. . 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: [email protected] * Nantachai Kantanantha 1* Norawat Luangtong 2 1,2 Department of Industrial Engineering, Faculty of Engineering, Kasetsart University, Bangkok E-mail: [email protected] * SMED Why-Why 3 41.04 SMED Abstract The purpose of this study is to reduce the mold change setup time for vacuum forming machine of the refrigerator manufacturer. The study begins from determining the mold change procedure in each step to determine the causes of the delay. Next the work study is performed using the time chart and flow process chart, and the activities are classified as internal and external setups according to the SMED (Single Minute Exchange of Die) Principle. The causes of the delay are then determined by Why-Why Analysis. This results in three improvement ways including planning the mold storage to reduce the mold moving time, preparing the tools before working to reduce the tool searching time during the operation, and re-ordering the steps of operations and re-assigning the duties of operators to balance the workload. As a result, the mold change setup time decreases 41.04 percent. Keywords: Mold Change, Work Study, Work Improvement, SMED Principle 1.

Mold Change Setup Time Reduction for Vacuum Forming Machine · 2014. 4. 22. · .. 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: [email protected]*

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mold Change Setup Time Reduction for Vacuum Forming Machine · 2014. 4. 22. · .. 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: nantachai.k@ku.ac.th*

. . 2556

16-18 2556

Mold Change Setup Time Reduction for Vacuum Forming Machine

1* 2

E-mail: [email protected]*

Nantachai Kantanantha1* Norawat Luangtong2

1,2Department of Industrial Engineering, Faculty of Engineering, Kasetsart University, Bangkok E-mail: [email protected]*

SMED Why-Why 3

41.04

SMED

Abstract

The purpose of this study is to reduce the mold change setup time for vacuum forming machine of the

refrigerator manufacturer. The study begins from determining the mold change procedure in each step to determine the causes of the delay. Next the work study is performed using the time chart and flow

process chart, and the activities are classified as internal and external setups according to the SMED (Single Minute Exchange of Die) Principle. The causes of the delay are then determined by Why-Why

Analysis. This results in three improvement ways including planning the mold storage to reduce the mold

moving time, preparing the tools before working to reduce the tool searching time during the operation, and re-ordering the steps of operations and re-assigning the duties of operators to balance the workload.

As a result, the mold change setup time decreases 41.04 percent.

Keywords: Mold Change, Work Study, Work Improvement, SMED Principle

1.

Page 2: Mold Change Setup Time Reduction for Vacuum Forming Machine · 2014. 4. 22. · .. 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: nantachai.k@ku.ac.th*

. . 2556

16-18 2556

Door Liner Vacuum Forming

(Acrylonitrite Butadiene Styrene, ABS)

(Door Liner) (Vacuum Forming Machine)

60 70

2.

2.1 (Work Study)

[1]

Li [2]

45.6%

2.2 (Flow Process Chart)

[1]

(Flow Diagram)

[3] (Turnaround Time) [4 ]

[5]

2.3 Why-Why (Why-Why Analysis)

Why-Why

(Toyota Production

System, TPS) [6] � � � �

5

5-Why Why-Why

Lakshman [7] Why-Why

2.4 SMED (Single Minute Exchange of

Die Principle)

SMED

(Internal Setup)

(External Setup)

Page 3: Mold Change Setup Time Reduction for Vacuum Forming Machine · 2014. 4. 22. · .. 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: nantachai.k@ku.ac.th*

. . 2556

16-18 2556

[8]

SMED

26.6

11.2

3.

3.1

Door Liner Vacuum Forming

ABS Door Liner

Door Liner Door Liner

3

1

2

3

3.2

8

3

68.86

3.3

3

1

1

3

85

1

(%) (%)

1 100 0

2 52 48

3 15 85

3.4

2

1

3

2

( )

( )

( )

( )

1 17 16 1 34

2 5 7 0 12

3 4 1 0 5

3.5

2 SMED

3

3

( )

( )

1 12 22

2 1 11

3 3 2

Page 4: Mold Change Setup Time Reduction for Vacuum Forming Machine · 2014. 4. 22. · .. 2556 16-18 2556 Mold Change Setup Time Reduction for Vacuum Forming Machine 1* 2 E-mail: nantachai.k@ku.ac.th*

. . 2556

16-18 2556

3 1

2

3

1 3 2

3.6 Why-Why

3 Why-why

4

4 5

1.

2.

3.

4.

ECRS ECRS

(Eliminate) (Combine) (Rearrange) (Simplify)

4 Why-Why

What Why Why Why Why

1. - -

2. - -

-

-

-

3. - C-Clamp - - C-Clamp

4. -

-

-

-

-

-

-

-

5. -

-

- -