55
Construction Method Construction Method

Metode Konstruksi Reklamasi Pantai

Embed Size (px)

DESCRIPTION

Pemecah Ombak

Citation preview

  • Construction Method

    Construction Method

  • Agenda Main Dike Construction Overview of Main Dike Alternatives Analysis Recommended Alternative

    Construction Sequence

  • Dike Alternatives Analysis VPA Requested an Evaluation of

    Alternatives

    Reduce Cost?

    Reduce Sand Required?

    Improve Constructability?

    Minimize Future Settlements?

  • Main Dike Alternatives

    Over 20 Alternatives were Considered for the Main Dike/Retaining Structure

    11 Determined Technically Preferable

  • Technically PreferableB1 Rock/Sand Dike, pre-dredge soft claysB2 Rock/Sand Dike, pre-dredge to -65 feet, Deep Soil Mixing to -100 feet +/-

    D1 Partial Height Concrete Caisson, pre-dredge to -100, backfill with sand/rock to -60, place caisson

    D2 Partial Height Concrete Caisson, with deep soil mixing D3 Partial Height Concrete Caisson, with sand backfillE1 Cellular Cofferdam, pre-dredge to -100, backfill (sand/rock) to -60, install steel

    sheets.

    E2 Cellular Cofferdam, with deep soil mixingF1 Combi-Wall, with deep soil mixingF2 Portal Frame, with deep soil mixing outside toeF3 Portal Frame, with deep soil mixing outside and insideF4 Portal Frame, with link beam, no DSM

    Dike Alternatives Evaluated

  • Base CaseDike Section (as Presented in Feasibility Report)

    Yorktown Formation(Dense Silty Sand)

    Foundation(Soft Clay)

    Sand FillDredged Fill

    Rip Rap

    700 Ft. (213 m)

    14 Million CY of Sand Pre-Dredge to -60

  • Rock/Sand Dikes

  • Rock/Sand Dike Alternative B1

    Yorktown FormationFoundation(Soft Clay)

    Pre-Dredge

    Pre-dredge -80 to -130

  • Sand FillQuarry Run Rock

    Rock/Sand DikeAlternative B1

  • Surcharge

    Pile Supported Wharf

    Dredge Fill

    Rock/Sand DikeAlternative B1

  • Rock/Sand Dike On DSMAlternative B

    Yorktown FormationFoundation(Soft Clay)

    Pre-Dredge Bathtubfor DSM Equipment

    Deep Soil Mixed Zone

    Deep Soil Mixed Pattern

    Plan

  • Quarry Run Rock

    Rock/Sand Dike On DSMAlternative B

  • Precast Concrete CaissonsAlternatives D1, D2 and D3

    Deltaport , Vancouver Port Authority

  • Precast Concrete Caissons

  • Sand Fill

    Quarry Run Rock

    Partial Height Caisson On Rock FillAlternative D1

    Pre-dredge -80 to -130

  • Concrete Caisson

    Partial Height Caisson On Rock FillAlternative D1

  • Yorktown Formation(Dense Silty Sand)

    Foundation(Soft Clay)

    Sand Fill

    Dredge FillQuarry Run Rock

    Concrete Caisson

    Partial Height Caisson On Rock FillAlternative D1

  • Concrete CaissonOn Rock Pad

    Partial Height Caisson On DSMAlternative D2

    Pre-Dredge After DSMDeep Soil Mixed Zone

  • Sand FillDredge Fill Quarry Run Rock

    Concrete Caisson

    Partial Height Caisson On DSMAlternative D2

  • Sand Fill

    Quarry Run Rock

    Partial Height Caisson Sand FillAlternative D3

    Pre-dredge -80 to -130

  • Sand Fill

    Quarry Run Rock

    Concrete Caisson

    Partial Height Caisson Sand FillAlternative D3

  • Cellular Cofferdams Alternatives E1 and E2

  • Sand Fill

    Sand Fill

    Cellular Cofferdam

    Cellular CofferdamAlternative E1

    Pre-dredge -80 to -130

  • Sand FillDredge Fill

    Surcharge

    Cellular CofferdamAlternative E1

  • Cellular Cofferdam On DSM Alternative E2

    Yorktown FormationFoundation(Soft Clay)

