Ministry of Transportation 3 NoName of ProjectGovernorate 86th of October logistic CenterGiza 9Light Rail Trans (Heliopolis - New Cairo)Cairo 10 Greater Cairo Metro - Line 5 "Nasr City - Heliopolis – El Sawah- Rod El-Farag" Cairo 11Greater Cairo Metro - Line 6Cairo 12Port Said TunnelsPort Said 13 Alexandria International Yacht and Entertainment Area Alexandria
Citation preview
Ministry of Transportation
1
Ministry of TransportationMinistry of Transportation
Ministry of Transportation
2
List of Projects
No Name of Project Governorate
1 High Speed Train
2 Ain Shams/ 10th Ramadan Railway
3 Luxor –Hurghada line
4 Beni Mazar- El bouty
5 Safaga - El Quseir - Marsa Alam
6 Ras Sudr - Sharm el-Sheikh
7 Alexandria – Abu Sumbel
Ministry of Transportation
3
No Name of Project Governorate
8 6th of October logistic Center Giza
9 Light Rail Trans (Heliopolis - New Cairo) Cairo
10 Greater Cairo Metro - Line 5"Nasr City - Heliopolis – El Sawah- Rod El-Farag" Cairo
11 Greater Cairo Metro - Line 6 Cairo
12 Port Said Tunnels Port Said
13 Alexandria International Yacht and Entertainment Area Alexandria
Ministry of Transportation
4
No Name of Project Governorate
14 Touristic Area of Alexandria PortArea Alexandria
15 Dekhila Container Terminal (CT3) Dekhila
16 Dekhila Dirty Bulk Terminal Dekhila
17 Dekhila Yields Terminal Dekhila
18 East Portsaid Port “East Port Said Dry Bulk Terminal (1)” Port Said
19 West Portsaid Port “Port Said Cruise Terminal” Port Said
Ministry of Transportation
5
No Name of Project Governorate
20 Al Arish Port “Al Arish Yields Terminal (2)” North Sinai
21 Damietta Port “Damietta General Cargo Terminal” Damietta
22 Damietta Port “Damietta Grains and Food Supplies Station Damietta
23 Adabia Port “Adabia Container Terminal” Suez
24 Adabia Port “Adabia Yields Terminal” Suez
25 Safaga Port “Safaga Container Terminal” Red Sea
Ministry of Transportation
6
No Name of Project Governorate
26 Hurgada Port “Hurgada Cruise Terminal” Red Sea
27 Hurgada Port “Hurgada Passenger Terminal” Red Sea
28 Sharm el-Sheikh Port “ Sharm El-sheikh international yacht and entertainment area” South Sinai
29 Sharm el–Sheikh Port “Sharm El Sheikh Cruise Terminal” South Sinai
30 Tawfiq Port “Tawfiq Yacht Terminal”
31 Tawfiq Port “General Cargo Terminal”
Ministry of Transportation
77
No Name of Project Governorate
32 El Tor Multipurpose Terminal (Container- General Cargo-Dry Bulk) Terminal South Sinai
33 Quena Port Qena
34 Sohag Port Sohag
35 Assiut Port Assuit
Ministry of Transportation
8
Main Data: Project Name: High Speed train (Alex – Aswan) (Alex – Aswan)
Project Description: A new railway alignment dedicated for the high speed train between Alexandria and Aswan through Cairo, Assiut and Luxor. The line is planned to be built on 3 phases:Phase I: Cairo- AlexA pre- feasibility study has been conducted by an Italian Company and it stated the following:-Line length: 202 km -The running speed: 300-350km/h-Execution duration: 5 years -Trip time: 60 minutes non stop-Expected passengers: from 10 to 18 million /yearPhase II: Cairo- LuxorThe development of the tender document and TOR for the feasibility study is ongoing and the following are the basic data of the line: -Line length: 680 km -The running speed: 300-350 km/h-Execution duration: 8 years -Expected passengers: from25 to 30 million/year
1- High Speed Train
Ministry of Transportation
9
Phase III: Luxor - AswanThe development of the tender document and TOR for the feasibility study is ongoing and following are the basic data of the line:-Line length: 210 km -The running speed: 300 -350km/h-Expected passengers: from25 to 30 million /year
1- High Speed Train
Investment data: Estimated cost for Phase I: Cairo- Alex: USD 3.5 billion
Estimated cost for Phase II: Cairo- Luxor: Under Study
Estimated cost for Phase III: Luxor - Aswan: Under Study
Ministry of Transportation
10
Location of Project:Location Description: Between Alexandria and Aswan Through Cairo.
