Item # 7a MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town Administrator DATE: May 2, 2019 RE: Preliminary Gate Design Discussion DISCUSSION: On March 29, 2019 the Board received copies of the preliminary gate plans for the Richfield and Fremont gates and was asked to provide any comments or concerns. Discussion was held at the April 18, 2019 Board meeting regarding the designs and SEH was asked to provide an alternative design for the Fremont Gate. Attached as Exhibit A are drawings from SEH of the three gate designs (2 for Fremont and 1 for Richfield), along with the corresponding probable construction cost estimates of each gate design and the gate specifications. Staff has talked with the traffic committee and believes that $50,000 for each “gate system” may be high. However, we cannot determine the actual cost until bids are received based on the specifications the Town is requesting. The Board must choose which location to move forward with for the Fremont gate and approve the preliminary designs. Once that is done, SEH will begin Task 2 which is the final design documents. Task 2 is expected to take 2-4 weeks and following the completion of Task 2 the RFP will be completed and put out for companies to bid on the project. ATTACHMENTS: Exhibit A - SEH Preliminary Gate Designs, Gate Specifications and Probable Construction Cost Estimates

MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

Item # 7a

MEMORANDUM

TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town Administrator DATE: May 2, 2019 RE: Preliminary Gate Design Discussion

DISCUSSION:

On March 29, 2019 the Board received copies of the preliminary gate plans for the Richfield and

Fremont gates and was asked to provide any comments or concerns. Discussion was held at the

April 18, 2019 Board meeting regarding the designs and SEH was asked to provide an

alternative design for the Fremont Gate.

Attached as Exhibit A are drawings from SEH of the three gate designs (2 for Fremont and 1 for

Richfield), along with the corresponding probable construction cost estimates of each gate

design and the gate specifications. Staff has talked with the traffic committee and believes that

$50,000 for each “gate system” may be high. However, we cannot determine the actual cost

until bids are received based on the specifications the Town is requesting.

The Board must choose which location to move forward with for the Fremont gate and approve

the preliminary designs. Once that is done, SEH will begin Task 2 which is the final design

documents. Task 2 is expected to take 2-4 weeks and following the completion of Task 2 the

RFP will be completed and put out for companies to bid on the project.

ATTACHMENTS:

Exhibit A - SEH Preliminary Gate Designs, Gate Specifications and Probable Construction Cost

Estimates

clerk
Typewritten Text
clerk
Typewritten Text
Page 2: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

13

811

TOWN OF FOXFIELD

AutoCAD SHX Text
EAST FREMONT AVE
AutoCAD SHX Text
SOUTH PARKER ROAD
AutoCAD SHX Text
INSTALL ENTRANCE GATE
AutoCAD SHX Text
INSTALL EXIT GATE
AutoCAD SHX Text
EXISTING MEDIAN TO REMAIN
AutoCAD SHX Text
PARKER ROAD RIGHT-OF-WAY (CDOT)
AutoCAD SHX Text
INSTALL ELECTRIC CONDUIT AND PULL BOX
AutoCAD SHX Text
EDGE OF EXISTING CONCRETE (ALL PAVEMENT TO REMAIN)
AutoCAD SHX Text
EXISTING OVERHEAD ELECTRIC
AutoCAD SHX Text
PROTECT EXISTING CULVERT IN PLACE
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING WATER LINE
AutoCAD SHX Text
INSTALL BOLLARDS WITH CHAIN
AutoCAD SHX Text
EXISTING EDGE OF ASPHALT
AutoCAD SHX Text
AutoCAD SHX Text
1.5%
AutoCAD SHX Text
4:1
AutoCAD SHX Text
6:1
AutoCAD SHX Text
2.5%
AutoCAD SHX Text
FREEMONT GATE ENTRANCE TYPICAL SECTION A-A
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE ISSUED
AutoCAD SHX Text
SEH PROJECT NO.
AutoCAD SHX Text
PHONE: 720.540.6800 2000 S. COLORADO BLVD. TOWER ONE, SUITE 6000 DENVER, CO 80222-7938
AutoCAD SHX Text
COLORADO LAW (SENATE BILL 93-155) REQUIRES PERSONS TO NOTIFY THE UTILITY NOTIFICATION UTILITY NOTIFICATION CENTER OF COLORADO 2 BUSINESS DAYS PRIOR TO 2 BUSINESS DAYS PRIOR TO MAKING OR BEGINNING AN EXCAVATION. NOTIFICATION MAY BE MADE BY CALLING:
AutoCAD SHX Text
P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Sheets\Freemont Gate Plan.dwg 4/25/2019 6:25:50 AM 4/25/2019 6:25:50 AM4/25/2019 6:25:50 AM
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
149576
AutoCAD SHX Text
3/27/2019
AutoCAD SHX Text
EO
AutoCAD SHX Text
EE/EO
AutoCAD SHX Text
SJ
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
0
AutoCAD SHX Text
feet
AutoCAD SHX Text
scale
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
FREEMONT GATE PLAN
clerk
Typewritten Text
Exhibit A
clerk
Typewritten Text
clerk
Typewritten Text
clerk
Typewritten Text
clerk
Typewritten Text
Page 3: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

