7

Mt Sinai WH Rplcmnt 081016

Embed Size (px)

Citation preview

Page 1: Mt Sinai WH Rplcmnt 081016
Page 2: Mt Sinai WH Rplcmnt 081016

GENERAL NOTES

L.R. ELL.

L.P.

LG.

LB.

KGV

INV.

INSUL.

IN.

I.D.

HVAC

HST

HPT

HP

H.P.

HO

HGL

GPM

GALV.

GAL.

FT.

FS

FPM

F.O.T.

F.O.S.

F.O.B.

FL.

FLEX.

FIT

FIN. GR.

FIN. FL.

FE

EXIST

EW

ENCL.

EL.

ELEC.

EGL

EFF. %

EFF.

ECC. RED.

DWG'S

DN

DIA.

D.I.

DET.

DEG. F.

CS

CPVC

CORP.

CONT.

CONN.

CONC.

C.O.

CMU

~

C.I.

CFM

BCR. BOD

ARCH.

APPROX.

AFF

ACFM

XPROOF

WS

WC

WxH

W/

VAC

V

TYP.

T.O.D.

T.O.C.

THK.

TEMP.

SW

STR.

STD.

S.S.

SR

SQ.

SPECS.

SPD

SL

SH.

SG

SCR

SCH.

RPM

REQ'D.

REINF.

REF.

RED. FLG.

RED.

R

PVC

PSIG

PSIA

PSI

PSH

PS

PLUMB.

`

P

OPER.

O.D.

O.C.

NTS

NPT

NOM.

No.

N.O.

N.C.

MIN.

MH

MGD

MECH.

MATL.

MAX.

LxW

LSP

LSH

L.R. RED. ELL.

L.R. RED. BASE ELL.

GENERAL MECHANICAL ABBREVIATIONS

GENERAL MECHANICAL NOTES

3.

2.

1.

NOTES:

2

GN

NTS

SHEET MAY NOT APPEAR ON THIS SET OF DRAWINGS.

ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS

REQUIRED ON MECHANICAL DRAWINGS.

FLANGED JOINTS. OTHER JOINTS ARE SHOWN AS

VALVES AND PIPE FITTINGS ARE SHOWN WITH

SPECIFICATIONS FOR ITEMS REQUIRED.

USE OF THE PLANS. REFER TO THE PLANS AND

THIS IS A GENERAL LEGEND PROVIDED TO FACILITATE

EXPLOSION PROOF

WATER SURFACE

WATER COLUMN

WIDTH x HEIGHT

WITH

VACUUM

VENT

TYPICAL

TOP OF DUCT

TOP OF CONCRETE

THICK

TEMPERATURE

SEAL WATER

STRUCTURAL

STANDARD

STAINLESS STEEL

RAW SEWAGE

SQUARE

SPECIFICATIONS

SUMP PUMP DISCHARGE

STOP LOG

SHEET

SLIDE GATE

SCREEN

SCHEDULE

REVOLUTIONS PER MINUTE

REQUIRED

REINFORCED

REFERENCE

REDUCING FLANGE

REDUCER

RADIUS

POLYVINYL CHLORIDE

POUNDS PER SQUARE INCH GAGE

POUNDS PER SQUARE INCH ABSOLUTE

POUNDS PER SQUARE INCH

PRESSURE SWITCH HIGH

PRESSURE SWITCH

PLUMBING

PLATE

PRESSURE GAUGE

OPERATING

OUTSIDE DIAMETER

ON CENTER

NOT TO SCALE

NATIONAL PIPE THREAD

NOMINAL

NUMBER

NORMALLY OPEN

NORMALLY CLOSED

MINIMUM

MANHOLE

MILLION GALLONS PER DAY

MECHANICAL

MATERIAL

MAXIMUM

LENGTH X WIDTH

LIQUID SAMPLE PORT

PRESSURE SWITCH LOW

LONG RADIUS REDUCING ELBOW

LONG RADIUS REDUCING BASE ELBOW

LONG RADIUS ELBOW

LOW POINT

LONG

POUND

KNIFE GATE VALVE

INVERT

INSULATION

INCHES

INSIDE DIAMETER

HEATING VENTILATION

HOIST

HOSE PIPE THREAD

HORSE POWER

HIGH POINT

HYDRAULIC OIL

HYDRAULIC GRADE LINE

GALLONS PER MINUTE

GALVANIZED

GALLONS

FEET

FLOW SWITCH

FEET PER MINUTE

FLAT ON TOP

FLAT ON SIDE

FLAT ON BOTTOM

FLANGE

FLEXIBLE

FLOW INDICATING TRANSMITTER

FINISHED GRADE

FINISHED FLOOR

FLOWMETER

EXISTING

EFFLUENT WATER

ENCLOSURE

ELEVATION

ELECTRICAL

ENERGY GRADE LINE

% EFFICIENCY

EFFLUENT

ECCENTRIC REDUCER

DRAWINGS

DOWN

DIAMETER

DUCTILE IRON

DETAIL

DEGREES FEHRENHEIT

CHLORINATED POLYVINYL CHLORIDE

CORPORATION

CONTINUATION

CONNECTION

CONCRETE

CLEANOUT

CONCRETE MASONRY UNIT

CENTERLINE

CAST IRON

CUBIC FEET PER MINUTE

BOTTOM OF DUCT

BRIDGE CRANE

ARCHITECTURAL

APPROXIMATE

ABOVE FINISHED FLOOR

ACTUAL CUBIC FEET PER MINUTE

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

NATIONAL ELECTRIC CODE (NEC) FOR THE APPROPRIATE ENVIRONMENT.

ALL MECHANICAL AND ELECTRICAL ITEMS INSTALLED IN THE WORK AREAS SHALL BE SUITABLE FOR THE ENVIRONMENT FOR WHICH THEY WILL EXIST AND CLASSIFIED BY THE

SUPPORT SYSTEMS WITH SUITABLE SPACING AS REQUIRED BY THE PROJECT SPECIAL PROVISIONS.

PIPE SUPPORTS FOR PIPES LESS THAN 8-INCHES IN DIAMETER ARE NOT SHOWN ON THESE PLANS FOR CLARITY. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PIPE

EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER.

FITS INTO THE ALLOCATED SPACES WITH SUITABLE CLEARANCE FOR ACCESS. THE CONTRACTOR SHALL PROVIDE ALL ALTERATIONS REQUIRED TO ACCOMODATE SUCH

DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED AT THE ENGINEER'S DISCRETION, PROVIDED THAT THE EQUIPMENT MEETS THE SPECIFIED RATINGS AND

BE RESPONSIBLE FOR CHECKING ALL OF THE EQUIPMENT DIMENSIONS TO ENSURE THAT ALL COMPONENTS WILL FIT INTO THE DESIGNATED SPACES INDICATED ON THE

THE DRAWINGS, SCHEDULES, AND SPECIFICATIONS, HAVE BEEN PREPARED USING SPECIFIC MANUFACTURERS FOR THE BASIS OF DIMENSIONAL DESIGN. THE CONTRACTOR SHALL

CONDITIONS AND APPROVED SHOP DRAWINGS.

DROP, OFFSET, FITTING, OR STRUCTURAL ELEMENT THAT MAY BE REQUIRED. THE CONTRACTOR SHALL VERIFY EXACT PLACEMENT OF ALL DEVICES AND EQUIPMENT WITH FIELD

THE PLANS ARE GENERALLY DIAGRAMMATIC IN NATURE. ROUTING OF PIPING, DUCTWORK, CONDUITS, ETC., AS SHOWN ON THE DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE,

THE CONTRACTOR SHALL MAKE ALL REQUIRED FIELD MEASUREMENTS TO VERIFY EXISTING AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS.

ALL FLEXIBLE CONNECTORS, EXPANSION JOINTS, AND SLEEVE COUPLINGS SUBJECT TO PRESSURE SHALL BE RESTRAINED AS REQUIRED FOR EXPANSION AND FLEXIBILITY.

