    1/5

    Document No : FP-MS-003

    Revision : 0

    Date : February 1, 2007

    Page : 1 of 5

    Parkway International Contracting (LLC)

    Index

    1. Scope

    2. References

    3. Responsibilities

    4. Procedures/Methods

    5. Manpower Requirement

    6. Material Requirement

    7. Health & Safety Provision

    8. Distribution

    9. Check List

  • 7/30/2019 MS for Painting Marina Mall

    2/5

    Document No : FP-MS-003

    Revision : 0

    Date : February 1, 2007

    Page : 2 of 5

    Parkway International Contracting (LLC)

    1. Scope /Objective/Purpose

    The Scope of this Method Statement covers the application of Painting. The

    Purpose of this procedure is to ensure that the correct methods are employed

    during the application of paint and to achieve compliance with the contract

    specifications and manufacturers recommendations.

    2. References

    a) Approved material submittals for painting works.

    b) Quality system procedure material receipt and inspection.

    c) Approved project safety plan & procedures.

    d) Engineers' instructions.

    e) Project specifications.

    f) Manufacturers recommendations/Data sheet.

    3. Responsibilities

    The Project Manager & the Construction Managers are responsible for the over

    all operation of this procedure & its revision when deemed necessary and to

    delegate the responsibility to nominated Site Engineer to directly supervise the

    works on site. The nominated Site Engineers are responsible for ensuring that allthe painting works are executed in accordance with the manufacturers paint

    application procedure and project specifications. The foreman responsible for

    painting works shall ensure that all the painting works are as per the procedure.

    The QC Inspector will be responsible for painting, compliance with QC

    requirements, including submission of inspection request and the documentation

    is signed-off by the concerned parties and filed in the quality department filing

    system.

    4. Application Procedures/Method

    Work shall be in accordance with Project specification section 09900, ITP,

    Schedule, mockup and Approved manufacturers method statement for each paint

    systems.

    1) Painting shall not be commenced until the clearance to be obtained from

    ALEC

    2) Shall protect the surfaces not to be painted from paint spatters, markings

    and other damages.

    3) All surfaces to be painted shall be cleaned from dust, dirt and other

    surface debris.

  • 7/30/2019 MS for Painting Marina Mall

    3/5

    Document No : FP-MS-003

    Revision : 0

    Date : February 1, 2007

    Page : 3 of 5

    Parkway International Contracting (LLC)

    4) Rinse scrubbed surfaces with clean water until foreign materials areflushed from surfaces and allow surfaces to dry thoroughly prior painting

    activities.

    5) Shall prevent contamination of cleaned surfaces before prime coat is

    applied and between applications of remaining coats.

    6) Surfaces shall be sanded to provide adequate adhesion and to remove

    visible defects

    7) Shall apply primer or paint as soon as possible after cleaning and before

    deterioration occurs.

    8) Provide protection to prevent damage from droppings, over spray, wind

    blown particles, etc.

    9) Safe access shall be provided to the location for materials and work force.10) Surface preparation shall be checked by QC Inspectors and offer for

    consultants approval.

    11) Paint that has been approved by consultant shall be used and apply as per

    manufactures application method/paint system

    12) Complete each specified coat of paint on an entire surface.

    13) Care shall be taken for drying time between coats as per manufacturers

    recommendation.

    14) Finish coat shall be smooth, free of brush marks, pile-up of paint, skipped

    or missed areas.

    15) Make edges of paint adjoining other materials or colours without over

    lapping the colours.

    5.Delivery and Storage

    1) All paint and related material shall be delivered to the site in

    manufacturers sealed containers with manufacturers labels which shall

    bear name, brand, type of paint, colour of paint and instructions for use.

    2) All paint materials shall store away from heat generating devices and in a

    well ventilated area

    3) Storage of paints and other related materials used on job shall be in a

    single place and shall keep such storage place clean and in order.

    4) Oily or solvent soaked rags shall be removed from storage area and all

    necessary precautions shall be taken to reduce fire hazard.

    6. Manpower Requirements

    a) Foremen

    b) Painters

    c) Helpers

  • 7/30/2019 MS for Painting Marina Mall

    4/5

    Document No : FP-MS-003

    Revision : 0

    Date : February 1, 2007

    Page : 4 of 5

    Parkway International Contracting (LLC)

    7. Material Requirements

    a) As per manufactures paint System

    8. Health & Safety Provisions

    a) Suitable access shall be provided for the work and shall provide safe

    scaffolding if required for painting activities as per the contract.

    b) High standard of house keeping shall be observed to prevent falling

    materials.

    c) The effect of weather conditions shall be considered and appropriateallowance will be made. Suitable personnel protective equipments shall

    be provided to prevent skin contact with paint and to prevent falls.

    d) Care shall be taken for the protection of all the works and removing the

    surplus material and waste from site and cleaning the working area during

    and after the completion of work

    e) All the safe practices will be adopted during painting activities for the

    safety, health and environment as per the manufactures recommendation.

    9. Distribution

    Copies of this method statement shall be issued to the following for information

    and action.

    1) Project Manager

    2) Construction Managers

    3) Site Engineer

    4) QA/QC

    5) Safety Engineer

    = = = = = END OF THE PROCEDURE = = = =

  • 7/30/2019 MS for Painting Marina Mall

    5/5

    Document No : FP-MS-003

    Revision : 0

    Date : February 1, 2007

    Page : 5 of 5

    Parkway International Contracting (LLC)

    CHECK LIST FOR PAINTING

    Project: Dubai Marina Mall &

    Hotel/Apartments

    .

    Location Area:

    SR.NO Activities / Items to be Inspected QCI Verifications

    1 Check the area released forPainting.

    2

    Check surface preparation-no

    dampness, scratches, broken or

    damages on the surfaces and shall

    be cleaned with out any loose

    particles.

    3Check for paint materials

    approval.

    4Check manufacturer and expiry

    dates for all the paints.

    5Check equipments/tools forpainting.

    6Check protection for all related

    services.

    7 Check application of primer.

    8Check application of stucco/skim

    coat.

    9Check application of first coat

    paint and colour.

    10

    Check application of final coat

    paint and colour.

    11Check paint system is as per

    manufacturers recommendation.

    Comments and Discrepancies (if any):

    fino/Parkway QA/QC Approval

    Name:

    Signature:

    Date: