July2014
Euroestudios S. L. Spain
in Association with
Segmental Consulting & Infrastructure
Advisory (P) Ltd.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 1
TABLE OF CONTENT
1. PROJECT OVERVIEW ………………………………………………………………………………………..............3
1.1. INTRODUCTION ................................................................................................................................... 3
1.2. THE PROJECT ROAD .......................................................................................................................... 3
1.3. THE PROJECT ROAD CONSTRAINTS ................................................................................................ 3
1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT .................................................................................. 4
1.5. PROJECT MAP ..................................................................................................................................... 5
2. PROJECT ASSIGNMENT .............................................................................................................................. 6
2.1. BACKGROUND .................................................................................................................................... 6
3. MOBILIZATION OF AGENCIES ..................................................................................................................... 6
3.1 INDEPENDENT ENGINEER ................................................................................................................. 6
3.2 DRAWL OF AGREEMENT WITH CONCESSIONAIRE ........................................................................ 8
3.3 PIU ........................................................................................................................................................ 8
4. PRE-CONSTRUCTION ACTIVITIES .............................................................................................................. 8
4.1. SHIFTING OF UTILITIES ...................................................................................................................... 8
4.2. UTILIES SHIFTING & OTHER HINDRANCES ...................................................................................... 9
4.2.1. STATUS OF UTILITY SHIFTING .......................................................................................................... 9
4.2.2. HINDRANCES .................................................................................................................................... 10
5. CONSTRUCTION SCHEDULE ..................................................................................................................... 10
5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS…………………………………………… 10
6. CONTRACTOR´S RESOURCES .................................................................................................................. 11
7. MEETINGS/SITE VISIT/PRESENTATION .................................................................................................... 12
7.1 MEETINGS ......................................................................................................................................... 12
7.2 SITE VISITS ........................................................................................................................................ 12
7.3 PRESENTATION ............................................................................................................................... 12
7.4 INAUGURATION ................................................................................................................................. 12
8. STATUS OF WORKS ................................................................................................................................... 12
9. INVOICES PAYMENT & REIMBURSEMENT ............................................................................................... 16
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 2
10. EXECUTING AGENCIES AND CONTRACT DATA ..................................................................................... 16
10.1 AGENCIES .................................................................................................................................... 16
10.2 CONTRACT DATA ......................................................................................................................... 17
10.2.1 PROJECT COST ........................................................................................................................... 17
10.2.2 CIVIL WORKS CONTRACT DETAILS ........................................................................................... 17
10.2.3 SCOPE OF WORK ........................................................................................................................ 17
10.2.4 STATUS OF SUB-CONTRACTORS .............................................................................................. 18
10.2.5 DETAILS OF OTHER AGENCIES/SUPPLIERS ............................................................................ 18
11. WEATHER REPORT .................................................................................................................................... 18
12. PROGRESS OF THE PROJECT .................................................................................................................. 19
12.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBAILITY ......................................................... 19
12.2 PHYSICAL PROGRESS CHARTS ................................................................................................. 20
12.2.1 MAIN TUNNEL ............................................................................................................................... 20
12.2.2 ESCAPE TUNNEL ......................................................................................................................... 21
12.2.3 CROSS PASSAGES ...................................................................................................................... 22
12.2.4 STRIP CHART OF BOTH TUNNELS ............................................................................................. 23
12.2.5 CROSS PASSAGES……………………………………………………………………………...……… 25
12.2.6 ROAD LINER PROGRESS ............................................................................................................ 25
12.2.7 PROGRESS OF BRIDGE & CULVERT ......................................................................................... 25
12.3 FINANCIAL PROGRESS DIAGRAM .............................................................................................. 26
13. UP TO DATE STATUS OF THE TESTS ....................................................................................................... 27
13.1 TEST RESULT OF CONCRETE CUBES ............................................................................................ 28
13.2 DETAILS OF AGGREGATES TESTING ............................................................................................. 33
14. SAFETY REPORTS ...................................................................................................................................... 35
15. MINUTES OF MEETING ............................................................................................................................... 36
16. BRIEF COMMENTS FROM ALL KEY PROFESSIONALS REGARDING CRUCIAL ISSUES AND…………37
PROGRESS OF WORK.
17. ESCROW ACCOUNT…………………………………………………………………………………………………..40
18. DEPLOYMENT OF MAN MONTH…………………………………………………………………………………… 41
19. PHOTOGRAPHIC REPORT ........................................................................................................................ 43
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 3
1. PROJECT OVERVIEW
1.1. INTRODUCTION
The Ministry of Road Transport and Highway (MORT&H) has taken a strategic decision to develop the
North-South corridor connecting Srinagar (J&K) to Kanya Kumari (Tamilnadu). The National Highways
Authority of India (NHAI) has been appointed by MORT&H, to implement this development.
NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Ventures with LRP Consultants, India
and in association with L&T Ramboll, India, and D2 Consultant for Tunnel as consultants to carry out the
detailed design, for the Patnitop Tunnel of the NH-1A, between Udhampur and Banihal (Km 66 to Km.
188) in the state of Jammu and Kashmir.
1.2. THE PROJECT ROAD
The NH-1A National Highway will be upgraded from its present two-lane layout, to a four-lane divided
carriageway configuration. The design of the road between Udhampur and Banihal, Km 67 to Km. 188 is
being carried out in five separate packages. The project will require the construction of numerous
structures, including one approx. 9 Km. long Tunnel (Patnitop Tunnel) and six short Tunnels (Tunnels with
length below 1 km).
1.3. THE PROJECT ROAD CONSTRAINTS
The existing road alignment of the NH-1A between Km 67 and Km 188 is typified by sub-standard, and
often steep curves and gradients, in the horizontal and vertical planes. The proposed improvement will
entail widening towards the valley side along most of the road, which will also involve the construction of
many new structures, including viaducts, bridges, retaining walls and Tunnels.
The project road area is within a region that is prone to frequent earthquakes of sizeable magnitude. Much
of the rock in the area is well jointed and highly fragmented. Combining seismic activity, with the extreme
prevailing weather conditions, also means the area experiences constant landslides.
The Kashmir region, with its exceptional scenic landscapes, abundant wildlife, culture diversity and
profuse number of historic and religion building, is a ‘Mecca’ for tourists from every corner of the globe.
The NH-1A being the main route between the principal cities of Jammu and Srinagar carries most of the
tourist for the entire area. Tourism peaks during the summer months of July and August, but spring and
autumn, can also be busy.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 4
1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT
In previous design stages different alternatives have been investigated for Tunnel, crossing of the Patnitop
range in approx. station Km 90 to Km 130 of the existing NH-1A. Five Tunnel alternatives varying from 1.2
Km length have been assessed and presented in earlier design stages. As the optimum alternative, the
longest one, a base Tunnel at elevation of approx. 1220 m a.s.l. was approved for further investigation and
elaboration of the Tunnel civil tender design documents.
Concerned section Km. 67 to Km. 188 is being carried out in five separate packages 1 – 5.
Patnitop Tunnel is designed as a base Tunnel. Passing under the Patnitop mountain range with
overburden more than 1 Km and belongs to NHDP Phase- II. This contract package start at existing road
starts from Km 89 and ends at Km 130 of existing road. Tunnel mined portals are located at approx. start
of Km 90 (southern portal) close to village of Chenani and Km 130 (northern portal) close to township of
Batote of existing road at elevations 1230 m and 1210 m respectively. Tunnel profile grade is of a roof
character with 0.5 % longitudinal profile grade. Tunnel horizontal alignment starts and ends with curves of
300 m radius, and the rest of mid-section is straight. Main Tunnel direction is South to North. Travel
distance will be reduced for more than 30 Km and climbing and descending of approx. 1000 m shall be
avoided. Tunnel shall be 2-lane, bidirectional tunnel with parallel escape Tunnel and cross connections
into escape Tunnel for emergency exit.
The Existing road (2-lane, bidirectional) will be utilized to accommodate the local traffic in the area as well
as over-sized and other vehicles non-suitable for tunnel operation. The existing carriageway will be
upgraded with minor improvement to both the horizontal and vertical alignment.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 5
1.5. PROJECT MAP
------------ CHENANI TO BATOTE EXISTING ROAD ======= TUNNEL ALIGNMENT
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 6
2. PROJECT ASSIGNMENT
2.1. BACKGROUND
NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Venture with LRP Consultants, India and
in association with L&T Ramboll, India, as consultant to carry out the Feasibility Study and DPR for 4-
Laning of the section Udhampur to Banihal, Km. 66 to Km 188 of NH-1A in the State of Jammu and
Kashmir. The Complete project length is divided into 5 packages.
3. MOBILIZATION OF AGENCIES
3.1 INDEPENDENT ENGINEER
It was decided that Independent Engineer may be invited to participate for project management so as to
have proper management and quality assurance. Accordingly Bids were invited from pre-qualified and
shortly listed consultants and the work was allotted to M/s Euroestudios.S.L. in Association with M/s
Segmental Consulting and Infrastructure Advisory (P) Ltd. In an agreement for Independent Engineer,
services were entered into between National Highways Authority of India, Plot No. G-5 and G-6 , Sector
No.10, Dwarka, New Delhi- 110045 and M/s M/S Euroestudios.S.L., Castelló, 128, E-28006 MADRID,
ESPAÑA in Association whit M/s Segmental Consulting and Infrastructure Advisory (P) Ltd., Unit No.
419A-421, Spaze I Tech Park, Tower B-4.Sector 49, Sohna Road Gurgaon-122002– India, by Letter No.
NHAI/12015/GM (N-1)/CS-88-92/JK/2010/512 dated 05th April 2011 for commencement of service and
accordingly mobilization of Key/ Sub Key Personnel was done.
M/S Euroestudios, S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd.,
as Independent Engineer in accordance with the terms of the agreement in MOU, have deployed
personnel to look after the project.