EQUIPMENT REMOVAL.

FOR FLANGED SYSTEMS, PROVIDE FLEXIBLE CONNECTORS WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION AND VALVE AND

SLEEVE COUPLINGS MAY BE USED WHERE NECESSARY, AND AS APPROVED BY THE ENGINEER, TO FACILITATE PIPING INSTALLATION.

ALL PIPE PENETRATIONS THROUGH INTERIOR AND EXTERIOR WALLS AND FLOORS SHALL BE SEALED WATERTIGHT AND FIREPROOF RATED.

ALL DIMENSIONS LOCATING EQUIPMENT ARE FROM FINISHED WALL SURFACES OR CENTERLINES, AS INDICATED.

CONTRACTOR TO PROVIDE A LAYOUT DRAWING SHOWING ALL PIPING, SUPPORTS, AND APPURTENANCES.

PUBLIC HEALTH (IDPH) REGULATIONS.

ALL WORK TO BE IN ACCORDANCE WITH THE CITY OF CHICAGO BUILDING CODES, COOK COUNTY DEPARTMENT OF PUBLIC HEALTH AND ILLINOIS DEPARTMENT OF

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\NOT_150084_02.sht

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

7/6/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC

Page 3: Mt Sinai WH Rplcmnt 081016

OVERALL PLAN VIEW PLN

3

SYSTEM AND PIPING

EXISTING WATER HEATING

NTS

OF BOILER ROOM

EXISTING WEST WALL

COLUMN

EXISTING BUILDING

ABANDONED IN PLACE

TO BE SEALED AND

EXISTING CATCH BASIN

WATER HEATERS

TYPE SEMI-INSTANTANEOUS

PROPOSED TRIPLEX, SKID

CONTROL PANELS

CONFIGURED

PROPOSED TRIPLEX

PIPING

ACCEPT PROPOSED

BE RECONFIGURED TO

HOT WATER PIPING TO

EXISTING STEAM AND INSTANTANEUOUS WATER HEATER

STEAM LINES TO PROPOSED SEMI-

TO BE REUSED. CONNECT EXISTING

EXISTING STEAM SUPPLY HEADER

AND CEILINGS

ROUTING THRU EXISTING WALLS

CONTRACTOR TO COORDINATE

DIAGRAMATIC CONDUIT ROUTING,

EXISTING HALLWAY

FRANKEL BUILDING

LOCATED IN BASEMENT OF

EXISTING BOILER ROOM L41

EXISTING MECHANICAL ROOM L42

(TO REMAIN)

SUMP PUMP

CONDENSATE

STEAM LINE

CONDUIT

INTERMEDIATE METAL

GROUND THWN IN 1"

NEUTRAL AND 3/C #12

3-1/C #12, 1/C #12

APPROX. 2' HIGH x 3' WIDE

METRO MIX MIXING VALVE HEADER

PROPOSED LOCATION OF

INSTANTANEOUS WATER HEATER SKID

CONTROL PANELS ON SEMI-

FOR POWER TO THE 3 PROPOSED

CIRCUIT BREAKERS IN PANELBOARD

PROVIDE 3 NEW, 2O AMP, 1-POLE

EXISTING LIGHTING PANEL RP-1.

OPERATIONAL

IN PLACE AND

HEATING SYSTEM IS

AFTER NEW WATER

ANCILLARY PIPING

REMOVED, WITH ALL

WATER HEATER TO BE

EXISTING 1500 GALLON

HOT WATER2" STEAM

1 8/10/16 IDPH COMMENTS GAH

BELOW FOR ROOM LOCATIONS

BUILDING LAYOUT PLAN

SEE EXISTING BASEMENT

(ROOMS L41 & L42)

LOCATION OF WORK AREA

EXISTING BASEMENT BUILDING LAYOUT PLAN

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\PLN_150084_03.sht

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

8/10/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC

1

1

Page 4: Mt Sinai WH Rplcmnt 081016

STEAM AND HEAT EXCHANGER

1'

6.

