5
MVCO Test Install Martha’s Vineyard CODAR Site June 30-July 1, 2009 Goals: Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site New site will provide additional regional coverage New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down

MVCO Test Install

  • Upload
    reuben

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

MVCO Test Install. Goals: Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site New site will provide additional regional coverage New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down. - PowerPoint PPT Presentation

Citation preview

Page 1: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Goals:

Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site

New site will provide additional regional coverage

New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down

Page 2: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 3: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 4: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Page 5: MVCO Test Install

MVCO Test InstallMartha’s Vineyard CODAR Site

June 30-July 1, 2009

Thank You:

-John Varkonda, Correllus State Forest. Provided Accommodations

-Chris Jakubiak, SMAST. Preformed Install

-Ethan Handel, Rutgers. Preformed Install

-Janet Fredericks, WHOI. Logistical Support

-Dennis Arnold, South Beach Staff Director. Site Permissions