Office Building for Team has been hired at Ekta Vihar, Near M.H. Hospital, Udhampur (J&K) and office is
fully operational.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 7
Key Staff S.No Position Name Date of Joining Remarks
1 Team Leader cum Sr. Tunnel Expert Mr. Valentín Salcedo 25.05.2011
2 Tunnel Design Engineer Mr. Jose Luis Cacho 28.10.2013 3 Sr. Geologist Mr. K.S. Jamwal 01.06.2011 4 Sr. Geotechnical Engineer Mr. Cesar Andia 11.08.2011 5 Sr. E & M Expert Mr. José Manuel Pineda 28.04.2012 6 Tunnel Safety Expert Mr. Sanjay Kr. Sharma 02.06.2011 7 Tunnel Ventilation Expert Mr. Rafat Ahmad Khan 30.06.2011 8 9
10 11 12 13 14 15
Tunnel Excavation Expert Tunnel Lining Expert Tunnel Lighting Expert Senior Quality Cum Material Expert Bridge / Structural Engineer Financial Expert Legal Expert
Mr. Sanat Kumar. Jain Mr. Ravi Kant Singh Mr. Vikas Kohli Mr. Ajay Mishra Mr. Manish Kr. Sharma
01.06.2011 01.06.2011 30.06.2011 03.06.2011 03.06.2011 30.06.2011 28.06.2011
Completed Completed
Tunnel Engineer-1 Mr. Sindu Bagati 25.05.2011 16 Tunnel Engineer-2 Mr. Neeraj Singh Datta 01.06.2011
Sub-Professional Staff S.No Position Name Date of Joining Remarks
1 Tunnel Fire Fighting Expert Mr. V.P Malhotra 07.06.2014
2 Environmental Expert 01.09.2011 Completed 3 4
Hydrologist/Drainage Expert Hydrologist/Drainage Expert
Mr. K.L. Razdan Mr. Susheel Sarotra
01.09.2011 15.09.2011
5 Geologist Mr. Paramjit Singh 12.09.2011 6 Geo-technical Engineer Mr. R.K. Singh 13.07.2011 Completed 7 Material Engineer Mr. Vishal Koul 08.07.2011 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23
Material Engineer Quantity Surveyor Highway Engineer Bridge Engineer Traffic & Transportation Expert Survey Engineer Survey Engineer Assist. Tunnel Excavation Expert Assist. Tunnel Excavation Expert Assist. Tunnel Lining Expert Assist. Tunnel Lining Expert Horticulturalist Lab. Technician Lab. Technician HTMS/Toll Expert CAD Expert
Mr. Vikas Gupta Mr. Mohit Gandotra Mr. Sanjay Gupta Mr. P.K. Mittal Mr. Gurpreet Singh Mr. Ratish Sharma Mr. Shekhar Modi Mr.Sindhu Misra Mr. K.S. Chamak Mr. Subash Chander Mr. Kuldeep sharma Mr. Amit Bhandari Mr. Rajesh Mishra Mr. Manish Deshpande
03.10.2011 02.01.2012 01.10.2013 03.01.2014 15.07.2013 01.08.2011 02.04.2012 13.06.2011 13.06.2011 17.06.2011 20.06.2011 14.07.2014 01.01.2013 24.06.2011 25.04.2012 02.01.2012
Completed Completed
Completed
Support Staff S.No Position Name Date of Joining Remarks
1 Office Manager Mr. Amnish Jamwal 01.06.2011
2 Accountant Mr. Pankaj Gupta 01.10.2013 3 Cashier Mr. J.S. Jaswal 12.04.2012 4 Steno Mrs .Superna Gandotra 01.08.2014 5 Computer Operator Mr. Ajay Singh 01.06.2011 6 Photocopier Mr. Sanat Kr. Mishra 25.05.2011 7 Office Boy Mr. Sahil Gupta 01.02.2012 8 9
Security Guard Security Guard
Mr. Ramesh singh Mr. Subash Chander
01.08.2014 01.07.2011
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 8
3.2 DRAWL OF AGREEMENT WITH CONCESSIONAIRE
Agreement was drawn by NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) with Chenani Nashri
Tunnel way Limited. (CNTL) on 28th June 2010. For this project IL&FS Transportation Networks Ltd has
formed a Special Purpose Vehicle (SPV) by the name of Chenani Nashri Tunnel way Limited (CNTL)
(hereinafter referred as the “Concessionaire”).
3.3 PIU
PROJECT DIRECTOR.
National Highway Authority of India – PIU
315/1, 2nd Floor, Channi Himmat
Jammu (J&K) 180015
4. PRE-CONSTRUCTION ACTIVITIES
4.1. SHIFTING OF UTILITIES
Km.89.00 to 90.20
(0.00-1.20)
Hilly Section
Revenue Land /Private Land
Km 00.00 to Km 00.300
Land Handed over, however compensation
for trees pending payment by ADC.
Km 00.300 to 1.20
Compensation for Land, Structures & Trees
pending payments by ADC.
Km. 90.20 to 130 Hilly Section
Forest Land
Km 1.20-10.70
Land Handed Over. Forest Diversion Cost
Deposited.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 9
4.2. UTILIES SHIFTING & OTHER HINDRANCES
4.2.1. STATUS OF UTILITY SHIFTING
North Portal
S. No. List of Utilities Chainage Unit Total Status
1 OFC Pillar 129.100‐129.500 & 129.500‐ 130.00 Nos. 11 Completed
2 Electrical Pole 129.100‐129.500 & 129.500‐130.00 Nos. 41 Completed
3 Transformer 129.100‐129.500 Nos. 2 Completed
4 Hand Pump 129.500‐ 130.00 Nos. 2 Completed
5 Shops 129.500‐ 130.00 Nos. 6 Completed
South Portal S. No. List of Utilities Chainage Unit Total Status
1 OFC Pillar 89.000‐90.000 Nos. 8 Completed
2 Electrical Pole 89.050‐90.00 Nos. 15 Completed
3 Transformer 89.950 Nos. 1 Completed
4 33KVA ELECTRICAL POLE
at Km 89.500 Nos. 18 Shifting in progress
5 HT Tower 89.680 Nos. 1 Completed
6 440 VA line near
Toll Plaza 89+850 Shifting yet to start
7 Electrical Pole Line 89.600‐90.000 Nos. 5 Completed
8 Water Line 89.900‐90.000 Nos. 2 Completed
9 House 89.650‐89.700, 89.900‐90.000
Nos. 6 Completed
10 Shops 89.000‐89.300,89.350‐ 89.400,89.950‐90.000
Nos. 17 Completed
11 Religious Structure 89.100,89.400,89.800 Nos. 3 Completed
12 Telephone Pole 89.050‐89.200,89.750‐89.900,89.950‐90.000
Nos. 7 Completed
13 Hand Pump 89.100 Nos. 1 Completed
14 PMGSY/Public Path
Nos. 1 completed
15 House beyond
Km 89.0 Nos. 1 Completed
15 Telephone Tower 89.100 Nos. 1 Completed
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 10
4.2.2. HINDRANCES
NIL
5. CONSTRUCTION SCHEDULE
5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS.
Milestone Financial Percentage
Date of Achievement of Milestone as envisaged
in Concession Agreement
Remarks
Appointed Date (As per Agreement)
0% 23‐05‐11 Appointed Date of the Project
Project Milestone 1 10% 23‐11‐11 Achieved
Project Milestone 2 20% 23‐05‐12 Achieved
Project Milestone 3 30% 23‐11‐12 Achieved
Project Milestone 4 40% 23‐05‐13 Achieved
Project Milestone 5 50% 23‐11‐13 Achieved
Project Milestone 6 60% 23‐05‐14 Financial Progress achieved
71.44%
Project Milestone 7 70% 23‐11‐14
Project Milestone 8 80% 23‐05‐15
Project Milestone 9 90% 23‐11‐15
Project Milestone 10 100% 23‐05‐16
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 11
6. CONTRACTOR´S RESOURCES
S. No
Name of Machinery Unit Quantity
Total Remarks North Portal South Portal
1 Jumbo Drill (2 Boom) No´s. 2 2 4
2 Jumbo Drill (3 Boom) No´s. 2 2 4
3 Track Drill No´s. 1 1 2
4 Wheel Loader No´s. 8 3 11
5 Back Hoe Loader No´s. 1 3 4
6 Tunnel Excavator No´s. 14 27 41
7 Shotcrete Machine (Normet) No´s. 3 5 8
8 Shotcrete Machine (Alivat) No´s. 0 3 3
9 Shotcrete Machine (Putzmeister) No´s. 2 - 2
10 Manitou Telehandler No´s. 4 6 10
11 GHH Trucks No´s. 5 5 10
12 D.G. Sets No´s. 14 15 29
13 Batching Plant (30 cum) No´s. 1 (45 cum) 1 2
14 Batching Plant (60 cum) No´s. 2 1 3
15 Jaw Crusher No´s. 0 2 2
16 Cone Crusher No´s. 0 2 2
17 Screen Chieftain No´s. 0 2 2
18 Dozer No´s. 2 2 4
19 Roller No´s. 4 5 9
20 Transit Mixers No´s. 26 31 57
21 Ventilation Fans No´s 4 5 9
22 Water Tankers No´s. 2 3 5
23 Diesel Tankers No´s. 1 2 3
24 Cranes No´s. 2 2 4
25 Lighting Towers No´s. 3 3 6
26 Boom placer No´s. 1 1 2
27 Concrete pump No´s. 6 4 10
28 Air Compressor No´s. 5 3 8
29 Soil Compactors No´s. 0 1 1
30 Grout Pumps No´s. 3 3 6
31 Flats bed Trucks No´s. 1 1 2
32 Welding Machines No´s. 3 - 3
33 Bar threading Machines No´s. 2 - 2
34 Vibrator needle No’s 1 - 1
35 Concrete Mixer No’s 1 - 1
36 Cutting Machine No’s 1 - 1
37 Concrete Vibrator No’s 1 - 1
38 Bar Cutting Machine 2 - 2
39 Bar Bending Machine No’s 2 - 2
40 Tractor No’s 1 - 1
Total 133 146 279
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 12
7. MEETINGS/SITE VISIT/PRESENTATION
7.1 MEETINGS
Meeting regarding Dumping Yard at I.E Office dated: 08.07.2014.
Monthly meeting at I.E. Office dated 08.07.2014.
Meeting with PD,NHAI at PIU Jammu office regarding firefighting dated 14.07.2014
Meeting with LIN and ITNL at IE Office Regarding Central Drainage on dated 19.07.2014
7.2 SITE VISITS
Acting Team Leader visited and North Portal dated 01.07.2014,
Acting Team Leader visited North Portal dated 04.07.14
Team Leader visited R.O Office, Jammu regarding shifting of water collector dated 17.07.2014.
Team Leader visited site regarding Slope Protection and Tunneling Works dated 23.07.2014.
Team Leader visited South Portal dated 28.07.2014.
7.3 PRESENTATION
Nil
7.4 INAUGURATION
Escape Tunnel (South Portal) :- First blast taken on 8th August 2011
Main Tunnel (South Portal) :- First blast taken on 18th August 2011
Escape Tunnel (North Portal) :- First blast taken on 8th October 2011
Main Tunnel (North Portal) :- First blast taken on 22nd October 2011
8. STATUS OF WORKS
Contractor has mobilized the resources for the work. Access roads for South & North Portal have been
completed on both Portals.
Progress of Main & Escape Tunnel at both Portals was less than targeted progress, especially in final lining
works.
Bridge B1 – Deck Slab casted, Arrangement for stressing in progress.
Bridge B2 – Construction of Crash Barrier completed, Expansion joint Pending.
Slope Protection Portal Completed for both South and North Portal.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 13
Toll Plaza slope Stabilization: In South Toll Plaza location, up to date they have completed
excavation cross section no 3&4 and cross section no.1, 2 is in progress. According to modified
design for full stabilization. Instability in lower part created a bulging and displacement of present
road, and diversion of road to accommodate 1 lane per direction has been completed. Geo
investigation of slide area is completed, drilling of boreholes with core recovery.
TUNNEL WORKS South Side North side
Cumulated This month Cumulated This month
Escape Tunnel
Portal erection
Excavation (Full face)
100%
4573.0 m
(100%)
Break
Through on
2nd June
2014
100%
4393.0 m
(100%)
Break
Through on
2nd June
2014
Main Tunnel
Portal erection
Excavation
- Heading(included adit
XP9)
- Benching (Left side)
- Benching (Right side)
Cross Passage
- XP 01 to XP 14
(14No.)
- XP 15 (33.65m)
- XP 16 (33.65m)
- XP 17 (33.65m)
- XP 18 (33.65m)
- XP 19 to XP 29
(11 No.)
100%
3650.5 mts
2753.3 m
2715.4 m
Completed
(100%)
-
112.0 m
237.5 m
319.4 m
100%
3706.50 m
3051.0 m
3113.0 m
10.0m
Completed
14.0 m
30.0 m
Completed
20.5 m
NIL
NIL
NIL
NIL
NIL
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 14
Contractor has established labor camp, site office, and other temporary structure on both the portals.
Batching plant 30 cum (Km 87) & 60 cum (near Tunnel Portal) on South side & 45 cum and 2 Nos. 60 cum
at Km 134 on North Portal are fully functional.
a) Documents:
Contractor has submitted documents regarding Slope Protection Works (NAR & SAR), Tunnel design &
works, Dump Areas design, Quality of materials, Permanent building work, Tunnel Monitoring, Bridge
Design & drawings, Utility Shifting, MEP works & design, etc.
Some of these documents have been reviewed and sent back to the Concessionaire after reviewing. The
following documents have been reviewed and sent back to the Concessionaire.
Letter No Date Subject S‐PD‐TE.RO‐2375 01.07.2014 Vertical Gradient approach road
S‐CO‐TE.SF‐2376 01.07.2014 Environmental Monitoring Report for the Month of May 2014
S‐CO‐TE.RO‐2377 01.07.2014 NAR Drainage Culvert pipe specifications
S‐CO‐TE.QL‐2385 03.07.2014 Approval of 3rd Party Lab.‐ Delhi Test House
S‐CO‐TE.GT‐2387 03.07.2014 Dump site at KM 137
S‐CO‐TE.EM‐2391
03.07.2014 MEP Works‐W&S FAT and GEODATA Review Report
S‐CO‐TE.QL‐2392 03.07.2014 R.C.C. Pipes (1600mm Diameter)
S‐CO‐TE.RO‐2393 03.07.2014 Reminder: 2 for review of alignment documents & permanent building Layout (North)
S‐CO‐TE.RO‐2394 04.07.2014 Temporary Traffic Diversion
S‐CO‐TE.RO‐2395 04.07.2014 NTP HSS Design report Drainage System calculation & Drawings
S‐CO‐TE.GE‐2396 04.07.2014 Review of Engineering Geological Drawings
S‐CO‐TE.RO‐2397 05.07.2014 Non submission of alignment drawings North approach road
S‐CO‐TE.QL‐2403 08.07.2014 Third Party Test report for Backfill material, North Portal
S‐CO‐TE.GE‐2405 09.07.2014 Review of Engineering Geological Drawings
S‐CO‐TE.GT‐2406 10.07.2014 NTP HSS Design report Drainage System Calculation & Drawings
S‐CO‐TE.BG‐2408 10.07.2014 Design of Slope Protection & Retaining Wall East Side of Bridge B2 without Fire Brigade Buildings and Drawings
S‐PD‐TE.EM‐2409 11.07.2014 Fire Fighting System for 9.0 km Tunnel
S‐CO‐TE.RO‐2410 11.07.2014 WMS for Cutting & Protection for North Portal Approach Road Construction & Temporary Construction of National Highway‐ 1A
S‐CO‐TE.BG‐2411 11.07.2014 Design of RCC Retaining Wall at Ch 370 to 380 at Junction with Culvert at Ch 0+379 SAR, Culvert at 0+379
S‐CO‐TE.BG‐2412 11.07.2014 Design and Drawing: North Dump Area
S‐CO‐TE.GE‐2415 14.07.2014 Review of Engineering Geological Drawings
S‐CO‐TE.EM‐2416
14.07.2014 MEP Works ‐ FFS Calculations ‐ FFS hydraulic cal fire water tank to tunnel NP & orifice plate cal inside
S‐CO‐TE.EM‐2417
14.07.2014 MEP Works – Tunnel Typical Section Fire Doors
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 15
S‐CO‐TE.EM‐2418
14.07.2014 MEP Works‐ TVS Technical Submission Differential Pressure switch ET fan
S‐CO‐TE.GE‐2419 15.07.2014 Review of Engineering Geological Drawings
S‐CO‐TE.TU‐2420 15.07.2014 Tunnel Foundation Beam Survey Report SMTLS
S‐PD‐TE.RO‐2421 15.07.2014 Maintenance of Existing Highway
S‐CO‐TE.TU‐2423 15.07.2014 Vertical Gradient approach road
S‐PD‐TE.FN‐2426 17.07.2014 Escrow account statement, Concurrent audit report of Chenani Nashri Tunnel way limited for the period December 2013 to March 2014
S‐CO‐TE.RO‐2433 19.07.2014 Tunnel Pavement Design Report
S‐CO‐TE.TU‐2434 21.07.2014 F5 Finish
S‐PD‐TE.RO‐2435 21.07.2014 Utility Shifting on South Approach Road
S‐CO‐TE.BG‐2437 22.07.2014 RW SAR Pedestrian Underpass Design Report & Drawings
S‐CO‐TE.GT‐2438 22.07.2014 North Dump Area Design and Documents, North Dump Area:‐ Design of RCC wall next to Existing Bridge from 0 to 15M
S‐CO‐TE.QL‐2439 23.07.2014 Mix Design for Concrete M‐30: Vishavkarma Crusher Aggregates
S‐CO‐TE.QL‐2440 23.07.2014 Mix Design for Lining Concrete M‐30: Vishavkarma Crusher Aggregates
S‐CO‐TE.QL‐2441 23.07.2014 Third Party Test for Geotextile Material
S‐CO‐TE.SF‐2442 23.07.2014 Environmental Monitoring Report for the Month of June 2014
S‐PD‐TE.EM‐2443 23.07.2014 Fire Fighting System for 9.0 Km Tunnel
S‐CO‐TE.RO‐2446 23.07.2014 Notes of Discussion between IE, ITNL, LWIN and Geodata held on 05.06.2014 at NHAI office, Jammu regarding Vertical Alignment‐Cattle underpass
S‐CO‐TE.RO‐2447 25.07.2014 Notes on Discussion between IE, ITNL and LIN held on 15.07.2014 at IE Office, Udhampur
S‐CO‐TE.RO‐2448 25.07.2014 Project wise details
S‐CO‐TE.GE‐2450 26.07.2014 Engineering Geological Sections (Vertical & Horizontal) of the Main Tunnel (Top Heading) South Portal TM 3+350 to 3+500m
S‐CO‐TE.GT‐2451 26.07.2014 RW: Design and Drawing of RCC Retaining Wall (Ch 1+015 to 1+105) Valley Side SAR and Toll Plaza
S‐CO‐TE.RO‐2452 28.07.2014 NAR Drainage Culvert pipe specifications and CoS
S‐CO‐TE.TU‐2453 28.07.2014 Status of NCR 02
S‐CO‐TE.TU‐2454 28.07.2014 Usage of Curing Compound for Final Lining
S‐CO‐TE.TU‐2457 28.07.2014 Main Tunnel Lay Bye Area Ventilation Slab Vertical Suspender Installation Details
S‐CO‐TE.TU‐2458 28.07.2014 WMS for Construction of Concrete Lining and Ventilation Slab
S‐CO‐TE.EM‐2463
30.07.2014 MEP Works‐ PSS Calculation LT Cable Voltage drop calculations & Main Single Line Diagram
S‐CO‐TE.TU‐2464 30.07.2014 Mix design concrete for M‐30 Chenab stone Crusher aggregates
S‐CO‐TE.RO‐2465 31.07.2014 Buildings Toll Plaza Building GA Functional Plan at Ground Level
S‐CO‐TE.BG‐2466 31.07.2014 NTP and Dump Site – Design of RC Wall to Existing Bridge NH1 from 0 to 15m
S‐CO‐TE.RO‐2467 31.07.2014 Alignment Drawings
S‐CO‐TE.QL‐2468 31.07.2014 Third Party Test for PVC Waterproofing membrane
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 16
b) Laboratory set up: M/s Leighton has established its Laboratory for South Portal End at Plant Site at Km
87 near the batching plant, and for North Portal, established near camp at KM 134.
9. INVOICES PAYMENT & REIMBURSEMENT
Invoice for the month of July 2014 has been submitted to Project Director NHAI (PIU Jammu) on
1st August 2014.
10. EXECUTING AGENCIES AND CONTRACT DATA
10.1 AGENCIES
1. Developer:
M/s IL & FS Transportation Networks Ltd is the Developer.
2. Concessionaire:
They have created SPV in the name of M/s CNTL for this Project. CNTL is the Concessionaire for
this project; they have mobilized staff and established its office Hotel Singh Axis, MH Morh, Near
Vishal Mega Mart, Udhampur-182101 Distt. M/s CNTL is represented by Mr. G. Viswanathan
Managing Director.
3. EPC Contractor:
M/s ITNL has awarded the construction to Leighton Contractors (India) Pvt. Ltd., The Contractor has
recruited following agencies for the project design purposes.
Geodata (Design Consultants)
Geometra International (Pvt.) Ltd., Singapore (Survey Consultants)
Geotrax International Services., Hyderabad (Survey Consultants)
SMEC (Design Consultants)
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 17
10.2 CONTRACT DATA
10.2.1 PROJECT COST
Project Cost (As per Concession Agreement) - Rs. 2519 Crore
10.2.2 CIVIL WORKS CONTRACT DETAILS
a) Concessionaire Chenani Nashri Tunnel way Ltd.
b) Contractor Section Chenani to Nashri Section of NH 1A From Km. 89.00 to 130.00
c) Contractor Length 10.800 Km
d) Agreement /MOU Date 28th June 2010
e) Agreement Amount Rs. 2519 Crs.
f) Commencement Date 23rd May 2011
g) Intended date of Completion 23rd May 2016
h) Performance Security released
i) Mobilization Advance and Date of payment (s) Nil
j) Equipment Advance and Date of Payment (s) Nil
k) Net Material Advance Nil
l) Retention Money upto date Nil
m) Liquidated damages, if any -
n) Defect Liability Period Nil
10.2.3 SCOPE OF WORK
Main Tunnel: 9.00 km (As per CA) Escape Tunnel: 9.00 Km Cross Passage: 29 nos. Rigid Pavement: 18.000 km (including Main Tunnel, Escape Tunnel and Bridges) Flexible Pavement: 1.800 km (four lane) Rotary Junction: 02 Nos. Minor Bridge: 02 nos. Culvert: 07 Nos. Box Culvert Toll Plaza: 02 Nos. Drainage pipe in Main Tunnel: 9.0 km (3 nos.) Drainage pipe in Escape Tunnel: 9.0 km (2 nos.) Drainage pipe in Cross passages: 29 Nos. (On both the ends) Slope Protection works at Valley Side: 1520 m Slope Protection works at Hill Side: 1750 m Lay bays: 15 nos. Firefighting Niches: 58 nos. Vehicular emergency exit: 08 nos. Ventilation Building: 02 nos. Tunnel Control Centre (Building):02 nos.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 18
10.2.4 STATUS OF SUB-CONTRACTORS
Nil
10.2.5 DETAILS OF OTHER AGENCIES/SUPPLIERS
Nil
11. WEATHER REPORT
11.1
Sr. No.
Date
North Portal South Portal
Max. Temp.
(°C)
Min. Temp.
(°C)
Snow (cm)
Rainfall (mm)
Max. Temp.
(°C)
Min. Temp.
(°C)
Snow (cm
Rainfall (mm)
1 26-June-14 30 17 0 5 30 17 0 0
2 27-June-14 30 16 0 0 30 16 0 0 3 28-June-14 32 18 0 0 32 18 0 0 4 29-June-14 32 17 0 0 32 17 0 0 5 30-June-14 33 19 0 0 33 19 0 0 6 I-July-14 29 19 0 0 29 19 0 0 7 2-July-14 26 19 0 4 26 19 0 4
8 3-July-14 23 18 0 12 23 18 0 12 9 4-July-14 27 17 0 7 27 17 0 7
10 5-July-14 30 17 0 2 30 17 0 2
11 6-July-14 28 15 0 0 28 15 0 0
12 7-July-14 30 16 0 0 30 16 0 0
13 8-July-14 31 16 0 0 31 16 0 0
14 9-July-14 32 18 0 0 32 18 0 0 15 10-July-14 32 19 0 0 32 19 0 0
16 11-July-14 32 19 0 0 32 19 0 0
17 12-July-14 32 20 0 0 32 20 0 0
18 13-July-14 30 19 0 0 30 19 0 0
19 14-July-14 32 20 0 0 32 20 0 0
20 15-July-14 32 20 0 0 32 20 0 0
21 16-July-14 25 21 0 2 25 21 0 2 22 17-July-14 25 20 0 11 25 20 0 11 23 18-July-14 30 20 0 0 30 20 0 0 24 19-July-14 28 17 0 0 28 17 0 0 25 20-July-14 31 16 0 0 31 16 0 0 26 21-July-14 32 18 0 0 32 18 0 0 27 22-July-14 33 20 0 0 33 20 0 0 28 23-July-14 31 18 0 3 31 18 0 2 29 24-July-14 31 21 0 19 31 21 0 19 30 25-July-14 31 20 0 17 31 20 0 17 31 26-July-14 30 20 0 23 30 20 0 23
Light Precipitation rate less than 2.5 mm/ hr Moderate Precipitation rate between 2.5 -7.6 mm/ hr Heavy Precipitation rate between 7.6-50 mm/ hr Violent Precipitation rate more than 50 mm/ hr
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 19
12. PROGRESS OF THE PROJECT
12.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBALITY
Physical Progress has not to be taken as reference for financial progress, because it does not include
cost incurred (i) Construction of Labour camps, Batching plants and Labs (ii) Procurement of machinery
and advanced materials for construction.
S. No. Item Unit WeightageTotal Scope
Progress%
ProgressOverall
Progress
1 Portal Construction LS 4.00% 1.00 0.90 90.00% 3.60%2 EMP work Portals LS 1.50% 1.00 0.90 90.00% 1.35%3 Dump Area South LS 1.50% 1.00 0.66 66.00% 0.99%4 Dump Area North LS 1.50% 1.00 0.52 52.00% 0.78%
5 Main Tunnel - Heading RM 23.40% 8966.00 7357.00 82.05% 19.20%
6 Main Tunnel - Benching RM 19.15% 8966.00 5573.00 62.16% 11.90%7 Escape Tunnel - Heading RM 12.09% 8966.00 8966.00 100.00% 12.09%8 Cross Passage - Heading RM 4.36% 945.38 898.40 95.03% 4.14%9 Staging for Lining No. 1.40% 10.00 8.00 80.00% 1.12%
10 Water Proofing - Main tunnel RM 2.85% 8966.00 3284.00 36.63% 1.04%11 Lining - Main Tunnel RM 5.35% 8966.00 3036.50 33.87% 1.81%12 Water Proofing - Escape tunnel RM 1.21% 8966.00 3792.00 42.29% 0.51%13 Lining - Escape Tunnel RM 2.25% 8966.00 3748.50 41.81% 0.94%14 Lining - Cross Passage RM 0.84% 934.00 25.90 2.77% 0.02%15 Ground Beam Works RM 1.68% 18894.00 7558.10 40.00% 0.67%16 Pavement -Main Tunnel RM 1.55% 8966.00 0.00 0.00% 0.00%17 Pavement -Escape Tunnel RM 0.90% 8966.00 0.00 0.00% 0.00%18 MEP works - Main Tunnel RM 4.20% 8966.00 0.00 0.00% 0.00%19 MEP works - Escape Tunnel RM 2.33% 8966.00 0.00 0.00% 0.00%20 Approach Road Works - EW RM 1.07% 1820.00 400.00 21.98% 0.24%
21 Approach Road Works -Granular RM 0.09% 1820.00 0.00 0.00% 0.00%
22 Approach Road Works - BT RM 0.15% 1820.00 0.00 0.00% 0.00%23 Misc work RM 0.46% 1.00 0.15 15.00% 0.07%24 Bridges LS 0.55% 1.00 0.90 90.00% 0.50%25 Toll Plaza LS 0.22% 1.00 0.02 2.00% 0.00%26 Project Facilities LS 0.26% 1.00 0.00 0.00% 0.00%
27 Maintenance of Road LS 0.26% 1.00 0.50 50.00% 0.13%
29 Design LS 2.28% 1.00 0.70 70.00% 1.60%30 Commercial Operations LS 2.60% 1.00 0.00 0.00% 0.00%
100.00% 62.71%
Physical Progress Percentage upto July 2014
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 20
12.2 PHYSICAL PROGRESS CHARTS
12.2.1 MAIN TUNNEL
S.NO.
Activ
ityun
itTotal
QuantityAu
g‐11
Sep‐1
1Oc
t‐11
Nov‐1
1De
c‐11
Jan‐12
Feb‐1
2Ma
r‐12
Apr‐1
2Ma
y‐12
Jun‐12
Jul‐12
Aug‐1
2Sep‐1
2Oc
t‐12
Nov‐1
2De
c‐12
Jan‐13
Feb‐1
3Ma
r‐13
Apr‐1
3Ma
y‐13
Jun‐13
Jul‐13
Aug‐1
3Sep‐1
3Oc
t‐13
Nov‐1
3De
c‐13
Jan‐14
Feb‐1
4Ma
r‐14
Apr‐1
4Ma
y‐14
Jun‐14
Jul‐14
Targe
t *90
002.0
046
.0093
.0021
1.00
202.0
018
5.00
153.5
023
1.50
174.5
018
3.00
215.0
022
0.50
247.5
023
8.00
311.0
030
6.00
337.5
037
5.00
284.0
030
0.00
125.0
012
5.00
120.0
087
.5012
5.00
150.0
015
0.00
150.0
023
0.50
242.0
023
2.50
200.0
020
0.00
265.0
033
7.50
400.0
0
Achie
ved
7357
.101.0
047
.6093
.6021
2.30
204.8
017
9.20
155.5
024
9.50
255.0
025
8.00
261.0
033
7.00
397.9
033
1.50
385.5
026
7.00
310.5
035
9.30
285.9
031
4.50
84.50
48.00
52.00
0.00
11.50
125.0
099
.5012
6.00
193.0
025
1.00
227.5
027
9.00
293.0
027
0.00
258.0
013
2.50
Targe
t *90
000.0
05.0
09.0
040
.0010
1.00
126.7
512
8.75
158.2
521
6.75
236.2
524
9.75
147.2
515
1.75
172.7
522
2.75
216.7
523
6.75
274.2
521
1.75
248.7
523
0.75
211.7
519
1.75
86.75
236.7
519
9.25
224.2
518
6.75
248.7
518
4.75
174.2
524
9.25
224.2
528
7.50
265.0
031
2.50
Achie
ved
5573
.000.0
03.0
07.0
056
.0010
5.50
184.0
018
8.25
224.2
521
3.50
253.2
512
9.50
216.5
020
8.70
308.0
033
5.00
275.0
031
2.00
207.5
023
7.50
242.0
011
0.75
101.7
511
6.00
39.00
109.0
070
.0041
.1047
.8023
3.90
146.0
018
5.50
177.0
013
4.75
88.50
208.0
057
.50
Targe
t *90
0015
0.40
228.4
026
0.40
130.4
097
.4011
2.40
167.4
028
0.40
489.4
037
4.40
525.0
030
0.00
637.0
064
9.00
650.0
0
Achie
ved
3284
.0010
8.00
186.0
021
8.00
88.00
55.00
70.00
125.0
023
8.00
447.0
033
2.00
226.0
018
1.00
445.0
030
5.00
260.0
0
Targe
t90
0011
.0023
7.00
180.0
015
0.00
150.0
015
0.00
166.0
027
0.50
292.0
031
1.50
555.0
049
5.00
525.0
049
5.00
540.0
0
Achie
ved
3036
.2011
.0023
7.00
180.0
015
0.00
30.00
30.00
120.4
027
0.50
292.0
031
1.50
314.4
027
7.90
294.8
022
4.50
292.2
0
Targe
t90
00
Achie
ved
0.00
Targe
t90
00
Achie
ved
0.00
3 64
Mtrs
Mtrs
MT Ro
ad wo
rk ins
ide tu
nnel
5MT
Electr
ificati
on/ V
enitla
tion/
Fire F
ightin
g and
Net W
orking
Mtrs
MT Fin
al Lin
ing
Mtrs
Mtrs
Mtrs
1 2
MT He
ading
MT Be
nchin
g
Wate
rproo
fing
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 21
12.2.2 ESCAPE TUNNEL
S.NO.