Governorate: Alexandria -Aswan
Project Launching Mechanism: •Execution duration for Phase I: Cairo- Alex is 5 years.
•Execution duration for Phase II: Cairo- Luxor is 8 years
1- High Speed Train
Ministry of Transportation
11
Main Data:
Project Name: Ain Shams/10th of Ramadan Railway
Project Description: •Electric Railway Line Linking industrial and Residential Area at 10th of Ramadan to Cairo
from the east and Belbis from the west side.•Both a passenger and freight link
2 -Ain Shams/10th of Ramadan Railway
Investment data: Estimated cost: USD 700 million
Ministry of Transportation
12
Main Data: Project Name: Luxor - Hurghada line
Project Description: This project consists of the following:•A new line begins from Luxor city to come across the current Qena-Safag line at X Location.
•Rehabilitation of the line between X and Safaga station•Establishment of a connection of 50 km between Safaga and Hurgada.
Project Objective: The purpose of this new line is to connect the monumental areas in Luxor with the touristic leisure and entertainment areas in Hurgada as well as transporting phosphate to Safaga Port.
3 -Luxor - Hurghada line
Investment data: Estimated cost: Under Study
Ministry of Transportation
13
Main Data: Project Name: Beni Mazar –El bouty
Project Description:
Project Objective:
4 -Beni Mazar –El bouty
Investment data: Estimated cost:
Ministry of Transportation
14
Main Data:
Project Name: Safaga - El Quseir - Marsa Alam
Project Description: •complete duplication of the road south of Safaga in the direction of the short distance of 35
km until Marsa Alam length of 180 km .•The total length through the Red Sea coast, stretching from Suez to Hurgada and Safaga,
short and Marsa Alam, to Halayib and Shalateen 1080 km.•double the road, even after South Safaga to El Quasar at 35 km.
5 -Safaga - El Quseir - Marsa AlamSafaga - El Quseir - Marsa Alam
Investment data: Estimated cost: USD 85 million
Ministry of Transportation
15
Main Data:
Project Name: Ras Sudr - Sharm El-Sheikh
Project Description: Duplication through the tunnel -Ras Sidr - Sharm el-Sheikh current to serve the tourist movement.
Project Objective:create duplication of the road aims to contribute to the development of tourism activities
and service traffic destined to and from seaports along the route of ports Tur and Sharm el-Sheikh and well as airport Abo Radis service and Sharm Sheikh addition to the service
area of industrial and mining activities area Abi Zenimah, in addition to reducing frequent accidents along the way.
6 -Ras Sudr - Sharm El-SheikhRas Sudr - Sharm El-Sheikh
Investment data: Estimated cost: USD 71 million
Ministry of Transportation
16
Main Data:
Project Name: Alexandria – Abu Sumbel
Project Description: extends the road from Alexandria in the north west of the Nile up to Abu Simbel in the south.
Project Objective:•create a free fast axis linking the north and south of the Republic contributes to the
expansion of this narrow valley on the Nile River.•create new hubs for different areas of development.
•create new jobs as the longitudinal kilometer of the road free provides about 60 jobs a year.
