ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE CONTRACT NO. : IMO-EMP-CT-10-0018 CALCULATION REPORT FOR ZOC PROCESS AREA (5) A2 12-Jul-12 HJ Issued for Review RWM LY NW SB A1 6-Jul-12 HJ Issued for Review RWM LY NW SB REV DATE BY DESCRIPTION CHECK APPR. CHECK APPR. CPP APPROVAL COMPANY APPROVAL REVISION CODE: A = Issued for Review (IFR); B = Issued for Approval (IFA); C = Approved for Construction (AFC) TOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE COMPANY PTTEP INTERNATIONAL LIMITED CPP ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE MM-ZTK-1A-ZOC-STR-CAL-5029 REV CLASS A2 1

Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

Embed Size (px)

DESCRIPTION

lng

Citation preview

Page 1: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

ZAWTIKA DEVELOPMENT PROJECT PHASE 1A

EPCIC OF ZAWTIKA ONSHORE PIPELINE

CONTRACT NO. : IMO-EMP-CT-10-0018

CALCULATION REPORT FOR ZOC PROCESS AREA (5)

A2 12-Jul-12 HJ Issued for Review RWM LY NW SB

A1 6-Jul-12 HJ Issued for Review RWM LY NW SB

REV DATE BY DESCRIPTION CHECK APPR. CHECK APPR.

CPP APPROVAL

COMPANY APPROVAL

REVISION CODE: A = Issued for Review (IFR); B = Issued for Approval (IFA); C = Approved for Construction (AFC)

TOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE COMPANY

PTTEP INTERNATIONAL LIMITED

CPP

ZAWTIKA DEVELOPMENT PROJECT PHASE 1A EPCIC OF ZAWTIKA ONSHORE PIPELINE

MM-ZTK-1A-ZOC-STR-CAL-5029 REV CLASS

A2 1

Page 2: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 2/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

CONTENTS   

1.0       CODES, STANDARDS AND ENGINEERING SPECIFICATIO ....................................................................... 3 

2.0       CALCULATION  FOR   FOUNDATION .................................................................................................... 3 

2.1      CALCULATION  FOR  TYPE   A  FOUNDATION ................................................................................................. 3 2.1.1   INFORMATION OF FOUNDATION ........................................................................................................................................ 3 2.1.2   INFORMATION OF CALCAULATION .................................................................................................................................. 3 2.1.3   CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 3 2.1.4   REINFORCE BAR OF FOUNDATION ...................................................................................................................................... 3 2.2      CALCULATION FOR  TYPE  B  FOUNDATION ................................................................................................... 3 2.2.1    INFORMATION OF FOUNDATION........................................................................................................................................ 3 2.2.2    INFORMATION OF CALCAULATION .................................................................................................................................... 4 2.2.3    CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 4 2.2.4    REINFORCE BAR OF FOUNDATION ............................................................................................................... 4 2.3       CALCULATION FOR  TYPE  C  FOUNDATION .................................................................................................. 4 2.3.1    INFORMATION OF FOUNDATION ................................................................................................................ 4 2.3.2    INFORMATION OF CALCAULATION .............................................................................................................. 4 2.3.3    CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION ..................................................................... 4 2.3.4    REINFORCE BAR OF FOUNDATION ............................................................................................................... 5 

3.0        APPENDIX  A SOIL REPORT ................................................................................................................. 7 

4.0        APPENDIX  B  BASIC EQUIPMENT FOUNDATION INFORMATION PROVIDED BY PIPE   DEPARMENT ... 41 

5.0        APPENDIX  C  STRUCTURAL DRAWINGS ............................................................................................ 44 

 

Page 3: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 3/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

IFICATIOAND ENGINEERING SPEC STANDARDSCODES, 1.0

GB 50007-2002 Code For Design Of Building Foundation GB 50010-2002 Code For Design Of Concrete Structures MM-ZTK-1A-GEN-CIV-REP-0001 Effect Of Seismic Activity Report (Onshore) MM-ZTK-1A-ONEP-CIV-SPE-5001 Specification For Civil/Structural Works Calculation Report For Pier Foundation (Mechanical)

FOUNDATIONFOR CALCULATION 2.0

2.1 CALCULATION FOR TYPE A FOUNDATION 2.1.1 INFORMATION OF FOUNDATION

Foundation Parameter High of foundation H = 1.65 m Length of foundation L = 1.0m Width of foundation W = 1.0m Area of foundation A = L*B=1.0m2

Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc

2.1.2 INFORMATION OF CALCAULATION

Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 1.61 m Average weight which foundation and soil γ=2T/m3

2.1.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION

Weight of column Wc = 3.6T Weight of soil Ws = 3.0T Allowable bearing capacity of soil Qa =10T/m2

Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A= 6.6T/m2 < Qa=10T/m2

Safety status:OK

2.1.4 REINFORCE BAR OF FOUNDATION

A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200

2.2 CALCULATION FOR TYPE B FOUNDATION 2.2.1 INFORMATION OF FOUNDATION

Foundation Parameter High of foundation H = 1.85m Length of foundation L = 0.5m

Page 4: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 4/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Width of foundation W = 0.5m Area of foundation A = L*B=0.25m2

Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc

2.2.2 INFORMATION OF CALCAULATION

Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 1.81m Average weight which foundation and soil γ=2T/m3

2.2.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION

Weight of column Wc = 0.2T Weight of soil Ws = 0.75T Allowable bearing capacity of soil Qa =10T/m2

Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A= 3.8T/m2 < Qa=10T/m2

Safety status:OK

2.2.4 REINFORCE BAR OF FOUNDATION

A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200

2.3 CALCULATION FOR TYPE C FOUNDATION 2.3.1 INFORMATION OF FOUNDATION

Foundation Parameter High of foundation H = 2.08 m Length of foundation L = 1.0m Width of foundation W = 1.3m Area of foundation A = L*B=1.3m2

Material Information Compressive strength of concrete: fc =240ksc Grade SD40 for deform bar yield strength: fy=4000ksc Grade SR24 for round bar design strength: fy=2400ksc

2.3.2 INFORMATION OF CALCAULATION

Structural important factor γo=1.0 Depth of foundation dh=1.5m Distance for resultant force to concrete edge as=40mm Effective high ho = H-as = 2.04 m Average weight which foundation and soil γ=2T/m3

2.3.3 CHECK BEARING CAPACITY AND STABILITY OF FOUNDATION

Weight of column Wc = 3.6T

Page 5: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 5/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Weight of soil Ws = 3.9T Allowable bearing capacity of soil Qa =10T/m2

Checking Soil Bearing Capacity Which Axial Load Action Compressive strength of foundation bottom Qb = (Wc+WS) / A=5.77T/m2 < Qa=10T/m2

Safety status:OK

2.3.4 REINFORCE BAR OF FOUNDATION

A few force on the foundation, reinforcement Re-bar only avoid crack. So use RB 9@200

Page 6: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 6/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 7: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 7/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

SOIL REPORT A APPENDIX 3.0

Page 8: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 8/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 9: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 9/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 10: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 10/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 11: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 11/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 12: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 12/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 13: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 13/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 14: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 14/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 15: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 15/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 16: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 16/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 17: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 17/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 18: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 18/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 19: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 19/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 20: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 20/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 21: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 21/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 22: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 22/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 23: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 23/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 24: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 24/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 25: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 25/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 26: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 26/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 27: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 27/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 28: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 28/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 29: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 29/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 30: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 30/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 31: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 31/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 32: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 32/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 33: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 33/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 34: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 34/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 35: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 35/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 36: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 36/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 37: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 37/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 38: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 38/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 39: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 39/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 40: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 40/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 41: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 41/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

ROVIDED BY PIPE DATION INFORMATION PBASIC EQUIPMENT FOUN B APPENDIX4.0 DEPARMENT

DWG5013 AxB(mm) ELEVATION(m) LOAD(N)

PS251 350×350 0.50 17000

PS252 350×350 0.50 17000

PS253 350×350 0.50 17000

PS254 350×350 0.50 17000

PS255 220×220 0.50 2000

PS256 220×220 0.50 2000

PS257 220×220 0.50 2000

PS258 600×900 0.58 36000

PS259 600×900 0.58 36000

PS260 350×350 0.50 17000

PS261 220×220 0.50 2000

PS262 350×350 0.50 17000

PS263 350×350 0.50 17000

PS264 220×220 0.50 2000

PS265 300×300 Hold 2000

PS266 350×350 0.50 17000

PS267 350×350 0.50 17000

PS268 220×220 0.50 2000

PS269 350×350 0.50 17000

PS270 300×300 HOLD 2000

PS271 350×350 0.50 17000

PS272 350×350 0.50 17000

PS273 220×220 0.50 2000

PS274 300×300 HOLD 2000

PS275 600×900 0.58 36000

PS276 350×350 0.50 17000

PS277 350×350 0.50 17000

PS278 350×350 0.50 17000

PS279 300×300 HOLD 2000

PS280 220×220 0.50 2000

PS281 350×350 0.50 17000

Page 42: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 42/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

PS282 220×220 0.50 2000

PS283 350×350 0.50 17000

PS284 600×900 0.58 36000

PS285 350×350 0.50 5100

PS286 600×900 0.58 36000

PS287 350×350 0.50 36000

Page 43: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 43/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

Page 44: Mm Ztk 1a Zoc Str Cal 5029 Rev a2_in

PTTEP International Limited Page 44/44

Zawtika Development Project Phase 1A Document : MM-ZTK-1A-ZOC-STR-CAL-5029

EPCIC of Zawtika Onshore Pipeline Revision : A2

Date : 12-Jul-2012

STRUCTURAL DRAWINGS C APPENDIX5.0