Activ
ityun
itTot
al Quan
tityAu
g‐11
Sep‐11
Oct‐1
1No
v‐11
Dec‐1
1Jan
‐12Feb
‐12Ma
r‐12
Apr‐1
2Ma
y‐12
Jun‐12
Jul‐12
Aug‐1
2Sep
‐12Oc
t‐12
Nov‐1
2De
c‐12
Jan‐13
Feb‐13
Mar‐1
3Ap
r‐13
May‐1
3Jun
‐13Jul
‐13Au
g‐13
Sep‐13
Oct‐1
3No
v‐13
Dec‐1
3Jan
‐14Feb
‐14Ma
r‐14
Apr‐1
4Ma
y‐14
Jun‐14
Jul‐14
Target
*89
6635
.0086
.0016
8.00
229.5
030
5.00
294.0
026
3.00
309.0
030
5.50
303.5
022
5.00
274.0
030
0.00
275.0
032
2.00
322.0
032
0.00
330.0
028
1.00
286.0
028
6.00
250.0
026
0.00
235.0
025
0.00
235.0
025
0.00
223.5
032
0.00
308.0
031
5.00
360.0
031
0.00
130.0
0
Achiev
ed89
66.00
31.00
94.00
162.0
022
9.50
312.5
028
3.00
263.2
028
3.60
358.0
033
1.00
332.7
047
7.00
428.0
039
4.50
401.0
035
2.00
443.5
040
0.00
322.5
032
7.50
135.0
011
2.50
124.5
077
.5055
.5015
9.50
148.3
017
7.20
318.0
028
4.00
303.5
028
8.00
287.5
026
6.00
2.50
Target
8966
30.00
286.0
025
0.00
350.0
027
0.00
130.0
048
0.00
420.0
048
4.00
446.0
050
0.00
580.0
054
5.00
555.0
0
Achiev
ed37
92.00
30.00
286.0
013
2.00
350.0
027
0.00
131.0
034
5.00
350.0
048
4.00
347.0
033
0.00
315.0
024
5.00
177.0
0
Target
8966
268
133
345
250
154
330
330
406
500.0
045
0.00
440.0
042
0.00
480.0
0
Achiev
ed37
48.90
268
133
339
257
154
331
330
406
389
345
346.4
029
8.70
151.5
0
Target
8966
Achiev
ed0.0
0
Target
8966
Achiev
ed0.0
0
Break
throu
gh on
2nd J
une
2014
Mtrs
Mtrs
Mtrs
Mtrs
ET Ro
ad wo
rk insi
de tu
nnel
Water
proofi
ngMt
rs
1ET
Excava
tion
3 4 5
ET Fin
al Lini
ng
ET Ele
ctrific
ation
/ Ven
itlatio
n/
Fire F
ightin
g and
Net W
orking
2
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 22
12.2.3 CROSS PASSAGE’S
S.NO.
Activity
unit
Total Q
uantity
Oct‐12
Nov
‐12
Dec
‐12
Jan‐13
Feb‐13
Mar‐13
Apr‐13
May‐13
Jun‐13
Jul‐1
3Aug
‐13
Sep‐13
Oct‐13
Nov
‐13
Dec
‐13
Jan‐14
Feb‐14
Mar‐14
Apr‐14
May‐14
Jun‐14
Jul‐1
4
Target
946
56.00
8.00
71.20
70.15
36.40
54.40
56.40
54.40
34.30
74.40
0.00
86.40
28.40
60.40
28.40
28.40
44.40
52.40
67.30
33.63
Achieved
898.40
42.75
33.00
63.50
77.65
35.62
45.50
34.50
45.50
37.15
25.50
2.50
38.50
24.00
47.50
42.70
42.70
39.00
84.79
65.29
16.50
54.25
Target
946
205.5
136.00
68.00
68.00
Achieved
109.10
37.6
28.00
4.85
38.65
Target
946
71.3
136.00
68.00
102.00
Achieved
25.90
9.1
0.00
8.10
8.70
Target
946
Achieved
0.00
Target
946
Achieved
0.00
Waterproo
fing
Mtrs
3Fina
l Lining
Mtrs
4Electrification
/ Ven
itlation
/
Fire Fighting an
d Net W
orking
Mtrs
1Excavation
Mtrs
5Ro
ad work inside
tunn
elMtrs
2
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 23
12.2.4 STRIP CHART OF BOTH TUNNELS
600
850
1250
1400
1450
1550
1650
1800
2100
2250
(H
EA
DIN
G)
(B
EN
CH
ING
)
(HEA
DIN
G)
(BEN
CH
ING
)
2850
3100
3500
3650
3700
3800
3900
4050
4350
4500
(H
EA
DIN
G)
(B
EN
CH
ING
)
(HEA
DIN
G)
(BEN
CH
ING
)600
850
1250
1400
1450
1550
1650
1800
2100
2250
(H
EA
DIN
G)
(B
EN
CH
ING
)
(HEA
DIN
G)
(BEN
CH
ING
)
2850
3100
3500
3650
3700
3800
3900
4050
4350
4500
(H
EA
DIN
G)
(B
EN
CH
ING
)
(HEA
DIN
G)
(BEN
CH
ING
)
34501200 3450
1000
200
100
1700
1200
1100
3950
2050
1750
3350
3550
4000
4200
4300
4250
1850
2050
37501500
1950
2900
3200
1500
1750
1700
1600
4150
2150 21504400
2900
350
2300
150
2250
50
0 0
2650
300
2500250
200 2450
400
3300
2800
2550
2700
2800
2250
2950
50
150
2650
RIGHT MAIN CARRIAGEWAY
550
500
2550
2500
2400
2600
2450
MA
IN T
UN
NE
L L
INE
AR
PR
OG
RE
SS
CH
AR
T
MA
IN T
UN
NE
L L
INE
AR
PR
OG
RE
SS
CH
AR
T
300
550
MAIN CARRIAGEWAY
2350
PR
OG
RE
SS
DIA
GR
AM
OF
CH
EN
AN
I -
NA
SH
RI
TU
NN
EL
WA
Y (
NH
1A
). (
IE/N
HD
P-P
ha
se-I
I/B
OT
/V/J
&K
)
ELEC
TR
ICA
L A
ND
M
EC
HA
NIC
AL IN
STA
LLA
TIO
N
EXCAVATION
INTIAL LINING
FIN
AL L
ININ
G
ELEC
TR
ICA
L A
ND
M
EC
HA
NIC
AL IN
STA
LLA
TIO
N
EXCAVATION
ELEC
TR
ICA
L A
ND
M
EC
HA
NIC
AL IN
STA
LLA
TIO
N
SO
UT
H P
OR
TA
L
EXCAVATION
INTIAL LINING
PR
OG
RES
S IN
METER
S
PR
OG
RES
S IN
METER
S
PR
OG
RES
S IN
METER
S
FIN
AL L
ININ
G
EXCAVATION
INTIAL LINING
FIN
AL L
ININ
G
NO
RT
H P
OR
TA
L
2400
2350
RIGHT MAIN CARRIAGEWAY
100
PR
OG
RES
S IN
METER
S
LEFT MAIN CARRIAGEWAY
INTIAL LINING
FIN
AL L
ININ
G
ELEC
TR
ICA
L A
ND
M
EC
HA
NIC
AL IN
STA
LLA
TIO
N
2600
2300
2750
250
2750
3050
3150
2950
3350
3000
3250
3200950
1150
3300
3950
4300
1050
800 3050
1050
950
700
350
500
400
900
650
450
3550
3400 3400
1100
1150 3400
1300
3150
1300
1600
4400
1350
1900
3850
1900
4100 1850
3850
4000
4200
2200 4450 2200
450
4450
2000
4100
4150
1350
2000
2700
3750
3600
4250
1950
3600
650
3250
700
800
900
3000750 750
1000
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 24
SO
UT
H P
OR
TA
L
PRO
GR
ESS
IN M
ETER
S
100
150
350
600
750
1000
1550
1650
1700
1850
1950
2050
2150
EXC
AV
ATI
ON
(FU
LL F
AC
E)
INTI
AL
LIN
ING
FIN
AL
LIN
ING
PAV
EMEN
T
ELEC
TRIC
AL
AN
D M
ECH
AN
ICA
L IN
STA
LLA
TIO
N
PRO
GR
ESS
IN M
ETER
S
2350
2400
2600
2850
3000
3250
3650
3800
3900
3950
4100
4200
4300
4400
EXC
AV
ATI
ON
(FU
LL F
AC
E)
INTI
AL
LIN
ING
FIN
AL
LIN
ING
PAV
EMEN
T
ELEC
TRIC
AL
AN
D M
ECH
AN
ICA
L IN
STA
LLA
TIO
N
NO
RT
H P
OR
TA
L
PRO
GR
ESS
IN M
ETER
S
100
150
350
600
750
1000
1550
1650
1700
1850
1950
2050
2150
EXC
AV
ATI
ON
(FU
LL F
AC
E)
INTI
AL
LIN
ING
FIN
AL
LIN
ING
PAV
EMEN
T
ELEC
TRIC
AL
AN
D M
ECH
AN
ICA
L IN
STA
LLA
TIO
N
PRO
GR
ESS
IN M
ETER
S
2350
2400
2600
2850
3000
3250
3800
3900
3950
4100
4200
4300
4400
EXC
AV
ATI
ON
(FU
LL F
AC
E)
INTI
AL
LIN
ING
FIN
AL
LIN
ING
PAV
EMEN
T
ELEC
TRIC
AL
AN
D M
ECH
AN
ICA
L IN
STA
LLA
TIO
N
1500
36501400
2950
3350
3200
1050
3750
3350
1150
1450
1200
1250
1400
0
1100
950
800
850
250
4450
200
2500
700
1500
2250
1100
1900
4500 45002250
4350
4150
1150
3700
3450
3700
1200
900
950
3750
3100
700
3100
ES
CA
PE
TU
NN
EL
LIN
EA
R P
RO
GR
ES
S C
HA
RT
3050
550
2950
650
2750
2900
200 2450
650
400
2900
900
2700
500
3050
2750
800
300
2800
250
450
550
PR
OG
RE
SS
DIA
GR
AM
OF
CH
EN
AN
I -
NA
SH
RI
TU
NN
EL
WA
Y (
NH
1A).