5.

4.

3.

2.

1.

NOTES:

NO.

ITEM

1

THRUSH STEAM TO WATER HEAT EXCHANGER

STRUCTURAL STEEL FRAME

PART NUMBER

4" X 2" FABRICATED ELBOW

2" GATE VALVE

2" FABRICATED SPOOL

2" STEAM CONTROL VALVE

2" STRAINER

2" FABRICATED TEE

2" GLOBE VALVE

2" FABRICATED ELBOW

2" FABRICATED HEADER

2" CONDENSATE HEADER

3" WAFER SILENT CHECK VALVE

3" HOT WATER HEADER

3" X 2" FABRICATED ELBOW

2" BUTTERFLY VALVE - 3H

3" COLD WATER HEADER

2" GATE VALVE

2" BALL VALVE

STEAM TRAP

2" CHECK VALVE

2" STRAINER

SUCTION PRESSURE GAUGE

CONTROLS ENCLOSURE24

23

22

21

20

19

18

17

16

15

14

13

12

10

11

9

7

6

8

5

4

3

2

3

3

6

1

3

3

1

3

1

1

3

3

6

3

3

3

6

3

1

3

3

3

3

DESCRIPTION

DSH8324

ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE

FLANGED

ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE

ELECTRONIC CONTROLLED

FLANGED CONNECTION

ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE

FLANGED

ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE

ANSI CLASS 150 FLANGES, SCHED. 40 BLK. PIPE

SOCKET WELD X P.E. SCHED. 80 BLK. PIPE

SILENT CHECK VALVE, WAFER STYLE, ANSI CLASS 125/250

ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE

ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE

ANSI CLASS 150 FLANGES, STAINLESS STEEL PIPE

SOCKET WELD

CARBON STEEL BALL VALVE

FT-S8-15

STAINLESS STEEL NPT CHECK VALVE

KECKLEY STYLE B

SUCTION PRESSURE - 100 PSI

WITH ALARM OPTION

3

QTY.

SCALE 1:8

TYP. AT 3 PLACES

DETAIL A

SPLIT

SKID

SPLIT

SKID

28 1/4"

23 3/4"

29"

10 3/4"

9 1/4"

49 3/4"

80 1/2"

CL

EA

RA

NC

E

RE

QD.

NE

C

42"

0"2"

8"

20"

32"

48"

60"

76"

81"

0"

1"

86"

14"

36 1/4"

48 1/4"

53 1/2"

58 1/4"

74 1/4"76 1/4"

4 1/2"

14"

9 1/2"

36 1/4"

53 1/2"

76 1/4"

TOP VIEW

REAR VIEW

FRONT VIEW

SIDE VIEW

ALL STEAM SUPPLY PIPING TO BE SCH. 40 BLK. STL.

ALL CONDENSATE PIPING TO SCH. 80 BLK. STL.

ESTIMATED SYSTEM WEIGHT: 5000 LBS

DISCHARGE CONNECTION ORIENTATION.

CONTRACTOR/ENGINEER TO VERIFY SUCTION &

SOME ITEMS NOT SHOWN FOR CLARITY.

SUBMITTALS.