14

811

TOWN OF FOXFIELD

AutoCAD SHX Text
6+00
AutoCAD SHX Text
EAST FREMONT AVE
AutoCAD SHX Text
INSTALL ENTRANCE GATE
AutoCAD SHX Text
INSTALL EXIT GATE
AutoCAD SHX Text
EXISTING MEDIAN TO REMAIN
AutoCAD SHX Text
PARKER ROAD RIGHT-OF-WAY (CDOT)
AutoCAD SHX Text
INSTALL ELECTRIC CONDUIT AND PULL BOX
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
EXISTING WATER LINE
AutoCAD SHX Text
PROPOSED MEDIAN
AutoCAD SHX Text
EAST EASTER WAY
AutoCAD SHX Text
18" CMP CULVERT
AutoCAD SHX Text
36" CMP CULVERT
AutoCAD SHX Text
INSTALL BOLLARDS WITH CHAIN
AutoCAD SHX Text
EXISTING DRIVEWAY AND CULVERT TO REMAIN
AutoCAD SHX Text
EXISTING DITCH
AutoCAD SHX Text
EXISTING 30" CMP CULVERT
AutoCAD SHX Text
REMOVE STOP SIGN
AutoCAD SHX Text
EXISTING STOP SIGN TO REMAIN
AutoCAD SHX Text
EXISTING DITCH
AutoCAD SHX Text
EXISTING EDGE OF ASPHALT
AutoCAD SHX Text
AutoCAD SHX Text
FREEMONT GATE ENTRANCE TYPICAL SECTION B-B
AutoCAD SHX Text
4%
AutoCAD SHX Text
6:1
AutoCAD SHX Text
6:1
AutoCAD SHX Text
2.5%
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
18" CULVERT
AutoCAD SHX Text
36" CULVERT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE ISSUED
AutoCAD SHX Text
SEH PROJECT NO.
AutoCAD SHX Text
PHONE: 720.540.6800 2000 S. COLORADO BLVD. TOWER ONE, SUITE 6000 DENVER, CO 80222-7938
AutoCAD SHX Text
COLORADO LAW (SENATE BILL 93-155) REQUIRES PERSONS TO NOTIFY THE UTILITY NOTIFICATION UTILITY NOTIFICATION CENTER OF COLORADO 2 BUSINESS DAYS PRIOR TO 2 BUSINESS DAYS PRIOR TO MAKING OR BEGINNING AN EXCAVATION. NOTIFICATION MAY BE MADE BY CALLING:
AutoCAD SHX Text
P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Sheets\Freemont Gate Plan Alternate.dwg 4/25/2019 7:18:45 AM 4/25/2019 7:18:45 AM4/25/2019 7:18:45 AM
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
149576
AutoCAD SHX Text
3/27/2019
AutoCAD SHX Text
EO
AutoCAD SHX Text
EE/EO
AutoCAD SHX Text
SJ
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
0
AutoCAD SHX Text
feet
AutoCAD SHX Text
scale
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
FREEMONT GATE PLAN ALTERNATE
Page 4: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

