Upload
others
View
10
Download
0
Embed Size (px)
Citation preview
adie mete wear wferencor Zeit /Tele —_: 0866-2483910 “a
(ase oiaes at usaf tare) Wea /Fax — : 0866-2474496 National Highways Authority of India 3-Fet / E-mail : sak na pili (Ministry of Road Transport & Highways) San EME . arate aaa aftert, aig as oS Office of the Regional Officer, Andhra Pradesh Region
wAe.5.29, tad Freie, Tears WH ant, aaaEI-420 cod sigue wees oe AOAG TO PROSPERITY Plot No.21, Teacher's Colony, Gurunanak Nagar Road, Vijayawada-520 008. A.P.
Ref : NHAI/RO-VJA/ OFC/2021/ 4S G Date : 26.02.2020
INVITATION OF PUBLIC COMMENTS
Sub: Permission for laying of Optical Fibre Cable (OFC) by M/s. Telesonic Network Ltd. from Km.54/500 to 61/400 (6600 mts) on Tada - Nellore section of NH-5 ( New NH-16) - Public Comments - Reg.
tkeke
The Project Director, PIU - Nellore submitted a proposal of M/s. Telesonic Network Ltd. from Km.54/500 to 61/400 (6600 mts) on Tada - Nellore section in the state of Andhra Pradesh.
2. As per MORTH guidelines vide letter No. RW/NH-33044/29/2015/S&R( R) dated 2274 November 2016, the Highway Administration will put out the application in the Public Domain for 30 days seeking claims and objections (on grounds of public inconvenience, safety and general public interest),
3. In view of the above, the comments of public, if any, on the above mentioned proposal is invited on below mentioned address.
Regional Officer - Vijayawada,
National Highways Authority of India, Plot No.21, Teachers’ Colony, Gurunanak Nagar Road,
Vijayawada, Andhra Pradesh. Pin: 520 008. Email: [email protected]
(R.K. Singh) Regional Officer RO - Vijayawada
BNUe Hratera : sit-5 wa 6, Aaet-10, gra, As feet - 110 075. Aaase : http://www.nhai.org Corporate Office : G-5 & 6, Sector -10, Dwaraka, New Delhi - 110 075 Website : http://www.nhai.org
Sreabar erate eee athe aeft/Tele —_: 0866-2483910 ase uhtaer sk waar dare) tera / Fax —: 0866-2474496
National Highways Authority of India = 2-1 / E-mail : [email protected]
(Ministry of Road Transport & Hi irovj ghways) [email protected]
area asta afar, sists aa Office of the Regional Officer, Andhra Pradesh Region ao STC cra atetta IAs Te AM, ESE eo oo 4 seTasT ween
ot No.21, Teacher's Colony, Gurunanak Nagar Road, Vijayawada-520 008. AP. SARATALA
Ref : NHAI/RO-VJA/ OFC/2021/ 4 S Baye Ree
To
The Sr. Technical Director,
NIC, Transport Bhawan,
New Delhi- 110001.
Sub: Permission for laying of Optical Fibre Cable (OFC) by M/s. Telesonic Network Ltd. from
Km.54/500 to 61/400 (6600 mts) on Tada - Nellore section of NH-5 ( New NH-16) -
Public Comments - Reg.
Sir,
Please find enclosed herewith the proposal of M/s. Telesonic Network Ltd. fram
Km.54/500 to 61/400 of (6600 mts) on Tada - Nellore section in the State of Andhra Pradesh
2. As per MORTH guidelines vide letter No. RW/NH-33044/29/2015/S&R (R) dated 22%
November 2016, the application along with the recommendation of PD, PIU - Nellore are
enclosed herewith with a request to host the same in the Ministry’s website for 30 days
seeking claims and objections (on grounds of public inconvenience, safety and general public
interest), for taking further necessary action.