7 -Alexandria – Abu SumbelAlexandria – Abu Sumbel
Investment data: Estimated cost: USD 46 million
Ministry of Transportation
17
Main Data:
Project Name: 6th of October logistic Center
Project Description: •The selected location area is along a freight rail line (Wahat) at km 84 exists a big plot of (nearly 400 ha) assigned to Dry Port Authority and suitable for building up a logistics village with all relative facilities. For the last mile from the intended logistic center to factories trucks will be used. 6th of October scored the best rate compared to the other locations. the 6th of October logistics center has an access to Ain Sokhna on the red sea and Alexandria and Dekhela Port on the Mediterranean sea and connected to the rail network.
• The distance between and both Alexandria and El Dekheila sea ports is about 230 KM.
8 -6th of October logistic Center6th of October logistic Center
Investment data: Estimated cost: USD 100 million
Ministry of Transportation
18
Main Data:
Project Name: Light Rail Trans (Heliopolis – New Cairo)
Project Description: •Upgrade the tram line Heliopolis current station Girls College in Heliopolis and extending until the American University in New Cairo length of 30 km (first phase) where achieve this linkage with the phase 2 of third Line of metro at stations Girls College and Stadium . A pre feasibility study and tender documents are under preparation by the World Bank .
9 -Light Rail Trans (Heliopolis – New Cairo)Light Rail Trans (Heliopolis – New Cairo)
Investment data:
Estimated cost: USD 435 million
Ministry of Transportation
19
Main Data: Project Name: Greater Cairo Metro - Line 5 "Nasr City - Heliopolis – El Sawah- Rod El-
Farag"
Project Description: •This Line starts at El Wfaa Wel amal in Nasr City , to Dr. Hassan El- Sharif Street at the Eighth suburb in Nasr City and crossing under Mostafa El Nahas St., then Hassan Maamoun St., reaching El Ahly Club at Nasr City and then down through El Nasr Road until it intersects with El-Nozha St. and continues underneath it to intersect with Line 3 at Haroun Station then continues under Abu Bakr El Sedeek St. in Heliopolis and continues to intersect with Line1 at Helmeyet El zeitoun Station and continues until El Sawah Square , then crosses down the railway to Ahmed Helmy St. and continue until El Khalafawy Square to intersect with Line 2 at El Khalafawy Station then Gisr El Bahr St. until El-Sahel area the end of this line with a length of about 20 km , the total number of stations will be about 17 underground station.
10 -Greater Cairo Metro - Line 5Greater Cairo Metro - Line 5
Investment data: Estimated cost: Under Study
Ministry of Transportation
20
Main Data:
Project Name: Greater Cairo Metro – Line 6
Project Description: •This line starts from El Khosous area at exit 18 of the Ring Road and then continues until the East of Shubra Al Khiemah then goes along beside Ismailia Canal, and will continue until El Sawah Square, then Port Said St. to cross above Line 1 at Ghamrah Station Until El-Sayeda Zeinab Square then continues to El Fustat Park to intersect with Line 4 and continues to the New Maadi area next to the Satellite area end of this line, with a length of about 30 km , 10 km of them on viaduct and about 20 km underground.•The sixth line will include 24 Stations, 4 elevated and 20 underground stations.
11 -Greater Cairo Metro - Line 6Greater Cairo Metro - Line 6
Investment data: Estimated cost: Under Study
Ministry of Transportation
21
Main Data:
Project Name: Port Said Tunnels
Project Description: •Three tunnels under Suez Canal in the South of Port Said at km 19.15 of Suez canal numbering .•Two tunnels for vehicles, one for each direction, and the third for railways. •The length of the tunnels is about (3) km . •The maximum height is 5,5 m .•The aim of this project is to achieve and provide direct services to industrial region in the East Coast of the Suez Canal.
Investment data: Estimated cost: USD 1 billion
Ministry of Transportation
22
Main Data:
Project Name: Alexandria International Yacht and Entertainment
Project Description: • Build and Operate an international yacht station (100,000 m2 total area includes 57000 m2 marine space and 43000 free floor entertainment space)• Berth length 750m which provides annual capacity of 20,000 Yachts,200,000 Visitor• Commercial and entertainment area of 30,000 m2 .
