9
MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District NAD/SAD REGIONAL DREDGING MEETING/WEDA

MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Embed Size (px)

Citation preview

Page 1: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

MOBILE DISTRICTFY 2007

DREDGING PROGRAM

MOBILE DISTRICTFY 2007

DREDGING PROGRAM

US Army Corps of EngineersMobile District

US Army Corps of EngineersMobile District

NAD/SAD REGIONAL DREDGING

MEETING/WEDA

NAD/SAD REGIONAL DREDGING

MEETING/WEDA

Page 2: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Mobile District Navigation Projects Mobile District Navigation Projects

5 Inland Waterways5 Inland Waterways

2200 Miles of Inland Waters2200 Miles of Inland Waters

7 Deep Water Harbors7 Deep Water Harbors

22 Shallow Draft22 Shallow Draft

FLFL

GAGA

TNTN

MSMS

Panama Panama City City

Port Port St. JoeSt. Joe

Bayou La BatreBayou La Batre PensacolaPensacola

PascagoulaPascagoula

GulfportGulfport

GIWW

FlintRiver

ALAlabamaRiver

Tenn-TomWaterway

TombigbeeRiver

MobileMobile

Black Warrior River

Chattahoochee River

Apalachicola River

Page 3: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT

FY07FY06 FY08Hopper Dredge

Maintenance Dredging

Scheduled FY07 Dredging Work in Mobile District

Mobile Hbr Bay/Bar (Rental)

Manson/ Glenn Edwards

Mobile Hbr Bay/Bar (Rental)

$4M IDIQB.O. OCT 06

Mobile Hbr Bay/Bar (Rental)

$4M IDIQB.O. JAN 07

Mobile Hbr Bay/Bar (Rental)

$4M IDIQB.O. Jun 07

Mobile Hbr Bay/Bar (Rental)

$4M IDIQ (Contingency)

Pascagoula Bar (Rental)

1MCY IDIQ

Used for emergency work, to be opened by amendment

B.O. MAR 07

Used for emergency work, to be opened by amendment

Mobile Hbr Bay/Bar (Rental)

$4M IDIQ (Contingency)

Panama City Beach Nourishment

Unit Price 500KCYB.O. FEB 07

Page 4: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Type of Work: MaintenanceDepth: 47’ Bar and 45’ BayWidth: 600’/400’Length: 42 MilesQuantity: 1.0/2.25 McyType of Material: Sand, Silt and ClayPlacement Area: Ocean D/ADistance to Placement Area: 30 MilesType of Equipment: HopperSmall Business Set Aside: NoLast Dredged: 2006Contract Amount: $1,000,000-$5,000,000Schedule: Continuous

Type of Work: MaintenanceDepth: 47’ Bar and 45’ BayWidth: 600’/400’Length: 42 MilesQuantity: 1.0/2.25 McyType of Material: Sand, Silt and ClayPlacement Area: Ocean D/ADistance to Placement Area: 30 MilesType of Equipment: HopperSmall Business Set Aside: NoLast Dredged: 2006Contract Amount: $1,000,000-$5,000,000Schedule: Continuous

Mobile HarborChannel

Mobile HarborChannel

Page 5: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Type of Work: MaintenanceDepth: 44’Width: 450’Length: 6.2 MilesQuantity: 1.0 McyType of Material: Sand, Silt and ClayPlacement Area: Ocean D/ADistance to Placement Area: 2-3 MilesType of Equipment: HopperSmall Business Set Aside: NoLast Dredged: 2004Contract Amount: $1,000,000-$5,000,000Schedule: Begin late March – End early

June

Type of Work: MaintenanceDepth: 44’Width: 450’Length: 6.2 MilesQuantity: 1.0 McyType of Material: Sand, Silt and ClayPlacement Area: Ocean D/ADistance to Placement Area: 2-3 MilesType of Equipment: HopperSmall Business Set Aside: NoLast Dredged: 2004Contract Amount: $1,000,000-$5,000,000Schedule: Begin late March – End early

June

Pascagoula BarChannel

Pascagoula BarChannel

Page 6: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT

FY07FY 06 FY08Hydraulic Pipeline Dredge

Maintenance Dredging

Scheduled FY07 Dredging Work in

Mobile District

Pascagoula Sound (Rental)

Mike Hooks Missouri H 27” 2M CY

Gulfport Sound Channel (Rental) 1.5M CY

Pascagoula Sound (Rental)

2MCY IDIQ

B.O. May 07

BWT/GIWW (Rental)

$15M IDIQ

Tenn-Tom/ Ala River (Rental)

$10M IDIQ

Mobile River (Rental)

800KCY IDIQ

B.O. MAY 07

B.O. FEB 07

B.O. FEB 07

Harrison County Beaches

Unit Price 800KCYB.O. NOV 06

Page 7: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Type of Work: MaintenanceDepth: 36’Width: 220’Length: 12 MilesQuantity: 1.5 McyType of Material: Silt, Clay and FluffPlacement Area: Open Water D/ADistance to Placement Area: 5-10 K FeetType of Equipment: Large CutterheadSmall Business Set Aside: NoLast Dredged: 2006Contract Amount: $1,000,000-$5,000,000Schedule: Begin early February – End mid

May

Type of Work: MaintenanceDepth: 36’Width: 220’Length: 12 MilesQuantity: 1.5 McyType of Material: Silt, Clay and FluffPlacement Area: Open Water D/ADistance to Placement Area: 5-10 K FeetType of Equipment: Large CutterheadSmall Business Set Aside: NoLast Dredged: 2006Contract Amount: $1,000,000-$5,000,000Schedule: Begin early February – End mid

May

Gulfport SoundChannel

Gulfport SoundChannel

Page 8: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

On-Going Dredging Work inMobile District

Page 9: MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers

Black Warrior and Tombigbee Rivers, Alabama River Tennessee-Tombigbee Waterway, GIWW

Black Warrior and Tombigbee Rivers, Alabama River Tennessee-Tombigbee Waterway, GIWW

Type of Work: MaintenanceDepth: 9’ – 12’Width: Various widthsLength: Various LengthsQuantity: RentalType of Material: Sand/GravelPlacement Area: Upland and Within BanksDistance to Placement Area: Various DistancesType of Equipment: 18” - 24” CutterheadLast Dredged: 2006Contract Amount: $1,000,000 - $5,000,000Schedule: Summer 2007

Type of Work: MaintenanceDepth: 9’ – 12’Width: Various widthsLength: Various LengthsQuantity: RentalType of Material: Sand/GravelPlacement Area: Upland and Within BanksDistance to Placement Area: Various DistancesType of Equipment: 18” - 24” CutterheadLast Dredged: 2006Contract Amount: $1,000,000 - $5,000,000Schedule: Summer 2007

Tenn-TomWaterway