Yours faithfully,
Encl: As above (R.K. Singh)
Regional Officer RO - Vijayawada
Copy to PD, PIU - Nellore - for information
anahe Brace : sit-5 wa nana ; _— = 6, Waet-10, Breen, 7S facet - 110 075. Tease : http:/www.nhai.org
: G- , Sector -10, Dwaraka, New Delhi - 110 075 Website : http:/Awww.nhai.org
T : y ude wets wreraet wrferercor deft Tele —: o861-2366040 8-H / E-mail ; [email protected],
(asa uae an Sr Hales) [email protected]
National Highways Authority of India (Ministry of Road Transport & Highways) oe Uaioe aroha gang, Aeeite, aiig. oc wreTert Project Implementation Unit, Nellore, A.P ee airk TLCS, Se WS Sas & oe, earns, Aree - uae ox, ay, merece Bypass Road Junction with Old GNT Road, Vedayapalem, Nellore - 524 004, A.P
Ref: 1200/0F C/NHAI/PIU/NELLORE/2019- |oY7 ol Dated: 14.12.2020 To ~N t.. IS+|2+2020 The Regional Officer, National Highways Authority of India, g i» . Plot No. 21, Teachers’ Colony, Gurunanak Nagar Road, N/ Al AEC 2628 Vijayawada — 520 008, W oy A\4 502)
Sir,
Sub: NHAI, PIU, Nellore ~ (Tada — Nellore section ) - Laying of OFC by M/s. Telesonic Network Ltd, from KM. 54/500 to 61/400 of Nellore — Chennai 6600 mts — Approval — Requested — Reg.
Ref. 1. M/s. Telesonic Netowrks Ltd, Visakhapatnam letter no. TNL/ROW/NEL- CHN/2020-21/20, dated 25.09.2020 2. This office letter no, 11010/Pkg-l/Cont/NHAI/P|U/NELLORE/2020-680, dated 05.10.2020 3. M/s. Aarvee Associates Pvit Ltd, Kovur letter no. Aarvee/NHAI/IE/20-21/1043, dated 17.10.2020 4. This office letter no. 11012/2.0/Vol. 1/T-N/NHAI/PIU/NELLORE/2019-762, dated 21.10.2020 5. Mis. Telesonic Netowrks Ltd, Visakhapatnam letter, dated nil (received this office on 01.12.2020)
With reference to the subject cited above, it is to inform that Telesonic Netowrks Ltd, Visakhapatnam, vide reference 1° cited above, has submitted proposal to this office for Laying of OFC by M/s. Telesonic Network Ltd, from KM. 54/500 to 61/400 of Nellore — Chennai 6600 mts and requested this office for approval of the same.
This office vide reference 2" cited above, has forwarded the proposal to IE, M/s Aarvee Associates Pvt Ltd, Kovur to examine the proposal as per MoRTH guidelines and furnish necessary comments/ recommendations to this office.
M/s. Aarvee Associates Pvt Ltd, Singaraykonda vide reference 3” cited above has recommended the above proposal, subject to certain condition (Copy enclosed).
This office vide reference 4" cited above has communicated said observations on the above proposal to the applicant for compliance.
M/s. Telesonic Network Ltd vide reference 5" cited above, has resubmitted the proposal duly attending the observations communicated by this office under reference 4! cited.
In this connection, the proposal submitted by M/s. Telesonic Network Ltd, has been examined in light of MORT&H circular dated 22.11.2016 and it is to inform that:
D: Vijay Kumar/My Documents/PD General Correspondance-5
——— —E
oe
SUNS Hates : Vit-5 we 6, Aaex-10, gem, as feet - 110 075. @aeage : http://www.nhai.org Corporate Office : G-5 & 6, Sector -10, Dwaraka, New Delhi - 110 075 Website - http:/Avww.nhai.org
#2#
The applicant has submitted the following :
(i) Checklist
(ii) Undertaking for submission of Performance Bank Guarantee @ Rs.100/- per route meter
(ili) Undertaking for Shifting / Relocation of O.F. Cable (as per SI.No.5 of Check list) (iv) Draft license agreement regarding granting of ROW permission for laying telecom
cable / O.F. Cable / ducts Plan showing proposed pipeline crossing, (v) Indemnity Bond. (vi) Draft Agreement fee of Rs. 1/- (vii) Key map
(viii) Route Strip plans (ix) Calculations for amount to be paid to NHA! towards license fee.
As per the submitted plan, the applicant has proposed to lay the optical Fiber Cable with single line by Horizontal Directional Drilling (HDD) method in ROW within 2m utility corridor,
Applicant submitted the typical cross sections of Optical Fiber Cable along and across the highway for HDD with methodology.
