35
Muon Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab Outline Muon Collider Concept • Muon Accelerator Program status • Physics Environment • Machine Detector Interface Studies Physics and

Muon Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

  • Upload
    joella

  • View
    43

  • Download
    0

Embed Size (px)

DESCRIPTION

Muon Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab. Outline Muon Collider Concept Muon Accelerator Program status Physics Environment Machine Detector Interface Studies Physics and detector studies Future plans and outlook. - PowerPoint PPT Presentation

Citation preview

Page 1: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Collider: Workshop, Physics/Detector R&D, andAccelerator Development Plans

Ronald Lipton, Fermilab

Outline• Muon Collider

Concept• Muon Accelerator

Program status• Physics Environment• Machine Detector

Interface Studies• Physics and detector

studies• Future plans and

outlook

Page 2: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Collider Motivation

• A muon collider is an attractive multi-TeV lepton collider option because muons don’t radiate as readily as electrons (mm / me ~ 207):

• Compact• Fits on laboratory site

• Multi-pass acceleration• Cost effective operation &

construction• Multipass collisions in a ring

(~1000 turns)• Relaxed emittance requirements

& hence relaxed tolerances

A 4 TeV Muon Collider wouldfit on the Fermilab Site

Page 3: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Challenges

• Muons are produced as tertiary particles. To make enough of them we must start with a MW scale proton source & target facility.

• Muons decay everything must be done fast and we must deal with the decay electrons. A 1.5 TeV muon travels 9,300 km in one lifetime (~2000 turns in MuCol ring).

• Muons are born within a large 6D phase-space. For a MC we must cool them by O(106) before they decay New cooling techniques (ionization cooling) must be demonstrated, and it requires components with demanding performance (NCRF in magnetic channel, high field solenoids.)

• After cooling, beams still have relatively large emittance

Page 4: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Collider Schematic

Proton source: Example: upgraded PROJECT X (4 MW, 2±1 ns long bunches)

1021 muons per year that fit within the acceptance of an accelerator: eN=6000 mm e//N=25 mm

√s = 3 TeV Circumference = 4.5kmL = 3×1034 cm-2s-1 m/bunch = 2x1012

s(p)/p = 0.1%eN = 25 mm, e//N=70 mmb* = 5mmRep Rate = 12Hz

Page 5: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Neutrino Factory c.f. Muon Collider

In present MC baseline design, Front End is same as for NF

NEUTRINOFACTORY

MUONCOLLIDER

Page 6: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

MAP

• Oct 1, 2009 letter from DOE-OHEP to FNAL Director:“Our office believes that it is timely to mount a concerted national R&D program

that addresses the technical challenges and feasibility issues relevant to the capabilities needed for future Neutrino Factory and multi-TeV Muon Collider facilities. ...”

• Letter requested a new organization for a national Muon Collider & Neutrino Factory R&D program, hosted at FNAL.

• Muon Accelerator Program organization is now in place & functioning: >200 participants from 15 institutions:

ANL, BNL, FNAL, JLab, LBNL, ORNL, SLAC, Cornell, IIT, Princeton, UCB, UCLA, UCR, U-Miss, U. Chicago

http://map.fnal.gov/• MAP R&D proposal reviewed August 2010 … committee concluded that the

“proposed work was very important to the field of high energy physics.”

Page 7: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Map Organization

Level 0

Level 1

Page 8: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

MAP Organization – L1 & L2

• L2 assignments - FNAL; 5 people - Other Labs: 3 people - Universities: 3 people - SBIR Companies: 1 person

“Level 1”

Page 9: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Fermilab Contributions

• Exploits Fermilab’s expertise and assets. • Tackle the most critical and hardest problems.• Exploit Fermilab’s unique testing capabilities

• Significant activities: • Organization & leadership (Level 0, Level 1, Level 2)• Front- end, cooling channel, & Collider Ring design studies.• Machine –Detector Interface studies (interfacing to the Muon Collider

physics/detector activities, including MARS background simulations).• Ionization cooling channel component development and testing,

including magnet and RF studies.

Page 10: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Accelerator – Merit

Merit-Proof-of-principle demonstration of a liquid Hg jet target in high-field solenoid CERN PS in Fall 2007.• Demonstrated a 20m/s liquid Hg jet

injected into a 15 T solenoid, & hit with a suitably intense beam (115 KJ / pulse !).

• Results suggest this technology OK for beam powers up to 8 MW with rep. rate of 70Hz !

Hg jet in a 15 T solenoidMeasured disruption length

= 28 cm

1 cm

Page 11: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Cooling Channel Design

• Perhaps the most challenging piece of MC design. Requires ideas & detailed design work to identify a set of hardware that can, if developed, do the job.

• Important FNAL contributors: Y. Alexahin, K. Yonehara, V. Balbekov

Page 12: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Accelerator - Mucool

MuCool Test Area• Built at end of FNAL Linac for ionization cooling

component testing • 5 T magnet, RF power at 805 MHz & 201 MHz,

clean room, LH2 handling capability, 400 MeV beam from linac.

