Request & in-kind support Earmarked Further requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$ OK, shipped MRI proposal 2M$ Japan 100 MJPY ~ 1 M$ 50 MJPY 50 MJPY CH 3 MCHF PSI solenoid (3M€) ~0.25 MCHF/yr 2 FTE +DAQ OK coupling coil 1MCHF? Italy ≤1M€ in hardware: (MuCal, TOF0, I, II) 2 (or 1) tracker solenoids? -- proposal submitted proposal postponed Belgiu m 100 k€ (~1/2 CKOV2) -- 100 k€ NL 100 k€ (Magnetic sensors) OK Postdoc+Student MICE funding status as of August 2005

MICE funding status as of August 2005

  • Upload
    quant

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

MICE funding status as of August 2005. at this point MICE (PhaseI) is an approved and funded project in 5 countries -- UK: 9.7M£ -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal -- success: 750k$) - PowerPoint PPT Presentation

Citation preview

  • MICE funding status as of August 2005

    Request & in-kind supportEarmarkedFurther requestsUK13 MProtons, Hall, Tracker10 M Yes3MUS23 M$

    RF Amplifiers ($500k) + R&D0.3+(1.2 negot.)M$OK, shippedMRI proposal 2M$Japan100 MJPY ~ 1 M$50 MJPY50 MJPYCH3 MCHF

    PSI solenoid (3M)~0.25 MCHF/yr 2 FTE +DAQOKcoupling coil 1MCHF?

    Italy1M in hardware: (MuCal, TOF0, I, II)2 (or 1) tracker solenoids? --proposal submitted

    proposal postponed Belgium100 k (~1/2 CKOV2)--100 kNL100 k (Magnetic sensors)OKPostdoc+Student CERNRF Amplifiers (value 1.2 MCHF) NB MICE is CERN rec expt RE11OKRF refurbish (170KCHF) EUMICE as TPW of Design Study?

  • at this point MICE (PhaseI) is an approved and funded project in 5 countries

    -- UK: 9.7M

    -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal --success: 750k$) + propose to build solenoid magnet within MC budget (+ longer term plan for Coupling coil) (Zisman at CB) ==>total expected 5.5 M$ in hardware -- Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) (+ 500k$ requested)

    -- Switzerland: PSI solenoid + Uni-Geneva-NSwissF (80KCHF/yr)+ 1 PDA+1PhDS bids to be placed for coupling coil (~1MCHF) and refurbishing of CERN RF power source O(170kCHF) -- Netherlands: Mag probes (in production!) + 1 PhDS + Proposal submitted in Italy (TOF, Calorimeter) and Belgium (Cherenkov)MICE is CERN recognized experiment RE11.

  • BeamUK3.6 MInfrastructureUK2.1 M Beam solenoidCH 2 MCHFTOF0INFN150 KCkovIUS(Mississipi)100 KTOF IINFN150 K Tracker Solenoid I US (LBL)1.25 M$Tracker I&II frames and detectors UK1.4 M fibers, DAQ Japan 0.4 M$ VLPC and electronics US 0.75 M$ Focus CoilsUK 2.2MAbsorbersUS-JapanHydrogen systemUKCoupling CoilsUS, CH 1.6M$RF cavities modules US1MRF power sources CERN1.2 MCHF + 0.17MCHF US 0.5 UK1 MTracker Solenoid IIUS (LBL)0.8 M$ToF II INFN150 KCkovIIBelgium100 KMuCalINFN350 KDAQ CH 300 KCHF