The proposal is found to be in order as per MORT&H norms circular RW/NH- 33044/29/2015/S&R (R), dated 22.11.2016. The proposal along with the copies of all the above mentioned documents is herewith submitted and it is recommended for approval of the Competent Authority Laying of OFC by M/s. Telesonic Network Ltd, from KM. 54/500 to 61/400 of Nellore —- Chennai 6600 mts at earliest please
Thanking You
Yours faithfully Encl: As above.
ray \r} 19 2 (Sanjay Channa Project Director
PIU- Nellore (AP)
D: Vijay Kumar/My Documents/PD General Correspondence-5
CERTIFICATE
1. Proposal submitted by applicant for laying of Optical Fibre Cable has been examined and found to be in order as it satisfies the standard conditions issued vide Ministry Circular No, RW/NH-33044/29/2015/S&R(R) cated 22.11.2016.
2. It is certified that any other location utility line would be extremely difficult and unreasonable costly and installation of utility line within RoW will not adversely affect the design, stability & traffic safety of highway nor the likely future improvement such as widening of the carriageway, easing of curve, etc.
3. Supervision of the work of laying of utility will be done by the Independent Engineer and it will be ensured that the defects in road portion shall be corrected after laying of utility.
4. It will be ensured that proposed permission is entered in the register of records.
Abs
(Sanjay Channa)
Project Director NHAI, PIU, Nellore
D: Vijay Kumar/My Documents/PD General Correspondence-5
SOx. JA
RY? AAIVES ASSOCIATSS “ c LINVU/ architects ens & Con sf & ©} lt,
IE Services during ORM sa reo for 4-lanz Tada - Nellore / on
section and Nellore Bypass section of NH-16 &
Nandigama - forahimpatnam - Vijeyewrada section of 2
NH-65 in the state of Andive Pracesh on BOT (Annuity? Ss
basis
Ref: Aarvee/NHAI/IE/20-21/1043 Dated: 17.10.2020
To Project Director, Project Implementation Unit, National Highways Authority of India, Nellore, Andhra Pradesh.
Sub; Independent Engineer Services during Operation &lMlaintenance Perlod for Tada -Nellore (Km.52.800 ta Km. 163.600} section of NH-16, Nandigama -lorahimpatnam -Vijayawada (Km. 217.000 to Km.265.000} section of NH-65 BOT Project & Nellore Gypass for the stretch from Km 161.034 to Km 178.200 section of NH-16 on BCT (Annuity) basis In the state of Andhra Pradesh -laying of Optical Fiber Cable by M/S. Telesonic Net Works Ltd.{airtel) from Km.54+500 to Km.61+100 on NH-16 Nellore — Chennai for a total length of 6600 mts. Submission of Comments-Reg.
Ref: 11010/Pkg-l/Cont/NHAI/PIU/NELLORE/2020- 680 date: 05.10.2020
Dear Sir,
This has reference to your office letter cited above, where in we have been advised to examine the proposals submitted by the M/S. Telesonic Net Works Ltc.(airtel] for laying of Optical Fiber cable along the National Highway from Km.S4+500 to Km.614100 for a total length of 6600 mts.
On attending to the ground verification, our observations are as under
1) The applicant is proposing the laying of Airtel OFC at the edge of the Row with in utility cortidor in line with the MoRTH Circular guide fines RW/NH-33044/29/2015/S&R(R)} dated 22.11.2016 using HDD method.
2) The applicant shall plan the activities with out any damages to the existing service road from
Km.54+700 to 55+000, fram Km.57+480 tn 474980 and from km .594+-930 te 604-300 on LHS,
3) The applicant has to execute the warks with aut any damages to the existing utilities on /
under ground.
4} The applicant should ptan the activities with out any obstruction to free flow of traffic on the highway and should follow the necessary safety measures,
The Permission far laying GFE line can be recommenced for the necessary appraval of Competent Authority
This is for your kind Information and necessary action.
Assuring our best services at all times.
Thanking you. Yours sincerely, .
WPiSkdsa Rao Tear Léacer cum Highwey Engineer Aarvee Associates Architects Engl cers &Cangultants Pvt .Ltd. i
Copy ta: 1. The Engineer, Aarvee Associates Architects Engineers &Consultants Pvt. Ltd for information
2. The COM M/s- STPL- Budhanam — for information
Cia. MY36 lalrestiuciv
Andhra Prades?