(IE
/NH
DP
-Ph
ase
-II/
BO
T/V
/J&
K)
ES
CA
PE
TU
NN
EL
LIN
EA
R P
RO
GR
ES
S C
HA
RT
500
450
400 2650
50
3002550
3150
2650
1750
3450
4000
3400
2200
1450
4050
2700
44502200
2100 2100
4250
4150
1800 4050
4000
2250
2500
4350
502300
3150
2450
3500
2550
3400
3200
1300
1800
1750
1250
0
850
3300
3500
1350 3600
1900
1050 3300
1350
2250
2800
3600
2300
38501600 16003850
2000 2000
1300
4250
3550 3550
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 25
12.2.5 CROSS PASSAGES.
12.2.6 ROAD LINER PROGRESS CHART
12.2.7 PROGRESS OF BRIDGE & CULVERT
Bridge B1 – Deck slab casted, Arrangement for stressing in progress
Bridge B2 – Construction of Crash Barrier completed, Expansion joint Pending
SOUTH & NORTH PORTAL
PROGRESS IN METERS
100
150
250
350
600
750
EXCAVATION (FULL FACE)
INTIAL LINING
FINAL LINING
PAVEMENT
ELECTRICAL AND MECHANICAL INSTALLATION
CROSS PASSAGE LINEAR PROGRESS CHART
500
4500 800
400
700
300
650
550
900
850
946
50 200
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 26
12.3 FINANCIAL PROGRESS DIAGRAM
1.7 3.4
5.1 6.8
8.5 10.2
11.9 13.6
15.3 17.0
18.7 20.4
22.1 23.8
25.5 27.2
28.9 30.6
32.3 34.0
35.7 37.4
39.1 40.8
42.5 44.2
45.9 47.6
49.3 51.0
52.7 54.4
56.1 57.8
59.5 61.2
62.9 64.6
66.3 68.0
69.7 71.4
73.1 74.8
76.5 78.2
79.9 81.6
83.3 85.0
86.7 88.4
90.1 91.8
93.5 95.2 96.4 97.6 98.8 100.0
0.0
0
15
.54
15
.99
19
.44
19
.91
20.5
1
21
.41
24
.37
25
.3 29
.4
30.3
32
.6
35.9
37
.1
38
.9
40.5
41
.9
43
.2
46
.9
48
.2
49
.8
54
54
54
55
56
56
57
58
59.2
4
63.1
3
64.2
65
.2
67
.2
68.3
69.3
70
.5
71
.4
0.0
20.0
40.0
60.0
80.0
100.0
120.0
1
Mile
Sto
ne P
erc
en
tage
Four Lanning of NH-1A from 89.00-130( Chenani- Nashri Section)
Month June 11 (1)
Jul -11 (2)
Aug-11 (3)
Sep-11 (4)
Oct-11 (5)
Nov-11 (6)
Dec-11 (7)
Jan-12 (8)
Feb-12 (9)
M ar-12 (10)Apr-12
(11)M ay-12
(12)Jun-12
(13)Jul- 12
(14)Aug-12 (15) Sep-12 (16)
Oct-12 (17)
Nov-12 (18) Dec-12 (19) Jan-13 (20)Feb-13
(21)M ar-13
(22)Apr-13
(23)M ay-13
(24)Jun-13 (25)
Jul- 13 (26)
Aug- 13 (27)
Sep- 13 (28)
Oct- 13 (29)
Nov- 13 (30)
Dec- 13
(31)
Jan- 14 (32)
Feb- 14
(33)
M ar-14 (34)
Apr-14 (35)M ay-14
(36)Jun-14 (37)
Jul- 14 (38)
Aug- 14 (39)
Sep-14 (40)
Oct-14 (41)
Nov-14 (42)
Dec-14 (43)
Jan-15 (44)
Scheduled Monthly Progress (As Per Milestone %)
1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
Cumulative Scheduled Progress (%) 1.7 3.4 5.1 6.8 8.5 10.2 11.9 13.6 15.3 17.0 18.7 20.4 22.1 23.8 25.5 27.2 28.9 30.6 32.3 34.0 35.7 37.4 39.1 40.8 42.5 44.2 45.9 47.6 49.3 51.0 52.7 54.4 56.1 57.8 59.5 61.2 62.9 64.6 66.3 68.0 69.7 71.4 73.1 74.8
Achieved Monthly Progress (%) 0.00 15.54 0.45 3.45 0.47 0.60 0.90 2.96 0.92 4.11 0.93 2.28 3.33 1.17 1.75 1.63 1.37 1.38 3.66 1.29 1.62 3.73 0.50 0.44 0.76 0.83 0.41 0.76 0.73 1.28 3.89 1.07 0.99 2.03 1.05 1.07 1.12 0.98
Cumulative Achieved Progress (%) 0.00 15.54 15.99 19.44 19.91 20.51 21.41 24.37 25.3 29.4 30.3 32.6 35.9 37.1 38.9 40.5 41.9 43.2 46.9 48.2 49.8 54 54 54 55 56 56 57 58 59.24 63.13 64.2 65.2 67.2 68.3 69.3 70.5 71.4
MonthFeb-15
(45M ar-15
(46)Apr-15 (47)
M ay-15 (48)
Jun-15 (49)Jul- 15
(50)Aug- 15
(51)Sep- 15
(52)Oct- 15
(53)Nov- 15
(54)Dec- 15
(55)Jan-16 (56) Feb-16 (57)
M ar-16 (58)
Apr-16 (59)M ay-16
(60)
Scheduled Monthly Progress (As Per Milestone %)
1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.2 1.2 1.2 1.2
Cumulative Scheduled Progress (%) 76.5 78.2 79.9 81.6 83.3 85.0 86.7 88.4 90.1 91.8 93.5 95.2 96.4 97.6 98.8 100.0
Achieved Monthly Progress (%)
Cumulative Achieved Progress (%)
Fin
anci
alF
inan
cial
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 27
13. UP TO DATE STATUS OF THE TESTS
Total no. of Tests Required
No. of Tests
Performed
No. of Tests
Passed
No. of Tests Failed
Total no. of Tests Required
No. of Tests
Passed
No. of Tests Failed
Action taken in case of Failied Tests./Remarks
1
a 16 293 293 0 514 4093 34
b 8 20 20 0 281 630 0
c 8 13 13 0 288 419 0
d 0 0 0 0 13 13 0
e 120 248 248 0 4345 5321 0
g 4 11 11 0 149 293 0
h 4 10 10 0 151 289 0
2
a 16 52 52 0 664 1665 68
b 120 372 372 0 5105 6845 0
c 0 0 0 0 10 10 0
3
a 4 4 4 0 117 117 0
b 4 4 4 0 117 117 0
c 4 4 4 0 117 117 0
d 4 4 4 0 117 117 0
4
a 9 9 9 0 336 336 0
b 12 12 12 0 342 342 0
c 15 15 15 0 336 336 0
5
55 55 55 0 2009 2009 0
6
07 Days 186 186 186 0 3171 3171 0
28 Days 549 549 549 0 7408 7408 0
07 Days 15 15 15 0 39 39 0
28 Days 69 69 69 0 78 78 0
07 Days 324 324 324 0 4851 4851 0
28 Days 1584 1584 1584 0 18209 18209 0
07 Days 186 186 186 0 918 918 0
28 Days 384 384 384 0 2464 2464 0
07 Days 0 0 0 0 192 192 0
28 Days 0 0 0 0 652 652 39
07 Days 3 3 3 0 24 24 0
28 Days 30 30 30 0 72 72 0
7
183 183 183 0 3910 3871 39
AIV
c
Log Angles
Consistency
Moisture content
Specific Gravity
07 days
Pullout Testing
Pullout Test for Rock Bolts at North/South Portals
Fineness
f M45
a M15
17.0 Up to Date Status of the Tests Up to July 2014
S. No
For the month July 2014 Cumulative upto July 2014
Soundness
Moisture Content
Gradation
Specific gravity
Gradation
FI + EI
Insitu Cores Compressive Strengthat North/South
Portals
Insitu Cores Compressive Strength Test
Cement Cube Strength
03 days
Cement Ambuja 53 Grade
M30
Concrete Cube's Compressive Strength Test
d M35
M25b
e M40
28 days
UPTO DATE STATUS
Fine Aggregate
Name of the Tests
Shortcrete / Concrete / Course Aggregate
IST & FST
Crushing value
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 28
13.1 TEST RESULT OF CONCRETE CUBES
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JULY 2014.
SOUTH PORTAL
DATE INSITU CORES PANEL CASTED
Remarks
Pass Fail 1 days 7 days 28 days
1-July-14 03 0 0 10 05
2-July-14 06 0 15 0 05
3-July-14 0 0 0 05 10
4-July-14 06 0 15 0 05
5-July-14 03 0 0 05 10
6-July-14 0 0 10 05 10
7-July-14 06 0 0 0 05
8-July-14 06 0 0 15 0
9-July-14 0 0 10 0 10
10-July-14 06 0 0 15 10
11-July-14 0 0 0 0 05
12-July-14 03 0 10 10 05
13-July-14 0 0 05 0 05
14-July-14 06 0 0 0 10
15-July-14 0 0 05 10 0
16-July-14 03 0 0 0 10
17-July-14 03 0 05 0 15
18-July-14 06 0 05 10 0
19-July-14 0 0 05 05 05
20-July-14 0 0 0 0 0
21-July-14 06 0 0 05 05
22-July-14 03 0 10 0 10
23-July-14 06 0 0 05 0
24-July-14 0 0 15 05 05
25-July-14 03 0 10 05 0
26-July-14 03 0 0 0 05
27-July-14 0 0 10 0 05
28-July-14 03 0 10 10 0
29-July-14 0 0 0 0 15
30-July-14 06 0 05 15 0
31-July-14 0 0 05 10 15
Total 87 0
150 145 185
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 29
DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JULY 2014.
