217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” U.S. Army Engineering and Support Center, Huntsville 24 October 2017 MULTIPLE ENVIRONMENTAL GOVERNMENT ACQUISITION (MEGA) RESTRICTED VIRTUAL INDUSTRY DAY 1

MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

U.S. Army Engineering and Support Center, Huntsville 24 October 2017

MULTIPLE ENVIRONMENTAL GOVERNMENT ACQUISITION (MEGA) RESTRICTEDVIRTUAL INDUSTRY DAY

1

Page 2: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

GOVERNMENT REPRESENTATIVES

Betina Johnson– Division Chief, Ordnance & Explosives Design Center

Kim Meacham- Chief, Environmental Protection & Utilities Branch

Althea Rudolph– Contracting Officer, Pre-Award

Gosia Thompson- Contract Specialist, Pre-Award

Melanie Braddock-Office of Counsel

Karen Baker– Deputy, Office of Small Business Programs

File Name

2

Page 3: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

RULES OF ENGAGEMENT

Everything discussed is subject to change!

Submit your questions via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. The Solicitation Number is W912DY-16-R-0077 The Bidder Inquiry Key is SXRF79-T59YS2

We are looking for your INPUT!

Look for the Survey, Presentation Slides, and Attendees List on FedBizOpps.gov

File Name

3

Page 4: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

AGENDA

• Huntsville Center Overview

• MEGA Mission and Background

• MEGA Services Provided

• Overview of Acquisition Strategy

• Office of Counsel Reminders

• Small Business

• Wrap up

4

Page 5: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

Ms. Betina JohnsonDivision Chief, Ordnance & Explosives Design Center

MISSION AND BACKGROUND

Page 6: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

USACE MISSIONS

File Name

6

Military Missions

Military Construction∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

COCOM Support, OverseasContingency Operations ( OCO )

∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Installation Support, Environmental,Energy and Sustainability Civil Works

Navigation, Flood Control,Disaster Response, Shore Protection,

Hydropower, Water Supply,Regulatory, Recreation,

Environmental Restoration

Contingency Operations

“Whole of Government”Disaster Response and Recovery

∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Life-Cycle Flood Risk Management∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Critical Infrastructure

Real Estate – Acquire, Manage and Dispose / DoD Recruiting Facilities / Contingency Operations

Research and Development

Warfighter∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Installations and Energy∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Environment∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Water Resources

Geospatial Support

Common Operating Picture / Environment∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙ Civil Works Programs∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Military Programs∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Emergency and Contingency OperationsInternational and Interagency

Federal / State / Local∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

“Whole of USACE” Capabilities∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙

Capacity Development

Page 7: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

CEHNC – MISSION AND VISION

Huntsville Center MissionThe U.S. Army Engineering and Support Center serves the U.S. Forces, their Families and the nation by providing specialized technical expertise, global engineering solutions, and cutting edge innovations through centrally managed programs in support of national interests.

Huntsville Center VisionA world class workforce with an expeditionary mindset providing effective, innovative, global engineering solutions to unique, complex, and high-risk missions in strengthened partnership with our strategic allies, in support of the Warfighter, their Families, and the nation.

7

Page 8: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

U.S. ARMY ENGINEERING & SUPPORT CENTER, HUNTSVILLE

Supporting DoD Operations Worldwide

Programmatic & Functional Missions Global Area of Operation, $2B AnnuallyWe do the Hazardous, Complex, Unusual We Integrate, Standardize, Economize Supporting Sustainment and Retrograde

Range and Mine Field Clearance

Munitions and UXO Disposal

Environmental Response

Physical and Electronic Security Medical Facility Design & Retrofit

Energy Conservation Facility Maintenance and Repair

Global Mission Areas

William J. SargentDirector, Ordnance & Explosives

[email protected]

Arthur Martin, IIIActing Director, Installation Support & Program

Management Directorate

[email protected]

8

Page 9: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

MEGA SERVICES

The objective of this Multiple Award Task Order Contract (MATOC) is to procure the services of Small Business firms to perform Military Munitions Response Program (MMRP) responses involving conventional munitions; Environmental Compliance and Remediation Services (ECRS); and Other Munitions-Related Services (OMRS), as necessary to enable lands and waters to be safely and efficiently used for their intended purpose

This work may occur at sites located throughout the United States, including Alaska and Hawaii, the U.S. territories, outlying areas as defined by FAR 2.101, and Territorial waters. The services provided under this contract will be used in support of various Department of Defense Commands and Installations and other federal agencies, where sponsored by an appropriate U.S. Government agency.

File Name

9

Page 10: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

HISTORY OF PROCUREMENT

2004-2010 Military Munitions Response Program - EXPIRED

2009-2017 Worldwide Environmental Remediation Services (UR) - EXPIRED 2010-2017 Worldwide Environmental Remediation Services (R) - EXPIRED

2016-2021 Multiple Environmental Government Acquisition (MEGA) HNC Unrestricted – CURRENTLY IN USE

2017-2022 International Remediation Environmental Services (IRES) HNC Unrestricted – CURRENTLY IN USE

(TBD) MEGA Restricted (aka Small Business Set- Aside Environmental Remediation Services

(ERS) with Military Munitions)

File Name

10

Page 11: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

HISTORICAL CUSTOMERS

Army Installations Army National Guard (ANG) Army Reserves (AR) Air Force Installations Navy Installations Marine Installations Air Force Center for Environmental Command (AFCEC) Air Force National Guard (AFNG) Army G3 office Missile Defense Agency (MDA) Formerly Used Defense Site (FUDS) Program Formerly Used Sites Remedial Action Program (FUSRAP) Base Realignment and Closure (BRAC) Office Installation Management Command (IMCOM) Assistant Chief of Staff - Installation Management (ACSIM) Army Environmental Command (AEC) Deputy Assistant Secretary of the Army (Environment, Safety and Occupational

Health (DASA (ESOH)) Defense Logistics Agency (DLA)

File Name

11

Page 12: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

TYPES OF FUNDING

Operations and Maintenance – Army (OMA) Defense Environmental Restoration Program-Formerly

Utilized Defense Sites (DERP-FUDS) Defense Environmental Restoration Program-Formerly

Utilized Sites Remedial Action Program (DERP-FUSRAP) DERP - Active DERP - Base Realignment and Closure (BRAC) Research, Development, Test & Evaluation (RDT&E) Other types of funds, as appropriate

File Name

12

Page 13: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

EXAMPLE – ENVIRONMENTAL COMPLIANCE & REMEDIATION SERVICES

File Name

13

Page 14: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

EXAMPLE WORK – MILITARY MUNITIONS RESPONSE PROGRAM

File Name

14

Page 15: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

EXAMPLE WORK – OTHER MUNITION RELATED SERVICES

File Name

15

Page 16: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

TASK ORDERS

Task Orders issued under this Contract may be Firm-Fixed Price and/or Cost- Reimbursable incorporating the Service Contract Labor Standards (formally known as the Service Contract Act) and/or the Construction Wage Rate Requirements (formally known as the Davis Bacon Act) Wage Determinations, as applicable, depending on the type of work being performed in each individual Task Order.

For each Task Order under this contract, the Government will provide a specific Scope of Work (SOW) or PWS describing at a minimum thework required to be performed, performance metrics, schedule requirements, types and numbers of submittals, and places for review.