+ 24147, Nellore Dist,
$9/271428 e-mail (0: OMS 1S2kovurtPaarvee nel
- 560 O28, India, Cin: UT4200TS meer TeOGEAT mail: veeGpediveenel: wet read Olice Havule Resid
Sa ets
Telesonic Networks Limited, www.airtel.in D.No.10-1-8/3, Vinayagarh Plaza Call: +9140 4000 9900 Near Sampath vinayak temple, Opp. HSBC Bank Visakhapatnam, AP 530003, India
To,
The Project Director,
NHAI, PIU, NELLORE.
Sub : Laying of Optical Fiber Cable by M/s. Telesonic Networks Limited. From Km.54/500 to Km.61/100, on NH-5 Nellore-Chennai 6600Mtrs. As shown in attached SLD — Permission Regarding.
Ref: LR No.11012/2.0//Vol.1/T-N/NHAI/PIU/NELLORE/2019-762 Dated:21.10.2020,
We are submitting additional documents with this letter
Rs.1/- DD towards application fee. Revised check list as per NHAJ/MORT&H norms. Revised License deed with witness signature signed. Revised Undertaking Letter as per NHAI/MORT&H norms. Calculated license fee and BG enclosed. Pl
eo
BS
po
We request you to issue demand note in accordance with your policy.
Thanking you,
Received on ff -lgy¥
. Yours faithfully, No Bu Hand Tee
For Telesonic Networks Limited PD =
7
Manager ML,
YP/ Site Enginees
Popa
JAO/ Acct.
Reg office: bharti crescent, nelson Mandela road, vasanth kunj Phase II, New Delhi -110 070, India.
\ >?
Telesonic Networks Lid. 4th floor, C-Wing, Airtel Centre Plot no. 16, Udyog www.airtel.in Vihar IV, Gurgaon - 122015 Call +91 124 4222229 ¢ (Haryana) Fax +91 124 4248063
@ [ rtel
Letter No. TNL/ROW/NEL-CHN/2020-21/20. DT: 25-9-2020
Telesonic Networks Ltd. 10-1-8/3 Vinayagarh plaza Near Sampath Vinayak Temple Visakhapatnam Andhra Pradesh
530003. GST - 37AAHCA8010G2ZV
To,
The Project Director, we
NHAI, PIU, NELLORE.
Sub: Laying of Optical Fiber Cable by M/s. Telesonic Networks Limited. From km.54/500 to Km.61/100, an NH-5 Nellore-Chennai 6600Mirs. As shown in attached SLD — Permission Regarding.
ok HE
1. . Telesonic Networks Limited ( Formerly Bharti Tele-Venture Limited) has been awarded license
to install, operate & maintain National Long Distance services within territorial boundaries of India, Vide license agreement No. 10-25/2001-BS-1(01) Dated 29-11-2001 by Government of
India, Ministry of Communications, Department of Telecommunications.
We are going to lay underground OFC through duct along the road From Km.54/500 to Km.61/100, on NH-5 Nellore-Chennai 6600Mtrs. As shown in attached SLD. The work should be carried out as per standards, guidelines and policies for laying of OFC including installation of chambers & route markers.
2. We request you to issue demand note in accordance with your policy.
Thanking you,
Yours faithfully,
For Telesonic Networks Limited
+ == iegistered Office : Bhartl Crescent, 1, Nelson Mandela Road, Vasant Kunj, New DelhI-110070 - 91-11-4666 6100, F +91-11-4166 6137, Emall: [email protected] -orporate identity Number : U64200DL2009PLC325406
(SE
© @e
@oeqeesad
@
Guidelines for processing the proposal for laying of utility line in the land along National Highway verted with NHAI/PWD/BRO.
