SHEPHERDESS WALK
MIC
AW
BE
R S
TRE
ET
WELLESLEY TERRACE
ASHWELL HOUSE
DRAWING NOTES: Space PlanningGround Floor Plan - Option 1
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-00-Opt1
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
A
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
Schroders / Stanhope plc
passenger /goods lift
123456713 14 15 16 17 18 19 2012 21119 1087
5
6
22
RWP
RW
PR
WP
RW
P
RW
PR
WP
RW
P
RW
P
refuge
C O R E 3
C O R E 4
C O R E 2
RWP RWP RWP RWP
refuseplatform
liftUP
UP
UP
DN
cleaner'sstore
1 2 3 4 5 6 7 8
RWP
C O R E 1RWP
RWP
RWP RWP RWP RWP
refu
geD
OW
NU
P
plat
form
lift
RWPRWP
GoodsLift Lobby
passengerlift
passenger /firefighting lift
passengerlift
platformlift
platformlift
plat
form
lift
RE
CE
PTI
ON
SHELL & CORE
SHELL & CORE
MAIN RECEPTION
RECEPTIONOFFICE
SHEPHERDESS WALKENTRANCE
21.2m
30.5
m
14.5m
14.7
m
- Issued for Information 11.10.17
84 desks2 receptionists2 no. booths (4 person)3 small meeting tables (5 person)1 large meeting table (14 person)
A Inventory added 30.11.17
SHEPHERDESS WALK
MIC
AW
BE
R S
TRE
ET
WELLESLEY TERRACE
ASHWELL HOUSE
DRAWING NOTES: Space PlanningGround Floor Plan - Option 2
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-00-Opt2
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
A
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
Schroders / Stanhope plc
passenger /goods lift
123456713 14 15 16 17 18 19 2012 21119 1087
5
6
22
RWP
RW
PR
WP
RW
P
RW
PR
WP
RW
P
RW
P
refuge
C O R E 3
C O R E 4
C O R E 2
RWP RWP RWP RWP
refuseplatform
liftUP
UP
UP
DN
cleaner'sstore
1 2 3 4 5 6 7 8
RWP
C O R E 1RWP
RWP
RWP RWP RWP RWP
refu
geD
OW
NU
P
plat
form
lift
RWPRWP
GoodsLift Lobby
passengerlift
passenger /firefighting lift
passengerlift
platformlift
platformlift
plat
form
lift
RE
CE
PTI
ON
SHELL & CORE
SHELL & CORE
MAIN RECEPTION
RECEPTIONOFFICE
ENTRANCE VIAMAIN RECEPTION
14 PERSONS
21.2m
30.5
m
14.5m
14.7
m
- Issued for Information 11.10.17
84 desks2 receptionists2 no. booths (4 person)2 small meeting tables (5 person)1 large meeting table (14 person)
A Inventory added 30.11.17
DRAWING NOTES: Space PlanningLower Ground Floor Plan
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-B1
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
A
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
passenger /goods lift
13 1412119 1087
5
4
3
2
1
6 15 16 17 18 19 20 21
BIKE STORE
RW
P
RW
PR
WP
RWP
RW
P
refuse store
UKPNSubstation
PLANT
PLANT
C O R E 3
C O R E 4
MALESHOWERS/CHANGING
FEMALESHOWERS/CHANGING
RWP
RWP
RWP
RW
PR
WP
refuseplatform
lift
UP
AccessibleShower /
WC
C O R E 2C O R E 1
refuse plant
plant
MALESHOWERSCHANGING
FEMALESHOWERSCHANGING
UP
RWP
RWP RWP RWP
RWP
RWPRWPRWP
BIKESTORE
plat
form
lift
RWP
lift pit
FFlift pit
plant
plantplant
FMbreakout
room
ASHWELL HOUSE
14 PERSONS
SHELL & CORE
21.2m
16.2
m
Schroders / Stanhope plc
- Issued for Information 11.10.17
34 desks1 large meeting table (14 person) 1 no. informal meeting table (10 persons)
A Inventory added 30.11.17
DRAWING NOTES: Space PlanningSecond Floor Plan
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-02
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
A
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
GOODSLIFT
RW
PR
WP
RW
PR
WP
RW
P
refuge
RW
P
C O R E 3
C O R E 1RWP
C O R E 2
refu