File Name

16

Page 17: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Kim Meacham- Chief, Environmental Protection & Utilities Branch

SCOPE OF SERVICES17

File Name

Page 18: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

TYPES OF WORK Preliminary Assessment; Site Inspection; Remedial Investigation & Feasibility Study; Engineering Evaluation and Cost Analysis; Action Memorandum; Proposed Plan; Decision Document; Record of Decision; Remedial Design Remedial/Removal Response Actions Short and Long Term Monitoring/Long Term

Operations or Long Term Response Action or Long Term Management;

Data management, data interpretation, engineering evaluation

RCRA Facility Investigation Corrective Measures Study; Monitoring well installation/abandonment; Optimization studies;

Ground-water modeling; hydrological, sediment and soil studies

Geophysical surveys; Remediation cost estimates; Management/Disposal of non-hazardous and

hazardous investigative derived waste (IDW); Environmental and human health risk

assessments; risk based remediation; MEC Risk assessment

Air emission issues including vapor intrusion; Surface water discharge, applying for

environmental permits; Hazardous, Toxic, and Radioactive Waste

sites; Range clearance activities; construction

support; Environmental building assessments to

include asbestos, lead-based paint, PCBs and other regulated materials

18

Page 19: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

TYPES OF WORK (CONT)

In other words….

Anything Environmental, this contract covers it CERCLA, RCRA, NEPA, Clean Air, Clean Water, Environmental Permits, HTRW, Munitions…

Plus… Other Munitions Related Services, Operational Range

Maintenance, Construction Support

File Name

19

Page 20: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

REMEDIAL PROCESS UNDER CERCLA

Comprehensive Environmental Response, Compensation, and Liability Act

20

Page 21: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

CORRECTIVE MEASURES UNDER RCRA

Similar to CERCLA

RCRA Facilities Investigation Corrective Measures Study Record of Decision/Corrective Measures Decision

Document

Resource Conservation and Recovery Act

21

Page 22: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SECTION C OF THE SOLICITATION

Covers… General RequirementsPermits, Licensing, Applicable Laws, Data

Ownership/Rights Health and Safety Program, Medical Surveillance, PPE…

Laboratory Capabilities !! DOD ELAP CERTIFICATION !!SecurityMajor changes since previous contracts Definitions, references (Be familiar with changes) AGC (Accredited companies are required)Data Item Descriptions – HNC-00#.0#Key personnel

File Name

22

Page 23: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SECTION C (CONT)

Chemical Warfare Materiel work is not included under this contract Definitions, references and unknown liquid filled munitions

discovery response requirements are included Necessary because you need to know what it is and what to do if

you accidentally find some.

File Name

23

Page 24: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SECTION L

Read it thoroughlySHALL means it is required – deficiency if not providedShould means requested/preferred information - enhances the proposal and may demonstrate higher level of understanding of the solicitation and/or PWS requirementsBasis of estimate (comprehensive and clear) should not contain any cost information and should support the technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories, equipment, materials, subcontractors, number of trenches, number of meetings, number of samples, etc. This includes a break down of the level of effort performed by the subcontractors. Page Count is important!!!

24

Page 25: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SECTION M

Read it thoroughly Factors 1: Technical Capability and Management and 2

Technical Approach to the Sample Task Order when combined are significantly more important than Factor 3: Past Performance.

No less than Acceptable must be achieved for Factors 1 and 2. Proposal meets requirements and indicates an

adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

File Name

25

Page 26: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SECTION M (CONT)

No less than Satisfactory Confidence or Unknown Confidence must be achieved for Factor 3 Based on the Offeror’s recent/relevant performance

record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or

No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

Factor 4 Cost/Price will be evaluated as follows: FFP elements for fairness and reasonableness. CPFF elements for fairness, reasonableness and

realism.File Name

26

Page 27: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SAMPLE TASK ORDER – ATTACHMENT C

Fictitious Site but located in a real county in Texas. There is a figure at the end of the PWS. It should be

used with professional judgment. Clearly state assumptions but don’t ‘assume away’ the

major issues/problems that may be faced. Demonstration of understanding of the requirements of

the Solicitation and the Performance Work Statement are critical.