CHECK - LIST
S.NO ITEM INFORMATION/STATUS REMARKS 1 General Information
Telesenic Networks Limited, D.No,10-1-8/3, Vinayagarh Plaza 44 Name and Address of the Applicant / Agency Near Sampath vinayak temple, Opp. HSBC Bank
Visakhapatnam, AP 530003, India 12 National Highway Number NH-5 1.3 State ANDHARA PRADESH 14 Location Nellore-Chennai_. 3 1.5 Chainage in Km along the Road LHS From km.54/500 to km.61/100. 1.6 Length in Meters 6,600 meters 17 Width of available ROW ;
(a) Left side from center line towards increase chainage/km direction Varies from 18 to 25 Metrs (b) Right side from center line towards increase chainage/km direction
1.8 Proposal to lay the utility
(a) Left side from center line towards increase chainage/km km.54/500 to Km.64/200. direction __
(b) Right side from center line towards Increase chainage/km direction
19 Proposal to acquire land
(a) Left side from center NA (b} Right side from center ; NA
ein Whether proposal is in the same side where land |s not to be acquired Yes if not then where to lay the cable ‘ At The edge of the ROW
464 Details of already Laid services, if any, along the proposed route NA
i142 [Number of Janes(2/4 / 6/8 lanes) existing 4lanes Propased number of lanes (2 lane with paved shoulders/4 / 1.13 6/8 lanes NA
1.14 |service road existing or not Avaitable if yes then which side
(a) Left side fram center Km.57/400 to Km.57/900, Km.59/800 to 60/400 (b) Right side from center NA
1.15 [proposed service road
(a) Left side from center NA (b) Right side from center NA Whether proposal to lay utility is after the service road or y)
ae between the service road and main carriageway ui (At + b}- Ry ”
4.17 coe. of sewage/OFC has been proposed on ie No, Utility (OFC) not propased on Bridges. yes, then mention the methodology proposed for the same.
148 Whether carrying of sewage/oFC has been proposed on the No, Utility (OFC) not propased an the parapet/any part of the . parapet/any part of the Bridges. Bridges.
if yes, then mention the methodology proposed for the same.
If Crossings of the road Involved
If yes, it shall be either encased In pipes or through structure
119 [or conduits specially built for that purposed at the expense of Not Applicable the agency awning the line.
a) Whether the existing drainage structures are allowed
to carry the OFC b) Is itona line normal to NH Yes c) What Is the distance of crossing the utility OFC from
the exisling structures?
Crossing shall not be too near the existing structures onthe National Highway, the minimum distance being 15 meter
Not Applicable
~ Project Direetar NHAI, PIU, Neilere,
od
0
CHECK - LIST
d)} The casing pipe (or Conduit pipe in the case of electric
cable) carrying the utility line steel, cast iron or reinforced
concrete and have adequate strength and large enough to
permit ready withdrawal of carrier pipe/cable.
Mention on type of casing.
Not Applicable
2) — Ends of the casing/conduit pipe shall be sealed from
the outside, so that it does not act as drinage path. Not Applicable
f) The casing/conduit pipe should be as minimum extend
from drain to drain In cuts and toe of slope In the fills. Not Applicable
B) The ctop of the caing/conduit pipe should be at least
1.5 meter below the surface of the road subject to being at
least 0.3m below the drain inverts.
Mention the praposed details,
Not Applicable
h) Mention the methodology propsed for crossing of the
road for the proposed sewage/OFC.
Crossing shall be by boring method (HDD) {Trenchless
Technolog), specially where the esisting road pavement is of
ement concrete or dense bituminous concre tyne.
Usig HDD Mathadology
i) The casing/conduit pipe shall be instaled with anewen
bering throughout its length and in such a manner as to
prevent the formation of a water way along it. Not Applicable
2 Document/drawing enclosed with the proposal YES Enclosed
ba cross section showing the size of trench for open trenching YES Enclosed
method.
Is it normal size of 1.5m deepX0.3m wide. ; Yes
i) Should be greater than 60 cms wider than the outer Yes
diameter of the pipe.
ii) Located as close to the extreme edge of the Right of Way as
possible but not less than 15m from the center line of the Drawing Enclosed
nearest carriageway.
iii) Shall not be permitted to run along the National
Highyways when the road formation is situated in duble
cutting nor shall these be aid over the existing culverts and Not Applicable
bridges.
iV) These shuld be so laid that their top is at least 0.6m below
the ground level so as not to obsruct drainage of the road Yes
land,
2 cross section showing the size of pit and location of cable for PDO Geaeenaion enuinedd
HOD method.
Strip plan/Route plan showing utility/OFC, chainage, width of . 23 ROW, distance of proposed pipe line from the edge of ROW, Strip plan showing all the details is enclosed
important mile stone, intersections, cross drainage works etc.