13

811

TOWN OF FOXFIELD

AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
S RICHFIELD ST
AutoCAD SHX Text
TOWN OF FOXFIELD BOUNDARY
AutoCAD SHX Text
EXISTING MEDIAN TO REMAIN
AutoCAD SHX Text
INSTALL EXIT GATE
AutoCAD SHX Text
INSTALL ENTRANCE GATE
AutoCAD SHX Text
EXISTING FENCE TO REMAIN
AutoCAD SHX Text
INSTALL ELECTRIC CONDUIT AND PULL BOX
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING R.O.W.
AutoCAD SHX Text
EXISTING R.O.W.
AutoCAD SHX Text
PROTECT EXISTING OVERHEAD ELECTRIC IN PLACE
AutoCAD SHX Text
9" RIPRAP
AutoCAD SHX Text
INSTALL 18" CMP CULVERT
AutoCAD SHX Text
FLEXIBLE REFLECTIVE DELINEATOR (TYP)
AutoCAD SHX Text
INSTALL BOLLARDS WITH CHAIN
AutoCAD SHX Text
EXISTING DRIVEWAY
AutoCAD SHX Text
PROTECT EXISTING DROP STRUCTURE
AutoCAD SHX Text
EXISTING EDGE OF ASPHALT
AutoCAD SHX Text
2%
AutoCAD SHX Text
6%
AutoCAD SHX Text
10%-15%
AutoCAD SHX Text
6:1
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
6" ROAD BASE
AutoCAD SHX Text
RICHFIELD GATE ENTRANCE TYPICAL SECTION
AutoCAD SHX Text
EX. ROW
AutoCAD SHX Text
EX. ROW
AutoCAD SHX Text
A-A
AutoCAD SHX Text
18" CULVERT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE ISSUED
AutoCAD SHX Text
SEH PROJECT NO.
AutoCAD SHX Text
PHONE: 720.540.6800 2000 S. COLORADO BLVD. TOWER ONE, SUITE 6000 DENVER, CO 80222-7938
AutoCAD SHX Text
COLORADO LAW (SENATE BILL 93-155) REQUIRES PERSONS TO NOTIFY THE UTILITY NOTIFICATION UTILITY NOTIFICATION CENTER OF COLORADO 2 BUSINESS DAYS PRIOR TO 2 BUSINESS DAYS PRIOR TO MAKING OR BEGINNING AN EXCAVATION. NOTIFICATION MAY BE MADE BY CALLING:
AutoCAD SHX Text
P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Sheets\Richfield Gate Plan.dwg 4/25/2019 6:48:16 AM 4/25/2019 6:48:16 AM4/25/2019 6:48:16 AM
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
149576
AutoCAD SHX Text
3/27/2019
AutoCAD SHX Text
EO
AutoCAD SHX Text
EE/EO
AutoCAD SHX Text
SJ
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
4/25/19
AutoCAD SHX Text
0
AutoCAD SHX Text
feet
AutoCAD SHX Text
scale
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
RICHFIELD GATE PLAN
Page 5: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

Town of Foxfield Gates Project Specifications April 25, 2019

BARRIER GATES 323113 - 1

SECTION 323113 – BARRIER GATES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Barrier Gates.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at TBD, Town of Foxfield.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For each type of fence and gate assembly.

1. Include plans, elevations, sections, details, and attachments to other work.

1.4 INFORMATIONAL SUBMITTALS

A. Product certificates.

B. Product test reports.

C. Sample warranty.

1.5 WARRANTY

A. Special Warranty: [Installer agrees] to repair or replace components of gates that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two (2) years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 BARRIER GATES

A. Barrier Unit:

Page 6: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

Town of Foxfield Gates Project Specifications April 25, 2019

BARRIER GATES 323113 - 2

1. Barrier Construction: Cabinet is to be designed for all weather use and painted. [manufacturer's standard protective coating and finish] <Insert finish>.

2. Barrier Height: The height of the Barrier Arm when in the closed (lowered) position, as measured from the top of the Arm frame to the road surface, will be a minimum of 3 feet.