NORTH PORTAL
DATE INSITU CORES PANEL CASTED
Remarks
Pass Fail 1 days 7 days 28 days
1-July-14 09 0 05 10 05
2-July-14 0 0 05 05 05
3-July-14 0 0 0 0 10
4-July-14 0 0 0 05 10
5-July-14 15 0 0 05 10
6-July-14 03 0 05 10 05
7-July-14 0 0 05 05 10
8-July-14 06 0 05 05 05
9-July-14 0 0 0 0 0
10-July-14 06 0 05 0 15
11-July-14 09 0 0 0 05
12-July-14 06 0 0 05 05
13-July-14 09 0 0 05 10
14-July-14 0 0 0 05 10
15-July-14 12 0 0 05 05
16-July-14 0 0 0 0 10
17-July-14 06 0 0 0 10
18-July-14 0 0 05 0 05
19-July-14 0 0 0 0 0
20-July-14 09 0 0 0 10
21-July-14 0 0 05 0 05
22-July-14 0 0 05 0 10
23-July-14 0 0 05 0 05
24-July-14 06 0 0 05 0
25-July-14 0 0 0 0 05
26-July-14 0 0 0 0 05
27-July-14 0 0 0 05 10
28-July-14 0 0 0 05 05
29-July-14 0 0 0 05 05
30-July-14 0 0 0 0 0
31-July-14 0 0 0 0 0
Total 96 0 50 85 195
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 30
DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2014.
NORTH PORTAL
DATE Grout Cube Testing
Remarks
3 days 7 days 28 days
1-July-14 0 0 0
2-July-14 0 0 0
3-July-14 0 0 0
4-July-14 0 0 0
5-July-14 0 0 0
6-July-14 0 0 0
7-July-14 0 0 0
8-July-14 0 0 0
9-July-14 0 0 0
10-July-14 0 0 0
11-July-14 0 0 0
12-July-14 0 0 0
13-July-14 0 0 0
14-July-14 0 0 0
15-July-14 0 0 0
16-July-14 0 0 0
17-July-14 0 0 0
18-July-14 0 0 0
19-July-14 0 0 0
20-July-14 0 0 10
21-July-14 0 0 0
22-July-14 0 0 0
23-July-14 0 0 0
24-July-14 0 0 0
25-July-14 0 0 0
26-July-14 0 0 0
27-July-14 0 0 0
28-July-14 0 0 0
29-July-14 0 0 0
30-July-14 0 0 0
31-July-14 0 0 0
Total 0 0 10
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 31
DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2014.
SOUTH PORTAL
DATE
Concrete Cube’s Compressive Strength Remarks
M 15 M25 M30 M35 M40 M45
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
1-July-14 0 09 03 0 09 06 06 0 0 0 0 0
2-July-14 0 21 0 0 06 18 03 12 0 0 0 0
3-July-14 0 24 03 0 09 24 03 12 0 0 0 0
4-July-14 03 06 0 0 06 21 0 0 0 0 0 0
5-July-14 06 27 0 0 03 15 06 15 0 0 0 0
6-July-14 0 06 0 0 06 21 0 0 0 0 0 0
7-July-14 03 0 0 0 03 12 03 21 0 0 0 0
8-July-14 0 24 0 0 09 39 03 0 0 0 0 0
9-July-14 06 15 0 0 09 63 06 09 0 0 0 0
10-July-14 0 06 0 0 03 0 09 12 0 0 03 15
11-July-14 0 09 0 15 03 69 0 0 0 0 0 0
12-July-14 06 0 0 0 0 18 03 0 0 0 0 0
13-July-14 03 0 0 0 03 21 0 0 0 0 0 0
14-July-14 06 12 0 0 09 27 0 15 0 0 0 0
15-July-14 06 0 03 0 03 36 15 06 0 0 0 0
16-Jul -14 0 0 0 0 03 45 0 15 0 0 0 0
17-July-14 0 09 0 0 06 48 0 0 0 0 0 0
18-July-14 0 06 0 0 06 30 09 0 0 0 0 0
19-July-14 0 06 0 0 0 39 06 18 0 0 0 0
20-July-14 0 06 0 0 03 30 03 0 0 0 0 0
21-July-14 0 06 0 0 06 54 03 0 0 0 0 0
22-July-14 0 0 0 09 0 36 0 24 0 0 0 0
23-July-14 0 0 0 0 06 18 03 03 0 0 0 0
24-July-14 03 0 0 15 03 51 06 03 0 0 0 0
25-July-14 06 06 0 0 09 27 03 0 0 0 0 0
26-July-14 0 09 0 0 03 12 0 18 0 0 0 0
27-July-14 06 0 0 0 06 21 03 0 0 0 0 0
28-July-14 0 06 0 0 0 15 06 09 0 0 0 0
29-July-14 03 0 0 0 15 57 03 12 0 0 0 0
30-July-14 0 15 0 0 06 27 03 15 0 0 0 0
31-July-14 09 0 0 0 09 06 03 27 0 0 0 15
Total 66 228 09 39 162 906 108 246 0 0 03 30
\
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 32
DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2014.
NORTH PORTAL
DATE
Concrete Cube’s Compressive Strength Remarks
M 15 M25 M30 M35 M40 M45
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
7 Days
28 Days
1-July-14 03 09 0 0 06 21 0 12 0 0 0 0
2-July-14 06 21 0 0 06 48 03 0 0 0 0 0
3-July-14 03 6 0 0 0 18 0 0 0 0 0 0
4-July-14 06 21 0 0 06 45 03 09 0 0 0 0
5-July-14 06 18 0 0 0 03 03 0 0 0 0 0
6-July-14 03 27 0 0 03 21 0 0 0 0 0 0
7-July-14 03 0 0 0 09 39 03 0 0 0 0 0
8-July-14 09 0 0 0 09 12 0 30 0 0 0 0
9-July-14 0 0 0 0 0 0 0 0 0 0 0 0
10-July-14 06 09 0 0 06 57 03 0 0 0 0 0
11-July-14 03 0 0 0 0 33 0 0 0 0 0 0
12-July-14 03 0 0 15 09 21 03 09 0 0 0 0
13-July-14 0 06 03 0 03 30 0 0 0 0 0 0
14-July-14 0 27 0 0 09 0 0 0 0 0 0 0
15-July-14 03 0 0 0 06 06 0 15 0 0 0 0
16-Jul -14 0 12 0 0 03 15 0 0 0 0 0 0
17-July-14 03 12 0 0 03 0 0 0 0 0 0 0
18-July-14 0 15 0 0 03 0 03 09 0 0 0 0
19-July-14 0 0 0 0 0 0 0 0 0 0 0 0
20-July-14 12 0 0 15 09 60 09 09 0 0 0 0
21-July-14 06 0 0 0 12 33 03 03 0 0 0 0
22-July-14 06 06 0 0 15 18 06 0 0 0 0 0
23-July-14 06 21 0 0 09 36 12 03 0 0 0 0
24-July-14 03 09 0 0 06 0 21 0 0 0 0 0
25-July-14 0 18 0 0 03 39 0 09 0 0 0 0
26-July-14 0 18 0 0 03 0 0 03 0 0 0 0
27-July-14 03 09 0 0 06 18 03 0 0 0 0 0
28-July-14 06 09 0 0 06 27 03 12 0 0 0 0
29-July-14 06 30 0 0 03 45 0 06 0 0 0 0
30-July-14 12 12 0 0 03 18 0 09 0 0 0 0
31-July-14 03 06 03 0 06 15 0 0 0 0 0 0
Total 120 321 06 30 162 678 78 138 0 0 0 0
0
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 33
13.2 DETAILS OF AGGREGATES TESTING
DETAILS OF TESTING IN THE MONTH OF JULY 2014.
SOUTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand 10 mm
Crusher Dust
20 mm Sand Combined F.I AIV
1-July-14 04 03 03 02 01 01 04
2-July-14 04 03 03 02 01 01 04
3-July-14 04 03 03 02 01 01 04
4-July-14 04 03 03 02 01 01 01 05 02 01
5-July-14 04 03 03 02 01 01 04
6-July-14 04 03 03 02 01 01 04
7-July-14 04 03 03 02 01 01 04
8-July-14 04 03 03 02 01 01 04
9-July-14 04 03 03 02 01 01 04
10-July-14 04 03 03 02 01 01 01 05 02 01
11-July-14 04 03 03 02 01 01 04
12-July-14 04 03 03 02 01 01 04
13-July-14 04 03 03 02 01 01 04
14-July-14 04 03 03 02 01 01 04
15-July-14 04 03 03 02 01 01 04
16-Jul -14 04 03 03 02 01 01 04
17-July-14 04 03 03 02 01 01 04
18-July-14 04 03 03 02 01 01 01 05 02 01
19-July-14 04 03 03 02 01 01 04
20-July-14 04 03 03 02 01 01 04
21-July-14 04 03 03 02 01 01 04
22-July-14 04 03 03 02 01 01 04
23-July-14 04 03 03 02 01 01 04
24-July-14 04 03 03 02 01 01 01 05 02 01
25-July-14 04 03 03 02 01 01 04
26-July-14 04 03 03 02 01 01 04
27-July-14 04 03 03 02 01 01 04
28-July-14 04 03 03 02 01 01 04
29-July-14 04 03 03 02 01 01 04
30-July-14 04 03 03 02 01 01 04
31-July-14 04 03 03 02 01 01 01 05 02 01
Total 124 93 93 62 05 31 31 129 10 05
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 34
DETAILS OF TESTING IN THE MONTH OF JULY 2014.
NORTH PORTAL
MOISTURE CONTENT % GRADATION
DATE 10 & 20
mm Crusher
Dust Sand 10 mm
Crusher Dust
20 mm Sand Combined F.I AIV
1-July-14 04 03 03 0 0 0 0 02 0 0
2-July-14 04 03 03 01 01 01 01 03 02 01
3-July-14 04 03 03 0 0 0 0 01 0 0
4-July-14 04 03 03 0 0 0 0 01 0 0
5-July-14 04 03 03 0 0 0 0 02 0 0
6-July-14 04 03 03 0 0 0 0 01 0 0
7-July-14 04 03 03 01 01 0 01 02 01 01
8-July-14 04 03 03 0 0 0 0 01 0 0
9-July-14 04 03 03 0 0 0 0 01 0 0
10-July-14 04 03 03 01 01 01 01 03 02 01
11-July-14 04 03 03 0 0 0 0 02 0 0
12-July-14 04 03 03 0 0 0 0 02 0 0
13-July-14 04 03 03 0 0 0 0 02 0 0
14-July-14 04 03 03 02 02 01 02 04 02 02
15-July-14 04 03 03 0 0 0 0 02 0 0
16-Jul -14 04 03 03 0 0 0 0 02 0 0
17-July-14 04 03 03 0 0 0 0 02 0 0
18-July-14 04 03 03 0 0 0 0 01 0 0
19-July-14 04 03 03 0 0 0 0 0 0 0
20-July-14 04 03 03 0 0 0 0 02 0 0
21-July-14 04 03 03 02 02 01 02 04 02 02
22-July-14 04 03 03 0 0 0 0 02 0 0
23-July-14 04 03 03 0 0 0 0 02 0 0
24-July-14 04 03 03 0 0 0 0 02 0 0
25-July-14 04 03 03 0 0 0 0 02 0 0
26-July-14 04 03 03 0 0 0 0 02 0 0
27-July-14 04 03 03 0 0 0 0 02 0 0
28-July-14 04 03 03 01 01 0 01 03 01 01
29-July-14 04 03 03 0 0 0 0 0 0 0
30-July-14 04 03 03 0 0 0 0 02 0 0
31-July-14 04 03 03 0 0 0 0 02 0 0
Total 124 93 93 08 08 04 08 59 10 08
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 35
14. SAFETY REPORT
S.no. Particulars Up to last Month Current Month Cumulative
1 Total Man- hours worked 21776555 901635 22678190 2 Average No. of Employees 30776 2770 33546
3 Incidents 63 2 65 4 Environment Incidents 0 0 0 5 Training (Man hours) 826825 40210 867035
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 36
15. MINUTES OF MEETING
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 37
16. BRIEF COMMENTS FROM ALL KEY PROFESSIONALS REGARDING CRUCIAL ISSUES AND
PROGRESS OF WORK.