2.4 Methodology for laying of OFC Enclosed Open trenching method (may be allow in utilit corridar only
ag where pavement is neither cement concrete not dense Yes, Methodology of OFC laying ettached.
bituminous concrate type).
lfyes, what is the methodology of refilling of trench.
a) The trench width should be at least 30 cms, but not
more than 60. ms. Wider than the outer diameter of the pipe.
Open Trench cross section enclosed
b) For filling af the trench, Bedding shall ba to a depth of
not less than 30 cms, It shall consist of granular material, free
of lumps, clods, cobbles and graded to yleld firm surface
without sudden change in the bearing value. Unsuitable soil Yes
and rock edges should be excavated and replaced by selected
material.
c) The backfill shall be completed in two stages-i} side fill
to the level of the tep of the pipe and Ii) overfill to the bottem Yes of the road crust,
Project Director NHAIL PIU. Nellore.
©o
oO ©
© ©
® ©
®@e@
@
CHECK - LIST
'd) The side fill shall consist of granular material laid in 15
cms. Layers each consolidated by mechanical tamperinng and
controlled addition of moisture to 95% of the proctor density.
Overfill shall be compacted to the same density 25 the
material that has been removed. Consolidation by saturartion
or ponding will not be perimitted.
Ves
e} The road crust shall be built to the same stength as the
existing crust on either side of the trench. Care shall be taken
to avold the formation of a dip at the trench.
Yes
f) The excavation shall be protected by flagman, Signs and
barricades and red lights during night hours. Yes
8) ‘If required a diversion shall be constructed at the
expense of agency owing the utllity line. Not Applicable
242 HDD (horizontal directional drilling} method Details provided in Methodolog of laying.
24.3
Methodology for laying of the OFC through CD works and
method laying. In case where the carrying of OFC on the
bridge becomes inescapable.
Yes, Methodology of OFC laying attached.
Draft license Agreement signed by two witness Enclased
3.1
The License fee estimate as per Ministry's guidalines issued
vide clreular No.RW/NH-33044/29/2015/S&R ° dated :
22.11.2016. Enclosed
Whether Performance Bank Guarantee as per Ministry's
guidelines issued vide circular No.RW/NH-
33044/29/2015/S&R © dated : 22.11.2016 is obtained.
Undertaking for submission of BG has been obtained from M/s
Telesonic Networks Limited.
4.1 Confirmation of BG has been obtained or not as per
MoRTH/NHAI guidelines.
Conformation of BG shall be obtained after BG submission by
from M/s Telesonic Networks Limited,
Affidavit/undertaking from the Applicant for following is to
be furnished.
5.1
Undertaking for not to damage any other utility , if damaged
then to pay the losses elther to NHAI or to the concerned
agency. Yes, Enclosed
2 Undertaking for Renewal of Bank Guarantee as and when
asked by MoRTH/NHAI. Yes, Enclosed
5.3 Undertaking for confirming all standard condition of
MoRTH/NHAI's guidelines, Yes, Enclosed
5.4 Undertaking for Indemnity against all damages and claims. Yes, Enclosed
5.5 Undertaking for management of traffic movement during
laying of utility line without hameering the traffic.
Yes, Enclosed
5.6 if any claim ts ralsed by the concessionaire then the same has
to be paid by the applicant Yes, Enclosed
7
Undertaking that prior approval of the NHAI shall be abtained
before undertaking any work of instalation shifting or repairs
or alteration to the utility located In the National Highway
Right of Ways.
Yes, Enclesed
5.8
Undertaking that expenditure if any incurred by NHA! for
repairing any damage caused to the NH by laing, maintenance
‘or shifting of the utility line will be borne by the applicant
agency owning the line.
Yes, Enclosed
5.9
Undertaking that test of the License deed is as per verbatim
of format issued by MORTH vide circular No.RW/NH-
33044/29/2015/S&R © dated : 22.11.2016.
Yes, Enclosed
5.10
Undertaking that the applicant has obtained various sa‘ety
clearance from the respective authorities such as Directorate
of Electricity, Chief Controller of Explosives, Petroleum and
Explosive Safety Organization. Oil industry Safety Directorate,
State/central pollution control board and any other satutory
clearances as applicable, before applying to Highway
Administration.
