    To:From:Submitted by:Subject:

    CITY OF CARMEL-BY-THE-SEACouncil ReportMarch 4, 2014

    Honorable Mayor and Members of the City CouncilJason Stilwell, City AdministratorSharon Friedrichsen, Public Services DirectorConsideration of a resolution awarding a Construction Contract toMonterey Peninsula Engineering, the Lowest Responsible Bidder, for the2014 Concrete Pavement Repair Project for a Not to Exceed mount of161,400; Approving a Not to Exceed mount of 16,140 for Project

    Contingency, and Approving a Not to Exceed mount of 8,070 to NeillEngineering for Project Management Services

    Recommendation s}: Considerat ion of a resolution awarding a construction contract toMonterey Peninsula Engineering, the lowest responsible bidder, for the2014 Concrete Pavement Repair Project for a not to exceed amount of

    161,400; approving a not to exceed amount of 16,140 for projectcontingency, and approving a not to exceed amount of 8,070 to NeillEngineering for Project Management Services.

    Executive Summary: On February 24 2014, three bids were submitted to the City for the 2014Concrete Pavement Repair Project. This project consists of the removaland replacement of sections of the cement concrete pavement locatedwithin the downtown business/commercial district along San CarlosSt reet, Seventh Avenue and Dolores Street. The City's Engineer hastabulated the bids received and determined that Monterey PeninsulaEngineering is the lowest responsible bidder. Per Municipal Code3.12.420, public works contracts for more than 25,000 shall be let byformal written contract approved by resolution of City Council.Therefore, this item is on the agenda for Council to award the contractand authorize the City dministrator to execute the contract documents.

    Analysis/Discussion: The project included a base bid and two alternative bid locat ions. Asnoted in the attachment, the bids received included:

  • 8/12/2019 Monterey Peninsula Engineering Construction Contract 03-04-14

    2/563

    Fiscal Impact:

    Table 1: id ResultsContractor ase id Bid 1 Bid 2 Total BidMPE $102,00 59AOO $32,000 $193AOONo Ca I $138,000 $73,128 $35A56 $246,584ConstructionDon Chapin Co $143,700 $94,050 $52,000 $289,500Engineer $150,000 $85,800 $44,800 $280,600Estimate

    It is therefore recommended that the contract be awarded to MontereyPeninsula Eng ineering for the ase bid and Bid 1 for a contract total of$161AOO. It is further recommended that a contingency of up to 10%, or$16,140, be included as part of the award In addition it isrecommended that up to 5 , or $8,070, be allocated to Ne ill Engineeringfor project management services associated with the projectThe anticipated start date for the repair work would be April 2014, withcompletion anticipated before May 31, 2014. A public informationalmeeting is scheduled for March 5 at 4 PM to discuss the project w ithinterested member of the public and business communityCouncil allocated $484,000 of Measure D for street and road projects aspart of the fiscal year 2013-14 budget:

    Actual of $136,000- road overlays Up to $83,000- sidewalk repairs Up to $73,000- paving for Santa Fe and 4th Storm drain project Up to $185,610 for concrete repair Balance of $27,85 for additional sidewalk/concrete repairs

    Budgeted yes/no): yesCIP Project: PW-1112-01,Account 13 89585

    Funding Source general fund, grant, state)MeasureD: $484,000 of MeasureD is includedwithin the CIP for streets and road projects It isrequested that $185,610 be allocated

    Previous CouncilAction/Decision History:

    Counci l allocated $484,000 for street and road project and sidewalkrepairs as part of the fiscal year 2013-14 budget adopted in June 2013.The road overlay and storm drain projects were awarded in September2014 and the sidewalk repair project was awarded in January 2014.

    2

  • 8/12/2019 Monterey Peninsula Engineering Construction Contract 03-04-14

    3/564

    Attachments ResolutionCity Engineer letter of recommendation

    eviewed byCity Adminis trator City ttorney b2( Administrat ive ServicesAsst. City Admin. Dir of CP Dir of Public Svcs bdPublic Safety Dir Library Dir OtherCity Engineer

    3

  • 8/12/2019 Monterey Peninsula Engineering Construction Contract 03-04-14

    4/565

    CITY OF CARMEL-BY-THE-SEACITY COUNCILRESOLUTION 2014-

    A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARMEL-BY-THE-SEAAWARDING THE 2014 CONCRETE PAVEMENT REPAIR PROJECTCONSTRUCTION CONTRACT TO MONTEREY PENINSULA ENGINEERING IN ANAMOUNT NOT TO EXCEED 161,400; APPROVING UP TO 16,140 OR PROJECTCONTINGENCY AND APPROVING UP TO 8,070 TO NEILL ENGINEERING FORPROJECT MANAGEMENT SERVICESWHEREAS, numerous concrete pavement segments have been identified as being inneed of repair; andWHEREAS, the City Council approved expenditure ofCapital Improvement funds forthe streets and road project as part of the FY 2013/2014 budget; which includes concrete

    pavement repair; andWHEREAS, the 201 4 concrete Ravement repair project was advertised in the MontereyCounty Herald on February 13 1hand 181\ 2014; andWHEREAS, three bids for the project were received on February 24, 2014 and the CityEngineer has determined that the lowest responsible bidder was Monterey PeninsulaEngineering; andWHEREAS, the project has been determined to be categorically exempt under CEQA15301(c).NOW, THEREFORE, E IT RESOLVED THAT THE CITY COUNCIL OF THE CITY

    OF CARMEL-BY-THE-SEA DOES:1 Award a contract for the 2014 Concrete Pavement Repair Project to MontereyPeninsula Engineering in the estimated amount of 161,400, subject to theprovisions of the documents and certifications set forth in the plans andspecifications applicable to the project and as required by California law.2. Authorize the City Administrator to execute the construction contract upon thereturn of the contractor's executed contract documents and the review andapproval ofthe City Attorney and the City' s Administrative Services Director.3. Approve a contingency in the not to exceed amount of 16,140, or 10%, andauthorize the City Administrator to approve change orders in an amount not to

    exceed 16,140.4 Approve up to 8,070, or 5%, for construction-related engineering and projectmanagement services for Neill Engineers.5 Authorize funding of up to 185,610 from MeasureD from Capital ImprovementAccount 13-89585.

    PASSED AND ADOPTED Y THE CITY OF COUNCIL OF THE CITY OFCARMEL-BY-THE SEA this 4th day ofMarch 2014, by the following roll call vote:

  • 8/12/2019 Monterey Peninsula Engineering Construction Contract 03-04-14

    5/566

    A YES: COUNCIL MEMBERS:NOES: COUNCIL MEMBERS:ABSENT: COUNCIL MEMBERS:ABSTAIN: COUNCIL MEMBERS:

    ATTEST:

    Daryl A. Betancur CMCDeputy City Clerk

    SIGNED

    Jason Burnett MAYOR