Drawing Status A – APPROV ED AS ST AGE COMPL ET ESheet 1 of 1
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/DwnC00
A9-A96IS-JAC-EGN-XXX-FG-EN-1301
Proposed Scheme(DMRB Stage 3 design)
Note: Water Classification Hub data is from 2017(2018 data not yet available). CSSEPT 2019 MUEIAR Publication KL DGC