View
216
Download
0
Tags:
Embed Size (px)
Citation preview
’94-’00
2001
2002
2003
2004
2005
2007
AIT DEMONSTRATION/VALIDATIONAIT DEMONSTRATION/VALIDATION
SNTSNT: PARTNERSHIP W/ NAVSUP : PARTNERSHIP W/ NAVSUP (per AMSR)(per AMSR)
UIDUID: OSD POLICY ISSUED: OSD POLICY ISSUED
JACG TASKINGS: T700 ENGINEJACG TASKINGS: T700 ENGINE
DoN VIRTUAL SYSCOM DoN VIRTUAL SYSCOM LEADLEAD
RFIDRFID: ENGINE CONTAINERS: ENGINE CONTAINERS
2010 ALL ASSETS IN DOD INVENTORY ALL ASSETS IN DOD INVENTORY UID’dUID’d
OSD INITIATES UID PROGRAMSOSD INITIATES UID PROGRAMS
OSD TO ISSUE BUDGET OSD TO ISSUE BUDGET GUIDANCEGUIDANCEALL SERIAL #’s ENTERED IN ALL SERIAL #’s ENTERED IN REGISTRYREGISTRY
SNT – UID Evolution
Aviation Asset/Information Flow
NAVY UID CONOPSBASELINE
OrganicDepot
Web-enabled
SNT System
RetailSector
WholesaleSector
LCAV
NALCOMISFoundation Tier
/
NALCOMIS (O)Top Tier
LMDSS (I)DMDS (D)
FACTSWMPSeRMS
OOMA
OIMA
OOMA
ASD
Carcass Shipment
‘O’Level
Carcass ScreeningTransshipment
Web-MRIL/ A-ORS
ATACHub / Node
ATACDB
DDD/FISC
Navy/CAV
Navy\CAV
DDD/FISC
I-Level
RFIWholesaleInventory
GTN
Information Systems
UICP
UICP
Connectivity Not Connected Asset FlowNo S/N
DepotRepair
NSWC CraneILSMIS
OrganicCAV-ORM
CommercialCAV
NRFIInventory
GTN
S/N
FIMARS
Inter Service
(Air Force-Tinker)
S/N Visibility
NAVAL INVENTORY CONTROL POINT
SNT w/ Human Readable Technology
S/N CHK008 24 Accurate Entries 6 Erroneous Entries
More?
S/N CHK008 24 Accurate Entries 6 Erroneous Entries
More?
UID IMPLEMENTATIONCHALLENGES
• Business Process Updates– Many Stakeholders
• Need to Get Industry on the Same Page
– Cultural Differences– Implementation Standardization
• Infrastructure– UID Compatibility/Integration
• Life Cycle Support– Policies, Processes, Procedures– Infrastructure– O&M– Supply Support– Training– Pubs, Drawings
• Cost
UID IMPLEMENTATIONTOOLBOX
• JACG UID Working Group• SPIs• OSD Depot Maintenance UID IPT• Virtual Systems Command UID IPT• NAVY AIT Steering Committee
• Communication• Education• Collaboration
CONCLUSION
• UID IS A STRATEGIC IMPERATIVE– Critical for TAM, TAV, SIM & SNT– Critical for Data Driven Migration from
Reactive Fleet Readiness Support to Proactive, PREDICTIVE Fleet Readiness Culture
– Critical for FLE and RCM
• Critical for Navy to Develop and Deploy a Unified, Manageable Implementation Strategy