50% rule will apply (Must perform 50% of the labor cost at the task order level)

File Name

27

Page 28: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

Ms. Gosia ThompsonContract Specialist, Pre-Award Division

MEGA OVERVIEW OF ACQUISITION STRATEGY

Page 29: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

MEGA ACQUISITION APPROACHThe following are expectations for the MEGA Restricted Multiple Award Task Order Contract (MATOC). Until all required acquisition related documents are approved, the expectations below are subject to change.

North American Industry Classification System (NAICS) Code –562910, Environmental Remediation Services Small business size 750 employees

Anticipate five (5) year contract ordering period (three year base period and one two-year option period).

Anticipated capacity $400 million (shared among the awardees)

MATOC is set aside for small businesses

The intent is to award to five (5) contractors (Government reserves the right to award to more, less, or none at all)

Page 30: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

MEGA ACQUISITION APPROACH –STAGGERED AWARDS

The government benefits from the Better Buying Power acquisition streamlining method:

Staggered awards enable new vehicles to be used sooner.

Staggered awards may save time and money by reducing the number of contractors in discussions. The Government reserves the right to award without

discussions.

Page 31: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Ms. Melanie BraddockOffice of Counsel

OFFICE OF COUNSEL

Page 32: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

THINGS TO REMEMBER – PROPOSALS

Read the entire solicitation If you have questions, ask them. Follow Directions! If it says “shall,” “must,” or “will” it is required If it is preferred, there is likely a greater consideration

given if you do that preferred thing Read your own proposal cover to cover with the RFP

beside you before you submit Know what is in your subs/key partners submissions Details matter, but parroting does not Substance over pretty

File Name

32

Page 33: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

Ms. Karen L. BakerDeputy, HNC Office of Small Business Programs

OFFICE OF SMALL BUSINESS PROGRAMS

Page 34: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SYSTEM FOR AWARD MANAGEMENT (SAM)

https://www.sam.gov/

Page 35: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

NORTH AMERICAN INDUSTRY CLASSIFICATIONSYSTEM (NAICS)

http://www.census.gov/eos/www/naics/index.html

Page 36: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SMALL BUSINESS ADMINISTRATION (SBA)TABLE OF SMALL BUSINESS SIZE STANDARDS

https://www.sba.gov/sites/default/files/files/Size_Standards_Table_2017.pdf

Page 37: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SMALL BUSINESS

Confirm your Reps and certs up to date

North American Industry Classification System (NAICS) Code – 562910, Environmental Remediation Services Small business size 750 employees- confirm you are

within the size standard at the applicable NAICS is listed in SAM

File Name

37

Page 38: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

JOINT VENTURE/MENTOR-PROTÉGÉ

When proposing as a joint venture, all members of the joint venture shall sign the SF 33 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal in Volume IV. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a), HUBZone, Service-Disabled Veteran-Owned, or Women Owned joint venture, the Offeror should ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125, 13 CFR Part 126, and 13 CFR Part 127 respectively.

When proposing as part of Mentor-Protégé Agreement, include a copy of the agreement and the Small Business Administration approval of the agreement in Volume IV.

File Name

38

Page 39: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

FAR 52.219-14 - LIMITATION OF SUBCONTRACTING CLAUSE

Prime Contractor - Self performance of 50% is required.

“At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern”

File Name

39

Page 40: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

FEDERAL BUSINESS OPPORTUNITIES (FBO)

https://www.fbo.gov

Page 41: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

SUBMIT QUESTIONS TO PROJNET

http://www.projnet.org/projnet. The Solicitation Number is W912DY-16-R-0077 The Bidder Inquiry Key is SXRF79-T59YS2

Any Small Business Questions; please send an email to [email protected] and put in the Subject Line “MEGA Restricted”

File Name

41

Page 42: MULTIPLE ENVIRONMENTAL GOVERNMENT ... Government...technical approach, show understanding of team make up, number of teams, labor productivity/duration, labor hours, labor categories,

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

WRAP UP42

File Name

Ms. Althea RudolphContracting Officer, Pre-Award Division