Not Applicable as the Utility line proposed is OFC
5.11
if the Morth/NHAI considers it necessary in future to move
the utility line for any work of improvement or repairs to the
road, It will be carried out as desired by the MoRTH/NHAI at
the cost of the Agency owning the utility line within a
reasonable time (not exceeding 60 days) of the intimation given. Yes, Enclosed
ta Project Director
NHAI, PIU, Nellore.
€>@d
Ce ot
> ®
©®oesd 0
CHECK - LIST
5.12
Certificate form the applicant in the following format i}
Laying of OFC will not have any deleterious effects on an of
the bridge corriponents and roadway safety far traffic.
ti}
we do undertake that I/we will relocate service
road/approach road/utilities at my/our own cost
notwithstanding the permission granted within such time as
will be stipulated by NHAI for future 4/6 laning or/any other
development.
Yes, Enclosed
Who will sign the agrement on behalf of OFC line agency?
Power of Attorney to sign the Agreement is available or not.
Yes, Enclosed
The Project Director shall submit the following Certificates
74
Certificate that the proposal is confiriming to all stands
conditions issued vide MoRTH circular No.RW/NH-
Enclosed
WZ
33044/29/2015/S&R ® dated : 22.11.2016. ee een eee ‘Tor: CETTMc av
I) "It is certified that an other location of the OFC would be
extrernely difficult and unneasonably costly and the
installation of OFC within ROW will not adversely affeect the
Design, stability and traffic safety of the highway nor the
likely future improvement such as widening of the carriage
way, easing of curve etc." ii) for 6 laning Enclosed
a) Where feasibility Is evailable
"| do certify that there will be no hindrance ta proposed six
laning based on the feasib'lity report considering proposed
structures at the said location".
b) In case feasibilityy report is not available.
"| do certify that sufficient ROW Is available at the site for
accommodating proposed six-laning".
Enclosed
Enclosed
if NHAI section proposed to be taken up by NH on BOT basis-
a clause fa to be inserted | the agrement " the permitted
highway on which license has been granted the right lay OFC
duct has also been granted as a right of way concessionable
under the concession agrement for up gradatio of NH-5
Nellore-Chennai From Km.54/500 to Km.61/100, 6600Mtrs
of NHAI(NH-5), on Build, Operate and Transfer Sasis] and
therefore , the licensee shall honour the same.
NA
Who will supervise the work of laying of Utility pipe line
a) On behalf of the applicant. Area Manger, Telesonic Netwarks Limited, AP. b) On behalf of MoRTH/NHAI NHAI PIU, Neliore/IE/Consultant
10
Who will ensure that the defects in road portion after laying
of OFG are corrected and if not coreected then what action
will be taken
a) On behalf of the applicant, Area Manger, Telesonic Networks Limited, AP. b) On behalf of MoRTH/NHAI NHAI PIU, Nellore/IE/Consultant
ii Wha will pay the claims for damages done/disruption in
working of concessionaire if asked by the Concessionaire? Telesonic Networks Limited
12 A certificate from PD that he will enter the proposed permission in the register of records of the permissions in the
prescribed proforma (copy enclosed)
Yes, Enclased
13
if any previous approval is.accorded for laying of cable then
photocopy of register of recards of permissions accorded (as maintained by PD) to be enclosed.
NA
P.Srinivas Reddy
ROW-Lead a
(Name Designation and signature of
Concerned field authority of NHAI/PWO/BRO
Project Director
NHAI, PLU, Nellore.