• Muon cooling channel requires NCRF operating in a magnetic channel. MTA measurements show max. RF gradient reduced in magnetic field.

• Several innovative ideas on how to mitigate this → critical R&D at MTA (FNAL contributors: A. Bross, A. Moretti, Y. Torun, K. Yonehara, M. Popovic, M. Jana, A. Tollestrup)

First beam in MTA 28 February 2011 High Pressure RF Cavity

(FNAL & Muons Inc.)

Page 13: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Accelerator - MICEMuon Ionization Cooling Experiment (MICE)• Tests short cooling section, in muon beam, measuring the muons before & after

the cooling section. one at a time.• Learn about cost, complexity, & engineering issues associated with cooling

channels.• Vary RF, solenoid & absorber parameters & demonstrate ability to simulate

response of muonsFNAL Contributors: A. Bross, Y. Torun, M. Popovic, V. Kashikhin

To be completed ~2014 Spectro-

meter

Cooling

section

Spectro-

meter

Page 14: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Accelerator – Front end Design

With a 4MW proton source, this will enable O(1021) muons/year to be produced, bunched, cooled & fit within the acceptance of an accelerator.

(Neuffler)

Page 15: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Accelerator – Ring and Magnet • Lattice design for 1.5 TeV Collider exists, & 3 TeV

ring progressing (Y. Alexahin, E. Gianfelice-Wendt)

• Ring magnet design studies, including radiation & thermal management, progressing. Requires lattice, magnet & MARS simulation expertise Have studied open mid-plane magnet design (radiation & heat loads, field non-uniformity & affect on lattice performance) → looks OK. More engineering studies needed.

(N. Mokhov, S. Striganov, Y. Alexahin, V.V. Kashikhin, I. Novitski, A. Zlobin)

MARS energy deposition map for 1.5 TeV collider dipole

Page 16: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Physics and Detector

• Although there is a revived muon accelerator effort, there has been little corresponding detector effort which could study the large beam-related backgrounds with modern simulation tools and detector technologies

• Beginning such an effort is crucial to understanding the physics reach of such a device and beginning a program to explore detector development for the muon collider environment.

• It is also crucial for community buy-in • We hope to commission this effort at the Muon Collider 2011

meeting in Telluride next week.

Page 17: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Physics Environment• Narrow beam energy spread

• Precision scan• Kinematic constraints

• 2 Detectors• DTbunch ~ 10 ms

• Lots of time for readout• Backgrounds don’t pile up

• (mm/me)2 = ~40000• Enhanced s-channel rates

for Higgs-like particles• Multi-TeV lepton collider cross

sections dominated by fusion

Beamstrahlung in any e+e- collider

E/E 2

(Eichten)

Page 18: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Luminosity Goals for High Energy Muon Collider

• L~1034 at 3 TeV provides ~965 events/unit R• Much of the yield is in fusion

reactions• Need to resolve W, Z jets• Large missing energies

• Physics environment similar to CLIC with lower beamstrahlung, higher decay backgrounds, lower polarization and central 10 degrees obscured by “the nose”

(Eichten)

Page 19: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

It’s All About the BackgroundExperiments at the Muon Collider will endure very harsh background environments. The first order of business in evaluating physics capabilities is to understand and simulate the machine backgrounds.1. IP m+m- collisions – real physics: Production x-section 1.34 pb

at √S = 1.5 TeV.2. IP incoherent e+e- pair production: of 3×104 electron pairs per

bunch crossing 3. Muon beam decays: For 0.75-TeV muon beam of 2x1012,

4.28x105 dec/m per bunch crossing, or 1.28x1010 dec/m/s for 2 beams; 0.5 kW/m.

4. Beam halo: Beam loss at limiting apertures; severe, can be taken care of by an appropriate collimation system far upstream of IP.

Page 20: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

The Nose

• Ivan Yakovlevitch … glanced into the roll's middle. To his intensesurprise he saw something glimmering there .. He stuck inhis fingers, and pulled out — a nose! .. .A nose! Sure enough a nose! Yes, and one familiar to him, somehow! Oh, horror spread upon his features! - “The Nose” Gogol (from google)

• A 10 degree tungsten/borated poly “noise”surrounds the beam pipe to absorb the e-m backgrounds 100-1000x background reduction.