WILL BE FORWARDED UPON RECEIPT OF APPROVED

FOR CONSTRUCTION. CONSTRUCTION DRAWINGS

THIS DRAWING IS PRELIMINARY LAYOUT ONLY. NOT

ANSI CLASS 125/150 BUTTERFLY VALVE - 250 PSI MAX

MDT1

4

PLANS AND SECTIONS

PROPOSED SEMI INSTANTANEOUS HOT WATER HEATER

HOT WATER2" STEAM

19 18 15 22 2016 21 18

24 24 24

2

13

14

A

14

17

12

1

11 5 8 49 10 13

3 23 4228 6 72

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\MDT1_150084_04.dgn

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

7/6/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC

Page 5: Mt Sinai WH Rplcmnt 081016

CONDENSATE PUMP

TO EXISTING

EXPANSION TANK

RETURN

HOT WATER

COLD WATER

HOT WATER

DWH #1

DWH #2

DWH #3

15 PSI STEAM

INLET

HOT WATER

INLET

COLD WATER

RETURN

BUILDING

OUTLET

MIXED WATER

SENSOR

METRO MIX

GENERATION SOURCE

RETURN TO HOT WATER

PIPING DIAGRAMS

LEGEND

P

GLOBE VALVE

CHECK VALVE

STRAINER

TEMPERATURE GAUGE

PRESSURE GAUGE

UNION

RECIRCULATION PUMP

CONTROL VALVE

TRAP

HOSE BIB

T

MDT2

5NTS

PROPOSED METRO MIX MIXING VALVE ONE LINE DIAGRAM

PROPOSED STEAM AND HEAT EXCHANGER ONE LINE DIAGRAM

PROPOSED EQUIPMENT SCHEDULE

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\MDT2_150084_05.sht

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

7/6/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC

TT

T

T

P

P

P

P

Page 6: Mt Sinai WH Rplcmnt 081016

6

MDT3

N.T.S.

NTS

METRO MIX MIXING VALVE DETAIL

STAINLESS STEEL PIPE

1 1/2" THREADED

STEEL PIPE

1" THREADED STAINLESS

?

?

? ?

?

? ?

?

?

?

?

GAUGE

PRESSURE

GAUGE

PRESSURE

GAUGE

TEMP.

GAUGE

TEMP.

GAUGE

TEMP.

GAUGE

TEMP.

GAUGE

PRESSURE

MOUNTING PLATE

FABRICATED

GAUGE

PRESSURE

MIXING VALVE

1 8/10/16 IDPH COMMENTS GAH

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\MDT3_150084_06.sht

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

8/10/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC

1

1

PROPOSED METRO MIX MIXING VALVE HEADER

EXISTING CONDITION PICTURES

WATER HEATER TO BE LOCATED IN THIS AREA

EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS

WATER HEATER TO BE LOCATED IN THIS AREA

EXISTING SOUTH WALL OF L41 SEMI INSTANTANEOUS

AND PRESSURE GAUGE TO BE REMOVED

EXISTING HOT WATER TANK SUPPLY LINES

FOR PROPOSED CONTROL PANELS

PROVIDE 3 1-POLE 20 AMP CIRCUIT BREAKERS

EXISTING LIGHTING PANEL IN MECH RM L41 TO

PIPING TO BE REMOVED

EXISTING WATER TANK AND RELATED

PUMP STATION

WALL SOUTH OF CONDENSATE

EXISTING WEST BOILER ROOM

NEW WATER HEATER

ACCOMODATE

TO BE REWORKED TO

EXISTING STEAM PIPING

BE ABANDONED AND SEALED

EXISTING CATCH BASIN TOR

ECIR

CU

LA

TIO

N

RE

TU

RN

RETURN TO HEATER

MIX

ED

WA

TE

R

OU

TL

ET

HO

T

WA

TE

R IN

LE

T

CO

LD

WA

TE

R IN

LE

T

Page 7: Mt Sinai WH Rplcmnt 081016

SPECIFICATIONS

7

SPC

NTS

CLIENT:

DRAWING NO.

SHEET OF

TITLE:

NO. DATE NATURE OF REVISION

FILE NAME N:\chicago\150084\Mech\SPC_150084_07.sht

CHKD.

JPCDSGN.

JPCCHKD.

SCALE:

DWN.

7/6/2016PLOT DATE:

jkennedyCAD USER:

PROJ. NO.

MODEL: Default

DATE:

ELP15-0084

JTK

GAH

CHICAGO, IL 60608

1501 SOUTH CALIFORNIA AVENUE

MT. SINAI HOSPITAL7

HW HEATER REPLACEMENT PROJ.

7//5/16MT. SINAI HOSPITAL - DOMESTIC