    Pre-Dredge Bathtubfor DSM Equipment

    Deep Soil Mixed Zone

  • Sand FillDredge Fill

    Surcharge

    Cellular Cofferdam On DSM Alternative E2

    Cellular Cofferdam

  • Combi-Wall

  • Pre-Dredge After DSMDeep Soil Mixed Zone

    Combi-Wall With DSMAlternative F1

    Combi-Wall

  • Sand Fill

    Combi-Wall With DSMAlternative F1

  • Install CIP Pile Cap and P/S Conc Sheet

    Pile Wall

    Portal Frame With Partial DSMAlternative F2

    Install 72 Dia. Steel Pipe Piles

  • Pre-Dredge After DSMDeep Soil Mixed Zone

    Portal Frame With Partial DSMAlternative F2

  • Sand FillDredge Fill

    Surcharge

    Portal Frame With Partial DSMAlternative F2

  • Deep Soil Mixed Zone

    Portal Frame With DSMAlternative F3

    CIP Pile Cap and AZ26 Sheet Pile Wall

    54 Dia. P/S Conc. Piles

  • Alternative F3Portal Frame With DSM

    Sand FillDredge Fill

    Surcharge

  • Cast Link Beam (El. -15)

    Cast Pile Caps

    Install P/S Conc Sheet Pile Wall

    Portal Frame With Link BeamAlternative F4

    72 Dia. Steel Pipe Piles for Portal Frame

  • Alternative F4Portal Frame With Link Beam

    Sand FillDredge Fill

    Surcharge

    Wick Drains

  • Evaluation of Alternatives

    Technical Feasible Alternatives Were: Ranked by Cost Evaluated by Risk

  • Factors to Evaluate Risk1. Price Risk.

    Materials and/or labor fluctuations

    2. Constructability & Precedence.

    Difficulty to construct.

    3. Material Sourcing (Sand/Rock).

    Construction materials availability.

    4. Permit Risk.

    Potential to delay permit process.

  • Factors to Evaluate Risk5. Schedule Risk.

    Hold-up rapid filling of cell.

    6. Impact on Dredged Material Capacity.

    Net storage capacity of Craney

    7. Design Life.

    Design life / maintenance requirements.

  • Costs / Risks

    Short Name

    C

    o

    n

    s

    t

    r

    u

    c

    t

    i

    o

    n

    C

    o

    s

    t

    -

    N

    o

    W

    h

    a

    r

    f

    P

    r

    i

    c

    e

    R

    i

    s

    k

    C

    o

    n

    s

    t

    r

    u

    c

    t

    a

    b

    i

    l

    i

    t

    y

    &

    P

    r

    e

    c

    e

    d

    e

    n

    c

    e

    M

    a

    t

    e

    r

    i

    a

    l

    S

    o

    u

    r

    c

    i

    n

    g

    (

    s

    a

    n

    d

    /

    r

    o

    c

    k

    )

    P

    e

    r

    m

    i

    t

    R

    i

    s

    k

    S

    c

    h

    e

    d

    u

    l

    e

    R

    i

    s

    k

    I

    m

    p

    a

    c

    t

    o

    n

    D

    r

    e

    d

    g

    e

    M

    a

    t

    e

    r

    i

    a

    l

    C

    a

    p

    a

    c

    i

    t

    y

    D

    e

    s

    i

    g

    n

    L

    i

    f

    e

    A

    v

    g

    .

