WILMINGTON DISTRICTDREDGING PROGRAM

WILMINGTON DISTRICTDREDGING PROGRAM

NAD/SAD REGIONAL DREDGING

MEETING/WEDA

NAD/SAD REGIONAL DREDGING

MEETING/WEDA US Army Corps of Engineers Wilmington District

US Army Corps of Engineers Wilmington District

Page 2: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA
Page 3: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Morehead City Harbor Morehead City Harbor FY08 WorkFY08 Work

Inner HarborInner Harbor

Estimated Quantity: 400,000 Estimated Quantity: 400,000 CYCY

Depth: 35’+2’ and 45’+2’Depth: 35’+2’ and 45’+2’

Bucket and barge to ODMDSBucket and barge to ODMDS

Distance: approximately 7 Distance: approximately 7 milesmiles

Ocean BarOcean Bar

Estimated Quantity:Estimated Quantity: 800,000 800,000 CYCY

Depth: 45’+2’Depth: 45’+2’

Hopper to near shore for Hopper to near shore for suitablesuitable

Hopper to ODMDS for Hopper to ODMDS for unsuitableunsuitable

Environmental window: : 1/1 – Environmental window: : 1/1 – 3/313/31

Solicitation date: 10/26/2007Solicitation date: 10/26/2007

Approximate start date: Approximate start date: 1/23/20081/23/2008

Page 4: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Morehead City HarborMorehead City HarborDredge Material Dredge Material

Management PlanManagement Plan Will look at disposal needs and alternatives for MHC Will look at disposal needs and alternatives for MHC

Harbor over the next 20 yearsHarbor over the next 20 years Will factor environmental considerations into Will factor environmental considerations into

decision processdecision process Disposal plan will be chosen based on federal Disposal plan will be chosen based on federal

standard of least cost alternative, consistent with standard of least cost alternative, consistent with sound engineering practices, and environmentally sound engineering practices, and environmentally sustainablesustainable

Will look at placing material on Brandt Island, Will look at placing material on Brandt Island, offshore, nearshore, and on the beachesoffshore, nearshore, and on the beaches

Final report expected in late 2009Final report expected in late 2009

Page 5: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Norfolk to Alligator River – FY08 and FY09 DMMP and EIS for Disposal Areas (North Landing River and Currituck Sound)

Alligator River to Pamlico River – FY07 Maintenance Dredging of Alligator-Pungo Landcut; and FY08 / FY09 DMMP and EIS for Disposal Areas (Alligator River)

Neuse River to Beaufort – FY07- Core Creek Landcut Maintenance Dredging.

Beaufort to Cape Fear–FY07- Topsail Inlet Crossing Maintenance Dredging. FY08- Maintenance Dredging of 1 to 3 shoaled areas.

Cape Fear to Little River– FY08/FY09 – No Funding

Norfolk, VA to Jacksonville, FL – Kick Off Meeting for Regional DMMP (Week of October 15th). Work to be completed with FY08 funds.

Atlantic Intracoastal Atlantic Intracoastal Waterway (AIWW)Waterway (AIWW)

FY08 WorkFY08 Work

Maintenance Dredging at Five Different Sites Total Estimated Quantity: 550,000 CYDisposal Locations: Beach / Upland

Page 6: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Manteo (Shallowbag) Manteo (Shallowbag) Bay, NC Bay, NC

FY08 WorkFY08 Work

Interior Channels ContractInterior Channels Contract

Estimated Quantity: 700,000 CYEstimated Quantity: 700,000 CY

Depth: 12’ + 2’Depth: 12’ + 2’

Type of Equipment: PipelineType of Equipment: Pipeline

Disposal Area: Bird Islands / Disposal Area: Bird Islands / UplandUpland

Solicitation Date: 10/18/2007Solicitation Date: 10/18/2007

Approximate Start Date: Approximate Start Date: 12/20/200712/20/2007

FY 08 Ocean Bar / Spit FY 08 Ocean Bar / Spit Contract(s)Contract(s)

Estimated Quantity: Estimated Quantity:

Ocean Bar: 560,000 CYOcean Bar: 560,000 CY

Navigation Spit: 200,000 CYNavigation Spit: 200,000 CY

Depth: 14’ + 3’Depth: 14’ + 3’

Type of Equipment: Hopper or Type of Equipment: Hopper or PipelinePipeline

Disposal Area: Nearshore or Disposal Area: Nearshore or BeachBeach

Approximate Start Date: Approximate Start Date: June/July 2008June/July 2008

Page 7: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

PROJECT: Far CreekPROJECT: Far Creek (Option (Option Item in FY08 Manteo Interior Item in FY08 Manteo Interior Channel Contract)Channel Contract)

Type Work: MaintenanceType Work: Maintenance

Depth: 10’ + 2’Depth: 10’ + 2’

Width: 80-100 ft Width: 80-100 ft

Quantity: 250,000 cy @ 12 ft.Quantity: 250,000 cy @ 12 ft.

Type of Material: Silt & SandType of Material: Silt & Sand

Disposal Area: UplandDisposal Area: Upland

Type of Equipment: Pipeline Type of Equipment: Pipeline

Last Dredged: 1999Last Dredged: 1999

Environmental Window: Environmental Window: Oct 1 – March 31 (Shrimp, Oct 1 – March 31 (Shrimp, Fisheries)Fisheries)

**Far Creek is located **Far Creek is located approximately 30 miles from the approximately 30 miles from the Manteo (Shallowbag) Bay Manteo (Shallowbag) Bay Project.Project.

Page 8: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Manteo (Shallowbag) Bay, Manteo (Shallowbag) Bay, NC NC

Dredge Material Dredge Material Management PlanManagement Plan

Will look at disposal needs and alternatives for Will look at disposal needs and alternatives for Manteo (Shallowbag) Bay over the next 20 years for Manteo (Shallowbag) Bay over the next 20 years for the entire Project (Interior Channels, Spit Channel, the entire Project (Interior Channels, Spit Channel, and Ocean Bar Channel).and Ocean Bar Channel).

Will factor environmental considerations into decision Will factor environmental considerations into decision processprocess

Disposal plan will be chosen based on federal Disposal plan will be chosen based on federal standard of least cost alternative, consistent with standard of least cost alternative, consistent with sound engineering practices, and environmentally sound engineering practices, and environmentally sustainablesustainable

Will look at current disposal options and future Will look at current disposal options and future needs, while coordinating this process with both needs, while coordinating this process with both resource agencies and local stakeholders.resource agencies and local stakeholders.

Final report expected in late 2009Final report expected in late 2009

Page 9: WILMINGTON DISTRICT DREDGING PROGRAM WILMINGTON DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA

Navigation Branch Chief:Navigation Branch Chief: Mr. Roger Bullock Mr. Roger Bullock (910) 251-4822 (910) 251-4822

[email protected]@usace.army.mil

Waterways Management Section: Mr. Jimmy Hargrove Waterways Management Section: Mr. Jimmy Hargrove (910) 251-4479 (910) 251-4479

[email protected]@usace.army.mil

Navigation Contract Questions:Navigation Contract Questions: Mr. Danny Kissam Mr. Danny Kissam (910) 251-4424 (910) 251-4424

[email protected]@usace.army.mil

Current Construction Contracts:Current Construction Contracts: Mr. Dennis Mr. Dennis LynchLynch

(910) 251-4642 (910) 251-4642

[email protected]@usace.army.mil

Wilmington DistrictWilmington DistrictPoints of ContactPoints of Contact