Geological:
From geological point of view the excavation behavior of rocks in tunnels is smooth & favorable inspite of
variation in compressive strength of interbebbed sequence of hard sandstone, medium siltstone and soft
claystone exposed on the Tunnel face. The expected ground water conditions were also not encountered
during the excavations of all Tunnels (Main, Escape & Cross Passages). Such favorable tunneling
conditions may continue further also till we trigger the last blast in the tunnels.
Tunnel Lining and Tunnel Excavation:
Final lining in Main Tunnel is lagging behind the schedule. The issue has been discussed in several
meeting but still no progress has been achieved expect bring one formwork for final lining Gantry in North
Portal.
Finishing of lining is not satisfactory. This issue was also discussed in last monthly meeting but still finish of
surface is not up to the mark.
Progress of fixing \geotextile water proofing membrane is also very slow
Undercut removal which is hampering the progress of lining
Health and Safety:
Miscellaneous issues regarding Health & Safety which effect progress of work are as following:
Muck dump inside tunnel at both portals is being removed on regular basis for better movement of traffic &
avoid any incident.
Housekeeping is little bit improved and also choked drains cleaned for proper drainage at North Portal.
Fire hydrants at various location of both tunnels at North portal was found without hose reels and water
connections and also provide very less quantity of signal/flag man’s inside tunnel for proper direction &
movement of vehicles.
Modify ventilation system to exhaust the gases from Tunnel mainly at North Portal
Mainly at North Portal, dumper used for disposed of muck was working without tarpoline cover which create
unhealthy environment.
Highway:
Existing Highway:
Repairing of all Patches has been done and repairing of potholes in progress.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 38
Approach Road:
South: Alignment drawing of South approach road a gradient of 7 % is given which is more than required
5% as per IRC and needs to be revised and advised to submit it along with cross section at every 10 m.
North: Alignment drawing reviewed by I.E. with some comments, revised drawing after incorporation by
Concessionaire has not been received till date
Dump Area:
South: Construction of R.C.C wall at South dump area is in progress.
60+000-210+000: R.C.C wall up to 4.0 m height completed.
Slope stabilization is in progress with a sloping angle of 35 degree and height 8 to 10 m
North: Gabion wall at North Portal Dumping yard collapsed for 24.0 m approx. from Ch. 533+000 –
557+000. Revised design submitted and reviewed by IE with some comments.
0-60 m: R.C.C wall up to 4.0 m height completed
Structure works:
Bridge B1 – Deck slab casted, Arrangement for stressing in progress
Bridge B2 – Construction of Crash Barrier completed, Expansion joint Pending
Base slab for Ventilation Building have been completed and column & walls in progress at south
and north portal
Reinforcement for base slab of Technical Building is in progress at North Portal .
Quality:
Energy absorption test for current/ ongoing shotcrete mix designs yet to be carried out. Concessionaire
is looking alternative lab other than IIT, Chenani to conduct energy absorption test.
Concessionaire is also looking alternative lab for testing of PVC membrane in India
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 39
Geotechnical:
Main Tunnel South Portal:
Between MS-TM 1702 to MS-TM 2448 up to 06-08-2014, 25% convergence is within the limits.
This stretch is considered critical as high level of deformation is continuing for long time, therefore it
is proposed to take special consideration and apply new countermeasures.
Between MS-TM 2477 to MS-TM 3150, 80% convergence is within the limits.
Between MS-TM 3178 to MS-TM 3469, 40% convergence is within the limits. This stretch is
considered critical for high level of deformation.
Rectification activity is Completed Up to Ch 1850. Additonal IBO Rock Bolts is completed up to
1960. Placing of Additonal IBO Rock Bolts is been carried out carried out From Ch. 2000
iaccording to Geodata Countermeasures Plan.
Escape Tunnel South Portal:
Between ES-TM 1804 to ES-TM 2370 up to 07-08-2014, near 70% convergence is within the
limits. This stretch we considered critical for high level of deformation. Therefore it is proposed to
apply countermeasures immediately.
Between ES-TM 2345 to ES-TM 4545 Up to 24-06-2014 near 95% convergence is within the
limits, now seems to be stabilizing.
Rectification activity is completed from CP 6 to CP 7. Rectification is in progress from CP 7 to CP
8 Consisting mainly removal of undercut, placing of lattice girders and Rock Bolts.
In North Portal need to support in CP 18, 19 and 22.
In Main tunnel North Portal need only smoothing and trimming and fill the shotcrete.
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 40
ESCROW ACCOUNT
Escrow account statement, Concurrent audit report of Chenani Nashri Tunnel way limited for the period
December 2013 to March 2014. It is clear from the report that borrowing cost to construction of road has
been treated as a part of capital work in progress and interest earned on temporary investment of borrowing
has been reduced from borrowing cost. We want to draw your kind attention that extra interest charged as
reported by the concurrent auditors should also be reduced from the borrowing cost after recovery so that
actual cost of Fixed Assets may be recognized at the time of capitalization.
We also want to comment on the Bank balance which has increased almost by 7 times as compared to last
year (i.e. from Rs. 2,77,35,048/- to Rs. 19,80,33,273/-) whereas it is clear from Note 8 of Fixed Assets that
the volume of work done in terms of value is less as compared to last year (i.e. from Rs. 8,29,70,39,973/- to
Rs. 6,38,24,90,296/-). Trade Payable has also reduced to half as compared to last year .
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 41
DEPLOYMENT OF MAN MONTH S
. N
o.
Name Position Man
Month(As per CA)
Man Month(Balance)
Remarks
I-a KEY PERSONNEL (PROFESIONAL STAFF)
1 Valentin Salcedo Team Leader 66 35.09
2 Jose Luis Cacho Tunnel Design Engineer 26.231 18.265
3 Mr. Kuldeep Singh Jamwal Sr. Geologist 41.146 7.512
4 Cesar Andia Sr. Geotechn. Engineer 31 0.000
5 J. Manuel Pineda Sr. E & M Expert 23.000 12.200
6 Mr. Sanjay Kumar Sharma Tunnel Safety Expert 63 25.033
7 Mr. Rafat Ahmad Khan Tunnel Ventilation Expert 31 7.491
8 Mr. Sanat Kumar Jain Tunnel Excavation Expert 48.735 11.000
9 Mr. Ravi Kant Singh Tunnel Lining Expert 61 23.000
10 Tunnel Lighting Expert 17 0.000 Completed
11 Mr. Vikas Kohli Senior Quality/ Material Expert 63 25.067
12 Structural, Bridge Engineer 31 0.000 Completed
13 Mr. Ajay Mishra Financial Expert 6 4.808
14 Mr. Manish Kumar Sharma Legal Expert 7 3.258
I-b SUB-PROFESIONAL STAFF
1 Mr. Sindu Bagati Tunnel Engineer 63 24.767
2 Mr. Neeraj Singh Datta Tunnel Engineer 63 25.000
3 Mr. Vijay Pal Mahlotra Tunnel Fire Fighting Expert 18 16.933
4 Raman Padha Environmental Engineer 11 0.000 Completed
5 Susheel Sarotra Hydrologist / Drainage Expert 45.516 11.000
6 Kanya lal Razdan Hydrologist / Drainage Expert 33 0.957
7 Paramjeet singh Geologist 41.633 7.000
8 Rakesh Kumar Singh Geotechnical Engineer 31 0.000 Completed
9 Vishal Koul Material Engineer 58.774 22.000
10 Vikas Gupta Material Engineer 55.935 22.000
11 Quantity Surveyor 18 0.000 Completed
12 Mohit Gandotra Highway Engineer 31 0.000 Completed
13 Mr. Sanjay Gupta Bridge Engineer 31 24.033
14 P.K Mittal Traffic and Transp. Expert 11 6.066
15 Gurpreet Singh Survey Engineer 33 1. 470
16 Survey Engineer 33 0.000 Completed
17 Sindhu Mishra Assist. Tunnel Excavation Expert 48.600 11.000
18 Shekhar Modi Assist. Tunnel Excavation Expert 49.114 11.615
19 Subhash Chander Assist. Tunnel Lining Expert 59.367 22.000
20 Kuldeep Singh Chamak Assist. Tunnel Lining Expert 59.367 21.900
21 Kuldeep sharma Horticulturalist cum LandScaping
Expert 11 9.623
22 Rajesh Mishra Lab. Tech 63 5767
23 Amit Bhandari Lab. Tech 63 26.097
24 Manish Deshpande HTMS /Toll Expert 6 5.134
25 Cad Expert 16 0.000 Completed
Sub total - Sub-profesional Staff (I -b)
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 42
II SUPPORT STAFF
1 Amnish Jamwal Office Manager 66 28.000
2 Pankaj Gupta Accountant 66 27.767
3 Mr. Jagdev Singh Jaiswal Cashier 66 27.767
4 Sanat Kumar Mishra Photo Machine Operator 66 28.767
5 Superna Gandotra Steno 66 28.200
6 Ajay Singh Computer Operator 66 28.000
7 Chuni Lal Security Guard 66 27.767
8 Sahil Gupta Security Guard 66 28.000
9 Subash Chander Office Boy 66 27.767
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 43
17. PHOTOGRAPHIC REPORT
Invert reinforcement fixing inside the Escape Tunnel
Deck of Bridge is in progress at South Portal
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 44
Water Proofing Membrane fixing inside the Main Tunnel
Fixing of Lattice Girder in the Bench of Main Tunnel North Portal
Monthly Progress Report July 2014
Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 45
Geological Face Mapping is in progress in Main Tunnel
Retaining Wall work is in progress at North Portal.