    R

    i

    s

    k

    B1 Rock/Sand $ 563,568,614 1 1 4 3 1 5 1 2.3B2 Rock/DSM $ 767,100,826 4 3 2 5 5 1 1 3.0D1 Caisson/Rock $ 746,844,645 2 2 5 3 1 5 2 2.9D2 Caisson/DSM $ 992,479,519 5 5 3 5 5 1 2 3.7D3 Caisson/Sand $ 707,159,632 2 2 5 2 1 5 2 2.7E1 Steel Cellular $ 631,847,815 4 4 5 2 1 5 5 3.7E2 Cellular/DSM $ 828,473,261 5 5 3 5 5 1 5 4.1F1 Combi-Wall $ 944,660,155 4 3 1 3 3 1 5 2.9F2 Portal Frame F2 $ 917,336,324 4 4 1 3 3 1 4 2.9F3 Portal Frame F3 $ 660,094,688 5 5 1 4 4 1 5 3.6F4 Portal Frame F4 $ 767,486,860 3 3 1 1 1 1 4 2.0

  • B1 Rock/Sand

    B2 Rock/DSMD1 Caisson/Rock

    D2 Caisson/DSM

    D3 Caisson/SandE1 Steel Cellular

    E2 Cellular/DSM

    F1 Combi-WallF2 Portal Frame

    F3 Portal Frame

    F4 Portal Frame

    $500,000,000

    $600,000,000

    $700,000,000

    $800,000,000

    $900,000,000

    $1,000,000,000

    $1,100,000,000

    1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0

    (less risk) - + (more risk)

    C

    o

    s

    t

    (

    8

    ,

    5

    0

    0

    L

    F

    )

    (

    B

    a

    s

    e

    d

    o

    n

    A

    s

    s

    u

    m

    e

    d

    S

    u

    b

    s

    u

    r

    f

    a

    c

    e

    i

    n

    P

    h

    a

    s

    e

    1

    )

    Cost vs Risks

  • Main Dike Alternatives Report

    Main Dike Alternatives Analysis Report Available for Download:

    http://craneyisland.info/Contractors.html

  • Agenda Main Dike Construction Overview of Main Dike Alternatives Analysis Recommended Alternative

    Construction Sequence

  • CIDMMA

    Shipping Channel

  • Existing Conditions

  • Pre-Dredging

    Current Design Rock/Sand Dike

    15.7 MCY Pre-Dredge (Total Length)

  • Main Dike Construction

    Current Design Rock/Sand Dike6.3 MCY Sand(Total Length)

  • Cross Dike Construction

    Dredge Depth After Construction

  • Pre-Dredging to the North

  • Filling South Cell

    6.5 MCY

  • Construct North Dike

  • Filling North Cell

    12.5 MCY

  • Achieving Final Grade

    Above +1825 MCY

    CIEE South & North Cell

  • Access Channel Dredging

    8.3 MCY

  • Conclusion - Dikes

    Component Quantity

    Pre-Dredging 15.7 MCY

    Access Channel Dredging 8.3 MCY

    Sand Fill - Main Dike 6.3 MCY

    Sand Fill - Cross Dikes 4.5 MCY

    Quarry Run Rock 6.3 Million Tons

    Rock/Sand Dike for Main Dike Dredging, Sand and Rock Volumes

    Construction Method AgendaDike Alternatives AnalysisMain Dike AlternativesDike Alternatives EvaluatedBase CaseDike Section (as Presented in Feasibility Report)Rock/Sand DikesRock/Sand Dike Alternative B1Rock/Sand Dike Alternative B1Rock/Sand Dike Alternative B1Rock/Sand Dike On DSMAlternative BRock/Sand Dike On DSMAlternative BPrecast Concrete CaissonsAlternatives D1, D2 and D3Precast Concrete CaissonsCellular Cofferdams Alternatives E1 and E2Combi-WallEvaluation of AlternativesFactors to Evaluate RiskFactors to Evaluate RiskCosts / RisksCost vs RisksMain Dike Alternatives ReportAgendaCIDMMAExisting ConditionsPre-DredgingMain Dike ConstructionCross Dike ConstructionPre-Dredging to the NorthFilling South CellConstruct North DikeFilling North CellAchieving Final GradeAccess Channel DredgingConclusion - Dikes