Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
SWF04 (Sc reta n Burn)
SWF03 (Beec hwo o d Burn)
SWF05
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF10 (T o wer Burn)
SWF09
SWF02 (Inshes Burn)
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF07
SWF06
SWF08 (Ca irnla w Burn)
SWF11
SWF12 (Kenneth's Bla c k Well)
SWF01 (Mill Burn)
SWF08 (Ca irnla w Burn)
A9
INV ERNESS
HIGHL AND MAIN
L INE RAIL WAY
SMIT HT ON
CU L L ODEN
A96
INSHES
INV ERNESS CAMPU S
ABERDEEN T O INV ERNESSRAIL WAY L INE
MORAY FIRT H
CRADL EHAL L
RESAU RIE
ST RAT T ON
C1032 BARN CHU RCH ROAD
B9006 CU L L ODENROAD
RAIGMOREINT ERCHANGE
U 1124 CAU L FIEL DROAD
INV ERNESS RET AILAND BU SINESS PARK
U 1058 CAU L FIEL DROAD NORT H
Catc hm ent E
Catc hm ent A
Catc hm ent B
Catc hm ent F
Catc hm ent C
Catc hm ent D
Catc hm ent G
Catc hm ent H
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure 13.4a
L egend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study Area
!( SuDS Outfall LocationsWatercourses
Dra ina ge Ca tc hm entsABCDEFGH
Client
ProjectA9/A96 Inshes to Sm ithto n
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure 13.4a
DMRB Sta ge 3 EIARDra ina ge Catc hm ent
C00
Drawing Status A – APPROV ED AS ST AGE COMPL ET ESheet 1 o f 3
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/DwnDGCKLEIAR Publication MUC00 SEPT 2019 CS
A9-A96IS-JAC-EGN-XXX-FG-EN-1304
Proposed Scheme(DMRB Stage 3 design)
Figure 13.4b
Figure 13.4c