Area: total area of 100,000 m2 includes 43,000 m2 ground space and freedom of 57000 m2
Berth: Old Gouna Basin length of about 750 meters
13 -Alexandria International Yacht and Entertainment Area
Investment data: Estimated cost: USD 15 million
Ministry of Transportation
23
Main Data:
Project Name: Touristic Area of Alexandria Port
Project Description: •Build and Operate a touristic area planned to include a 500 rooms 5 stars hotel, international trade center, International exhibitions center and parking •A unique location between the Port Marina and the Cruise Terminal•The project will be open to Alexandria city and community.
Area: 65,000 m2
Berth: El Gouna area between berth 5 and berth 14
14 -Touristic Area of Alexandria Port Area
Investment data:
Estimated cost: USD 170 million
Ministry of Transportation
24
Main Data:
Project Name: Dekhila Container Terminal (CT3)
Project Description: •Build and Operate a new container terminal on the Mediterranean which will increase its capacity from 1 million TEUs to reach 2.5 million TEUs.•Great opportunity to attract new generation of large vessels.•Proximity to industrial zones in Alexandria and Borg Al Arab .
Area: 360000 m2
Berth: 100 Quay - length of 1,000 m
depth: 17 meters
15 -Dekhila Container Terminal (CT3)
Investment data:
Estimated cost: USD 280 million
Ministry of Transportation
25
Main Data: Project Name: Dekhila Dirty Bulk Terminal
Project Description: •Build and Operate a Dirty Bulk Terminal including high capacity storage for dry bulk and raw materials according to environmental standards•Establishing a breakwater with 320m length is required•Transfer of The Coal Terminal in Alexandria Port is required•Operator is allowed to add berths with 14m draft in the eastern part of the treminal•Expected annual capacity is 5 million Tons.
Area: 102 896 m2
Berth: Extension to berth 90 for mineral ores with original length of 600m and proposed extension of 320m Depth: 20m
depth: 20 meters
16 -Dekhila Dirty Bulk Terminal
Investment data:
Estimated cost: USD 185 million
Ministry of Transportation
26
Main Data: Project Name: Dekhila Yields Terminal
Project Description: •Build and Operate Yields Terminal to support yields imports and storage •Warehouses , yards, silos and handling equipment are required•Expected annual capacity is 3.5 million Tons
Area: Ground space of 262 370 m2 and the water surface of 162 610 m2
Berth: Basin of two berths with 800m total length located between berth 91 and berth 92
depth: 14 meters
17 -Dekhila Yields Terminal
Investment data:
Estimated cost: USD 170 million
Ministry of Transportation
27
Main Data: Project Name: East Port Said Dry Bulk Terminal (1)
Project Description: •Build and Operate a Dry Bulk Terminal in the eastern part of the first basin to support international trade and industry in the Middle east and eastern Mediterranean•The terminal will contain transit and medium term warehousing facilities•Expected annual capacity is 5 million .