3. Barrier Width: The width of the Barrier Arm shall be a minimum of 10 feet in length. 4. Barrier Angle: The angle from horizontal of the Barrier Arm when in the open position

will be 90 degrees (plus/minus 10 degrees). 5. Finish: The Barrier Arm is to be finished in diagonal strips of black and white, yellow,

red or orange. Arm must have a protective edge. 6. Auto Reverse: Arm should reverse in the event of contact with an object.

B. Technical Details: 1. Operation: The gate must be capable of operating on a variable programmable time

specific open/close cycle with daily and weekend programs. 2. Motor: The motor used shall be sufficiently sized to allow for continuous operation

(100% duty cycling). 3. Temperature: The motor shall be capable of operating at a minimum temperature of -22

degrees Fahrenheit and a maximum temperature of 158 degrees Fahrenheit. 4. Power Fail Conditions: The Barrier Arm shall revert to a fully open position in the event

of electrical power failure.

C. Control Systems: 1. Power Supply: Battery Powered with Photovoltaic 2. Programmability: Control system shall have secure ability to change open/close schedule

via external source as well as the ability to have several open/close time schedules per day.

3. System Interfacing: The control system will be capable of accepting inputs from – keypad, wireless interface, PC or similar interface.

4. Communication: USB, RS-232, R5-485, Ethernet or other standard connection type. 5. Data Collection: System shall be capable of generating an event log, gathering vehicle

count, and time and date information. 6. Camera: Vehicle entrance and exit shall be recorded by a camera mounted to the unit.

D. Access Control: 1. Gate Activation: RFID Windshield sticker activation capability – Bluetooth or similar.

Permitting operation from both sides of gate. 2. Emergency Vehicle Access: Opticom system for emergency police/fire vehicles access.

E. Performance: Standard operation speed will be a maximum of 4 seconds for either raising or lowering.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Do not begin installation before final grading is completed unless otherwise permitted by Engineer.

Page 7: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

Town of Foxfield Gates Project Specifications April 25, 2019

BARRIER GATES 323113 - 3

3.2 PREPARATION

A. Stake locations of gates and terminal posts. Indicate locations of utilities, lawn sprinkler system, underground structures, benchmarks, and property monuments.

3.3 BARRIER GATE INSTALLATION

A. TBD

3.4 ADJUSTING

A. Gates: Adjust gates to operate smoothly, easily, and quietly, free of binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range.

B. Lubricate hardware and other moving parts.

3.5 DEMONSTRATION

A. Demonstrate work & training for Town – to be edited

END OF SECTION 323113

Page 8: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

PROJECT NAME: Fremont and Richfield GatesFremont Gate LOCATION OF PROJECT: Town of Foxfield

Alternative: Prepared By:

Date Prepared:

Unit Quantity Unit Cost Extended CostClearing and Grubbing LS 1 $1,000.00 $1,000.00 Unclassified Excavation CY 30 $40.00 $1,200.00 Ground Sign EACH 2 $350.00 $700.00 Landscaping LS 1 $1,500.00 $1,500.00 Aggregate Base Course (Class 6) CY 33 $50.00 $1,650.00 Bollard EACH 2 $100.00 $200.00 Chain EACH 1 $50.00 $50.00 12-Inch Restrained Coupling Adapter EACH 1 $100.00 $100.00 Erosion Control L S 1 $2,000.00 $2,000.00 Traffic Control (Special) L S 1 $10,000.00 $10,000.00 Electrical Conduit and Pull Box L S 1 $4,000.00 $4,000.00 Complete in place.

Gate System L S 1 $50,000.00 $50,000.00 Based on Traffic Committee Estimates

$72,400.00

20.0% $14,480.0010.0% $7,240.00

$72,400.00$94,100.00

NOTES:

04/24/19 13:18:58P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Specs and quantities\[Gates_SOAQ-Prelim.xlsx]OPCC - UPDATED ALT

Engineers Estimate of Probable Construction Cost ENGINEER'S ESTIMATEE. ELEFANTE & E. OLSEN4/22/2019

Item Shaded Fields are for INPUT

Total Project Cost

Mobilization (4 - 10%)Contingency (0-30%)