Page 21: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

MDI Model

W

Q = 10o 6 < z < 600 cm x:z = 1:17

BCH2

Q1

There has been excellent progress in modeling the intense decaybackgrounds . Large weights have been removed and accurate backgroundsimulations are available from MARS and G4beamline

Page 22: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Neutron BackgroundNon-ionizing background ~ LHC

Page 23: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Energy Distributions

164 TeV 5.8 TeV 92 TeV

92 TeV 172 TeV 12 TeV

Page 24: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Detector Simulation Status

• A small group from Lecce has been working on Muon Collider simulations in the ILCROOT framework for about a year• First studies using full GEANT simulation of a detector with

MARS backgrounds imbedded• First studies of calorimeter and tracker background with

timing cuts• A detector simulation using LCSIM (SLAC) has been

implemented and first studies are beginning. This is complementary to the ILCROOT studies – the detector is more “generic” and the simulation is more flexible. We have not yet simulated full background events in this framework

Page 25: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Detector Models based on ILC (SiD, ILD, 4Th)

LCSIM Detector Model ILCROOT Detector Model

Page 26: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

ILCROOT Background Studies (Dual Readout Calorimeter)

Central barrel 4x4 cm em+had cell

(DiBenedetto)

Page 27: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

LCSIM Background Studies

An example of background reduction utilizing timing

ECal: Tungsten, 10 x 1cm layers 1x1x1cm cellsBackground1ns timing cut

No timing Cut 10 GeV e

EM cal layerReduction:EM – 23% of energy survives a 1 ns timing cut

6% of that energy is beyond 1st EM cellHadron- 0.95% of energy survives a 1 ns cut

Page 28: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Track Information

(LCSIM)

• Tracking can benefit from precise timing, low occupancy in a pixelated silicon detector.

Background

Single Muon

DT +/- 5 ns

DE/DX

DE/DX

DT +/- 5 ns

DT

DE/DX

Page 29: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

ILCSIM Tracking Studies

• Dominated by neutrons and photons• This is not energy weighted, many are soft

tracks

DE/DX and IP (3cm)Cut2110 tracks

TOF cut at 3 ns41 tracks

(Terentiev) (Mazzacane)

Recently demonstrated track finding in a full background event• Cuts on IP, DEDX, and TOF (3ns)

Page 30: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Accomplishments in the last Year• Introduced an SiD-like Muon Collider detector into the LCSIM

framework• Provided LCSIM simulation infrastructure at Fermilab• Incorporated MARS backgrounds into LCSIM• Initiated physics studies by university and laboratory groups

based on SiD/LCSIM model.• Detailed background studies

• Hit rates in various regions of the tracker • Energy deposit in various regions and depths in the

calorimeter• Time dependence of tracker and calorimeter hits

• Studies of single tracks with backgrounds Much of these studies were by the Lecce group in collaboration with the FNAL MDI group

Page 31: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Collaboration on Lepton Collider R&D• Laboratory “White Paper” on Lepton Colliders last summer

established the goals of future efforts:• Establish the requirements of detector systems so the physics can be

extracted, taking into account the very different operating conditions at each machine.

• Provide feedback to the machine design to further optimize the physics potential.

• Propose necessary detector and other R&D to verify detector technologies.

• Compare the physics potential of these machines and carry out a cost‐benefit analysis.

• Coordinate the detector and physics program.• First joint effort was to submit a unified proposal to the “Collider Detector

R&D” program (program not funded in FY2011)• Included support for Muon Collider simulation at FNAL and SLAC• Muon Collider detector R&D would come later

Page 32: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Plans• Summer 2011 – Fall 2011

• Parameterize backgrounds to enable faster physics simulation

• Initial physics study including full background simulation• Physics studies using parameterized background

Iterate both the shielding and detector designs based on results of simulation studies. • 2012-2013 Define detector requirements, and identify needed

detector R&D, begin studies to establish a long-term simulation and analysis environment.

• 2014- 2015 Detector R&D + simulation studies to establish likely detector performance

• 2015-2017 Define overall detector design, complete studies for the design feasibility report.

Page 33: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Muon Collider Workshop at Telluride next week

• We hope the workshop will provide a venue to introduce the community to the current state of physics and background simulations and serve as an entry point for more extensive university collaboration on Muon Collider Physics

• We hope to come out of the workshop with a specific set of short and long term goals for physics and detector studies. We aim for demonstration of the physics capability of the machine on the same time scale as the MAP accelerator program goals for accelerator feasibility studies (~FY16)

Page 34: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Manpower

• We had hoped to receive some funding for computing support through the KA15 detector R&D program. That has been delayed until next FY.

• The Lecce (ILCROOT) group has contributed a great deal, but are likely to dissipate without strong FNAL support.

• Work at NIU and FNAL is beginning using the LCSIM framework provided by SLAC. More work needs to be done to build up momentum for this effort.

We hope to make significant progress at Telluride, but we will need an increased level of support to mount a sustained effort

Page 35: Muon  Collider: Workshop, Physics/Detector R&D, and Accelerator Development Plans Ronald Lipton, Fermilab

Conclusions

• Muon Accelerator Project is up and running – making substantial progress

• We are beginning a renewed physics and detector program• We now have a strong foundation – reliable MARS simulation

of backgrounds integrated into GEANT-based detector models.

• We hope to build on that foundation at Telluride an beyond and provide studies comparable to those undertaken for CLIC and ILC that will provide the HEP community with a basis for informed decisions in the future.