MWPC prototyping and testing of STAR inner TPC upgrade
Shuai Wang, Shandong University
for the STAR collaboration
PANIC 2017,Beijing
September , 2017
1 PANIC2017 3/09/2017
Outline
2
1. Upgrade motivation of iTPC
2. Upgrade components of iTPC
3. iTPC MWPC prototyping
4. iTPC MWPC test with 55Fe X-ray
5. Summary and Outlook
Shuai Wang PANIC2017 3/09/2017
3
RHIC Beam Energy Scan(BES)
RHIC-BES key objective
Mapping the features of the QCD phase diagram.
Physical mechanism
Heavy ion collisions allow to explore the QCD phase structure by varying the collision energy.
RHIC-BES program (I->II)
Goals
Turn-off of QGP signatures
Search for critical point
First order phase transition
Schedule
BES-I completed 2010~2014
BES-II in 2019~2020
It Need detailed study of the key region.
Shuai Wang
PANIC2017 3/09/2017
Why to upgrade STAR iTPC
Inner TPC upgrade: Increase inner sector pad coverage from 20% to 100% Extend TPC acceptance from |η|<1 to |η|<1.5 Lower pT measured minimum limit from 125MeV/c to 60 MeV/c Improve the dE/dx resolution from 7.5% to 6.5% (|η|<1)
4 Shuai Wang
PANIC2017 3/09/2017
5
STAR TPC geometry
Shuai Wang
PANIC2017 3/09/2017
STAR-TPC,NIM A499(2003)659
Outer sector
Inner sector
6
1. Pad coverage 20%->100%
2. Gain uniformity better than 10%
3. Detection efficiency >98%
Produce and replace all 24 inner sectors
• Increase readout channels
• Renew all three wire frames
• New electronics for inner sectors
iTPC MWPC upgrade content
Shuai Wang
PANIC2017 3/09/2017
7
iTPC MWPC production procedure
PCB bonding Wire mounts installing Pining wire mounts
Mounting wires Epoxying wires Soldering wires
Shuai Wang
PANIC2017 3/09/2017
Wire winding for MWPC
Anode wires: gold-plated tungsten wires 20um diameter, tension 0.5N accuracy requirement:±0.03N
Shield wires: gold-plated beryllium copper wires 75um diameter, tension 1.2N
Gated grid: gold-plated beryllium copper wires 75um diameter, tension 1.2N
Why wiretension is so important May influence the uniformity of the gain Prevent the wire vibration under high voltage
Three layers of wire for MWPC
Winding machine at SDU 8 Shuai Wang
PANIC2017 3/09/2017
Wire tension measurement system
9
When the length of wire L and linear density ρ are known, the wire tension can be calculated by the formula :T=4 ρ f2L2
By the fast Fourier analysis program FFT , the fundamental frequency f is extracted from the vibration signal
Shuai Wang
PANIC2017 3/09/2017
10
Some test results of wire tension
Measurement uncertainty: <1% Meet the tension accuracy requirements 0.5±0.03N.
Anode wire tension test result
Shuai Wang
PANIC2017 3/09/2017
Xu Wang,Fuwang Shen,Shuai Wang,Cunfeng Feng,Changyu Li,Peng Lu,Jim Thomas, Qinghua Xu,Chengguang Zhu NIM 859(2017),page 90-94. “Design and implementation of wire tension measurement system for MWPCs used in the STAR iTPC upgrade”
Shuai Wang
11
Wire pitch and height control
Wire comb and pitch control Wire pitch and height control schematic diagram
PANIC2017 3/09/2017
12
Testing system for iTPC at SDU
Temperature transmitter
Pressure transmitter
Cooling fan for FEEs and RDO boards
Amplifier + MCA
Temperature and pressure transmitter Amplifier + MCA Radioactive source 55Fe X-ray transmission window 100 um PCB with graphite coating
Shuai Wang
PANIC2017 3/09/2017
13
55Fe spectrum of a single wire
• Anode voltage: 1120V • P10(Ar:CH4 = 9:1) • Gas pressure: +2mbar • Temperature: 27.3℃ • Amplifier: A225+A206 • MCA Data Total rate: ~2077 Gas gain: 2700 Energy resolution(FWHM):
~20%
Main Peak
Escape Peak
Shuai Wang
PANIC2017 3/09/2017
14
Correcting temperature and pressure dependence
Measuring accuracy: ΔT= ± 0.05℃ ΔP= ± 0.05mbar Data for 180 hours
Measuring accuracy: ΔT= ± 0.05℃ ΔP= ± 0.05mbar Data for 180 hours
Wire number:98th Data collected in 10 days Gas gain versus : Gain=ec0+c1T/P
Correction set:T=25℃ P=1013mbar Gas gain variation: before correction=17.7%, after correction=4.8%
Shuai Wang
PANIC2017 3/09/2017
Gain=ec0+c1T/P
15
Gas gain uniformity
Scan time : last 1 day The gain are corrected to 25℃, and the pressure corrected to 2mbar above the standard atmospheric pressure. Gain variation:6%(Max-Min),1%(RMS)
After correction
Before correction
Shuai Wang
PANIC2017 3/09/2017
16
Anode voltage scan
Measured gain under different anode voltage Gain Vs HV follow the exponential distribution The peak position ratio of main peak to escape peak decrease
from1.95 to 1.65 Temperature: 25.3℃-25.8℃
Shuai Wang
PANIC2017 3/09/2017
17
iTPC mass production for STAR started in June 2017,and it is expected to be finished in August 2018 on schedule.
Winding machine, Wire tension measurement system,and the test system for iTPC has been set up. Wire tension and other technical parameters all meet the requirements.
The iTPC performance test with 55Fe for the first two sectors are completed. The uniformity met the requirement too.
Summary and Outlook
Shuai Wang
PANIC2017 3/09/2017
Thanks!