ge
DNU
P
DN
UP
refu
ge
DN
UP
UP
RWP RWP
RWP RWPRWP
LIFT
LIFT
FFLIFT
C O R E 4
RWPRWP RWP RWP
16 PERSONS14 PERSONS
14 PERSONS
RECEPTION
14.5m
2m
93m
20.2
m
17.1
m30
.5m
2m
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
Schroders / Stanhope plc
- Issued for Information 11.10.17
238 desks2 receptionists3 large meeting rooms (14-16 person)2 small meeting rooms (6 person)2 informal meeting tables (5 person)2 breakout areas
A Inventory added 30.11.17
DRAWING NOTES: Space PlanningThird Floor Plan
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-03
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
A
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
GOODSLIFT
refuge
C O R E 1 C O R E 2
refu
ge
DN
UPDOWN
DO
WN
UP
LIFT
LIFT
FFLIFT
refu
ge
C O R E 4
C O R E 3
14 PERSONS14 PERSONS
14 PERSONS
RECEPTION
11.6m
2m
93m
20.2
m
17.1
m30
.5m
3.5m
4.5m
2.5m
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
Schroders / Stanhope plc
- Issued for Information 11.10.17
168 desks2 receptionists3 no. 1 person offices5 no. 2 person offices3 no. 4 person booths10 no. 1 person carrels
3 large meeting rooms (14 person)4 small meeting rooms (6 person)2 informal meeting tables (5 person)2 breakout areas
A Inventory added 30.11.17
DRAWING NOTES: Space PlanningFifth Floor Plan
866_A-x-P-xx-BuildingSCALE
DATE
DRAWING
DWG No. REVISION
Information contained on this drawing is the sole copyright ofBuckley Gray Yeoman and is not to be reproduced without their permission.
DRAWING FILE REF
DRAWN BYAW
866_SP-05
(1:400 @ A3)
Sept. 2017
DRAWING STATUSFOR INFORMATION
PROJECT
CLIENT
Schroders
Shepherdess WalkREVISION DATE
Buckley Gray YeomanStudio 4.04, The Tea Building
56 Shoreditch High Street,London E1 6JJTel: 020 7033 9913 Fax: 020 7033 9914
STATUS
-
1:200 @ A1
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings.
Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes/dimensions.
Sizes of and dimensions to any service elements are indicative only. See service engineers drawings for actual sizes and dimensions.
This drawing to be read in conjunction with all other Architect's drawings, specifications and other Consultants' information.
All proprietary systems shown on this drawing are to be installed strictly in accordance with the Manufacturers/Suppliers recommended details.
Any discrepancies between information shown on this drawing and any other contract information or manufacturers/suppliers recommendations is to be brought to the attention of the Architect.
DO NOT SCALE FROM THIS DRAWING.
DRAWING NOTES:
0 5 10 M
GOODSLIFT
C O R E 1 C O R E 2
refu
ge
DN
DN
UP
UP
LIFT
LIFT
FFLIFT
refu
ge
C O R E 3
16PERSONS
20 PERSONS
12 P
ER
SO
NS
20 PERSONS 20 PERSONS
12 P
ER
SO
NS
12 P
ER
SO
NS
12 P
ER
SO
NS
KITC
HEN
BR
EAKO
UT
RECEPTION
10 PERSONS 10 PERSONS
20 PERSONS
18 PERSONS
SERVERYSTORAGE
greenroof
90m
17.2
m
2m
Note on building survey data:The existing survey information was taken from the Maltby building survey dated June 2014.
BGY cannot guarantee nor be held responsible for the accuracy of the buidling survey.
All structural slab levels and underside of slab levels have been assumed based on the Cecil Denny Heighton & Partners record drawings (dated May 1988) and will need to be checked.
Schroders / Stanhope plc
- Issued for Information 11.10.17