Area: 500,000 m2
Berth: First phase 1200 m berths
depth: 15: 17 meters
18 -East Portsaid Port “East Port Said Dry Bulk Terminal (1)”
Investment data:
Estimated cost: USD 260 million
Ministry of Transportation
28
Main Data: Project Name: Port Said Cruise Terminal
Project Description: •Build and Operate a berth to serve as a cruise terminal on international standard•Cruise Terminal will serve on regular touristic lines to Port Said ( between 4000 and 5000 tourist)•Cruise Terminal berth should support serving touristic buses and required trucks •The Terminal will contain commercial and entertainment area•Expected annual capacity is 200,000 cruise passenger and visitor
Area: 15,000 m2
Berth: Berths of 400 m length
depth: 9: 11 meters
19 -West Portsaid Port “Port Said Cruise Terminal”
Investment data:
Estimated cost: USD 35 million
Ministry of Transportation
2929
Main Data: Project Name: “Al Arish Yields Terminal (2)”
Project Description: •Build and Operate Yields Terminal to support yields imports and storage in the Mediterranean •Warehouses , yards, silos and handling equipment are required•Expected annual capacity is 1 million Tons
Area: 125,000 m2
Berth: Berths of 350m length
depth: 12 meters
20 -Al Arish Port “Al Arish Yields Terminal (2)”
Investment data:
Estimated cost: USD 45 million
Ministry of Transportation
303030
Main Data: Project Name: Damietta General Cargo Terminal
Project Description: •Build and Operate General Cargo Terminal supporting agricultural and industrial activities in the Deta Governorates•All types of general cargo are permitted•Yards and all types of warehouses and needed equipment and facilities are required•Environmental Standards will be enforced
Area: : 260,000 m2
Berth: Three berths with total length of 700m le
depth: 15:17 meters
21 -Damietta Port “Damietta General Cargo Terminal”
Investment data:
Estimated cost: USD 100 million
Ministry of Transportation
31313131
Main Data: Project Name: Damietta Grains and Food Supplies Station
Project Description: •Build and Operate Grains and all types of Food Supplies Station to support imports and warehousing•Warehouses , yards, silos are required•Motor belts between the berth and the station are available•Yields Railway line is operating
Area: 28,500 m2
Berth: The Station to be linked to the existing berth 15
22 -Damietta Port “Damietta Grains and Food Supplies Station”
Investment data:
Estimated cost: USD 25 million
Ministry of Transportation
32323232
Main Data: Project Name: Adabia Container Terminal
Project Description: •Build and Operate the first container terminal in Adabia Port, Red Sea with expected annual capacity of 1.2 million TEUs•Great opportunity to attract new generation of large vessels•Project will serve on industrial regions of mid Egypt,Red Sea,Suez and Cairo
Area: 400,000 m2
Berth: Berths of 900 m length
depth: 17 meters
23 -Adabia Port “Adabia Container Terminal”
Investment data:
Estimated cost: USD 170 million
Ministry of Transportation
3333333333
Main Data: Project Name: Adabia Yields Terminal
Project Description: •Build and Operate Yields Terminal to support yields imports and storage •Warehouses , yards, silos and handling equipment are required•Expected annual capacity is 2.5 million Tons•Great opportunity where the nearest yields terminal is located in Safaga (400km far)
Area: 250,000 m2
Berth: Berths of 250 m length
depth: 14 meters
24 -Adabia Port “Adabia Yields Terminal”
Investment data:
Estimated cost: USD 60 million
Ministry of Transportation
343434343434
Main Data: Project Name: Safaga Container Terminal
Project Description: •Build and Operate the first container terminal in Adabia Port, Red Sea with expected annual capacity between 500 k to 1.2 million TEUs to be built on phases•Great opportunity to attract new generation of large vessels•Project will serve on Upper Egypt industrial cities
Area: 56,0000 m2
Berth: quay length of 800 m
depth: 17 meters
25 -Safaga Port “Safaga Container Terminal”
Investment data:
Estimated cost: USD 115 million
Ministry of Transportation
35353535353535
Main Data: Project Name: Hurgada Port “Hurgada Cruise Terminal”
Project Description: •Build and Operate a berth to serve as a cruise terminal on international standard•Cruise Terminal will serve on regular touristic lines to Port Said ( between 4000 and 5000 tourist)•Cruise Terminal berth should support serving touristic buses and required trucks •The Terminal will contain commercial and entertainment area•Expected annual capacity is 250,000 cruise passenger and visitor