Total of Construction Bid Items

Page 9: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

PROJECT NAME: Fremont and Richfield GatesFremont Gate Alternate Layout LOCATION OF PROJECT: Town of Foxfield

Alternative: Prepared By:

Date Prepared:

Unit Quantity Unit Cost Extended CostClearing and Grubbing LS 1 $1,000.00 $1,000.00 Unclassified Excavation CY 30 $40.00 $1,200.00 Ground Sign EACH 2 $350.00 $700.00 Landscaping LS 1 $5,000.00 $5,000.00 Aggregate Base Course (Class 6) CY 30 $50.00 $1,500.00 Riprap (9 Inch) CY 2 $150.00 $300.00 Bollard EACH 2 $100.00 $200.00 Chain EACH 1 $50.00 $50.00 Curb and Gutter LF 33 $25.00 $825.00 Median Cover Material SF 37 $10.00 $370.00 18 Inch Corrugated Metal Pipe LF 55 $120.00 $6,600.00 36 Inch Corrugated Metal Pipe LF 75 $100.00 $7,500.00 12-Inch Restrained Coupling Adapter EACH 1 $100.00 $100.00 Erosion Control L S 1 $2,000.00 $2,000.00 Traffic Control (Special) L S 1 $10,000.00 $10,000.00 Electrical Conduit and Pull Box L S 1 $4,000.00 $4,000.00 Complete in place.

Gate System L S 1 $50,000.00 $50,000.00 Based on Traffic Committee Estimates

$91,345.00

20.0% $18,269.0010.0% $9,134.50

$91,345.00$118,700.00

NOTES:

04/24/19 13:18:42P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Specs and quantities\[RichfieldGate_SOAQ-Prelim.xlsx]OPCC - UPDATED

Total Project Cost

Contingency (0-30%) Mobilization (4 - 10%) Total of Construction Bid Items

Engineers Estimate of Probable Construction Cost ENGINEER'S ESTIMATEE. ELEFANTE & E. OLSEN4/22/2019

Item Shaded Fields are for INPUT

Page 10: MEMORANDUM - Home | Colorado.gov · 2019. 7. 9. · MEMORANDUM TO: Mayor Jones and Members of the Board FROM: Karen Proctor, Town ... April 18, 2019 Board meeting regarding the designs

PROJECT NAME: Fremont and Richfield GatesRichfield Gate LOCATION OF PROJECT: Town of Foxfield

Alternative: Prepared By:

Date Prepared:

Unit Quantity Unit Cost Extended CostClearing and Grubbing LS 1 $1,000.00 $1,000.00 Unclassified Excavation CY 20 $40.00 $800.00 Ground Sign EACH 2 $350.00 $700.00 Landscaping LS 1 $1,500.00 $1,500.00 Aggregate Base Course (Class 6) CY 22 $50.00 $1,100.00 Riprap (9 Inch) CY 1 $150.00 $150.00 Bollard EACH 2 $100.00 $200.00 Chain EACH 1 $50.00 $50.00 Delineator EACH 7 $30.00 $210.00 12-Inch Restrained Coupling Adapter EACH 1 $100.00 $100.00 18 Inch Corrugated Metal Pipe LF 42 $120.00 $5,040.00 Erosion Control L S 1 $2,000.00 $2,000.00 Traffic Control (Special) L S 1 $10,000.00 $10,000.00 Electrical Conduit and Pull Box L S 1 $4,000.00 $4,000.00 Complete in place.

Gate System L S 1 $50,000.00 $50,000.00 Based on Traffic Committee Estimates

$76,850.00

20.0% $15,370.0010.0% $7,685.00

$76,850.00$99,900.00

NOTES:

04/24/19 13:18:06P:\FJ\F\FOXFD\126350\CIP Projects\Freemont Gate\Specs and quantities\[RichfieldGate_SOAQ-Prelim.xlsx]OPCC - UPDATED

Engineers Estimate of Probable Construction Cost ENGINEER'S ESTIMATEE. ELEFANTE & E. OLSEN4/22/2019

Item Shaded Fields are for INPUT

Total Project Cost

Mobilization (4 - 10%) Contingency (0-30%)

Total of Construction Bid Items