|
2IPUL "E000ES
S4HAI00S9 dv
‘weujedeyyesi, !euuay)
ue -310)[9N
OSH
‘ddo ‘ajdwey
yekeuiayjeduies seeqy
S-HN uO
eZB|q Webefeuia
‘cig ‘OOL/T9
WH ON
“FOL ON
Gpaywry
0} SJOMISN |
(4aql4) 005/75" Wy
auosajal “s/iAy
340 | leuuayp-aoyjan
Way
wol4 SLuUJOU
paepueys (uongau1p
HLHOI SUS
Jo wy
adeureys wood]
jJUuawaaize |
juswaeiZe |
quawasiZe ssoippe
SuIseasouUl (IADy
UL UOIEIASp
| = uonsadsul
| jo
AqIpleq jo
Suiudis #eQUOS pue |
aguas
YILe1 |
spyemoj) HN
jo azeujeyd)
SysRWISy Auy |
ise] Jo
a3eq jo
ajeg jo
ajeg sasusal
jo aweN |
jo puly
PUE UOHDa5
| apis
1YSIY 40
Yat uoneI07
S-HN - J4OQUNN
HN ‘Pp
SJO}[AN : JUa/EAINby
JO UOIsiIAIg
GAAd JO
BWEN
“¢
IWHN: {IVHN/OUG/aMd)
Aoua8yjoawen +z
Hsaqvud YuHaNy :
ayes joawen
-T
(juajeainba Jo
uolsinig GMd
Alana “a}8S
pue HN
Alana 404
Ajajyesedas paulequiew
ag of)
D4AO SulAe|
Joy peyuess
uoissimsed Aem
$9 1Ysly
Jo Spioday
Sulurequiew JO}
RWI
(u)wes/st0z/6z/pyOee-HN/MU’ON 4279817
(H 8
LY 40
“103q) ISOIN
0} aunsojsug
II-aunxauuy
QO
5 )
a
o
-~
Ww VW
W&
o S®eee
ee ecoeceodod ao
‘mojaq UMOYs si ABJOPOYJEW! GGH (e0!0AL ¥
“SOBLNS peos ay} Hulqunysip NOUYM poyjew BHuryjug jeuoyoeuiq jeJUOZIJOL Aq auop aq |JIM e]noy ayy UO Bulssouo |v
"YMoJB aunjonyjsedju! 0} BAIONpUOD saloijod JUBWUIAOB jeleaas 0} anp ABojopoyjew pawajoid ayy useq sey GGH sieah jueoal Ul ‘seniiqedes Buses pue Bu)yoes sey pue eoejins ay} 0} e|Bue mojjeus e ye Buus [JUup eB saoejd pue seyoune| yey Bu |up payunow-soeuns e Buisn punosB Mojsg ‘saul ApyyN Buipnjoul ‘sedid yonpoid Buljjeysul 10} anbiuyoe9} e s! (QqH) Bulg Jeuojdauig je}uoz|OH
POUJSIN CGH :Bulssoi9 ssejyouedy
‘4901 Jamod Ayeulpso sepiseq pasiyn aq IM JawUeY Boy “ajeduico ajejd ay!) juswdinbe uoyoedwog jeloadg ‘sajoedwoo ayejd/ Jejjor semod AlBUIpIO Aq pajsedwoo ueym WwW S/ Bulpsaoxe jou siaAe] Ul pajoedwos ‘JeusyewW payeavoxs BY} JO PUBS as1eO9 YIM JEyye pai aq jj Bund jo yjdep aijua ayy “seyouasy JO juawsjejsules Burjjy ul pasn aq jim jeuayew Jejnues6 pajoajas Ajuo ‘swajqoud PeIIIE JeYyjO PUB jUSUE}es aunjny jsuleBe UoYNeoed jUuepunqe jo ainseaw e sy
pouysyy Suri|4 youory “SOBJINS |BUIBLO $}! 0} payeysulas 8q || YOUR) ayy ‘ajqed Jeqi4 jeaNdo 10} pie] aze
S}ONP UONWOE}Old / 3dQH SU} Jaye yey ABM eB YONs U JoUUeW paseyd UI Jno pales aq [ILM 30m Bule] ajqeD ey, “UIPIM Ul SO gp puke Ydep UI sO gg} aq |IIM Yous Ol} Jo UO|sUBUIP BY] “poyjew Bulysuel) aulyoey pue jenueUW/poyjeW jeUoUaAUoD Aq euOCp 9q |[IM a}nNoJ peuonuelW ay} Buoje jeuUsyD-soljeN Buoje aiqeg Jeqi4 jeaydo jo Burke
:poyyey Buiyoual
(QGH) Sseyouel] Pe BUYSUST] U8GG - D40 Jo BUIAey Jo ABOjopouleny
TDN
@-Lld GQH
jong? SdH
WwwOp
NOILOSS LSV1
NOILOAS JLVWIGSWHSLNI
NOlLOaS TWILL!
|
oes
t-Lid QGH
Ge
Ge
go
TON
oooL
CH
404 Jeuanses
ssoid jeoidA |