Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee January 27, 2009 Energy Program Update Jason Willett,

Embed Size (px)

Citation preview

  • Slide 1

Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee January 27, 2009 Energy Program Update Jason Willett, Chair, MCES Energy Team Slide 2 Background: 2006 Energy team created by MCES General Manager Bill Moore Goal: 15 percent energy reduction of purchased fossil fuel (2010 compared to 2006) Slide 3 Status of Initiatives 1.Energy Conservation 2.Renewable Energy 3.Energy and Carbon Measurement 4.Energy Cost Savings and Financial Issues 5.Energy Collaborations Slide 4 1. Energy Conservation The cheapest energy is the energy you dont use. Slide 5 Energy Conservation and Efficiency Overview Process efficiency, lighting redesign, and facility re-commissioning Completed 26 energy-related studies identifying: 40 energy saving opportunities totaling 46 million kWh ($3 million/year); of those, MCES implemented 16 measures to date = 23 million kWh ($1.4 million/year) 24 more studies planned in 2009 Slide 6 Energy Conservation and Efficiency Completed work Metro: Aeration study Annual kWh savings = 6,700,000 Metro: Enhanced maintenance in aeration process Annual kWh savings = 4,000,000 Slide 7 Energy Conservation and Efficiency Completed work Metro: Odor control energy improvement Annual kWh savings = 688,000 Metro: Instrument air compressor modifications Annual kWh savings = 340,000 Slide 8 Energy Conservation and Efficiency Completed work Blue Lake: Refurbished secondary aeration system Annual kWh savings = 3,000,000 Seneca: Refurbished secondary aeration system kWh savings = 899,000 Facility re-commissioning on eight facilities Annual kWh savings = 250,000 Slide 9 Energy Conservation and Efficiency In process work Metro: Tunnel lighting redesign 2008 design; 2009 construction Slide 10 Energy Conservation and Efficiency In process work Metro Liquids Business Unit Operating Changes 50 percent reduction sludge pump run hours 8,000 annual hour reduction in grit collector drives Less double pumping of sludge Annual kWh savings = 3,000,000 Metro: Steam Trap Program 15% completed in 2008; remainder scheduled for 2009 Slide 11 Energy Conservation and Efficiency In process work Rosemount: Decommissioning Annual kWh savings = 1,500,000 (net) Rosemount Plant, 2008 Slide 12 Energy Conservation and Efficiency In process work Energy design standards for capital projects Employee energy campaign 1,800 computers reconfigured to go into low energy state after inactivity Printer default is two-sided copies Employees to shut down computers and electronics when not in use Slide 13 Energy Conservation and Efficiency Identified additional energy efficient improvements Seneca: New energy efficient HVAC system Blue Lake: New energy efficient HVAC system Lift Station L-35: Energy efficient lighting Lift Stations L-74, L-75: Efficient motors Slide 14 2. Renewable Energy Renewable energy can make us energy-independent and energy-secure. Slide 15 R&D and Renewable Energy Completed RE Fluidized Bed Incinerators/ cogeneration of heat and electricity Slide 16 R&D and Renewable Energy Completed RE Eagles Point: Thermal energy recovery from effluent Slide 17 R&D and Renewable Energy In process RE Empire: Micro- turbine demo project Slide 18 R&D and Renewable Energy In process RE Blue Lake: Design of liquids process change to anerobic digestion and substitution of produced biogas for purchased natural gas Metro: Heat Pump 2008: Study on energy savings opportunities from heat pump and heat recovery technologies 2009: Initiating installation of non-condensing turbine/generator Seneca: New scrubber heat exchanger Slide 19 R&D and Renewable Energy Identified RE possibilities Algae R&D Bio-diesel from brown grease Slide 20 R&D and Renewable Energy Identified RE possibilities Metropolitan Counties Energy Coalition (MCEC) Wind Initiative Xcel Energy and MCES Renewable Collaboration, possible solar farm at Blue Lake Slide 21 3. Energy and Carbon Measurement You cant manage what you cant measure. Slide 22 Energy and Carbon Management In process work Energy database EPA and Energy Star Program GHG Emissions Research The Climate Registry (TCR) reporting Slide 23 4. Energy Cost Savings and Financial Issues MCES spent $17 million on energy in 2008. Slide 24 Energy Cost Savings and Financial Issues Completed work Carbon costing for alternatives analysis Solar facilities economic analysis Rebates earned in 2008: $225,000 Peak Control Agreement savings in 2008 $350,000 Slide 25 Energy Cost Savings and Financial Issues In process work Lift station tariff analysis and charges Xcel Energy rate case Monetization of emission reduction projects FBI turbine accreditation and penalties Peak Control Agreementsreview Slide 26 5. Energy Collaborations Slide 27 Energy Collaborations University of Minnesota (Institute for Renewable Energy & Environment) Xcel Energy (Process Efficiency Program & RE) Metro Energy Policy Coalition (Counties) Inter-agency Energy & Environment Team Chamber of Commerce Slide 28 Summary Conservation: 66% of goal complete Over 100% of opportunities identified More studies underway Renewable energy: Additional possibilities being investigated Financial impact: $1.4 million/year conserved.3 rebates received (2008).3 peak control savings (2008) $2.0 million