Area: 20,000 m2
Berth: Extension to the Berths by 175m to reach 575 m length
depth: 9:11 meters
26 -Hurgada Port “Hurgada Cruise Terminal”
Investment data: Estimated cost: USD 20 million
Ministry of Transportation
3636363636363636
Main Data: Project Name: Hurgada Port “Hurgada Passenger Terminal”
Project Description: •The project is located outside the customs port of Hurgada•The project aims to create a service station for passengers on an area • of 13,500 m2 to the port of Hurgada•Accessory building Yards waiting compounds, a mosque, cafeteria and administrative offices, shops and banks and Motels to accommodate the passengers during periods of congestion
Area: 13.500 m2
27 -Hurgada Port “Hurgada Passenger Terminal”
Investment data: Estimated cost: USD 7 million
Ministry of Transportation
373737373737373737
Main Data: Project Name: Sharm El-sheikh international yacht and entertainment area
Project Description: •Build and Operate an international yacht station on 29,000 m2• Expected to provide annual capacity of 5,000 Yachts,300,000 Visitor• Commercial, touristic and Entertainment is required
Area: 29,000 m2
28 -Sharm el-Sheikh Port “ Sharm El-sheikh international yacht and entertainment area”
Investment data:
Estimated cost: USD 22 million
Ministry of Transportation
3838383838383838
Main Data: Project Name: Sharm El Sheikh Cruise Terminal
Project Description: •Build and Operate a berth to serve as a cruise terminal on international standard•Development of Touristic Passenger area as well as building a third berth serving on cruise lines is required •Cruise Terminal will serve on regular touristic lines to Sharm El Sheikh•The Terminal will contain commercial and entertainment area•Expected annual capacity is 250,000 cruise passenger and visitor
Area: 60,000 m2
Berth: 550 m
depth: 10 meters
29 -Sharm el–Sheikh Port “Sharm El Sheikh Cruise Terminal”
Investment data: Estimated cost: USD 22 million
Ministry of Transportation
393939393939393939
Main Data: Project Name: “Tawfiq Yacht Terminal”
Project Description: •Build and Operate an international yacht station on 65,000 m2•Unique location , the only yacht terminal in Suez (100km far from Cairo)• Expected to provide annual capacity of 16,000 Yachts, 200,000 Visitor• Commercial, touristic and Entertainment is required
Area: 65,000 m2
Berth: berth of 500 m length
depth: 10 meters
30 -Tawfiq Port “Tawfiq Yacht Terminal”
Investment data: Estimated cost: USD 10 million
Ministry of Transportation
40404040404040404040
Main Data: Project Name: General Cargo Terminal
Project Description: •Build and Operate a General Cargo Terminal in a Suez Red Sea Port•Serve Middle Cargo VesselsExpected annual Capacity 1.5 million Tons
Area: 50,000 m2
Berth: berth along with breakwater with length of 750 m
depth: 10 meters
31 -Tawfiq Port “General Cargo Terminal”
Investment data:
Estimated cost: USD 50 million
Ministry of Transportation
4141414141414141414141
Main Data: Project Name:El Tor Multipurpose Terminal (Container- General Cargo-Dry Bulk) Terminal
Project Description: •Build and Operate three stations for container, general cargo and dry and agriculture bulk•Serve linking industrial and agricultural areas in Sinai with Arab and African Countries•Expected annual capacity of 1,8 million Tons
Area: 243,000 m2
Berth: Berths of 1000 length linear meters
depth: 10 - 12meters
32 -El Tor Multipurpose Terminal (Container- General Cargo-Dry Bulk) Terminal
Investment data:
Estimated cost: USD 50 million
Ministry of Transportation
424242424242424242424242
Main Data: Project Name: Quena Port
Project Description: •Storage Capacity of 255,000 tons•Annual Throughput: 6.6 million tons
Area: 15 Acres
length: 250 m
depth: 250 meters
33 -Quena Port
Investment data:
Estimated cost: USD 30 million
Ministry of Transportation
434343434343434343434343
Main Data: Project Name: Sohag Port
Project Description: •Storage Capacity of 197,200 tons•Annual Throughput: 5.1 million tons
Area: 11.6 Acres
length: 350 m
depth: 70 meters
34 -Sohag Port
Investment data:
Estimated cost: USD 30 million
Ministry of Transportation
44444444444444444444444444
Main Data: Project Name: Assuit Port
Project Description: •Storage Capacity of 578,000 tons•Annual Throughput: 15 million tons
Area: 34 Acres
length: 540 m
depth: 256 meters
35 -Assuit Port
Investment data:
Estimated cost: USD 30 million